SORCE Weekly Status Report - 11292007 to 12052007

Document Sample
SORCE Weekly Status Report - 11292007 to 12052007 Powered By Docstoc
					      SORCE Weekly Status Report – 11/29/2007 to 12/05/2007

1. Introduction
   This status report addresses the performance of the SORCE spacecraft, instruments,
   and ground assets during the week of Thursday, November 29, through Wednesday,
   Dec. 5, 2007.


2. Spacecraft Summary        (submitted by D. McCabe, 06 Dec.)

       11/29       11/30      12/01       12/02         12/03    12/04        12/05
        333         334        335         336           337      338          339

   There was one MU Read 0 events reported during the past week.
      2007/339-09:13:34

   GCI lockups:                                           (MINUTES)
   Instrument         Lockup Time    Response Time         Duration     Lat      Lon
   solstice_a   2007/333-02:00:36   2007/333-02:09:55         9.32    -21.9      -53.3
   solstice_a   2007/334-00:38:20   2007/334-00:49:25        11.08    -20.4      -41.2
   solstice_a   2007/334-02:17:11   2007/334-02:26:30         9.32    -24.1      -60.5
   solstice_a   2007/334-04:01:17   2007/334-04:03:37         2.33    -35.7      -60.3
   solstice_a   2007/335-07:45:04   2007/335-09:11:37        86.55    -34.7      -58.4
   solstice_a   2007/335-09:28:05   2007/335-10:48:45        80.67    -24.6      -61.9
   solstice_a   2007/335-23:32:43   2007/335-23:45:43        13.00    -20.9      -36.8
   solstice_a   2007/336-22:11:41   2007/336-22:25:32        13.85    -21.8      -21.2
   solstice_a   2007/337-01:28:20   2007/337-01:39:51        11.52    -27.0      -62.4
   solstice_a   2007/338-03:38:16   2007/338-05:11:40        93.40    -37.6      -25.9
   solstice_a   2007/338-21:08:26   2007/338-21:23:50        15.40    -26.9       -9.5
   solstice_b   2007/336-08:04:03   2007/336-09:28:22        84.32    -29.4      -56.2
   solstice_b   2007/336-09:47:09   2007/336-11:05:30        78.35    -17.0      -61.6
   solstice_b   2007/337-01:28:19   2007/337-01:39:45        11.43    -27.0      -62.4
   solstice_b   2007/337-10:02:02   2007/337-11:22:41        80.65    -18.7      -74.3
   solstice_b   2007/338-00:09:48   2007/338-00:20:01        10.22    -31.8      -38.5
   solstice_b   2007/338-03:42:46   2007/338-05:11:35        88.82    -31.8       -8.0
   solstice_b   2007/339-21:17:01   2007/339-21:42:57        25.93    -12.2      -40.4
   sim_a        2007/334-00:44:00   2007/334-00:47:49         3.82    -31.2      -22.7
   sim_a        2007/334-17:00:27   2007/334-18:15:07        74.67    -38.5      114.1
   sim_a        2007/335-06:14:02   2007/335-07:13:23        59.35    -24.4      -12.3
   sim_a        2007/336-01:10:53   2007/336-01:21:14        10.35    -23.2      -58.1
   sim_a        2007/337-08:21:52   2007/337-09:30:36        68.73    -25.2      -59.2
   sim_a        2007/339-03:59:53   2007/339-05:18:53        79.00    -29.1      -12.9
   sim_b        2007/335-23:36:35   2007/335-23:44:12         7.62    -28.4      -24.6
   sim_b        2007/336-23:49:55   2007/337-00:01:10        11.25    -24.1      -42.4
   sim_b        2007/337-08:19:39   2007/337-09:30:41        71.03    -29.3      -66.4
   sim_b        2007/337-22:28:18   2007/337-22:41:25        13.12    -23.7      -28.9
   sim_b        2007/338-00:02:05   2007/338-00:06:55         4.83    -16.9      -63.1
   sim_b        2007/339-00:21:05   2007/339-00:27:03         5.97    -24.1      -63.4
   tim          2007/333-07:15:01   2007/333-08:10:14        55.22    -33.0      -32.9
   tim          2007/333-08:55:21   2007/333-09:47:28        52.12    -27.4      -45.8
   tim          2007/334-05:52:42   2007/334-06:51:39        58.95    -34.3      -22.1
   tim          2007/334-23:12:45   2007/334-23:28:46        16.02    -11.0      -38.8
   tim          2007/336-01:14:53   2007/336-01:22:39         7.77    -30.7      -44.8
   tim          2007/338-05:23:30   2007/338-06:33:40        70.17    -24.9      -19.7
   tim          2007/338-21:04:28   2007/338-21:09:44         5.27    -18.7      -21.8
   tim          2007/339-07:13:00   2007/339-08:30:55        77.92    -30.7      -65.5
   XPS          2007/333-03:42:19                                     -30.7      -62.8
   XPS          2007/337-01:30:34                                     -30.8      -55.0
   XPS          2007/338-07:03:06                                     -19.8      -36.9
   XPS          2007/338-22:44:54                                     -25.8      -35.9

