The municipal buildings of Cottage Grove are relatively young and well maintained. A few of the departments have
a shortage of space, improperly configured space, or a combination of the two. Growth of the community, with a
corresponding increase in staff and equipment, will exacerbate the problem.

The Department of Public Works has the greatest need for additional space. The department lacks centralized
garage, storage, and yard space forcing the department to inefficiently use a variety of buildings spread throughout
the Village. The main building at 225 Bonnie Road is well maintained but lacks specific facilities needed to ensure
efficient operation. Further, the DPW building on south Main Street is going to be removed from service, forcing
loss of storage space and the water meter test and repair operation.

The Recreation Department is expanding as the community grows and programs are developed. Developing a space
needs program for the Aquatics Center was not a part of this study, but consideration should be given to providing
Recreation Department office, program, and storage space in that facility if the project proceeds.

There are a number of ways to resolve these space issues by mixing the following strategies to best affect:
    • Expand village hall
    • Expand fire / ems
    • Build new north side fire station
    • Expand DPW
    • Build new DPW
    • Expand police
    • Build new police


Methodology
This study was conducted over the summer of 2006. The bulk of the work consisted of three major tasks:
    • Evaluating the condition of existing buildings:
             o Village Hall at 221 E. Cottage Grove Rd
             o Department of Public Works at 225 Bonnie Road
             o Fire / EMS station 4030 S Main Street
             o The Police Station at 2560 Nora Rd and several remote Public Works facilities were toured.
                 Their physical condition was not evaluated because of their size or ownership.
    • Determining the future needs of each department and provide individual space needs program for each
         department. (See attached spreadsheets).
    • Identifying alternate ways to provide for the needs of each department
Cottage Grove Municipal Facilities Masterplan
PRA Project No. 06049
4 December 2006
Page 2




Facilities Conditions
All of the facilities are of recent vintage and well maintained. Minor problems were discovered at each facility, but
are consistent with the age of the facility and era in which it was designed. Strictly speaking, the physical condition
of each building is such that it can remain in service for years to come with appropriate maintenance. However,
some of the buildings require changes to enable them to efficiently support operations.

Village Hall
The Village Hall was constructed in 1993 and is located at 221 E. Cottage Grove Rd. The building is a one story
structure of 5,460 square feet and constructed per the requirements of “Type 8 Wood Frame Unprotected” under the
building code in effect at the time of construction. The building uses modest materials and straight forward
detailing to project an image of careful and restrained use of tax payers’ resources.

A visual assessment of the building identified few maintenance or code issues: There is some minor rusting of
exterior hollow metal doors, and minor staining of the exterior insulation system (Stucco). The Americans with
Disabilities Act has matured since the building was built and restroom push/pull clearances, floor space, and knee
protection and thresholds at exterior doors are not consistent with the latest proposed bill and so should be addressed
as part of any major renovation / addition. The batteries in the emergency lighting have failed and should be
serviced or replaced. Several plumbing issues were discovered, including poorly applied pipe insulation and water
heater with a failed thermostat, and several suggestions for increasing the quality of service and minimize backflow.
The most important HVAC issue is the inability to properly set temperature for various spaces within the building or
augment exterior skin losses with perimeter heat. These are primarily user comfort issues and are the result of
balancing construction cost with control of the system. If the ability to control the system is sufficient to please staff
and patrons there is little incentive to alter this system now. See attached reports for further information.

The open office is very organized and has a good relationship to the front counter and front door. This area is
packed full of people and files, creating tight spaces and difficulty in providing for staff growth. Fire proof records
storage is overfull with some records having overflowed into the fireproof storage at the Department of Public
Works. The expanding Recreation Department has limited equipment storage and must use various locations around
the Village shared with the Department of Public Works and transports materials from place to place as needed.
Also, the recreation department has limited choices for low-impact indoor programming.

The meeting room is divisible and also used for municipal court. Storage is limited as the original chair / table
storage room has been converted turned into a technology room to support televising public meetings. There is also
a separate conference room, but its use allows general public to bypass the security to the back office. This
community makes heavy use of the meeting facilities and there are often three meetings occurring simultaneously.

The span of the roof trusses are arranged to ease expansion to the east or west. With the addition of more space the
building is well suited for continued use as a Village Hall. Any renovation and expansion should address the
following issues:
             • Correction of maintenance or code issues
             • Increase fire proof records storage
             • Increase general storage in support of the multipurpose room
             • Increase Recreation Department storage (unless this department is relocated)
             • Increase office / work space
             • Relocate the Municipal Court Clerk to more easily operate a service window independently of the
                   front office transaction counter
             • Provide a useable staff break area

The obvious location for a building expansion is shown on the illustration titled “Village Hall, Possible Expansion”.
Cottage Grove Municipal Facilities Masterplan
PRA Project No. 06049
4 December 2006
Page 3


The following table summarizes typical useful life of well maintained building components, and provides a
projection of when each of the systems may require additional work beyond typical maintenance.

                                         Village Hall – Lifecycle Comparison
                                                                      Typical        Projected
          Component                          Description                Life        Replacement             Remark
 Site
         Paved approaches        Asphalt (2” on 8” base)                10          2005 – 2010     Regrind
         Parking area            Asphalt (2” on 8” base)                10          2005 – 2010     Regrind
         Walks                   Decorative concrete                    20          2015 – 2020     Replace
 Building Envelope
         Roof                    Asphalt shingle on pitched wood
                                 trusses, alum. Gutters
           Asphalt shingle                                              20          2010 – 2015     Replace
           Gutters &                                                    25          2015 – 2020     Patch and replace
           downspouts
          Walls                  Masonry cavity wall w/ wood stud
                                 backup and EIFS on wood stud
           Masonry                                                      50          2040 – 2050     Repoint
           EIFS                                                         20          2010 – 2015     Clean & repair
          Doors / Windows
           Windows               Alum. clad wood windows                25          2015 – 2020
           Entrance              Aluminum storefront system             30          2020 – 2025     Reseal glass,
                                                                                                    refinish exterior
            HM Doors             Hollow metal frames and doors          25          2015 – 2020
 Building Interior
         Ceiling finishes        Drywall, acoustical ceiling tile       20          2010 – 2015     Replace as needed
         Wall finishes           Drywall, ceramic tile                  40          2030 – 2040     Replace as needed
         Floor finishes          Carpet, ceramic tile, vinyl            20          2010 – 2015     Replace as needed
                                 composition tile
 Building Systems
      HVAC
          Furnace                See attached report                    18          2010 – 2015
          Condensing unit        See attached report                    15          2008 – 2010
          Thermostats            See attached report                    16          2010 – 2015
          Electric heaters       See attached report                    13          2008 – 2010
      Plumbing
         Sanitary drainage       See attached report                    50          2040 – 2050
         Domestic water          See attached report                    50          2040 – 2050
            Water heater         See attached report                    15          2007 – 2010
         Fixtures                See attached report                    50          2040 – 2050
            Drinking fountain    See attached report                    20          2010 – 2015
      Electrical
            Service &            See attached report                    30          2020 - 2025
            Distribution
            Lighting             See attached report                    25          2015 - 2020
            Phone system         See attached report                    25          2015 - 2020
            Structured cabling   See attached report                                2015 - 2020     Update as needed
            Audio / Video        See attached report                    N/A         N/A             Update as needed
Cottage Grove Municipal Facilities Masterplan
PRA Project No. 06049
4 December 2006
Page 4


Department of Public Works
The Department of Public Works is located at 225 Bonnie Road in a 9,665 square foot single story building. The
building was constructed in 1996 for a private company. The Village has not performed any major work on the
building since acquiring it. The department also utilizes other buildings throughout it’s service area. One of these, a
decrepit garage located on south Main Street, is currently used as a meter shop and is likely to be taken out of use to
make use for new development. The equipment shed adjacent to the Police Department is used to house some new
equipment but it is a remote facility, not heated, and the property is rented by the Village. The rest of the consist of
park storage buildings scattered throughout the community, and which are shared with the Recreation Department.

A visual assessment of the building at 225 Bonnie Road identified several maintenance or code issues. The garage
area lacks the required emergency egress lighting and vehicle exhaust capture system, the HVAC system for the
front office lacks the required amount of outdoor air, and does not have the required access to the HVAC equipment,
and the plumbing fixtures are in violation of current code. There are a few locations where the exterior metal panel
fasteners have become lose. There is evidence of past roof leaks over the office area but discussion did not uncover
any recent problem.

The main garage is undersized, lacks integral floor drainage system, and is not suited to storage of the current
equipment. The staff makes the best of the situation but spends a great deal of time squeezing trucks and equipment
in and out of the garage everyday and exert a lot of effort moving materials between the various storage locations as
use dictates or as the needs of the Recreation Department require. The building lacks useful space for records
storage or plan review, space for maintenance or washing of the equipment, appropriate space for receiving the
public, space for group meetings, or space for locker and shower facilities.

The site shares a paved easement area with a neighbor to the south which limits access to the garage and ability to
restripe the area for better vehicle control. The front lot is small, so even parking is at a premium. On a plus, the
site abuts park area to the west which is otherwise very difficult to access.

This building is difficult to expand because of the tight site. The continued use of this building as a DPW
headquarters is not advisable. The most promising future use of this facility is to return it to the private sector.
However, such decisions must also consider the unique access to the adjacent public park area.
Cottage Grove Municipal Facilities Masterplan
PRA Project No. 06049
4 December 2006
Page 5


The following table summarizes typical useful life of well maintained building components, and provides a
projection of when each of the systems may require additional work beyond typical maintenance.


                                 Department of Public Works – Lifecycle Comparison
                                                                     Typical    Projected
          Component                        Description                 Life    Replacement                  Remark
 Site
         Paved approaches        Asphalt (3” on 8” base)                10          2005 – 2010     Regrind
         Parking area            Asphalt (3” on 8” base)                10          2005 – 2010     Regrind
         Walks                   Concrete                               20          2015 – 2020     Replace
 Building Envelope
         Roof                    Metal roof panels on pitched frames    25          2020 – 2025
           Gutters &             Metal gutters & downspouts             25          2020 – 2025
           downspouts
         Walls                   Masonry cavity wall w/ steel stud      25          2020 – 2025
                                 backup, or Metal panel on stud /
                                 steel girts
         Doors / Windows
            Windows              Aluminum                               30          2025 – 2030
            Entrance             Aluminum storefront system             30          2025 – 2030
 Building Interior
         Ceiling finishes        Acoustical ceiling tile                20          2015 – 2020
         Wall finishes           Drywall                                40          2035 – 2040
         Floor finishes          Carpet, vinyl composition tile         20          2015 – 2020
 Building Systems
      HVAC
           Furnace               See attached report                    18          2015 – 2020
           Condensing unit       See attached report                    15          2010 – 2015
           Thermostats           See attached report                    16          2010 – 2015
           Rooftop unit          See attached report                    15          2010 – 2015
      Plumbing
         Sanitary drainage       See attached report                    50          2045 – 2055
         Domestic water          See attached report                    50          2045 – 2055
            Water Heater         See attached report                    15          2010 – 2015
         Compressed air          See attached report                    50          2045 – 2055
         Fixtures                See attached report                    50          2045 – 2055
            Drinking Fountain    See attached report                    20          2015 – 2020
      Electrical
            Service &            See attached report                    30          2025 – 2030
            Distribution
            Lighting             See attached report                    25          2020 – 2025
            Phone system         See attached report                    20          2015 – 2020
            Structured cabling   See attached report                    20          2015 – 2020     Update as
                                                                                                    technology and
                                                                                                    needs change
Cottage Grove Municipal Facilities Masterplan
PRA Project No. 06049
4 December 2006
Page 6


Emergency Services Building
The Emergency Services Building was constructed in 1998 and is located at 4030 S Main Street. The building is a
two story structure with a partially exposed basement of 23,420 square feet and constructed as a “Type No. 6 –
Metal Frame Unprotected” per the requirements of under the building code in effect at the time of construction. The
building is very handsome and projects an image of strength and professionalism.

A visual assessment of the building identified few maintenance or code issues: Metal flashing above windows and
doors are rusting and should be cleaned and repainted or replaced within five years, efflorescence has developed on
the northern exterior wall, and there are various locations of missing caulk around the building exterior and loose
door weather stripping. Additionally, the second floor area is directly open to the apparatus bay, and while not
strictly code required (assuming that the HVAC system is operating correctly) this architect recommends providing
a glazed wall at the second floor balcony to ensure that vehicle exhaust does not work into occupied portions of the
second floor, and to ease the heating and cooling load on the second floor.

The first floor supports the majority of activity. It includes offices for the Fire and EMS chiefs, billing offices, space
for inspection, training, and investigation, sleeping facilities for EMS “Interns”, meeting areas, kitchen, showers, the
main apparatus bay, and other support spaces. The second floor houses a large exercise area, storage, and has a
modest locked area set aside for use by the Fire Department. The basement includes an Emergency Operations
Center, and various office, garage, and storage spaces previously used by the Police Department. The Fire and EMS
departments have slowly been adapting the basement space for their use since the Police Department vacated the
building.

The existing plan configuration has several problems including lack of an appropriate reception area, lack of
sufficient work areas for specific tasks, under sized kitchen, and lack of enough suitable sleeping facilities. Many of
the existing spaces are severely under utilized and the building has a great potential for supporting increased
operations with only modest changes.

The apparatus bay is configured to ease expansion to the north. The site includes a large amount of hillside and
large storm detention area, suggesting the best location for other expansion is to build out the basement towards the
south. Renovation or expansion of the building should address the following issues:
             • Correction of maintenance or code issues
             • Vacate the basement for use by other municipal departments
             • Combine ‘dispatch’ and the adjacent conference room and use as a combined conference / work
                  area and new Emergency Operations Center (vacating the basement EOC)
             • Combine FD and EMS dayrooms, game, and study areas into one location
             • Reconfigure the second floor to provide room for current basement storage and new dayroom,
                  offices, sleeping and/or study rooms.
             • Provide additional sleeping space for volunteers and “externs” by reconfiguring the EMS
                  operations office on the first floor, or reconfiguring the FD space on the second floor
             • Provide enlarged kitchen
             • Provide a workable vehicle exhaust extraction system

The obvious location for a building expansion is shown on the illustration titled “Fire / Ems Station 1, Possible
Expansion”.
Cottage Grove Municipal Facilities Masterplan
PRA Project No. 06049
4 December 2006
Page 7


Community growth drives the size of emergency service
departments. The location of the growth, in relation to
the station location(s) is also important. The location of
the current station limits the response area to locations
mostly south of Highway BB. The adjacent map
illustrates the addresses that can be arrived at within 4
minutes of leaving the station. Growth of the
community is occurring further north, and consideration
must be given to a new north-side Fire / EMS station
located between Interstate 94 and Highway BB to reduce
response times
Cottage Grove Municipal Facilities Masterplan
PRA Project No. 06049
4 December 2006
Page 8


The following table summarizes typical useful life of well maintained building components, and provides a
projection of when each of the systems may require additional work beyond typical maintenance.

                                      Emergency Service - Lifecycle Comparison
                                                                      Typical  Remaining
           Component                        Description                Life    Useful Life                  Remark
 Site
      Paved approaches            Asphalt, normal and heavy duty        10           2010 – 2015    3” / 6” and 4” / 9”
      Parking area                Asphalt, normal and heavy duty        10           2010 – 2015    3” / 6” and 4” / 9”
      Walks                       Concrete                              20           2020 – 2025
 Building Envelope
      Roof                        Ballasted single ply membrane,
                                  tapered insulation, metal deck, and
                                  steel beams or joists
          Membrane                                                      20           2020 – 2025
        Walls                     Masonry cavity wall over masonry
                                  backup, metal stud over masonry
                                  backup, or EIFS and metal panel
                                  over metal stud backup
          Masonry                                                       50           2030 – 2035
          Eifs                                                          20           2020 – 2025
        Doors / Windows           Aluminum storefront and entrance
                                  system, and sectional metal
                                  overhead doors
         Windows                                                        30           2025 – 2030
         Entrance                                                       30           2025 – 2030
         OH Door                                                        15           2010 – 2015
 Building Interior
      Ceiling finishes            Drywall, acoustical ceiling tile      20           2020 – 2025
      Wall finishes               Drywall, concrete masonry unit,       40           2040 – 2045
                                  brick
        Floor finishes            Carpet, vinyl composition tile,       20           2020 – 2025
                                  exposed concrete
 Building Systems
      HVAC
         Furnaces                 See attached report                   18           2015 – 2020
         Condensing units         See attached report                   15           2015 – 2020
         Unit heaters             See attached report                   13           2010 – 2015
         Rooftop unit             See attached report                   15           2015 – 2020
         Air handler              See attached report                   18           2015 – 2020
         Makeup unit              See attached report                   15           2015 – 2020
         Elec. Baseboard          See attached report                   10           2010 – 2015
      Plumbing
         Sanitary drainage        See attached report                   50           2045 – 2055
         Storm drainage           See attached report                   50           2045 – 2055
         Domestic water           See attached report                   50           2045 – 2055
           Water heater           See attached report                   15           2010 – 1015
           Water softener         See attached report                   20           2025 – 2030
         Compressed air           See attached report                   50           2045 – 2055
         Fixtures                 See attached report                   50           2045 – 2055
           Drinking fountain      See attached report
Cottage Grove Municipal Facilities Masterplan
PRA Project No. 06049
4 December 2006
Page 9


                                       Emergency Service - Lifecycle Comparison
                                                                       Typical  Remaining
         Component                           Description                Life    Useful Life                  Remark
      Electrical
         Service &                 See attached report                     30          2030 – 2035
         Distribution
         Generator & Transfer      See attached report                     30          2030 – 2035
         Switch
         Lighting                  See attached report                     25          2025 – 2030
         Fire Alarm                See attached report                     20          2015 – 2020
         Intercom & Clock          See attached report                     20          2015 – 2020
         Phone system              See attached report                     25          2025 – 2030
         Structured cabling        See attached report                     N/A         N/A             Update as
                                                                                                       technology and
                                                                                                       needs changes




Police Station
The Police Department, located at 2560 Nora Rd, is housed in a rented single story 6,500 square foot building. The
building owner converted the building from its prior use for use by the Police Department. The rental also includes
a modest equipment shed which is used to house patrol vehicles and is shared with the Department of Public Works.

