									                                          EQUIPMENT INSPECTION AND CALIBRATION SCHEDULE
                                                      FOR CALENDAR YEAR 1997

                  ITEM                      Frequency Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep.   Oct. Nov. Dec. Last Insp. Remarks
 I.    GENERAL EQUIPMENT
A.1    Thermometers ( all others)            12 mos.
B.1    Balances, All Classes                 12 mos.
B.2    General Weights                       12 mos.
 C     Ovens, General Purpose              twice/season
D.1    Sieve Shaker Efficiency               12 mos.
D.2    Sieves, No. 4 and Larger              12 mos.
D.3    Sieves, Smaller than No. 4            12 mos.
 F     Timers, Electronic                     6 mos.
 G     Vacuum Systems                        12 mos.
 H     Sample Size Reducers (Splitters)      12 mos.
 I     Straight Edges                        12 mos.
 J     Digital Calipers                      12 mos.


II.    ASPHALTIC MATERIALS

III.   ASPHALTIC MIXTURES
 A     Marshall Hammer & Pedestal            12 mos.
 B     Mechanical Marshall Hammer            12 mos.
 C     Marshall Compaction Molds             12 mos.
 D     Loading Jack & Breaking Heads         12 mos.
 E     Rice Pycnometers & Glass Bowls        12 mos.
 F.    SHRP Gyratory Compactor + Molds       12 mos.
                                      EQUIPMENT INSPECTION AND CALIBRATION SCHEDULE
                                                  FOR CALENDAR YEAR 1997

                ITEM                      Frequency Jan. Feb. Mar. Apr. May Jun. Jul. Aug. Sep.   Oct. Nov. Dec. Last Insp. Remarks
IV.   SOIL AND AGGREGATE
 A    Sand Equivalency                      12 mos.
 B    Hydrometer & Accessories              24 mos.
 C    Moisture-Density Hammer & Mold        12mos.
 D    Mechanical Compactor                  36 mos.
 F    Liquid Limit Device & Accessories     12 mos.
 G    S.G. Conical Mold & Tamper            12 mos.
 H    Organic Impurity Bottles              12 mos.


V.    HYDRAULIC CEMENT

VI.   CONCRETE
A     Compression Testing Machine           12 mos.
B     Unit Weight Measures                  12 mos.
C     Slump Cone                            12 mos.
D     Pressure Air Meters                 once/season
 E    Single-Use Cylinder Molds           each shpmnt
 F    Sulfur Capping Compound                3 mos.

								