									                                Kitimat LNG
                                Terminal Design

                                    The proposed terminal will include a jetty for LNG vessels, an LNG
                                    terminal containing a process area, storage tank/containment area,
                                    and a natural gas send-out pipeline. The terminal facility and jetty
                                    area within the property fence line is 80 acres, approximately
                                    15 per cent of the size of the nearby Methanex site.

                                                 4                            3                             2                                      1




                                D                                                                                                                                                      D




                                C                                                                                                                                                      C




                                B                                                                                                                                                      B




                                A                                                                                                             KITIMAT LNG TERMINAL                     A

                                                                                                                                                        PLOT PLAN
                                                                                                                                       SIZE   FSCM NO         DWG NO             REV
                                                                                                                                                              PLT-004            4
                                                                                                                                      SCALE                    SHEET    1 OF 1
                                                 4                            3                             2                                      1


                                    Major Project Components:
                                    • a construction berth for receiving materials and      • water supply piping (closed loop or intake/discharge,
                                      equipment during construction                           potable water)
                                    • tug berth for temporary moorage of tugs associated    • various supporting utilities and safety systems for safe
                                      with LNG tanker assists                                 operation of the terminal
                                    • a shoreline LNG tanker berth and unloading platform   • on-site infrastructure (roads, car park, fencing, and buildings)
                                    • LNG storage consisting of three 160,000 m3            • off-site facility access road (800 metres) and upgrades to
                                      (operating capacity) full containment LNG tanks         the existing access road
                                    • vent stacks                                           • emergency power generation facilities
                                    • re-condenser                                          • concrete batching plant during construction
                                    • low pressure (LP), medium pressure (MP) and high      • hazard detection and control systems
                                      pressure (HP) LNG pumps                               • aerial transmission line (287kV supply from BC Hydro) and
                                    • submerged combustion burner type LNG vapourizers        associated right-of-way
                                    • natural gas liquids (NGL) separation unit             • potential dredging activities and ocean disposal of
                                    • vapour handling system, including boil-off gas          dredging materials
                                      compressors;
                                    • impoundment system
                                    • an 18-km send-out gas pipeline lateral (30 inch
                                      diameter, underground)
                                    • three 18-km NGL product pipeline laterals (6 inch
                                      diameter, underground)
                                    • pipe rack