Docstoc

Address

Document Sample
Address Powered By Docstoc
					SHOEI FINISHING PVT. LTD.       ENQUIRY FORM

Information Required By
                                    _______________________________________
A)   Name of the Company :          _______________________________________
     Address                :       _______________________________________
                                    _______________________________________
                                    _______________________________________
     Telephone No.          :       _____________ Fax No. ________________
     Contact Person         :       _______________________________________
     Designation            :       _______________________________________

B)   Process Material Information
     1) Material to be process
         a)   Size                _______________________________________
         b)   Composition         _______________________________________
         c)   Analysis            _______________________________________
         d)   Specific Heat       _______________________________________
         e)   Conductivity        _______________________________________
         f)   Component Wt.       _______________________________________
         g)   Bulk Density        _______________________________________
              (Please attach sketch, if possible)

     2)   Process Type      :       Hardening           Tempering
                                    Annealing           Sealed Quench
                                    Sintering           Brazing
                                    Stress Reliving     _____________________
     2A) Process                    Continuous          Batch Type
          Capacity                       Kg/Hr.               Kg/Batch

     3)   Temperature       :   ___________________________________________
          Cycle             :   ___________________________________________
                            :   _________________________________________
                                (Please attach graph if possible)

     4)   Temp. Uniformity :     +100C                + 50C
          Required
     5)   Discharge Temp. :         0C


     6) Atmosphere          :    Yes        No

     7) Surface finish      :    __________________________________________

          desired                __________________________________________
   8)    Case Hardening      :    __________________________________________
                                 (Please specify Carburising/Carbonitriding etc.

   9)    Case dept regd.:    :
   10)   Quenchant           :        Oil         Water       Other
   11)   Cooled By         :          Air       Water
   12)   If any specific   :     __________________________________________
         requirement/rest-       __________________________________________
         riction, Please         __________________________________________
         specify
   13)   Preheat/post       :    __________________________________________
         Heat treat         :    __________________________________________
         Operation, specify :    __________________________________________
   14)   Ref :-part on     :     __________________________________________
         which prod. to be :     __________________________________________
         based, specify.   :     __________________________________________
   15)   Available space     :   Length            Width           Height
         to install the
         eqpt.
   16)   Location of the     :   __________________________________________
         site where eqpt     :   __________________________________________
         to be installed
   17)   type of equipment :     Roller Hearth               Pusher Type
         Preferred               Conveyor Belt               Box       Pit
                                 To be suggested
                                 By manufacture
   18)   Heating Preferred :          Gas          oil                electrical
   19)   Power Available     :        Kw
   20)   Crane for                    Tonne/s
         Erection
   21)   Approx. period      :   __________________________________________
         reqd. to finalize   :   __________________________________________
         the order
   22)   enquiry Stage       :   Primary                 Budgetary information
                                 Immediate
                                 Purchase

NOTE :     Additional information if any, please attach separate sheet.

				
DOCUMENT INFO
Shared By:
Categories:
Stats:
views:18
posted:5/6/2010
language:English
pages:2