							lmpro ving Software Project Management
  Through System Dynamic Modeling
    Creating schedules and tracking progress are two
    activities software managers perform.
    These activities become more complex with larger
    projects.
. Wrong decisions implemented into a project could have
    disastrous results, reducing the probability of success.
.   Understanding the many system dynamics and feedback
    loops associated with a project, especially a large
    project, is a formidable task.
. There are plenty of Commercial Off The Shelf (COTS)
    project management tools Available.
. Many perform basic features such as scheduling, budget
    tracking, man-hour reporting, resource allocation, and
    capital expenditure tracking.

.   None of the tools available take into consideration how
    system dynamic variables affect a project.
The following thesis is proposed:

Using the "iThinkntool available from High
Performance Systems, a new tool can be
developed to help a software manager plan, track,
and predict the outcome of a software project
better than the more traditional approaches by
incorporating system dynamic feedback loops
into the tool.
.   "Staying the Course With the Project Control Panel"
        by Susan Mann Beagley
    4 Status Indicators:        4 Controllable Parameters:
      n                            n
                                       Resources
     g       Budget                    Work Seauence

     wI

             Percent Complete
     nrvvl
     t./     Quality
INCREMENTAL DESIGN APPROACH
                       Productivity

 Defects    -    n
                mP
Generafed       .PmW
                          'i'
                                                                          Schedule Pressure:
    Rate of productivity of each level of Engineer.                   10 -   Don't Include; 1 Include   -                    I
                                                                      I             inciudo Scneauie Press =    I   1   J
                                                                                    0.0 .........   -           g 1.0       T7
                 Eng 2 Productivity =   1-1                               Communication Overhead:
               00    =--a---=                 2.0        v                 -
                                                                          0 Don't Include; 1 Include    -
                 Eng 3 Productivity =     r          j                             lnclucle Cornrn Overhead =   I   T   ]    I
               0.0    p
                     =-                       2.0        T7

    Quality:
    Quality will automatically generate defects that are generated by the engineers. These defects
    are converted to hours to fix and filtered back into the model. Quality must be included
    in order to include the reviews and/or rework %

10    - Don't Include: 1- Include
                                   =
                     Include Qual~ty          C'IiI                       Include Reiviews:
               0.0                             1.0
                                                         v.               Quality must also be included for this to work.
                                                                          When included the model will use 10% of the
     Rework %:                                                            design and code phase for doing reviews.
    l ~ u a l i must also be included for this to work.
                t~                                            I
    (percent of time allocated for rework.                    I            -
                                                                          0 Don't Include; 1 Include    -
I                    Entered Rework =    1-                   1   ]                        Include Review =     (
                                                                                                                1            1

                      errors per hr =     tzzizl              I
Increment #3
                                                    7
                                                        Number of Engineers Separated by the level 1
 The scope of the work effort for each phase.
                                                                                   Level 3
                                                        expertise. Level 1 (less) --: (Highest) I
                  lnit Design 3 =    0
                                     l l                               Eng 1 lncr 3 =       I x a
            O w .      *.            '   2500                     -p
                                                                 0.0                            5.0           'i7

                  Init Code 3 =      rn                                Eng 2 lncr 3 =       cxzl
            0
                             - .
                                         2500                    0.0n
                                                                    p                           5.0           'i7-
                   Init Int 3 =           0                            Eng 3 lncr 3 =       m
                                                                  -p
                                                                 0.0                            5.0           \7
                                     -    p     p   ~    ~




 This is the level of messaging that will                Task #3 Dependencies
   -
 0 No messages                                           -
                                                         0         -            -
                                                        1 None; 1 Design 2 Code; 3 Increment-                   I
  -
 1 Message Upon Completion of Task
  -
 2 1 + Msg after Code Phase Completes                             lncr 3 Dependent on 1 =

 3 - 2 + Msg after Design Phase Completes

                lncr 3 Msg Level =                  1             lncr 3 Dependent on 2 =   1         7   1     I
                 Percent Complete Danqer Zone

I   1 : Danger Zone 2: Schedule % Comp




I          % Complete: Page 1            Hours
                                        SCHEDULE                                                                               BUDGET
1: lncr 1 Scope                      2: lncr 2 Scope            3: lncr 3 Scope               1 : Total Staff Load                 2: Total Cost




                                                                                                     Budget: Page 1                   noun



                        PERCENT COMPLETE                                                                                       QUALITY
  I : Danger Zone 2: Schedule X Comp 3: Porcelved X Comp 4: Actual X Comp                  1: Total Allocated Rework 2: Rework & Defects 3: Total Rework 4: Total Defects




            .
            Y Complete: Page 1                          Hours                                        Quallty: Page 1                   Houn



   r   schedule R Cornp 1     -I 1                     L lncr 1 ScoDe      I I 0.00 1 [ Rework R Defects / i
                                                                                             ]
                                                                                 ] Icliedule Pressure I 1                                                 3.362    j
   [    Actual %Cornp         ]                            lncr 2 Scope     ]    1 Work Rate Souqht ]     [ Total Rework 1 7                                       1
   [ ~ e r c e i v e d Camp
                      %       1-r
                               1                       [   lncr 3 Scope     I 1- I Work Rate 11 -         I Total Defects 1] -
   (      Tolal Hours      1-1                                                        I    Exliauslion         11      13.43   1    Quality 1      -1 1
   (       Total Cost        1                                                        I ~ a Tolerable Exh...
                                                                                            x                  I7              1
   (    Total Staff Load     ] (            T     I
                              Scenario #1                                                                              Scenario #2
 1: Danger Zone 2: Schedule 96 Comp    3: Perceived % Comp 4: Actual % Cornp              1: Danger Zone 2: Schedule O/o Comp 3: Perceived % Cornp 4: Actual % Cornp




         X Complete: Page 1                Houra                                   I              X Complete: Page 1                  Hours




1: Total Allocated Rework 2: Rework & Defects 3: Total Rework   4: Total Defects       I: Total Allocated Rework    2: Rework & Defects   3: Total Rework 4: Total Defects




         Quality: Paqe 1                   Hours                                                  Quality: Page 1                     Hours



                               Scenario #I             -   Does Not Include Communication Overhead
                               Scenario #2             -   Does     Include Communication Overhead.
                              4%
                              JQ:*?. *
                              t
                                  -- .-*
                                       -

The validate approach.

    .    Identify a group of well qualified, reputable experts with good credentials
        that are familiar with software engineering principles.

    . Demo the tool with canned data to these experts, explaining the
        implementation and characteristics of the tool.

    . Give each evaluator the opportunity to make modifications to the canned
        data.

    . Give each evaluator the opportunity to run their own project supplied
        data.

   . Ask each evaluator to fill out and return an evaluation summary form.
.                                                 .
    The first is to enhance the depth of the tool (For example, increase the
    number of increments or better model the current feedback loops.)

. The second area is to improve the tool by adding breadth. (For example,
    model the effects of various testing techniques on a project or adding
    requirements analysis to the model.)

    The third area is identifying other useful applications for the tool. (For
    example, using it for training software managers.)

						