									        SORCE Weekly Status Report – 1/31/2008 to 2/06/2008

1. Introduction
   This status report addresses the performance of the SORCE spacecraft, instruments,
   and ground assets during the week of Thursday, Jan. 31, through Wednesday, Feb. 06,
   2008.


2. Spacecraft Summary        (submitted by D. McCabe, 30 Jan.)

       01/24       01/25      01/26       01/27         01/28    01/29        01/30
        024         025        026         027           028      029          030

   There were two MU Read 0 events reported during the past week.
      2008/026-16:35:03
      2008/028-18:03:57
   GCI lockups:                                           (MINUTES)
   Instrument         Lockup Time    Response Time         Duration     Lat     Lon
   solstice_a   2008/026-21:50:08   2008/026-22:12:27        22.32    -10.1     -29.4
   solstice_a   2008/027-02:59:13   2008/027-03:04:03         4.83    -39.5     -40.2
   solstice_a   2008/030-03:48:09   2008/030-04:00:35        12.43    -39.9     -61.1
   solstice_b   2008/024-00:22:18   2008/024-00:34:35        12.28    -20.7     -34.0
   solstice_b   2008/024-07:18:50   2008/024-08:40:15        81.42    -25.0     -20.8
   solstice_b   2008/025-00:36:50   2008/025-00:51:39        14.82    -18.8     -47.1
   solstice_b   2008/026-18:50:35   2008/026-18:57:58         7.38    -37.0      68.1
   solstice_b   2008/027-03:27:45   2008/027-04:41:10        73.42      5.1      58.5
   solstice_b   2008/028-06:41:07   2008/028-08:14:02        92.92    -30.6     -48.4
   solstice_b   2008/029-05:19:50   2008/029-06:55:46        95.93    -30.1     -33.1
   sim_a        2008/024-08:53:00   2008/024-09:53:59        60.98    -30.3     -55.2
   sim_a        2008/024-10:35:48   2008/024-11:31:14        55.43    -19.3     -61.8
   sim_a        2008/025-02:16:06   2008/025-02:27:18        11.20    -23.3     -65.4
   sim_a        2008/025-09:09:55   2008/025-10:13:03        63.13    -28.1     -61.3
   sim_a        2008/026-06:02:10   2008/026-07:17:47        75.62    -39.4     -58.8
   sim_a        2008/027-06:20:50   2008/027-07:37:10        76.33    -37.0     -55.8
   sim_a        2008/027-23:48:10   2008/028-00:06:19        18.15    -22.4     -48.8
   sim_a        2008/028-03:14:59   2008/028-03:20:48         5.82    -39.6     -49.4
   sim_a        2008/028-16:54:05   2008/028-17:39:53        45.80     34.5    -104.3
   sim_a        2008/030-02:05:40   2008/030-02:21:43        16.05    -37.3     -60.7
   sim_b        2008/024-05:39:00   2008/024-06:39:33        60.55    -30.2      -5.6
   sim_b        2008/024-07:09:20   2008/024-08:16:48        67.47    -38.6     -57.0
   sim_b        2008/025-21:53:03   2008/025-23:11:25        78.37    -39.7      46.6
   sim_b        2008/026-07:48:30   2008/026-08:55:09        66.65    -27.8     -46.6
   sim_b        2008/027-04:44:14   2008/027-05:59:58        75.73    -36.6     -29.5
   sim_b        2008/029-00:12:49   2008/029-00:25:15        12.43    -37.1     -26.5
   sim_b        2008/029-06:54:27   2008/029-08:15:08        80.68    -34.1     -67.1
   tim          2008/024-00:21:03   2008/024-00:34:29        13.43    -18.2     -37.5
   tim          2008/024-23:01:16   2008/024-23:14:25        13.15    -21.7     -18.4
   tim          2008/026-02:37:34   2008/026-02:46:05         8.52    -33.8     -55.4
   tim          2008/026-06:09:01   2008/026-07:15:12        66.18    -32.0     -30.6
   tim          2008/026-23:31:28   2008/026-23:49:28        18.00    -19.7     -42.1
   tim          2008/027-23:47:51   2008/028-00:07:44        19.88    -21.7     -49.8
   tim          2008/028-08:19:18   2008/028-09:31:01        71.72    -28.7     -69.1
   tim          2008/029-05:14:02   2008/029-05:18:24         4.37    -37.9     -55.9
   tim          2008/030-00:28:56   2008/030-00:45:50        16.90    -37.5     -35.1
   XPS          2008/025-05:47:35                                     -38.8     -44.3
   XPS          2008/025-10:49:24                                     -23.3     -78.0
   XPS          2008/025-17:04:46                                     -39.8     133.4
   XPS          2008/026-07:44:15                                     -34.8     -62.5
   XPS          2008/029-00:06:43                                     -28.1     -49.8

