									    STATUS OF COMPLAINTS UNDER MAHATMA GANDHI NREGA
Sl. No.    State         Name of the                 Allegations made              Action taken by Ministry   Action taken                 by    State
                         complainant                                                                          Government
   1.     Andra     Sh. S.Somi Reddy,        Irregularities in NREGA funds and Requested State Government for Reply is awaited
          Pradesh   contractor-Panchayati,   use of machines instead of labour investigation on 2.3.10
                    Anaparthy village,
                    East Godavari
   2.     Assam     Shri Bankim Chandra       Improper      implementation        of Forwarded to the State              DC Kokrajhar was asked vide
                    Brahma, Kokrajhar         NREGA in Assam due to bad Government on 14.6.2007. Reply                   letter no. RDD/267/2006/249
                    Zila Committee,           infrastructure and illegal activities awaited. Reminders sent on           dtd. 27/6/2007/ to make an
                    Assam                                                            16.7.2007, 22.08.07, 28.11.07,      enquiry into this matter and
                                                                                     26.02.08., 5.5.2008 ,23.1.09        submit a report. No report has
                                                                                     ,27.05.09 , 21.08.2009 &            been received as yet.
                                                                                     05.11.2009
   3.     Assam     Shri Hazrat Ali,         Non-payment of wages under              Forwarded to the State              D.C. Darang was requested to
                    village No.-2 Kuari      NREGA at Galandi Panchayat.             Government on 31.7.08 and           enquire into the matter and
                    Pukhuri, GP Golondi,                                             reminder sent on 23.1.09 ,          submit report.    Report is
                    District                                                         27.05.09, 21.08.2009 &              awaited.
                    Darrang                                                          05.11.2009
   4.     Assam     Shri Billal Hussain,      Non-issuance of job cards             Forwarded to the State              D.C. Darang was requested to
                    village No.-3 Golondi     Asking money for issuing job          Government on 31.7.08 and           enquire into the matter and
                    Goan, GP Golandi,           cards                                reminder sent on 23.1.09            submit report.    Report is
                    district Darrang          Not respecting the gender quota       &27.05.09 , 21.08.2009 &            awaited.
                                              Non-payment of wages under            05.11.2009
                                                NREGA.
   5.     Assam     Shri Daniel Teron,        Non-issuance of job cards             Forwarded to the State              D.C. Karbi was requested to
                    Gen. Secy. Karbi          Discriminated against people in       Government on 31.7.08 and           enquire into the matter and
                    Anglong and North           providing job cards                  reminder sent on 23.1.09 27.05.09   submit report.   Report is
                    Cachar Hill, Kisan        Failure to register a complaint       , 21.08.2009 & 05.11.2009           awaited
                    Sharamik Sobha              under NREGA in Karbi Anglong
                                                District.
6.   Assam   Shri Labjen Kemprai,       Non-payment of wages                 Forwarded to the State              D.C. NC Hill was requested to
             village Topodisa, S.O.     Misuse of funds under NREGA          Government on 31.7.08 and           enquire into the matter and
             Sarkari Bagan,              in North Cachar Hills of Assam       reminder sent on 23.1.09 27.05.09   submit report.     Report is
             Haflong, district N.C.                                           , 21.08.2009 & 05.11.2009           awaited.
             Hills
7.   Assam   Article in the Times of   Tea plantation workers dying a         Forwarded to the State              Reply is awaited
             India                     slow death                             Government 8/9/08 and reminder
             September 4, 2008                                                sent on 23.1.09 , 28.05.09 ,
                                                                              21.08.2009 & 05.11.2009
8.   Assam   Article in the „The       Hungry villagers scoff at rural „job   Forwarded to the State             Reply is awaited
             Telegraph‟        13      scheme for all‟. (Karbi Anglong)       Government on 13.01.09 and
             January, 2009                                                    reminder sent on 23.1.09 ,
                                                                              27.05.09 , 21.08.2009 & 05.11.2009
9.   Assam   Article in the Morung     Discrepancies in Tuensang NREGS        Forwarded to the State             Reply is awaited
             Express                   detected                               Government on 15.12.08 and
             Dated, 11 December                                               reminder sent on 23.1.09 ,
             2008                                                             27.05.09 , 21.08.2009 & 05.11.2009
10. Assam    Shri Sadananda Nath       Implementing authority has not         Forwarded to the State             Reply is awaited
             and others, Chakchaka     started work for job card holders on   Government on 27.2.09 and
             Development Block in      the plea that no fund for the work     reminder sent on 27.05.09 ,
             Barpeta District,         has been released under NREGA          21.08.2009 & 05.11.2009
             Assam
11. Assam    Shri Ashit Ranjan Das     Misappropriation of funds by Shri      Forwarded to the State              Reply is awaited
             (Secretary), G.P.         Krishna Singh Chhatri under            Government on 27.2.09 and
             Kalibari, under kalain    NREGA.                                 reminder sent on 27.05.09 ,
             A.P & cachar Zila                                                21.08.2009 & 05.11.2009
             Parishad, Silchar,
             district Cachar, Assam
12. Assam    Shri Labjen Kemprai,      Misuse of funds in respect of          Forwarded to the State              Reply is awaited
             forwarded by Ministry     NREGA and other Central Schemes        Government on 27.3.09 and
             of Home Affairs           in North Cachar Hills Autonomous       reminder sent on 27.05.09 ,
                                       Council in Assam                       21.08.2009 & 05.11.2009
13. Assam   Shri Azizur Rohaman          Bribe is asked for issuing job      Requested State Government for Reply is awaited
            Mazumder , Senior             cards                               investigation on 08.05.2009 and
            Citizen, Village and         Job card not yet delivered to the   reminder sent on     27.05.09 ,
            Post Nagdirgram-IV,           applicants from 07-08               21.08.2009 & 05.11.2009
            District   Cachar ,          Use of machinery instead of
            Assam                         labour
                                         No Social Audit since 07-08
                                          onwards Random violations of
                                          NREGS Acts Drastic corruption
                                          by the BDO (Mr, Rosoraj Das
                                          of Narsingpur and Sonai block
                                          with the close associate of
                                          Mr.S.M.Dev the Congress MP.
14. Assam   Shri Abul Kalam           Formulation of plan of NREGA &          Requested State Government for Reply is awaited
            Hussain, President and    its     implementation       without    investigation on 23.06.2009 and
            Shri Abur Rahim,          maintaining             transparency    reminder sent on 21.08.2009 &
            Asst. genl. Secy. Of      safeguards in a hasty and haphazard     05.11.2009
            Assam           United    manner.
            Democratic       Front
            (AUDF), Pancharatna
            Road, Golpara District
            of Assam.
15. Assam   Smt. Falguni Das and      Gram Sabha meetings are not being       Requested State Government for Reply is awaited
            others,          gram     held before the commencement of         investigation on 17.07.2009 and
            Panchayat     Katirail,   the work under NREGA and no             reminder sent on 21.08.2009 &
            Block Katigorah and       social audit of NREGA works is          05.11.2009
            Cachar District           taking place.
16. Assam   Shri     Nur  Ahmed     Releasing of more funds for           Requested State Government for Reply is awaited
            Barbhuiya, President,   generating employment in the          investigation on 04.08.2009 and
            Tupkhana       Gram     Gram Panchayat-Tupkhana Barak         reminder sent on   21.08.2009 &
            Panchayat,      P.O.    Valley. It is also alleged that the   05.11.2009
            Arunachal 25, Cachar    NREGA Scheme could not be
            District.    Mobile:    properly implemented as no funds
            9954961711              were sanctioned under NREGA for
                                    the year 2008-09 to Gram
                                    Panchayat- Tupkhana.

