Renewable energy sources and CHP
Document Sample


HELLENIC TRANSMISSION SYSTEM OPERATOR S.A.
Renewable energy sources and CHP
Monthly Bulletin
January 2008
MW
Ja
0
100
200
300
400
500
600
700
800
900
Fen-0
M b-03
a
Apr-03
M r-03
a
Ju y-03
n 3
J -0
Auul-03
Wind
Seg-03
O p-03
N ct-03
o Small-hydro
D v-03
ec 3
Ja -0
Biomass-Biogas
D n-03
e
M c-04
a
A r-04
M pr-04
a
Ju y-04
n 4
Ju -04
A l-0
Seug- 4
p 0
O t-04
N ct-04
o
D v-04
ec 4
Ja -0
D n-04
e
M c-05
a
Apr-05
M r-05
a
Ju y-05
n 5
J -0
Auul-05
Se g- 5
p 0
O t-05
N ct-05
o
D v-05
ec 5
Ja -0
D n-05
e
M c-06
a
A r-06
M pr-06
a
Ju y-06
n 6
Ju -06
A l-0
Seug- 6
p 0
O t-06
N ct-06
o
D v-06
ec 6
Ja -0
D n-06
e
M c-07
a
Apr-07
M r-07
a
2003-2008 Installed RES capacity in the interconnected system (Art.9, Law 3468/2006)
Ju y-07
n 7
J -0
Auul-07
Se g- 7
p 0
O t-07
N ct-07
o
D v-07
ec 7
Ja -0
HTSO/ JANUARY 2008
n- 7
08
2008 Regional distribution of RES and CHP stations in the interconnected system
(Art.9, Law 3468/2006)
Wind (MW) Small-hydro (MW)
17 17 3 17 1 9
44 1
207
106 4
34
36 25
40
6
197
Evoia Voiotia Eastern Macedonia & Thrace Western Greece
Eastern Macedonia & Thrace Western Greece Western Macedonia Epirus
Peloponnese Ionian Islands Thessalia Central Macedonia
Central Macedonia Thessalia Peloponnese Central Greece
Attica
Biomass-Biogas (MW) CHP (MW)
1
7,8 28
0,4
63
15
29,6 3
Eastern Macedonia & Thrace Attica
Attica Thessalia Central Macedonia Thessalia Central Macedonia
Central Greece
HTSO/ JANUARY 2008
GWh
Ja
0
50
100
150
200
250
300
Fen-0
M b-03
a
Apr-03
M r-03
a
Ju y-03
n 3
J -0
Auul-03
CHP
Wind
Seg-03
O p-03
N ct-03
o
Small-hydro
D v-03
ec 3
Ja -0
Biomass-Biogas
D n-03
e
M c-04
a
Apr-04
M r-04
a
Not interconnected islands
Ju y-04
n 4
J -0
Auul-04
Se g- 4
p 0
O t-04
N ct-04
o
D v-04
ec 4
Ja -0
D n-04
e
M c-05
a
Apr-05
M r-05
a
Ju y-05
n 5
Ju -05
A l-0
Seug- 5
p 0
O t-05
N ct-05
o
D v-05
ec 5
Ja -0
D n-05
e
M c-06
a
Apr-06
M r-06
a
Ju y-06
n 6
Ju -06
A l-0
Seug- 6
p 0
O t-06
N ct-06
o
D v-06
ec 6
Ja -0
D n-06
e
M c-07
a
Apr-07
M r-07
a
Ju y-07
n 7
2003-2008 Total Greek electricity generation from RES and CHP (Art.9 and 10, Law 3468/2006)
J -0
Auul-07
Se g- 7
p 0
O t-07
N ct-07
o
D v-07
ec 7
HTSO/ JANUARY 2008
Ja -0
n- 7
08
Electricity generation from RES and CHP in the interconnected system 2008 (Article 9, Law 3468/ 2006)
Wind Small-hydro Biomass-Biogas CHP Total
Energy Installed Energy Installed Energy Installed Energy Installed Energy Installed
Month Generated Capacity Generated Capacity Generated Capacity Generated Capacity Generated Capacity
(MWh) (MW) (MWh) (MW) (MWh) (MW) (MWh) (MW) (MWh) (MW)
January 122.671 667 28.780 97 15.262 35 5.560 51,275 172.273 849,797
February
March
April
May
June
July
August
September
October
November
December
Total (MWh) 122.671 28.780 15.262 5.560 172.273
HTSO/ JANUARY 2008
Photovoltaic stations of the interconnected system 2008
(Article 9, Law 3468/2006)
Capacity (kW)
Energy generated
Month
(MWh) With PPA In operation
