                                                SECTION 11 – ANSTO OVERVIEW

                                 SECTION 11

       AGENCY OVERVIEW AND APPROPRIATIONS
                    SUMMARY
AGENCY OVERVIEW

The Australian Nuclear Science and Technology Organisation (ANSTO) is Australia’s
national nuclear organisation and the centre of Australian nuclear expertise. The role
of ANSTO includes:

      providing scientific and technical advice for and on behalf of government on
       the nuclear fuel cycle, including reactor operations, reactor safety and the
       safeguarding of nuclear material;
      making significant contributions to international research and development in
       selected nuclear fields commensurate with Australia’s nuclear non-proliferation
       and other nuclear fuel cycle interests;
      promoting appropriate nuclear-related guidelines and practices nationally and
       internationally;
      operating national nuclear facilities and associated infrastructure in Australia
       and overseas for the benefit of the Australian research and development
       community and industry;
      enhancing and improving the efficiency and effectiveness of those facilities in
       order to yield high quality research, products and services;
      applying nuclear-based techniques in research projects that are integral to
       national and international programs on understanding natural processes and
       the impact of human activities on the environment;
      refining, developing and implementing new approaches to safely immobilise
       and dispose of radioactive waste and to minimise the environmental impact of
       the nuclear and mining industries;
      advising government on radioactive waste management, including the
       environmental impact of uranium mining;
      contributing to the development of critical technologies aimed at enhancing
       the global competitiveness and sustainability of those Australian industry
       sectors that can benefit through the application of nuclear science and
       technology and ANSTO’s unique mix of technical capabilities; and
      supplying internationally competitive radiopharmaceuticals and other
       radioisotopes for medical, industrial and environmental use in Australia and for
       export.

ANSTO acts in partnership with major stakeholder groupings to service the needs of
government, industry and the general public, and encourages joint efforts with the
research community in applications where nuclear science and technology solutions
can be of benefit.

                                          179
SECTION 11 – ANSTO OVERVIEW

APPROPRIATIONS

The total appropriation for Outcomes 2 and 3 forANSTO in the 2003-04 Budget is
$120.621 million.

Table 11.1, on the following page, shows the total appropriation for ANSTO for
2003-04 for its three outcomes by price of outputs. There are no administered
appropriations for ANSTO.

ADMINISTERED CAPITAL AND DEPARTMENTAL EQUITY INJECTIONS AND
LOANS

In 2003-04 ANSTO will receive an equity injection of $79.210 million to fund the
construction of a replacement research reactor and $5.480 million to upgrade
security at Lucas Heights. The expenditure of $84.690 million is shown in the Capital
Budget Statement (see Table 13.4).




                                         180
                  AUSTRALIAN NUCLEAR SCIENCE AND TECHNOLOGY ORGANISATION - APPROPRIATIONS 2003-04

Table 11.1 Appropriations ($’000)

   OUTCOMES                            Agency (Price of Outputs)                                               Administered
                         Revenue from Government               Revenue     Price of            Annual               Special           Total         TOTAL
                             (Appropriations)                 from other   Outputs          Appropriations          Approps        Administered APPROPRIATIONS
                                                                Sources                                                           Appropriations
                      Bill No 1    Special        Total                                   Bill No 1    Bill No 2
                                   Approps                                                             (SPPs &
                                                                                                        NAOs)
                         (A)          (B)      (C=A+B)           (D)       (E=C+D)           (F)         (G)          (H)          (I=F+G+H)       (J=C+I)
Outcome 1:                     0                          0                           0                                                                      0
Nuclear-based
Infrastructure
Outcome 2:              14,512                     14,512                     14,512                                                                    14,512
Disposition of
Spent Fuel
Outcome 3:             106,109 (1)                106,109        39,190      145,299                                                                   106,109
Science and
Technology
Solutions
     TOTALS           120,621                   120,621         39,190     159,811                 0            0             0             0         120,621
Amounts in shading are included in annual appropriation bills                              Agency Capital (Equity Injections and Loans)                84,690
                                                                                                                       Administered Capital                  0
(1). Includes $1.32m for waste management facility for payment to related entity.
                                                                                                                      TOTAL APPROPRIATIONS            205,311
BUDGET MEASURES – AGENCY SUMMARY

Table 11.2 lists all Budget Measures from the 2003-04 Budget including forward years, which have resource implications for the Australian
Nuclear Science and Technology Organisation
Table 11.2 - Summary of Budget Measures disclosed in the 2003-04 Budget
                                                             Appropriations         Appropriations         Appropriations Forward Appropriations Forward




                                           Output Group
           Measure                                               Budget           Forward Estimate           Estimate 2005-06       Estimate 2006-07