17. Assam   Asom Mojuri Srameek Violation of NREGA guidelines Requested State Government for Reply is awaited
            Union,          Cachar regarding issuing of job cards, investigation on 07.08.2009 and
            District, Assam         registration of workers and reminder sent on 05.11.2009
                                    allocation of work, payment of
                                    unemployment allowances, holding
                                    of Gram Sabha meetings by various
                                    Gram Panchayats in the Cachar
                                    District of Cachar.
18. Assam   Shri         Muktharul Non- issuance of job cards, work Requested State Government for Reply is awaited
            Hassan,      President/ applications not accepted instead investigation on 11.09.2009 and
            Secretary,      Assam applicants threatened and payment reminder sent on 05.11.2009
            Mojuri Sramek Union, of wages not being made to
            Village- Garkhapon, workers.
            P.O.-         Badarpur,
            District Karimganj.
19. Assam                           Irregularities in the muster roll of Forwarded  to    the    State Reply is awaited
             Shri Assme Momtaz
                                    Bhella Gram Panchayat causing Government on 29/01/2010
                 Wahid, Gram
                                    delay in MIS and Gross anomaly
               panchaayat 1No.
                                    made by the Panchayat President
             Bhella, CIC operator,
                                    under The Mahatma Gandhi
                 Barpeta CIC.
                                    NREGA.
                   Keotkuchi
20. Bihar   Shri Suresh Rai, Irregularities   and             improper Forwarded to the State              Reply is awaited
            Coordinator,       implementation   of             NFFWP Government on 15.02.07. Reply
            Meenapur,          Muzzafarpur                             waited. Reminders sent on
            Muzzafarpur, Bihar                                         23.3.2007, 16.7.2007, 22.08.07,
                                                                       28.11.07, 26.02.08., 5.5.2008,
                                                                       23.05.08, 29.05.08, 23.1.09 ,
                                                                       27.05.09 , 21.08.2009 ,05.11.2009
21. Bihar   Shri Maheshwar          Alleging Corruption under Rozgar Complaint received on 03.07.07        Reply is awaited
            Prasad Yadav, MLA       Guarantee Yojana, Katra            forwarded to the State
            Bihar Vidhan Sabha                                         Government on 28.09.07.
                                                                       Reminders sent on 28.11.07,
                                                                       26.02.08., 5.5.2008, 23.05.08,
                                                                       29.05.08, 23.1.09, 27.05.09 ,
                                                                       21.08.2009 , 05.11.2009
22. Bihar   Shri Digvijay Singh, Alleged corruption, irregularities Complaint received on 24.08.07         Reply is awaited
            General      Secretary, and improper implementation of forwarded to the State
            AICC                    NREGA in Munger, Bihar             Government on 10.09.07.
                                                                       Reminders sent on 28.11.07,
                                                                       26.02.08, 5.5.2008 , 23.1.09,
                                                                       27.05.09, 21.08.2009 &
                                                                       05.11.2009
23. Bihar    Shri Birendra Kumar Alleged financial irregularities by Forwarded to the State                Reply is awaited
            Singh                   the President and Secretary of GP, Government on 01.10.07.
                                    Mokar, Rohtas District, Bihar.     Reminders sent on 28.11.07,
                                                                       26.02.08, 5.5.2008, 23.05.08,
                                                                       29.05.08, 23.1.09 , 27.05.09 ,
                                                                       21.08.2009 & 05.11.2009
24. Bihar    Shri Rajnikant Rai,     Misuse of funds by forgery by     Forwarded to the State              As per report called from State
            village Chataneswar,    Mukhiya under NREGA.               Government on 29.4.08, 29.05.08,    Government complaint was
            block Warishnagar,                                         31.07.08 and reminder sent on       found correct explanation has
            district Samastipur                                        23.1.09, 27.05.09 , 21.08.2009 &    been called from J.E.
                                                                       05.11.2009
25. Bihar    Shri Parmod Yadav,       Regarding underpayment of         Forwarded to the State              Reply is awaited
            vill. Odhara, block        wages.                            Government on 29.4.08 and
            Rajone, district Banka    Failure to pay wages on time      reminder sent on 5.5.2008,
                                                                         23.05.08, 29.05.08, 31.07.08
                                                                         23.1.09 , 27.05.09 , 21.08.2009 &
                                                                         05.11.2009
26. Bihar    Shri Ram Dyal Ram,      Regarding failure to pay wages on   Forwarded to the State              Reply is awaited
            vill. Teliya Sarai,      time under NREGA                    Government on 29.4.08 and
            district Vaishali                                            reminder sent on29.05.08,
                                                                         31.07.08, 23.1.09 , 27.05.09,
                                                                         21.08.2009 & 05.11.2009
27. Bihar    Shri Chandeshwar        Misuse of funds and corruption      Forwarded to the State              Reply is awaited
            Pandey, vill.            under NREGA                         Government on 26.5.08, and
            Keshonarayanpur,                                             reminder sent on 29.05.08,
            Bhaya-Shahpur Patori,                                        31.07.08, 23.1.09 , 27.05.09,
            district Samstipur                                           21.08.2009 & 05.11.2009
28. Bihar   Smt. Gyanti Devi,           Manipulation in job cards       Forwarded to the State              Reply is awaited
            District President,                                          Government 31.3.08 and reminder
            Woman Rastriya Janta                                         sent on 29.05.08, 31.07.08,
            Dal , District                                               23.1.09 , 27.05.09, 21.08.2009 &
            Jahanabad                                                    05.11.2009
29. Bihar   Shri Mahavir Jha,           Showing completion of work      Forwarded to the State              Reply is awaited
            GP-Raj Yajuar(Med.),         without carrying out any work   Government 31.3.08 and reminder
            Block Katara, District      Fake entries in the             sent on 29.05.08, 31.07.08 ,
            Muzaffarpur                  Measurement Book under          23.1.09 , 27.05.09, 21.08.2009 &
                                         NREGA                           05.11.2009
30. Bihar   Shri Sanjay Kumar &         Non-issuance of job cards by    Forwarded to the State              Reply is awaited
            others, GP-Lagama,           Panchayat Secretary and         Government 31.3.08 and reminder
            Block Sonvarsha Raj,         Mukhiya under NREGA             sent on 29.05.08, 31.07.08,
            District Saharsa                                             23.1.09 , 27.05.09 , 21.08.2009 &
                                                                         05.11.2009
31. Bihar   Shri Sarfraj Khan,          Migrations of rural labourers Forwarded to the State                Reply is awaited
            village Palatpura,           due to not providing the work Government 31.3.08 and reminder
            block Bihar Sharif,          under NREGA.                    sent on 29.05.08, 31.07.08,
            district Nalanda                                             23.1.09 , 27.05.09, 21.08.2009 &
                                                                         05.11.2009
32. Bihar   Shri Subash Tiwari,         Misuse of funds and work is Forwarded to the State                  Reply is awaited
            village Taajpur, block       being got done by children Government 31.3.08 and reminder
            Motipur, district            under NREGA.                    sent on 29.05.08, 31.07.08,
            Muzaffarpur                                                  23.1.09 , 27.05.09, 21.08.2009 &
                                                                         05.11.2009
33. Bihar   Shri Ganesh Parshad         Misuse of funds                 Forwarded to the State              Reply is awaited
            Thakur, village Vina,       Non issuance of job cards Government 31.3.08 and reminder
            block 20, district           under NREGA.                    sent on 29.05.08, 31.07.08,
            Supoul                                                       23.1.09 , 27.05.09, 21.08.2009 &
                                                                         05.11.2009
34. Bihar   Smt. Laxmi Sahni,           Failure to register a complaint Forwarded to the State              Reply is awaited
            village Anandpur             and not provide the work to job Government 31.3.08 and reminder
            Gangaoliya, district         cards holders under NREGA.      sent on 29.05.08, 31.07.08,
            Muzaffarpur                                                  23.1.09 , 27.05.09 , 21.08.2009 &
                                                                         05.11.2009
35. Bihar   Shri Moin Ahmad             Reconstructions of road which Forwarded to the State                As per report called from State
            Khan, village                is in good condition under Government 31.3.08 & 8.10.08             Government complaint found
            Govindpur Khanjuri,          NREGA                           and reminder sent on 23.1.09 ,      correct and explanation has
            block Kalyanpur,                                             27.05.09 , 21.08.2009 &             been asked from the Rozgar
            district Samstipur                                           05.11.2009                          Sewak and J.E.
36. Bihar   Shri M.O.A. Sakib,          Misuse of funds                 Forwarded to the State              Reply is awaited
            village Mehsaol,            Using fake muster roll          Government 31.3.08 and reminder
            district Sitamadi           Not respecting the gender sent on 29.05.08, 31.07.08,
                                         quota                           23.1.09 , 27.05.09 , 21.08.2009 &
                                                                         05.11.2009
37. Bihar   Shri Ajay Singh,            Misuse of funds                    Forwarded to the State                Reply is awaited
            village Rohiya, block       Not respecting the gender          Government 31.3.08 and reminder
            Dumrov, district             quota in block Dumrov under        sent on 29.05.08, 31.07.08,
            Buxar                        NREGA.                             23.1.09 , 27.05.09, 21.08.2009 &
                                                                            05.11.2009
38. Bihar   Shri Murari Parshad       Non issuance of job cards, Forwarded to the State                          As per report called from State
            Sharma and others,           misuse      of     funds     under Government 31.3.08 and reminder       Government case has been
            Goravan Panchayat,           NREGA.                             sent on 29.05.08, 31.07.08,           registered against the guilty
            block Silaaw, district                                          23.1.09 , 27.05.09 , 21.08.2009 ,     person.
            Nalanda                                                         21.08.2009 & 05.11.2009
39. Bihar   Article in The Mint      Bihar‟s efforts to track rural job      Forwarded to the State               Reply is awaited
            August 18, 2008          scheme stuck                            Government 19.8.08 and
                                                                             reminder sent on 23.1.09 ,
                                                                             27.05.09 , 21.08.2009 & 05.11.2009
40. Bihar   Shri Uma Shanker           Misuse of funds,                    Forwarded to the State                Reply is awaited
            Prashad Singh(Vice-        Non payment of wages                Government on 8.10.08 and
            president, Congress        Use of sub-standard material        reminder sent on 23.1.09 ,
            Committee) Village           under the NREGA                    27.05.09 , 21.08.2009 &
            Shabaajpur, Post                                                05.11.2009
            Bhikanpur, District
            Muzaffarpur
41. Bihar   Smt. Neelam Mishra          Non-payment of wages underForwarded to the State                         Reply is awaited
            (Woman Congress              the NREGA.                Government on 8.10.08 and
            Committee) Village                                     reminder sent on 23.1.09 ,
            Shotia, District                                       27.05.09 , 21.08.2009 &
            Darbanga                                               05.11.2009
42. Bihar   Sh Pawan Sahni and          Misuse of funds           Forwarded to the State                         As per report called from State
            others, Village Raj         Low payment of wages      Government on 8.10.08 and                      Government complaint found
            Harpur Barhota,             Non issuance of job cards reminder sent on 23.1.09 ,                     correct and explanation has
            District Samatipur           under NREGA               27.05.09 , 21.08.2009 &                        been asked from the Rozgar
                                                                   05.11.2009                                     Sewak and J.E.
43. Bihar   Shri Govinchin              Misuse of funds and using of Forwarded to the State        Reply is awaited
            Mahamrik, Village            fake muster roll under the Government on 8.10.08 and
            Sikendarpur, Post            NREGA.                        reminder sent on 23.1.09 ,
            Bonsi, District Banka                                      27.05.09 , 21.08.2009 &
                                                                       05.11.2009
44. Bihar   Shri Ram Nanad Ray          Misuse of funds               Forwarded to the State       As per report called from State
            (Panchayat Member),         Using fake muster roll under Government on 8.10.08 and     Government complaint is
            Village Kewas, Block         the NREGA.                    reminder sent on 23.1.09 ,   found correct and final report
            Kewas Nijamat,                                             27.05.09 , 21.08.2009 &      will be send after thorough
            District Samastipur                                        05.11.2009                   investigation.
45. Bihar   Shri Arun Kumar             Misuse of funds under NREGA Forwarded to the State         Reply is awaited
            Mishra Bagi, Village                                       Government on 8.10.08 and
            Sasaram, District                                          reminder sent on 23.1.09 ,
            Rohtas                                                     27.05.09 , 21.08.2009 &
                                                                       05.11.2009
46. Bihar   Shri Gultel Yadav and       Use of machinery instead of Forwarded to the State         Reply is awaited
            others, Village              labour under NREGA            Government on 8.10.08 and
            Chirchodi District                                         reminder sent on 23.1.09 ,
            Banka                                                      27.05.09 , 21.08.2009 &
                                                                       05.11.2009
47. Bihar   Shri Suresh Singh and       Failure to opening account on Forwarded to the State       Reply is awaited
            others, Panchayat            bank post                     Government on 8.10.08 and
            Suryapur District           Non-issuance of job cards reminder sent on 23.1.09 ,
            Rohtas                       under the NREGA.              27.05.09 , 21.08.2009 &
                                                                       05.11.2009
48. Bihar   Shri Amresh Thakur,         Misuse of funds               Forwarded to the State       Reply is awaited
            Ex-Writer, Gram             Bogus job       cards under Government on 8.10.08 and
            Panchayat Raj Yajuaar        NREGA.                        reminder sent on 23.1.09
            (Centre), Block Katra,                                     27.05.09 , 21.08.2009 v
            District Muzaffarpur
49. Bihar   Shri Viswash Bhajan         Underpayment of wages              Forwarded to the State       Reply is awaited
            (Sarpanch) and others,      Using of fake job cards            Government on 8.10.08 and
            Block Makhadumpur,          Failure to provide work on         reminder sent on 23.1.09 ,
            District Jahanabad           time                               27.05.09 , 21.08.2009 &
                                        Using fake muster roll and         05.11.2009
                                         manipulation in job cards
                                         under NREGA.
50. Bihar   Smt. Gulesh Devi            Asking for money for issuing       Forwarded to the State       Reply is awaited
            (Sarpanch), Village          job cards                          Government on 8.10.08 and
            Kumardin, Block             To keep job cards in his           reminder sent on 23.1.09 ,
            Makhadumpur,                 custody by Sarpanch                27.05.09 , 21.08.2009 &
            District Jahanabad          Not to show the muster roll in     05.11.2009
                                         the public under NREGA.
51. Bihar   Smt. Sangita Devi,          Regarding              financial   Forwarded to the State       Reply is awaited
            Member, Panchayat            exploitation     by       Block    Government on 10.10.08 and
            Samiti, Village & P O        Programme Officer                  reminder sent on 23.1.09 ,
            Nad , Shivsagar,                                                27.05.09 , 21.08.2009 &
            Rohtas District                                                 05.11.2009
52. Bihar   Kumari Sobha Sinha,         Alleging that works approved       Forwarded to the State       As per report called from State
            President, Zilla             by Zilla Parishad in Gaya          Government on 12.11.08 and   Government , with
            Parishad, Seh Zilla          District    are   not   being      reminder sent on 23.1.09 ,   unnecessary interference work
            Yojana Samiti, Gaya          sanctioned by the State Rural      27.05.09 , 21.08.2009 &      was interrupted.
                                         Development Department.            05.11.2009
53. Bihar   Shri Sabir Ali,             Alleging discrimination in         Forwarded to the State       Reply is awaited
            MP(RS)                       allocation of NRFGA funds to       Government on 1.12.08 and
                                         Zilla Parishads in Purbi           reminder sent on 23.1.09 ,
                                         Champaran district                 27.05.09 , 21.08.2009 &
                                                                            05.11.2009
54. Bihar   Article in               “Job Guarantee scheme comes a          Forwarded to the State       Reply is awaited
            www.newkerala.com        cropper in Bihar”                      Government on 23.12.08 ,
                                                                            27.05.09 , 21.08.2009 &
                                                                            05.11.2009
55. Bihar   Shri Kailash Kumar       Misappropriation of Rs.387.000         Forwarded to the State             Reply is awaited
            Yadav, General           lakhs by the junior Engineer,          Government on 18.02.09 and
            Secretary, Bihar         Assistant Engineer and Engineer by     reminder sent on 27.05.09
            Pradesh Janta Dal        making fake muster rolls under         Proposal sent to depute an
            United, Gram             NREGA.                                 NLM.NLM report received and
            Panchayat Matadeeh,                                             copy forwarded to State
            Dharhara Prakhand,                                              Government for necessary action
            District Munger, Bihar                                          and comments on 21.07.2009 and
                                                                            reminders sent on 21.08.2009 &
                                                                            05.11.2009
56. Bihar   Shri Sitaram Yadav,      Misappropriation of funds, bogus       Forwarded to the State             Reply is awaited
            MP(LS),                  voucher, muster roll and no enquiry    Government on 18.02.09 and
                                     till date even after the decision of   proposal sent to depute an NLM.
                                     Sitamarhi District Vigilance and       and reminders sent on 27.05.09 ,
                                     Monitoring Committee in Zila           21.08.2009 & 05.11.2009
                                     Parishad Sitamarhi, Sursand,
                                     Sonvarsa and Bajpatti Prakhand,
                                     Bihar
57. Bihar   Shri Baldev Singh,       Misuse of funds of Rs. Sixty Lakhs     Forwarded to the State             Reply is awaited
            Gram Panchayat Raj       by Devendra Rai (Mukhiya) and          Government on 02.03.09 and
            Dhabaich, Block          Vinod kumar Singh (Panchyat            reminders sent on 27.05.09 ,
            Patepur, District        Secretary) under NREGA                 21.08.2009 & 05.11.2009
            Vaishali
58. Bihar   Shri Premchandra         Non opening of Account for the         Forwarded to the State             Reply is awaited
            Hazra, Village           payment of wages by Bank and           Government on 02.03.09 and
            Mathiyavrit Baithniya,   Post offices in Gram Panchyat          reminders sent on 27.05.09 ,
            District West            under the Block Majholiya, District    21.08.2009 & 05.11.2009
            Champaran                West Champaran under NREGA.
59. Bihar   Shri Prem Nath Singh,    Misappropriation of NREGA            Forwarded to the State            Reply is awaited
            President, Prakhand       funds.                               Government on 02.03.09 and
            Congress Committee,      Exploitation of job cards holder.    reminders sent on 27.05.09 ,
            Darbhanga                Use      of     Machinery      by    21.08.2009 & 05.11.2009
                                      Programme Officer , J.E and
                                      Rozgar Sewak in Village
                                      Metuniya, Block Bhedi, District
                                      Darbhanga under NREGA.
60. Bihar   Visambhar Paswan,         Construction of 40ft. Wide,          Forwarded to the State            Reply is awaited
            Village-Mathurapur        200ft.long, 10ft. Deep canal by      Government on 28.04.2009 and
            post Jagdishpur Baha      Sarpanch of village-Jagdish pur      reminders sent on 27.05.09 ,
            Nagari Thana-Sakra,       against Governmant law.              21.08.2009 & 05.11.2009
            Gram Panchayat-
            Jagdish
            purMuzaffarpur,
61. Bihar   Meena Devi and          Construction of road by Gram           Forwarded to the State            Shri Ajay Kumar Sinha, Dy.
            Others, Gram            Pradhan from soil of playing field.    Government on 22.4.2009 and       Sec., Govt. of Bihar ordered
            Panchayat Vasori,       Irregularties in making BPL            reminders sent on 27.05.09 ,      district programme co-
            Block tarari, Gram      list.The Fund has been sanctioned      21.08.2009 & 05.11.2009           ordinator, Bhojpur, AAra,
            Panchayat Vasori,       for road from school to labna                                            Bihar to look into the matter.
            Block Tarari, Bhojpur   village but work is not started yet.
            Aara
62. Bihar   Member, prakhand        Fake muster rolls and bank account     Requested State Government for    Reply is awaited
            Karyakaram              under NREGA.                           investigation on 01.05.2009 and
            Karyavayan Samiti,                                             reminders sent on 27.05.09 ,
            Madhepur,                                                      21.08.2009 & 05.11.2009
63. Bihar   Sh.Kailash Kumar        Misappropriation       of              Requested State Government for    Reply is awaited
            Yadav, Ex-              NREGA funds by fake                    investigation on 01.05.2009 and
            Mahasachiv, Student     muster rolls by B.D.O.                 reminders sent on 27.05.09 ,
            JDU, Bihar                                                     21.08.2009 & 05.11.2009
64. Bihar   Sh. Ashok Paswan,         complaining    of   Sh.            Requested State Government for    Reply is awaited
            District Upaadhyaksh,     Shambhu Kumar, B.D.O for           investigation on 01.05.2009 and
            Nawada,                   fraud of NREGA fund                reminders sent on 27.05.09 ,
                                                                         21.08.2009 & 05.11.2009
65. Bihar   Md. Mustkiya              Not getting work or unemployment   Requested State Government for    Reply is awaited
            &others, Gram             allowances.                        investigation on 01.05.2009 and
            Sohray, Panchyat                                             reminders sent on 27.05.09 ,
            Madanpur, District                                           21.08.2009 & 05.11.2009
            Madhubani,
66. Bihar   All labourers of          Delay in payments under NREGA.     Requested State Government for    Reply is awaited
            Katihar district, Bihar                                      investigation on 01.05.2009 and
                                                                         reminders sent on 27.05.09 ,
                                                                         21.08.2009 & 05.11.2009
67. Bihar   Gramin janta of           Use of J.C.B machinery.            Requested State Government for    Reply is awaited
            Tareya Prakhand,                                             investigation on 01.05.2009 and
            Tikampur Village,                                            reminders sent on 27.05.09 ,
            Chhapra district, Bihar                                      21.08.2009 & 05.11.2009
68. Bihar   Kumar Jagnath             Labourers are not getting work.    Requested State Government for    Reply is awaited
            Prasad, Ex-                                                  investigation on 01.05.2009 and
            Sarpanch,Prakhand                                            reminders sent on 27.05.09 ,
            Dumri-                                                       21.08.2009 & 05.11.2009
            Katsari,Maksudpur-
            Kararia Panchayat,
            District Shephar,
69. Bihar   Sh. Brij Kishore,         Fake muster rolls and NREGA fund   Requested State Government for    Reply is awaited
            Gram Chakni, Post         distribute between Panchayat       investigation on 01.05.2009 and
            Chamanpur,                Sachiv, J .E. and B.D.O. without   reminders sent on 27.05.09 ,
            Panchayat                 starting any work.                 21.08.2009 & 05.11.2009
            Chamanpur, Sheoher
            district,
70. Bihar   NREGA workers,          Manipulation in job cards and non-   Requested State Government for       Reply is awaited
            Gram Radhopur,          payment of wages under NREGA.        investigation on 11.05. 2009 and
            District Supol,                                              reminders sent on 27.05.09 ,
                                                                         21.08.2009 & 05.11.2009
71. Bihar   Shri Vipin kumar &      Alleged that the Programme Officer Requested State Government for         The State Government has
            others , Konch Block,   , Sh Umakanth Verma and the          investigation on 28.05. 2009 and     reported that the complaint
            Gaya District, Bihar    Junior Engineer Sh. Sashikant        reminders sent on 21.08.2009 &       will present in a social audit
                                    Shashi are seeking illegal           05.11.2009                           and they will report the action
                                    gratification for implementation of                                       taken within 15 days.
                                    NREGA. And it involves allegation
                                    of corruption.
72. Bihar   Shri T.Pathak,          Misappropriation of funds,           Requested State Government for       Reply is awaited
            Malipur Gram            irregularity in construction of road investigation on 08.07. 2009 and
            Panchayat, Garhpura     under NREGA with an ulterior         reminders sent on 21.08.2009 &
            Block                   motive of encroaching on property    05.11.2009
                                    of the public and other private
                                    persons, organisation of fictitious
                                    Gram Sabhas, forgery of muster
                                    rolls, use of tractors in place of
                                    workers, issue of job to ineligible
                                    persons and inactionof local
                                    administration on submission of
                                    information in this manner.

