North Truckee Drain Relocation Project
Document Sample


HDR | Presentation
North Truckee Drain
Relocation Project
Update to Flood Project Working Group
Shawn Gooch, P.E.
City of Sparks
February 27, 2008
North Truckee Drain
Relocation Project
City of Sparks/HDR Engineering, Inc.
Final Project Update JoAnn Meacham, P.E.
December 18, 2007 Utility Manager
City of Sparks
Shawn K. Gooch, P.E. Jay Aldean, P.E.
Flood Control Manager Project Manager
City of Sparks HDR
HDR | Presentation
What has happened since our last meeting?
• Corps decided to check/review their hydrology for
the North Truckee Drain
• Changed calculation methods
• Found inconsistencies with application of original method
• HDR performed hydrologic update
• Changed design criteria for the Truckee River
Flood Project from the 100-yr to the 117-yr
storm
• Resulted in a significantly larger conveyance structure
(from 2: 10’ x 10’ culverts to 2: 22’ x 10’ culverts)
HDR | Presentation
Large Box Culvert Photos
HDR | Presentation
Alternative Alignments Considered
HDR | Presentation
Alignments as Analyzed
HDR | Presentation
Alignments Characteristics
ALIGNMENT 1 – PURPLE (NDOT – VISTA)
Runs east along Brierley Way to Vista
Located in UPRR R/W (north of tracks) east of Vista
3 Jack & Bore Crossings: Vista, I-80, UPRR
Overall Length: ~ 6,400 LF
ALIGNMENT 2 – GREEN (UPRR TO LARKIN CIR)
300 LF J&B under I-80 to the South
People’s Drain flow combined w/ NTD on the south side of UPRR
Stays in back yards of private property
Crosses Greg Street with 40’ deep open cut
Follows Larkin Circle to outfall at the Truckee River
Overall Length: ~ 5,900 feet
ALIGNMENT 3 – BLUE (KLEPPE LN TO LARKIN CIR)
300 LF J&B under I-80 to the South
People’s Drain flow combined w/ NTD on the south side of UPRR
Alignment follows existing NTD to Kleppe Ln
From Kleppe Ln across parking lot to Greg St
Crosses Greg Street with 40’ deep open cut
Follows Larkin Circle to outfall at the Truckee River
Overall Length: ~ 5,300 feet
HDR | Presentation
Alignment 2
HDR | Presentation
Project Costs
Costs presented are in million dollars and do not include land costs
Alignment 1 $67
Land Requirements (PERM) (TEMP)
UPRR 3.4 ac 6.0 ac
NDOT 2.9 ac 4.3 ac
Other Private 0.1 ac 0.9 ac
# Lots Impacted 1 5
Alignment 2 $45
Land Requirements
UPRR 0.4 ac 1.1 ac
NDOT 0.4 ac 0.6 ac
Other Private 3.0 ac 7.5 ac
# Lots Impacted 15 18
Alignment 4 $46
Land Requirements
UPRR 0.4 ac 1.2 ac
NDOT 0.4 ac 0.6 ac
Other Private 2.3 ac 6.2 ac
# Lots Impacted 15 23
HDR | Presentation
North Truckee Drain Realignment
Next Steps
Value Engineering Analysis
Environmental Assessment
Utilities
Geotechnical Engineering
Surveying
Right-of-Way
Design Build vs Design Bid Build
104 Cost Sharing and Authorization
HDR | Presentation
Questions
Current 100-yr Inundation HDR | Presentation
HDR | Presentation
2006 Storm Inundation