This facility is an improvement over the space previously occupied by the Police Department but is not ideal for this
use. There is a shortage of space for group meetings, records / evidence / patrol / general office storage, lockers,
officer work areas, public visitor facilities, and training areas. The configuration of rooms is not efficient and
creates situations where it is can be difficult to control privacy issues.

Many of the space issues may be solved by a facility that modestly larger, but with a better configuration. Staff
growth will drive the need for a larger building, however. Any future planning should include consideration for
clear separation of public, administrative, and patrol functions and include properly sized evidence storage and
processing facilities and attached garage for patrol vehicles.

Unique Opportunities
The current condition and location of buildings, proposed future development, and relationship between the Village
and Town provide several opportunities unique to Cottage Grove:
    • Placing a new municipal building, perhaps the Village Hall, in a newly constructed downtown district
        offers enormous potential to help establish the downtown district and provide a municipal ‘face’ in an
        active urban area.
    • The Emergency Services building has a surplus of space.
    • Land for a new DPW or PD facility may be available from local developers or from the Town of Cottage
        Grove.
    • The Village Hall is relatively new and in good shape.
    • The Fire station is relatively new and in good shape, and is well located within it’s service area.
    • The Police station is well located within its service area
    • The School system is interested in providing covered parking for the school bus fleet. They may be
        interested in cost sharing land acquisition or construction costs to gain such a facility.
Cottage Grove Municipal Facilities Masterplan
PRA Project No. 06049
4 December 2006
Page 10


Resolving the Space Problem
The following five schemes represent various approaches to meeting the 2030 space needs of Cottage Grove. The
options cover a range of options and range in complexity and cost. The “final” option is probably not represented
here… these schemes are meant to create discussion in an attempt to find the “right” solution. The variation in
estimated construction cost, from low to high, is less than 20%. Please see the report section titled “Construction
Cost Estimates” for outline of the costs, in 2007 dollars.

A number of decisions should be made as part of the discussion about developing the “right” solution. Please see
the report section titled “Next Steps”.

Scheme 1
This scheme relocates the recreation department into the lower level of the Emergency Services building to reduce
the size of the Village Hall expansion. This is one of the lowest cost schemes available, but might also be seen as a
“stop-gap” approach which buys time until a larger recreation and aquatics facility can be built in Fireman’s Park.
A simplified space needs program for a Recreation Department located outside of Village Hall is as follows:
          Reception                  115sf
          Park / Recreation Director 120sf
          Recreation Assistant(s)    180sf
          Workroom                   100sf
          Program / Conf             500sf
          Storage                    750sf
          Bathroom(s)                200sf
                   Sub               1965sf
          Net to gross @ 1.2x        393sf
                   Total             2358sf

Scheme 1 Highlights:
    • Relocate Recreation into the lower level of the Emergency Services building
    • Reallocates space in the Emergency Services building for better efficiency
    • Build new north side Fire / EMS Station on new land (one to two acres)
    • Build new Public Works facility on new land (five to six acres)
    • Expand Village Hall (minor expansion)
    • Purchase and expand the current Police Station


Scheme 1 Pros / Cons:
       Recreation:
                 Pro:      Utilizes empty space in the FD
                 Pro       Provides ample space for seasonal storage
                 Pro:      Provide space for a program room
                 Pro:      Provides individual ‘face’ for an expanding recreation department
                 Con:      FD may feel they are losing space
                 Con:      May need to provide a receptionist / assistant for recreation
                 Con:      Splits fee collection between Village Hall and Recreation Department
       Public Works:
                 Pro:      Consolidates department
                 Pro:      Provides appropriate storage and maintenance facilities
                 Pro:      Sale of existing building provides portion of funding
                 Pro:      Existing building put back onto tax rolls.
                 Con:      Requires site acquisition
                 Con:      New Construction requires funding
Cottage Grove Municipal Facilities Masterplan
PRA Project No. 06049
4 December 2006
Page 11


                 Con:    Availability of suitable sites may be limited
                 Con:    Requires funding for major project
        Village Hall:
                 Pro:    Provides additional space for storage and offices
                 Pro:    Maintains Village Hall in current location
                 Con:    Requires modest funding
        Police:
                 Pro:    Maintains Police Department in current location (well suited for patrol area)
                 Pro:    Expands existing equipment shed for use as garage.
                 Con:    Requires purchase of building
                 Con:    Requires funding for expansion
                 Con:    Difficult expansion / renovation while occupied by the department
        Fire / EMS:
                 Pro:    Relocates space for EOC, Dispatch, Conference, Dayroom, Accounts Manager, Extern
                         Sleeping, and other spaces
                 Pro:    Makes good use of existing space
                 Pro:    Provides new Fire / EMS station on the north side of the service area
                 Con:    FD may feel they are losing space.
                 Con:    Requires funding for major project
Cottage Grove Municipal Facilities Masterplan
PRA Project No. 06049
4 December 2006
Page 12



Scheme 2
This scheme groups emergency services and public works functions into a centrally located campus on land adjacent
to the existing Emergency Services building and assumes that land can be made available. This scheme reduces
overall construction cost by combining Public Works and Police into a single new building and avoids doing any
remedial work for the Emergency Services building.

Scheme 2 highlights:
    • Build joint Public Works and Police Department adjacent to the existing FD (six to eight acres)
    • Build new north side Fire / EMS Station (one to two acres)
    • Expand Village Hall (modest expansion)

Scheme 2 Pros / Cons
       Public Works:
                 Pro:     Consolidates department
                 Pro:     Provides appropriate storage and maintenance facilities
                 Pro:     Sale of existing building provides portion of funding
                 Pro:     Returns building to tax rolls.
                 Pro:     Relative savings by sharing portion of garage with PD
                 Con:     Availability of suitable sites may be limited
                 Con:     Requires funding for major project
       Police:
                 Pro:     Allows optimal design of department
                 Pro:     Shared building services with DPW reduces overall size by 5%
                 Con:     Availability of suitable sites may be limited
                 Con:     Requires funding for major project
       Village Hall:
                 Pro:     Provides additional storage space
                 Pro:     Provides additional office space
                 Pro:     Provides additional meeting space
                 Pro:     Maintains Village Hall and Recreation department in current location
                 Pro:     Potentially reduces future staffing needs of the Recreation department.
                 Con:     Requires modest funding
       Fire / EMS:
                 Pro:     Leaves FD alone, allowing space for dormitories if FD converts to full time Fire Staff.
                 Pro:     Provides new Fire / EMS station on the north side of the service area.
                 Con:     Requires funding for major project
Cottage Grove Municipal Facilities Masterplan
PRA Project No. 06049
4 December 2006
Page 13



Scheme 3
This scheme provides a new municipal building as a center point to the future new downtown. This scheme also
leaves the existing Emergency Services building untouched.

Scheme 3 highlights:
    • Build new Village Hall in new downtown district
    • Build new north side Fire / EMS Station (one to two acres)
    • Purchase and expand PD
    • Build new Public Works facility on new land (five to six acres)

Scheme 3 Pros / Cons
       Village Hall
                 Pro:  Provides optimal design for Village Hall
                 Pro:  Places Village Hall in a vibrant urban core
                 Pro:  Provides opportunity for shared parking and other amenities
                 Pro:  Return Village Hall to tax rolls.
                 Con:  Use of existing Village Hall building unsure (sell to whom?)
                 Con:  Requires funding for major project
       Public Works:
                 Pro:  Consolidates department
                 Pro:  Provides appropriate storage and maintenance facilities
                 Pro:  Sale of existing building provides portion of funding
                 Pro:  Returns building to tax rolls.
                 Pro:  Relative savings by sharing portion of garage with PD
                 Con:  Availability of suitable sites may be limited
                 Con:  Requires funding for major project
       Police Department:
                 Pro:  Maintains Police Department in current location (well suited for patrol area)
                 Pro:  Expands existing equipment shed for use as garage.
                 Con:  Requires purchase of building
                 Con:  Requires funding for expansion
                 Con:  Difficult expansion / renovation while occupied by the department
       Fire / EMS:
                 Pro:  Leaves FD alone, allowing space for dormitories if FD converts to full time Fire Staff.
                 Pro:  Provides new Fire / EMS station on the north side of the service area.
                 Con:  Requires funding for major project
Cottage Grove Municipal Facilities Masterplan
PRA Project No. 06049
4 December 2006
Page 14



Scheme 4
This scheme relocates the Recreation Department into the current Public Works building with only minor interior
renovations. This provides ample room for Recreation. Similar to Scheme 1, this decreases the space crunch at
Village Hall but may also increase Recreation Department staffing due to the requirement for a receptionist. This
scheme also develops a new campus on the north side of the community to house Public Works and a shared Fire /
EMS / PD facility. This new north side campus would be well suited for a school bus fleet garage.

Scheme 4 highlights:
    • Relocate Recreation into current Public Works building.
    • Build new joint north side Public Works / Fire / EMS / PD on new land (ten to twelve acres)
    • School system fleet garage may be co-located on the north side site.
    • Expand Village Hall (minor expansion)

Scheme 4 Pros / Cons:
       Public Works:
                 Pro:     Consolidates department
                 Pro:     Provides appropriate storage and maintenance facilities
                 Pro:     Past investment in purchase of Public Works building is maintained.
                 Pro:     Relative savings by sharing portion of garage with PD
                 Con:     Locates Recreation Department into unattractive industrial area.
                 Con:     Availability of suitable sites may be limited
                 Con:     Requires funding for major project
       Village Hall
                 Pro:     Provides additional storage space
                 Pro:     Provides additional office space
                 Pro:     Provides additional meeting space
                 Pro:     Maintains Village Hall in current location
                 Pro:     Provides ample space for Recreation to expand into.
                 Pro:     Maintains access to park land adjacent to Bonnie Road.
                 Con:     Potentially increases staffing needs of the Recreation department.
       Police:
                 Pro:     Allows optimal design of department
                 Pro:     Shared building services with Fire / EMS reduces overall size by 5%
                 Pro:     Co-locating the departments benefits inter-departmental coordination.
                 Con:     Availability of suitable sizes may be limited.
                 Con:     Requires funding for major project.
       Fire / EMS:
                 Pro:     Leaves FD alone, allowing space for dormitories if FD converts to full time Fire Staff.
                 Pro:     Provides new Fire / EMS station on the north side of the service area.
                 Pro:     Shared building services with PD reduces overall size by 5%
                 Pro:     Co-locating the departments benefits inter-departmental coordination.
                 Con:     Requires funding for major project
Cottage Grove Municipal Facilities Masterplan
PRA Project No. 06049
4 December 2006
Page 15



Scheme 5
This scheme consolidates the command structure of the Emergency Service Departments into one building, by
expanding the existing Emergency Services building with a large Police Department addition.

Scheme 5 highlights:
    • Build new Public Works facility on new land (six to eight acres)
    • Build north side Fire / EMS Station on new land (one to two acres)
    • Reallocates space in the Emergency Services building for better efficiency
    • Expand Village Hall (modest expansion)
    • Expand existing Fire / EMS to include PD

Scheme 5 Pros / Cons:
       Public Works:
                 Pro:    Consolidates department
                 Pro:    Provides appropriate storage and maintenance facilities
                 Pro:    Sale of existing building provides portion of funding
                 Pro:    Existing building put back onto tax rolls.
                 Con:    Requires site acquisition
                 Con:    New Construction requires funding
                 Con:    Availability of suitable sites may be limited
                 Con:    Requires funding for major project
       Fire / EMS:
                 Pro:    Relocates space for EOC, Dispatch, Conference, Dayroom, Accounts Manager, Extern
                         Sleeping, and other spaces
                 Pro:    Makes good use of existing space
                 Pro:    Provides new Fire / EMS station on the north side of the service area
                 Con:    FD may feel they are losing space
                 Con:    Removes easy ability to accommodate future change to full time FD.
        Village Hall:
                 Pro:    Provides additional storage space
                 Pro:    Provides additional office space
                 Pro:    Provides additional meeting space
                 Pro:    Maintains Village Hall and Recreation department in current location
                 Pro:    Potentially reduces future staffing needs of the Recreation department.
                 Con:    Requires modest funding
        Police:
                 Pro:    Maintains Police Department near current location (well suited for patrol area)
                 Pro:    Consolidates all Emergency Service Department management into one location
                 Pro:    Allows near-optimal design of department
                 Con:    Requires funding for major project
Cottage Grove Municipal Facilities Masterplan
PRA Project No. 06049
4 December 2006
Page 16




Next steps:
Cottage Grove must develop a plan for resolving the building / space issues outlined in this report. A reasonable
step by step approach may be:
         Identify:        Highest priority items.
         Decide:          Keep Recreation Department at Village Hall?
         Decide:          Keep ownership of the Public Works building on Bonnie Road?
         Decide:          Move new functions into existing Emergency Services building?
         Decide:          Purchase existing Police Station?
         Decide:          Plan for north side Fire / EMS station?
         Decide:          Combine new construction into one location (DPW / Fire / EMS / PD)?
         Decide:          Combine PD into existing Emergency Services building?
         Decide:          Number of PD squads requiring covered parking?
         Plan:            Develop single implementation plan, with updated space needs program and milestones
                          for construction and costs.
         Identify:        Sources for funding projects.
         Update:          Plan based on available funding.
         Implement:       Design and construct as schedule requires.
         .
Cottage Grove Municipal Facilities Masterplan
PRA Project No. 06049
4 December 2006
Page 17



                                                -Appendix-

                                          •     Village Hall, Illustration of Possible Expansion

                                          •     Fire / EMS Station 1, Illustration of Possible Expansion

                                          •     Cost Estimates

                                          •     Departmental Space Needs

                                          •     Structural Engineering Review

                                          •     Mechanical Engineering Review

                                          •     Electrical Engineering Review
                                                                                                                                                                                         11000 West Park Place
                                                                                                                                                                                           Milwaukee, WI 53224
                                                                                                                                                                                               Tel 414 359-3060
                                                                                                                                                                                              Fax 414 359-3070
                                                                                                                                                                                                www.prarch.com



Project: Cottage Grove Municipal Facilities, 2030 Space Needs                                                                                                             Construction Cost Estimate
Project #: 06049                                                                                                                                                                         10/31/2006


                                                                                            Scheme 1                             Scheme 2                            Scheme 3
         Village Hall
                  Renovation                                                                               600sf                                600sf                                   0sf
                                                                                  $40/sf          $      24,000        $40/sf          $     24,000        $40/sf         $         -
                  New Construction                                                                        2160sf                              3680sf                             9140sf
                                                                                  $160/sf         $     345,600        $160/sf         $    588,800        $160/sf        $ 1,462,400
                                                                                             Sub $      369,600                   Sub $     612,800                   Sub $ 1,462,400
                  Temporary Conditions (Phasing / Difficutly)                     0.03x           $      11,088        0.03x           $     18,384        0.00x          $         -
                                                                                             Sub $      380,688                   Sub $     631,184                   Sub $ 1,462,400
                  Construction Contingency                                        0.15x           $      57,103        0.15x           $     94,678        0.08x          $     116,992
                                                                                            Total $     437,791                  Total $    725,862                  Total $ 1,579,392

         Fire Station #1
                    Renovation               Lower Level (Rec. Dept)                                      2600sf                                     0sf                                0sf
                                             First Floor                                                  1000sf                                     0sf                                0sf
                                             Second Floor                                                 1200sf                                     0sf                                0sf
                                                                                                          4800sf                                     0sf                                0sf
                                                                                  $75/sf          $     360,000        $75/sf          $         -         $75/sf         $         -
                  New Construction                                                                               0sf                                 0sf                                0sf
                                                                                  $160/sf         $          -         $160/sf         $         -         $160/sf        $         -
                                                                                             Sub $      360,000                   Sub $          -                    Sub $         -
                  Temporary Conditions (Phasing / Difficutly)                     0.04x           $      14,400        0.04x           $         -         0.04x          $         -
                                                                                             Sub $      374,400                   Sub $          -                    Sub $         -
                  Construction Contingency                                        0.15x           $      56,160        0.15x           $         -         0.15x          $         -
                                                                                            Total $     430,560                  Total $         -                   Total $        -