73. Bihar   Shri Vikash Singh,      In the construction of drainage from   Requested State Government for     Reply is awaited
            District Coordinator,   Lal Khan to Adampur Canal,             investigation on 07.07. 2009 and
            Jamalpur post, Block-   payment was made without any           reminders sent on 21.08.2009 &
            Jamalpur, Munger        work. He also informed the District    05.11.2009
            district                Magistrate in writing, but no action
                                    was taken.
74. Bihar   Shri Birulal            Passbooks       have      not   been Requested State Government for      Reply is awaited
            Bhanmbhi, Gram          distributed to workers, payment of investigation on 23.07. 2009 and
            Panchayat Bucheya,      wages made through factious work. reminders sent on 21.08.2009 &
            Block Sidhvalia                                              05.11.2009
75. Bihar   Shri Gopal Paswan       Irregularities in the digging work   Requested State Government for      Reply is awaited
            and others, village     under NREGA, payment is not          investigation on 23.07. 2009 and
            Saidi, Gram Panchayat   made through passbooks.              reminders sent on 21.08.2009 &
            Andhana, District                                            05.11.2009
            Nalanda
76. Bihar   Shri Ghan Shyam         Huge amount of soil has been taken    Requested State Government for     Reply is awaited
            Singh and others,       forcefully from their personal land   investigation on 22.07. 2009 and
            Village Pakra, Block    under the construction of Road-14     reminder sent on 21.08.2009
            naugachhia,District
            Bhagalpur
77. Bihar   Shri Rajesh Kumar,      Regarding migration of labour and  Requested State Government for        Reply is awaited
            Vice Chairman,Zilla     failure to conduct Programmes on   investigation on 22.07. 2009 and
            Parishad, District      time under NREP.                   reminders sent on 21.08.2009 &
            Darbhanga                                                  05.11.2009
78. Bihar   Villagers of Gram       Misappropriation of funds and less Requested State Government for        Reply is awaited
            Panchayat- Keshopur,    payment given to workers by        investigation on 07.08. 2009 and
            Block- Jhajha, Jamui    Mukhiya and Rozgar Sewak           reminders sent on 21.08.2009 &
            District                                                   05.11.2009
79. Bihar   Shri Panchu Rishidev    Regarding embezzlement of          Requested State Government for        Reply is awaited
            Singhpur, P.O.          NREGA funds by fake signatures in investigation on 04.08. 2009 and
            Kumarkhand,             the passbook in the Kumarkhand     reminders sent on 21.08.2009 &
            Madhepura District      post office, against Sh. S.N. Hal, 05.11.2009
                                    Sub Post office Vasad, and other
                                    post masters of Branch Rani Patti,
                                    Branch Laxmipur Bhagavati,
                                    Branch Parmanandpur, and Branch
                                    Mangkhanda.
80. Bihar   Dr. Murari Mohan         Work is not provided to workers         Requested State Government for     Reply is awaited
            Jha, Vice President,     under NREGA in District                 investigation on 03.09. 2009 and
            Darbhanga District       Darbhanga                               reminder sent on 05.11.2009
            Congress, Gram
            Darhar, Post
            Laheriasarai, District
            Darbhanga
81. Bihar   Shri Kesvar Yadav,       Alleging embezzlement and               Requested State Government for     Reply is awaited
            Tiwari Vigha, Post-      corruption of funds in the post         investigation on 25.09. 2009 and
            Rafiganj, District       office of block- Rafiganj               reminder sent on 05.11.2009
            Auranagabad
82. Bihar   Smt. Viyafi Devi,        Regarding to appointment the            Requested State Government for     Reply is awaited
            Gram- Sarupai(Tola       Panchayat Rozgar Sewak in Gram-         investigation on 25.09. 2009 and
            Khape), Post-            Sarupai.                                reminder sent on 05.11.2009
            Jagdishpur, Block-
            Vijayepur
83. Bihar   Article in Dainik        Construction of public park under       Requested State Government for     Reply is awaited
            Jagaran                  NREGA in Motihari Town of East          investigation on 30.09. 2009 and
                                     Champaran District of Bihar             reminder sent on 05.11.2009
84. Bihar   Mohmad Ashfhak S/o       Alleging embzzlement of funds in        Requested State Government for     Reply is awaited
            Mohd. Israel, Gram &     NREGA works.                            investigation on 12.10. 2009 and
            Panchayat- Jalwara,                                              reminder sent on 05.11.2009
            Block- Kawati,
            District Darbhanga
85. Bihar   Shri Akshay Kumar,       Regarding failure to povide job         Requested State Government for     Reply is awaited
            Coordinator, Post        card to an eligible household,failure   investigation on 12.10. 2009 and
            office Street,           to pay unemployment allownace as        reminder sent on 05.11.2009
            Chhitrguptnagar,         per provisions of the Act & failure
            Kakkarvada, Patna        to conduct social audit, no
                                     inspection of muster rolls.
86. Bihar   Mohd. Naushad Alam,       Misuse of NREGA funds in Gram         Requested State Government for     Reply is awaited
            General Secretary         Panchayat No.17 Gangwar Buzurg        investigation on 27.10. 2009 and
            Delhi Pradesh,            Tehsil Runni Saidpur, District        reminder sent on 05.11.2009
            Purwanchal Social         Sitamarhi, Bihar
            Organisations (Regd.)
87. Bihar   Shri Asha Devi and        Embezzlement of NREGA funds by Requested State Government for            Reply is awaited
            others, Gram              Gram Panchayat Mukhiya and        investigation on 06.11. 2009
            Panchayat Madhopur,       payment made to ghost workers at
            District Patna            Gram Panchayat Madhopur,
                                      District Patna
88. Bihar   Shri Lal Chandra                                            Requested State Government for         Reply is awaited
                                      Embezzlement and Corruption in
            Thakur, Ward                                                investigation on 06.11. 2009
                                      NREGA by Mukhiya and NREGA
            Member No. 07, Gram
                                      Sewak at Gram Panchayat
            Panchayat Bagnagar,
                                      Bagnagar, Block Jokihat, District
            Block Jokihat, District
                                      Araria
            Araria
89. Bihar   Shri Ramji Singh          Fake entries in muster roll, payment Requested State Government for      Reply is awaited
            Sharma, Gram              made by forge signature in Bank      investigation on 06.11. 2009
            Dakhner, Thana            Passbook Gram Dakhner, Thana
            Parayya, District Gaya    Parayya, District Gaya
90. Bihar   Dr. Murari Mohan                                               Requested State Government for      Reply is awaited
            Jha, Vice President,                                           investigation on 11.11. 2009
                                      Work is not provided to workers
            Darbhanga District
                                      under NREGA in District
            Congress, Gram
                                      Darbhanga
            Darhar, Post
            Laheriasarai, District
            Darbhanga
91. Bihar   Shri Sanat Kumar,                                               Requested State Government for     Reply is awaited
                                      Issuance of job cards to ineligible
            Gram & Post- Karma,                                             investigation on 11.11. 2009
                                      persons, failure to provide full
            Block- Kudni,
                                      payment to the workers
            Panchayat-Karamidih,
            District Muzzafarpur
92. Bihar   Shri Nilendu Thakur,   Irregularities (use of JCB machines    Forwarded to State Government       Reply is awaited
            President, Biraul      and fake muster roll) in the           on 04.01. 2010
            Block Kisan Khet       implementation of NREGA in Itwa
            Majdoor Congress       Shiv Nagar and Saho Gram
            (Rajiv Gandhi          Panchayats.
            Bhawan)
93. Bihar   Gram Panchayats‟       Regarding inadequate bank staff for    Forwarded to State Govt on          Reply is awaited
            Mukhiya of Semari,     the disbursement of wages to           04.01.2010
            Sahinaw, Sahinav and   NREGA workers.
            Gazipur and form
            Panchayat Samiti
            members of
            Nathmalpur East,
            Gaziapur and Sinha
94. Bihar   Shri Radheshyam        Regarding release of Rs 30 lakh for    Forwarded to State Govt on 11.01.   Reply is awaited
            Singh, Member, All     the maintenance of irrigation canal    2010
            India Congress         to Barachatti Block, Gaya
            Committee
95. Bihar   Shri Alimuddin         Irregularities in the implementation   Forwarded to State Govt on 18.01.   Reply is awaited
            Ansari, Hind Khet      of NREGA in the districts of           2010
            Majdoor Panchayat      Purnea, Araria, Kishanganj and
                                   Katihar.
96. Bihar   Smt. Kumkum            Regarding irregularities in the        JD NLM has been requested to        Reply is awaited
            Bhardwaj, member of    implementation of Mahatma              depute two NLM on 25-1-2010
            Congress Party,        Gandhi NREGA in the district of
            Lakhisarai, Bihar      Lakhisarai, Bihar
97. Bihar    Eleven NREGA             Financial irregularities in the          Forwarded to State Govt on 11 th   Reply is awaited
             workers                  implementation of the Mahatma            February, 2010
                                      Gandhi       NREGA       in   Malwa
                                      Panchayat,         Obra        Block,
                                      Aurnagabad district.
                                      it has been highlighted that money
                                      was withdrawn from the accounts
                                      of workers.
98. Bihar    Shri Baidya Nath         Regarding irregularities in the          Forwarded to State Govt on 11 th   Reply is awaited
             Choudhary, village       implementation of the Mahatma            February, 2010
             Eraji Jagat, P.O.        Gandhi NREGA. In the enclosed
             Benapatti, district      letter it has been highlighted that in
             Madhubani                actual works were not executed but
                                      money were withdrawn and in
                                      some cases where works were
                                      executed were of poor quality.
99. Bihar    Shri Suman Kumar         regarding non payment of wages to        Forwarded to State Govt on 11 th   Reply is awaited
             Singh                    workers, absence of citizen board        February, 2010
                                      and works not provided to women
                                      and physically challenged. In the
                                      enclosed letter it has been
                                      highlighted that amount incurred
                                      for digging work has been
                                      exaggerated
100. Bihar   Shri Sanjay Singh, Ex-   Regarding irregularities in the          Forwarded to State Govt on 16-2-   Reply is awaited
             Mukhiya Nawabganj,       appointment of Programme Officer,        2010
             Araraia                  Shri Bhola Das, Chhatpur district
101. Bihar   Shri Prem Kumar          Financial irregularities in the          Forwarded to State Govt on 24-2-   Reply is awaited
             Sharma                   implementation of the Mahatma            2010
                                      Gandhi NREGA in by the
                                      Postmaster of Phulwari, Bhojpur
                                      district.
102. Bihar       Shri Ramesh Karpat      Regarding financial irregularities      Forwarded to State Govt on 24-2-   Reply is awaited
                                         by the Rojgar Sewak and Mukhiya         2010
                                         of Bhimpur Gram Panchayat,
                                         Chhtapur Block, Supaul District. It
                                         is highlighted that 62 workers
                                         worked for 18 days but were paid
                                         only for 9 days after two months.
103. Chhattisg   Sh. Nand Lal Jaiswal,   Regarding irregularities in Land        Forwarded to the State             The State Government has
     arh         Narainpur,              Reforms works in Narainpur              Government on 31.7.08 and          reported that, three member
                 Chhattisgarh.           district under NREGA.                   reminders sent on 23.1.09 ,        enquiry team was constituted
                                                                                 27.05.09 , 21.08.2009              by the Collector Nariainpur.
                                                                                 &05.11.2009                        However       as   the   Gram
                                                                                                                    Panchayat Garpa is situated
                                                                                                                    around 110 KM from Orcha
                                                                                                                    Janpad Panchayat and in a
                                                                                                                    severely naxal affected part of
                                                                                                                    the district. The team has not
                                                                                                                    been able to conduct the
                                                                                                                    enquiry.
                                                                                                                    Enquiry report awaited
104. Chhattisg   Article in Dainik       „Palayan Se ujre Darjan Bhar Gaav‟      Forwarded to the State             Reply is awaited
     arh         Bhaskar Dated 31                                                Government on 5.1.09 and
                 December 2008                                                   reminders sent on 27.05.09 ,
                                                                                 21.08.2009 &05.11.2009
105. Chhattisg   Shayam Lal Kanwar,      Complaint against executive             Forwarded to the State             Reply is awaited
     arh         Paudi Uproda, Korba     engineer Shri Sanjay Sharma for         Government on 04.05.2009 and
                                         financial Irregularties. No technical   reminders sent on 27.05.09 ,
                                         engineer appointed for road             21.08.2009 &05.11.2009
                                         construction.
106. Chhattisg   Sh. S.L. Salooja,         Non- issuance of job cards under       Requested State Government for    Reply is awaited
     arh         Behind High Court,        NREGA                                  investigation on 8.05.2009 and
                 near Shanti Niketan,                                             reminders sent on 27.05.09 ,
                 District Bilaspur,                                               21.08.2009 &05.11.2009
                 Chhattisgarh
107. Chhattisg   Shri Ashok                Poor quality of work, involvement      Requested State Government for    The State Government has
     arh         Manikpuri, Adarsh         of contractors under NREGA in          investigation on 10.08.2009 and   reported vide letter dated
                 Nagar ward no. 03,        District Kabirdham.                    reminders sent on 21.08.2009      7/12/2009 that the complain
                 near Shiv Mandir,                                                &05.11.2009                       has been forwarded to
                 Kawardha, District                                                                                 Collector, Kabirdham for an
                 Kabirdham                                                                                          enquiry.
                                                                                                                    Enquiry report is awaited
108. Chhattisg   417/APS/M(RD)/09          Nonpayment of wages to workers         Requested State Government for    Reply is awaited
     arh         Shri Ankit Bagbahara,     since last six months under            investigation on 06.11.2009
                 District-co-ordinator,    NREGA
                 Babu Sagar Chand
                 Ward No.11, Janpad
                 Baghabahara, District
                 Mahasamund,
                 Chhattisgarh
109. Chhattisg   Shri Kushal Kaushik,      Fake entries in muster roll, use of    Requested State Government for    The State Government has
     arh         Gram Panchayat            low quality material in construction   investigation on 06.11.2009       reported vide letter dated
                 Peepertarai, Block        of road at Gram Panchayat                                                17/12/2009 that the complain
                 Kota, District Bilaspur   Peepertarai, Block Kota, District                                        has been forwarded to
                                           Bilaspur                                                                 Collector, Bilaspur for an
                                                                                                                    enquiry. Reply is awaited
110. Chhattisg   Shri Bhupendra Singh   Irregularities in muster roll         Forwarded to State Government      The State Government has
     arh         Saluja and Shri                                              on 11.01. 2010                     reported vide letter dated 22-1-
                 Surendra Agrawal,                                                                               2010 that the complain has
                 Mahasamund                                                                                      been forwarded to CEO,
                                                                                                                 Mahasamund and asked for
                                                                                                                 Action Taken Report
                                                                                                                 Action taken Report is
                                                                                                                 awaited
111. Chhattisg   Shri Mukesh Jahria,    Regarding irregularities in the       Forwarded to State Govt on         Reply is awaited
     arh         President, Vigilance   execution of work under Mahatma       20.01.2010
                 and Monitoring         Gandhi NREGA.
                 Committee, District
                 Kabirdham
112. Chhattisg   Shri Ramesh Sahu       Regarding detail of Action taken by   Forwarded to State Govt on 11-2-   Reply is awaited
     arh                                the State Government against Shri     2010.
                                        Chetan Chandrakar, SDO, Dept of
                                        water resources
113. Goa         Prof.     Nelly     J. Complainant has alleged that          Requested State Government for Replay is awaited
                 Rodrigues,        Zila devolution of powers is very bad      investigation on 07/07/2009 and
                 Panchayat     Member   and Zila Panchayat in Goa are not     reminders sent on 21.08.2009
                 Colva     Constiuency, given any role as far as NREGA is     &05.11.2009
                 Calata,      Majorda,  concerned.
                 Salcete, Goa
114. Gujarat     From Shri Madhu         A report on NREGA work in            Requested State Government for     Reply is awaited.
                 Sudan Mistry , Dahod District Gujarat on 27-29               comments on 12.02.2010
                 Member , CEGC  January,2010
                 ,MGNREGA
115. Haryana   Sh. Sanjay Sharma,        Irregularities in the            Forwarded to the State             It is reported that a copy of the
               Govind Nagar, Hisar        implementation of NREGA          Government on 20.10.08 and         complaint was sent to the
               Road, District Sirsa      Misuse of funds under NREGA      reminders sent on 23.1.09,         DPC, Sirsa on 4-9-08 to get an
                                          in Sub-Division Odha of          27.05.09 , 21.08.2009              enquiry conducted by a Senior
                                          District Sirsa by Shri Pashel    &05.11.2009                        Officer and submit report.
                                          Kumar, S.D.O.                                                       DC Sirsa on 18.09.08 had
                                                                                                              informed that the matter is
                                                                                                              being enquired into by the
                                                                                                              Superintendent of police, State
                                                                                                              Vigilance Bureau, Hissar.
                                                                                                              Report is awaited.
116. Haryana   Article in Times of    “Panchayat employee held while        Forwarded to the State            Reply is awaited
               India                  accepting bribe”                      Government on 27/03/2009 and
               Dated: 26 March 2009                                         reminders sent on 27.05.09 ,
                                                                            21.08.2009 &05.11.2009
117. Haryana   Shri Mansingh          problem in opening of account and     Requested State Government for    Reply is awaited
               Chauhan                J.E. are not willing to work          investigation on 29/06/2009 and
                                                                            reminders sent on 21.08.2009
                                                                            &05.11.2009
118. Haryana   Smt Aina, Member of    Financial irregularities (Rs         Forwarded to the State             Reply is awaited
               VMC and other GP       4,92,000) in the implementation of   Government on 05.01.2010
               members                NREGA by the Pradhan of Tigaon
                                      Gram Panchayat.
119. Haryana   Akhil Bharatiya        Regarding irregularities in the      Forwarded to State Govt on 11-2-   Reply is awaited
               Bhrastachar Unmulan    implementation of Mahatma            2010
               and Kalyan Sansathan   Gandhi NREGA by the Sarpanch
                                      and Secretary. It has been
                                      highlighted that 350 accounts were
                                      opened on false name, whereas in
                                      actual only 50 workers were
                                      employed for digging well.
120. Haryana   Shri Baldev Singh,      Regarding not providing               Forwarded to State Govt on 8-3-   Reply is awaited
               resident of Rania       information related with the          2010
               Tehsil, Sirsa           Mahatma Gandhi NREGA under
                                       RTI Act 2005 by the Block
                                       Development Officer and Panchyat
                                       Officials.
121. Himachal Dr. Krishan Lal,         Enquiry against Gram Pradhan for      Forwarded     to    the State     The State Government has
     Pradesh  village Kanol, Block     self       recommendation       for   Government on 28.04.2009 and      reported that as per inquiry
              Pragpur, Tehsil Dehra,   construction of Protection walls &    reminders send on 27.05.09,       report which is conducted by
              Village Kalon,Tahsil     drainage                              21.08.2009 & 05.11.2009           the BDO Pragpur, the GP
              Dehra, Kangra                                                                                    Kanol has executed Tiala
                                                                                                               works under NREGA. Project
                                                                                                               Officer , DRDA Kangra has
                                                                                                               directedBDO     Pragpur     to
                                                                                                               recover the amount from
                                                                                                               defaulting GP for spending
                                                                                                               NREGA funds on            non
                                                                                                               permissible works. ATR is still
                                                                                                               awaited.
122. Himachal Shri Ravindra Kumar,   Fake entry in muster roll and Requested State Government for       As per report received from
     Pradesh  VPO Kamlah Fort,       corruption by Pradhan and other investigation on 01.05.2009 and    State Government, DC cum
              Tehsil Sarkaghat,      members under NREGA             reminders send on 27.05.09 ,       DPC (NREGA) Mandi has
              District Mandi                                         21.08.2009 & 05.11.2009            informed that according to
                                                                                                        enquiry conducted by the BDO
                                                                                                        Dharmpur, the GP Kamlah
                                                                                                        Fort has misappropriation of
                                                                                                        the funds tuning to Rs.37015/-
                                                                                                        and out of that amounting to
                                                                                                        Rs. 20850/- have been
                                                                                                        resubmitted in the Panchatay
                                                                                                        account by the concerned GP
                                                                                                        members . As complainant has
                                                                                                        lodged an FIR against the
                                                                                                        concerned GP and relevant
                                                                                                        records i.e.     cash book,
                                                                                                        proceeding register and bill
                                                                                                        vouchers are in the custody of
                                                                                                        police, accordingly conducting
                                                                                                        of further enquiry is not
                                                                                                        possible/      The     District
                                                                                                        Panchayat Officer Mandi has
                                                                                                        been     asked     to   initiate
                                                                                                        proceedings against defaulting
                                                                                                        GP and action taken report is
                                                                                                        still awaited.
123. Himachal Villagers of Gram      Use of Machinary instead of Requested State Government for         Reply is awaited
     Pradesh  Panchayat -            labourers in the construction of investigation on 14.10.2009 and
              Saryanj, Block         road and recording of fictitious reminder send on 05.11.2009
              Kunikar, District      workers in muster roll by
              Solan                  pradhan.
124. Himachal Letter received from     Requesting for nomination of Requested State Government for        Reply is awaited
     Pradesh  the chairman & MD,       Shri Akhtar Ali as Gram investigation on 08.02.2010
              Council of Islamic       Panchayat Rojgar Sevak in
              Education,               Gram panchayat Majra, Tehsil
              Research, Training,      Paonta Sahib , District Sirmor,
              Human Rights &           Himachal Pradesh
              Welfare
              (Regd.),District
              Yamuna Nagar,
              Haryana.
125. Jammu & Two         newspaper      Stoppage of construction of road   Forwarded    to    the  State Reply is awaited.
     Kashmir cutting                    from Demchok to Demchok            Government on 2.12.2009
                                        Phoo in Leh District
126. Jharkhan   Shri Kishori Rajwar,                                  Forwarded to the State
                                       Regarding effort by unscrupulous                                   Reply is awaited
     d          VPO Kukraha, block                                    Government on 26.5.2008 and
                                       persons to disrupt on going work
                Sarath, district       under NREGA in village Kukraha reminders sent on 23.1.09 ,
                Deoghar                                               27.05.09 , 21.08.2009 &
                                                                      05.11.2009,
                                                                      16.12.09,08.02.10,03.03.10 and
                                                                      31.03.2010
127. Jharkhan   Shri Ramayan            Poor quality of work         Forwarded to the State              It is reported that report sought
     d          Sharma, Sushila         Late payment of wages under Government on 30.6.2008 and          from Dc- cum- DPC, Ranchi
                Bhavan, Post-Saparom     NREGA in Saher Panchayat of reminder sent on 23.1.09 ,           vide letter no.7677 dated
                (Nagadi), Ranchi         block Ratu, District Ranchi. 27.05.09 , 21.08.2009 &             22.11.08. and reminder
                                                                      05.11.2009,                         no.1434 dated 24.02.09 and
                                                                      16.12.09,08.02.10,03.03.10 and      2966 dated 27.04.09
                                                                      31.03.2010
128. Jharkhan   Shri Om Prakash          Non- payment of wages for the past     Forwarded to the State                It is reported that the reply
     d          Aman, State              many months to NREGA workers           Government on 2.7.08. NLM             received from Dc-cum- DPC
                Representative,          in Manika Block of Latehar             deputed, report received as per       Latehar and is under
                Jharkhand Pradesh        District.                              which the complaint is not found      examination.
                Congress Committee                                              correct. reminder sent on 23.1.09 ,
                                                                                27.05.09 & 21.08.2009 ,
                                                                                05.11.2009,
                                                                                16.12.09,08.02.1003.03.10 and
                                                                                31.03.2010
129. Jharkhan   Times of India           Activists come under attack for        Forwarded to the State                Reply is awaited, ATR not
     d          June 8, 2008             exposing graft in Jobs scheme-         Government on 8.6.08 and              received
                                         Social audit threat to local leaders   reminders sent on 23.1.09 ,
                                                                                27.05.09 , 21.08.2009 &
                                                                                05.11.2009,
                                                                                16.12.09,08.02.10,03.03.10 and
                                                                                31.03.2010
130. Jharkhan   Online article in        NREG wages not paid, farmer sets        Forwarded to the State               Reply is awaited, ATR not
     d          Indian Express           himself on fire                         Government on 3.6.08 and             received
                July 3, 2008                                                     reminders sent on3.7.08, 23.1.09
                                                                                 , 27.05.09, 21.08.2009 &
                                                                                 05.11.2009,
                                                                                 16.12.09,08.02.10,03.03.10 and
                                                                                31.03.2010
131. Jharkhan   PMO office                Manipulation in payment of            Forwarded to the State               State Govt. has reported that
     d          forwarding a letter of     wages                                 Government on 21.7.08 and            incomplete report received
                Shri Pitambar             Involvement of middlemen &            reminders sent on 23.1.09 ,          from DC-cum-DPC, Simdega.
                Kandeyang, Village         contractors and corruption in         27.05.09 , 21.08.2009 &              Fresh report has been sought
                Navatoli, District         the implementation of NREGA           05.11.2009,                          vide letter no.8541 dated
                Simdega                                                          16.12.09,08.02.10,03.03.10 and       19.12.08 and reminder letter
                                                                                 31.03.2010                           no 1642 dated 28.02.09
132. Jharkhan   Smt. Neelu Chopra,      Misappropriation of funds,       Forwarded to the State               The State Government has
     d          District Dhanbad        Use of sub standard material     Government on 1/10/2008. NLM         appointed Sh. D.K. Tiwari,
                                        Getting commission under         deputed, report received as per      SLM to make an enquiry and
                                         NREGA in Topchanchi block        which the complaint is not found     report.
                                         of District Dhanbad, Jharkhand   correct. Reminders sent on 23.1.09   DC-cum-DPC, Dhanbad has
                                         by Shri Sanjiv Kumar (DFO)       , 27.05.09 , 21.08.2009 &            been asked to submit report
                                         Dhanbad.                         05.11.2009,                          vide letter no.6769 dated
                                                                          16.12.09,08.02.10,03.03.10 and       20.10.08 and reminder no.2352
                                                                          31.03.2010                           dated 26.03.09.
                                                                                                               Report is awaited.
133. Jharkhan   Shri Raj Kumar Shau,    Using fake muster roll          Forwarded       to     the    State   It is reported that report sought
     d          Village Turwa and       Misuse of funds                 Government on 8/10/2008 and           from DC-cum-DPC, Latehar
                Ekmhuwa, Block          Failure to opening account reminders sent on 23.1.09 ,                vide letter no. 7676 dated
                Chandwa, District         under NREGA.                   27.05.09     ,     21.08.2009    &    22.11.08. Reminder 8791
                Latehaar                                                 05.11.2009,                           dated 31.12.08 and letter
                                                                         16.12.09,08.02.10,03.03.10     and    no.1644 dated 23.02.09.
                                                                         31.03.2010                            Reply is awaited
134. Jharkhan   Article received Via    Low payment of wages              Forwarded to the State              It is reported that report sought
     d          Email by Mr. R.K.       Manipulation in job cards        Government on 15/09/2008 and         form DC, Chatra vide letter no.
                Rajak                   Bogus job cards under NREGA      reminders sent on 23.1.09 ,          7628 dated 20.11.08 and
                September 12, 2008        in village Paroriya, Post       27.05.09 , 21.08.2009 &              reminder no 2895 dated
                                          Badgawan, and District Chatra.  05.11.2009,                          22.04.09.
                                                                          16.12.09,08.02.10,03.03.10 and       Reply is awaited
                                                                          31.03.2010
135. Jharkhan   Shri Panjabi Rawut,      Misappropriation of funds       Forwarded to the State               It is reported that report is
     d          President Twenty         Irregularities in the           Government on 5.11.08 and            awaited from Dc, Deoghar is
                Point Programme           implementation of NREGA         reminders sent on 23.1.09 ,          awaited.
                Implementation                                            27.05.09 , 21.08.2009 &              Reply is awaited
                Committee, Block                                          05.11.2009,
                Mohanpur, Diostrict                                       16.12.09,08.02.10,03.03.10 and
                Deogarh                                                   31.03.2010
136. Jharkhan   E-mail received by the   Pending payment of                   Forwarded to the State           Reply is awaited
     d          Ministry from Jean       Unemployment allowance in            Government on 28.11.08 and
                Dreze                    Manika Block                         reminders sent on 23.1.09 ,
                                         (two letters have been sent)         27.05.09 , 21.08.2009 &
                                                                              05.11.2009,
                                                                              16.12.09,08.02.10,03.03.10 and
                                                                              31.03.2010
137. Jharkhan   Shri Rameshwar             Misappropriation of funds         Forwarded to the State           Spot inspection has been
     d          Oraon, village Rehal,      Use of fake muster roll by Shri   Government on 2.12.08 and        conducted on 27.11.08 by
                GP Pandaypur, district      Nand Kumar Ram , (Ex.             reminders sent on 23.1.09 ,      Joint secretary, R.D.D.,
                Latehar                     Engineer), Virender Chobe         27.05.09 , 21.08.2009 &          Jharkhand and report
                                            (A.E.), Dineshwar Tiwari          05.11.2009,                      submitted on16.12.08. That
                                            (J.E.)and mediator Shiv Nandan    16.12.09,08.02.10,03.03.10 and   report has been sent to Dc,
                                            Yadav, Abhas Miya and Sanjay      31.03.2010                       Latehar for necessary action
                                            Oraon.                                                             vide letter no. 527 dated
                                                                                                               20.01.09.

