					                                                       Estimating Checklist

             Task                  Materials                       Labor             Sub bids/      Task       Notes/
          description       Unit Amt. Cost     Total   Unit Amt.     Cost   Total   Equip. rental   total   allowances
                                                                                       rental
Planning & initialization
Building permits
Construction heating
Inspection fees
Office trailer setup
Plans
Safety barriers
Sewer connection fee
Temporary power
Water meter fees
Other
Site work
Backfill & grading
Basement excavation
Earth imported/export
Footings excavation
Off site improvements
Sewer lateral/waterline
Site preparation
Soil treatment
Other
Concrete
Flatwork
Footings
Foundation
Additives
Area wells
Bolts
Chamfer strips


                                                                                                                         1
Cold joint

                                                      Estimate Checklist (Continued)

                Task              Materials                    Labor                    Sub bids/      Task       Notes/
             description   Unit Amt. Cost     Total   Unit Amt. Cost        Total      Equip. rental   total   allowances
Columns                                                                                   rental
Drayage
Expansion joint
Form oil & cleaner
Forms & whalers
Forms, stakes, braces
Poly/visqueen
Rebar-1/2" @ft.
Rebar-3/8" @ft.
Rebar-5/8" @ft.
Rebar-7/8" @ft.
Rental equipment
Straw/hay
Ties & tie wire
Waterproofing foundation
Window & door bucks
Wire mesh
Other

Rough lumber
Studs 2 x 4
Studs 2 x 6
Trusses
Fir 2 x 8 x 8
Fir 2 x 8 x10
Fir 2 x 8 x12
Fir 2 x 8 x14
Fir 2 x10 x10
Fir 2 x10 x12
Fir 2 x10 x14
Fir 2 x12 x10
Fir 2 x12 x12
                                                                                                                            2
Fir 2 x12 x14

Fir 2 x12 x _________
                                                       Estimate Checklist (Continued)

               Task                Materials                       Labor                 Sub bids/      Task       Notes/
            description     Unit Amt. Cost     Total   Unit Amt.     Cost    Total      Equip. rental   total   allowances
1 x 4 #2 Grade                                                                             rental
1 x 6 #2 Grade
1 x 8 #2 Grade
1 x 10 #2 Grade
Post-4 x 4"
Post-6 x 6"
Glulam
Plywood 3/8"
Plywood 1/2"
Plywood 5/8"
Plywood 3/4"
Plywood T & G 5/8"
Plywood T & G 3/4"
Fascia
Soffit
Frieze
Caulking & sealants
Builders adhesive
Scaffolding
Equipment rental
Nails 16d box
Nails 16d nail gun
Nails 8d box
Nails 8d nail gun
Nails 16d duplex
Nails 8d duplex
Nails-finish (rough only)
Bolts, washers, nuts
Framing connectors
Saddles
Staples, air gun

                                                                                                                             3
Other
Roofing
Built-up
                                                      Estimate Checklist (Continued)

              Task                Materials                    Labor                    Sub bids/      Task       Notes/
           description     Unit Amt. Cost     Total   Unit Amt. Cost        Total      Equip. rental   total   allowances
Tile                                                                                      rental
Shake
Cedar
Drying-in
Felt-#15
Felt-#30
Ice & water shield
Flashing & counter F.
Drip edge
Valley tin
Roof jacks & vents
Galv. roof nails-3/4"
Galv. roof nails-1-1/2"
Simplex nails
Roofing cement
Other
Insulation
Walls
Ceiling
Miscellaneous insulation
Radiant barrier
Vapor barrier
Drywall
Corner bead
Drytite nails-@ lb.
Hot mud
J-Metal
Knife blades
Masking supplies
Perfa-tape
                                                                                                                            4
Quick-tape
Topping-boxes
Other
                                                      Estimate Checklist (Continued)

               Task               Materials                       Labor                 Sub bids/      Task       Notes/
           description     Unit Amt. Cost     Total   Unit Amt.     Cost    Total      Equip. rental   total   allowances
Finish carpentry                                                                          rental
Base molding
Chair rail
Crown molding
Doors
Door casing
Front door
3/0 exterior
2/8 exterior
Fire rated/self-closing
3/0 Hollow Core interior
2/8 H. C. interior
2/6 H. C. interior
2/4 H. C. interior
2/0 H. C. interior
Bi-fold 7'
Bi-fold 6'
Bi-fold 5'
Bi-fold 4'
By-pass 7'
By-pass 6'
By-pass 5'
By-pass 4'
Pocket 3/0
Pocket 2/8
Pocket 2/6
Pocket 2/4
Specialty doors
Garage door
Shelving 1 x12

                                                                                                                            5
Shelving 1 x16
1 x 4" pine
1 x 6" pine
1 x12" pine
                                                     Estimate Checklist (Continued)