         Fire Station #2
                    New Construction                                                                     11500sf                             11500sf                            11500sf
                                                                                  $185/sf         $ 2,127,500          $185/sf         $ 2,127,500         $185/sf        $ 2,127,500
                                                                                             Sub $ 2,127,500                      Sub $ 2,127,500                     Sub $ 2,127,500
                  Construction Contingency                                        0.05x           $     106,375        0.05x           $    106,375        0.05x          $     106,375
                                                                                            Total $ 2,233,875                    Total $ 2,233,875                   Total $ 2,233,875

         Police Department
                  Renovation                                                                              1200sf                                     0sf                         1200sf
                                                                                  $75/sf          $      90,000        $75/sf          $         -         $75/sf         $      90,000
                  New Construction                                                                        3080sf                             12700sf                             3080sf
                                                                                  $165/sf         $     508,200        $165/sf         $ 2,095,500         $165/sf        $     508,200
                  New Construction, Garage                                                                9500sf                             12500sf                             9500sf
                                                                                  $100/sf         $     950,000        $100/sf         $ 1,250,000         $100/sf        $     950,000
                                                                                             Sub $ 1,548,200                      Sub $ 3,345,500                     Sub $ 1,548,200
                  Temporary Conditions (Phasing / Difficutly)                     0.03x           $      46,446        0.00x           $         -         0.03x          $      46,446
                                                                                             Sub $ 1,594,646                      Sub $ 3,345,500                     Sub $ 1,594,646
                  Construction Contingency                                        0.10x           $     159,465        0.05x           $    167,275        0.10x          $     159,465
                                                                                            Total $ 1,754,111                    Total $ 3,512,775                   Total $ 1,754,111
         Public Works
                  New Construction                                                                        6925sf                              6925sf                             6925sf
                                                                                  $145/sf         $ 1,004,125          $145/sf         $ 1,004,125         $145/sf        $ 1,004,125
                  New Construction, Garage                                                               45252sf                             45252sf                            45252sf
                                                                                  $110/sf         $ 4,977,720          $110/sf         $ 4,977,720         $110/sf        $ 4,977,720
                                                                                             Sub $ 5,981,845                      Sub $ 5,981,845                     Sub $ 5,981,845
                                                                                                         10000sf                             10000sf                            10000sf
                  Salt Shed                                                       $16/sf          $     160,000        $16/sf          $    160,000        $16/sf         $     160,000
                                                                                             Sub $ 6,141,845                      Sub $ 6,141,845                     Sub $ 6,141,845
                  Special site work, as percentage of building cost               0.05x           $     307,092        0.05x           $    307,092        0.05x          $     307,092
                                                                                             Sub $ 6,448,937                      Sub $ 6,448,937                     Sub $ 6,448,937
                  Construction Contingency                                        0.10x           $     644,894        0.05x           $    322,447        0.05x          $     322,447
                                                                                            Total $ 7,093,831                    Total $ 6,771,384                   Total $ 6,771,384

         Construction Totals                                                                      $ 11,950,168                         $ 13,243,896                       $ 12,338,762

         Note     Prices assume construction in Spring 2007
                  Prices do NOT include site acquisition, furniture or specialized equipment / apparatus, lease of temporary space, moving costs, or professional fees.
                                                                                                                                                                                    11000 West Park Place
                                                                                                                                                                                      Milwaukee, WI 53224
                                                                                                                                                                                          Tel 414 359-3060
                                                                                                                                                                                         Fax 414 359-3070
                                                                                                                                                                                           www.prarch.com



Project: Cottage Grove Municipal Facilities, 2030 Space Needs                                                                                                             Construction Cost Estimate
Project #: 06049                                                                                                                                                                         10/31/2006


                                                                                            Scheme 4                             Scheme 5
         Village Hall
                  Renovation                                                                               600sf                                600sf
                                                                                  $40/sf          $      24,000        $40/sf          $     24,000
                  New Construction                                                                        2160sf                              3680sf
                                                                                  $160/sf         $     345,600        $160/sf         $    588,800
                                                                                             Sub $      369,600                   Sub $     612,800
                  Temporary Conditions (Phasing / Difficutly)                     0.03x           $      11,088        0.03x           $     18,384
                                                                                             Sub $      380,688                   Sub $     631,184
                  Construction Contingency                                        0.15x           $      57,103        0.15x           $     94,678
                                                                                            Total $     437,791                  Total $    725,862


         Fire Station #1
                    Renovation               Lower Level                                                         0sf                          2600sf
                                             First Floor                                                         0sf                          1000sf
                                             Second Floor                                                        0sf                          1200sf
                                                                                                                 0sf                          4800sf
                                                                                  $75/sf          $          -         $75/sf          $    360,000
                  New Construction, PD                                                                           0sf                          6500sf
                                                                                  $165/sf         $          -         $165/sf         $ 1,072,500
                  New Construction, PD Garage                                                                    0sf                         12500sf
                                                                                  $100/sf         $          -         $100/sf         $ 1,250,000
                                                                                             Sub $           -                    Sub $ 2,682,500
                  Temporary Conditions (Phasing / Difficutly)                     0.04x           $          -         0.04x           $    107,300
                                                                                             Sub $           -                    Sub $ 2,789,800
                  Construction Contingency                                        0.15x           $          -         0.15x           $    418,470
                                                                                            Total $          -                   Total $ 3,208,270

         Fire Station #2
                    New Construction                                                                     11500sf                             11500sf
                                                                                  $185/sf         $ 2,127,500          $185/sf         $ 2,127,500
                                                                                             Sub $ 2,127,500                      Sub $ 2,127,500
                  Construction Contingency                                        0.05x           $     106,375        0.05x           $    106,375
                                                                                            Total $ 2,233,875                    Total $ 2,233,875

         Police Department
                  Renovation                                                                                     0sf                                 0sf
                                                                                  $75/sf          $          -         $75/sf          $         -
                  New Construction                                                                       12700sf                                     0sf
                                                                                  $165/sf         $ 2,095,500          $165/sf         $         -
                  New Construction, Garage                                                               12500sf                                     0sf
                                                                                  $100/sf         $ 1,250,000          $100/sf         $         -
                                                                                             Sub $ 3,345,500                      Sub $          -
                  Temporary Conditions (Phasing / Difficutly)                     0.03x           $     100,365        0.00x           $         -
                                                                                             Sub $ 3,445,865                      Sub $          -
                  Construction Contingency                                        0.10x           $     344,587        0.05x           $         -
                                                                                            Total $ 3,790,452                    Total $         -
         Public Works
                  Renovation ( of existing for Recreation Department)                                     2000sf                                     0sf
                                                                                  $75/sf          $     150,000        $75/sf          $         -
                  New Construction                                                                        6925sf                              6925sf
                                                                                  $145/sf         $ 1,004,125          $145/sf         $ 1,004,125
                  New Construction, Garage                                                               45252sf                             45252sf
                                                                                  $110/sf         $ 4,977,720          $110/sf         $ 4,977,720
                                                                                             Sub $ 5,981,845                      Sub $ 5,981,845
                                                                                                         10000sf                             10000sf
                  Salt Shed                                                       $16/sf          $     160,000        $16/sf          $    160,000
                                                                                             Sub $ 6,141,845                      Sub $ 6,141,845
                  Special site work, as percentage of building cost               0.05x           $     307,092        0.05x           $    307,092
                                                                                             Sub $ 6,448,937                      Sub $ 6,448,937
                  Construction Contingency                                        0.10x           $     644,894        0.05x           $    322,447
                                                                                            Total $ 7,093,831                    Total $ 6,771,384

         Construction Totals                                                                      $ 13,555,949                         $ 12,939,391

         Note     Prices assume construction in Spring 2007
                  Prices do NOT include site acquisition, furniture or specialized equipment / apparatus, lease of temporary space, moving costs, or professional fees.
                                                                                                                                                                                                                                                                                                                                                              11000 West Park Place
                                                                                                                                                                                                                                                                                                                                                                Milwaukee, WI 53224
                                                                                                                                                                                                                                                                                                                                                                    Tel 414 359-3060
                                                                                                                                                                                                                                                                                                                                                                   Fax 414 359-3070
                                                                                                                                                                                                                                                                                                                                                                     www.prarch.com



Cottage Grove Space Program
                                                                                  2006 - Existing Conditions                                                                                             2015                                                                                                    2030
                                                                 Village Population: 4829            Town Population: 3915                                                     Village Population: 8483         Town Population: 4023                                                  Village Population: 15788        Town Population: 4212
Space                                       Emp    Office Type   Shared?         Size         Qty        Total                    Note                  Emp    Office Type   Shared?      Size         Qty       Total                         Note           Emp     Office Type   Shared?       Size        Qty        Total                         Note

Village Administration
Staff Spaces
   Village Administrator                    1.0        B             -         120sf            1           120sf                    -                  1.0        B             -       175sf        1          175sf                           -             1.0        B             -        175sf        1          175sf                           -
   Clerk                                    0.5        A             -                     In workroom                       Clerk / Treasurer          0.5        A             -       120sf        1          120sf                   Clerk / Treasurer     1.0        B             -        120sf        1          120sf                           -
   Treasurer                                0.5        A             -                     In workroom                       Clerk / Treasurer          0.5        A             -        0sf         0            0sf                   Clerk / Treasurer     1.0        A             -        120sf        1          120sf                           -
   Deputy Clerk                             0.5        A             -                     In workroom                 Deputy Clerk / Utility Billing   1.0        A             -       90sf         1           90sf                           -             1.0        A             -         90sf        1           90sf                           -
   Utility Billing                          0.5        A             -                     In workroom                 Deputy Clerk / Utility Billing   1.0        A                     90sf         1           90sf                           -             1.0        A                       90sf        1           90sf                           -
   Deputy Treasurer                         0.5        A             -                     In workroom                 Deputy Treas / Admin Asst        1.0        A             -       90sf         1           90sf                           -             1.0        A             -         90sf        1           90sf                           -
   Admin Assistant                          0.5        A             -                     In workroom                 Deputy Treas / Admin Asst        2.0        A                     90sf         2          180sf                           -             3.0        A                       90sf        3          270sf                           -

   Parks / Recreation Director              1.0        A             -                     In workroom                            -                     1.0        B             -       120sf        1          120sf                          -              1.0        B             -        120sf        1          120sf                          -
   Recreation Assistant                      -         -             -          0sf             0            0sf                  -                      1.0       A             -        90sf        1           90sf                          -              2.0        A             -        90sf         2          180sf                          -
   Recreation Seasonal Staff                50.0       -             -          0sf             0            0sf          Coaches, Ref's, etc           75.0       -             -         0sf        0           0sf                           -             100.0       -             -         0sf         0           0sf                           -
   Parks Director                            -         -             -          0sf             0            0sf                  -                       -        -             -         0sf        0            0sf                          -              1.0        B             -         90sf        1           90sf                          -
   Aquatics Supervisor                       -         -             -          0sf             0            0sf                  -                      1.0       B             0        90sf        0           0sf                    Located at Pool       1.0        B             -        90sf         0           0sf                    Located at Pool

   Municipal Court Clerk                    0.5        B             -         120sf            1           120sf                  -                    0.5        B             -       120sf        1          120sf                           -              -         B             -        120sf        1          120sf                           -
                                                                                                                                   -                                                                              0sf
   Transient Staff                           -         C             Y            In workroom / breakroom            Inspection / Planner / Audit /                A            Y         90sf        2          180sf           Outsourced or Seasonal Use    -          A            Y         90sf         2          180sf           Outsourced or Seasonal Use
                                                                                                                            Licensing / etc                                                                                                                    -
                                            5.5       <- W/out Seasonal                                                                                 10.5      <- W/out Seasonal                                                                           14.0       <- W/out Seasonal
Support Spaces
   Reception Counter                         -          -            Y         132sf            1           132sf                -                       -          -            -       200sf        1          200sf                  Inc. Public Use PC      -          -            -        200sf        1          200sf                  Inc. Public Use PC
   Reception / Waiting Area                  -          -            Y         48sf             1           48sf                 -                       -          -            -       100sf        1          100sf                            -             -          -            -        100sf        1          100sf                            -
   Workroom                                  -          -            Y         775sf            1           775sf        Holds most of staff             -          -            -       250sf        1          250sf                  Files / Copy / Misc     -          -            -        250sf        1          250sf                  Files / Copy / Misc

   Conference Room                           -          -            Y        1260sf            1          1260sf           Board Room                   -          -            -       1260sf       1         1260sf                          -               -          -            -       1260sf        1         1260sf                          -
   Conference Room Storage                   -          -            -          0sf             0             0sf                 -                      -          -            -        200sf       1          200sf                          -               -          -            -        200sf        1          200sf                          -
   Conference Room                           -          -            Y         183sf            1           183sf                 -                      -          -            -        180sf       1          180sf                          -               -          -            -        180sf        1          180sf                          -
   Conference Room                           -          -            -          0sf             0             0sf                 -                      -          -            -        180sf       1          180sf                          -               -          -            -        180sf        1          180sf                          -
   Video                                     -          -            -         185sf            1           185sf                 -                      -          -            -        185sf       1          185sf                          -               -          -            -        185sf        1          185sf                          -
   Recreation Storage                        -          -            -         192sf            1           192sf                 -                      -          -            -        550sf       1          550sf                          -               -          -            -        750sf        1          750sf                          -
   File Storage                              -          -            -         120sf            1           120sf                 -                      -          -            -        250sf       1          250sf                          -               -          -            -        250sf        1          250sf                          -
   Vault / Fire Storage                      -          -            -         110sf            1           110sf        Some stored off-site            -          -            -        400sf       1          400sf                          -               -          -            -       400sf         1          400sf                          -
   Staff / Break Room                        -          -            Y         160sf            1           160sf                 -                      -          -            -        160sf       1          160sf                          -               -          -            -        160sf        1          160sf                          -
   Locker                                    -          -            -          0sf             0             0sf                 -                      -          -            -        160sf       1          160sf                  Locker space only       -          -            -        160sf        1          160sf                  Locker space only
   Staff Bathroom                            -          -            -         35sf             1            35sf                 -                      -          -            -        60sf        1           50sf                          -               -          -            -        60sf         1           60sf                          -
   Public Bathroom                           -          -            -         210sf            1           210sf                 -                      -          -            -        320sf       1          320sf                          -               -          -            -        320sf        1          320sf                          -
       Total                                                                                               3,650sf                                                                                              5,700sf                                                                                                 6,300sf
       Net to Gross Adj *                                                                                   1.50x              <-Computed                                                                        1.45x                                                                                                   1.45x
                           Building Total                                                                  5,460sf                                                                                              8,270sf                                                                                                 9,140sf

Exterior Spaces
   Recycling / Dumpster                                                        100sf            1          100sf                                                                         500sf        1          500sf                                                                           500sf         1         500sf
   Parking                                                                                                22,125sf               61 Stalls                                               365sf        61        22,265sf                     61 Stalls                                           365sf        61        22,265sf

Satellite Buildings
   Misc. Parks Buildings                                                              -Not included in totals-           Small and scattered
                                                                                  2006 - Existing Conditions                                                                                        2015                                                                                                          2030
                                                                 Village Population: 4829            Town Population: 3915                                                Village Population: 8483         Town Population: 4023                                                        Village Population: 15788        Town Population: 4212
Space                                       Emp    Office Type   Shared?         Size         Qty        Total                 Note                Emp    Office Type   Shared?      Size         Qty       Total                        Note                   Emp    Office Type   Shared?       Size        Qty        Total                       Note

Police
Staff Spaces
  Chief                                     1.0        B             -                                  0sf                      -                  1.0       B            -        175sf         1         175sf               Incl. conference area           1.0        B            -         175sf        1          175sf               Incl. conference area
  Lieutenant                                 -         -             -                                  0sf                      -                  2.0       B            -        100sf         2         200sf                         -                     4.0        B            -         100sf         4         400sf                         -
  Sergeant                                  1.0        B             -                                  0sf                      -                  3.0       B            -        120sf         3         360sf                         -                     6.0        B            -         120sf         6         720sf                         -
  Detective                                 1.0        B             -                                  0sf                      -                  3.0       B            -        120sf         3         360sf                         -                     6.0        B            -         120sf         6         720sf                         -
  Officer                                   8.0        C             Y                                  0sf                      -                 13.0       C            Y         0sf         13          0sf                          -                     20.0       C            Y          0sf         20          0sf                          -
  Clerk                                     1.5        B             -                                  0sf                      -                  3.0       B            -        120sf         3         360sf                         -                     5.0        B            -         120sf         5         600sf                         -

  School Officer                             -          -            -                                  0sf                      -                 2.0        B            Y        100sf        1          100sf              Most of time @ school            3.0        B            Y         100sf        1          100sf              Most of time @ school
  Traffic Officer                            -          -            -                                  0sf                      -                 1.0        C            -        100sf        1          100sf                         -                     2.0        C            -         100sf        1          100sf                         -

