MEMO�

W
Shared by: xzibit
-
Stats
views:
80
posted:
2/11/2009
language:
English
pages:
2
Document Sample
scope of work template
							MEMO… Date: December 12, 2003 To: Long Range Facility Planning Committee

From: Darlene Schottle Re: FUNCTIONAL CAPACITY

The estimates of functional capacity were generated by staff and administration in December 2003 in an effort to establish building capacities for K-12 schools in the development of a Long Range Facility Plan. The numbers for capacity were derived using the School District No. 5 student-teacher ration: K-2 @ 20 to 1 3-4 @ 25 to 1 5-6 @ 28 to 1 7-12 looked at actual seating space available in the building as one criteria and square feet per students as a second criteria Recap of the data: School Edgerton Elrod Hedges Peterson Russell Linderman KJHS

Capacity 10/06/03 Available Capacity 578 538 40 352 340 12 357 343 14 352 332 20 329 309 20 330 308 22 830 1,019 -189 880 -139 Using 130 sq.ft. per student with building size of 114,415 sq. ft. FHS 2,234 1,817 433 1,584 -233 Using 160 sq.ft. per student with building size of 253,487 sq.ft. Laser Voc Ag 84 250 (in FHS count)

Current enrollment with combined grades: 7-8 652 6-7-8 934 9-12 2,484

Notes: 1. Edgerton includes 2 special education self-contained rooms 2. Russell includes 1 special education self-contained room 3. All elementary have one music, one special education resource and one computer room excluded from capacity. 4. Edgerton, Hedges and Peterson have a science room excluded from capacity. 5. Flathead High School capacity encompasses the main facility only


						
Related docs