Please keep the following cost guidelines in mind when requesting a Wireless Site Survey.

A typical Elementary School will cost between $7,000 and $10,000 to provide wireless coverage for
the entire building. This cost would include 7 to 10 AP’s which includes the access points, power
injectors, wiring, installation, power strips and switch ports. It takes two networking technicians
approximately one full day (16 hours labor) to do an Elementary School survey.

A typical Middle School will cost between $10,000 and $16,000 to provide wireless coverage for the
entire building. This cost would include 10 to 16 AP’s which includes the access points, power
injectors, wiring, installation, power strips and switch ports. It takes two networking technicians
approximately two full days (32 hours labor) to do a Middle School survey.

A typical comprehensive High School will cost between $25,000 and $30,000 to provide wireless
coverage for the entire building. This cost would include 25 to 35 AP’s which includes the access
points, power injectors, wiring, installation, power strips and switch ports. It takes two networking
technicians approximately three full days (48 hours labor) to do a comprehensive High School survey.


1) Call MIS Customer Service as 3-4357 and request a Wireless Site Survey
   a) When calling to request a survey, please have the following information available
       i) Type of coverage (part or the entire school)
       ii) Amount of simultaneous users to support
       iii) Software applications intended to use; Internet, Outlook, etc.

2) MIS Customer Service will create a work order and assign it to Toby Taylor

3) Toby will schedule and complete the survey and review the findings

4) Toby will complete the ‘Wireless Site Survey Approval Form’ with all the necessary information
   and signatures
   a) The Funding Account and principal’s signature must appear on the Approval Form.

5) MIS will coordinate ordering the equipment and scheduling the wiring installation and final AP
   installation with SSC

6) Turn around time from the receipt of the survey request to the completed installation is
   approximately 90 days
Revised: 11/10/04                                                                                 Page 2 of 2




MIS NETWORK SERVICES

                           Wireless Site Survey Approval Form
SCHOOL: ________________________________________

CONTACT NAME:______________________________CONTACT NUMBER__________________


Design requirements

Type of coverage:

Amount of simultaneous users to support:

Applications intended to be used: Internet, Outlook,

Security to be implemented: WPS80211-SSID with 128 bit WEP ( separate Vlan)

Data wiring requirements:

Additional requirements:

Equipment needed:
 - Cisco - AIR-AP1121g-A-K9 Wireless Access Points 802.11G ($380)
 - Cisco - AIR-PWRINJ3 Power Injector ($40)

__________ Access Points @ $380.00              =______________

__________ Power Injectors @ $40.00             =______________

__________ Cabling Runs @ $ 367.75              = ______________

               Total Wireless Project           = ______________


Funding String ____ . ________ . ____ . ___________ . ___


Principals Signature __________________________________ Date _________________

Equipment ordered ____________________ W/O to SSC __________________________

MIS will order the wireless access points and charge them to the funding string that you have provided us. The
same funding string will be charged by SSC for cabling costs.

Approximate turnaround time fro receipt of the hardware is 30-45 days from equipment order date. You will be
contacted if back orders effect shipping dates.