  Officer, Outside Departments               -          -            -                                  0sf                      -                  -         A            Y        100sf        1          100sf                  Adjacent to Intake            -         A            Y         100sf        1          100sf
                                            12.5                                                                                                   28.0                                                                                                         47.0
Support Spaces
  Reception / Lobby                          -          -            -                                  0sf                      -                  -         -            -        120sf        1          120sf                        -                       -         -            -         120sf        1          120sf                         -
  Clerk Work Room                            -          -            -         48sf         1          48sf                      -                  -         -            -        120sf        1          120sf                        -                       -         -            -         120sf        1          120sf                         -
  Officer Work Room (Report writing, etc)    -          -            -                                  0sf                      -                  -         A            Y         50sf        3          150sf         Three work areas in shared room        -         A            Y         50sf         5          250sf          Five work areas in shared room
  Squad Room                                 -          -            -                                  0sf                      -                  -         -            -        250sf        1          250sf                        -                       -         -            -         250sf        1          250sf                         -
  Conference Room                            -          -            -                                  0sf                      -                  -         -            -          0sf        0           0sf                         -                       -         -            -         150sf        1          150sf                         -
  Conference / Training Room                 -          -            Y         154sf        1          154sf                     -                  -         -            -        850sf        1          850sf                 w/ Kitchenette                 -         -            -         850sf        1          850sf                  w/ Kitchenette
  Conference / Training Storage              -          -            -                                  0sf                      -                  -         -            -        200sf        1          200sf                        -                       -         -            -         200sf        1          200sf                         -
  Breakroom                                  -          -            -         48sf         1          48sf                      -                  -         -            -        150sf        1          150sf                 w/ Kitchenette                 -         -            -         150sf        1          150sf                  w/ Kitchenette

  Patrol / Support Storage                   -          -            Y         64sf         1          64sf                      -                  -          -           -        250sf        1          250sf            Patrol eqmnt, weapons, etc          -          -           -         350sf        1          350sf           Patrol eqpmnt, weapons, etc.
  Departmental Storage                       -          -            Y         100sf        1          100sf        Located in Evidence Storage     -          -           -        250sf        1          250sf             Det. Eqpm, DARE, etc.              -          -           -         350sf        1          350sf             Det. Eqpm, DARE, etc.
  Records Storage - Long Term                -          -            Y         154sf        1          154sf          Located in Conf Room          -          -           -        400sf        1          400sf                          -                     -          -           -         500sf        1          500sf                          -
  Office Supply Storage                      -          -            -                                  0sf                      -                  -          -           -        150sf        1          150sf                          -                     -          -           -         150sf        1          150sf                          -
  Evidence Storage                           -          -            Y         100sf        1          100sf                     -                  -          -           -        500sf        1          500sf                          -                     -          -           -         650sf        1          650sf                          -
  Evidence Storage, short term               -          -            -                                  0sf                      -                  -          -           -        300sf        1          300sf             Bikes, etc, adj. to garage         -          -           -         300sf        1          300sf             Bikes, etc. adj. to garage
  Evidence Processing                        -          -            Y         144sf        1          144sf         Shared w/ Patrol Storage       -          -           -        300sf        1          300sf                          -                     -          -           -         300sf        1          300sf                          -

  Intake / Processing Area                   -          -            -                                  0sf                      -                  -          -           -        200sf        1          200sf          Breathalyzer, desk, benches, etc      -          -           -         200sf        1          200sf          Breathalyzer, desk, benches, etc
  Interview Room, Suspect                    -          -            -         100sf        2          200sf                     -                  -          -           -        100sf        2          200sf              Adj. to Intake, Garage            -          -           -         100sf        2          200sf              Adj. to Intake, Garage
  Interview Room, Victim                     -          -            -         100sf        1          100sf                     -                  -          -           -        100sf        1          100sf                  Adj. to Lobby                 -          -           -         100sf        1          100sf                  Adj. to Lobby

  Men's Locker                               -          -            Y         40sf         1           40sf                     -                  -          -           -        520sf        1          520sf           (20 lockers, w/ movable wall)        -          -           -         910sf        1          910sf           (35 lockers, w/ movable wall)
  Women's Locker                             -          -            -                                   0sf                     -                  -          -           -        390sf        1          390sf           (15 lockers, w/ movable wall)        -          -           -         520sf        1          520sf           (20 lockers, w/ movable wall)

  Men's Shower                               -          -            -                                  0sf                      -                  -          -           -        160sf        1          160sf                      (4 stalls)                -          -           -         160sf        1          160sf                     (4 stalls)
  Women's Shower                             -          -            -                                  0sf                      -                  -          -           -        160sf        1          160sf                      (4 stalls)                -          -           -         160sf        1          160sf                     (4 stalls)

  Staff Restroom                             -          -            -                                   0sf                     -                  -          -           -         60sf        1           60sf                          -                     -          -           -         60sf         1          60sf                          -
  Public Restroom                            -          -            -                                   0sf                     -                  -          -           -        200sf        1          200sf                          -                     -          -           -         200sf        1          200sf                         -
  Communications / Computer Eq. Room         -          -            -         12sf         1           12sf                     -                  -          -           -        100sf        1          100sf                          -                     -          -           -         100sf        1          100sf                         -

  Garage                                     -          -            -         384sf        1          384sf
  Garage                                     -          -            -        1200sf        1         1200sf        Est., In adjacent DPW Garage    -          -           -        500sf        17         8500sf       12 squads, impound, sheriff, storage    -          -           -         500sf        25        12500sf       20 squads, impound, sheriff, storage
     Total                                                                                               -                                                                                                 14,680sf                                                                                                      19,900sf
     Net to Gross Adj *                                                                                  -                                                                                                  1.30x                                                                                                         1.30x
                         Building Total                                                               6,500sf       Does not include adj. garage                                                           19,090sf                                                                                                      25,870sf




Exterior Spaces
  Recycling / Dumpster                       -          -            -          100          1         100sf                 (on grass)                                             500sf        1          500sf                                                                                 500sf         1         500sf
  Parking                                    -          -            -                      21                          Space for Approx 21                                         365sf        50        18,250sf                                                                               365sf        80        29,200sf
  Generator                                  -          -            -           0           0                                                                                       500          1         500sf                                                                                  500          1
                                                                                        2006 - Existing Conditions                                                                                        2015                                                                                                        2030
                                                                       Village Population: 4829            Town Population: 3915                                                Village Population: 8483         Town Population: 4023                                                      Village Population: 15788        Town Population: 4212
Space                                             Emp    Office Type   Shared?         Size         Qty        Total                     Note            Emp    Office Type   Shared?      Size         Qty       Total                         Note                Emp    Office Type   Shared?       Size        Qty        Total                         Note

Fire / EMS
Staff Spaces
   EMS Chief                                      1.0        B             -         192sf        1          192sf                         -             1.0        B            -        175sf        1          175sf                           -                 1.0        B            -         175sf        1          175sf
   EMS Asst. Chief                                 0.0       C             -          0sf         0           0sf                          -              1.0       A            -         90sf        1           90sf                           -                 1.0        A            -          90sf        1          90sf
   EMS Captain                                    3.0        A             -          0sf         0           0sf                          -             4.0        A            -        60sf         4          240sf                           -                 6.0        A            -         60sf         6          360sf
   EMS Lieutenant                                  1.0       A             -          0sf         0           0sf                          -              2.0       A            -         60sf        2          120sf                    Share a room             2.0        A            -         60sf         2          120sf                    Share a room
   EMS Volunteer                                   4.0       C             Y          0sf         0           0sf                          -              4.0       C            Y         0sf         0           0sf                            -                  4.0       C            Y           0sf        0           0sf
   Interns                                        4.0        C             Y          0sf         0           0sf                          -             4.0        C            Y         0sf         0           0sf                            -                 4.0        C            -          0sf         0           0sf
   Externs                                        2.0        C             Y          0sf         0           0sf                          -             2.0        C            Y         0sf         0           0sf                            -                 2.0        C            -          0sf         0           0sf
   FD Chief                                       1.0        B             -         148sf        1          148sf                    Volunteer          1.0        B            -        175sf        1          175sf                           -                 1.0        B            -         175sf        1          175sf
   FD Volunteers                                  40.0       C             Y          0sf         0           0sf                     Volunteer          40.0       C            Y         0sf         0           0sf                            -                 40.0       C            Y          0sf         0           0sf
   Seasonal                                       4.0        -             Y          0sf         0           0sf                  Festival staff, etc   4.0        C            Y         0sf         0           0sf                   Festival staff, etc.       4.0        C            Y          0sf         0           0sf                   Festival staff, etc.

  Accounts Manager                                1.0        A             -         535sf        1          535sf                          -            1.0        A            -        120sf        1          120sf                           -                 2.0        A            -         120sf        2          240sf

Support Saces
  Waiting / Reception                              -          -            -           0          0           0sf                           -             -          -           -        100sf        1          100sf                           -                  -          -           -         100sf        1          100sf                           -

  Conference Room                                  -         -             -        1000sf        1         1000sf             Conf / Training            -          -           -        1000sf       1         1000sf                         -                    -          -           -        1000sf        1          1000sf                        -
  Conference Storage                               -         -             -           0sf        0            0sf                     -                  -          -           -         200sf       1          200sf                         -                    -          -           -         200sf        1           200sf                        -
  Kitchen                                          -         -             -         155sf        1          155sf                     -                  -          -           -        250sf        1          250sf                         -                    -          -           -         250sf        1           250sf                        -
  Conference / Workroom                            -         -             -        148sf         1         148sf              Adj to Dispatch            -          -           Y        444sf        1         444sf                          -                    -          -           Y         444sf        1           444sf                        -
  Quiet Study Room                                 -         -             -           0sf        0            0sf                     -                  -          -           -          50sf       2          100sf                         -                    -          -           -          50sf        2           100sf                        -
  Admin Workroom                                   -         -             -           0sf        0            0sf                     -                  -          -           -         150sf       1          150sf        Adj. to dispatch, incl workstation    -          -           -         150sf        1           150sf                        -
  Communication Room (Dispatch)                    -         -             -         296sf        1          296sf                     -                  -          -           Y          0sf        1           0sf       Combine into Conference / Workroom      -          -           Y          0sf         1            0sf       Combine into Conference / Workroom
  Fire Inspection / Training / Investigation       -         A             Y         140sf        1          140sf           Supports three desks         -          -           Y        250sf        1          250sf                         -                    -          -           Y         250sf        1           250sf                        -
  Unassigned Storage                               -         -             -         222sf        1          222sf              Lower Level               -          -           -          0sf        0            0sf                         -                    -          -           -           0sf        0            0sf                         -
  Unassigned Office                                -         -             -         62sf         1          62sf               Lower Level               -          -           -          0sf        0           0sf                          -                    -          -           -          0sf         0            0sf                         -
  Unassigned Office                                -         -             -         40sf         1          40sf               Lower Level               -          -           -          0sf        0           0sf                          -                    -          -           -          0sf         0            0sf                         -
  Unassigned Office                                -         -             -         62sf         1          62sf               Lower Level               -          -           -          0sf        0           0sf                          -                    -          -           -          0sf         0            0sf                         -
  EMS Dayroom                                      -         -             -         418sf        1          418sf              Lower Level               -          -           -           0sf       0            0sf         Combine into Shared Dayroom          -          -           -          0sf         0            0sf         Combine into Shared Dayroom
  Emergency Government                             -         -             -         609sf        1          609sf              Lower Level               -          -           Y          0sf        1           0sf       Combine into Conference / Workroom      -          -           Y          0sf         1            0sf       Combine into Conference / Workroom
  Unassigned Storage                               -         -             -         552sf        1          552sf              Lower Level               -          -           -          0sf        0            0sf                         -                    -          -           -           0sf        0            0sf                         -
  FD Personnel Office                              -         -             -          60sf        1           60sf              Lower Level               -          -           -         60sf        1           60sf                         -                    -          -           -         100sf        1           100sf                        -
  FD Game Area                                     -         -             -         123sf        1          123sf              Lower Level               -          -           -          0sf        0            0sf         Combine into Shared Dayroom          -          -           -          0sf         0            0sf         Combine into Shared Dayroom
  Sleeping, Chief or Volunteer                     -         -             Y         136sf        1          136sf                Sleeps 1                -          -           Y        123sf        1         123sf                      Sleeps 1                 -          -           Y         123sf        1           123sf                        -
  Sleeping, 'Extern' or Volunteer                  -         -             Y         158sf        2          316sf           Lower Leve, Sleeps 1         -          -           Y        184sf        2          368sf                     Sleeps 2                 -          -           Y         184sf        2           368sf                    Sleeps 2
  Sleeping, Intern                                 -         -             Y        184sf         2         368sf                 Sleeps 2                -          -           Y        184sf        2         368sf                      Sleeps 2                 -          -           Y         184sf        2           368sf                    Sleeps 2
  Communications / Computer Eq. Room                                                  0sf         0            0sf                     -                  -          -           -        100sf        1          100sf                         -                    -          -           -         100sf        1           100sf                        -
  Toilet / Shower, Intern, Extern                  -          -            -          63sf        2          126sf                     -                  -          -           -         63sf        2         126sf                          -                    -          -           -          63sf        2           126sf                        -
  Men Toilet / Shower                              -          -            -         210sf        1          210sf                     -                  -          -           -         210sf       1          210sf                         -                    -          -           -         210sf        1           210sf                        -
  Women Toilet / Shower                            -          -            -         210sf        1          210sf                     -                  -          -           -        210sf        1          210sf                         -                    -          -           -         210sf        1           210sf                        -
  FD Dayroom (Association Rm)                      -          -            -         693sf        1          693sf              Second Floor              -          -           -          0sf        0           0sf          Combine into Shared Dayroom          -          -           -           0sf        0            0sf         Combine into Shared Dayroom
  FD Storage                                       -          -            -         113sf        1          113sf              Second Floor              -          -           -        113sf        1          113sf                         -                    -          -           -         113sf        1           113sf                        -
  FD Game Area                                     -          -            -         154sf        1          154sf              Second Floor              -          -           -          0sf        0            0sf         Combine into Shared Dayroom          -          -           -          0sf         0            0sf         Combine into Shared Dayroom
  Storage                                          -          -            -         197sf        1          197sf              Second Floor              -          -           -        225sf        1          225sf                         -                    -          -           -         300sf        1           300sf                        -
  Exercise Room                                    -          -            -        1068sf        1         1068sf              Second Floor              -          -           -        750sf        1          750sf                         -                    -          -           -         750sf        1           750sf                        -
  Storage                                          -          -            -          99sf        1           99sf                     -                  -          -           -         99sf        0           0sf                          -                    -          -           -          99sf        0            0sf                         -
  Laundry                                          -          -            -         176sf        1          176sf                     -                  -          -           -        176sf        1          176sf                         -                    -          -           -         176sf        1           176sf                        -
  Storage                                          -          -            -          86sf        1           86sf                     -                  -          -           -         86sf        0           0sf                          -                    -          -           -          86sf        0            0sf                         -
  Shared Dayroom                                   -          -            -          0sf         0           0sf                      -                  -          -           -        693sf        1         693sf          FD / EMS Dayroom & Games             -          -           -         693sf        1           693sf         FD / EMS Dayroom & Games
                                                                                                                                                          -          -           -
                                                                                                                                                                                                                                                                                                                                0sf
  Apparatus Bay                                    -          -            -        6870sf        1         6870sf                        -               -          -           -        6870sf       1          6870sf                          -                  -          -           -        6870sf        1          6870sf                          -
  Un-Assigned Garage                               -          -            -        515sf         1          515sf                  Lower Level           -          -           -          0sf        0            0sf                           -                  -          -           -          0sf         0            0sf                           -
  Drying Tower                                     -          -            -         208sf        3          624sf                 On Three Floors        -          -           -         208sf       3           624sf                          -                  -          -           -         208sf        3           624sf                          -
    Total                                                                                                  16,723sf                                                                                              14,430sf                                                                                                    14,785sf
          Net to Gross Adj *                                                                                 1.40x                                                                                                1.35x                                                                                                       1.35x
                                   Lower Level                                                              5720sf                                                                                                  incl                                                                                                        incl
                                    First Floor                                                            14221sf                                                                                                  incl                                                                                                        incl
                                  Second Floor                                                              3480sf                                                                                                  incl                                                                                                        incl
                     Building total                                                                        23,421sf                                                                                              19,481sf                                                                                                    19,960sf

Exterior Spaces
  Recycle                                          -          -            -         100sf         1          100sf                Stored on Grass        -          -           -         100          1          100sf                          -                  -          -           -          100          1          100sf                          -
  Staff Parking                                    -          -            -           -          49        20800sf                       -               -          -           -        365sf        46        16790sf                          -                  -          -           -         365sf        46        16790sf                          -
  Visitor Parking                                  -          -            -           -          17        6500sf                        -               -          -           -        365sf        17        6205sf                           -                  -          -           -        365sf         17         6205sf                          -
  Apron                                                                    -        6338sf         1         6338sf                       -               -          -           -        6338sf        1         6338sf                          -                  -          -           -        6338sf         1         6338sf                          -

  Northside Fire Station                           -          -            -          0sf         0           0sf                           -             -          -           -          0sf        0           0sf                            -                  -          -           -        11500sf       1         11500sf                          -
                                                                                           2006 - Existing Conditions                                                                                            2015                                                                                                         2030
                                                                          Village Population: 4829            Town Population: 3915                                                    Village Population: 8483         Town Population: 4023                                                       Village Population: 15788        Town Population: 4212
Space                                                 Emp   Office Type   Shared?         Size         Qty        Total                  Note                   Emp    Office Type   Shared?      Size         Qty       Total                        Note                  Emp    Office Type   Shared?       Size        Qty        Total                       Note

