Enthusiastic About New Technologies

VIEWS: 2 PAGES: 5

I think what you do is work towards the 2010 date. The timing is still fine if you are going to deploy in 2016 or 2017 that you go and work towards the licensing activity in 2010. At the same time, you are doing the detailed design for the next three years and unless there is a problem, which we don't anticipate, then you should be coming together at the right point to do an Engineering, Procurement and Construction (EPC). Then right after, you get that design license for the plant.