                                Outcome
                                                                2003-04                2004-05                      ($m)                   ($m)
                                                                  ($m)                  ($m)
                                                          Equity Dept           Equity   Dept              Equity     Dept                Equity    Dept
                                                          Inject Output Total   Inject Output Total        Inject    Output   Total       Inject   Output   Total
Security at the Australian
Nuclear Science and Technology                              5.5      -    5.5     5.6         -      5.6        -        -            -        -        -           -
Organisation
Australian Nuclear Science and
Technology Organisation –      3          All                 -    1.7    1.7       -       1.7      1.7        -      1.7      1.7            -      1.7     1.7
enhanced security (1)

(1) This measure also provides for additional depreciation funding of $0.3m per annum from 2005-06 onwards.

RECEIPTS FROM INDEPENDENT SOURCES

Table 11.3.1 Revenue from independent sources

 Description                                                                   Estimated             Estimated
                                                                            Revenue 2002-03       Revenue 2003-04
                                                                                 $’000                 $’000
 Sale of goods and services                                                           35,521                37,948
 Interest                                                                                590                   640
 Net gains – asset sales/foreign exchange                                                602                   602

 Total estimated revenue                                                                36,713             39,190
Refer tables 11.1 and 12.3.1
                                    SECTION 12 – ANSTO OUTCOMES AND OUTPUTS

                                      SECTION 12

        OUTCOMES AND OUTPUTS INFORMATION
OUTCOME AND OUTPUT

The map on the following page shows the relationship between outcomes and the
contributing outputs of ANSTO’s activities.
Further details can be found:

                                        Financial Details                Non-financial Details

Outcome 1                               Table 12.1.1                     Table 12.1.2

Outcome 2                               Table 12.2.1                     Table 12.2.2

Outcome 3                               Table 12.3.1                     Table 12.3.2

The following graph illustrates the allocation of resources across the three ANSTO
outcomes in 2003-04.

Graph 12.1: Departmental appropriation by outcome 2003-04




                  Outcome 3
                  $106.109m
                    88.0%




                                                       Outcome 2
                                                       $14.512m
                                                         12.0%




Note: Outcome 1 is funded by equity injection and is therefore not included in the above table.




                                                 183
SECTION 12 – ANSTO OUTCOMES AND OUTPUTS


OUTCOMES AND OUTPUTS
                                                                    Australian Nuclear Science and Technology Organisation
                                                                              Chief Executive, Professor Helen Garnett
                                                                                 Total Price of Outputs $159.811m
                                                                          Departmental Outcomes Appropriation $120.621m
                                                                                     Equity Injection $84.690m


                          Outcome 1                                                                  Outcome 2                                                             Outcome 3
                  Nuclear-based Infrastructure                                                Disposition of Spent Fuel                                        Science and Technology Solutions
       The replacement research reactor is operational and                     Removal of spent fuel from the ANSTO site in line with                Timely delivery of valued nuclear-related scientific and
    providing improved core nuclear facilities for industrial and               stringent safety arrangements and community views                  technical advice services and products to government and
                    R&D applications by 2006                                                                                                                           other stakeholders
                                                                                             Total Price $14.512m                                                    Total Price $145.299m
                       Equity Injection $79.210m                                  Departmental Outputs Appropriation $14.512m                          Departmental Outcomes Appropriation $106.109m
                                                                                                                                                                    Equity Injection $5.480m




     Output 1.1                  Output 2.1                 Output 3.1                    Output 3.2                 Output 3.3              Output 3.4                Output 3.5                Output 3.6
 Effective                   A program of              Management of                 Expert scientific and     The acquisition of       Science and                Regular production        The exploitation
 management for the          shipments for             core nuclear                  technical services        knowledge, through       technology services        and sale of               of ANSTO’s
 design and                  reprocessing of all       facilities, providing         for, and on behalf        research, and its        to industry and the        radiopharma-              intellectual and
 construction of the         HIFAR spent fuel in       Australia with                of, Government in         utilisation, through     Australian research        ceuticals and             physical assets
 replacement                 place                     nuclear capability            support of                innovation, to           and development            radioisotopes for
 research reactor                                      and credibility from          Australia’s national      advance the              community,                 medical and
                                                       which socio-                  and international         beneficial               including training of      industrial
                                                       economic benefits             strategic and             applications of          students in nuclear        applications and
                                                       flow to Australia,            nuclear policy            nuclear science and      science and                other services,
                                                       the R&D community             objectives                technology to            technology and its         through designated
                                                       and industry                                            problems of              applications               business units
                                                                                                               environmental,
                                                                                                               medical, social and
                                                                                                               industrial
                                                                                                               importance
                             Total Price               Total Price                   Total Price               Total Price              Total Price                Total Price               Total Price
 Equity Injection            $14.512m                  $56.457m                      $10.107m                  $46.317m                 $8.267m                    $23.823m                  $0.328m
 $79.210m                    Approp $14.512m           Approp $55.513m               Approp $9.512m            Approp $43.514m          Approp $2.194m             Approp $-0.277m           Approp $-4.347m
                                                       Equity Injection
                                                       $5.480m
                                                    SECTION 12 – ANSTO OUTCOMES AND OUTPUTS