Public Works Department
Staff Spaces
   Director                                           1.0       B             -          224          1          224sf                     -                    1.0        B            -        225sf        1          225sf        W/ file, conference, drawing layout    1.0       B            -         225sf        1          225sf        W/ file, conference, drawing layout
   Assistant Director / Forman                        1.0       B             -           0           0           0sf                      -                    1.0        B            -        175sf        1          175sf        W/ file, conference, drawing layout   1.0        B            -         110sf        1          110sf        W/ file, conference, drawing layout
   Forman                                             3.0       C             Y           0           0           0sf                      -                    5.0        A            -         90sf        5          450sf                         -                    11.0       A            Y          90sf        8          720sf                    Share space
   Crew / workers                                     3.0       -             -          248          1          248sf                Shop Office               8.0        C            -         0sf         0           0sf              Use locker space, below          15.0       C            -          0sf         0           0sf              Use locker space, below

   Receptionist / Clerk                                -         -            -          68           1          68sf                       -                   1.0        C            -        125sf        1          125sf       Adjacent to work room and reception    2.0        C            -         125sf        1          125sf       Adjacent to work room and reception

   Unassigned (Library Director)                       -         -            -          143          1          143sf                      -                    -          -           -          0sf        1           0sf                           -                    -          -           -          0sf         1           0sf                          -

   Municipal Engeering, Potentially                    -         -            -           0           0           0sf                       -                   1.0        A            -        225sf        1          225sf          This is a contingency position      3.0        A            -         225sf        3          675sf          These are contingency positions

   Streets Superintendant                              -         -            -           0           0           0sf                       -                    1.0       A            -         90sf        1           90sf                          -                    1.0       A            -         90sf         1           90sf                         -
   Water Superintendant                                -         -            -           0           0           0sf                       -                    1.0       A            -         90sf        1           90sf                          -                    1.0       A            -         90sf         1           90sf                         -
   Sewer Superintendant                                -         -            -           0           0           0sf                       -                    1.0       A            -         90sf        1           90sf                          -                    1.0       A            -         90sf         1           90sf                         -
                                                      8.0                                                                                                       20.0                                                                                                        36.0
   Reception / Waiting                                 -         -            -          285          1          285sf                  -                         -         -           -        180sf        1          180sf                        -                       -         -           -         180sf        1          180sf                        -
   Office Work Area                                                                      205          1          205sf                  -                         -         -           -        350sf        1          350sf                        -                       -         -           -         350sf        1          350sf                        -
   Conference                                          -         -            -          143          1          143sf            DPW Board room                  -         -           -        300sf        1          300sf                  DPW Board room                -         -           -         300sf        1          300sf                  DPW Board room
   Conference                                          -         -            -            0          1           0sf                   -                         -         -           -        175sf        1          175sf                        -                       -         -           -         175sf        1          175sf                        -
   Office Toilet                                       -         -            -           47          1          47sf                   -                         -         -           -        90sf         1          90sf                         -                       -         -           -         90sf         1          90sf                         -

   Break Room                                          -         -            -          370          1          370sf                     -                     -          -           -        300sf        1          300sf                          -                    -          -           -         300sf        1          300sf                          -
   Communications / Computer Eq. Room                                                    0sf          0           0sf                      -                     -          -           -        100sf        1          100sf                          -                    -          -           -         100sf        1          100sf                          -
   Records Storage                                     -         -           Yes         88           1          88sf                 Fire Proof                 -          -           -        300sf        1          300sf                     Fire Proof                -          -           -         600sf        1          600sf                     Fire Proof
                                                                                                                             Includes Village Hall Storage
   Male Locker Rooms                                   -         -            -           0           0           0sf                      -                     -          -           -        546sf        1          546sf                         -                     -          -           -         962sf        1          962sf                         -
   Frmale Locker Room                                  -         -            -           0           0           0sf                      -                     -          -           -        120sf        1          120sf                         -                     -          -           -         120sf        1          120sf                         -
   Male Showers                                        -         -            -           0           0           0sf                      -                     -          -           -        240sf        1          240sf                    (6 showers)                -          -           -         320sf        1          320sf                    (8 showers)
   Female Shower                                       -         -            -           0           0           0sf                      -                     -          -           -        100sf        1          100sf                    (2 showers)                -          -           -         100sf        1          100sf                    (2 showers)
   Shop Toilets                                        -         -            -          47           1          47sf                      -                     -          -           -        120sf        1          120sf                         -                     -          -           -         300sf        1          300sf                         -

Apparatus spaces
   Large Vehicle Storage                               -         -            -         5510          1         5510sf      Inefficient layout, incl. storage    -          -           -        750sf        15        11,250sf       Individual 50x15 Pull-thru bays       -          -           -         750sf        25        18750sf         Individual 50x15 Pull-thru bays
   Utility Vehicle Storage                                                                                                                                                                       300sf        5          1,500sf       Individual 30x10 Pull-thru bays                                        300sf        10         3000sf         Individual 30x10 Pull-thru bays
   Equipment Storage                                   -         -            -          474          1          474sf                      -                    -          -           -        9500sf        1         9,500sf                                                                             12500sf        1        12500sf                        -

   Shop Storage                                        -         -            -          58           1          58sf                       -                    -          -           -        200sf        1          200sf                  One desk, phone              -          -           -         200sf        1          200sf                  One desk, phone

   Maintenance / Parts Storage                         -         -            -          290          1          290sf                      -                    -          -           -        1250sf       1         1,250sf                         -                    -          -           -        1250sf        1          1250sf                        -

   Chemical / Hazardous Storage                        -         -            -          155          1          155sf                       -                   -          -           -         300sf       1           300sf                         -                    -          -           -         300sf        1           300sf                        -
   Machine Shop                                        -         -            -          300          1          300sf                       -                   -          -           -         650sf       1           650sf                         -                    -          -           -         650sf        1           650sf                        -
   Meter Shop                                          -         -            -           0           1           0sf             In satellite building          -          -           -        1000sf       1          1,000sf                        -                    -          -           -        1000sf        1          1000sf                        -
   Vehicle Maintenance                                 -         -            -           0           1           0sf                        -                   -          -           -         850sf       1           850sf                   w/ lift, tools             -          -           -         850sf        1           850sf                        -
   Vehicle Wash                                        -         -            -           0           1           0sf                        -                   -          -           -         850sf       1           850sf                   w/ catwalk                 -          -           -         850sf        1           850sf                        -
      Total                                                                                                     8,655sf                                                                                                 31,741sf                                                                                                     45,372sf
      Net to Gross Adj *                                                                                         1.12x                                                                                                    1.15x                                                                                                       1.15x
                          Building Total                                                                        9,665sf                                                                                                 36,510sf                                                                                                     52,180sf


Exterior Spaces
   Dumpster                                                                               -           -                                     -                    -          -           -        600sf        1          600sf                          -                    -          -           -          0sf          0           0sf                         -
   Yard space                                          -         -            -           -           -                                     -                    -          -           -       43560sf       1         43560sf                 Misc. yard space             -          -           -        43560sf       1         43560sf                        -
   Salt Shed                                           -         -            -           -           -                                     -                    -          -           -       10000sf       1         10000sf                 6,000ton capacity            -          -           -        10000sf       1         10000sf                        -
   Compost Collection                                  -         -            -           -           -                                     -                    -          -           -       1000sf        1          1000sf                         -                    -          -           -        1000sf        1          1000sf                        -
   Staff / Visitor Parking                             -         -            -           -           -                                 11 stalls                -          -           -        365sf        30        10950sf                     30 stalls                -          -           -         365sf        45        16425sf                    45 stalls

Satellite Buildings
   Storage Shed (adjacent to current PD)                                                2240          1          2,240sf       Not owned by Village
   Old Shop (south Main Street)                                                         1350          1          1,350sf   May soon lose to redevelopment
   Misc. Parks Buildings                                                                    -Not included in totals-            Small and scattered
                             Total useful DPW space                                                             13,255sf                                                                                                                                                                                                             2.7 acres   Assume a min 5 acre parcel, depending
                                                                                                                                                                                                                                                                                                                                                   on zoning and storm requirements
August 10, 2006

STRUCTURAL SURVEY & REPORT

Cottage Grove Municipal Facilities Study
Cottage Grove, Wisconsin

PIERCE ENGINEERS, INC. (PE) recently completed a review and brief site evaluation of the Cottage Grove Municipal
Facilities located at 221 East Cottage Grove Road in Cottage Grove, Wisconsin. The purpose of the investigation
was to review the structural systems and the general structural condition of the building. Design drawings were
available and were used as a reference for the walk-through. The following paragraphs present observations noted
during the visit in addition to professional opinions regarding the overall condition of the building’s structural systems.

The facilities study includes three buildings, the Cottage Grove Municipal Building, the Department of Public Works
(DPW) building, and the Fire Department building. These buildings were constructed between the years of 1993 and
1998.

COTTAGE GROVE MUNICIPAL BUILDING

         OBSERVATIONS (PLAN REVIEW)
                  According to existing building drawings, Cottage Grove Municipal Building is a one-story wood
         framed building of approximately 5,460 sq. ft. The roof framing is composed of conventional wood trusses
         set on load-bearing 2x6 wood stud walls.

         OBSERVATIONS (SITE VISIT)
                   The majority of the ceiling area consists of a typical acoustical drop ceiling. This looks to be in
         generally good condition. The remaining ceiling area consists of a gypsum sheath fastened directly to the
         wood roof trusses. The gypsum ceiling observed shows no cracking or other signs of distress. Wall finishes
         consist of gypsum sheathing fastened directly to the wood stud walls. The wall sheathing observed shows
         no cracking or other signs of distress.
                   At the exterior of the building, the exterior brick appears to be in good condition. The foundation
         wall is partially exposed. It shows no significant cracking and appears to be in good condition. Gutters and
         downspouts are in place and appear to be functioning properly. See Photographs 1 and 2 for typical interior
         and exterior conditions.

         CONCLUSIONS
                   The structure observed appears to be consistent with the framing shown in the design drawings.
         Overall, it is the opinion of PE that the building is in good structural condition with no remediation work
         required.
Cottage Grove Municipal Facilities Study
STRUCTURAL SURVEY & REPORT
August 1, 2006
Page 2

DPW BUILDING

        OBSERVATIONS (PLAN REVIEW)
                 The DPW building is a prefabricated one-story metal building with an interior above grade vault.
        The front portion of the building is partitioned for office and lobby space. The remainder of the building is
        garage and storage space. There is a small mezzanine area in the garage that consists of 2x10 joists
        supported by wood stud walls. There is also a loading dock at the southeast corner of the building.

        OBSERVATIONS (SITE VISIT)
                  The lobby and office area ceiling area consists of a typical acoustical drop ceiling (See Photograph
        3). This appears to be in good condition. The one area of note is in the lobby area, where there is some
        discoloration in the ceiling tile, possibly due to water infiltration (See Photograph 4). Wall finishes consists
        of gypsum sheathing in the office/lobby area, and look to be in good condition.
                  The exposed structural steel all appears to be in good condition. There are no signs of rust or
        other deterioration (See Photograph 5).
                  The wood mezzanine framing appears to be in good condition (See Photograph 7). There is no
        sign of cracking in the observed joists or studs. There is also no sign of any water damage.
                  There are some cracks observed in the concrete slab on grade in the garage area, but they are
        considered minor. There is also some cracking in the loading dock walls, but they are also considered minor
        (See Photograph 8 and 9). In both cases, the cracking seems consistent with normal wear and tear.
                  The exterior finishes on the building appear to be in good condition and show no signs of
        deterioration (See Photograph 6). Downspouts are present and appear to be functioning properly.

        CONCLUSIONS
                 The structure observed appears to be consistent with the framing shown in the design drawings.
        The one area of note is the discoloration of one of the drop ceiling tiles in the front lobby area. It may be
        advisable to investigate the source of the discoloration to prevent any future issues. Overall, it is the opinion
        of PE that the building is in good structural condition with no remediation work required.

FIRE STATION

        OBSERVATIONS (PLAN REVIEW)
                  The fire station consists of 1st floor multi-use space, a garage with clerestory, mezzanine, hose
        tower, and partial basement. The roof is framed with steel joists supported by either load-bearing masonry
        or structural steel. The mezzanine consists of a concrete slab supported by metal deck and steel joists.
        The joists bear on either load-bearing masonry or structural steel. 1st floor space is primarily slab-on-grade
        construction. Over the basement areas, the first floor framing consists of precast (PC) plank supported by
        concrete foundation walls or structural steel.

        OBSERVATIONS (SITE VISIT)
                 The majority of the 1st floor space is finished with a drop ceiling (See Photograph 10). The ceiling
        looks to be in good condition and shows no signs of deterioration.
                 Interior and exterior walls are primarily exposed CMU block. The exterior CMU block has some
        cracking in multiple areas, primarily near wall openings (See Photograph 11 and 12). The cracking is
        considered minor and does not significantly impact its structural capacity. Other walls are finished with a
        gypsum sheathing, which appears to be in good condition and shows no signs of distress.
Cottage Grove Municipal Facilities Study
STRUCTURAL SURVEY & REPORT
August 1, 2006
Page 3

                  Where visible, the slab-on-grade appears to be in good condition. There is minor cracking visible
         in a few areas, but it does not have a significant structural impact (See Photograph 17). The concrete
         mezzanine slab appears to be in generally good condition. There are some areas where cracking has
         occurred and a patch has been applied (See Photograph 15). The 1st floor PC plank appears to be in good
         condition (See Photograph 16). No cracks are visible and the plank shows no visible signs of distress.
                  The structural steel and steel joists observed on site appear to be in good condition (See
         Photograph 13 and 14). There are no signs or rust or other deterioration. They appear to be functioning
         properly with no signs of distress.
                  As viewed from above, the roof appears to be in good condition. There are no visible signs of
         water damage or drainage issues.

         CONCLUSIONS
                  The structure observed appears to be consistent with the framing shown in the design drawings.
         The cracking observed in both the CMU walls is minor and does not affect the structural capacity. The
         cracking in the concrete slab-on-grade is also minor and considered normal wear and tear. The cracking
         observed in the mezzanine slab looks to be minor. Further investigation should be done to determine when
         the cracks in the slab occurred and when the patch was applied. It is the opinion of PE that the building is in
         good structural condition with no remediation work required.

SUMMARY

         In conclusion, the existing structural systems observed in the three Cottage Grove Municipal Facilities all
appear in good condition. Any signs of deterioration observed are minor seem consistent with normal wear and tear.
They do not significantly impact the structural capacity of the building in question.

        Please review the above report and contact PE’s office if further clarification is necessary or if additional
questions develop.

Sincerely,




PIERCE ENGINEERS, INC.
Joshua S. Dietsche, P.E.
Structural Engineer
Cottage Grove Municipal Facilities Study
STRUCTURAL SURVEY & REPORT
August 1, 2006
Page 4




                         Photograph 1 - Municipal Building; Typical Interior Finishes




                         Photograph 2 - Municipal Building - Typical Exterior Finishes
Cottage Grove Municipal Facilities Study
STRUCTURAL SURVEY & REPORT
August 1, 2006
Page 5




                             Photograph 3 - DPW; Typical Interior Office Finishes




                            Photograph 4 - DPW; Possible Water Penetration Issue
Cottage Grove Municipal Facilities Study
STRUCTURAL SURVEY & REPORT
August 1, 2006
Page 6




                                  Photograph 5 - DPW; Typical Steel Framing




                                Photograph 6 - DPW; Typical Exterior Finishes
Cottage Grove Municipal Facilities Study
STRUCTURAL SURVEY & REPORT
August 1, 2006
Page 7




                               Photograph 7 - DPW; Typical Mezzanine Framing




                         Photograph 8 - DPW; Minor Cracking @ Loading Dock Door
Cottage Grove Municipal Facilities Study
STRUCTURAL SURVEY & REPORT
August 1, 2006
Page 8




                          Photograph 9 - DPW; Minor Cracking at Loading Dock Wall




                             Photograph 10 - Fire Station; Typical Interior Finishes
Cottage Grove Municipal Facilities Study
STRUCTURAL SURVEY & REPORT
August 1, 2006
Page 9




                      Photograph 11 - Fire Station; Minor Cracking in Exterior CMU Wall




                      Photograph 12 - Fire Station; Minor Cracking in Exterior CMU Wall
Cottage Grove Municipal Facilities Study
STRUCTURAL SURVEY & REPORT
August 1, 2006
Page 10




                      Photograph 13 – Fire Station; Typical Steel Roof Trusses in Garage




                    Photograph 14 – Fire Station; Typical Steel Roof Trusses at Mezzanine
Cottage Grove Municipal Facilities Study
STRUCTURAL SURVEY & REPORT
August 1, 2006
Page 11




                          Photograph 15 - Fire Station; Crack repair at Mezzanine Slab




                Photograph 186 - Fire Station; Typical PC Plank and Steel at 1st Floor Framing
Cottage Grove Municipal Facilities Study
STRUCTURAL SURVEY & REPORT
August 1, 2006
Page 12




                       Photograph 17 - Fire Station; Minor Slab Cracking at Garage Slab
                              SURVEY AND REPORT
      FIRE AND EMS, ADMINISTRATION, & MAINTENANCE
                       BUILDINGS
             VILLAGE OF COTTAGE GROVE, WISCONSIN

                                   INTRODUCTION

A site visit was made on July 19, 2006 to review the existing plumbing, heating,
ventilating and air conditioning systems serving the above facilities.

