					Call for a Green China - Hunan

Industrial Water and Energy Efficiency
for a cleaner Xiangjiang



            Lars Skov Andersen
            COWI China (LSA@COWI.COM)
                              Qingshuitan Industrial Zone


                                 Changsha



                                                      Qingshuitan Industrial Zone
                          Xiangjiang




          Xiangtan                          Zhuzhou




      1    Call for Green China - Hunan Province

May 2009   Industrial Wastewater Strategy
                              Qingshuitan Industrial Zone

Established: 1992

Area: 35 km2

Factories: 130

Types of production:
  Thermal power
  Metallurgy
  Chemical
  Building materials

Wastewater discharge:
 28.6 million ton per year
 80,000 ton per day



      2    Call for Green China - Hunan Province

May 2009   Industrial Wastewater Strategy
                                Value of water in industry

                                       GDP           Water Use     Value of
                                                                    Water
                                 Billion RMB         million ton   RMB/ton

Zhuzhou                                60.5             28.6        2,100

Denmark                               2,500             8.1        308,600

   Industrial water efficiency in Denmark is approximately 150
   times higher than in Zhuzhou
   Difference in part reflects different structure of industry, but
   indicates potential for huge water savings in industry in Hunan
   Data:
   –       World Fact Book
   –       Hunan Statistical Yearbook 2007


       3     Call for Green China - Hunan Province

May 2009     Industrial Wastewater Strategy
                              Industrial Symbiosis




      4    Call for Green China - Hunan Province

May 2009   Industrial Wastewater Strategy
                                Kalundborg Model



     Kemira                                        Kalundborg                                       Hashoej
    Chemicals                                    District Heating                        Gas         Biogas

                                                                                                         Biomass
           Sulphur                           Cold water         Hot water

                                                                                                   Novozymes




                                                                                                                             Organic Fertilizer
                           Steam                                                         Steam      Enzymes




                                                                                                                   Biomass
      Statoil
                                                  Power Station
     Refinery
                        Cooling Water                                                    Steam    Novo Nordisk
                                                                                                 Pharmaceuticals
           Sulphur                      Gypsum                          Fly ash
                                                                                                         Yeast


   Agro-Coop                       GYPROC                              Concrete Pipes
                                                                                                     Farms
  Fertilizer Plant              Gypsym Boards                          Building Blocks

                                                  Mineral Fertilizer




      5     Call for Green China - Hunan Province

May 2009    Industrial Wastewater Strategy
                              Strategy

 Management                             Objective                    Outputs
    Level
 River Basin              Safe drinking water for         Early warning and
                          Zhuzhou, Xiangtan and            emergency response system
                          Changsha
                                                          Integrated river basin
                          Improved hydro-ecology of        management outline
                          Xiangjiang                       and action plan
 Industry zone            Economically and               • Wastewater Management
                          environmentally                  Strategy and Plan
                          sustainable development
                                                         • Financing Plan
 Factory                  Reduce environmental            Inventory of waste and
                          charges                          wastewater streams
                          Symbiosis turning waste into    Mapping of demand for waste
                          raw materials                    products
 Production line          Clean technology solutions      Environmental audit report
                          to minimise water use by
                          recycling of process water


      6    Call for Green China - Hunan Province

May 2009   Industrial Wastewater Strategy
                                         Industrial wastewater
                                         treatment




                       Wastewater                                      Wastewater                    Wastewater
                   Hazardous and toxic                             Heavy metals, salts,            Biodegradeable
                   organics and sludge                              acids and alkalies           organics and sludge




                Easy degradable          • Separation
                 Oil & Solvents          • Oxidation



                                         • Chemical oxidation
                Hard degradable &                                Chemical Precicipitation         Activated Sludge
                                         • Membrane filtration
                  toxic organics                                       Treatment                     Treatment
                                         • Carbon filtration



                    Cyanide              • Chemical oxidation




                  Complexing             • Chemical oxidation                        Sludge                            Sludge
                    agents               • Membrane filtration                         for                               for
                                                                                    deposition                      incineration




                                                                                                     Clean water
                                                                                                     for reuse or
                                                                                                      discharge




      8    Call for Green China - Hunan Province

May 2009   Industrial Wastewater Strategy
                              Industrial Symbiosis

                                                   Gypsum Waste




            Gypsum Building Boards


      9    Call for Green China - Hunan Province

May 2009   Industrial Wastewater Strategy
                        Energy Efficient Design




    10     Call for Green China - Hunan Province

May 2009   Industrial Wastewater Strategy
                              冷水塔机组扩建
2 old towers                                       4 new towers
(2 x 500 m3/hour)                                  (4 x 500 m3/hour)




                                                   8 old towers
                                                   (8 x 325 m3/hour)




    11     Call for Green China - Hunan Province

May 2009   Industrial Wastewater Strategy
                              新建冷水塔机组
                                       Parallel or serial cooling according to demand


                                                               /h
                                  New cooling towers: + 2.000 m³

                                    新建冷水塔:扩容 +2000 m3/hour

                                                                    Existing cooling towers
                                                                       现有冷水塔




    12     Call for Green China - Hunan Province

May 2009   Industrial Wastewater Strategy
                              Energy saving be 2 step
                              coolong通过两步制冷节约能源


   Average cooling water demand: 875 m3/h

   Average temperature reduction: 2.8°C

   Electricity price: 750 RMB/MWhour

   Energy reduction: 4,900 MWh/year

   CO2 reduction (cf coal power plant): 4,200 ton/year

   Cost saving: > 3.5 Million RMB/year

   Investment: ≈ 2.5 Million RMB

   Payback period: < 1 year


    13     Call for Green China - Hunan Province

May 2009   Industrial Wastewater Strategy
                              Process optimisation

           Counter current rinse may save 90%-99% water.


                          Item transport              Item transport             Item transport




                                                                                                            Water

                Process                                                                           Rinse 3
                                            Rinse 1                    Rinse 2
                  bath


                             Wastewater




    14     Call for Green China - Hunan Province

May 2009   Industrial Wastewater Strategy
                              TAJCO NingBo Metal Plating




                                                   Wastewater discharge is only
                                                   1% of discharge from
                                                   traditional technology
                                                   95% of the rinse water is
                                                   recycled
                                                   99.9 % of the heavy metals
                                                   are removed



    15     Call for Green China - Hunan Province

May 2009   Industrial Wastewater Strategy
                              Barriers to efficient solutions

1. Political level
   –     Economic growth and environmental protection NOT going hand in
         hand
   –     Inadequate administrative and financial (dis-) incentives
   –     Weak enforcement of otherwise good legislation
2. Industry zone level
   –     Zone management has limited authority over enterprises
3. Factory level
   –     Focus on fixing of visible short-term problems rather than long term
         planning
   –     Focus on technology rather than management solutions
   –     Lack of trust in outside consultants
4. Working level
   –     Strong hierarchies make interviews and data collection difficult
   –     Low incentive for workers to promote practical solutions


    16     Call for Green China - Hunan Province

May 2009   Industrial Wastewater Strategy
                           Thank you !

                                            谢谢!


    17     Call for Green China - Hunan Province

May 2009   Industrial Wastewater Strategy