CHANGES TO OUTCOMES AND OUTPUTS

There are no changes to the outcomes from 2002-03.

TRENDS IN RESOURCING ACROSS OUTCOMES

Graph 12.2 shows the trends in resourcing ANSTO’s outcomes.



Graph 12.2: Trends in appropriations for all outcomes


                        Outcome 1                              Outcome 2                                   Outcome 3


     $150


                                                                                                                             $40.686
                                                                                                                   $40.937




                                                                                                                                       $0.000

                                                                                                        $33.242
     $100




$m



                                                                                                                                         06.1
                                                                                                                                       $1 09
     $50                                                                                                                     $99.064
                                                                                                                   $93.931


                                                                                                         $72.193


                                $28.136

                                                     $0.029                    $0.029        $0.000
                      $16.689
                                                     $13.400                     4.1
                                                                               $1 71           4.51
                                                                                             $1 2
            $7.082
            $0.000    $0.000     $0.000    $0.000                   $0.029
                                                                    $0.778
      $0
            2000-01   2001-02   2002-03   2003-04   2000-01      2001-02       2002-03      2003-04     2000-01    2001-02   2002-03   2003-04

                                                    Appropriation                        Capital Use Charge




Note:        1. Figures for 2003-04 exclude Capital Use Charge.
             2. ANSTO has no administered appropriations.




                                                                         185
SECTION 12 – ANSTO OUTCOMES AND OUTPUTS

OUTCOME 1 – DESCRIPTION

Nuclear-based Infrastructure

Through ANSTO, the Government is providing access to core nuclear-based facilities
in Australia and overseas for the benefit of industry and the Australian research and
development community. The major facility access is to a nuclear research reactor
for strategic, industrial, environmental and research purposes, and manufacture of
nuclear medicines and other forms of radioisotopes.

Appropriations for Outcome 1 cover the acquisition of a replacement research reactor
in order to provide strategic nuclear expertise, accommodate a range of advanced
scientific and industrial applications and to secure a sufficient supply of radioisotopes
for health care and industrial applications over the next 40 to 50 years. It also covers
funding for ANSTO’s contract management component for the project.

OUTCOME 1 – RESOURCING

Table 12.1.1 shows how the 2003-04 appropriations translate to total resourcing for
Outcome 1, including revenue from government (appropriation) and the total price of
outputs.

Table 12.1.1: Total resources for outcome 1
                                                          Estimated Actual   Budget Estimate
                                                              2002-03           2003-04
                                                               $’000             $’000
Administered Appropriations
Total Administered Expenses                                              0                 0

Departmental Appropriations (1)
   Output 1.1 Effective management for the design and
                                                                    28,136                 0
   construction of the replacement research reactor.
     Total Revenue from Government (Appropriation)
                                                                   28,136                  0
         Contributing to Price of Departmental Output
Revenue from other sources                                              0                  0
                    Total Price of Departmental Outputs            28,136                  0
TOTAL RESOURCING                                                   28,136                  0

AVERAGE STAFFING LEVELS                                                 13                13

(1) Capital Use Charge only




                                            186
                               SECTION 12 – ANSTO OUTCOMES AND OUTPUTS

OUTCOME 1 – CONTRIBUTION OF OUTPUTS

A detailed project management schedule has been developed that embraces external
factors in relation to government and contractor interaction as well as internal factors
in relation to the management procedure.

Additionally a detailed project plan has been developed together with the successful
tenderer to monitor project progress as the building work progresses (see below).
Justification for the output chosen to achieve Outcome 1 is described in Table 12.1.2.
The Table provides information on the strategies chosen to deliver Outcome 1, and
shows the links between the output and the Outcome. The Table lists the
performance information that ANSTO will use to assess the level of its achievement
of Outcome 1 during 2003-04.