Following are descriptions of the existing systems serving the buildings. The description
of the systems is based on review of existing mechanical drawings and site observations.

Comments with regard to the condition of the existing systems are based on observations
made during the site visit and should not be construed as a complete evaluation of the
systems and their conditions.


ADMINISTRATION BUILDING: HVAC SYSTEMS

ASSESSMENT

Heating, Ventilating and Air Conditioning (HVAC) System

The building is heated and air conditioned
by four Carrier Model 58SXC100G, gas-
fired, up-flow, sealed combustion, high
efficiency furnaces. The furnaces have
excellent combustion efficiency ratings of
93%. Each furnace has a rated volume of
2,000 cfm supply air with a scheduled
minimum outdoor ventilation air of 500
cfm. The furnaces are located in two
separate mechanical rooms and were
installed as original equipment when the
building was constructed in 1993.




                                         Page 1
Air conditioning for each
furnace is provided by an
evaporative cooling coil
located in the discharge side
of the ductwork matching
condensing unit dedicated for
each furnace. The
condensing units are located
on grade along the north side
of the building. Each
condensing unit is rated at 5
tons of air conditioning.

Each furnace is equipped
with a Honeywell 7-day, programmable electric thermostat. There is one thermostat for
each furnace.

The toilet rooms, staff room, meeting room, and janitor closets
have dedicated exhaust fans. The total scheduled exhaust
volume is slightly less than the total scheduled supply volume.
The result is that, when operating properly, the building should
be at a slight positive pressure relative to the outdoors. This
should mean that the influx of cold air during the winter when
entrance doors are open should be minimized. If the amount of
outdoor ventilation air to each furnace is less than scheduled, the
opposite may be true.

The vestibule and exit door corridors are equipped with electric
wall heaters that have their own integral thermostats


General Comments

   1. The original installation shows strong evidence of quality workmanship. The
      ductwork is clearly labeled, neatly insulated, quality manual balancing dampers
      are installed, and there is evidence that the furnace air volumes were measured
      and balanced.
   2. The amount of outside air scheduled for each furnace is 25% of the total airflow
      of the furnace. While there is no evidence to the contrary, most furnaces like
      these usually operate at a limit of around 20% maximum outdoor air.
   3. The fact that there are only four thermostats to serve the entire building means
      that most workers will have comfort complaints sometime during the year. This
      is most common in open office areas having adjacent entrance doors. It is
      expected that the building suffers, not from heating or cooling capacity, but from
      a lack of control due to the limited number of thermostatically controlled zones in
      the building.



                                           Page 2
   4. The building does not have any type of baseboard or perimeter heating to offset
      winter heat losses along the exterior walls. Not all buildings require perimeter
      heating, but as a general rule of thumb, when the heat loss in a building’s exterior
      envelope exceeds 400 btus/lineal foot of wall, then consideration should be given
      to providing some type of perimeter skin heat.


APPARENT CODE VIOLATIONS

Heating, Ventilating and Air Conditioning (HVAC) System

   1. None noticed.

PROJECTION OF EQUIPMENT USEFUL LIFE

Heating, Ventilating and Air Conditioning (HVAC) System

The building HVAC system appears to be reasonably well maintained, and no equipment
appears to be in imminent requirement of replacement. The nominal expected useful
service life of various pieces of HVAC equipment is listed in the ASHRAE Applications
Handbook (2003 edition). The applicable nominal lives of the HVAC equipment in the
building are as follows:

Equipment             Age             ASHRAE                 Est. Useful Remaining Life
Furnaces              13 years        18 years               5 to 10 years
Condensing Units      15 years        15 years               2 to 7 years
Thermostats           13 years        16 years               5 to 10 years
Electric Heaters      13 years        13 years               2 to 5 years

As dictated by architectural and Owner end-use requirements, the HVAC equipment in
the future may or may not be required to be different than it is today. If, operationally,
the end-use remains similar, then it is recommended that future equipment replacement
be on a one for one basis using similar equipment. This is most cost effective.
Consideration could also be given to adding perimeter heat to specific areas, and adding
sub-zoning controls to the four furnaces to allow more occupants control over their
environment.

Opinion of Probable Cost

HVAC: $5.00 to $7.00 per square foot.




                                          Page 3
MAINTENANCE BUILDING: HVAC SYSTEMS

ASSESSMENT

Heating, Ventilating and Air Conditioning (HVAC) System

The front offices of the building, the shop office, and break room are heated and air
conditioned by one gas-fired, sealed combustion, high efficiency furnace. The furnace
has an estimated volume of 1,600 cfm supply air
with no known outdoor ventilation air. The
furnace is located in a dry walled enclosure
located above a storage room and appears to have
been installed as original equipment when the
building was constructed in 1996. Access to the
furnace is almost non-existent. In order to get to
the furnace, a ladder must be used and one must
climb onto the ceiling of room below. Old
computers, printers, boxes, etc., must be moved in
order to gain access to the hole cut into the
drywall. It is not known when the unit was last
serviced.

There is a roof mounted condensing unit that
serves the furnace. The unit is a Comfortmaker
Model AG 048GAI, and has a nominal capacity
of 4 tons of cooling. It appears to be original.

The furnace is equipped with a Honeywell 7-day,
programmable electric thermostat.

The toilet rooms have dedicated Broan type exhaust fans. The fans operate by a wall
switch that also controls the light in the toilet room.

The vehicle maintenance/storage
bay is heated by a roof mounted,
gas-fired heating and ventilating
unit. It is an InterCity Products
Model ZAXB050EPB unit. It
has a natural gas input of
270,000 btus with an output of
216,000 btus when on high fire.
It is controlled by a wall
mounted electric Honeywell
thermostat.




                                         Page 4
General Comments

   1. There are complaints that
      the front offices are cold
      during the winter. This is
      not surprising given the
      relatively poor access to
      the furnace for servicing.
      It is suspected that the
      filters and/or cooling coil
      are plugged.
   2. The vehicle
      maintenance/storage bay
      is lacking proper exhaust
      which must be provided
      if more than 5 vehicles
      are stored in the building.
      Staff reported that up to 10 vehicles are normally stored.

APPARENT CODE VIOLATIONS

Heating, Ventilating and Air Conditioning (HVAC) System

   1. The Wisconsin code requires that garages storing over 5 vehicles or greater than
      850 square feet in area be exhausted at the rate of ½ cfm per square foot of floor
      area. This volume could be less if the space was continuously monitored for
      carbon monoxide and nitrogen dioxide.
   2. The Wisconsin code requires that office spaces be provided with a minimum of
      7.5 cfm of outdoor air whenever they are occupied. At the present time, there is
      an office worker in the front of the building and the furnace serving the worker
      has no provision for outdoor air.
   3. The Wisconsin code requires that rooms containing appliances (e.g., the furnace)
      shall be provided with a door and an unobstructed passageway measuring not less
      than 36 inches wide by 80 inches high. If in an attic, then the there must be an
      unobstructed access and an opening large enough to allow the removal of the
      appliance.

PROJECTION OF EQUIPMENT USEFUL LIFE

Heating, Ventilating and Air Conditioning (HVAC) System

The building HVAC system appears to have no regularly scheduled maintenance. The
nominal expected useful service life of various pieces of HVAC equipment is listed in the
ASHRAE Applications Handbook (2003 edition). The applicable nominal lives of the
HVAC equipment in the building are as follows:



                                         Page 5
Equipment             Age             ASHRAE                 Est. Useful Remaining Life
Furnace               10 years        18 years               Unknown
Condensing Unit       10 years        15 years               2 to 7 years
Thermostats           10 years        16 years               5 to 10 years
Rooftop HV Unit       10 years        15 years               4 to 7 years

Recognizing that the building is a maintenance shop, no wholesale changes to the HVAC
system are required. Modifications are in order, to be sure. It is recommended that the
furnace be provided with proper access and service. The furnace should be retrofitted
with a small amount of code required outside air equal to at least 7.5 cfm per person.
This could be provided by a duct and damper arrangement installed through the roof to
the unit. If the front offices are used continuously in the future, then it might be to the
Owner’s advantage to install baseboard (electric) along the perimeter walls that need
heating. The vehicle bay should be provided with an exhaust system to meet code. The
exhaust fan should be sized and controlled in conjunction with the existing rooftop
heating/ventilating unit.

Opinion of Probable Cost

HVAC: $1.50 to $2.50 per square foot (minimum)
      $4.50 to $6.00 per square foot (maximum) depending on office renovation




                                          Page 6
FIRE STATION: HVAC SYSTEMS

ASSESSMENT

Heating, Ventilating and Air Conditioning (HVAC) System

Lower Level

The lower level is heated and
air conditioned by two Trane,
Model XE90, gas-fired,
sealed combustion, high
efficiency furnaces. Furnace
F-1, the second furnace on
the right in the photo, was
installed as original
equipment. The furnace has
an excellent combustion
efficiency rating of 93%.
The furnace has a rated
volume of 1,200 cfm supply          Furnace 2                                     Furnace 1
air with a scheduled
minimum outdoor ventilation air of 300 cfm. The second furnace (F-3) serving the
Lower Level was install sometime in 1999 and has an estimated 1,400 cfm supply air
with an unknown quantity of outdoor ventilation. While access to the furnace room was
locked during our visit, it is probable that the unit shares the same excellent combustion
efficiency as furnace F-1. Furnace F-1 appears to be in excellent condition with evidence
of regular maintenance.

Air conditioning for each furnace is provided by an evaporative cooling coil located in
the discharge side of the ductwork and a matching condensing unit dedicated for each
furnace. The condensing units are located on grade outside of the building. The
condensing unit serving furnace F-1 is rated at 3 tons of air conditioning, while the unit
serving furnace F-3 is rated at 3-1/2 tons.

Each furnace is equipped with a Honeywell 7-day, programmable electric thermostat.
There is one thermostat for each furnace.

First Floor

South of West Entrance and Stairwell

This area includes the lounge and EMS. It is heated and air conditioned by one Trane
gas-fired, sealed combustion, high efficiency furnace. Furnace F-2, the first furnace on
the left in the photo shown above for the Lower Level, was installed as original
equipment. The furnace has an excellent combustion efficiency rating of 93%. The
furnace has a rated volume of 1,990 cfm supply air with a scheduled minimum outdoor


                                          Page 7
ventilation air of 300 cfm. Like the furnace F-1, furnace F-2 appears to be in excellent
condition with evidence of regular maintenance.

Air conditioning for the
furnace is provided by an
evaporative cooling coil
located in the discharge side of
the ductwork and a matching
condensing unit dedicated for
the furnace. The condensing
units for furnace F-1 and F-2
are located on grade outside of
the building near the
emergency generator. The             Condensing
condensing unit serving              Units for F-1
furnace F-2 is rated at 4.3 tons     and F-2
of air conditioning.

The furnace is equipped with a Honeywell 7-day, programmable electric thermostat.
There is one thermostat for each furnace.

Meeting Room

The meeting room is served by a
rooftop unit, RTU-1. The unit is a
Trane Model YCD048. It has a
nominal 1,520 cfm of supply air         Condensing Unit                     RTU-1
with a scheduled 330 cfm of             CU-3 for AHU-1
outside ventilation air. The unit
has a gas-fired heating section
having an input of 90,000 btus and
an output of 70,000 btus which
equates to a combustion efficiency
of 78%. The unit has 4 tons of air
conditioning to supply the meeting
room. Staff personnel indicated
that the meeting room had
difficulty maintaining comfort
levels. The rooftop unit would continuously cycle between cold air and hot air. The
original thermostat was changed recently, and it is now reported that the comfort levels
have improved because the unit no longer cycles between heating and cooling as it
previously did.




                                          Page 8
Center of Building including Conference, Offices, Training, Dispatch, and Kitchen and
Second Floor

This part of the building is served by an horizontal air handler, AHU-1, hanging from the
ceiling in a room on the second floor. The unit has a nominal air flow of 2,000 cfm with
a scheduled outside air ventilation volume of 400 cfm. The unit has an indirect gas-fired
heater having a heating capacity of approximately 40,000 btus of unknown combustion
efficiency. A five ton condensing unit, CU-3, located on the roof next to RTU-1 provides
air conditioning to the spaces.

Besides being served by AHU-1, Dispatch is also heated by a continuous bank of electric
heating elements installed behind the service counters along the entire three window
walls.

The second floor has been renovated since the building was constructed and it appears
that AHU-1 was tapped into to provide heating and air conditioning for the spaces.

The toilet rooms and shower rooms have dedicated exhaust fans that appear to meet code.

Apparatus Bay and Hose Tower

The Apparatus Bay was originally heated
only with a Titan direct-fired gas make up
air unit. The unit has a scheduled supply air
of 9,500 cfm and 3,400 cfm of outside air.
The unit has a scheduled heating capacity of
596,000 btus. From discussions with staff,
the Apparatus Bay was not kept warm
enough during winter by only running the
Titan unit.


                                         Consequently, in 2005, an infrared heating
                                         system was installed to supplement the heating
                                         in the space. An Ener Radiant XL heating
                                         system was installed throughout the Bay, and it
                                         is now reported that last winter heating issues
                                         were resolved. There are six ceiling fans
                                         installed to help destratify the air in the Bay.




The Apparatus Bay has an exhaust fan, EF-4, rated at 3,400 cfm, to exhaust the Bay.
This volume appropriately matches the amount of outside air that the Titan unit provides
to the space. The exhaust fan is controlled, as code allows, by a Vulcain Model VA201C,



                                          Page 9
Gas Detection Controller. The controller measures CO and NO2 and controls the exhaust
fan operation so that the fan runs whenever the CO and NO2 levels exceed a
predetermined level.

The Apparatus Bay also has a Carmon Vehicle Exhaust
System installed. The purpose of the system is to
capture vehicle exhaust emissions at the tailpipe source
and evacuate the emissions safely out of the building.
The system installed is a Carmon system.
Unfortunately, the system utilizes fixed hose drops that
don’t allow any flexibility. The drops are placed
throughout the Bay and unless a truck is in the vicinity
of a drop, the system cannot be easily used to collect
exhaust. At the present time, the only vehicle using the
system is the Ladder Truck. During the site survey, the
balance of the flexible hoses were found unused and in
a box in the Lower Level.

The Hose Tower is equipped with circulating fan and
indirect gas-fired heating unit to aid in the drying of the hoses. It was not in operation
during the site visit.

General Comments

   1. The building is generally well maintained from an HVAC perspective. Filters on
      units appear to be regularly changed, and there is evidence of seasonal
      maintenance.
   2. The Vulcain Gas Detector Controller is no longer being made, so while
      maintenance may not be an issue in the short term, parts availability in the future
      may become an issue.
   3. The Carmon vehicle exhaust system is essentially a non-functioning piece of
      equipment given it’s lack of flexibility.


APPARENT CODE VIOLATIONS

Heating, Ventilating and Air Conditioning (HVAC) System

   1. Present code requires that the Apparatus Bay exhaust fan be run a minimum of
      five hours per day even with the gas detector controller. It is not known if this is
      the case.




                                          Page 10
PROJECTION OF EQUIPMENT USEFUL LIFE

Heating, Ventilating and Air Conditioning (HVAC) System

The building HVAC system appears to be reasonably well maintained, and no equipment
appears to be in imminent requirement of replacement. The nominal expected useful
service life of various pieces of HVAC equipment is listed in the ASHRAE Applications
Handbook (2003 edition). The applicable nominal lives of the HVAC equipment in the
building are as follows:

Equipment              Age            ASHRAE                 Est. Useful Remaining Life
Furnace F-1,2          8 years        18 years               10 to 15 years
Furnace F-3            6 years        18 years               10 to 15 years
Cond Units CU-1,2      8 years        15 years               7 to 10 years
Cond Unit CU-3         6 years        15 years               8 to 10 years
Unit Heaters           8 years        13 years               5 to 10 years
Rooftop RTU-1          8 years        15 years               7 to 10 years
Air Handler AHU-1      8 years        18 years               10 to 15 years
Makeup Unit ABay       8 years        15 years               7 to 10 years
Elect Baseboard Ht     8 years        10 years               2 to 7 years

As dictated by architectural and Owner end-use requirements, the HVAC equipment in
the future may or may not be required to be different than it is today. If, operationally,
the end-use remains similar, then it is recommended that future equipment replacement
be on a one for one basis using similar equipment. This is most cost effective.

If the requirement for a fully functional vehicle exhaust system is deemed necessary, then
a system similar to a Plymovent of Blaschke system is strongly recommended. These
types of systems allow drive-thru bays, back up bays, and provide maximum flexibility
and ease of use.

Opinion of Probable Cost

HVAC remodeling : $9.00 to $12.00 per square foot.
Vehicle Tailpipe Exhaust: $10,000 per vehicle drop.




                                          Page 11
VILLAGE HALL: PLUMBING SYSTEMS

ASSESSMENT

Sanitary Drainage System

Sanitary waste is discharged by gravity from the building. The design of the interior
drainage system reflects the Plumbing Code at the time of construction.

The above ground waste and vent piping material appears to be polyvinyl chloride (PVC)
with solvent hub and spigot joints. The above ground waste and vent piping appears to be
in good condition.

