Consultation Proposal Consultation Proposal Deeping Gate Castle End Maxey
Document Sample


Consultation Proposal
Consultation Proposal N
Deeping Gate
Castle End
Maxey
Northborough
Etton
Bainton Peakirk Newborough
Glinton
NORTH-EAST
Wothorpe Pilsgate Helpston Neighbourhood Investment Area
Barnack 3,500 dwellings 3 hectare
Ashton
Ufford
10 minutes
walking distance
Thorney
Werrington
Southorpe Possible Area for
Wittering NORTH-WEST
Neighbourhood Investment Area Urban Extension
Marholm Eye
2,300 dwellings 3 hectares
EAST
Neighbourhood Investment Area
Thornhaugh 1,800 dwellings 17 hectares
Millfield
10 minutes
walking distance
Upton Bretton 10 minutes
walking distance
Wansford
Ailsworth
Sutton Castor
CITY CENTRE
7,000 dwellings 30 hectares
SOUTH-WEST
Neighbourhood Investment Area
1,900 dwellings 2 hectares
Orton Total
10 minutes 24,600 dwellings 180 hectares
walking distance
Primary Growth locations Growth Quantum Minimum Requirements 10 minutes
walking distance
(Common to all Options)
Hausing Housing - 500 Dwellings Serpentine Green
Mixed Use
Employment - 15 hectares
Employment
Growth in Villages
SOUTH-EAST
Growth in Urban Extensions 17,000 dwellings 140 hectares Neighbourhood Investment Area
Intensification Zones
Growth in Urban Area 8,100 dwellings 125 hectares
Possible Area for
EMPLOYMENT
Growth in City Centre
HOUSING
Urban Extension
District Centres Intensification
Secondary Growth locations
Local Centres Intensification
Boundaries
Urban Extensions Neighbourhood
Legend Investment Area
Urban Area 2km 4km
City Centre
HOUSING (number of dwellings) The Consultation Proposal would provide:
Area* Villages Urban District Centres Local Centres City Rest of Total
Extensions Centre Urban Area
• 24,610 dwellings between 2007 and 2026
North East 10 1,000 1,260 200 0 1,070 3,540 (including 35% affordable dwellings) - this
East 210 0 580 200 0 900 1,890 exceeds the minimum target by more than
North West 380 0 910 200 0 860 2,350 7,000 dwellings
Minimum Requirement
17,000 dwellings 180 hectares Option 2 Option 3
South West 0 0 1,640 200 0 40 1,880 Minimum Requirement 17,000 dwellings
• 27,500 new jobs between 2001 - 2021 (including
South East 0 5,000 610 200 0 2,140 7,950
15,800 service related jobs)
City Centre 0 0 0 0 7,000 0 7,000
Total 600 6,000 5,000 1,000 7,000 5,010 24,610 • The key feature of this proposal is greater
mixed use development in all five district
Option 2
*The district has been divided into PCC’s five service delivery areas, (Neighbourhood Investment Areas), except the city
Urban centres
centres and some local Extensions
centre which has been identified separately. Option 1 Option 2 Option 3
• This proposal suggests higher densities in
Urban Area
Boundary
option
the city centre (as in City Centre 3)
District Centres
Intensification
• There would be a limited amount of growth
in the villages
EMPLOYMENT LAND (hectares)
Area* Villages Urban District Centres Local Centres City Rest of Total • Two urban extensions have been
Extensions Centre Urban Area identified, in case of problems in acheiving the
North East 0 0 2 0 0 1 3 growth targets in the urban area
East 0 13 2 0 0 2 17
• Social infrastructure requirements have been
North West 1 0 2 0 0 1 3
calculated based on a projected additional
South West 0 0 2 0 0 0 2 population of 56,580. The likely requirements
South East 0 120 2 0 0 3 125 include: 4,400 primary places, 2,200
City Centre 0 0 0 0 30 0 30 secondary places, 6 new health centres, 345
Total 1 133 10 0 30 6 180 ha of open space and 165 ha of Local Nature
Reserves; as well as a need for additional
services, such as 38 local shops, 5 libraries
and 2 leisure centres
These requirements are based on standards
and may be provided through enhancement of
existing facillities and/or new facilities
Related docs
Get documents about "