					COURSE CODE : C - 457                                                             SURVEYING - II
1.    RATIONALE :
      The elementary knowledge of survey will be dealt with in course C - 456, where as in
this course the knowledge & use of the adv. & precise equip. like Theodolite will be given.
Some very quick precise and appropriate methods for conducting survey in odd terrains (like
uneven, hilly, sloping) for any irrigation project, w.s. proj., road project, housing project;
survey is the first & foremost requirement. Hence, this course is very important for the civil
engg. technicians.
2.    SCHEME OF STUDIES AND EXAMINATIONS : SR. NO. CODE NO COURSE
      L P C EXAM SCHEME
 SR.    CODE       NAME OF           Pre.    L P C                       Exam. Scheme
NO.      NO        COURSE            req.                        Th.      Pr.      T.W. Total
 1.     C–457     Surveying–II                3       4 5        100      25        50   125
3.   SCHEME OF TEACHING :
 Sr.                                                                   No. of Hours
No.      Name of Topic                                      Lect.         Prac.       Total
1.       Theodolite                                         14            26          42
2.       Trigonometrical levelling                           6             8          14
3.       Tacheometric survey                                12            14          26
4.       Settingout curves                                  10             8          16
                                            Total           42            56          98
*      FIELD SURVEY PROJECTS FOR TERM WORK :
       1. Theodolite traverse survey                                                  10 hrs
       2. Tacheometric survey                                                         22 hrs
       3. Setting out curves                                                           8 hrs
                                                                           Total     40 hrs.
4.  TECHNOLOGY RELATED SKILLS (TRS) TO BE DEVELOPED IN THIS COURSE
TRS 1 : Use survey instruments viz. Theodolite, work station, EDM etc. efficiently in
        the given situations.
EOs :
    1.1 Identify the various components of theodolite, workstation, EDM etc.      (Topic 1)
    1.2 Select the appropriate equipment/instrument and suitable method for       (Topic 1)
         carrying out survey in the given situation.
TRS-2    Record the data and compute the results in the standard
         formats correctly.
EOs :
    2.1 Enter the observed readings in the standard formats correctly.         (Topic-1,2,3)
    2.2 Select appropriate method of computing the results.                    (Topic-1,2,3)
                                                  1
COURSE CODE : C - 457                                                          SURVEYING - II
TRS-3     Prepare map for the given area/site using Theodolite by conducting traverse
          survey.
EOs :
    3.1 Use Theodolite to measure/compute length, angle and        (Topic-1,2,3 Project & T.W.)
        elevation correctly.
    3.2 Measure and compute length, angle, bearing, elevation (Topic-1,2,3 Project & T.W.)
        of different points using Theodolite
    3.3 Plote the details on paper using computed results/ data. (Topic-1,2,3 Project & T.W.)
5.  COMMUNICATION SKILLS :
    1. Express ideas effectively in English in oral form
    2. Express views in English in written form effectively
    3. Lead group discussions and meetings independently in English
6.  TOPICS/SUB-TOPICS
1.0 Theodolite (E.D.M. & Work station)                                                   14 hrs.
    1.1 Types of Theodolites including E.D.M. & work station
        1.1.1     Comprehend the advantages
    1.2 Component parts and their functions
    1.3 Procedure to read verniers and micrometers
    1.4 Axis and their relationship
    1.5 Temporary adjustments of Theodolite
        1.5.1     For horizontal and vertical angles
    1.6 Operational aspects
        1.6.1     Procedure for changing face
        1.6.2     Necessity for reading both faces
    1.7 Use of Theodolite in field work for measuring Horizontal angle (both methods) & Vertical
        angle
        * Run a straight line between two points under different conditions
        * Prolonging a straight line
        * Locate point of intersection of two straight lines
    1.8 Theodolite traversing
        1.8.1     Included & deflection angles
        1.8.2     Traverse computations
    1.9 Sources of errors and its rectifications in Theodolite work.
2.0 Trigonometrical levelling                                                             6 hrs.
    2.1 Methods to determine relative altitudes in various cases.
    2.2 Computation of RLs using above methods in various cases
        2.2.1     Procedure to determine difference in elevation for various cases
        2.2.2     Complete the elevation of a point for various cases.

                                              2
COURSE CODE : C - 457                                                           SURVEYING - II
3.0   Tacheometric survey                                                                 12 hrs.
      3.1 Purpose of providing fined & movable stadia hairs
      3.2 Principles of tacheometry
      3.3 Compute constants of given instrument in field
      3.4 Stadia method and fixed hair with staff held vertical
      3.5 Use of tangential method
      3.6 Horizontal distance & RL of staff station for different positions
4.0   Setting out curves                                                                  10 hrs.
      4.1 Use of curves in Civil engg.
      4.2 Types of curves- Horizontal & vertical curves
      4.3 Simple circular curve- its elements
      4.4 Problems on simple curve involving elements
      4.5 Methods of setting out simple curve using chain, tape & Theodolite
             4.5.1   Linear methods
             4.5.2   Angular methods
      4.6 Calculate elements of simple circular curve required to set out
      4.7 Obstacles in setting out curves and procedures to overcome these difficulties
      4.8 Transition curve.
             4.8.1   Definition & concept
             4.8.2   Purpose & conditions to be fulfilled
             4.8.3   Types & their uses.
      4.9 Elements of vertical curve
                                                                               Total      42 hrs.
7.    TERM WORK AND PROJECTS :
      (A) Projects for Term work           (on working Saturdays )
Sheet - I        “Theodolite Traverse Survey “                                            10 hrs.
                 Co-ordinate method and preparing Gale’s Traverse Table (Minimum 5 stations)
Sheet - II       “Tacheometric survey “ (minimum 5 stations)                              22 hrs.
                 Prepare contour map
Sheet - III      “Setting out curves ” (minimum 2 curves)                                  8 hrs.
                 using different methods
                                                                               Total      40 hrs.

