									         SORCE Weekly Status Report – 6/12/2008 to 6/18/2008

1. Introduction
   This status report addresses the performance of the SORCE spacecraft, instruments,
   and ground assets during the week of Thursday, June 12, through Wednesday, June 18,
   2008.


2. Spacecraft Summary          (submitted by Deb McCabe, 19 June)

        06/12        06/13       06/14       06/15        06/16       06/17        06/18
         164          165         166         167          168         169          170

   On DOY 149 there was TMON 42 limit violation for one sample. This appears to be due to
   nominal battery degradation. Short term, the TMON limits will be changed so the associated
   TMONs do not trip. The TMON trip thresholds were set conservatively at launch. Long term
   solution is being developed.

   On AGO 29221 a GCI error (PM_ENABLED = DISABLED) was detected. The post mortem buffer
   was dumped and post mortem logging re-enabled per standing SOACR 260. The fault was due to a
   read zero of the PCI I/O command buffer start pointer

   There were four MU Read 0 events reported during the past week.
          2008/165-16:06:04
          2008/165-18:32:19
          2008/166-09:26:06
          2008/166-13:13:06

   GCI lockups:                                        (MINUTES)
   Instrument           Lockup Time    Response Time          Duration       Lat      Lon
   solstice_a     2008/164-10:43:46   2008/164-11:46:19         62.55      -16.3      -28.8
   solstice_a     2008/167-20:05:44   2008/167-20:44:46         39.03      -25.2      -66.0
   solstice_a     2008/168-11:59:33   2008/168-12:57:55         58.37      -38.8      -21.4
   solstice_b     2008/164-12:21:26   2008/164-13:23:20         61.90      -17.7      -51.7
   solstice_b     2008/165-16:06:07   2008/165-16:54:25         48.30      -39.7      -55.2
   solstice_b     2008/165-19:31:03   2008/165-20:08:42         37.65      -31.8      -57.6
   solstice_b     2008/167-18:31:38   2008/167-19:07:25         35.78      -19.2      -32.4
   solstice_b     2008/169-15:33:50   2008/169-16:32:59         59.15      -39.9      -60.0
   solstice_b     2008/170-09:03:58   2008/170-10:23:59         80.02      -18.9      -38.8
   solstice_b     2008/170-15:56:06   2008/170-16:53:23         57.28      -34.1      -41.6
   sim_a          2008/165-12:41:56   2008/165-13:25:51         43.92      -27.9      -46.6
   sim_a          2008/168-10:05:30   2008/168-11:10:57         65.45       -9.0      -54.6
   sim_a          2008/169-12:00:30   2008/169-13:05:53         65.38      -14.7      -83.1
   sim_a          2008/169-17:25:48   2008/169-17:57:19         31.52      -19.0      -28.2
   sim_a          2008/169-19:02:40   2008/169-19:34:28         31.80      -19.0      -53.0
   sim_b          2008/164-13:58:49   2008/164-14:43:05         44.27      -18.7      -75.0
   sim_b          2008/164-19:22:09   2008/164-19:35:04         12.92      -18.8      -25.2
   sim_b          2008/165-12:42:10   2008/165-13:25:55         43.75      -28.5      -45.5
   sim_b          2008/166-09:34:17   2008/166-10:31:42         57.42       -8.3      -34.5
   sim_b          2008/167-11:34:58   2008/167-12:29:14         54.27      -26.0      -46.1
   sim_b          2008/168-18:47:06   2008/168-19:17:04         29.97      -19.3      -43.0
   sim_b          2008/169-07:13:32   2008/169-08:14:29         60.95      -23.5        3.0
   sim_b          2008/169-10:26:18   2008/169-11:28:48         62.50      -20.6      -50.7
   sim_b          2008/169-18:59:43   2008/169-19:34:33         34.83      -25.3      -62.3
   sim_b          2008/170-10:39:05   2008/170-11:45:53         66.80      -14.7      -68.8
   tim            2008/164-19:15:54   2008/164-19:32:24         16.50      -31.2      -45.8
   tim            2008/164-20:52:48   2008/164-21:09:44         16.93      -31.4      -70.9
   tim            2008/165-14:20:10   2008/165-15:00:37         40.45      -30.2      -66.8
   tim            2008/168-13:30:09   2008/168-14:22:47         52.63      -31.0      -71.8

                                                                                    Page 1 of 8
   XPS           2008/164-21:02:51                                          -10.6     -39.7
   XPS           2008/166-21:52:02                                           29.9      -9.1
   XPS           2008/167-16:52:29                                          -23.7     -14.2
   XPS           2008/167-16:52:36                                          -23.4     -13.7
   XPS           2008/168-10:09:23                                          -17.7     -44.1
   XPS           2008/168-11:53:52                                          -32.2     -44.5
   XPS           2008/169-12:06:38                                          -27.2     -65.0
   XPS           2008/169-12:11:36                                          -35.3     -46.7
   XPS           2008/170-07:26:16                                          -17.5     -15.9

                     SIM A       SIM B        SOL A         SOL B        TIM        XPS*
         Week          5          10            3             7           4          9
         Total       1651        2084          1125          1330        1805       1626


3. Ground Support / Contact Summary                  (submitted by D. McCabe)

14 Ground station contacts were performed over the past week including one blind acquisition
due to an AGO tracking computer problem.

