Prioritizing Maintenance and
Renovation to Strengthen the
Bottom Line
Dick Dowdell, Richmond Cold Storage, Com
Good maintenance starts with good design
Selection of contractors is critical
Selection of good quality suppliers is
extremely important
1
Good design
- Floors
- Doors
- Dock doors and equipment
- Dock levelers and pits
- Mechanical systems
- Fire protection systems
- Refrigeration
- Electrical
Contractor selection
- Pre qualify contractors
- Good track record for quality
- Competitive
- Can deliver on time
2
Suppliers
- Good quality
- Proven reliability
- Provide assistance where needed
- Stand behind their products
MP2
RCS uses MP2 maintenance program to
schedule:
- Preventative maintenance
- Maintenance
- Training
- Safety requirements
- PSM requirements
- OSHA requirements
3
MP2
MP2 provides
- Maintenance history
- Last date performed
- Duration
- Next due date
- It automatically prepares work orders
- Tracks costs if desired
MP2
General
- Bi-weekly safety meeting are recorded in the
MP2 program
- Quarterly evacuation drills
4
MP2
General – Monthly
- AED inspection
- Check first aid supplies
- Check MSD books
- Ladder inspections
- Eye wash/safety shower inspections
- Check fork lift operator training
MP2
General – Quarterly
- Fall protection equipment checks
General – Annual
- Review ergonomic assessment for
employees
- Ladder training
- Lock out tag out assessment
- Lock out tag out training
5
MP2
Miscellaneous Refrigeration- Annual
- Audit PPE program
- Audit respirator program
- Annual respirator training
- Respirator physical – 2 yr
- Audit hazard communication program
- Review Hazcom check list in PSM
- Hazmat suit pressure test
MP2
Miscellaneous Refrigeration- Annual
- Confined space training
- Evaluate emergency procedures
- Operating procedures for PSM
- PSM 8 hour training
- Annual IIAR Inspection
6
MP2
Miscellaneous Refrigeration – 3 yr
- PSM audits
- SCBA air tank inspections
Miscellaneous Refrigeration – 5 yr
- PSM compliance audits
- Replace Hazmat suits
- RMP updates
MP2
Compressors - Annual
- Calibrate slide valves
- Check safety controls
- Check drive alignment
- Check foundations bolts
- Clean filters and strainers
- Oil samples
- Vibration analysis
7
MP2
Compressors – Various times
- Drain compressor oil bottles – mo.
- Blow down oil pots – wk.
- Grease motors – 3 mo.
- Log hours – mo
- Change coalescent elements – (30,000 hrs or
re-build)
- Change oil – samples
- Check drives and guards
MP2
Valves – Various
- Inspect relief valves – mo.
- Check relief valves – yr
- Replace relief valves – 5 yr
- Check isolation valves – 5yr
8
MP2
Condenser
- Clean VRTX strainer – wk
- Inspect – mo.
- Grease fans and pumps
- Clean – 6 mo.
- USDA water sample - yr
MP2
Miscellaneous refrigeration items - Various
- Check AHU fans, guards, pans, controls – yr
- Check purger – wk
- Drain purger of any oil accumulation – 6 mo
- Check/rotate ammonia pumps – mo
- Inspect ammonia pumps – yr
- Test ammonia detector and sensors – 3 mo
- Check wind socks – 3 mo
- Check ammonia charge – 3 mo
- Clean machine room - mo
9
MP2
Miscellaneous refrigeration items - Various
- Inspect vessels – wk
- Inspect vessel insulation – yr
- State Vessel Inspection – 2 yr
- Inspect pipe insulation – yr
- Ammonia training using Infos Program – 1
mo per year
- Check under floor heating system - mo
MP2
Fire Protection
- Weekly fire inspection
- Weekly fire pump test
- Monthly fire extinguisher inspection
- Fire pump test – yr
- Annual inspection
10
MP2
Fire Protection
- Trip tests – yr
- Check for ice plugs -yr
- Audit fire protection program - yr
- Insurance company inspection – yr
- Full trip tests – 3 yr
- 5 year sprinkler inspection and tests
MP2
Material Handling
- Clean fork lift shop – wk
- Log fork lift run times
- Check MHE batteries – mo
- Clean MHE batteries – 3 mo
- Inspect lift chains for excessive wear – yr
- Inspect OH crane - yr
11
MP2
Dock - Quarterly
- PM dock levelers
- PM dock doors
- Check truck restraints
- Check wheel chocks
MP2
Other
- Inspect storage racks – wk
- Check sewer pumps – mo
- Check tools – mo
- Check strip curtains – 3 mo
- PM doors – 3 mo
- PM other equipment – per manufacturer
- Check HVAC equipment and change filters – 6
mo
12
MP2
Electrical
- Check exit and emergency lights - mo
- Test GFI operation - mo
- Check power cords - mo
- Check breakers – 3 mo
- Thermal scans – 6 mo
CCS #03 COMP. 2ND
IR00140.ISI
Info:
Image Path F:\IR00140.ISI
Image Thursday, June 12, 2003 9:50:19 AM
Date/Time
Report Wednesday, June 25, 2003 3:57:33 PM
Date/Time
Temp Unit Fahrenheit
User DOUG CUMMINGS
Location CCS
Target COMP. #3 BREAKER
13
Blast #7 Contactor
IR00027.ISI
Info:
Image Path E:\IR00027.ISI
Image Wednesday, December 22, 2004 3:01:06 PM
Date/Time Data: HOT SPOT LEG #1
CONTACT. MAX. TEMP.
Report Wednesday, December 22, 2004 3:46:49 PM
Date/Time 54.4 C ( 103 F )
Comments: NEED TO
Temp Unit Celsius
REPLACE CONTACTS
User DPC
AND RESHOOT.
Location CCS
Target CONTACTOR
COMP. #1 BREAKER
IR00028.ISI
Info:
Image Path E:\IR00028.ISI Data: FOUND HOT SPOT
Image Wednesday, December 22, 2004 3:06:04 PM ON #3 WIRE. MAX TEMP.
Date/Time 47.8C
Report Wednesday, December 22, 2004 3:24:23 PM Comments: NEED TO
Date/Time SHUT DOWN UNIT
Temp Unit Celsius TIGHTEN THE
CONNECTIONS AND
User DPC
Location CCS
RESHOOT.
Target BREAKER INLET WIRES
14