atm kiosk _34_
Document Sample


COMPASS BAnk reMOte AtM QuiCk StArt Guide
COMPASS BANK System Wiring 8. Connecting Zone Inputs to XR500N Panel
REMOTE ATM SYSTEM INFORMATION All wiring must be in accordance with NEC, ANSI, and NFPA 70. Use non-shielded Zones 1-10 are located directly on the XR500N control panel. Zones 1 through 8
22 AWG wire for short wire runs from the panel. Use non-shielded 18 AWG wire each terminate with a 1k Ohm EOL resistor. Zones 9 and 10 each terminate with a
NOTE: PRIOR TO INSTALLING ANY EQUIPMENT FILL IN THE for longer wire runs from the panel. Refer to the LX-Bus/Keypad Bus Wiring Note 3.3k Ohm EOL resistor. Use the included 22 AWG four-conductor wire and connect
FOLLOWING INFORMATION AND REFER TO THE WORKPLAN AND ALL (LT-2031). It is recommended that strain reliefs be used in all locations where each device to the zone input connections as listed in the following table.
REFERENCE DOCUMENTS LISTED IN SECTION 2. wires exit an enclosure and conduit is not used. Zone # Name Zone # Name
Bank Programming Department Phone Number: (800) 239-1122 Reference Documents 1 ATM Safe Door 6 ATM Topper Door (TANE 60 or PB-52TC)
As needed during installation, refer to the wiring diagram on the back, the XR500 2 ATM Heat/Seismic 7 spare
Account Number _____________________________________________________ Series Installation Guide (LT-0681), XR500 Series Programming Guide (LT-0679),
3 ATM Kiosk Door 8 spare
7060 Keypad Installation (LT-0883), and any documentation included with the
Address ____________________________________________________________ system components. 4 ATM Motion 9 spare
5 ATM HUA 10 spare
Phone Number _______________________________________________________ Also refer to the Workplan for specific instructions and requirements for Compass
Bank Installations. 9. Wire the Batteries
Installation Date _____________________________________________________ Power Reference Observe polarity when connecting batteries. Wire all batteries in
Remove all Power! Remove all AC and battery power from the panel parallel. Ensure all battery harness connectors are fully inserted
Installer Name _______________________________________________________ before installing or connecting any modules, cards, or wires. to prevent shorting. The panel’s internal battery cutoff relay
automatically turns on when the AC transformer is powered. Refer to Step 10.
Customer Job # ______________________________________________________ 3. Current Draw
DMP requires each battery be separated by a PTC in the battery harness wiring
Combined current draw from XR500N Auxiliary (Terminal 7), Smoke (Terminal 11),
Panel IP Address _____________________________________________________ to protect each battery from a reversal or short within the circuit.
and LX-Bus (J22 or additional LX-Bus cards) must not exceed 350mA in order
Gateway Address ____________________________________________________ to support 24 hours standby operations. A separate power supply is needed to Compass Bank requires each battery be clearly labeled with the installation date.
support devices beyond 350mA. The 350mA rating includes all devices as shown in Mark the date on the included White labels and attach one to each battery before
Subnet Mask ________________________________________________________ the wiring diagram. installing in the enclosures.
4. Set the XR500N and 341 Enclosure 1. In the panel enclosure, connect the Black battery wire to panel terminal 4
Programming Port: 2001 negative.
Note: It is not necessary to remove the XR500NPCB when installing the enclosure.
1. System Components - Lev. A (KIT-COMP-SMATM) Ensure strain reliefs are used for all wires exiting an enclosure. 2. Connect the Red battery wire to panel terminal 3 positive.
The system package includes the following components: ATM Topper Installations: Do not permanently mount the enclosure. After all 3. Plug the panel Red and Black battery wires onto the 318EXT Battery Harness
• One XR500N Panel in 341 Enclosure with transformer connections are made, slide the enclosure into place inside the Topper. Extension.
• One 7060 32-Character LCD Keypad (Ivory) ATM Secure Room or Kiosk Building Installations: Mount the 341 enclosure with 4. Connect the 318EXT Battery Harness Extension to the 318 Dual Battery
• One 696 Keypad Backbox (Ivory) the XR500N panel in a dry place on the wall. Harness. Connect the 318 Dual Battery Harness to the two 12 VDC 7.0 Ah
• One 3012 Clip-on Tamper Switch Batteries. Observe Black and Red polarity on all connections.
5. Mount the Model 3012 Tamper Switch
• One 306 Tamper Harness Attach one Model 3012 Tamper Switch to the lower right side of the panel 10. Installation Completion
• One 318 Dual Battery Harness enclosure. Mount the tamper switch with the button protruding past the enclosure Ensure all devices are properly addressed and all Keypad Bus wiring is free of
• One 318EXT Battery Harness Extension edge. Plug the 306 tamper harness connector onto the XR500N panel J4 Tamper grounds, wire-to-wire shorts, AC, and RF noise. Ensure all field devices are
• Two 369 12 VDC 7.0 Ah Batteries Header. Connect the 306 tamper harness wires to the 3012 Tamper Switch properly terminated to the panel zone inputs. Make note of device addresses.
mounted in the panel enclosure. This provides tamper protection for the panel This is needed when programming the zones to ensure proper operation.
• 18 AWG Non-Shielded Two-Conductor Wire 30’ for Transformer Connection
enclosure. Write the battery installation date on the enclosed White labels and place one on
• 22 AWG Non-Shielded Four-Conductor Wire 50’ for Keypad and XR500N Panel
Zone Connections 6. Network Connection each battery. Mount the 9 x 12 Document Storage bag on the alarm system door.
Using the 357-10 Ethernet cable with RJ45 connectors, plug one end of the cable Place all documentation included with the installation in the storage bag.