                                            Captured        Recorded            %
                                            VCDUS            VCDUS
                  SC housekeeping            314119          314131         100
                  IM housekeeping             43197           43199         100
                      Science                311586          311600         100

4. Instrument Status

4.1.     TIM     (submitted by Greg Kopp, 18 June)

         TIM operations during previous week
         • Normal Ops (TSI data w/ Cavity B)
         • Cavity A&B comparisons

         Current work
         • Normal Operations
                o Version 8 data processing provides daily updated TSI values
         • Instrument temperatures are increasing and heater power necessary to maintain
            heat sink is decreasing due to orbit beta angle
                o This is normal for this time of year and should peak next week

         TIM anomalies during previous week
         • None

4.2.     SIM     (submitted by Jerry Harder, 19 June)

         For days 2008/164 (June 12) to 2008/171 (June 19):

         •   Calibration Activities:          SIM A             SIM B
              -- Prism Calibration A_cal_B      0                 0
              -- Prism Calibration B_cal_A      0                 0
              -- CCDDump                        2                 2
              -- Image Dark                     1                 0
              -- Image Light                    1                 1
              -- Servo Gain 20 sec half cycle   2                 2
                                                                                    Page 2 of 8
            -- Servo Gain 50 sec half cycle    1             1
            -- Cruciform Scans                 0             0
            -- FOV Maps                        0             0

       •   Science Activities:                SIM A         SIM B
            -- ESR Full Scan Segments           11           11
            -- 24-minute Scans                  23            11
            -- 24-minute Scans w/ HRT            0             0
            -- IR scans                          5            0

       •   Additional Activities:
           -- Continued work on paper to be submitted to the journal Nature.
           -- Continued work on version 16 processing

4.3.   SOLSTICE      (submitted by Marty Snow, 18 June)

       For days 2008/163 (June 11) to 2008/170 (June 18):

       •   SOLSTICE A grating drive errors:
           2008/167, 20:46:26
           2008/168, 12:58:53

       •   SOLSTICE B grating drive errors:
           2008/165, 20:10:20

       •   Data Gaps for SOLSTICE A (date, length in minutes)
           2008/164, 11:47:06     63 minutes
           2008/167, 20:45:33     40 minutes
           2008/168, 12:58:42     59 minutes

       •   Data Gaps for SOLSTICE B (date, length in minutes)
           2008/163, 14:44:38     59 minutes
           2008/164, 13:24:07     63 minutes
           2008/165, 16:55:12     49 minutes
           2008/165, 20:09:29     38 minutes
           2008/167, 19:08:12     37 minutes
           2008/169, 16:33:47     60 minutes




                                                                               Page 3 of 8
4.4.   XPS     (submitted by Tom Woods, 18 June)

       For days 2008/158 (June 6) to 2008/169 (June 17):
       • Number of XPS GCI errors: 14
       • SORCE XPS Data Gaps: None
       • SORCE XPS Calibration Experiment Duration: None
       • Flares: None above class M1.0




5.     Planning       (submitted by Jay Kominek, 19 June)

       Plans completed 12 June – 19 June:

       SORCE Spacecraft
       Activity                      Total                  Total Time
       Solar Rolls                   571                      14:14
       Stellar Rolls                 230                       6:13
       Ram Avoidance                   0                       0:00
       Solar Alignment                 0                       0:00
       Stellar Alignment               0                       0:00
       Field of View Maps              0                       0:00
       FSS Calibration                 0                       0:00
       Station Contacts               14                       2:26
       GCI Checks                    834                       0:13
       State Vector Upload             7                       0:21
       MU Checksum                     1                       0:12

       SIM A (Primary)
       Solar Activity                Total                  Total Time
       ESR Mode                        7                       6:37
       ESR Mode with HRT               0                       0:00
       IR Scan                         6                       7:34

                                                                         Page 4 of 8
Quick Scan                 20           8:07
Quick Scan HRT              0           0:00
Calibration Activity
Fixed Wavelength            0           0:00
Servo Gain Calibration      2           1:20
Solar Alignment             0           0:00
Field of View Map           0           0:00
Prism Calibration           0           0:00
Image Light                 1           0:07
Image Dark                  1           0:05
ESR Full Scan               7           5:45
Dark                       40           0:26
Special Activity
Power Cycle Checks        208          13:52

SIM B (Secondary)
Solar Activity            Total      Total Time
ESR Mode                    0           0:00
ESR Mode with HRT           0           0:00
IR Scan                     0           0:00
Quick Scan                  7           2:51
Quick Scan HRT              0           0:00
Calibration Activity
Fixed Wavelength            0           0:00
Servo Gain Calibration      2           1:20
Solar Alignment             0           0:00
Field of View Map           0           0:00
Prism Calibration           0           0:00
Image Light                 1           0:07
Image Dark                  1           0:05
ESR Full Scan               7           5:45
Dark                       14           0:08
Special Activity
Power Cycle Checks        208          13:33