Table 12.1.2: Performance information for Outcome 1

Effectiveness – Overall achievement of the outcome –
(Measures, indicators and targets used as appropriate)

The replacement research reactor is             Level of compliance with project plan –
operational and providing improved core         achievement of specific milestones:
nuclear facilities for medical, industrial          On time
and R&D applications by 2006.                       Within budget
Contributions of outputs to outcome

ANSTO’s specific output relates directly to client supervision of the design, construction
and pilot testing of the outcome in the form of an operational replacement research
reactor together with instrumentation.
Performance Information for departmental outputs

Output 1.1

Effective contract management for the           Targets
design and construction of the                        Complete detailed engineering work
                                                       packages (March 2003)
replacement research reactor
                                                      Construct reactor building up to 17
                                                       metre level (August 2003)
                                                      Complete auxiliary building structure
                                                       (March 2004)
                                                      Commence construction of offices
                                                       and visitors centre (August 2003)




                                          187
SECTION 12 – ANSTO OUTCOMES AND OUTPUTS

OUTCOME 2 – DESCRIPTION

Disposition of Spent Fuel

Spent fuel from the High Flux Australian Reactor (HIFAR) research reactor has been
stored in a safe, interim storage facility at Lucas Heights. Disposition of the
inventory of spent fuel arising over the lifetime of HIFAR has been made possible
through allocated government funding for this purpose.

Appropriations for Outcome 2 covers removal of spent fuel from the ANSTO site in
line with stringent safety arrangements and community views.

OUTCOME 2 – RESOURCING

Table 12.2.1 shows how the 2003-04 appropriations translate to total resourcing for
Outcome 2, including revenue from government (appropriation) and the total price of
outputs.
Table 12.2.1: Total resources for Outcome 2
                                                         Estimated Actual   Budget Estimate
                                                             2002-03           2003-04
                                                              $’000             $’000
Administered Appropriations
Total Administered Expenses                                             0                 0

Departmental Appropriations
   Output 2.1 A program of overseas shipments for
                                                                   14,200             14,512
   reprocessing of all HIFAR spent fuel in place.
     Total Revenue from Government (Appropriation)
                                                                  14,200             14,512
        Contributing to Price of Departmental Output
Revenue from other sources                                             0                  0
                   Total Price of Departmental Outputs            14,200             14,512
TOTAL RESOURCING                                                  14,200             14,512

AVERAGE STAFFING LEVELS                                                 3                 3




                                           188
                               SECTION 12 – ANSTO OUTCOMES AND OUTPUTS

OUTCOME 2 – CONTRIBUTION OF OUTPUTS

The project involves extensive consultation with a range of regulatory authorities and
contracting organisations.

Justification for the output chosen to achieve Outcome 2 is described in Table 12.2.2.
The Table provides information on the strategies chosen to deliver Outcome 2, and
shows the links between the output and the Outcome. The Table lists the
performance information that ANSTO will use to assess the level of its achievement
of Outcome 2 during 2003-04.

Table 12.2.2: Performance information for Outcome 2
Effectiveness – Overall achievement of the outcome –
(Measures, indicators and targets used as appropriate)

Removal of spent fuel from the             Safety procedures adhered to fully and
ANSTO site in line with stringent          shipments:
arrangements and community views               On time
                                               Within budget
Contributions of outputs to outcome

The output is directly related to the outcome.

Performance Information for departmental outputs

Output 2.1

A program of shipments for                          Shipment effected according to
reprocessing of all HIFAR spent fuel in              schedule
place                                               A sixth shipment of HIFAR spent
                                                     fuel is currently scheduled for late
                                                     2003




                                          189
SECTION 12 – ANSTO OUTCOMES AND OUTPUTS

OUTCOME 3 – DESCRIPTION

Science and Technology Solutions

ANSTO is charged with delivering specific, nuclear-based scientific services and
products to government, industry, the medical sector, academia and other research
organisations in support of the Government effort to encourage innovation in
Australia and national strategic interests. It does so through the development of
new knowledge, delivery of quality services and products, and technology delivery
and transfer in support of business opportunities and through ensuring that nuclear
science and technology and related capabilities provide an innovative impetus to
benefit society.

To deliver the outcome ANSTO will:

      provide timely delivery of valued scientific advice and technical and medical
       services for and on behalf of government and to other customers and
       stakeholders;

      fulfil Australia’s national and international nuclear obligations, advancing
       Australia’s interests through international nuclear science and technology and
       its applications;

      enhance and improve national nuclear science and technology based facilities
       and other associated infrastructure to produce high quality research, products
       and services;

      contribute, either alone or with others, to generating and applying new
       knowledge in selected, relevant core research areas in nuclear science, the
       nuclear fuel cycle and related technologies;

      focus on core business opportunities where innovative solutions or
       technologies can generate economic, environmental or social benefits;

      empower and motivate staff to be at the cutting edge of their disciplines,
       pursue research excellence, and be able to adjust to new ideas and
       information in an evolving internal and external environment; and

      embrace continuous improvement in business management practices.