• One 9 x 12 Document Storage Bag
• One PB-52TC Terminal Door Contact — as needed in ATM Topper installations into the XR500N panel connector J1. Plug the other end of the Ethernet cable into 11. Connect the Transformer and AC Power
the company network LAN/WAN connection. DO NOT plug the transformer into dedicated outlet not controlled by a
• One TANE 60 Door Contact — as needed in ATM Topper installations
• One 357-10 Cat-5 Network Cable 10’ 7. Install the 696 Backbox and 7060 Keypad switch until all devices are connected to the panel.
Use the included wiring harness and, as needed, the included 22 AWG Note: Never share the transformer output with any other equipment.
• One sheet White adhesive labels
four-conductor wire to connect the DMP 7060 Keypad bus wiring to the XR500N
2. Reference Information terminals 7, 8, 9, and 10. Observe wire colors when connecting and do not use As needed, use the included 18 AWG two-conductor wire to extend the transformer
shielded wire. Mount the 696 Backbox where indicated by Compass, then install wires. Run the transformer wires into the panel enclosure through a knockout and
System Grounding
the 7060 Keypad on the backbox. You can install a maximum of 16 addressable connect the wires to panel terminals 1 and 2. After all components are connected,
Connect a 14 AWG or larger wire from XR500N panel terminal 4 to a good Earth
supervised devices on the keypad bus. plug the transformer into a 120 VAC outlet not controlled by a switch.
Ground. DMP recommends a cold water pipe ground, building ground, or a ground
rod. Do not connect to an electrical ground, conduit, sprinkler or gas pipes, or to a
telephone company ground.
LT-0987 © 2008 Digital Monitoring Products, Inc.
8312
12. Reset, Initialize and Program the Panel 341 Enclosure Cover
After system power-up, perform the following steps to set the panel up for remote
programming.
1. Reset the panel using J16 jumper. Remove the jumper and store it on one
J16 pin for future use.
Cover Mounting Holes (4 places)
2. At the programming Keypad set to Address #1, enter 6653 and press
COMMAND.
3. At the INITIALIZATION menu press any top row SELECT key.
4. Answer YES to all Initialization options.
5. At the NETWORK OPTIONS menu press any top row SELECT key. 341 Enclosure
6. Leave DHCP set to NO.
306 Tamper Harness
7. Enter the Local IP Address, Gateway Address, Subnet Mask, and Programming
Port. J3
Phone XR500N J6
8. Set TCP Communications to YES. Line
Interface
Command Processor™ Card
9. Press COMMAND until STOP displays. J4 Panel Expansion
Tamper
Note: The information entered is NOT SAVED until you run the STOP
J1
Ethernet
Connector
routine. Resistors
1.0k Ohm - Zones 1-8
Tamper Wires
10. At the STOP menu press any top row SELECT key to save the programming J23
J21 3.3k Ohm - Zones 9-10
Power R
RS-232 1.0k Ohm - Bell Circuit Supervision
11. The system is now ready to program using Remote Link™. LED L
X
RED
J22
LX OVC
Fill out an XR500 Series Programming Sheet (LT-0678) prior to programming to J10
Output 1
J2
Output 2
ensure all the necessary information is defined to properly program the panel.
Out1 Out2
J11
K6 K7 3 J16
Battery
4 Outputs 3-6 Reset
J8 5
6
13. Program the 7060 LCD Keypad
Start PROG
If needed, see the Reference Documents listed in Step 2. AC AC +B –B BELLGND RED YEL GRN BLK SMK GND Z1 GND Z2 Z3 GND Z4 Z5 GND Z6 Z7 GND Z8 Z9+ Z9–Z10+Z10–
1. On the 7060 keypad, hold down the <— (Back Arrow) and CMD keys for two 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
seconds to display SET BRIGHTNESS. Use included 22 AWG 3012
four-conductor wire Clip-on
2. Enter the code 3577 (INST) and press CMD. for keypad and panel Tamper
357-10 zone connections.
3. Press the left Select key under KPD OPT (Keypad Options). Switch
4. Press the CMD key to display KEYPAD ADDRESS and confirm the keypad is set
to address #6.
5. Press the CMD key to display KEYPAD MODE. Press the Select key under SUP
to configure the keypad for Supervised operation.
6. Press the CMD key to display DEFAULT KPD MSG. Press any top row Select 14 AWG
Ground Wire
key. Refer to the information at the beginning of this document and enter
7060 Keypad
COMPASS and the 5 digit account number, centered, as the default keypad
Address #6
display. Press the CMD key to accept the name.
7. Press the CMD Key to display ARM PANIC KEYS. Press the Select key below
the option to display an asterisk next to PN indicating that the Panic option
Earth Ground
is enabled. Dedicated
Duplex 327
8. Press the CMD key until STOP displays. Press the right Select key under STOP Outlet Transformer Use included 18 AWG 318EXT Battery
two-conductor wire for Harness Extension
to exit keypad programming.
transformer connection.
Network
14. Work Plan Instructions to LAN/WAN
Black
Refer to the ADT Workplan and complete all instructions to download the panel Connection.
programming, perform test procedures, training instructions with Compass Bank, 318 Battery Harness Red
and documentation sign-off. XR500N Terminals 1-10
PTC
and Keypad Detail
15. Wiring Diagram To 7060
The figure to the right illustrates the Compass ATM wiring. Keypad
XR500NK
Model 369 12 VDC 7.0 Ah Battery Model 369 12 VDC 7.0 Ah Battery Panel 1 2 3 4 5 6 7 8 9 10
AC AC +B -B Bell GND RED YEL GRN BLK
To
BLACK
RED
[Write the installation date on an included [Write the installation date on an included Transformer
White label and attach to the battery.] White label and attach to the battery.] To Batteries
Get documents about "