                                                                                                               Reply is awaited
138. Jharkhan   Shri Jean Dreze,         Alleging involvement of Shri         Forwarding to the Sate           It is reported that report sought
     d          forwarding a             Tasleem Ansari in NREGA scam         Government on 31.12.2008 and     from DC-cim-DPC, Palamu.
                complaint of Shri        „construction of two roads at the    reminder sent on 23.1.09 ,
                Lakahman Bhuiyan,        same spot‟ in Palamau.               27.05.09 , 21.08.2009,           Reply is awaited
                Jharkhand                                                     16.12.09,08.02.10,03.03.10 and
                                                                              31.03.2010
139. Jharkhan   E-mail from Shri Jean    Two NREGA activists Bhukan           Forwarding to the Sate           Reply is awaited
     d          Dreze,                   Singh and Niyamat Ansari were        Government on 17.3.2009 and
                                         arrested on false charges in Manika, reminders sent on 27.05.09 &
                                         district Latehar                     21.08.2009 & 05.11.2009,
                                                                              16.12.09,08.02.10,03.03.10 and
                                                                              31.03.2010
140. Jharkhan   Shri Jayant Pandey,      Alleged for increase in the salary of Forwarding to the State           It is reported that report has
     d          NREGA Karamchari         NREGA karamchari. The                 Government on 20.04.2009 and      been sought from Dc-cum-
                Sangh, Dhanbad,          complainant alleged that Rs 3500 is   reminders sent on 27.05.09 ,      DPC, Dhanbad.
                                         very less in compare to Panchayat     21.08.2009 & 05.11.2009,
                                         Sewak                                 16.12.09,08.02.10,03.03.10 and    Reply is awaited
                                                                               31.03.2010
141. Jharkhan   People of Khusdad        Execution of work(check dam, dug Requested State Government for         Reply is awaited
     d          Village, Nagar Uttari    well) in violation of the decision of investigation on 08.07.2009 and
                Police Station           the Aam Sabha and inaction of the     reminders sent on 21.08.2009 &
                                         local administration of information 05.11.2009,
                                         in this matter.                       16.12.09,08.02.10,03.03.10 and
                                                                               31.03.2010
142. Jharkhan   Sh. Thakur Hasda,        Fraud of NREGA funds in               Requested State Government for    Reply is awaited
     d          Praband Parishad         Hiranpur- Block, Pakur District of    investigation on 17.07.2009 and
                member, Gram             Jharkhand                             reminders sent on 21.08.2009 &
                Jampur                                                         05.11.2009,
                                                                               16.12.09,08.02.10,03.03.10 and
                                                                               31.03.2010
143. Jharkhan   Times Of India, 1st      Harassing the women worker. The Requested State Government for          Reply is awaited
     d          June 2009                worker Smt. Geeta Devi has alleged investigation on 02.06.2009 and
                                         that she received Rs 47000 for        reminders sent on 21.08.2009 &
                                         construction of well. However, the 05.11.2009,
                                         second installment was not            16.12.09,08.02.10,03.03.10 and
                                         provided to her.                      31.03.2010
144. Jharkhan   Social Activist from     Corruption, malpractices and          Requested State Government for    Reply is awaited
     d          Jaag Hazaribagh          irregularities under NREGA.           investigation on 29.07.2009 and
                organisation, District                                         NLM division is requested on
                Hazaribagh                                                     28.08.09. Reminder sent on
                                                                               21.08.2009 & 05.11.2009,
                                                                               16.12.09, 08.02.10,03.03.10 and
                                                                               31.03.2010
145. Jharkhan   Shri kailash Prasad,   Financial irregularities in the    Requested State Government for    Reply is awaited
     d          Gram, Post, Prakhand   implementation of NREGA by the     investigation on 27.07.2009 and
                & Thana- Borio         BDO, Borio Block and not           reminders sent on 21.08.2009 &
                Bazar, District        providing the information sought   05.11.2009,
                Sahebganj, Jharkhand   under the RTI Act,2005.            16.12.09,08.02.10,03.03.10 and
                                                                          31.03.2010
146. Jharkhan   Shri Sudama Pandey,    Involvement of middlemen in        Requested State Government for    Reply is awaited
     d          President of           alloting work, underpayment of     investigation on 07.08.2009 and
                Madhupur, Block        wages and fradulent payment of     reminders sent on 21.08.2009 &
                Congress Committee,    wages                              05.11.2009,
                Gram Saptar, Block-                                       16.12.09,08.02.10,03.03.10 and
                Madhopur, Deoghar                                         31.03.2010
                District. Mobile:
                9431313635
147. Jharkhan   Prof. Jean Dreze,   Alleging two cases of corruption,   Requested State Government for   1. There was no siphoning off
     d          Member, Central     malpractices and irregularities     investigation on 07.09.2009.     NREGA funds because the
                Employment          under NREGA in Khunti and           Evidences submitted by           amount had been paid to the
                Guarantee Council   Palamau Districts of Jharkhand.     complainants were forwarded to   workers as per their actual
                and Ms. Reetika                                         State Government on 15.09.09     number of working days
                Khera, Centre for                                       reminders on 16.09.09 &          though irregularities were
                Development                                             05.11.2009 and replied to the    detected in muster roll.
                Economics                                               complainant on 23 .10.09. and    The District Administration
                                                                        reminder on 31.03.2010           has taken immediate action
                                                                                                         against Rojgar Sathi and Gram
                                                                                                         Rojgar Sewak for irregularities
                                                                                                         detected in the MRs. FIR has
                                                                                                         been lodged against Rojgar
                                                                                                         Sathi(Mate) Shri Sunil
                                                                                                         Prajapati & Shri Ram Janam
                                                                                                         Ram and the contract of Shri
                                                                                                         Chandan Kumar,GRS has been
                                                                                                         cancelled.
                                                                                                         2. Report awaited from the
                                                                                                         State Government
                                                                                                         3.
                                                                                                         (i) FIR lodged aginst Sri Buka
                                                                                                            Munda, Smt. Sumitra Sanga
                                                                                                            and Sh. Dondo Pahan all
                                                                                                            Abhikartas    of      scheme(
                                                                                                            Construction of Pond at
                                                                                                            Siladon and Plantation at
                                                                                                            Samra Sthal in the village
                                                                                                            Sildon under Birhu Gram
                                                                                                            Panchayat)

                                                                                                         (ii) Labhuk         Samities
                                                                                                               dissolved.
                                                                                                         (iii) GRS of Birhu panchayat
                                                                                                               dismissed
                                                                                                         (iv) Panchayat Sewak of
                                                                                                               Birhu        Panchayat
                                                                                                               suspended.
                                                                                                          (v) Recommended to the
                                                                                                          State Government        for
148. Jharkhan   Shri Jai Prakash Sahu,   Demand for bribe for doing work       Requested State Government for    Reply is awaited
     d          Pravakta, Zila           and making measurement book ,         investigation on 08.09.2009 and
                Kryakani Sadasya,        embezzlement and corruption in        reminder sent on 05.11.2009,
                Jharkhand Mukti          NREGA projects, misuse of funds       16.12.09,08.02.10,03.03.10 and
                Morcha Block-            and irregularities in various         31.03.2010
                Dhanvar, District        schemes, use of poor quality
                Giridih                  materials, wages not being paid by
                                         the post offices and banks.
149. Jharkhan   Shri Gopi Ram and        Regarding failure to provide work     Requested State Government for    Reply is awaited
     d          others, Block Godda,     during last two years                 investigation on 11.09.2009 and
                District Godda,                                                reminder sent on 05.11.2009,
                Jharkhand                                                      16.12.09,08.02.1003.03.10 and
                                                                               31.03.2010
150. Jharkhan   Shri Gopiram and                                               Requested State Government for    Reply is awaited
     d          others, District Godda   Work not provided under NREGA         investigation on 11.11.2009,
                                         in District Godda                     16.12.09,08.02.10.03.03.10 and
                                                                               31.03.2010
151. Jharkhan   Shri Chandan             Payment of wages not made by          Requested State Government,       Reply is awaited
     d          Hembrem, Block           Bank Accounts, underpayment of        16.12.09,08.02.1003.03.10nt for
                Barhet, District         wages under NREGA at Block            investigation on 11.11.2009
                Sahebganj                Barhet, District Sahebganj
152. Jharkhan   Shri Rohitashv                                                 Requested State Government for    Reply is awaited
                                         Duplication of works under
     d          Bhagat, Gram                                                   investigation on 11.11.2009,
                                         NREGA at Gram Panchayat Gram
                Panchayat Pratappur,                                           reminders on
                                         Panchayat Pratappur, Block
                Block Mehrama,                                                 16.12.09,08.02.1003.03.10 and
                                         Mehrama, District Godda
                District Godda                                                 31.03.2010
153. Jharkhan   Shri Trilokinath Dev     Irregularities in the renovation of   Requested State Government for    Reply is awaited
     d          and others, Gram         pond, Social Audit being not          investigation on 11.11.2009,
                Panchayat Lakhoria,      conducted at Gram Panchayat           reminders on
                Thana Sarwan,            Lakhoria, Thana Sarwan, District      16.12.09,08.02.10,03.03.10 and
                District Devghar         Devghar                               31.03.2010
154. Jharkhan   Jayant Pandey,         Alleged for increase in the salary of   Requested State Government for   Reply is awaited
     d          NREGA Karamchari       NREGA karamchari. The                   investigation on 20.4.2009
                Sangh, Dhanbad         complainant alleged that Rs 3500 is     reminders on 21.08.2009 &
                                       very less in compare to Panchayat       05.11.2009,
                                       Sewak                                   16.12.09,08.02.10,03.03.10 and
                                                                               31.03.2010