                                          190
                                SECTION 12 – ANSTO OUTCOMES AND OUTPUTS

MEASURES AFFECTING OUTCOME 3


A Safer Australia — enhanced security for the Australian Nuclear Science
and Technology Organisation

Capital ($m)
     2003-04               2004-05                 2005-06                 2006-07
        5.5                  5.6                     0.0                     0.0

The Government will provide $11.1 million over the next two years to enhance the
security of the Australian Nuclear Science and Technology Organisation's main
entrance.

Additional security devices will also be installed across the facility, including the site
of the current research reactor. This initiative will significantly enhance security as a
response to the current heightened security environment.

A Safer Australia — enhanced security for the Australian Nuclear Science
and Technology Organisation

Expenses ($m)
    2003-04                2004-05                 2005-06                 2006-07
       1.7                   1.7                     1.7                     1.7

The Government will provide additional funding of $1.7 million per annum to
enhance security at the Lucas Heights Science and Technology Centre and the
Replacement Research Reactor construction site.




                                            191
SECTION 12 – ANSTO OUTCOMES AND OUTPUTS

OUTCOME 3 – RESOURCING

Table 12.3.1 shows how the 2003-04 appropriations translate to total resourcing for
Outcome 3, including revenue from government (appropriation) and the total price of
outputs.

Table 12.3.1: Total resources for Outcome 3 ($’000)
                                                                Estimated Actual   Budget Estimate
                                                                    2002-03           2003-04
                                                                     $’000             $’000
Administered Appropriations
Total Administered Expenses                                                    0                 0

Departmental Appropriations
  Output 3.1 Management of core nuclear facilities,                       73,090            55,513
  providing Australia with nuclear capability and credibility
  from which socio-economic benefits flow to Australia, the
  R&D community and industry.
   Output 3.2 Expert scientific and technical services for                12,570             9,512
   and on behalf of, Government in support of Australia’s
   national and international strategic and nuclear policy
   objectives.
   Output 3.3 The acquisition of knowledge, through                       57,291            43,514
   research, and its utilisation, through innovation, to
   advance the beneficial applications of nuclear science
   and technology to problems of environmental, medical,
   social and industrial importance.
   Output 3.4 Science and technology services to industry                  2,888             2,194
   and the Australian research and development
   community, including training of students in nuclear
   science and technology and its applications.
   Output 3.5 Regular production and sale of                                -365              -277
   radiopharmaceuticals and radioisotopes for medical and
   industrial applications and other services, through
   designated business units.
   Output 3.6 The exploitation of ANSTO’s intellectual and                -5,723            -4,347
   physical assets.
    Total Revenue from Government (Appropriation)                       139,751            106,109
         Contributing to Price of Departmental Output
Revenue from other sources
   Output 3.1                                                                769               944
   Output 3.2                                                                329               595
   Output 3.3                                                              2,334             2,803
   Output 3.4                                                              4,895             6,073
   Output 3.5                                                             23,428            24,100
   Output 3.6                                                              4,958             4,675
                     Total revenue from other sources                    36,713             39,190
              Total Price of Departmental Outputs                       176,464            145,299
TOTAL RESOURCING                                                        176,464            145,299
AVERAGE STAFFING LEVELS                                                     794                819

Note: Actual for 2002-03 includes capital use charge $40,686

                                                      192
                               SECTION 12 – ANSTO OUTCOMES AND OUTPUTS

OUTCOME 3 – CONTRIBUTION OF OUTPUTS

ANSTO has developed a value-driven framework to ensure that delivery of specified
outputs meets or exceeds anticipated requirements of customers, and opens up
opportunities for the further generation of new knowledge, and the creation of new
knowledge-based enterprises, industries, products and services for Australia. All
ANSTO’s activities are implemented as projects and are designed to deliver the
objectives of a core business area. Five of these core business areas have objectives
that address the outputs in this outcome. Individual performance indicators measure
project achievements and project results are aggregated into output categories.

Justification for the outputs chosen to achieve Outcome 3 is described in Table
12.3.2. The Table provides information on the strategies chosen to deliver
Outcome 3, and shows the links between the outputs and the Outcomes. The Table
lists the performance information that ANSTO will use to assess the level of its
achievement of Outcome 3 during 2003-04.

