ILIAS next open meeting Chambery March ILIAS next STATUS
Document Sample


ILIAS-next
open meeting
Chambery
1st March 2007
ILIAS-next
STATUS OF THE PROPOSAL
Andrea Giuliani
University of Insubria (Como) and INFN Milano Bicocca
Preamble
1. Cooperation
2. Ideas
FP7 3.
4.
People
Capacities (Research Infrastructure)
5. Joint Research Center + EURATOM
Integrating activities (I3): projects aiming at structuring better, on a European
scale, the way research infrastructures operate in a given field
I3 should combine, in a closely coordinated manner
(i) Networking activities
(ii) Trans-national access and/or service activities
(iii) Joint research activities.
All three categories of activities are mandatory as synergistic effects are
expected from these different components
Structure for ILIAS-next
Research infrastructures ! Underground laboratories
Basic philosophy
! Networks based on physics
• keep unity of each community
• structure and favor relations between communities
• address fundamental topics in ApPEC / ASPERA roadmap
! Joint Research Activities based on technologies
• favor exchange of technologies among different but nearby research areas
• save resources by avoiding duplication of problems in different contexts
• stimulate R&D in key sectors of astroparticle physics
! Transnational Accesses to infrastructures and services
General structure of ILIAS-next
Transnational access
A1 – transnational access to european underground Labs
A2 – low-background services in underground laboratories
Networks Joint Research Activities
N1 – management
N2 – underground labs JRA1 – low background
N3 – dark matter JRA2 – detectors
N4 – neutrino mass JRA3 – support technologies
N5 – gravitational waves JRA4 – support experiments
N6 – theory JRA5 – simulations
N1
Coord.
JRA1
Manag. N2 Low background
Deep Lab net
TA1
Access
TA2 N3 JRA2
Detection techniques
Service Dark Matter net
JRA5
N6 N4 Simulations
Theory
net
Neutrino Mass net JRA3
Support technologies
LHC
N5
results
Grav. Wave net JRA4
Support experiments
OUTSIDE ILIAS
X-ray "-ray Astro
Cosmo Radio HEAP
Procedure for proposal editing
ILIAS-next Proposal Committee
Munich town meeting (November 2005)
" ILIAS II Annual meeting – LNGS (March 2006)
Geppo Cagnoli g.cagnoli@physics.gla.ac.uk
José Manuel Carmona jcarmona@unizar.es
# Raffaele Flaminio [N5]
Formation of a proposal committee flaminio@lapp.in2p3.fr
Gilles Gerbier [N1] gerbier@dapnia.cea.fr
A. G. [JRA2] andrea.giuliani@mib.infn.it
$ I ILIAS-next open meeting – Paris (September 26th, 2006)
Josef Jochum [JRA4]
Hans Kraus [JRA3]
josef.jochum@uni-tuebingen.de
h.kraus1@physics.ox.ac.uk
% Vitaly Kudryavtsev [JRA5] v.kudryavtsev@sheffield.ac.uk
Three calls for drafts addressed to the activity coordinators:
Matthias Laubenstein [JRA1] matthias.laubenstein@lngs.infn.it
Luciano Pandola [TA1-TA2]
October 15th, 2006 luciano.pandola@lngs.infn.it
Juha Peltoniemi 2006
December 15th, juha.peltoniemi@oulu.fi
Present version of the proposal
Fabrice Piquemal [N2]
February 15th, 2007 piquemal@cenbg.in2p3.fr
André Rubbia andre.rubbia@cern.ch
Gunter Sigl having in mind that calls for I3 are foreseen for Fall 2007
Plan next steps[N6] sigl@iap.fr
& Neil Spooner will n.spooner@sheffield.ac.uk
(probably the call[N3] close on May 2008)
Christian Weinheimer [N4] weinheimer@uni-muenster.de
Gabriela Miu gabriela.miu@cea.fr
Information requested up to now for each activity and status
For each activity, very preliminary proposal draft with:
YES
! Acting coordinator YES check community
representation
! Drafting group representing the related community
Not homogeneous
! List of participants / contractors (without distinctions) Grid to be prepared
Contractor definition
! General Objective YES
! Work Packages structure divided in Tasks YES Not homogeneous
Not complete
! Objective, implementation plan with deliverables for each tasks
Often not defined
! Budget Where defined, often no clear
connection with real work
Related docs
Get documents about "