							    CMM 9.99 Map of Old CMM to New CMM

                                                                   Wisconsin Department of Transportation
                Construction and Materials Manual
                  Map of Old CMM to New CMM
           Old                                              New
           Chapter 1 - General
           Construction Notes                               1.10
           Glossary of Terms                                1.15
           Forms/Worksheets                                 1.20
           Chapter 2 - Contract Management
           2-2-5 Contracts and Agreements                   2.10
           2-2-10 Contract Types                            2.10
           2-2-12 Federal Aid Local Road Projects           2.14
           2-2-14 Consultant Contracts for Construction     2.16
                Services
           2-2-20 Contract Supervision and Relations        2.18
           2-2-50 Public Relations                          2.20
           2-2-70 Laws and Standards                        2.28
           2-2-90 Right of Way                              2.30
           2-2-130 Hazardous Materials                      1.30
           2-2-150 Safety                                   1.35
           2-2-155 Construction Site Crashes                1.55
           2-2-160 Contract Claims                          2.54
           2-2-180 Contract Records                         1.65
           2-5-2 Utilities                                  2.56
           2-5-5 Railroad Agreement                         2.58
           2-10-10 Source of Materials                      8.40
           2-10-20 Subcontracting                           2.60
           2-10-40 Progress Schedule                        1.65
           2-10-50 Erosion Control                          6.45
           2-10-70 Labor Compliance                         2.24
           2-10-80 Preconstruction Meeting                  2.26
           2-10-90 Project Diary                            1.60
           2-10-100 Field Facilities and State Owned        1.40
                Equipment
           2-10-110 Traffic Control                         1.45
           2-10-120 Construction Equipment                  1.50
           2-15-10 Notice to Proceed                        2.22
           2-15-20 Start Up Documentation and Records       1.65
           2-20-10 Measurement and Payment                  2.32
           2-20-30 Site Time - Damages and Incentives       2.34
           2-20-60 Intermediate/Tentative/Final Estimates   2.36
           2-20-65 Administrative Items                     2.38
           2-20-90 Prompt Payment                           2.40
           2-20-100 Contract Modifications                  2.42
           2-20-110 Cost Reduction Incentive                2.44
           2-20-120 Force Accounts                          2.46
           2-25-10 Suspension of Work                       2.48
           2-25-30 Project Acceptance                       2.50
           2-25-50 Bonds and Warranties                     2.52
           2-25-60 Contractor Performance Evaluations       1.70
           2-25-70 Consultant Performance Evaluations       1.70
           2-25-80 Performance Measures                     1.70
           2-25-100 As-Built Plans                          1.65


November 2008
CMM 9.99 Map of Old CMM to New CMM



           2-30-10 Final Project Documentation                 1.65
           Chapter 3 - Survey
           3-1-10 General                                      7.10
           3-5-12 Introduction                                 7.15
           3-5-22 Storm Sewer System                           7.20
           3-5-32 Subgrade and Base                            7.25
           3-5-42 Curb, Gutter, Curb and Gutter, and           7.30
                Concrete Barrier
           3-5-52 Pipe Culvert                                 7.35
           3-5-62 Structure Layout                             7.40
           3-5-72 Concrete Pavement                            7.45
           3-5-82 Re-Surfacing Reference                       7.50
           3-5-92 Electrical Installations                     7.55
           3-5-102 Initial Layout                              7.60
           3-5-112 Right of Way                                7.65
           3-5-122 Cross Sections and Digital Terrain Models   7.70
                (DTM)
           3-5-132 Borrow Pits                                 7.75
           3-10-14 Statutory Basis for Construction and        7.80
                Restoration
           3-10-24 Construction Standard for the State Trunk   7.80
                Highway System
           3-10-34 Layout Procedures                           7.80
           3-15-16 U.S. Government Survey Monument             7.85
                Relocation
           3-15-26 Landmark Reference Monuments                7.85
           3-15-36 State of Wisconsin Survey Monument          7.85
                Relocation
           3-15-46 County Survey Monument Relocation           7.85
           3-15-56 Record and Certification of U.S. Public     7.85
                Land Survey Control Station
           Chapter 4 - Materials
           4-5-10 Control of Material                          8.10
           4-5-20 Non-Conforming Materials                     8.10
           4-5-30 Materials Found on the Project               8.10
           4-5-50 Weighed Materials                            8.13
           4-5-90 Density Testing                              8.15
           4-5-100 Archeological and Burial Considerations     1.58
           4-5-110 Post Award Acceptance of Design/Build       5.60
                Retaining Walls
           4-10-10 Materials Independent Assurance             8.20
                Sampling and Testing Program
           4-10-30 Verification And Quality Assurance          8.30
           4-15-12 General                                     8.30
           4-15-22 Subgrade                                    8.32
           4-15-32 Aggregate                                   8.34
           4-15-42 Concrete                                    8.35
           4-15-52 HMA-Hot Mix Asphalt                         8.36
           4-15-62 IRI Ride                                    8.38
           4-20-10 General                                     8.40
           4-20-20 Sampling Responsibility                     8.40
           4-20-30 Selection of Sampling Method                8.40
           4-20-40 Submittal of Samples to Central Materials   8.40
                Laboratory
           4-20-50 Material Specifications Transition Period   8.40