Table 12.3.2: Performance information for Outcome 3

Effectiveness – Overall achievement of the outcome –
(Measures, indicators and targets used as appropriate)

ANSTO operates within a set of performance indicators agreed with Government to
provide an insight into its overall effectiveness and success in achieving the science
and technology outcome. Performance indicators are defined as part of the
triennium funding agreement that ANSTO has with the Department of Education,
Science and Training, and the Department of Finance and Administration. ANSTO
will also be reporting on performance indicators for National Research Priorities.

ANSTO reports against those indicators in its Annual Report.




                                          193
SECTION 12 – ANSTO OUTCOMES AND OUTPUTS


Performance Information for departmental outputs
Output 3.1
Management of core nuclear facilities,    World leading capabilities
providing Australia with nuclear           available and access provided to
capability and credibility from which      full customer expectations
socio-economic benefits flow to           Excellence in service delivery
Australia, the R&D community and          Facilities maintained to world
industry                                   standard
                                          Expanding customer base
Output 3.2
Expert scientific and technical services  Response rate at target of 100%
for, and on behalf of, Government, in     Accurate and relevant
support of Australia’s national and       Full client satisfaction
international strategic and nuclear
policy objectives
Output 3.3
The acquisition of knowledge, through             Research internationally
research, and its utilisation, through             recognised
innovation, to advance the beneficial             Research projects developed
applications of nuclear science and                addressing identified business
technology to problems of                          opportunities
environmental, medical, social and                Appropriate networking
industrial importance                              established
                                                  Research results contributing to
                                                   policy on environmental issues
                                                   such as global climate change
                                                  Publication of results in leading
                                                   scientific journals
                                                  New and improved technologies
                                                   developed and assessed
                                                  Collaborative arrangements in
                                                   place with CRCs and other
                                                   organisations
                                                  Contribution to National Research
                                                   Priority Goals




                                         194
                              SECTION 12 – ANSTO OUTCOMES AND OUTPUTS


Output 3.4
Science and technology services to                  Appropriate networking
industry and the Australian research and             established
development community, including                    External funds gained as a
training of students in nuclear science              percentage of total funds
and technology and its applications                 Publication of collaborative results
                                                     in leading scientific journals
                                                    New and improved technologies
                                                     assessed
                                                    Results delivered on time and to
                                                     budget
                                                    Radiation protection services
                                                     commercially utilised by external
                                                     clients
                                                    Solutions for the mining industry
                                                    Contribution to National Research
                                                     Priority Goals
Output 3.5
Regular production and sale of                      Profitable operation of
radiopharmaceuticals and radioisotopes               radioisotope business for health
for medical and industrial applications              and industrial applications
and other services, through designated              Adoption of ANSTO developed
business units.                                      technology
Output 3.6
The exploitation of ANSTO’s intellectual            Facilities maintained to world
and physical assets                                  standard
                                                    Adoption of ANSTO developed
                                                     technology, including patent and
                                                     licensing arrangements
                                                    Management of ANSTO
                                                     Technology Park

ANSTO employs rigorous business planning and project approval processes when
deciding what activities it will undertake in any given year. Factors considered when
assessing a project proposal include ANSTO’s charter as defined in the Australian
Nuclear Science and Technology Organisation Act 1987; its Corporate Vision and
Mission; its Strategic Plan; and its Business Guidelines with procedures to assess the
scientific and business cases for undertaking a project.

ANSTO is also advised on the relevance and quality of ANSTO-led research by an
external Technical Advisory Committee reporting to its Board. The Committee
consists of science and technology leaders from the academic, industrial and
scientific communities.



                                           195
SECTION 12 – ANSTO OUTCOMES AND OUTPUTS

The result of the combination of ANSTO’s planning process and the external advice
provided by the Technical Advisory Committee, is a portfolio of projects published in
the ANSTO Operational Plan, whereby ANSTO believes it can maximise its potential
to deliver socio-economic benefits to Australia with the resources it has available.
Performance in terms of producing outputs by specified target dates for each activity
and the achievement of outputs is monitored through quarterly reporting and annual
project reviews.

EVALUATIONS

The effectiveness of ANSTO in delivering Government outcomes is illustrated in the
2001-2002 ANSTO Annual Report, which includes reports against performance
indicators. These indicators supplement reports of the achievements of specific
research projects, which represent the most direct outcomes of ANSTO’s scientific
and technological activities in its core business areas.




                                         196
                   SECTION 13 – ANSTO BUDGETED FINANCIAL STATEMENTS

                                 SECTION 13

           BUDGETED FINANCIAL STATEMENTS
The budgeted financial statements for the Australian Nuclear Science and Technology
Organisation are presented in this section. The budgeted financial statements will
form the basis of the financial statements that will appear in the Australian Nuclear
Science and Technology Organisation 2003-04 Annual Report, and form the basis for
the input into the Whole of Government Accounts.