155. Jharkhan   Mr. Sambhu Nath        Financial irregularities to the tune    Requested State Government for   Reply is awaited
     d          Singh, Coordinator,    of Rs 3.995 Crores (mainly The          investigation on 31/03/2010
                Rastriya Mudde ke      Mahatma Gandhi NREG
                liye Nagorik Ayog,     scheme),Violation of The Mahatma
                Gumla, Jharkhand       Gandhi NREG Act and guidelines,
                                       False entry in the Mahatma Gandhi
                                       NREGA‟s Management
                                       Information System (MIS), Fake
                                       muster roll entries, Bogus vouchers
                                       for material purchase and No
                                       investigation/ action has been taken
                                       by the District Commissioner on
                                       the matter.
156. Karnatak   E-mail received from   No proper monthly payment, no            Forwarded to the State          Reply is awaited
     a          the Secretary of       payment, no pay slips and no             Government on 27/03/2009 and
                Karnataka              identification from KEONICS              reminders sent on 27.05.09 ,
                25 March 2009                                                   21.08.2009 &05.11.2009
157. Karnatak   Shri Shashi Kumar      Irregularities in the implementation    Forwarded to the State           Reply is awaited
     a                                 of NREGA by the Panchayat               Government on 30.12.2009
                                       Secretary and Engineer in
                                       Biadarakote, Gram Panchayat,
                                       Mandya district.
158. Karnatak   Shri C. K. Gangaiah,   Regarding irregularities in the        JD (NLM) has been requested to    Reply is awaited
     a          Member, Gram           implementation of Mahatma              depute NLM for investigation on
                Panchayat,             Gandhi NREGA in the district of        29.01.2010.
                Honisigere, Tumkur     Tumkur, Karnataka by Panchayat
                district               President, Secretary, Engineers and
                                       concerned Government officials.
159. Kerala     Shri G. Radhamani,     Irregularities in the implementation   Forwarded to State Government     Reply is awaited
                Valiyamoolayil         of Mahatma Gandhi NREGA in             on 3-2-2010
                Veedu, Akathumuri,     Cherunniyoor Gram Panchayat,
                Vennicode (PO),        Kerala,
                Varkala, Trivandrum    like not providing employment,
                (Dist)                 unemployment allowance and non
                                       payment of wages
160. Madhya     Shri Ram Kumar and     Misuse of funds under the NREGA        Forwarded to the State            Deputed State Quality Monitor
     Pradesh    others, Village                                               Government on 30.9.08 and         (SQM) Shri M.K. Shastri for
                Panchayat Janpad,                                             reminders sent on 23.1.09,        investigation. Report awaited.
                Block Junardev,                                               27.05.09 , 21.08.2009 &
                District Chhindwara                                           05.11.2009
161. Madhya     Shri Uttam Pandey,    Construction of PCC and drain at        Forwarded to the State            Reply is awaited
     Pradesh    District Sidhi,       Nagar Panchayat Rampur Nakin            Government on 01.04.09 and
                Madhya Pradesh        instead    of     Gram      Panchyat    reminders sent on 27.05.09 ,
                                      Ghughata under NREG Scheme in           21.08.2009 & 05.11.2009
                                      District Sidhi. Which is violation
                                      of the guidelines of NREGA.
162. Madhya     Ashok Patni, Bilala Forging & misappropriating of             Forwarded to the State            Reply is awaited
     Pradesh    Mill Road, Gram amount in Gram Panchayat Kaka                 Government on 28/04/2009 and
                Panchayat Kaka kheri, Kheri in 2008 ,neither any work         reminders sent on 27.05.09 ,
                District-Ashoknagar   took place nor any issue of             21.08.2009 & 05.11.2009
                                      jobcard& complaint against
                                      sarpanch, C.O., Sub. Engineer,
                                      Engineer,R.I.S &fake work shown
                                      on paper
163. Madhya    Raghuvir and Others,                                           Forwarded to the State              Reply is awaited
                                    Use of machinery, corruption in
     Pradesh   Gram Panchayt Guda,                                            Government on 20.04.2009 and
                                    Panchayat works.
               Pali                                                           reminders sent on 27.05.09 ,
                                                                              21.08.2009 & 05.11.2009
164. Madhya    Shri Atul Gautham,       Fund flow and unemployment            Requested State Government for      Reply is awaited
     Pradesh   Social Worker, Satna,    allowance which is due from last      investigation on 11.05.2009 and
                                        two years by Satna Zila Panchayat.    reminders sent on 27.05.09 ,
                                                                              21.08.2009 & 05.11.2009
165. Madhya    Shri        Harprasad    Corrupt practices by Shri Verma,      Requested State Government for      Reply is awaited
     Pradesh   Adivasi,    adhyaksh,    CEO, Zila Panchayat palera and        investigation on 29.05.2009 and
               Zila Panchayat Palera,   requesting for investigation by the   reminders sent on 21.08.2009 &
               District   Tikamgarh,    CEO, Tikamgarh.                       05.11.2009
               Madhya Pradesh.
166. Madhya    Shri     Vishvakarma,    Against Executive Engineer of         Requested State Government for      Reply is awaited
     Pradesh   Vishvakarma Sadan,       PWD, Sh. Rajkumar Kala, S.D.O.        investigation on 19.06.2009 and
               Malviya Colony, Lal      Sh. S.L.Batham and Junior             reminders sent on 21.08.2009 &
               Chowki,       District   Engineers Sh. R.S. Sawnalay, Sh.      05.11.2009
               Khandwa,      Madhya     K.K.Kurapa, Sh. S.C. Dighe
               Pradesh                  regarding corruption in various
                                        road projects. Alleged that only
                                        35% of sanctioned money was used
                                        for road projects. Found corruption
                                        of 22.5 lakh.

167. Madhya    Sh. Avaneesh             Non payment and Delay in wages,       Requested State Government for      Reply is awaited
     Pradesh   Bhargava, President,     fake payment and use of machinery     investigation on 16.7.2009 and
               District Congress        in Bhopal.                            reminders sent on 21.08.2009 &
               Committee Bhopal                                               05.11.2009 and NLM report
               (Gramin), Bhopal                                               forwarded to State Government for
                                                                              action and comments on
                                                                              09.10.2009
168. Madhya    Shri Chainsingh                                               Requested State Government for       Reply is awaited
                                         Sarpanch is demanding money
     Pradesh   Nagar, Gram                                                   investigation on 06.07.2009 and
                                         from complainant for completing
               Panchayat Tutiahedi,                                          reminders sent on 21.08.2009 &
                                         the well excavation work.
               Tehsil Sarangpur                                              05.11.2009
169. Madhya    Shri Rameshchandra        Sarpanch is demanding money         Requested State Government for       Reply is awaited
     Pradesh   Nagar, Gram               from complainant for                investigation on 06.07.2009 and
               Panchayat Tutiahedi,      completingthe well excavation       reminders sent on 21.08.2009 &
               Tehsil Sarangpur          work.                               05.11.2009
170. Madhya    Shri Jeevan Sakhla,       Misconduct of publicity work in the Requested State Government for       Reply is awaited
     Pradesh   Press Reporter, Khatik    Khatik Mohalla, Garoth District- investigation on 17.07.2009 and
               Mohalla,       Garoth-    Mandsaur and misappropriation of reminders sent on 21.08.2009 &
               Janpad,       District-   funds of around Rs. 4 lakhs         05.11.2009
               Mandsaur,     458880,
               09826340807
171. Madhya    Shri Kunwar S/o Shri      Use of criminal force to obtained      Requested State Government for    Instructions has been issued to
     Pradesh   Hukum Singh Parihar,      signature from poor villagers for      investigation on 15.07.2009 and   CEO Shivpuri to look in to
               Village & Post &          certifying the organization of gram    reminders sent on 21.08.2009,     matter early
               Thana         Survaya,    sabha, forgery of job cards, low       05.11.2009 &11.12.2009
               Janpad      Panchayat-    quality    of    road    work     &
               Shivpuri,     District-   misappropriation of funds, failure
               Shivpuri                  to conduct social audit
172. Madhya    Shri Jaswant Singh        Misappropriation of funds and          Requested State Government for    Instructions has been issued to
     Pradesh   Rathore, 75,              corruption in digging of wells under   investigation on 17.07.2009 and   CEO Dhar to look in to matter
               Kashibagh Colony ,        Kapil Dhara Yojna                      reminders sent on 21.08.2009 &    early
               Dhar                                                             05.11.2009
173. Madhya    Shri Shivnarayan          Non Payment of wages and dug           Requested State Government for    Instructions has been issued to
     Pradesh   Dwedi, Gram               well work under NREGA has been         investigation on 17.07.2009 and   CEO Rewa to look in to matter
               Panchayat Aitla,          stopped                                reminders sent on 21.08.2009 &    early
               Janpad Panchayat                                                 05.11.2009
               Raipur Kurch, District
               Rewa
174. Madhya    Villagers of Gram        Complaining of improper                 Requested State Government for    Instructions has been issued to
     Pradesh   Panchayat Jamuniya       implementation of NREGA and             investigation on 17.07.2009 and   CEO Chindwara to look in to
               Jethu, Tehsil Parasia,   requesting to investigate muster        reminders sent on 21.08.2009 &    matter early.
               District Chindwada       rolls, Physical verification of works   05.11.2009
               (Shri Surender           and quality checking in respect of
               Satankar & others)       M.B. road construction and scrutiny
                                        of Panchayat documents relating to
                                        NREGA works during last 3 years.
175. Madhya    Shri Anand Kumar         Fake Muster rolls and payment of        Requested State Government for    Instructions has been issued to
     Pradesh   Sharma, Gram and         wages in digging of wells under         investigation on 17.07.2009 and   CEO Satna to look in to matter
               Post Badkhera, Janpad    Kapil Dhara Yojna under NREGA           reminders sent on 21.08.2009 &    early
               Panchayat Majhgaun,                                              05.11.2009
               District Satna
176. Madhya    Shri Jalil Ansari, S/o   Misappropriation of funds and         Requested State Government for      Instruction has been issued to
     Pradesh   Shri Khalil, R/o Bahar   corruption in digging of wells under investigation on 24.07.2009 and      the Collector/D.P.C ,
               Shaher Chanderi,         Kapil Dhara Yojna in NREGA.           reminders sent on 21.08.2009 &      Ashoknagar, M.P. to
               District Ashoknagar                                            05.11.2009                          investigate the matter.
177. Madhya    Shri Mangi Lal           Wages not being paid to the           Requested State Government for      Instruction has been issued to
     Pradesh   Rathod, Gram Dabla       workers and nonpayment to the         investigation on 24.07.2009 and     the Collector/D.P.C ,
               MadhoSingh, Tehsil       material supplier also for last three reminders sent on 21.08.2009 &      Mandsaur, M.P. to investigate
               Bhanpura, District       months                                05.11.2009                          the matter.
               Mandsaur
178. Madhya    News paper item          Editor of Saptahik “Khabro Ka           Requested State Government for    Reply is awaited
     Pradesh   forwarded by the         Hamrahi” Chhattarpur , Madhya           investigation on 04.08.2009 and
               Editor of Saptahik       Pradesh complaining against             reminders sent on 21.08.2009 &
               “Khabro Ka Hamrahi”      Sarpanch & Secretary of Kund            05.11.2009
                                        Gram Panchayat in Chhattarpur
                                        District for alleged forgery in
                                        muster rolls by including the name
                                        of a dead person under NREGA
179. Madhya    Shri Kandhi Lal Sahu    Regarding ficitious road work from   Requested State Government for     Instruction has been issued to
     Pradesh   S/o Shri Lachi Ram      Dhoomavati Mandir to Kisanpur        investigation on 31.07.2009 and    the Collector/D.P.C , Seoni,
               Sahu, Panchayat         under NREGA & failure to enter       reminders sent on 21.08.2009 &     M.P. to investigate the matter.
               Reprsentatives, Gram    data in NREGA website                05.11.2009
               Panchayat- Dhooma,
               Janpad- Lakhnadaun,
               Seoni
180. Madhya    Shri Kailash Kundal,    Fake entries in Job cards, use of    Requested State Government for     Instruction has been issued to
     Pradesh   President of District   machinery, payment made through      investigation on 24.08.2009 and    the Collector/D.P.C , Dewas,
               Congress Committee,     fake vouchers & bills under          reminders sent on 21.08.2009 &     M.P. to investigate the matter
               Dewas District          NREGA                                05.11.2009. The MoS (RD-PJ) has
                                                                            replied to the complainant on
               (Forwarded by Sh.                                            30.09.2009
               Suresh Pachauri
               through MOS(PJ))
181. Madhya    Shri Nathu Singh S/o    Alleged that Sarpanch Sh. Sardar     Requested State Government for     Reply is awaited
     Pradesh   Shri Magoo singh        singh has stopped the work of        investigation on 12.08.2009 and
               Gram- Piplya            construction of well under NREGS     reminders sent on 21.08.2009 &
               Mohmmmad, Tehsil-       and is demanding bribe to restart    05.11.2009
               Garoth, Mandsaur        the work
               District

182. Madhya    Shri Ram Lal Shukla     Not providing information sought       Requested State Government for   Instruction has been issued to
     Pradesh   S/o Shri Ram Vishal     under RTI Act, 2005 and requesting investigation on 21.08.2009 and      the CEO Rewa , M.P. to
               Shukla, Gram and        to investigate into irregularities and reminder sent on 21.08.2009      investigate the matter
               Post- Lohi, Tehsil-     corruption in the NREGS.
               Hujur

