BROADWAY CORE TOILET ROOM RENOVATION BUDGET TEMPLATE MARKET Specification

Shared by: icecube
-
Stats
views:
101
posted:
2/10/2009
language:
English
pages:
1
Document Sample
scope of work template
							29 BROADWAY CORE TOILET ROOM RENOVATION BUDGET TEMPLATE 2003 MARKET                                             FULL RENOVATION        UNIT: CORE M/W TR

Specification Section - CSI Master Format 1995 Edition                   $ AMOUNT             $/ SF          % SCOPE ITEM              CONTRACTOR

01310   Division 1 General Requirements - Project Management                          0   0.00 SF       0.00%   Project Management     JMI
01320   Division 1 General Requirements - Project Photographs                         0   0.00 SF       0.00%   Project Photos         Not Required
01740   Division 1 General Requirements - Final Cleaning                              0   0.00 SF       0.00%   Final Cleaning         GC
01780   Division 1 General Requirements - Closeout Submittals                         0   0.00 SF       0.00%   As Built Plans         Fox & Fowle
02223   Division 2 Site Construction - Minor Demolition for Remodeling            2,500 29.41 SF        6.29%   Demolition             ARGO
02223   Division 2 Site Construction - Minor Demolition for Remodeling                0   0.00 SF       0.00%   Removals & Carting     ARGO
04400   Division 4 Masonry - Stone (Counter Top)                                 11,000 129.41 SF      27.67%   Stone (All Stone)      Stone Source
09111   Division 9 Finishes                                                      21,500 252.94 SF      54.09%   General Construction   ARGO
09111   Division 9 Finishes - Non-Load Bearing Metal Framing                          0   0.00 SF       0.00%   Layout & Frame         ARGO
09260   Division 9 Finishes - Gypsum Board Assemblies                                 0   0.00 SF       0.00%   Walls                  ARGO
09380   Division 9 Finishes - Tile (Marble Walls)                                     0   0.00 SF       0.00%   Marble Walls           Stone Source
09630   Division 9 Finishes - Masonry Flooring (Marble Floors)                        0   0.00 SF       0.00%   Marble Floors          Stone Source
09900   Division 9 Finishes - Paints and Coatings                                     0   0.00 SF       0.00%   Paint                  ARGO
09900   Division 9 Finishes - Stainless Bars & Mirror Box                         2,500 29.41 SF        6.29%   SS Bars/Mirror Box     Omnitec
15100   Division 15 Mechanical - Building Services Piping                             0   0.00 SF       0.00%   Plumbing               ARGO
15100   Division 15 Mechanical - Building Services Piping                           750   8.82 SF       1.89%   Radiator Relocation    M&T
15400   Division 15 Mechanical - Plumbing Fixtures and Equipment                      0   0.00 SF       0.00%   Fixtures               ARGO
16050   Division 16 Electrical - Basic Elect. Materials and Methods                 850 10.00 SF        2.14%   Electric               Sertzen
16500   Division 16 Electrical - Lighting                                           650   7.65 SF       1.64%   Light Fixtures         Sertzen

Subtotal - Apartment Renovation Hard Costs                                       39,750 467.65 SF 100.00%

*Excludes Fox & Fowle Architural Fees & Dagher Engineering Fees          Argo scope incudes all Plumbing Fixtures

						
Related docs