AGENCY STATEMENTS

Budgeted Agency Statement of Financial Performance
This statement provides a picture of the expected financial results for the
Organisation by identifying full accrual expenses revenues and capital use charge,
which highlights whether the Agency is operating at a sustainable level.

Budgeted Agency Statement of Financial Position
This statement shows the financial position of the Organisation. It helps decision-
makers to track the management of the Agency’s assets and liabilities.

Budgeted Agency Statement of Cash Flows
Budgeted cash flows, as reflected in the statement of cash flows, provides
information on the extent and nature of cash flows by categorising them into
expected cash flows from operating activities, investing activities and financing
activities.

Agency Capital Budget Statement
Shows all planned Organisation capital expenditure (capital expenditure on non-
financial assets), whether funded either through capital appropriations for additional
equity or borrowings, or from funds from internal sources.

Agency Non-financial Assets – Summary of Movement
Shows budgeted acquisitions and disposals of non-financial assets during the budget
year.




                                          197
Table 13.1 – Budgeted Agency Statements of Financial Performance
for the period ended 30 June

                                      Estimated            Budget          Forward        Forward        Forward
                                        Actual            Estimate         Estimate       Estimate       Estimate
                                       2002-03             2003-04         2004-05        2005-06        2006-07
                                           $’000               $’000        $’000          $’000          $’000


REVENUES
 Revenue from government                    182,087            120,621       114,294         111,204       113,680
 Interest and dividends                            590             640              690            690         600
 Other                                       36,123             38,550         41,665         44,444        49,570
Total Revenues                             218,800             159,811      156,649        156,338        163,850


EXPENSES
Employees                            (1)     51,107             60,200         62,182         64,024        65,922
Suppliers                                    71,294             71,005         63,388         59,469        64,334
Other (Depreciation)                         27,548             28,606         31,079         32,845        33,594
Total Expenses                             149,949             159,811      156,649        156,338        163,850


Net surplus or deficit                      68,851                     0              0              0              0


Capital Use Charge                           68,851


Net surplus or deficit after                         0                 0              0              0              0
capital use charge




(1) Excludes capitalised salaries ($5.6 million)




                                                         198
                          SECTION 13 – ANSTO BUDGETED FINANCIAL STATEMENTS


Table 13.2 – Budgeted Agency Statement of Financial Position
as at 30 June

                                  Estimated         Budget            Forward        Forward        Forward
                                    Actual         Estimate           Estimate       Estimate       Estimate
                                  2002-03          2003-04            2004-05        2005-06        2006-07
                                    $’000               $’000          $’000          $’000          $’000


ASSETS
Financial Assets
Cash                                   9,878              15,559         13,028         12,364         13,151
Receivables                           24,903              10,853         10,637         10,656         11,033
Investments                                               18,500         18,500         18,500           7,600
Other                                       139                 139            139            139            100
Total Financial Assets               34,920               45,051        42,304         41,659         31,884


Non-financial Assets
Land and Buildings                   135,973             136,160        133,714        132,516        134,486
Plant and Equipment                  199,841             212,220        225,147        230,353        233,233
National Facility Asset under
Construction                         180,769             287,976        346,753        349,981        349,981
Intangibles                            7,551               6,497           5,507          4,407          3,507
Inventories                           14,000              13,000         13,000         13,000         13,000
Other                                       500                 500            500            500            500
Total Non-Financial Assets          538,634              656,353       724,621        730,757        734,707


Total Assets                        573,554              701,404       766,925        772,416        766,591


LIABILITIES
Provisions and payables
Employees                             22,000              22,390         23,509         24,628         25,700
Suppliers                              3,569              22,159         22,218         22,277         11,400
Other                                 15,327               2,006           2,026          2,047          1,987
Total Provisions and payables         40,896              46,555         47,753         48,952         39,087
Interest Bearing Liabilities           2,200               2,300           2,500          2,700          2,770
Total Liabilities                    43,096               48,855        50,253         51,652         41,857



EQUITY
Accumulated Results                   76,921              76,921         76,921         76,921         76,921
Capital                              168,234             286,921        351,044        354,072        354,072
Reserves                             285,303             288,707        288,707        289,771        293,741
Total Equity                        530,458              652,549       716,672        720,764        724,734




                                                  199
Table 13.3 – Budgeted Agency Statement of Cash Flows
for the period ended 30 June

                                   Estimated          Budget        Forward        Forward        Forward
                                     Actual          Estimate       Estimate       Estimate       Estimate
                                   2002-03           2003-04        2004-05        2005-06        2006-07
                                     $’000               $’000       $’000          $’000          $’000