183. Madhya    Shri Mansingh Thakur    Alleging irregularities and          Requested State Government for     Reply is awaited
     Pradesh   and others, Gram        corruption done by Secretary and     investigation on 2.09.2009 and
               Panchayat-Virora        Sarpanch in the NREGA                reminders sent on 21.08.2009 &
               Pahar Khas,                                                  05.11.2009
               Tikamgarh District
184. Madhya    Shri Shivkumar         Alleging works are not done            Requested State Government for    Reply is awaited
     Pradesh   Patwa, Former          physically like road construction,     investigation on 04.09.2009 and
               General Secretary ,    pond construction etc.                 reminder sent on 05.11.2009
               Zila - Congress        misapprorpriation of funds &
               Committee, District-   forgery in muster rolls against
               Singhroli              Secretary and Sarpanch of Gram
                                      Panchayat Kursa
185. Madhya    Shri Ramayan, Gram     Payment of wages made through          Requested State Government for    The State Government has
     Pradesh   Panchayat Kheda,       ghost workers and dead persons,        investigation on 08.09.2009 and   reported that the DC cum DPC
               District Sidhi         use of low quality material in         reminder sent on 05.11.2009       Sidhi to reply immediately
                                      works, Gram Pradhan Keep job
                                      cards in his custody.
186. Madhya    Shri Chandan Pandey,   Bypassing trained mates and            Requested State Government for    The State Government has
     Pradesh   Gram Panchayat         corruption under NREGA                 investigation on 08.09.2009 and   reported that the DC cum DPC
               Duari, Janpad                                                 reminder sent on 05.11.2009       Rewato reply immediately
               Panchayat Raipur
               Kurch, District Rewa
187. Madhya    Shri Kailash Prasad    Non-payment of wages of workers,       Requested State Government for    The State Government has
     Pradesh   Yadav, Gram            job cards kept by Sarpanch,            investigation on 08.09.2009 and   reported that the DC cum DPC
               Panchayat Lidwaha,     duplication in dug well construction   reminder sent on 05.11.2009       Tikamgarh to reply
               Tehsil Prithivipur ,   works under NREGA at Durretha,                                           immediately
               District Tikamgarh     Mastapur and Raniganj Gram
                                      Panchayats in District Tikamgarh.
188. Madhya    Shri Kashiram, Gram    Non-payment of wages to the            Requested State Government for    The State Government has
     Pradesh   Panchayat Dargaun      workers, manipulation in the job       investigation on 08.09.2009 and   reported that the DC cum DPC
               Khurd, District        cards under NREGA                      reminder sent on 05.11.2009       Tikamgarh to reply
               Tikamgarh                                                                                       immediately
189. Madhya    Shri Yadvendra         Not completing various works           Requested State Government for    The State Government has
     Pradesh   Yadav, MLA, Taal       under NREGA in District                investigation on 08.09.2009 and   reported that the DC cum DPC
               Darwaja, Tikamgarh     Tikamgarh                              reminder sent on 05.11.2009       Tikamgarh to reply
                                                                                                               immediately
190. Madhya    Shri Punte Ahirwar,     Duplication of well construction       Requested State Government for    The State Government has
     Pradesh   Gram Kurrai, Tehsil     works and involvement of               investigation on 08.09.2009 and   reported that the DC cum DPC
               Jatara, District        contractors under NREGA.               reminder sent on 05.11.2009       Tikamgarh to reply
               Tikamgarh                                                                                        immediately
191. Madhya    Shri Mannulal, Gram     Payment of wages not being not to      Requested State Government for    The State Government has
     Pradesh   Panchayat Kantikhas,    workers, embezzlement, corruption      investigation on 08.09.2009 and   reported that the DC cum DPC
               District Tikamgarh      in the Gram Panchayat Kantikhas        reminder sent on 05.11.2009       Tikamgarh to reply
                                                                                                                immediately
192. Madhya    Shri Brijnandan         Duplication in construction of         Requested State Government for    The State Government has
     Pradesh   Yadav, Orcha road,      dugwells, corruption under             investigation on 08.09.2009 and   reported that the DC cum DPC
               Prithivipur, District   NREGA in the Block Prithivipur of      reminder sent on 05.11.2009       Tikamgarh to reply
               Tikamgarh               Tikamgarh District.                                                      immediately
193. Madhya    Shri Chota, Gram        Use of low quality material in         Requested State Government for    The State Government has
     Pradesh   Panchayat Dargaun       construction of dug wells,             investigation on 08.09.2009 and   reported that the DC cum DPC
               Khurd, Tehsil Jatara,   paymement of wages not being           reminder sent on 05.11.2009       Tikamgarh to reply
               District Tikamgarh      made under NREGA in Gram                                                 immediately
                                       Panchayat Dargaun Khurd
194. Madhya    Smt. Meera Yadav,       Duplication of dug wells               Requested State Government for    The State Government has
     Pradesh   MLA, A/139 Housing      contruction works, use of low          investigation on 08.09.2009 and   reported that the DC cum DPC
               Board Colony,           quality material, job cards kept by    reminder sent on 05.11.2009       Tikamgarh to reply
               Kohefiza, Bhopal        Gram Pradhan in Gram Panchayat                                           immediately
                                       Bhamaura, Tehsil Niwadi, District
                                       Tikamgarh
195. Madhya    Shri Ramkumar and       Fake works taken up,                   Requested State Government for    It is reported that quality of
     Pradesh   others, Gram-           misappropriation of funds ,bogus       investigation on 08.09.2009 and   work is poor. The amount,
               Jyoramora, Tehsil-      job cards ,using fake bills and poor   reminder sent on 05.11.2009       which is to be recovered ,is
               Prithvipur, District    quality of materials were used in                                        being estimated.
               Tikamgarh               NREGS.
196. Madhya    Shri Mahendra Singh,     Duplication and use of low quality     Requested State Government for    The State Government has
     Pradesh   Taal Darwaja, District   material in the construction of dug    investigation on 11.09.2009 and   reported that the DC cum DPC
               Tikamgarh                wells under NREGA, Gram Sabha          reminder sent on 05.11.2009       Tikamgarh to reply
                                        Meetings not being held, no shelf of                                     immediately
                                        projects preparedin District
                                        Tikamgarh.
197. Madhya    Shri Brijmohan, Gram     Payment of wages not made to           Requested State Government for    Reply is awaited
     Pradesh   Purainia, Gram           workers, fudged entries in muster      investigation on 11.09.2009 and
               Panchayat Ramnagar,      rolls, embezzlement done under         reminder sent on 05.11.2009
               District Tikamgarh       NREGA.
198. Madhya    Shri Sobaran Singh,      Use of machinery and involvement       Requested State Government for    Reply is awaited
     Pradesh   Gram Panchayat           of contractor under NREGA.             investigation on 11.09.2009 and
               khanjapura, Tehsil                                              reminder sent on 05.11.2009
               Sewenda, District
               Datia
199. Madhya    Shri Bharat Pal and      Duplication of works and               Requested State Government for    The State Government has
     Pradesh   others, Gram             embezzlement under NREGA in            investigation on 11.09.2009 and   reported that the DC cum DPC
               Panchayat Bhamaura,      District Tikamgarh.                    reminder sent on 05.11.2009       Tikamgarh to reply
               District Tikamgarh.                                                                               immediately
200. Madhya    273/PS/M(RD)/09          Corruption, misuse of NREGA            Requested State Government for    Reply is awaited
     Pradesh   Shri Harpal Singh,       fund, fake muster rolls and            investigation on 30.09.2009 and
               Ward Panch,              fraudulent withdrawal from bank        reminder sent on 05.11.2009
               Panchayat Pveya,         accounts of non- existent workers
               Vikas Khand Sohaval      by Sarpanch, Sachiv, J.E. and
               , District Satna,        Divisional Officer under NREGA
               Madhya Pradesh
201. Madhya    Shri Banke Bihari        Various problems of Panchayat          Requested State Government for    Reply is awaited
     Pradesh   Sharma, Prantia          Sachiv under NREGA                     investigation on 22.10.2009 and
               Upadhyaksh,                                                     reminder sent on 05.11.2009
               Panchayat Sachiv
               Mahasangh Bhopal,
               Madhya Pradesh
202. Madhya    Shri Shivraman Singh    Corruption in the printing of job      Requested State Government for    Reply is awaited
     Pradesh   Rathore, Gram           cards and photographs under            investigation on 14.10.2009 and
               Panchayat Indergarh,    NREGA in District Datia.               reminder sent on 05.11.2009
               District Datia
203. Madhya    537/VIP/Secy RD         Requesting to create a Task Force      Requested State Government for    Reply is awaited
     Pradesh   Prime Minister‟s        for proper implementation of           investigation on 06.11.2009
               Office forwarded        NREGA Scheme in Madhya
               aletter of Shri Uday    Pradesh
               Pratap Singh, Member
               of Parliament (LS)
               dated 19.09.2009
204. Madhya    Shri Nabin Sahu,        Corruption, manipulation in job        Requested State Government for    Reply is awaited
     Pradesh   District President,     cards and use of machinery under       investigation on 17.11.2009
               District Youth          NREGA.
               Congress (I)
               Committee
               (Grameen), Jatara,
               District Tikamgarh,
               Madhya Pradesh (
               From office of MOS-
               RD-PJ)
205. Madhya    Shri Mukesh Gupta,      Failure to provide work for job card   Requested State Government for    Reply is awaited
     Pradesh   Shri Rakesh Sahu, and   holders, corruption, fake muster       investigation on 17.11.2009
               Villegers, Gram         rolls and misuse of NREGA fund
               Kamrari, District       by Secretary and Pradhan.
               Datia, Madhya
               Pradesh
206. Madhya    Shri Chiddo Khan,       Failure to conduct committee           Requested State Government for    Reply is awaited
     Pradesh   Sabhapati, Sanchar      meeting                                investigation on 11.11.2009
               and Sankaram Samiti,
               Gram- Bodera, Janpad
               Panchayat- Tikamgarh
207. Madhya    Villagers of Gram        To keep job cards in the custody of      Requested State Government for   Reply is awaited
     Pradesh   Panchayat- Bharjhuna     Secretary & works done by                investigation on 11.11.2009
               Kala, Janpad             contractors in the Kapil Dhara
               Panchayat- Sohawal,      project
               District- Satna
208. Madhya    Smt Gangotri Devi        Issuance of fake job cards, fake         Requested State Government for   Reply is awaited
     Pradesh   and others, Gram         entries in muster roll, duplication in   investigation on 11.11.2009
               Panchayat Chatuwa,       well construction work under
               Block Dindori,           NREGA at Gram Panchayat
               District Dindori         Chatuwa, Block Dindori, District
                                        Dindori
209. Madhya    Shri Narayan Verma,      Embezzlement and corruption              Requested State Government for   Reply is awaited
     Pradesh   Gram Panchayat           under NREGA at Gram Panchayat            investigation on 11.11.2009
               Patlawad, Block          Patlawad, Block Dhamnod, Tehsil
               Dhamnod, Tehsil          Dharampuri, District Dhar
               Dharampuri, District
               Dhar
210. Madhya    Villagers of Gram        Use of low quality material in           Requested State Government for   Reply is awaited
     Pradesh   Panchayat Dumduma,       various projects under NREGA at          investigation on 11.11.2009
               Block Prithivipur,       Gram Panchayat Dumduma, Block
               District Tikamgarh       Prithivipur, District Tikamgarh
211. Madhya    Shri Manohar Singh       Embezzlement of NREGA funds              Requested State Government for   Reply is awaited
     Pradesh   and others, Gram         around Rs. 80 Lacks, use of JCB          investigation on 11.11.2009
               Panchayat- Auston,       machines, use of poor quality
               District- Tikamgarh      materials.

212. Madhya    Shri Radhey Shyam        Use of JCB machines, work are not        Requested State Government for   Reply is awaited
     Pradesh   and others, Gram         done physically, irregularities and      investigation on 11.11.2009
               Post- Chirola, Tehsil-   corruption done in various NREG
               Pathariya, District-     Schemes.
               Damoh
213. Madhya    760/VIP/S(RD)/09          Corruption by the Sarpanch, Gram          Requested State Government for    Reply is awaited
     Pradesh   A letter from the         Panchayat Barethi, Satna District,        investigation and requested NLM
               Hon‟ble Prime             Madhya Pradesh.                           Division for appointing NLM on
               Minister forwarding a                                               09.12.2009
               copy of letter dated
               06.11.09 of Shri
               Devraj Singh Patel,
               Member of
               Parliament, Lok
               Sabha.
214. Madhya    Shri Ashok Shinde,        Alleged irregularities amounting to Rs.   Requested State Government for    Reply is awaited
     Pradesh   Editor in charge,         13.68 crore by Sh. Nikunj Srivastava,     investigation on 6.1.2010
               Navbharat Press,          Collector, Chhindwara, under National
               Chhindwara, Madhya        Rural Employment Guarantee Scheme
               Pradesh
215. Madhya    Shri Deepak Kumar         Allegations of corruption against Sh. Requested State Government for        Reply is awaited
     Pradesh   Mishra, Advocate          Santosh Patel, CEO, Sohagpur investigation on 8.1.2010
               District and Session      Panchayat in Shahdol district in the
               Court, Shahadol,          implementation of NREGA &
               Madhya Pradesh            possessing assets of more than his
                                         known source of income.


216. Madhya    Petition of the workers   Alleged non payment of wages to           Requested State Government for    Reply is awaited
     Pradesh   of Gram Morrammana,       workers and use of machines/tractors      investigation on 8.1.2010
               Gram Panchayat Guda,      under NREGA.
               near Pali, District
               Tikamgarh, Madhya
               Pradesh
217. Madhya    Shri Vijay Agrawal,       Alleged lack of support from district     Requested State Government for    Reply is awaited
     Pradesh   6PM Newspaper,            administration to the people of Mhow      investigation on 8.1.2010
               Lunawat Publications &    Tehsil.
               Media (P) Ltd., Dhenu
               market, Indore,, Madhya
               Pradesh
218. Madhya    Shri Umesh Agnihotri,      Irregularities and corruption of crore of Requested State Government for   Reply is awaited
     Pradesh   President , BJP,           rupees by the collector Sh. Maneesh investigation on 8.1.2010
               Bhrastachar Unmulan        Shrivastava in the implementation of
               Manch, Bhopal, Madhya      NREGA in the district of Shivpuri,
               Pradesh                    Madhya Pradesh.


219. Madhya    Sh. Chandrika Prasad        Alleged corruption under NREGA to Requested State Government for          Reply is awaited
     Pradesh   Dwivedi, Member,           the tune of rupees 12.73 lakhs by the Sri investigation on 13.1.2010
               Madhya Pradesh             Krishna Swasahayata Samooh Sanstha,
               Congress Committee,        Gram Alampura, Janpad Panchayat
               Bhopal, Madhya             Palera, District Tikamgarh, Madhya
               Pradesh                    Pradesh.



220. Madhya    Sh. Manish Vani,            Alleged      corruption,  substandard Requested State Government for      Reply is awaited
     Pradesh   District Vice President,   work/construction, use of machines and investigation on 13.1.2010
               Youth Congress, 31,        contractors under NREGA in Alirajpur
               Vinoba Marg, Jobat,        district, Madhya Pradesh.
               District Alirajpur,
               Madhya Pradesh,
221. Madhya    Shri Deepak Kumar           Allegations of irregularities and Requested State Government for          Reply is awaited
     Pradesh   Mishra, Advocate            corruption against 77 Sarpanchs and investigation on 21.1.2010
               District and Session        Secretaries of Gram Panchayats in
               Court, Shahdol              Sohagpur Block of Shahdol district,
                                           Madhya Pradesh in the implementation
                                           of NREGA

222. Madhya    The report dated            Reported starvation death in NREGA Requested State Government for         Reply is awaited
     Pradesh   6.1.2010, captioned         worker‟s family in Sehora block of the investigation on 21.1.2010
               “Starvation death in        Jabalpur district in Madhya Pradesh.
               NREGA worker‟s
               family”, published in
               The Hindu newspaper
223. Madhya    Shri    Shobha    Ram Alleging misappropriation of funds          Requested State Government         for Reply is awaited
     Pradesh   Chaudhary and      Shri under NREGA by Delgaon Panchayat.         investigation on 1.2.2010.
               Girdharilal Chaudhary,
               Delgaon, PO-Dhangaon,                                             An NLM enquiry has been conducted.
               district Khandwa of                                               After examining the report it has been
               Madhya         Predesh                                            observed that the complaints are
               (forwarded          by                                            malafide and has no substance. The
               President’s Secretariat                                           complainants failed to prove the
               )                                                                 allegation against the Sarpanch and
                                                                                 Secretary inspite of the best efforts by
                                                                                 the NLM.
224. Madhya    Shri Santosh Kumar Rai,    Alleging irregularities amounting to   Requested State Government for           Reply is awaited
     Pradesh   Councillor,      Housing   Rs. 13.68 crore by Shri B.M.Sharma,    investigation on 5.2.2010
               Board             Colony   Collector, Dhar and incharge Sh.
               (forwarded by President    Bhadhoria under NREGS
               Secretariat), Chhindwara

225. Madhya    Shri Jairam Choudhary, Alleged misappropriation of funds          Requested State Government         for   Reply is awaited
     Pradesh   Delgaon, PO-Dhangaon, under NREGA by Sarpanch and                 investigation on 5.2.2010
               district Khandwa of Secretary of Delgaon Panchayat.
               Madhya          Predesh                                      An NLM enquiry has been conducted.
               (forwarded           by                                      After examining the report it has been
               President Secretariat)                                       observed that the complaints are
                                                                            malafide and has no substance. The
                                                                            complainants failed to prove the
                                                                            allegation against the Sarpanch and
                                                                            Secretary inspite of the best efforts by
                                                                            the NLM.
226. Madhya    Shri    Vijay     Kumar Misappropriation of fund by using Requested State Government for              Reply is awaited
     Pradesh   Choudhary and others     name of non existence workers under investigation on 5.2.2010
                                        NREGA in GP-Khami, Barghat, Seoni
                                        district.
227. Madhya    Shri Shiv Prasad Shukla, Corruption & payment of the wage in Requested State Government for           Reply is awaited
     Pradesh   village Mughar, tehsil the non existence workers by village investigation on 5.2.2010
               Nagoud, district Satna.  Sarpanch.
228. Madhya    Sh.    Rajesh   Nayak    Taking         commission          and   Requested State Government for   Reply is awaited
     Pradesh   Saurabh,        Deputy   misappropriation of fund under           investigation on 5.2.2010
               President Yuva JD(U),    NREGA in district Panchayat Katni by
               Katni                    Sh. Rajendra Singh incharge officer.
229. Madhya    Villagers of Kachriya,   Using fake muster roll and under         Requested State Government for   Reply is awaited
     Pradesh   Post-Kaparwari,          payment of wage by sarpanch/sachiv       investigation on 5.2.2010
               Chhindwara.              in GP Kachriya, district Chhindwara.
230. Madhya    Sh.    Sanjay   Misra,   Corruption and violation of NREGS‟s      Requested State Government for   Reply is awaited
     Pradesh   Khandwa                  guideline in execution of following      investigation on 17.2.2010
                                        works:
                                         Alteration and widening of road
                                            from Dival to Bilud
                                         Alteration from Arud to Hirapur
                                         Alteration of road from Rustampur
                                            to Pandhana
                                         Expansion & deepening of drain
                                            in Bamangoan Aakhai
                                         Desilting, earthwork, pitching and
                                            construction of „Ghat‟ in Punasa


                                          by Sh. Nikunj Srivastava, collector
                                       then Khandwa, Dr. Sanjay Goyal then
                                       CEO, Shri J.P. Srivastva, existing
                                       collector Neemach, Shri R.R. Ahirwar
                                       account officer, Executive Engineer
                                       (water resource) Sh. L.N. Gandhi and
                                       Executive Engineer (PWD) Sh. P.N.
                                       Vajpayee.
231. Madhya    Sh. Suresh Kumar, Non-payment of wage under NREGA. Requested State Government for                  Reply is awaited
     Pradesh   village Barod, Tehsil                                          investigation on 17.2.2010
               Sitamau,       district
               Madsour
232. Madhya    Shri     Radheshyam, Corruption and misappropriation of      Requested State Government for   Reply is awaited
     Pradesh   [forwarded by MoS fund under NREGS                           investigation on 17.2.2010
               (RD-SA)]      Village
               Chirola,       Tehsil
               Pathria,      District
               Damoh of Madhya
               Predesh.