                                                 3
COURSE CODE : C - 457                                                 SURVEYING - II
(B) Allocation of time for Field Survey Practice and Exercises :
     1. Component parts, their functions, Temperory adjustments of Theodolite.  4 hrs.
     2. Reading of verniers in Theodolite.                                      4 hrs.
     3. Measure horizontal angle, vertical angle.                               6 hrs.
     4. Measure bearings, angle, prolong the straight line.                     6 hrs.
     5. Check verticality of objects (buildings/towers)                         2 hrs.
     6. Computation of Horizontal distance and R.L. using tacheometry          14 hrs.
        (Atleast 7 problems on field)
     7. Computation of R.L. of an object using trigonometrical levelling        8 hrs.
        (Atleast 3 problems on field)
     8. Problems on Curves (1 problem on each method on field)                  6 hrs.
     9. Permanent adjustments of Theodolite (transit vernier)                   6 hrs.
        & level (Dumpy)
                                                                         Total 56 hrs.
Note :  Compare manual computations of travese survey, tacheometry survey and curve
        survey with computer output.

8.    REFERENCES :
      1. Plane and Geodetic survey (Vol. I)   David Clark
      2. Surveying and levelling (Vol. I)     T.P.Kanetkar & S.V.Kulkarni
      3. Surveying (Vol. I)                   Dr. B.C.Punmia
      4. Surveying and levelling              Hussain & Nagrani
      5. Surveying                            C.L.Kochher
9.    SUGGESTIVE INSTRUCTIONAL STRATEGIES :
   Sr. TRS       EOs        Instructional    Key resources
   No.   No.     No.        Strategy         needed
   1.     1       1.1       Field exercise   Suitable/respective
                            instruments with
                            accessories
   2.     1       1.1       ——do———          ———do———
   3.     2       2.1       ——do———          ———do———
   4.     2       2.2       T.W. Exercise     —
   5.     3       3.1       Field Exercises  Suitable/respective
                                             instruments with
                                             accessories
         6.        3        3.2              T.W. Exercise
   7.     3       3.3       T.W. Exercise    Drawing Board &
                                             accessories
                                             Paper/ sheets


                                         4
COURSE CODE : C - 457                                            SURVEYING - II
10. PERCENTAGE WEIGHTAGES:
      No.           Name of Topic                           % WEIGHTAGES
      1.            Theodolite                                   35
      2.            Trigonometrical levelling                    15
      3.            Tacheometric survey                          30
      4.            Settingout curves                            20
                                                    Total       100


11.    SUPPORT FACULTY :
       POLYTECHNIC FACULTY :
      1.    Prof.     Y.N.Desai
      2.    Prof.     G.D.Doshi
      3.    Prof.     A.U.Barot
      4.    Prof.     V.R.Pandya
      5.    Prof.     V.G.Patel
      6.    Prof.     N.B.Purohit


       C.D.C. FACULTY :
      1.    Prof.     K.L.Rao
      2.    Prof.     R.M.Thakkar


TTTI FACULTY :
      1.    Prof.     V.H.Radhakrishan
      2.    Prof.     J.P. Tegar




                                                5
                                              C – 457


DIPLOMA PROGRAMME IN CIVIL ENGINEERING




               CURRICULUM FOR

             SURVEYING – II




                                      (SEPTEMBER 1999)



     CURRICULUM DEVELOPMENT CENTRE,

(UNDER TECHNICAL EXAMINATIONS BOARD, GUJARAT STATE)

              SOLA, AHMEDABAD.
      CONTENTS :                                        PAGE NO.

1.    RATIONALE                                             1

2.    SCHEME OF STUDIES AND EXAMINATIONS                    1

3.    SCHEME OF TEACHING                                    1

4.    TECHNOLOGY RELATED SKILLS (TRS)
      & ENABLING OBJECTIVES (EOs)                           1

5.    COMMUNICATION SKILLS                                  2

6.    TOPICS / SUB-TOPICS                                   2

7.    LABORATORY EXPERIENCES/ TERM WORK/ PROJECT-WORK       3

8.    REFERENCES                                            4

9.    SUGGESTIVE INSTRUCTIONAL STRATEGIES                   4

10.   PERCENTAGE WEIGHTAGES                                 5

11.   SUPPORT FACULTY.                                      6

				
DOCUMENT INFO
Shared By:
Categories:
Stats:
views:44
posted:5/5/2010
language:English
pages:7