SOLSTICE A (MUV)
Solar Activity           Total    Total Time
Normal Scan                94          96:21
Quick Scan                 42          12:02
Mini Quick Scan            35            9:54
Stellar Activity
Fixed Wavelength            0           0:00
Companion                   0           0:00
Stellar Scan                0           0:00
Zero Order Scan             0           0:00
Number Unique Targets       0           0:00
Calibration Activity
Filter Calibration          1           1:17
Fixed Wavelength            0           0:00
AB Comparison               1           1:18
Mini 64 Scan                7           8:51
MUV Solar Alignment         2           0:38
FUV Solar Alignment         2           0:37
MUV Stellar Alignment       0           0:00
FUV Stellar Alignment       0           0:00
MUV Field of View Map       0           0:00
FUV Field of View Map       0           0:00
Special Activity

                                                  Page 5 of 8
Power Cycle Checks             104                        4:29
Step Response Test               1                        0:02

SOLSTICE B (FUV)
Solar Activity                 Total                  Total Time
Normal Scan                     96                     104:50
Quick Scan                      43                       8:12
Mini Quick Scan                 35                       6:43
Stellar Activity
Fixed Wavelength               108                        5:26
Companion                       15                        0:52
Stellar Scan                    46                        5:32
Zero Order Scan                144                        4:11
Number Unique Targets           34                       16:07
Calibration Activity
Fixed Wavelength                  0                       0:00
AB Comparison                     1                       1:18
Mini 64 Seam                      7                       8:51
MUV Solar Alignment               2                       0:38
FUV Solar Alignment               2                       0:37
MUV Stellar Alignment             0                       0:00
FUV Stellar Alignment             0                       0:00
MUV Field of View Map             0                       0:00
FUV Field of View Map             0                       0:00
Special Activity
Power Cycle Checks             104                        4:37
Step Response Test               1                        0:03

TIM
Solar Activity                Total                Total Time
Normal Solar                   103                     136:30
Normal Eclipse                  99                      24:41
Calibration Activity
Degradation A                     1                       1:20
Degradation C                     1                       1:21
Aliveness D                       1                       1:20
Gain Calibration AB               0                       0:00
Gain Calibration CD               0                       0:00
Solar Alignment                   2                       1:19
Field of View Map                 0                       0:00
Special Activity
Power Cycle Checks             209                        8:58

XPS
Calibration Activity
Calibration                       0                       0:00

Since December 2005, the Planning and Scheduling group activates XPS for a continuous 1-min
integration at filter wheel position 6 (0.1-18 nm range) and only plans a monthly calibration
experiment.




                                                                            Page 6 of 8
6. Data Processing Summary

TIM (submitted by Doug Lindholm, 5 June 2008)
   • Status
         o Version 8 TSI data have been released and are available on LISIRD and the
             SORCE web site.
         o Normal routine daily processing of version 8 data is ongoing.
         o TIM TSI data daily delivery to the Goddard Earth Sciences DISC has been put on
             hold while a new data format is being implemented for version 8 data products.
             The version 7 data products are available but not being updated.
   • Work in progress
         o Planning for version 9.
         o Code modifications (generalizations) to support Glory TIM data processing.
   • Future Plans


SOLSTICE (submitted by Doug Lindholm, 29 May 2008)
  • Status
        o Routine data processing is routinely producing version 9 level 3 FUV and
           MUV SOLSTICE data products. These are available on the SORCE web site
           and LISIRD.
        o MgII index is being produced routinely and is available on the SORCE web
           site.
  • Work in Progress
        o Filter experiment analysis to Improve dead time correction and filter
           transmission.
        o Improvement of alignment analysis from cruciform scans.
        o Porting to new hardware.
        o Update of the degradation calibrations.
  • Future Plans
        o Analysis of instrument misalignment calibration.
        o Analysis of level 3 uncertainties.
        o Jan 2006 slit anomaly correction.
        o Improvement of field of view maps.


SIM (submitted by Doug Lindholm, 5 June 2008)
   • Status
        o Version 15 data products are being processed daily.
        o Version 15 level 3 products are available on the SORCE web site and LISIRD.
        o New degradation parameters have been prepared.
   • Work in Progress
        o Testing of new SIM exposure time algorithm.
        o Preparing for version 16 reprocessing (ingesting calibration data, testing)
   • Future Plans
        o Version 16 reprocessing
        o Processing of SIM B.
        o Calibration to improve the quality of early mission data.




                                                                           Page 7 of 8
XPS (submitted by Brian Templeman, 12 June 2008)
  • SORCE XPS Data Processing Statistics for 2008/151 to 2008/159:
             Total level 1b Observations Processed: 29742
             Percent used in level 2 Processing:    49.6671
             Total level 3 Observations Processed:  14772




              Weekly Image




             Diode Time Series




                                                                     Page 8 of 8

								
To top