Floor drains are equipped with nickel bronze tops. The underground waste and vent
piping was not accessible for review. No assessment of condition can be made unless
exposed and inspected.

Storm Drainage System

Storm water is collected by exterior gutters, downspouts and discharges to grade.

Domestic Water System

The design of the domestic water service and distribution system generally reflects the
Plumbing Code at the time of construction. The building is supplied by a 1-1/4 inch water
service. Its ¾-inch meter has a remote register and a sampling faucet.

The domestic water distribution system appears to consist of copper pipe with soldered
fittings and bronze gate valves rated for 600 psi. Pipe insulation of polyurethane foam is
poorly installed. Pipe labels are stenciled and valve tags are of brass tags. A water
softener treats hot water for the building. The softener has a mechanical control and
demand meter. The backwash pipe is not fitted with a code-complying vacuum breaker
tee. The softener system is equipped with shutoff valves and a bypass valve. The piping
at the meter and at the urinal flush valve deflect with modest pressure.

The domestic hot water is supplied from a 30 gallon Rheem electric water heater. The
water heater is equipped with thermometers, a circulation pump and an inlet check valve.
It is not equipped with an expansion tank. One thermometer is not working.

The appearance of spout outlets suggests an accumulation of mineral deposits caused by
hard water. The source is likely to be the cold water which is not treated by the softener.

Fire Suppression Systems

No sprinkler system was observed.




                                          Page 12
Plumbing Fixtures

In general, the plumbing fixtures appear to be in excellent condition, with the following
observations.

Hose Bib: Brass, chrome-plated, loose-keyed, exposed-type short spout, freeze-resistant,
              hose connection vacuum breaker.

Drinking Fountain: a pair of surface-mounted electric water cooler, basin of stainless
             steel, vinyl covered steel base, ADA.

Lavatory: Self-rimming, vitreous china, ADA, centerset single-lever metered faucet,
               tubular brass trap, offset grid strainer, no insulation. Run time exceeds 20
               seconds

Mop Basin: acrylic basin, 24-inch square, chrome-plated brass faucet and spout vacuum
             breaker, hose bracket and mop hangers. The faucet lacks supply stops.

Sink: Self-rimming, stainless steel single compartment sink, deck-mounted faucet with
              single-lever, swing spout and vegetable spray, plastic trap

Urinal: Wall-mounted, wash-down, vitreous china, top-spud urinal with hand operated
              exposed flush valve. The concealed electric portion of a former sensor
              control remains in the wall behind the flush handle.

Water Closet: Floor outlet, tank type, vitreous china water closet, 3.5 gallon per flush,
              ADA design, American Standard.

General Comments

   1. Eliminate two potential health hazards by installing a vacuum breaker tee at the
      water softener and a hose connection vacuum breaker at the mop basin. Add code-
      required supply stops at the mop basin.
   2. A timer on the hot water circulation pump will meet the energy code. An
      expansion tank on the cold water side of the water heater is then recommended.
   3. It is recommended that piping at the meter and urinal be fully secured.
   4. The water closets do not meet current Federal water conservation requirements.
   5. It is recommended that cold water to fixtures, in addition to the hot water, be
      softened. A larger water softener is then required and the exterior hose bibs will
      require a separate distribution system. The metering faucets and all aerators are
      recommended to be replaced since the revised softener will improved their
      performance.
   6. It is recommended that pipe insulation be repaired or replaced and relabeled if
      necessary.
   7. ADA deficiencies include: supplies and traps on lavatories do not have insulation.



                                          Page 13
A PROJECTION OF EQUIPMENT USEFUL LIFE

Sanitary Drainage System

With an estimated 50 year life of a sanitary drainage system similar to the one installed,
we estimate 37 years of useful life remaining in this building. Thereafter, component
failures are likely to occur and the frequency of occurrence will grow in succeeding
decades.

Domestic Water System

With an estimated 50 year life of a water supply distribution system similar to the one
installed, we estimate 37 years of useful life remaining in this building. With an estimated
15 year life of a water heater, we estimate 2 years of useful life remaining. With an
estimated 20 year life of a water softener, we estimate 7 years of useful life remaining.
Thereafter, component failures are likely to occur and the frequency of occurrence will
grow in succeeding decades.

Plumbing Fixtures

With an estimated 50 year life of adequately maintained, commercial-grade plumbing
fixtures similar to the ones installed, we estimate 37 years of useful life remaining in this
building. With an estimated 20 year life of adequately maintained electric drinking
fountains similar to the ones installed, we estimate 7 years of useful life remaining.
Adequate maintenance includes minor part replacements of faucets and flush
mechanisms.

Opinion of Probable Cost

The following opinions apply to full system replacements.
       $2.50 to $3.50 per square foot or
       $2200 per fixture

REVIEW OF EQUIPMENT REPLACEMENTS

Sanitary and Storm Drainage Systems

None is recommended.

Domestic Water System

Replace water softener as described under General Comments. Replace water heater with
similar heater but installed with a circulation pump timer and expansion tank.




                                          Page 14
Opinion of Probable Cost

Opinion of providing a larger water softener and separate distribution to hose bibs: $1900
to $3400

Opinion of replacing water heater: $1200 to $1700

Fixture replacement with the same rough-in: $300 to $400 except electric drinking
fountain at $1700.




                                         Page 15
FLEET MAINTENANCE BUILDING: PLUMBING SYSTEMS

ASSESSMENT

Sanitary Drainage System

Sanitary waste is discharged by gravity from the building. The design of the interior
drainage system reflects the Plumbing Code at the time of construction.

The above ground waste and vent piping material appears to be polyvinyl chloride (PVC)
with solvent hub and spigot joints. The above ground waste and vent piping appears to be
in good condition.

Floor drains are equipped with nickel bronze tops. The underground waste and vent
piping was not accessible for review. No assessment of condition can be made unless
exposed and inspected.

A single garage catch basin serves the vehicle maintenance space.

Storm Drainage System

Storm water is collected by exterior gutters, downspouts and discharges to grade.

Domestic Water System

The design of the domestic water service and distribution system generally reflects the
Plumbing Code at the time of construction. The building is supplied by a 1-1/2 inch water
service located more than 30 feet from the building exterior, which is beyond the three
foot limitation of the Plumbing Code. Its ¾-inch meter has a remote register.

The domestic water distribution system is generally located below the floor. It appears to
consist of copper pipe with soldered fittings and bronze gate valves. Pipe insulation,
poorly installed in short lengths of hot water pipe only, is polyurethane foam. Pipes are
not labeled and valves are not tagged.

The domestic hot water is supplied from (2) Rheem electric water heaters located in two
separate locations. The water heaters are equipped with an inlet shutoff valve and relief
valve. They are not equipped with an outlet shutoff valve. On one of them, the relief
valve discharge is piped to another room, which is not code allowed.

The appearance of spout outlets suggests an accumulation of mineral deposits caused by
hard water.

Fire Suppression Systems

No sprinkler system was observed.



                                         Page 16
Compressed Air System

A two-stage air compressor, Quincy QT-5 rated at 17 CFM @ 175 psi but set to
approximately 100 psi, with air receiver supplies air to 12 service outlets.

The distribution pipe material is black steel with threaded joints. Each service outlet
includes a hose quick-connect and a threaded connection on a ball valve rated for 600 psi.

Plumbing Fixtures

In general, the plumbing fixtures appear to be in excellent condition, with the following
observations.

Drinking Fountain: surface-mounted electric water cooler, single basin of stainless steel,
             vinyl covered steel base, ADA.

Lavatory: Wall hung, vitreous china, ADA, centerset single-lever faucet, tubular brass
              trap, offset grid strainer, no insulation.

Laundry tub: acrylic basin, gooseneck spout, single-lever control

Sink: The building has several styles of sinks
               a. Self-rimming, stainless steel single compartment sink, gooseneck
                  spout, single lever control, plastic trap
               b. Self-rimming, stainless steel double compartment sink, deck-mounted
                  faucet with single-lever, swing spout and vegetable spray, plastic trap,

Water Closet: Floor outlet, tank type, vitreous china water closet, 3.5 gallon per flush,
              ADA design, American Standard.

General Comments

   1. The water closets do not meet current Federal water conservation requirements.
   2. The west water heater requires revising the relief valve to discharge into the
      vehicle maintenance space.
   3. It is recommended that hot and cold water supply to fixtures be treated with a
      water softener. The exterior hose bibs will then require a separate distribution
      system.
   4. It is recommended that the insulation of the hot water piping be repaired or
      replaced.
   5. It is recommended that pipes be labeled and valves tagged.
   6. ADA deficiencies include: supplies and traps on lavatories do not have insulation
      and drinking fountains are at one level only.




                                          Page 17
A PROJECTION OF EQUIPMENT USEFUL LIFE

Sanitary Drainage System

With an estimated 50 year life of a sanitary drainage system similar to the one installed,
we estimate 40 years of useful life remaining in this building. Thereafter, component
failures are likely to occur and the frequency of occurrence will grow in succeeding
decades.

Domestic Water System

With an estimated 50 year life of a water supply distribution system similar to the one
installed, we estimate 40 years of useful life remaining in this building. With an estimated
15 year life of a water heater, we estimate 5 years of useful life remaining. Thereafter,
component failures are likely to occur and the frequency of occurrence will grow in
succeeding decades.

Compressed Air System

With an estimated 50 year life of a compressed air system similar to the one installed, we
estimate 40 years of useful life remaining in this building. Thereafter, component failures
are likely to occur and the frequency of occurrence will grow in succeeding decades.

Plumbing Fixtures

With an estimated 50 year life of adequately maintained, commercial-grade plumbing
fixtures similar to the ones installed, we estimate 40 years of useful life remaining in this
building. With an estimated 20 year life of adequately maintained electric drinking
fountains similar to the ones installed, we estimate 10 years of useful life remaining.
Adequate maintenance includes minor part replacements of faucets and flush
mechanisms.

Opinion of Probable Cost

The following opinions apply to full system replacements.
       $3.00 to $4.00 per square foot or
       $2200 per fixture

REVIEW OF EQUIPMENT REPLACEMENTS

Sanitary and Storm Drainage Systems

None is recommended.




                                          Page 18
Domestic Water System

Install a water service valve within three feet of where the water service enters the
building.

Opinion of Probable Cost

Opinion of providing a water softener and separate distribution to hose bibs: $1500 to
$3000

Opinion of installing the water service valve: $1000 to $2000

Fixture replacement with the same rough-in: $300 to $400 except electric drinking
fountain at $1700. Additional cost for fixture rough-in: $1400 to $1800.




                                          Page 19
FIRE AND EMS: PLUMBING SYSTEMS

ASSESSMENT

Sanitary Drainage System

Sanitary waste is discharged by gravity from the building through two 4-inch laterals.

The above ground waste and vent piping material appears to be polyvinyl chloride (PVC)
with solvent hub and spigot joints. The above ground waste and vent piping appears to be
in good condition.

Floor drains and floor cleanouts with nickel bronze tops are by J.R. Smith. The
underground waste and vent piping was not accessible for review. No assessment of
condition can be made unless exposed and inspected.

A sump pump with a simplex submersible pump connects to a floor drain at the base of
the hose tower.

A garage catch basin is connected to each of three trench drains and is served by one of
the sewer laterals. The material of the basin grates and trench drain body and grates is
cast iron. No vent piping is shown on the drawings nor observed as would be expected
for a code-compliant design. Otherwise, the design of the interior drainage system
reflects the Plumbing Code at the time of construction.

Storm Drainage System

The storm water is collected by roof drains with interior conductors and drain piping.
Drain body and dome appear to be cast iron.

The piping material appears to be polyvinyl chloride (PVC) with solvent hub and spigot
joints. The underground piping was not accessible for review. No assessment of condition
can be made unless exposed and inspected.

Water Supply System

Except as noted, the design of the domestic water service and distribution system
generally reflects the Plumbing Code at the time of construction. The building is supplied
by (2) 2-inch water services. The one entering the southwest wall of the basement
supplies domestic. Its ¾-inch meter has a remote register, sampling faucet and 2-inch ball
valves rated for 175 psi. The other service enters the northwest corner of the apparatus
bay with a 1-1/2 inch meter, remote register and no bypass or sampling faucet. It
connects to two 1-1/2 inch fire hose connections without backflow preventers.

The domestic water distribution piping system appears to consist of copper pipe with
soldered fittings and bronze gate valves. Pipe insulation is fiber glass with kraft vapor
barrier or mastic. The distribution system includes separate cold water for softened and


                                         Page 20
unsoftened water as well as hot water with hot water return. Pipes are secured to the
building with either saddles below the pipe insulation or clamps directly attached to the
pipes. Identity includes brass valve tags and adhesive-backed pipe labels.

The softened water is treated with a simplex ion exchange water softener, Hellenbrand
H100-32. The softener is equipped with a mechanical control and a demand meter. The
backwash pipe is fitted with a code-complying vacuum breaker tee. The softener system
is equipped with an inlet check valve, shutoff valves and a bypass valve.

The domestic hot water is supplied from a 40 gallon gas water heater, A.O. Smith FPSH
40. The water heating system is equipped with an expansion tank, an outlet thermometer,
vacuum relief valve, inlet shutoff valve, and a recirculation pump. It is not equipped with
an inlet check valve, outlet shutoff valve, pump motor controller or combustion-air intake
pipe to the exterior.

Staff has reported water quality issues that occurred prior to the installation of the water
softener.

Fire Suppression Systems

No sprinkler system was observed. A fire hydrant was observed close to the front
overhead doors. A partial dry manual standpipe with hose connections and exterior
Siamese connection was observed in the hose tower.

Compressed Air System

A two-stage air compressor, Devilbiss rated at 10 CFM @ 90 psi but set at 138 psi, with
air receiver supplies air to several apparatus. The supply pressure regulator is set for 95
psi. Four methods remove moisture from the compressed air: a Wright-Austin tank
automatic drain, a Wright-Austin cast iron automatic separator, a dirt and moisture leg for
manual drainage, and a Wilkerson line filter near each hose drop.

The distribution pipe material is black steel with threaded joints. Each hose drop to
apparatus includes the line filter and a hose reel.

Plumbing Fixtures

In general, the plumbing fixtures appear to be in excellent condition, with the following
observations.

Clothes washer connections: Gray box for residential washer, hose bibs and concrete curb
              for commercial washer

Drinking Fountain: surface-mounted electric water cooler, single basin of stainless steel,
             vinyl covered steel base, ADA.




                                          Page 21
Hose Bib: Brass, exposed-type short spout, freeze-resistant, hose connection vacuum
              breaker.

Lavatory: The building has several styles of lavatories.
              a. Wall hung, vitreous china, ADA, centerset single-lever faucet, tubular
                  brass trap, offset grid strainer, no insulation.
              b. Self-rimming oval vitreous china, ADA, centerset single-lever faucet,
                  tubular brass trap, offset grid strainer, no insulation.

Mop Basin: acrylic basin, 24-inch square, chrome-plated brass faucet with integral stops
             and hose connection vacuum breaker, hose bracket and mop hangers

Shower: The building has several styles of showers
             a. Concealed thermostatic mixing valve, lever handle, handheld shower,
                 vinyl hose, sliding bracket, wall outlet, elevated vacuum bracket with
                 wall flanges, ADA-complying, Powers L425
             b. Concealed thermostatic mixing valve, lever handle, swivel shower
                 showerhead, elevated vacuum bracket with wall flanges, Powers L425
             c. Surface-mounted thermostatic mixing valve, lever handle, two vandal-
                 resistant shower heads, diverter valve, Powers Hydrol-Panel

Sink: The building has several styles of sinks
               a. Self-rimming, stainless steel single compartment sink, deck-mounted
                  faucet with swing spout, plastic trap
               b. Self-rimming, stainless steel double compartment sink, deck-mounted
                  faucet with pull-out spout, plastic trap, dishwasher connections and
                  under-counter grease interceptor, Schier AT 1815-L
               c. Free-standing, stainless steel double compartment sink with left and
                  right drain boards, pair of backsplash-mounted faucets with swing
                  spouts and lever handles, plastic traps

Urinal: Wall-mounted, wash-down, vitreous china, top-spud urinal with hand operated
              exposed flush valve.

Water Closet: Floor outlet, tank type, vitreous china water closet, 1.6 gallon per flush,
              ADA design but the handle location is not on the wide side of the fixture
              in most toilet rooms, American Standard.

General Comments

   5. The water service and 1-1/2 inch fire hose connection are not code-compliant,
      neither with the current code nor at the time of construction. A bypass is required
      at the meter and a backflow preventer, reduced pressure principle type, is required
      either at the start the distribution or at each hose connection. A garden hose bib
      was erroneously included near each the fire hose connection and should be
      removed since it lacks a shutoff valve.



                                         Page 22
   6. The garage catch basin design, as indicated on the drawings, is not code-
      compliant, neither with the current code nor at the time of construction. The
      current code requirement is a vent connection at the basin outlet, a trapped inlet
      and a trapped outlet.
   7. It is recommended that the water heater be equipped with an inlet check valve, an
      outlet shutoff valve, a pump motor controller, and a combustion-air intake pipe to
      the exterior. The capacity of the water heater appears marginal given the size of
      the commercial washer in the laundry.
   8. The discharge of the compressed air receiver is diverted from the floor drain to a
      covered container that appears excessively saturated with oil.
   9. ADA deficiencies include: the flush handles on several water closets are not on
      the wide side of the fixture, supplies and traps on lavatories do not have
      insulation, drinking fountains are at one level only.