                                                                               Page 1 of 8
                       SIM A            SIM B          SOL A      SOL B        TIM        XPS*
       Week              6                6             11          7           8          4
       Total           1432             1802            970        1126        1583       1413


3. Ground Support / Contact Summary                        (submitted by D. McCabe)

   14 Ground station contacts were performed over the past week.

                                                     Captured     Recorded            %
                                                     VCDUS         VCDUS
                  SC housekeeping*                    317647       317648         100
                  IM housekeeping*                     43385        43386          100
                       Science                        313288       313867        99.82


4. Instrument Status

4.1.   TIM        (submitted by Greg Kopp, 06 Dec.)

       TIM operations during previous week
       • Normal Ops (TSI data w/ Cavity B)
       • Cavity A&B comparisons
       • Gain CD Calibration

       Current work
       • Normal Operations
              o Version 7 data processing is operating smoothly
       • Instrument temperatures are increasing due to orbit beta angle
              o Happens regularly this time of year

       TIM anomalies during previous week
       • None


4.2.   SIM



4.3.   SOLSTICE              (submitted by Marty Snow, 05 Dec.)

       SOLSTICE has been observing comet 17/P Holmes at Lyman alpha. Below is an article
       that appeared in the SORCE Nov. Newsletter –

       SOLSTICE Observes Comet 17/P Holmes at Lyman Alpha –
       By Marty Snow, LASP, University of Colorado

           The SOLSTICE instrument on SORCE can observe both the Sun and bright stars by simply
       changing apertures and exposure times. We made use of the increased sensitivity in stellar mode
       to observe comet 17/P Holmes in late November 2007. The results discussed here are
       preliminary, and more detailed analysis of the observing geometry will be required to produce a
                                                                                          Page 2 of 8
       quantitative radiance measurement. The main complicating factor in a Lyman alpha measurement
       from SORCE is the contribution from airglow. Solar Lyman alpha photons are multiply scattered
       by the upper atmosphere.
           Figure 1 shows the raw SOLSTICE observation. In order to correct for the airglow
       background, we use an observing technique where we point at a dark region of space, followed by
       an observation of the target, and then return to the dark region again. The contribution from the
       comet above the background can then be estimated by fitting a polynomial to the dark region
       observations. The figure’s lower panel below shows the resulting count rate after subtraction for
       airglow. However, the SOLSTICE observation was not centered on the comet nucleus, so the
       conversion of this count rate to a radiance will require further analysis.




       Figure 1. Top panel shows the raw count rates for the observation. The middle piece at 19:00 is
       the comet plus background, while the sections at the beginning and end of the observation are of
       the airglow alone. The curve is a simple polynomial fit. The bottom panel shows the net count
       rates for the observation after background subtraction.




4.4.   XPS      (submitted by Tom Woods, 05 Dec.)

       For days 2007/327 (Nov. 23) to 2007/338 (Dec. 4):
       • Number of XPS GCI errors: 8
       • SORCE XPS Data Gaps: None
       • SORCE XPS Calibration Experiment Duration: None
       • Flares: None above class M1.0




                                                                                     Page 3 of 8
5.   Planning       (submitted by Jay Kominek, 06 Dec.)

     Plans completed 29 November – 06 December:

     SORCE Spacecraft
     Activity                      Total                  Total Time
     Solar Rolls                   510                      11:40
     Stellar Rolls                 311                       6:59
     Ram Avoidance                   0                       0:00
     Solar Alignment                 0                       0:00
     Stellar Alignment               0                       0:00
     Field of View Maps              0                       0:00
     FSS Calibration                 0                       0:00
     Station Contacts               14                       3:10
     GCI Checks                    834                       0:14
     State Vector Upload             7                       0:21
     MU Checksum                     1                       0:12

     SIM A (Primary)
     Solar Activity                Total                  Total Time
     ESR Mode                       11                       9:25
     ESR Mode with HRT               0                       0:00
     IR Scan                         7                       8:26
     Quick Scan                     14                       5:38
     Quick Scan HRT                  0                       0:00
     Calibration Activity
     Fixed Wavelength                0                       0:00
     Servo Gain Calibration          2                       1:20
     Solar Alignment                 2                       1:18
     Field of View Map               0                       0:00
     Prism Calibration               0                       0:00
     Image Light                     1                       0:07
     Image Dark                      1                       0:05
     ESR Full Scan                   0                       0:00
     Dark                           28                       0:24
     Special Activity

                                                                       Page 4 of 8
Power Cycle Checks        209          13:56

SIM B (Secondary)
Solar Activity            Total      Total Time
ESR Mode                    0           0:00
ESR Mode with HRT           0           0:00
IR Scan                     0           0:00
Quick Scan                  0           0:00
Quick Scan HRT              0           0:00
Calibration Activity
Fixed Wavelength            0           0:00
Servo Gain Calibration      2           1:20
Solar Alignment             2           1:18
Field of View Map           0           0:00
Prism Calibration           0           0:00
Image Light                 1           0:07
Image Dark                  1           0:05
ESR Full Scan               0           0:00
Dark                        0           0:00
Special Activity
Power Cycle Checks        209          13:36

