Elimination of the bottleneck of the north- south

Document Sample
Elimination of the bottleneck of the north- south Powered By Docstoc
					                                             Elimination of the bottleneck of the north-
                                             south artery A2 (E25): building the urban
                                                   highway tunnel in Maastricht
                                                                   2009-NL-00010-E
European Economic Recovery Plan

Member States involved:
The Netherlands

Implementation schedule
Start date: July 2009
End date: June 2012

Implementing body:
City of Maastricht

Budget:
National budget: €119,505,000
Regional budget: €15,495,000

Total project cost covered
by this Decision: €150,000,000

EU contribution: €15,000,000

Percentage of EU support:
Works: 10%                           This project launches the construction of a tunnel for the A2/E25 highway which
                                     runs through the centre of Maastricht. A 400 m section the overall tunnel will be
Additional information:              realised within this action after the preparatory works are completed. These
                                     include the setting up the building site, deviation of the technical infrastructure,
European Commission, DG MOVE         demolishment of parts of housing estates and construction of a temporary road
http://ec.europa.eu/dgs/transport/   for the A2. It builds on a predecessor project funded by the TEN-T programme
index_en.htm                         which studied the feasibility and planning of this project.

Trans-European Transport Network     The construction of the city tunnel includes several objectives:
Executive Agency (TEN-T EA)
http://ec.europa.eu/tentea                   New economic and social developments by resolving an important
                                              bottleneck and reducing travel time
Beneficiary & Implementing                   Improvement to the quality of life in the city by reducing both air and
body:                                         noise pollution and increased traffic safety at the same time
City of Maastricht                           Improvement of the multimodal connections in the region, including the
www.maastricht.nl                             ports and the airports of Maastricht and Liege.

                                     The action is part of a global project with investments of up to €1 billion, including
                                     a €690 million forecasted share from the Dutch government. The remaining share
                                     is planned to be mostly covered from private sources. The global project entails
                                     the construction of the entire tunnel, its connection to other highways and the
                                     urban re-development of the space gained from putting the highway underground.