A PROJECTION OF EQUIPMENT USEFUL LIFE

Sanitary Drainage System

With an estimated 50 year life of a sanitary drainage system similar to the one installed,
we estimate 42 years of useful life remaining in this building. Thereafter, component
failures are likely to occur and the frequency of occurrence will grow in succeeding
decades.

Storm Drainage System

With an estimated 50 year life of a storm drainage system similar to the one installed, we
estimate 42 years of useful life remaining in this building. Thereafter, component failures
are likely to occur and the frequency of occurrence will grow in succeeding decades.

Water Supply System

With an estimated 50 year life of a water supply distribution system similar to the one
installed, we estimate 42 years of useful life remaining in this building. With an estimated
15 year life of a water heater, we estimate 7 years of useful life remaining. With an
estimated 20 year life of a water softener, we estimate 19 years of useful life remaining.
Thereafter, component failures are likely to occur and the frequency of occurrence will
grow in succeeding decades.

Compressed Air System

With an estimated 50 year life of a compressed air system similar to the one installed, we
estimate 42 years of useful life remaining in this building. Thereafter, component failures
are likely to occur and the frequency of occurrence will grow in succeeding decades.




                                          Page 23
Plumbing Fixtures

With an estimated 50 year life of adequately maintained, commercial-grade plumbing
fixtures similar to the ones installed, we estimate 42 years of useful life remaining in this
building. With an estimated 20 year life of adequately maintained electric drinking
fountains similar to the ones installed, we estimate 12 years of useful life remaining.
Adequate maintenance includes minor part replacements of faucets, flush mechanisms
and shower valves.

Opinion of Probable Cost

The following opinions apply to full system replacements.
       $5.00 to $6.00 per square foot or
       $2200 per fixture

REVIEW OF EQUIPMENT REPLACEMENTS

Sanitary and Storm Drainage Systems

None is recommended.

Water Supply System

Provide revised water service with meter bypass and backflow preventer for the
distribution to the 1-1/2 inch fire hose connections.
Provide a water heater with a 75 or 100 gallon tank and a larger recovery capacity to
more generously meet the demands of the commercial-sized clothes washer.

Opinion of Probable Cost

Fixture replacement with the same rough-in: $300 to $400 except electric drinking
fountain at $1700. Additional cost for fixture rough-in: $1400 to $1800.

Opinion of the revised water service cost: $4000 to $5000

Opinion of the water heater replacement installed cost: $6500 to $8000.




                                          Page 24
                             SURVEY AND REPORT

       FIRE AND EMS, ADMINISTRATION, & MAINTENANCE
                        BUILDINGS

             VILLAGE OF COTTAGE GROVE, WISCONSIN

                                   INTRODUCTION

A site visit was made on July 26, 2006 to review the existing electrical systems serving
the above facilities. Following are descriptions of the existing systems serving the
buildings. The description of the systems is based on review of existing electrical
drawings and site observations. Comments made in regard to the condition of the
existing system are based on observations made during the site visit and should not be
construed as a complete evaluation of the system and their conditions.


ADMINISTRATION BUILDING: ELECTRICAL SYSTEMS


ASSESSMENT

Electric Service and Power Distribution

The building is served by a utility transformer on the north side of the building. The
service is 400A, 120/208 volt, 3-phase 4-wire. No demand data was available from the
utility. There is one 400A panelboard serving the entire building. There is room for at
least 10 more 20A/1P circuits.

Emergency Generator and Transfer Switch

This building does not have an emergency generator.

Interior and Exterior Lighting

The majority of interior lighting is T8 fluorescent with electronic ballasts. The storage
and mechanical rooms have T12 fluorescent lamps. Because of the minimal usage of
these rooms, the energy savings from replacing them with T8 fluorescent will not provide
a payback of the cost to retrofit. Other fixtures have either compact fluorescent or biax
lamps; which are still specified in new construction.

The majority of exterior lighting, both building mounted and parking lot fixtures, is metal
halide. There are compact fluorescent wall sconces at the main entrance. This lighting is
controlled via photocell on/timeclock off.




                                          Page 1
Fire Alarm

This building does not have a fire alarm system. Current Code does not require one in a
business occupancy of this size.

Intercom and Clock Systems

This building does not have an intercom or clock systems.

Security Systems

This building does not have intrusion alarm, keyless entry, or closed-circuit television
systems.

Phone System

This building has its own PBX-type Samsung phone switch with voicemail. There are
five Centrex lines serving the building and 10 phones are connected to the system. The
system is serviced by Precision Communications in Sun Prairie, WI. The system is
expandable to handle additional phones and voicemail boxes.

Structured Cabling

This building has Cat 5e data and voice outlets in addition to wireless access points.
There is no central standardized data closet. If additional data outlets are installed, the
data system should be reworked to follow standard telecommunication system design
with a grounded data rack, patch panels, etc. This building is not connected to a Village-
wide network; only the municipal court in this building and police department building
are interconnected.

Audio/Video

The meeting room in this building is equipped with a sound system and 3 cameras – 2
fixed and 1 stand mounted for distributing the board meetings to the local cable television
company to broadcast to the community. The mixing equipment is rack- and desk-
mounted in the adjacent storage room.


APPARENT CODE VIOLATIONS

Interior and Exterior Lighting

None of the battery-powered emergency egress lighting operated when tested. This
lighting is Code required in any path of egress and room with an occupant load greater
than 50 persons (i.e. meeting room). Therefore, it should be replaced.




                                          Page 2
Under current Code emergency egress lighting is also required immediately outside of
each exit. This is a new Code since the construction of this building. Existing buildings
are not required to comply with the new Code, however if other emergency egress
lighting is being replaced it is logical that this lighting is added at the same time.

The existing exit lights are compact fluorescent. The batteries of the exit lights were not
tested at time of walk-thru, but it is likely that they are not operational. Therefore, the
exits should be replaced with LED, more energy efficient exits.


PROJECTION OF EQUIPMENT USEFUL LIFE

Electric Service and Power Distribution

The electrical service and power distribution equipment has at least another 15 years of
useful life. The service does not have the capacity for an addition. However the possible
addition of electric heat for perimeter offices could be accommodated. An additional
panel may need to be installed to accommodate the additional circuits if the baseboard
requires a 2 or 3-pole breaker.

Interior and Exterior Lighting

The interior and exterior lighting has at least another 10 years of useful life remaining.

Phone System

The existing phone switch is relatively new and has at least another 10 years of useful life
remaining.

Structured Cabling

Technology is always changing and the existing voice and phone cabling will need to be
adapted in the coming years. This is typical in new construction as well. With the use of
wireless network technology, the existing cabling will likely be adequate for another 10
years. A centralized data closet should be provided if an addition or remodeling will be
completed.

Audio/Video

The audio and video system in the Board Room is new. There is no need for this system
to be updated. However, there could be better organization of the head-end equipment in
the adjacent data room.




                                           Page 3
OPINION OF PROBABLE COST

Circuits for baseboard heaters along perimeter assuming additional panelboard
required.                                                                           $5,000

Replace existing emergency egress lighting.                                         $2,100

Provide emergency egress lighting at exterior doors.                                $1,400

Replace existing exit lights.                                                       $2,800

Data closet                     (included in new/addition and remodeling square foot costs)

New/addition electrical construction cost.                              $15.00/square foot

       New electric service if new addition is added.                              $10,000

Remodeling electrical construction cost.                                $16.00/square foot




                                           Page 4
MAINTENANCE BUILDING: ELECTRICAL SYSTEMS

ASSESSMENT

Electric Service and Power Distribution

The building is served by a utility transformer on the north side of the building. The
service is 1,200A, 120/208 volt, 3-phase 4-wire. The utility demand for this building is
recorded as 20kW or approximately 50A per phase. The main distribution panel does not
have a main breaker and therefore utilizes the “6-disconnect” rule per the National
Electrical Code. There are currently 4 breakers, so only two additional breakers can be
added to the main panel to meet the “6-disconnect” limit. There are four distribution
panels in addition to this main service panel. There is adequate space in this equipment
for additional circuits.

Emergency Generator and Transfer Switch

This building does not have an emergency generator.

Interior and Exterior Lighting

The shop area has metal halide low-bay fixtures with some fluorescent strips that remain
on as night lights. There is no emergency egress lighting in the machine shop area. The
office area has T8 fluorescent lighting with electronic ballasts.

The building mounted exterior lighting is metal halide Ruud wall-packs to provide
general illumination.

The existing exit lights are battery powered compact fluorescent type.

Fire Alarm

This building does not have a fire alarm system. Current Code does not require one in an
occupancy of this type and size.

Intercom and Clock Systems

This building does not have an intercom or clock systems.

Security Systems

This building does not have intrusion alarm, keyless entry, or closed-circuit television
systems.




                                          Page 5
Phone System

This building has its own PBX-type AT&T phone switch with voicemail. It is located on
the north wall of the machine shop. The system is expandable to handle additional
phones and voicemail boxes.

Structured Cabling

This building has Cat 5e data and voice outlets in addition to wireless access point
located along the north wall of the machine shop. There is no central standardized data
closet. If additional data outlets are installed, the data system should be reworked to
follow standard telecommunication system design with a grounded data rack, patch
panels, etc. This building is not connected to a Village-wide network.

Audio/Video

None.


APPARENT CODE VIOLATIONS

Interior and Exterior Lighting

The machine shop does not have emergency egress lighting. The current Code requires 1
foot-candle of emergency egress lighting in all paths of egress. Therefore, emergency
egress battery pack lighting should be installed.


PROJECTION OF EQUIPMENT USEFUL LIFE

Electric Service and Power Distribution

The electrical service and power distribution equipment has at least another 20 years of
useful life. The service would be large enough to serve a building addition and the
addition of an exhaust system in the garage area and electric baseboard heaters in the
office area.

Interior and Exterior Lighting

The interior and exterior lighting has at least another 15 years of useful life. The existing
compact fluorescent type exit lights could be replaced with more energy efficient LED-
type.




                                           Page 6
Phone System

The phone switch has at least another 10 years of useful life.

Structured Cabling

Technology is always changing and the existing voice and phone cabling will need to be
adapted in the coming years. This is typical in new construction as well. With the use of
wireless network technology, the existing cabling will likely be adequate for another 10
years. A centralized data closet should be provided if an addition or remodeling will be
completed.


OPINION OF PROBABLE COST

Feeder for exhaust system in garage area.                                         $7,500

Circuits for baseboard heaters in office area.                                    $2,500

Replace existing exit lights with LED-type.                                       $2,100

Provide emergency egress lighting in machine shop.                                $2,800

Data closet                   (included in new/addition and remodeling square foot costs)

New/addition electrical construction cost.                              $8.00/square foot

       New service if addition is proposed over the existing service.            $15,000

Remodeling electrical construction cost.                                $9.00/square foot




                                            Page 7
FIRE STATION: ELECTRICAL SYSTEMS

ASSESSMENT

Electric Service and Power Distribution

The building is served by a utility transformer on the south side of the building. The
service is 800A, 120/208 volt, 3-phase 4-wire. No demand data was available from the
utility. The main service panel is located in the basement. Other distribution panels are
located throughout the building.

Emergency Generator and Transfer Switch

This building has a 55kW natural gas generator. It is located outside of the building,
adjacent to the utility transformer. There is only one automatic transfer switch. It is
located in the basement electrical room adjacent to the main service panel. It feeds Panel
“EA”, which sub-feeds Panel “EB”. These two emergency panels serve both life safety
and non-life-safety loads.

Interior and Exterior Lighting

The majority of the interior lighting is T8 fluorescent. The apparatus bay has metal
halide fixtures. Some of these fixtures (the ones connected to the emergency lighting
circuit) have quartz restrike to have instant-on lighting if the power turns off and on
quickly.

Both building mounted and parking lot exterior lighting is metal halide. It is controlled
via photocell on/timeclock off or photocell on/photocell off.

Emergency egress lighting is provided by select fixtures connected to emergency lighting
circuits.

Exit lights are energy efficient LED-type.

Fire Alarm

An addressable Fire-Lite MS-9200 fire alarm system is installed in this building. It is
serviced by Com-Tronics in Madison. Under the current Code, a business occupancy like
this would not require a fire alarm system unless the occupant load is greater than 500
persons or any floor above or below the lowest level of exit has an occupant load greater
than 100 persons. However, the sleeping rooms in this building are required to have
single-station smoke alarms that have both audible and visual notification. The path of
egress out of the sleeping rooms must also have smoke detection. The elevator also
requires a fire alarm recall system. Therefore, because of these two requirements and the
fact that this building houses a fire department, it is logical to have a fire alarm system
throughout the building.



                                          Page 8
The existing system consists of manual pull stations at all exterior exits and exits from
each floor level; heat detection in mechanical spaces, apparatus room, kitchen; smoke
detection in storage areas, dispatch, and EMS sleeping rooms and lounge; duct smoke
detectors; audible notification throughout; visual notification in toilet rooms, laundry,
training, meeting room, conference room, and first floor EMS sleeping rooms.

The EMS sleeping rooms in the basement do not have smoke detection or visual and
audible notification.

Intercom and Clock Systems

This building has approximately 15 speakers throughout the building and an amplifier to
annunciate the radio paging for the EMS and fire services. This amplifier could be tied to
the phone system as well to allow paging of the entire building via any phone.

This building does not have a clock system.

Security Systems

This building does not have intrusion alarm, electronic keyless entry, or closed-circuit
television systems.

Phone System

This building has its own Comdial PBX-type phone switch with voicemail. The system
is expandable to handle additional phones and voicemail boxes. A lightning strike
recently caused some problems with the system, but it has been repaired and is now
operating correctly.

Currently the phone system is not tied into the ceiling/wall mounted speakers located
throughout the building. However, the occupants indicated a desire to allow paging thru
the phone system to annunciate over the speakers as well.

Structured Cabling

This building has Cat 5e data and voice outlets in addition to wireless access points.
There is no central standardized data closet. If additional data outlets are installed, the
data system should be reworked to follow standard telecommunication system design
with a grounded data rack, patch panels, etc. This building is not connected to a Village-
wide network.

Audio/Video

None.




                                          Page 9
APPARENT CODE VIOLATIONS

Emergency Generator and Transfer Switch

Current WI Comm 16 requires the utility transformer to be at least 20’ away from the
emergency generator incase one of the two pieces of equipment experiences a violent end
of life it would not take out the other piece of equipment. Existing installations are not
required to comply with current Code, but it is an item that should be noted. It would not
be recommended to move the generator at this time.

The transfer switch and emergency panelboards are located adjacent to the main service
panel. This violates NFPA 110. The emergency power system equipment can not be
located in the same room as the main service panel. Again, existing installations are not
required to comply with current Code, but it is an item that should be noted. It would not
be recommended to move the transfer switch and panelboards at this time.

The transfer switch serves both life-safety and non-life-safety loads. This violates the
National Electrical Code. Again, existing installations are not required to comply with
current Code, but it is an item that should be noted. It would not be recommended to
move provide a second transfer switch and additional panelboard for non-life-safety loads
at this time.

All three of these code violates should be addressed if the generator or transfer switch is
replaced in the future.

Fire Alarm

The existing system is deficient in visual notification devices. All public spaces should
have visual notification.

The EMS sleeping rooms do not have smoke detection with visual and audible
notification.


PROJECTION OF EQUIPMENT USEFUL LIFE

Electric Service and Power Distribution

The electrical service and power distribution equipment has at least another 25 years of
useful life. The service does not have the capacity for an addition. The service would be
large enough to handle the addition of an exhaust system in the apparatus bay.




                                          Page 10
Emergency Generator and Transfer Switch

The emergency generator and transfer switch should have another 25 years of useful life
if proper maintenance and testing is continued.

Interior and Exterior Lighting

The interior and exterior lighting has at least 20 years of useful life remaining.

Fire Alarm

The fire alarm system has at least 15 years of useful life remaining.

Intercom and Clock Systems

The intercom/paging system has at least another 15 years of useful life.

Phone System

The phone switch has at least another 10 years of useful life.

Structured Cabling

Technology is always changing and the existing voice and phone cabling will need to be
adapted in the coming years. This is typical in new construction as well. With the use of
wireless network technology, the existing cabling will likely be adequate for another 10
years. A centralized data closet should be provided if an addition or remodeling will be
completed.




                                          Page 11
OPINION OF PROBABLE COST

Interface intercom and phone system.                                                $1,500

Provide fire alarm visual notification throughout all public spaces.                $5,000

Provide fire alarm smoke detection and visual and audible notification
in EMS sleeping rooms.                                                              $3,000

Data closet                   (included in new/addition and remodeling square foot costs)

New/addition electrical construction cost.                               $12.00/square foot

       New service if addition is proposed over the existing service.              $15,000

       If additions to this facility are proposed and additional emergency
       power is required, a new generator may be required. The capacity of
       the existing generator and an estimate of new loads will need to be
       investigated further. This is only a rough budget number at this time.      $50,000

Remodeling electrical construction cost.                                 $13.00/square foot