SOLSTICE A (MUV)
Solar Activity           Total    Total Time
Normal Scan                94          91:18
Quick Scan                 43          12:10
Mini Quick Scan            34            9:39
Stellar Activity
Fixed Wavelength            0           0:00
Companion                   0           0:00
Stellar Scan                0           0:00
Zero Order Scan             0           0:00
Number Unique Targets       0           0:00
Calibration Activity
Filter Calibration          1           1:16
Fixed Wavelength            0           0:00
AB Comparison               1           1:10
Mini 64 Scan                7           8:27
MUV Solar Alignment         2           0:37
FUV Solar Alignment         2           0:37
MUV Stellar Alignment       0           0:00
FUV Stellar Alignment       0           0:00
MUV Field of View Map       0           0:00
FUV Field of View Map       0           0:00
Special Activity
Power Cycle Checks        104           4:32
Step Response Test          1           0:03

SOLSTICE B (FUV)
Solar Activity            Total      Total Time
Normal Scan                96          99:34
Quick Scan                 44           8:18
Mini Quick Scan            34           6:33
Stellar Activity
Fixed Wavelength          400          13:47
Companion                  48           2:47
Stellar Scan                7           0:25
Zero Order Scan           187           5:24
                                                  Page 5 of 8
     Number Unique Targets           34                       23:25
     Calibration Activity
     Fixed Wavelength                  0                       0:00
     AB Comparison                     1                       1:10
     Mini 64 Seam                      7                       8:27
     MUV Solar Alignment               2                       0:37
     FUV Solar Alignment               2                       0:37
     MUV Stellar Alignment             3                       0:27
     FUV Stellar Alignment             3                       0:27
     MUV Field of View Map             0                       0:00
     FUV Field of View Map             0                       0:00
     Special Activity
     Power Cycle Checks             104                        4:38
     Step Response Test               1                        0:03

     TIM
     Solar Activity                Total                Total Time
     Normal Solar                   103                     128:01
     Normal Eclipse                 109                      32:55
     Calibration Activity
     Degradation A                     1                       1:24
     Degradation C                     1                       1:24
     Aliveness D                       1                       1:24
     Gain Calibration AB               0                       0:00
     Gain Calibration CD               0                       0:00
     Solar Alignment                   2                       1:18
     Field of View Map                 0                       0:00
     Special Activity
     Power Cycle Checks             209                        8:54

     XPS
     Calibration Activity
     Calibration                       0                       0:00

     Since December 2005, the Planning and Scheduling group activates XPS for a continuous 1-min
     integration at filter wheel position 6 (0.1-18 nm range) and only plans a monthly calibration
     experiment.




6. Data Processing Summary

  TIM (submitted by Barry Knapp, 8 November 2007)
     • Status
        o Normal routine daily processing of v. 7 data continues.
        o TIM data is sent to the Goddard Earth Sciences DAAC on a daily basis.
     • Work in progress
        o Preparing for v. 8 mission-length reprocessing (new gain and degradation
           calibrations)
     • Future Plans
        o Code modifications (generalizations) to support Glory TIM data processing.

  SOLSTICE (submitted by Doug Lindholm, 8 November 2007)
    • Status
       o Routine data processing is producing all SOLSTICE data products, including
          version 9 level 3 MUV and FUV. These are available on the SORCE web site.
                                                                                 Page 6 of 8
          o  MgII index is being produced routinely and is available on the SORCE web
             site.
      •   Work in Progress
          o Filter experiment analysis to Improve dead time correction and filter
             transmission.
          o Processing new field of view maps
          o Improvement of field of view maps.
          o Improvement of alignment analysis from cruciform scans.
          o Porting to new hardware.
          o Processing code review and bug fixes.
      •   Future Plans
          o Analysis of instrument misalignment calibration.
          o Analysis of level 3 uncertainties.
          o Jan 2006 slit anomaly correction.
          o Update of the degradation calibrations.

SIM (submitted by Doug Lindholm, 29 November 2007)
   • Status
        o Level 2 and level 3 products have been reprocessed as version 15 and are being
             processed daily.
        o Version 15 level 3 products are available on the SORCE web site.
   • Work in Progress
        o Comparison of processing results to scientist's analysis.
        o Improvement of CCD shift algorithm.
        o Investigation of residual degradation to account for differences in SIM/TIM TSI
             comparison is under way (wavelength shifts, column determination with 1AU
             corrected accumulated exposure times). Comparisons are also being checked
             against overlapping SOLSTICE wavelengths and an independent processing
             effort.
   • Future Plans
        o Processing of SIM B.
        o Calibration to improve the quality of early mission data.

XPS (submitted by Brian Templeman, 6 December)
  • SORCE XPS Data Processing Statistics for 2007/325 to 2007/334:
             Total level 1b Observations Processed: 29697
             Percent used in level 2 Processing:    49.2272
             Total level 3 Observations Processed:  14619




                                                                         Page 7 of 8
Weekly Image




Diode Time Series




                    Page 8 of 8

				
DOCUMENT INFO
Shared By:
Categories:
Stats:
views:20
posted:5/16/2010