Good maintenance starts with good design
Selection of contractors is critical
Selection of good quality suppliers is
extremely important




                                             1
Good design
-   Floors
-   Doors
-   Dock doors and equipment
-   Dock levelers and pits
-   Mechanical systems
-   Fire protection systems
-   Refrigeration
-   Electrical




Contractor selection
-   Pre qualify contractors
-   Good track record for quality
-   Competitive
-   Can deliver on time




                                    2
  Suppliers
  -   Good quality
  -   Proven reliability
  -   Provide assistance where needed
  -   Stand behind their products




MP2

  RCS uses MP2 maintenance program to
  schedule:
  -   Preventative maintenance
  -   Maintenance
  -   Training
  -   Safety requirements
  -   PSM requirements
  -   OSHA requirements




                                        3
MP2

  MP2 provides
  - Maintenance history
  - Last date performed
  - Duration
  - Next due date
  - It automatically prepares work orders
  - Tracks costs if desired




MP2

  General
  -   Bi-weekly safety meeting are recorded in the
      MP2 program
  -   Quarterly evacuation drills




                                                     4
MP2

  General – Monthly
  -   AED inspection
  -   Check first aid supplies
  -   Check MSD books
  -   Ladder inspections
  -   Eye wash/safety shower inspections
  -   Check fork lift operator training




MP2

  General – Quarterly
  - Fall protection equipment checks
  General – Annual
  - Review ergonomic assessment for
  employees
  - Ladder training
  - Lock out tag out assessment
  - Lock out tag out training




                                           5
MP2

  Miscellaneous Refrigeration- Annual
  - Audit PPE program
  - Audit respirator program
  - Annual respirator training
  - Respirator physical – 2 yr
  - Audit hazard communication program
  - Review Hazcom check list in PSM
  - Hazmat suit pressure test




MP2

  Miscellaneous Refrigeration- Annual
  - Confined space training
  - Evaluate emergency procedures
  - Operating procedures for PSM
  - PSM 8 hour training
  - Annual IIAR Inspection




                                         6
MP2

  Miscellaneous Refrigeration – 3 yr
  - PSM audits
  - SCBA air tank inspections
  Miscellaneous Refrigeration – 5 yr
  - PSM compliance audits
  - Replace Hazmat suits
  - RMP updates




MP2

  Compressors - Annual
  - Calibrate slide valves
  - Check safety controls
  - Check drive alignment
  - Check foundations bolts
  - Clean filters and strainers
  - Oil samples
  - Vibration analysis




                                       7
MP2

  Compressors – Various times
  -   Drain compressor oil bottles – mo.
  -   Blow down oil pots – wk.
  -   Grease motors – 3 mo.
  -   Log hours – mo
  -   Change coalescent elements – (30,000 hrs or
      re-build)
  -   Change oil – samples
  -   Check drives and guards




MP2

  Valves – Various
  -   Inspect relief valves – mo.
  -   Check relief valves – yr
  -   Replace relief valves – 5 yr
  -   Check isolation valves – 5yr




                                                    8
MP2

  Condenser
  -   Clean VRTX strainer – wk
  -   Inspect – mo.
  -   Grease fans and pumps
  -   Clean – 6 mo.
  -   USDA water sample - yr




MP2

  Miscellaneous refrigeration items - Various
  -   Check AHU fans, guards, pans, controls – yr
  -   Check purger – wk
  -   Drain purger of any oil accumulation – 6 mo
  -   Check/rotate ammonia pumps – mo
  -   Inspect ammonia pumps – yr
  -   Test ammonia detector and sensors – 3 mo
  -   Check wind socks – 3 mo
  -   Check ammonia charge – 3 mo
  -   Clean machine room - mo




                                                    9
MP2

  Miscellaneous refrigeration items - Various
  - Inspect vessels – wk
  - Inspect vessel insulation – yr
  - State Vessel Inspection – 2 yr
  - Inspect pipe insulation – yr
  - Ammonia training using Infos Program – 1
  mo per year
  - Check under floor heating system - mo




MP2

  Fire Protection
  -   Weekly fire inspection
  -   Weekly fire pump test
  -   Monthly fire extinguisher inspection
  -   Fire pump test – yr
  -   Annual inspection




                                                10
MP2

  Fire Protection
  -   Trip tests – yr
  -   Check for ice plugs -yr
  -   Audit fire protection program - yr
  -   Insurance company inspection – yr
  -   Full trip tests – 3 yr
  -   5 year sprinkler inspection and tests




MP2

  Material Handling
  - Clean fork lift shop – wk
  - Log fork lift run times
  - Check MHE batteries – mo
  - Clean MHE batteries – 3 mo
  - Inspect lift chains for excessive wear – yr
  - Inspect OH crane - yr




                                                  11
MP2

  Dock - Quarterly
  - PM dock levelers
  - PM dock doors
  - Check truck restraints
  - Check wheel chocks




MP2

  Other
  -   Inspect storage racks – wk
  -   Check sewer pumps – mo
  -   Check tools – mo
  -   Check strip curtains – 3 mo
  -   PM doors – 3 mo
  -   PM other equipment – per manufacturer
  -   Check HVAC equipment and change filters – 6
      mo




                                                    12
MP2

  Electrical
  - Check exit and emergency lights - mo
  - Test GFI operation - mo
  - Check power cords - mo
  - Check breakers – 3 mo
  - Thermal scans – 6 mo




                                CCS #03 COMP. 2ND




                                              IR00140.ISI


       Info:
      Image Path   F:\IR00140.ISI

      Image        Thursday, June 12, 2003 9:50:19 AM
      Date/Time
      Report       Wednesday, June 25, 2003 3:57:33 PM
      Date/Time
      Temp Unit    Fahrenheit

      User         DOUG CUMMINGS

      Location     CCS

      Target       COMP. #3 BREAKER




                                                            13
                                        Blast #7 Contactor




                                                       IR00027.ISI
Info:
Image Path   E:\IR00027.ISI

Image        Wednesday, December 22, 2004 3:01:06 PM
Date/Time                                                            Data: HOT SPOT LEG #1
                                                                     CONTACT. MAX. TEMP.
Report       Wednesday, December 22, 2004 3:46:49 PM
Date/Time                                                            54.4 C ( 103 F )
                                                                     Comments: NEED TO
Temp Unit    Celsius
                                                                     REPLACE CONTACTS
User         DPC
                                                                     AND RESHOOT.
Location     CCS

Target       CONTACTOR




                                       COMP. #1 BREAKER




                                                   IR00028.ISI



Info:
Image Path   E:\IR00028.ISI                                          Data: FOUND HOT SPOT
Image        Wednesday, December 22, 2004 3:06:04 PM                 ON #3 WIRE. MAX TEMP.
Date/Time                                                            47.8C
Report       Wednesday, December 22, 2004 3:24:23 PM                 Comments: NEED TO
Date/Time                                                            SHUT DOWN UNIT
Temp Unit    Celsius                                                 TIGHTEN THE
                                                                     CONNECTIONS AND
User         DPC

Location     CCS
                                                                     RESHOOT.
Target       BREAKER INLET WIRES