233. Madhya    Sh. Arundev Pandey,       Misuse of fund under NREGS by Requested State Government for        Reply is awaited
     Pradesh   Advocate, vill.           Sh. Diwakar Narayan Patel, then investigation on 19.2.2010
               KhatKhari, Post-          CEO, Devsar-Badain
               Khutar, District
               Sangrouli
234. Madhya    Sh.      Om     Prakash   Misappropriation of fund and Requested State Government for         Reply is awaited
     Pradesh   Pandey & others, Vill.    inferiority in work under NREGS. investigation on 19.2.2010
               Jhonta,          Block-
               Majhgawan,district
               Satna
235. Madhya    Sh. Mangi Lal, vill.      Corruption in implementation of Requested State Government for      Reply is awaited
     Pradesh   Pahela, tehsil Karahal,   NREGS in GP Pahela.             investigation on 19.2.2010
               district Sheopur
236. Madhya    Sh. Pawan Dhuwara,        Corruption under NREGS in Requested State Government for            Reply is awaited
     Pradesh   Mahamantri, District      district Tikamgarh and Chhatarpur. investigation on 19.2.2010
               Congress Committee
               Tikamgarh
237. Madhya    Sh. Daulatram Patel,      Newspaper      cuttings  alleging Requested State Government for    Reply is awaited
     Pradesh   Ujjain                    charging of commission by the in- investigation on 4.3.2010
               [forwarded by Prime       charge from Panchayat Secretaries
               Minister’s Office]        for implementation of NREGA.
238. Madhya     Sh.       Laxminarayan      Regarding filling up of pond well Requested State Government for        Reply is awaited
     Pradesh    Nayak, Ex-MP (Lok           from river Jamani and Dhasaan by investigation on 4.3.2010
                Sabha)                      making stop dams in Tikamgarh
                [forwarded by Prime         district of Madhya Pradesh.
                Minister’s Office]
239. Madhya     Shri Kalu, village          Fake      job        cards      and Requested State Government for Reply is awaited
     Pradesh    Chhaayanmaina, tehsil       misappropriation of fund            investigation on 3.3.2010
                Sonkachch,       district
                Devas
240. Madhya     Ram Bihari Garg,            Irregularities in conferring „Nirmal Requested State Government for     Reply is awaited
     Pradesh    G&P Khutaha, district       Gram Puruskar‟ to GP-Khutaha         investigation on 3.3.2010
                Satna
241. Madhya     Sh. Ram Prakash             Making of job card of   dead person, Requested State Government for     Reply is awaited
     Pradesh    Chaturvedi, Dy.             Fake muster roll and    fraud of Rs. investigation on 5.4.2010
                Sarpanch, village           20 lakh approximate     by secretary
                panchayat Charhet,          Rakesh Kumar with       the help of
                JP- Jaisinghnagar,          CEO Jaisinghnagar.
                district Shahdol
242. Madhya     Villagers of Jamali,        Work is not provided, under           Requested State Government for    Reply is awaited
     Pradesh    tehsil      Gandhvani,      payment of wage, non disclosure of    investigation on 5.4.2010
                district Dhar               information and late payment of
                                            wage by village Secretary
243. Maharash Shri Rajan Kshirsagar,        Non-issuance of job cards, delay in   Forwarded    to     the    State Reply is awaited.
     tra      Joint Secretary,              starting the NREGA work and           Government on 29.8.08 and
              Maharashtra Rajya             failure to provide the                reminders sent on 23.1.09 ,
              Shetmajoor Union                                                    27.05.09   ,    21.08.2009    &
                                            unemployment allowance as per the
              (lalbawta)                                                          05.11.2009
              Shivajinagar,                 provision of NREG Act.
              Parbhani, district Beed
244. Maharash Shri Baliram            Non- issuance of job card, works     Forwarded    to     the    State The        Government       of
     tra      Bhumbe,Taluka           not being started and refusal to     Government on 29.8.08 and        Maharashtra,          Planning
              Committee Majalgaon     accept form no. 04 under NREGA.      reminders sent on 23.1.09 ,      Commission vide letter No.
              District Beed,                                               27.05.09   ,    21.08.2009    &  MREGS-2008/CR-51/EGS-6,
              Maharastra                                                   05.11.2009                       dated 18-2-2010 has reported
                                                                                                            that the enquiry was conducted
                                                                                                            under the Collector of Beed
                                                                                                            and the Action Taken Report
                                                                                                            has been sent to the
                                                                                                            complainant.
245. Maharash Shri Harishchandra      Misappropriation of NREGA Fund       Forwarded    to     the    State Reply is awaited.
     tra      Pawar, Human Right      by the Govt. of Maharashtra.         Government on 29.8.08 and
              Activist, C/16, Hudco                                        reminders sent on 23.1.09 ,
              Colony Mangrulpir                                            27.05.09   ,    21.08.2009    &
              Tah. Mangrulpir,                                             05.11.2009
              District Washim
246. Maharash Shri. Harishchandra     Nonpayment of legitimate wages of Requested State Government for Reply is awaited
     tra      Pawar, President of     one hundred days from 2006 to investigation on 08.05.2009 , and
              NREGS, Labour           2008                              reminders sent on 27.05.09 ,
              Organisation, Tq                                          21.08.2009 & 05.11.2009
              Mangrulpir , District
              Washim,
              Maharashtra
247. Maharash Mr. Harishchandra       Failure of the Government in         Requested State Government for Reply is awaited
     tra      Pawar, President,       proper implementation of the         investigation on 09. 06.09 and
              Adarsh Gram Vikas       NREGA.      Misappropriation of      reminders sent on 21.08.2009 &
              Mandal                  NREGS funds and failure in the       05.11.2009
              District Mangrulpir     formulation of rules under section
                                      32 of NREG Act, failure in
                                      submission of Annual Reports, etc
248. Maharash Mr. Rajan Kshirsagar,    Job Cards have not been issued to     Requested State Government for Reply is awaited
     tra      General Secretary,       all the applicants, No training to    investigation on 04. 06.09 and
              Centre of Indian Trade   Gram Rozgar Sevak's, Minimum          reminders sent on 21.08.2009 &
              Union                    wages not paid at Walur Tal Selu.     05.11.2009

249. Maharash Col. B. K Gupta,                                                                         ATR in Marathi language has
                                       Irregularities in Amaravathi District Requested State Government for
     tra      NLM Report               of Maharashtra.                                                 been received form State Govt.
                                                                             investigation on 15. 07.09 and
                                                                                                       State Govt has been requested
                                                                             reminders sent on 21.08.2009 &
                                                                             05.11.2009                to     forward     ATR      in
                                                                                                       English/Hindi language
250. Maharash Shri Harischandra        Threatening to go on fast unto Forwarded to State Government Reply is awaited
     tra      Pawar, President , The   death from 15.08.09 in front of on 19.08.2008 and reminder sent
              NREGS Labour             Rashtrapati Bhavan, New Delhi. on 05.11.2009
              Organisation of India    Regarding payment of wages and
                                       unemployment allowance.
251. Maharash General Secretary,       Regarding demands of Gram       Forwarded to the State          Reply is awaited
     tra      Centre of India Trade    Rozgar Sahayaks of Aurangabad   Government on 22.01.2010
              Unions
252. Maharash Prof. Madhu Patil        Regarding irregularities in the Forwarded to State Govt on 24-2-           Reply is awaited
     tra                               implementation of the Mahatma 2010
                                       Gandhi NREGA in Parnada Block,
                                       Osmanabad District.

253. Manipur   www.Kanglaonline.co     Ccpur Villagers beaten up badly for   Forwarded to the State               Reply is awaited
               m                       refusing to pay militants.            Government on 1.06.08 and
               June 1, 2008                                                  reminders sent on 23.1.09 ,
                                                                             27.05.09 , 21.08.2009 & 05.11.2009
254. Manipur   Article in The          Fake job card scam under scanner      Forwarded to the State               Reply is awaited
               Statesman               in Manipur                            Government on 26.08.08 and
               August 26, 2008                                               reminders sent on 23.1.09 ,
                                                                             27.05.09 , 21.08.2009 & 05.11.2009
255. Manipur    Shri      Paominthang,      Job card holders do not         Forwarded to the State               Reply is awaited
                Social         Worker,       received actual allotted work   Government on 17.10.08 and
                Henglep           Sub-      General public of Henglep       reminders sent on 23.1.09 ,
                Division,                    Block got only 65 days of       27.05.09 , 21.08.2009 & 05.11.2009
                Churachandpur                works in comparison with
                District ,Manipur            other Blocks
                                            Deputy Commissioner has
                                             diverted 45 days working
                                             money for Famine Relief
                                             Funds
256. Manipur    Article in www.e-        NREGS workers file case against     Forwarded to the State               Reply is awaited
                pao.net                  Pradhan                             Government on 20/03/2009 and
                Dated: 16 March 2009                                         reminders sent on , 27.05.09 ,
                                                                             21.08.2009 & 05.11.2009
257. Manipur    Shri Dineshwar           Regarding show cause notice by Forwarded to the State                    Reply is awaited
                Meetei, Pradhan,         Smt Bimola Devi, Member, Takyel Government on 9-3-2010
                Gram Panchayat           Zilla Parishad to Shri Dineshwar
                                         Meetei, Pradhan, Takyel Gram
                                         Panchayat .

258. Nagaland   Article in The Morung    Where is the NREGA money?           Forwarded to the State               Reply is awaited
                Express                                                      Government 3.9.08 and reminders
                1st September, 2008                                          sent on 23.1.09 , 27.05.09
                (Villagers of Rurur in                                       ,21.08.2009 & 05.11.2009
                Shamator Block,
                Dimapur)
259. Orissa   Shri Jayadev Jena,       Alleged Non-issuance of job cards    Forwarded to State Government          The enquiry revels that there is
              M.L.A. & President,      under NREGA in Launa Patuni          on 19.09.07. Reminders sent on         no such village in the name of
              Orissa Pradesh           Village of Chamakpur GP under        28.11.07, 26.02.08, 5.5.2008,          Launa Patuni Chamkpur GP
              Congress Committee,      Joda Block in Keonjhar district of   23.5.08, 29.5.08,5.06.08 , 23.1.09 ,   under Joda Block in Keonjhar
              Bhubaneswar              Orissa                               27.05.09 & 21.08.2009 &                District as reported by PD,
                                                                            05.11.2009,                            DRDA, Keonjhar. Hence the
                                                                            16.12.09,08.02.10,03.03.10 and         question of Non-issuance of
                                                                            31.03.2010                             job cards to villager‟s dosen‟t
                                                                                                                   arises so the allegation is
                                                                                                                   baseless.
260. Orissa   Shri Ayodhaya Nath       Issuance of job cards to non –       Forwarded to the State                 It is reported by PD, DRDA,
              Mishra, vill. Bargaon,   labourers under NREGA                Government 8.5.08 and reminders        Nuapada that the allegation
              district Nuapada                                              sent on 23.1.09 , 27.05.09             made by Shri Ayodhaya Nath
                                                                            21.08.2009 & 05.11.2009,               Mishra regarding corruption,
                                                                            16.12.09,08.02.10,03.03.10 and         payment made through
                                                                            31.03.2010                             imperfect muster rolls, poor
                                                                                                                   quality of work are baseless .
                                                                                                                   on enquiry it is found that in
                                                                                                                   the GP Bargaon there were
                                                                                                                   1029 households registered
                                                                                                                   under NREGS and job cards
                                                                                                                   have been issued to all of
                                                                                                                   them. Hence, there is no
                                                                                                                   deviation in regard to issuance
                                                                                                                   of job cards.
261. Orissa   Times of India      Activists come under attack for        Forwarded to the State              This allegation relates to two
              June 8, 2008        exposing graft in Jobs scheme-         Government on 8.06.08 and           districts namely Koraput and
                                  Social audit threat to local leaders   reminders sent on 23.1.09 ,         Raygarh
                                                                         27.05.09 , 21.08.2009 &             Koraput:
                                                                         05.11.2009,                         As per the enquiry report of
                                                                         16.12.09,08.02.10,03.03.10and       PD, DRDA Koraput, Narayan
                                                                         31.03.2010                          Heraka Nayeb Sarpanch of
                                                                                                             Borigi GP under Narayanpatna
                                                                                                             Block expired on 9.5.2008 due
                                                                                                             to an accident while he was
                                                                                                             riding a bike. He met with this
                                                                                                             accident with a tractor coming
                                                                                                             in opposite direction. The said
                                                                                                             driver of the tractor arrested
                                                                                                             on 14.5.2008 and was
                                                                                                             forwarded to court of JMFC,
                                                                                                             Laxmipur Police have initiated
                                                                                                             case under section – 279&
                                                                                                             304 (A) of IPC against him.
                                                                                                             Raygarh:
                                                                                                             As per the enquiry report of
                                                                                                             PD, DRDA, Rayagarh
                                                                                                             regarding report published in
                                                                                                             Times of India on 8.6.2008 is
                                                                                                             far from truth, unsound and
                                                                                                             baseless. Hence it considers no
                                                                                                             merit.
262. Orissa   Online article in   NREG wages not paid, farmer sets       Forwarded to State Government       On enquiry it was found that
              Indian Express      himself on fire                        on 3.07.08 and reminders sent on    the allegation is baseless.
              July 3, 2008                                               23.1.09 , 27.05.09 , 21.08.2009 &
                                                                         05.11.2009,
                                                                         16.12.09,08.02.10,03.03.10 and
                                                                         31.03.2010
263. Orissa   Shri Beraja Prashad      Misappropriation of NREGA        Forwarded to State Government       As per the enquiry report of
              Parida and others,        funds                            on 7.10.08 and reminders sent on    PD, DRDA, Jajpur the
              Kalamatia G.P, Block     Using of false bills and fakes   23.1.09 , 27.05.09 , 21.08.2009 &   allegation is baseless.
              Bari, District Jajpur     muster roll under NREGA.         05.11.2009,
                                                                         16.12.09,08.02.10,03.03.10 and
                                                                         31.03.2010

264. Orissa   Ex-Sarpanch & others,    Corruption                       Forwarded to State Government       Enquiry report will be
              Village Arandua          Using of fake muster roll        on 7.10.08 and reminders sent on    submitted soon. Reply is
              Block Basudebpur,        Use of sub-standard material     23.1.09 , 27.05.09 , 21.08.2009 &   awaited
              District Bhadrak          under NREGA.                     05.11.2009,
                                                                         16.12.09,08.02.10,03.03.10 and
                                                                         31.03.2010

265. Orissa   Shri Lalit Mohan         Non- payment of wage             Forwarded to State Government       Enquiry report will be
              Pradhan, Village         Payment of wage to the wrong     on 7.10.08 and reminders sent on    submitted soon. Reply is
              Saleising, Post           persons under NREGA.             23.1.09 , 27.05.09 , 21.08.2009 &   awaited
              Bhaghiapada, District                                      05.11.2009
              Boudh                                                      , 16.12.09,08.02.10,03.03.10 and
                                                                         31.03.2010
266. Orissa   Shri Nimai Chandra        Regarding mis-utilisation of funds   Forwarded to State Government       Irregularities and miss-
              Sarkar, M.L.A.,           by violation of Govt. instruction    on 24.10.08 and reminders sent on   utilization of funds by
              Malkangiri, Orissa        under NREGA by Gompakonda GP         23.1.09 , 27.05.09 , 21.08.2009 &   Panchayat executive officer,
              Legislative Assembly,     Secretary, VLW-cum–AEO and           05.11.2009                          GP Secretary and Sarpanch
              Bhubaneswar               GPEO of Kalimela Block in            , 16.12.09,08.02.10,03.03.10 and    appers to be true on the basis
                                        Gompakonda Gram Panchayat,           31.03.2010                          of enquiry report of PD,
                                        Kalimela Block of Malkangiri                                             DRDA, Malkanagiri.
                                        Constituency (along with findings                                        Accordingly, executive officer
                                        of report of social audit of NREGS                                       , panchayat Secretary and
                                        conducted by the NGOs RITES                                              Sarpanch of Gompakonda
                                        Forum and Harmony at Nuaguda                                             Gram Panchaya, Kalimela
                                        and Gangala Panchayats,                                                  Block of Malkanagiri have
                                        Malkangiri Block)                                                        been placed under suspension.
                                                                                                                 Local Fund Audit has been
                                                                                                                 requested to conduct a special
                                                                                                                 Audit for financial
                                                                                                                 irregularities in Gornpakoda
                                                                                                                 GP.
267. Orissa   Article in the Business   In Orissa, Ghost come to life        Forwarded to State Government       On enquiry it is found that the
              Standard                                                       on 29.9.2008 and reminders sent     payment of wages has been
              24 September, 2008                                             on 23.1.09 27.05.09 , 21.08.2009    made to those labourers who
                                                                             & 05.11.2009,                       have worked under NREGS.
                                                                             16.12.09,08.02.10,03.03.10 and      Hence the allegation is
                                                                             31.03.2010                          baseless.
268. Orissa   Villagers of Gram         Alleging misappropriation of funds   Forwarding to the State             The enquiry report revels that
              Panchayat Kulunda,        more than Rs. 3.00 Lakh and          Government on 31.12.2008 and        the allegation is baseless.
              Orissa.                   demanding percentage of money        reminders sent on 23.1.09 ,
                                        from executants of NREGA works       27.05.09 , 21.08.2009 &
                                        out if estimated cost by B.D.O and   05.11.2009,
                                        Mr. Fakira(Executive Officer)        16.12.09,08.02.10,03.03.10 and
                                        under NREGA                          31.03.2010
269. Orissa   Shri Arun Gochhayat      Violation of NREGA guidelines.   Forwarding to the State          On enquiry by BDO, Banarpal,
              and other villagers,                                      Government on 27.02.2009 and     when petitioner was contacted,
              Village Santarapur,                                       reminders sent on 27.05.09 ,     he denied the fact regarding
              Block Banarpal,                                           21.08.2009 & 05.11.2009,         making allegation about
              District Angul                                            16.12.09,08.02.10,03.03.10 and   violation of NREGs Act and
                                                                        31.03.2010                       Gudiline.he is satisfied with
                                                                                                         implementation of NREGA in
                                                                                                         his area. Further Shri Arun
                                                                                                         Gochhayat have got job card
                                                                                                         bearing No. 28970 whose
                                                                                                         family member have
                                                                                                         completed 100 days work and
                                                                                                         satisfied with the payment
                                                                                                         under NREGS. Hence the
                                                                                                         allegation is totally false.
270. Orissa   Unnamed (Because of       Complaining of Smt. Rasmita    Forwarding to the State          The local enquiry conducted
              a chance of a threat),     Mishra (J.E) under NREGA for   Government on 27.02.2009 and     by PD, DRDA, Ganjam revels
              Block Rangeilunda,         preparing false bills.         reminders sent on 27.05.09 ,     that the allegation is baseless.
              District Ganjam,          Allowing machinery.            21.08.2009 & 05.11.2009,
              Orissa                    Involvement of middleman.      16.12.09,08.02.10,03.03.10 and
                                                                        31.03.2010
271. Orissa   Shri Basant Naik and     Violation of NREGA guidelines         Forwarding to the State          On enquiry by BDO, Banarpal,
              others, Village Talmul   under NREGA.                          Government on 27.02.2009 and     when petitioner was contacted,
              Sasan (Harajanshai),                                           reminders sent on 27.05.09 ,     he denied the fact regarding
              GP Talmul, Block                                               21.08.2009 & 05.11.2009,         making allegation about
              Banarpal, District                                             16.12.09,08.02.10,03.03.10 and   violation of NREGs Act and
              Angul, Orissa                                                  31.03.2010                       Gudilines. Further Shri Basant
                                                                                                              Naik have got job card bearing
                                                                                                              No. 8865 who is working as
                                                                                                              Gram Rakhi and is not
                                                                                                              interested for NREGS work.
                                                                                                              On verification of all the GP
                                                                                                              by the enquiry officers , it was
                                                                                                              found that there is no violation
                                                                                                              of NREGS Gudeline and rules.