                                                                               Page 1 of 7
   XPS           2008/029-06:57:57                                     -28.4     -54.4
   XPS           2008/029-20:57:19                                      -4.3     -42.7
   XPS           2008/030-00:19:54                                     -23.5     -68.1
   XPS           2008/030-00:21:18                                     -26.1     -63.8
   XPS           2008/030-05:41:33                                     -18.1     -24.1
   XPS           2008/030-07:12:52                                     -29.4     -66.8


                    SIM A       SIM B      SOL A       SOL B        TIM        XPS*
         Week        10           7          3           7           9          11
         Total      1523        1904        1025        1194        1670       1486



3. Ground Support / Contact Summary             (submitted by D. McCabe)

14 Ground station contacts were performed over the past week.

                                         Captured      Recorded            %
                                         VCDUS          VCDUS
                  SC housekeeping         317713        317714         100
                  IM housekeeping          43464         43465         100
                      Science             312834        312835         100




4. Instrument Status

4.1.     TIM     (submitted by Greg Kopp, 11 Feb.)

         TIM operations during previous week
         • Normal Ops (TSI data w/ Cavity B)
         • Cavity A&B, A&C, B&D comparisons

         Current work
         • Normal Operations
                o Version 7 data processing is operating smoothly
         • Preparing calibration items for Version 8 data
         • External (non-regulated) instrument temperatures peaked this week and are now
                decreasing due to spacecraft orbit

         TIM anomalies during previous week
         • Lost Housekeeping data from 2-Feb-2008 03:51 to 15:00 UT due to an Operations
            commanding error. No Level 2 data are available for these times. The instrument
            continued to operate with no problems throughout, but all housekeeping data were
            lost.


4.2.     SIM



4.3.     SOLSTICE

                                                                               Page 2 of 7
4.4.   XPS     (submitted by Tom Woods, 07 Feb.)

       For days 2008/026 (Jan. 26) to 2008/037 (Feb. 6):
       • Number of XPS GCI errors: 11
       • SORCE XPS Data Gaps:
          -- 2008/033 for 11.144 hours
       • SORCE XPS Calibration Experiment Duration: None
       • Flares: None above class M1.0




5.     Planning       (submitted by Jay Kominek, 07 Feb.)

       Plans completed 31 January – 07 February:

       SORCE Spacecraft
       Activity                      Total                  Total Time
       Solar Rolls                   405                      10:22
       Stellar Rolls                 419                      10:51
       Ram Avoidance                   0                       0:00
       Solar Alignment                 0                       0:00
       Stellar Alignment               0                       0:00
       Field of View Maps              0                       0:00
       FSS Calibration                 0                       0:00
       Station Contacts               15                       3:21
       GCI Checks                    832                       0:21
       State Vector Upload             7                       0:21
       MU Checksum                     1                       0:12


                                                                         Page 3 of 7
SIM A (Primary)
Solar Activity            Total     Total Time
ESR Mode                    7          5:58
ESR Mode with HRT           0          0:00
IR Scan                     7          7:43
Quick Scan                 14          5:37
Quick Scan HRT              0          0:00
Calibration Activity
Fixed Wavelength            0           0:00
Servo Gain Calibration      2           1:20
Solar Alignment             2           1:36
Field of View Map           0           0:00
Prism Calibration           0           0:00
Image Light                 1           0:07
Image Dark                  1           0:05
ESR Full Scan               0           0:00
Dark                       28           0:26
Special Activity
Power Cycle Checks        208         13:52

SIM B (Secondary)
Solar Activity            Total     Total Time
ESR Mode                    7          5:58
ESR Mode with HRT           0          0:00
IR Scan                     1          1:09
Quick Scan                  2          0:48
Quick Scan HRT              0          0:00
Calibration Activity
Fixed Wavelength            0           0:00
Servo Gain Calibration      2           1:20
Solar Alignment             2           1:36
Field of View Map           0           0:00
Prism Calibration           0           0:00
Image Light                 1           0:07
Image Dark                  1           0:05
ESR Full Scan               0           0:00
Dark                        4           0:04
Special Activity
Power Cycle Checks        208         13:36

SOLSTICE A (MUV)
Solar Activity           Total    Total Time
Normal Scan                92          79:43
Quick Scan                 41          11:32
Mini Quick Scan            35          10:06
Stellar Activity
Fixed Wavelength            0           0:00
Companion                   0           0:00
Stellar Scan                0           0:00
Zero Order Scan             0           0:00
Number Unique Targets       0           0:00
Calibration Activity
Filter Calibration          1           1:04
Fixed Wavelength            0           0:00
AB Comparison               1           1:08
Mini 64 Scan                7           7:40
MUV Solar Alignment         0           0:00
FUV Solar Alignment         0           0:00