January 77,38 4.880,50 889,80
February
March
April
May
June
July
August
September
October
November
December
* In Low Voltage the energy generated is
Energy generated in 2008 (MWh) 77,38 metered every 4 months (Law 3468/2006)
Photovoltaic stations in operation per region (kW)
149,3 105,2
62
264,3
111,5
0
100,4 97 0
Eastern Macedonia and Thrace Central Macedonia Western Macedonia
Epirus Thessalia Ionian Islands
Western Greece Central Greece Peloponnese
Attica Thessaloniki
HTSO/ JANUARY 2008
First stage of deployment program of PV stations –
Distribution of PV stations in operation per region (kWp)
HTSO/ JANUARY 2008
National generation from RES and CHP (GWh) and
National consumption (TWh)
0
50
100
150
200
250
300
Oc
No t-02
36,23
3,
Dev-02 9
3, 1
Ja c-0 2 9
4, 4
36,49
3
60,76
Fen-03 4, 8
2
26,46
49,80
Mab-03 4, 6
2
28,95
79,62
Apr-0 4, 2
33,88 110
2
34,34
93
M a r-0 33 3, 8
90
86
37,64
Ju y-0 3 4,
0
37,17
n -0
J 4, 9
4
77
Auul-03 5, 7
3
94 91
37,55
Seg-03 4, 1
p 3 90
99
Oc -03 4,
No t-03 2
4, 1
149
1
84
34,21 34,45 34,57
Dev-03 4, 1
0
37,07 35,85
Ja c-0 4, 6
6
9391
35,62
Den-03 4 4, 0
6
30,20
Mac-04
National Consumption (TWh)
4, 8
r-0 2
30,01
Ap 4, 3
2
32,33
M a r-0 44 3, 7
Ju y-0 4 92
4,
133
n -0 0
101 27,88
J
Mean System Marginal Price (€/MWh)
4, 3
125
4
114 31,17
Auul-04 5, 5
106 29,96 105
4
77
Se g - 0 4
32,05
Monthly national generation from RES and
p 4 5, 2
CHP Articles 9 &10, Law 3468/2006 (GWh)
03
26,73
Oct-04 4,
128
4
80
31,55
No t-04 4, 0
15
32,17
Dev-04 4,
2
88
Ja c-0 4, 7 33,39
Den-04 7
5 4, 7
7 102
37,80
Mac-05 4, 3
132
r-0 36
49,43
Ap 4,
118 33,39 119
3
32,86
M a r-0 55 4, 7
141
12
35,69
Ju y-0 5 4,
122
n -0 2
43,67
J 5 4, 6
133
5
41,54
Auul-05 5, 9
106
Se g - 0 5
45,98
p 5 5, 5
101
1
47,24
Oct-05 4, 6
115
5
45,67
No t-05 4, 1
112
3
45,12
RES and CHP Billing
Dev-05 4, 1
105
5
61,39
Ja c-0 4, 1
1
8
51,68
Den-05 6 4, 4
15354
Mac-06 9
4, 8
180
r-0 45
60,46
Ap 4,
4
50,43
M a r-0 66 3, 7
96
50,88176 50,24
Ju y-0 6 4,
164
n -0 4
61,68
J 4, 8
1
8
68,42
Auul-06 5, 1
150 15353
Se g - 0 6 2
67,11
p 6 5, 9
5
Oct-0 4, 2
251
5
71,49
No t-06 6 4, 6
132 134
4
74,79 74,81
Dev-06 4, 0
161
c-0 5
78,74
Ja 4, 6
173
9
76,63
Den-06 7 4, 4
151
85
71,96
Mac-07 4,
155
r-0 4
70,49
Ap 7 4, 5
198
6
62,65
M a r-0 7 4, 8
193
24
54,18
Ju y-0 7 4,
222
n 6
61,33
Ju -0 7 5, 1
166
2
62,29
Au l - 0 6, 0
144
Se g - 0 7 2
70,83
p 7
134
5, 2
5
65,44
Oct-07 4, 8
209
7
60,35
No t-07 4, 3
6
72,66
Dev-07 4, 4
180
6
73,30
Ιαc-07 5, 1
173 175
ν-0 1
75,66
8 5, 1
212
16
81,63
226
HTSO/ JANUARY 2008
0
204
10
20
30
40
50
60
70
80
90
Mean System Marginal Price (€/ΜWh)
Status of investments on RES and CHP in the interconnected system (Art.9, Law 3468/2006)
8000
7000
122 729
19
6000 365
697
5000
MW
4000
In operation
In tentative operation
3000
5185 With power purchase agreement
but not in operation
2000 With connection contract
With installation permit
1000
Only with generation
authorization
0
1
HTSO/ JANUARY 2008
Get documents about "