OPERATING ACTIVITIES
Cash received
Appropriations                         168,252            134,456     114,294        111,204        113,680
Sales of goods and services             34,975             37,968      41,023         43,802         48,580
Interest                                     520              640            690            690            639
GST Input Credit Receipts                8,626             15,052        9,730          3,248          2,148
GST Receipts from Customers              3,323              3,607        3,896          4,161          4,616
Total cash received                  215,696             191,723     169,633        163,105        169,663


Cash used
Employees                               50,895             59,810      61,063         62,905         64,850
Suppliers                               73,888             64,613      63,095         59,210         75,140
GST Payments to Suppliers               11,949             18,450      13,358           7,332          6,764
Total cash used                      136,732             142,873     137,516        129,447        146,754


Net cash from operating                78,964             48,850      32,117         33,658         22,909
activities


INVESTING ACTIVITIES
Cash received
Proceeds from sales of PP&E and              224              685            696            687            672
intangibles
Total cash received                          224             685          696            687            672


Cash used
Purchase of PP&E and intangibles        93,113            144,041      99,467         38,037         33,694
Investments                            -17,953             18,500                                    -10,900
Total cash used                        75,160            162,541      99,467         38,037         22,794


Net cash from investing               -74,936            -161,856    -98,771        -37,350        -22,122
activities




                                                   200
                        SECTION 13 – ANSTO BUDGETED FINANCIAL STATEMENTS

Table 13.3 – Budgeted Agency Statement of Cash Flows (Continued)
for the period ended 30 June

                                  Estimated        Budget        Forward     Forward      Forward
                                    Actual        Estimate       Estimate    Estimate     Estimate
                                  2002-03         2003-04        2004-05     2005-06      2006-07
                                    $’000             $’000       $’000       $’000        $’000


FINANCIAL ACTIVITIES
Cash received
Capital injections                     40,178         118,687       64,123        3,028
Total cash received                    40,178         118,687       64,123        3,028


Cash used
Dividends paid                         68,851
Total cash used                        68,851


Net cash from financial               -28,673         118,687       64,123        3,028
activities


Net increase/decrease in Cash        -24,645            5,681       -2,531        -664          787
Held


Cash at beginning of reporting         34,523            9,878      15,559      13,028       12,364
period


Cash at end of reporting period        9,878           15,559      13,028      12,364       13,151




                                                201
Table 13.4 - Agency Capital Budget Statement

                                      Estimated    Budget     Forward     Forward     Forward
                                        Actual    Estimate    Estimate    Estimate    Estimate
                                      2002-03     2003-04     2004-05     2005-06     2006-07
                                        $’000      $’000       $’000       $’000       $’000
CAPITAL APPROPRIATIONS
Total equity injections                104,175      84,690      34,123       3,028
Total Loans


Represented by:
Purchase of non-current assets          104,175      84,690      34,123       3,028
Other
TOTAL                                  104,175      84,690      34,123       3,028


PURCHASE OF NON-CURRENT ASSETS
Funded by Capital Appropriation         104,175      84,690      34,123       3,028
Funded internally by Organisation’s
resources                                30,400      36,834      40,955      35,009      33,694
TOTAL                                  134,575     121,524      75,078      38,037      33,694




                                           202
                        SECTION 13 – ANSTO BUDGETED FINANCIAL STATEMENTS

Table 13.5 - Agency Non-Financial Assets – Summary of Movement

                                        Land     Buildings      Total Land        Total           Total
                                                                   and       infrastructure,   Intangibles
                                                                 Buildings      plant and
                                                                               equipment
                                        $’000      $’000          $’000          $’000           $’000
Gross Value
As at 1 July 2003 (Opening)             53,224      112,414       165,638           612,488          9,842
Additions                                               3,000        3,000          140,695               346
Revaluations                                            3,404        3,404
Disposals                                                                                817
As at 30 June 2004                      53,224      118,818       172,042          752,366         10,188


Accumulated Depreciation
As at 1 July 2003 (Opening)                            29,665      29,665           231,878          2,291
Disposals                                                                                697
Charge for the reporting period                         6,217        6,217            20,989         1,400
As at 30 June 2004                                     35,882      35,882          252,170          3,691


Net book value as at 30 June 2004      53,224       82,936        136,160          500,196          6,497
                     (1)
(closing book value)


Net book value as at 1 July 2003       53,224       82,749        135,973          380,610          7,551
(opening book value)


Total Self funded Additions                            3,000         3,000           33,488              346



(1) The whole of the value of the National Facility Asset under Construction (Table 13.2) is contained
within the classification ‘Total infrastructure, plant and equipment’ in the above table.




                                                 203
204