                                                 Page 4 of 7
MUV Stellar Alignment             0                       0:00
FUV Stellar Alignment             0                       0:00
MUV Field of View Map             0                       0:00
FUV Field of View Map             0                       0:00
Special Activity
Power Cycle Checks             104                        4:32
Step Response Test               1                        0:02

SOLSTICE B (FUV)
Solar Activity                 Total                  Total Time
Normal Scan                     93                      87:27
Quick Scan                      43                       8:05
Mini Quick Scan                 37                       6:54
Stellar Activity
Fixed Wavelength               511                       18:53
Companion                       72                        4:11
Stellar Scan                    11                        1:11
Zero Order Scan                302                        8:43
Number Unique Targets           38                       34:11
Calibration Activity
Fixed Wavelength                  0                       0:00
AB Comparison                     1                       1:08
Mini 64 Seam                      7                       7:40
MUV Solar Alignment               0                       0:00
FUV Solar Alignment               0                       0:00
MUV Stellar Alignment             6                       0:55
FUV Stellar Alignment             2                       0:18
MUV Field of View Map             0                       0:00
FUV Field of View Map             0                       0:00
Special Activity
Power Cycle Checks             104                        4:38
Step Response Test               1                        0:03

TIM
Solar Activity                Total                Total Time
Normal Solar                   102                     114:59
Normal Eclipse                 122                      44:31
Calibration Activity
Degradation A                     1                       1:05
Degradation C                     0                       0:00
Aliveness D                       0                       0:00
Gain Calibration AB               0                       0:00
Gain Calibration CD               0                       0:00
Solar Alignment                   2                       1:36
Field of View Map                 0                       0:00
Special Activity
Power Cycle Checks             208                        8:59

XPS
Calibration Activity
Calibration                       0                       0:00

Since December 2005, the Planning and Scheduling group activates XPS for a continuous 1-min
integration at filter wheel position 6 (0.1-18 nm range) and only plans a monthly calibration
experiment.




                                                                            Page 5 of 7
6. Data Processing Summary

TIM (submitted by Doug Lindholm, 24 January 2008)
   • Status
         o Normal routine daily processing of v. 7 data continues.
         o TIM data is sent to the Goddard Earth Sciences DAAC on a daily basis.
         o TIM data products are now being processed on new Linux servers.
   • Work in progress
         o Preparing for v. 8 mission-length reprocessing (new gain and degradation
             calibrations)
   • Future Plans
         o Code modifications (generalizations) to support Glory TIM data processing.

SOLSTICE (submitted by Doug Lindholm, 24 January 2008)
  • Status
        o Routine data processing is routinely producing version 9 level 3 FUV and
           MUV SOLSTICE data products. These are available on the SORCE web site
           and LISIRD.
        o MgII index is being produced routinely and is available on the SORCE web
           site.
        o Field of view maps from recent experiments have been processed.
  • Work in Progress
        o Filter experiment analysis to Improve dead time correction and filter
           transmission.
        o Improvement of alignment analysis from cruciform scans.
        o Porting to new hardware.
        o Update of the degradation calibrations.
  • Future Plans
        o Analysis of instrument misalignment calibration.
        o Analysis of level 3 uncertainties.
        o Jan 2006 slit anomaly correction.
        o Improvement of field of view maps.

SIM (submitted by Doug Lindholm, 24 January 2008)
   • Status
        o Level 2 and level 3 products have been reprocessed as version 15 and are being
             processed daily.
        o Version 15 level 3 products are available on the SORCE web site.
        o SIM data products are now being processed on new Linux servers.
   • Work in Progress
        o Investigation of ESR phase sensitive detection.
        o Improvement of CCD shift algorithm.
        o Investigation of residual degradation to account for differences in SIM/TIM TSI
             comparison is under way (wavelength shifts, column determination with 1AU
             corrected accumulated exposure times). Comparisons are also being checked
             against overlapping SOLSTICE wavelengths and an independent processing
             effort.
   • Future Plans
        o Processing of SIM B.
        o Calibration to improve the quality of early mission data.

XPS (submitted by Brian Templeman, 31 January 2008)
  • SORCE XPS Data Processing Statistics for 2008/020 to 2008/026:
                                                                           Page 6 of 7
      Total level 1b Observations Processed:   29745
      Percent used in level 2 Processing:      49.1377
      Total level 3 Observations Processed:    146168




Weekly Image




      Diode Time Series




                                                         Page 7 of 7

								