November 2008
CMM 9.99 Map of Old CMM to New CMM



           4-25-10 General Instructions                        8.45
           4-25-20 Minor Quantities and Incidental Work        8.45
           4-25-24 Acceptance Types                            8.45
           4-25-27 Diary Documentation and Visual Inspection   8.45
           4-25-29 Acceptance Procedures, Documentation,       8.45
                and Reporting
           4-25-30 Materials Testing and Acceptance Guide      8.50
           4-25-40 Earthwork                                   8.55
           4-25-50 Aggregates                                  8.60
           4-25-60 Asphalt                                     8.65
           4-25-70 Concrete                                    8.70
           4-25-80 Structures                                  8.75
           4-25-90 Incidentals                                 6.60
           4-30-15 Evaluating Field Test Results               8.45
           4-30-40 Materials Test Record                       8.45
           4-30-45 Materials Certification                     8.45
           Chapter 5 - Inspection
           5-1-10 General                                      1.60
           5-1-20 Item Daily Record                            1.65
           5-20-10 Clearing and Grubbing                       3.10
           5-20-70 Removing Miscellaneous Structures           3.15
           5-20-80 Roadway and Drainage Excavation             3.20
           5-20-90 Structure Excavation                        3.25
           5-20-100 Embankments                                3.30
           5-20-110 Borrow Excavation                          3.35
           5-25-10 Granular Subbase Course                     3.40
           5-25-20 Calcium Chloride                            3.45
           5-25-50 Rubblizing Concrete Pavement                3.50
           5-30-10 Project Administration                      4.50
           5-30-20 Mixing Plants                               4.51
           5-30-40 Salvaged/Reclaimed Asphaltic Pavement       4.50
                Material
           5-30-50 Mix Production                              4.53
           5-30-60 Preparation of Foundation                   4.54
           5-30-70 Pavement Marking, Roads Open to Traffic     4.65
           5-30-80 Hauling Mixture                             4.56
           5-30-90 Asphalt Pavers                              4.57
           5-30-100 Placing Mixtures                           4.58
           5-30-110 Mat Inspection                             4.59
           5-30-120 Checking Yield or Spread                   4.59
           5-30-130 Compaction/Density                         4.61
           5-35-10 Introduction                                4.10
           5-35-30 Preparation of Foundation                   4.11
           5-35-40 Setting String Lines and Forms              4.11
           5-35-50 Paving Operations                           4.10
           5-35-60 Reinforcement                               4.10
           5-35-70 Hauling and Placing Concrete                4.15
           5-35-80 Consolidation                               4.16
           5-35-90 Finishing                                   4.17
           5-35-100 Texturing and Tining                       4.18
           5-35-110 Protecting Freshly Placed Concrete         4.19
           5-35-120 Surface Testing and Correction             4.24
           5-35-130 Pavement Joints                            4.21
           5-35-140 Concrete Pavement Repair                   4.24

November 2008
CMM 9.99 Map of Old CMM to New CMM



           5-35-150 Measurement and Payment                4.24
           5-35-160 Inspection                             4.24
           5-40-10 Concrete Masonry                        5.10
           5-40-20 Concrete Structures                     5.15
           5-40-30 Steel Bridges                           5.20
           5-40-35 Bridge Decks                            5.25
           5-40-40 Paint and Painting                      5.30
           5-40-50 Piling                                  5.40
           5-40-60 Railing                                 5.45
           5-40-70 Pipe Culverts                           5.50
           5-40-80 Shop Fabrication Plans                  5.55
           5-45-10 Concrete Curb and Gutter                6.10
           5-45-20 Storm Sewer                             6.15
           5-45-30 Manholes and Inlets                     6.20
           5-45-40 Marker Posts, Cable Guard Fence, and    6.25
               Steel Plate Beam Guard
           5-45-50 Property Fence and Right of Way Fence   6.30
           5-45-60 Maintenance and Repair of Haul Roads    6.35
           5-45-70 Concrete Deck Overlays and Structure    5.28
               Repairs
           5-45-80 Topsoil                                 6.40
           5-45-90 Fertilizer and Limestone                6.40
           5-45-100 Seeding                                6.40
           5-45-110 Sodding                                6.40
           5-45-120 Mulching                               6.40
           5-45-130 Erosion Control Items                  6.45
           5-45-140 Trees, Shrubs, and Vines               6.40
           5-45-150 Electrical Construction Overview       6.55
           5-45-160 Conduit                                6.55
           5-45-170 Lighting, Traffic Signals, and Loop    6.55
               Detectors
           5-45-180 Pavement Marking                       6.50
           5-45-190 Landmark Reference Monuments           7.85
           5-45-200 Detectable Warning Fields              6.55