					INTERNATIONAL MARITIME ORGANIZATION

                                                                                                                  E
                                                         IMO

MARITIME SAFETY COMMITTEE                                                                                   MSC 79/6/5
79th session                                                                                         17 September 2004
Agenda item 6                                                                                       Original: ENGLISH

                 GOAL–BASED NEW SHIP CONSTRUCTION STANDARDS

                                Concept on ship safety assurance system

                                               Submitted by Poland

                                                     SUMMARY
    Executive summary:        This document presents a concept on ship safety assurance system
    Action to be taken:       Paragraph 9
    Related documents:        MSC 78/6/2, MSC 78/6/3, MSC 78/26 (section 6) and MSC 79/6/1


Introduction

1       Referring to the comments presented in document MSC 79/6/4, submitted by Poland on
potential subjects identified by the MSC Chairman in document MSC 79/6/1, Poland proposes a
concept of ship safety assurance system.

2        This concept covers the whole ship’s life and refers to natural stages thereof.

Concept of safety assurance system

3       The proposed structure of a safety assurance system (see annex), covering the assumed
ship’s life span, is divided into three natural stages: design, construction and operation.

4       The structural safety level for the whole life of the ship (the goal) is to be determined by
IMO GBS, which comprise criteria that determine what the ship’s structure should be reasonably
expected to withstand in terms of operational loads, environmental actions and sufficient
structure strength, all of which must be satisfied by the design (e.g. as presented in document
MSC 78/6/3).

The GBS rationale is based on appropriate quality of ship construction and maintenance.

GBS is also a reference system for developing instruments enabling implementation of the
standard or verification of compliance therewith by the Administration/Recognized Organization
(RO).

5      The level of ship construction quality should be determined in Ship Construction Quality
Requirements (SCQR), which meet GBS prerequisites for the quality of ship construction.

                          For reasons of economy, this document is printed in a limited number. Delegates are
                          kindly asked to bring their copies to meetings and not to request additional copies.
I:\MSC\79\6-5.DOC
MSC 79/6/5                                     -2-


SCQR should be set by IMO.

SCQR will contain requirements related to the structure (e.g. criteria on continuity of members,
requirements for materials and their connections, shape of connections, size and shape of
openings in the structure, tolerance of imperfections, requirement referring to the “Ship
Construction File”).

SCQR will be a reference system for developing ship quality construction procedures.

6      The level of a ship’s technical condition should be determined by the Ship Structure
Condition Requirements (SSCR), which meet GBS prerequisites concerning the ship’s technical
condition during operation.

SSCR should be set by IMO.

SSCR will include requirements referring to means of access, corrosion additions, survey
regulations, the “Ship Inspection and Maintenance File”, etc.

SSCR will be a reference system for developing survey guidelines and instructions.

7      In the ship safety system the following could be carried out by ROs:

       .1      appraisal and approval of ship’s technical plans;

       .2     supervision of ship under construction based on construction quality procedures;
              and

       .3     supervision of ship in operation based on survey guidelines and instructions
              supported by appropriate computer systems.

Ship surveys and inspections would also be carried out by Port State Control, the Administration,
and at the operational level by crew, owner, etc. Their results should be gathered to process all
input information giving the best possible picture of the ship’s technical condition.

8      Organizations intended to act as Recognized Organizations should demonstrate in the
recognition process that the instruments they develop (rules, computer programs, etc.) will enable
implementation of GBS or verification of compliance of ship structure with GBS.

Organizations should also demonstrate adequate abilities, experience and resources to sustain
service at the required level.

Action to be taken by the Committee

9      The Committee is invited to consider the proposal and decide as appropriate.


                                               ***




I:\MSC\79\6-5.DOC
                                                                                                           MSC 79/6/5


                                                          ANNEX

                                        FLOW CHART OF SHIP SAFETY SYSTEM

   STAGE OF
                          PARTY
   SHIP'S LIFE                                              SHIP SAFETY ASSURANCE SYSTEM
                        INVOLVED
     SPAN



                        DESIGNER                       SHIP DESIGN                              IMO CONVENTIONS



                                                 SHIP STRUCTURE STANDARD
                           IMO
                                                           (GBS)



                       ADMINISTRATION                INSTRUMENTS FOR
                            / RO               IMPLEMENTATION&VERIFICATION
       DESIGN




                                                 TECHNICAL DESIGN OF SHIP                                  WITHDRAWAL
                        DESIGNER                                                     CORRECTIONS               OF
                                                       STRUCTURE                                           SUPERVISION

                                                                                                     OR

                                                 VERIFICATION OF STANDARD
                            RO                                                                  NONCONFORMITIES
                                                      IMPLEMENTATION




                                                   SHIP CONSTRUCTION
                           IMO
                                               QUALITY REQUIREMENTS (SCQR)




                      SHIPYARD / RO          CONSTRUCTION QUALITY PROCEDURES
       CONSTRUCTION




                                                                                                           WITHDRAWAL
                        SHIPYARD                    HULL CONSTRUCTION                CORRECTIONS               OF
                                                                                                           SUPERVISION


                                                                                                     OR


                                                     VERIFICATION OF
                            RO                    INCORPORATION OF THE                          NONCONFORMITY
                                                          SCQR




                                                 SHIP STRUCTURE CONDITION
                           IMO
                                                   REQUIREMENTS (SCQR)




                       ADMINISTRATION               SURVEY GUIDELINES,
                            / RO               INSTRUCTIONS FOR SURVEYORS
       OPERATION




                                                                                                           WITHDRAWAL
                      OWNER / CREW                  SHIP IN OPERATION                      REPAIR              OF
                                                                                                           SUPERVISION


                                                                                                     OR
                            RO/
                      ADMINISTRATION/
                          PSC/
                                                       INSPECTION                               NONCONFORMITY
                      UNDERWRITER/
                       SHIP CREW/
                         OTHERS




I:\MSC\79\6-5.DOC