              Task               Materials                       Labor                 Sub bids/      Task       Notes/
           description    Unit Amt. Cost     Total   Unit Amt.     Cost    Total      Equip. rental   total   allowances
3/4" Ply/pressed wood                                                                    rental
Shims
Keyed locks
Deadbolts
Privacy locks
Passage locks
Other locks/latches
Pulls & catches
Door bumpers/stops
Towel bars/rings
Paper holders
Soap dishes
Closet rods
Robe hooks
Other bathroom hardw.
Door viewer
House numbers
Mail box
Garage door operator
Thresholds
Weatherstripping
Screen doors
Other
Wall coverings
Acoustical ceiling tile
Ceramic tile
Masking supplies
Paint rollers/brushes
Paint-alcohol sealer
                                                                                                                           6
Paint-latex
Paint-oil
Paint-PVA
Paneling (sheets)
                                                       Estimate Checklist (Continued)

              Task                 Materials                       Labor                 Sub bids/      Task       Notes/
          description       Unit Amt. Cost     Total   Unit Amt.     Cost    Total      Equip. rental   total   allowances
Sandpaper, caulking, etc.                                                                  rental
Stain & varnish
Textured paints
Wainscot
Wallpaper tools/glue
Wallpaper/border (rolls)
Other
Floor covering
Area rugs
Asphalt/rubber tile
Base (rubber)
Carpet glue
Carpet tool rental
Carpets
Ceramic tile
Concrete sealer
Cove
Hardwoods/parquet
Linoleum
Linoleum glue
Metal trim
Nails & glue
Other exterior carpets
Other floor paint
Padding
Quarry tile
Rock
Roller & blades
Seam filler
Seam tape
                                                                                                                             7
Staples
Synthetic turf
Tack strips
Other
                                                     Estimate Checklist (Continued)

              Task               Materials                    Labor                    Sub bids/      Task       Notes/
           description    Unit Amt. Cost     Total   Unit Amt. Cost        Total      Equip. rental   total   allowances
Glazing                                                                                  rental
Windows
Patio sliding door
Stained glass
Sandblast/etched glass
Other glazing
Specialty glass
Mirrors
Medicine cabinets
Skylights
Other

Masonry
Fireplace
Fireplace face
Veneer
Masonry sidewalks/paths
Fence
Other

Plumbing
Rough
Finish
Jacuzzi - spa
Shower stall
Tub - enclosure
Extra water heaters
Fixture allowance
Water softener
Sprinkling sys./rough
Other
                                                                                                                           8
HVAC
Furnace & distribution
Attic vents
                                                     Estimate Checklist (Continued)

               Task              Materials                       Labor                 Sub bids/      Task       Notes/
           description    Unit Amt. Cost     Total   Unit Amt.     Cost    Total      Equip. rental   total   allowances
Bathroom vents                                                                           rental
Kitchen vent
Other vents
Evaporative cooler
Air conditioning
Special controls
Area heater
Wood-burning stove
Fireplace - gas log
Fireplace blower
BBQ grill
Humidifier
Electronic air purifier
Other

Electrical
Rough
Finish
Light fixture allowance
Landscape light(s)
Connect HVAC, etc.
Doorbell/chime
Security system
TV/ stereo sys/antenna
Intercom system
Computer system
Smoke/fire alarm sys
Telephone installation
Other



                                                                                                                           9
Cabinets

Kitchen cabinets
Bath cabinets
Linen closets
Bookshelves
                                                     Estimate Checklist (Continued)

              Task               Materials                    Labor                    Sub bids/      Task       Notes/
           description    Unit Amt. Cost     Total   Unit Amt. Cost        Total      Equip. rental   total   allowances
Pantry                                                                                   rental
Clothes chute
Garage - cabinets
Garage - workbench
Other

Hard surfaces/counters
Ceramic tile
Corian
Extra materials
Plastic laminate bid
Synthetic marble
Other

Appliances
Countertop unit
Dishwasher
Disposal
Freezer
Microwave oven
Range
Range hood
Refrigerator
Separate oven(s)
Trash compactor
Under cabinet units
Other
Exterior wall coverings
Gutter & downspout
                                                                                                                           10
Rock
Siding
Stucco
Other


                                                      Estimate Checklist (Continued)

              Task                Materials                       Labor                 Sub bids/      Task       Notes/
          description      Unit Amt. Cost     Total   Unit Amt.     Cost    Total      Equip. rental   total   allowances
Decorating                                                                                rental
Decorator fee
Model home furnishing
Other

Landscaping
Bark/gravel/rock
Boxes /borders/ pots
Flowers
Fountain
Grading
Irrigating
Shrubs
Sod/ lawn
Topsoil
Trees
Yard light
Other

Misc. & other structures
Breezeway
Decking
Fence - block @ ft.
Fence - chainlink @ ft.
Fence - other
Fence - prefab concrete
Fence - wood @ ft.
Final cleanup


                                                                                                                            11
Gazebo

Glass breakage allow.
Greenhouse
Interest incurred
Lattice
Ornamental iron
Railing
                                                   Estimate Checklist (Continued)

             Task              Materials                    Labor                    Sub bids/       Task       Notes/
          description   Unit Amt. Cost     Total   Unit Amt. Cost        Total      Equip. rental    total   allowances
Shed                                                                                   rental
Signs
Theft
Vandalism
Other ___________
Other ___________
Other ___________
Subtotals:
                                                                                        ______%
                                                                     Contingency
                                                                                        ______%
                                                                        Overhead
                                                                                        ______%
                                                                           Profit
                                                                                    Total estimate