272. Orissa   B.K. Sandh (President    Corruption in implementation under    Forwarding to the State          Corruption in NREGS
              RJD, District            NREGA work and violation of           Government on 8.04.2009 and      implementation, violation of
              Committee, Bolangir)     norms and guidelines and taking       reminders sent on 27.05.09 ,     terms and guidelines and poor
                                       bribe by B.D.O in Block Titilagarh,   21.08.2009 & 05.11.2009,         quality of work, no
                                       District Bolangir.                    16.12.09,08.02.10,03.03.10 and   maintenance of 60:40 and
                                                                             31.03.2010                       taking bribe by BDO
                                                                                                              Titilagarh as are not correct as
                                                                                                              initimated by PD, DRDC,
                                                                                                              Bolangir after enquiry.
273. Orissa   Shri Abul Kalam,       Non- issuance of job cards and       Forwarding to the State          As initimated by PD, DRDC
              Marginal Farmer        taking bribe for issuing job cards   Government on 8.04.2009 and      Jajpur, though the job card of
              (forwarded by office   under NREGA.                         reminders sent on 27.05.09 ,     Abul Kalam prepared and kept
              of the Minister of                                          21.08.2009 & 05.11.2009,         in GP office for month
              State for Rural                                             16.12.09,08.02.10,03.03.10 and   together, he did not atten the
              Development)                                                31.03.2010                       GP to receive the same despite
                                                                                                           being reminded from time to
                                                                                                           time. However Sarpanch and
                                                                                                           GRS handed over the job card
                                                                                                           to him at his residence.
274. Orissa   E-mail dated 01-08-09 Regarding delay in NREGA wage        Requested State Government for    As per the enquiry report of
              from Shri Ajith Kumar payments in Bhainsadani Village of   investigation on 11.08.2009 and   PD, DRDA Nuapada, it is
              Panda, r/o Ward No-6, Boden Block in Nuapada District.     reminders sent on 21.08.2009 &    found that none of the
              P O Khariar, District                                      05.11.2009. Evidences of the      labourers have maded
              Nuapada, Orissa.                                           complaint has been sent on        unemployment allowance. Due
                                                                         22.10.2009,                       to non open of accounts in the
                                                                         16.12.09,08.02.10,03.03.10 and    post office /bank before
                                                                         31.03.2010                        payment is observed that some
                                                                                                           delay have been made due to
                                                                                                           criss of account payee cheques
                                                                                                           to the labourers. This has been
                                                                                                           sorted out by issuing of bearer
                                                                                                           cheque to labour by BDO
                                                                                                           immediately. The allegation
                                                                                                           regarding of eight days is false
                                                                                                           but total 12 days of work are
                                                                                                           done. The allegation regarding
                                                                                                           false payments against some
                                                                                                           labourers who have not work
                                                                                                           so totally baseless. The
                                                                                                           amounts have been paid
                                                                                                           through cheque to the
                                                                                                           labourers who actually
                                                                                                           worked. other lesion could not
                                                                                                           be proved.
275. Orissa   Shri Mohan Sahu and    Wages have been drawn on forged     Requested State Government for    From the enquiry report of
              others, Village /PO    names from Andhra Bank. Also        investigation on 25.09.2009 and   BDO Deogaon, it real that
              Sikuan, District       requested to investigate into the   reminder sent on 05.11.2009,      migrations of people due to
              Bolangir               misuse of funds released under      16.12.09,08.02.10,03.03.10 and    non availability of work not a
                                     NREGS.                              31.03.2010                        fact. The allegation regarding
                                                                                                           the payment most of the
                                                                                                           labouers without work is
                                                                                                           baseless and fabricated.
276. Orissa   Villegers, vill.        Miss-utilisation of NREGS fund        Forwarded to the State             Reply is awaited
              Nuagan, GP. Pritipur,   sanctioned against the project "      Government on 08.01.2010
              PS. Binjharpur, Dist.   Renovation of Panda Tank''            &14.01.2010 and reminder sent on
              Jajpur,dated:                                                 08.02.10,03.03.10 and 31.03.2010
              21/11/2009
277. Punjab   Shri Roshan Lal and      Fake entry in job cards.         Requested State Government for Reply is awaited
              others, Village          Keeping job cards in his custody investigation on 05.05.2009 and
              Gambowal, Tehsil          by Sarpanch.                     reminders sent on 27.05.09 &
              Dasuha, District         People not getting work.         21.08.2009 & 05.11.2009
              Hosiharpur
278. Punjab   Shri Ranjit Singh S/o   Misappropriation of fund of Rs. 2 Requested State Government for Reply is awaited
              Kawal singh, Kot        Lakh by Sarpanch, Praveen kumar   investigation on 23.06.2009 and
              Khurd, Gram                                               reminders sent on 21.08.2009 &
              Panchayat, tehsil ,                                       05.11.2009
              District Jalandhar
              (East), Panjab
279. Punjab   Shri Ranjit Singh,      Misuse of funds by Sarpanch Shri      Requested State Government for Reply is awaited
              Gram Panchayat Kot      Praveen Kumar, GP Kot Khurd by        investigation on 06.07.2009 and
              Khurd, Block East,      allowing construction of road in      reminders sent on 21.08.2009 &
              Distrit Jalandhar       other village kukar Pind and not in   05.11.2009
                                      Kot Khurd village
280. Punjab   Shri Sahib Ram          Regarding bogus job cards.            Requested State Government for Reply is awaited
              Kadwasara, former                                             investigation on 20.08.2009 and
              Sarpanch Gram                                                 reminders sent on 21.08.2009 &
              Panchayat- Ramsra,                                            05.11.2009
              Tehsil- Abohar ,
              Firozpur District
281. Punjab   Shri Jai Singh,        1). Mrs. Charanjit Kaur, Delay in    Requested State Government for Reply is awaited
              president, Nrega       payment of wages in villaghe         investigation on 22.10.2009 and
              Workers Union, B-      sarawan Bodla, Block Mlout,          reminder sent on 05.11.2009
              1/665, Ranjitgarh      District Mukatsar, Punjab
              Gurudwara Road,        2). NREGA Workers Union,
              Phillaur, District     Violation of NREGA ,2005 and
              Jalandhar has          non-issuance of job cards in Village
              forwarded complaints   Subhra in Patti Block of District
              of Mrs. Charanjith     Taran Taran.
              Kaur and NREGA
              Workers Union
282. Punjab   673/APS/M(RD)/09       Inadequacies e.g. no prospective        Requested State Government for Reply is awaited
              Shri Vijay Inder       plan, improper distribution of          investigation on 07.11.2009
              Singla, Member of      funds, no work has been provided
              Parliament (Lok        and no record of data entry under
              Sabha)                 NREGA Scheme in district
                                     Sangrur, Punjab.
283. Punjab   Shri Jai Singh,        Non-payment of wages to 10              Forwarded to State Government     Reply is awaited
              President, NREGA       workers of Sarawan village since        on 31.12.2009.
              Workers Union,         April 2009
              Phillaur, District
              Jalandhar.
284. Punjab   Residents of Village   Regarding financial irregularities in   Forwarded to State Govt on 2-3-   Reply is awaited
              Mehta, Tehsil Baba     the implementation of Mahatma           2010
              Bakala, District       Gandhi NREGA by the Sarpanch
              Amritsar
285. Rajasthan   PMO office forwarded      Manipulation in job cards &       Forwarded to the State             No irregularities found on the
                  the complaint of Shri     muster roll                       Government on 21/7/08 and          work site payment given to the
                  Gula Ram, President      Non-display of proper board       reminders sent on 23.1.09 ,        labour through bank/post offices
                                                                                                                 account
                   ABKS, Rattangarh        Non-payment of wages through      27.05.09 , 21.08.2009 &
                                            bank or post office               05.11.2009, 16.12.09,
                                           No facility of crèche, drinking   08.02.10,03.03.10 and 31.03.2010
                                            water, shade etc.


286. Rajasthan Shri Radhey Shyam       Asking of money to open bank           Forwarded to the State             Reply is awaited
               Sharma, Village         account under NREGA.                   Government on 17.10.08 and
               Dargama, Post                                                  reminders sent on 23.1.09 ,
               Pancholi, Tahsil                                               27.05.09 , 21.08.2009 &
               Madrayal, District                                             05.11.2009, 16.12.09,
               Karauli                                                        08.02.10,03.03.10 and 31.03.2010

287. Rajasthan Shri Ram Niwas,         Misuse of funds under NREGA            Forwarded to the State            Reply is awaited
               Village Khera                                                  Government on 17.10.08 and
               Jagannathpura, Tahsil                                          reminders sent on 23.1.09 ,
               Chaksu, District Jaipur                                        27.05.09 , 21.08.2009 &
                                                                              05.11.2009,16.12.09,08.02.10,03.0
                                                                              3.10 and 31.03.2010
288. Rajasthan Shri P. Ravindran,        Regarding digging of public pond     Forwarded to the State             All the villagers of Mukundpura
               APS to M/o                under NREGA.                         Government on 17.10.08 and         denied to made the sanctioned
               Agricalture &                                                  reminders sent on 23.1.09 ,        Tank due to the safety of school
               Consumer Affairs                                               27.05.09 , 21.08.2009 &            building and its students.
               Food & Public                                                  05.11.2009, 16.12.09,
               Distribution,                                                  08.02.10,03.03.10 and 31.03.2010
               Government of India
               ( forwarding a letter
               of Shri Bodan Meena,
               Village Mukundpura,
               Tahsil Rajgarh,
               District Alwar)
289. Rajasthan Anonymous, village           Discrimination against the       Forwarded to the State             Reply is awaited
               Thakurwas, Panchayat          people in providing jobs         Government on 17.10.08 and
               Malsa Bawari, District       Late payment of wages            reminders sent on 23.1.09 ,
               Pali                          Failure to provide medical and   27.05.09 , 21.08.2009 &
                                             other facilities under NREGA.    05.11.2009,
                                                                              16.12.09,08.02.10,03.03.10 and
                                                                              31.03.2010

290. Rajasthan Article in Frontline      Accounts of Corruption               Forwarded to the State             Reply is awaited
               Dated 3 Jan 2009                                               Government on 5.1.09 and
                                                                              reminders sent on 23.1.09 ,
                                                                              27.05.09 , 21.08.2009 &
                                                                              05.11.2009,
                                                                              16.12.09,08.02.10,03.03.10 and
                                                                              31.03.2010

291. Rajasthan Shri Bharat Lal Meena     Asking money for opening bank        Forwarded to the State             Reply is awaited
               and others, village       account.                             Government on 31.03.09 and
               Ralawat, Tehsil           Supplying withdrawal form under      reminders sent on 27.05.09 ,
               Chaksu, District Jaipur   NREGA.                               21.08.2009 & 05.11.2009
292. Rajasthan Villagers , Gram       Misappropriation of funds by using   Forwarded to the State           The State Government has been
               Panchayat Katkar, PS   fake muster rolls by sarpanch&       Government on 31.03.09 and       reported that FIR 38/09 has been
               Hindone, District      Secretary.                           reminders sent on 27.05.09 ,     registered against Sarpanch and
               Karouli                                                     21.08.2009 & 05.11.2009,         Sachiv on 24.01.2009
                                                                           16.12.09,08.02.10,03.03.10 and   investigation is in progress.
                                                                                                            Recommended for suspension of
                                                                           31.03.2010
                                                                                                            Sarpanch and Sachiv,
                                                                                                            commissioner and secretary
                                                                                                            Panchayati Raj Department
                                                                                                            Rajasthan has been requested to
                                                                                                            look in to the matter.
293. Rajasthan Shri Om Prakash and    Misappropriation of funds by using   Forwarded to the State           Reply is awaited
               others, Village        fake muster roles                    Government on 31.03.09 and
               Rampura, District      Failure to provide medical and       reminders sent on 27.05.09 ,
               Hanumangarh            other facilities.                    21.08.2009 & 05.11.2009,
                                                                           16.12.09,08.02.10,03.03.10 and
                                                                           31.03.2010

294. Rajasthan Shri Mangala Ram       Manipulation in muster rolls.        Forwarded to the State           Surpanch and Upsarpanch found
               Meena( Ex-                                                  Government on 31.03.09 and       guilty disciplinary actions against
               Sarpanch), G.P.                                             reminders sent on 27.05.09       all related is under process.
               Boskhoh, Panchayat                                          21.08.2009 & 05.11.2009,
               Samiti Bassi,                                               16.12.09,08.02.10,03.03.10
               DistrictJajpur                                              and 31.03.2010

295. Rajasthan Article in Frontline   Accounts of Corruption               Forwarded to the State           Reply is awaited
               Dated 3 Jan 2009                                            Government on 5/1/2009 and
                                                                           reminders sent on 27.05.09 ,
                                                                           21.08.2009 & 05.11.2009,
                                                                           16.12.09,08.02.10,03.03.10 and
                                                                           31.03.2010
296. Rajasthan Villagers of Gram            Low payment of wages             Forwarded to the State           It was got enquired by State Level
               Kundli Nadi, GP-             Misuse of funds and other        Government on 9/4/2009 and       Monitor, No irregularity from in
               Bhookha, Tehsil               irregularities under NREGA       reminders sent on 27.05.09,      development works UC and CC
               Malarna Dungar,                                                21.08.2009 & 05.11.2009,         work issued by competent
               district Sawai                                                 16.12.09,08.02.10,03.03.10 and   authorities.
               Madhopur                                                       31.03.2010

297. Rajasthan Shri Yoginder, Village    Misappropriation of funds by         Forwarded to the State           Reply is awaited
               Jhoroll, Tehsil Tadbai,   Sarpanch and Secretary under         Government on 27/4/2009 and
               District Bhartpur         NREGA.                               reminders sent on 27.05.09,
                                                                              21.08.2009 & 05.11.2009,
                                                                              16.12.09,08.02.10,03.03.10 and
                                                                              31.03.2010

298. Rajasthan Villagers, Village          Use of J.B.C. machinery instead   Forwarded to the State           It was got enquired by SLO, No
               Badakheda, Tehsil            of labour                         Government on 27/4/2009 and      JCB and other machine work
               Bayawar, District          Misappropriation of funds by       reminders sent on 27.05.09 &     used in that work. Matter under
               Ajmer, Rajasthan                                               21.08.2009 & 05.11.2009,         process.
                                            Sarpanch, Secretary Shri
                                                                              16.12.09,08.02.10,03.03.10 and   Reply is awaited
                                            Shankar lal
                                          Unexperienced untrained mate,      31.03.2010
                                            J.E Shri Bhgalaram and B.D.O.
                                            Shri Balwant Singh Pawar
                                            under NREGA
299. Rajasthan All Rojgar Sahayak,       Low wages rate under NREGA.          Forwarded to the State           All the Gram Rojgar Sahayak are
               District Jalore,                                               Government on 27/4/2009 and      getting their salary according
               Rajasthan                                                      reminders sent on 27.05.09,      circular issued by the Finance
                                                                              21.08.2009 & 05.11.2009,         Department Govt. of Rajasthan
                                                                              16.12.09,08.02.10,03.03.10 and
                                                                              31.03.2010
300. Rajasthan Shri M.P Kotnala,        Misappropriation of funds and       Forwarded to the State           Reply is awaited
               Assistant Private        bogus job cards by Sarpanch under   Government on 27/4/2009 and
               Secretary to Minister    NREGA.                              reminders sent on 27.05.09,
               of State for                                                 21.08.2009 & 05.11.2009,
               Environment &                                                16.12.09,08.02.10,03.03.10 and
               Forests forwarding the                                       31.03.2010
               complaint of Shri
               Praladh Meena &
               others, Village
               Ghaghurda, Tehsil &
               District Karoli
301. Rajasthan Jafar Khan, Moliser      Use of machinery- tractor & JCB     Forwarded to the State           It was got enquired by state level
               chotta village of        machine, reference of Rajasthan     Government on 04.05.2009 and     monitor the surpanch secretary
               Jandva Gram              patrika dated 28-03-09, FIR lodge   reminders sent on 27.05.09,      and Gram Rojgar Sahayak was
               Panchayat, Tehsil        against Gram sewak                  21.08.2009 & 05.11.2009,         found guilty to create irregularity.
               Ratan Garh, Churu                                            16.12.09,08.02.10,03.03.10 and   The District collector Churu has
                                                                                                             instructed to conducted
                                                                            31.03.2010
                                                                                                             disciplinary action against them.


302. Rajasthan All NREGA workers,       Nonpayment of wages from 4          Forwarded to the State           Reply is awaited
               village-Abhayapura,      months of post office-Radhopura,    Government on 21.04.2009 and
               Post –Radhopura,         Block- Bamanwas                     reminders sent on 27.05.09,
               Sewai Madhopur                                               21.08.2009 & 05.11.2009,
                                                                            16.12.09,08.02.10,03.03.10 and
                                                                            31.03.2010

303. Rajasthan Sohan Lal Dara,State     Regarding appointment of           Forwarded to the State            In NREGA the required staff
               Mahamantri,Rajasthan     experience staff in 'NREGA staff   Government on 28.04.2009 and      approved by the Rajasthan Rojgar
               Gram Sewak Sangh,        pattern of block/Gram panchayat in reminders sent on 27.05.09,       Gurantee Parishad is posted.
               Jaipur,                  NREGA(Rajasthan)                   21.08.2009 & 05.11.2009
304. Rajasthan Villagers of Gram      Half payment of wages by Gram        Forwarded to the State            It was got enquired by State Level
               Kundali Nadi, Gram     Sarpanch. Only 70 persons work       Government on 08.04.09 and        Monitor, No irregularity from in
               Panchayat Bhookha,     and Sarpanch and Gram Secretary      reminders sent on 27.05.09,       development works UC and CC
               Tehsil Malarna         made fake entry of 300 persons. No   21.08.2009 & 05.11.2009,          work issued by competent
               Dungar, Gram           Photograph on Job cards.             16.12.09,08.02.10,03.03.10 and    authorities.
               Kundali Nadi, Gram                                          31.03.2010
               Panchayat Bhookha,
               Tehsil Malarana,
               Sawai Madhopur
305. Rajasthan Shri Srichand and      Construction of Grewal road          Requested State Government for    Reply is awaited
               others, Gram Barras,   without measurement and use of       investigation on 06.05.2009 and
               Tehsil Laxmangarh,     machinery instead of labour under    reminders sent on 27.05.09,
               District Sirkar        NREGA.                               21.08.2009 & 05.11.2009,
                                                                           16.12.09,08.02.10,03.03.10 and
                                                                           31.03.2010

306. Rajasthan Shri Jaswanth Singh    Change of working hours of           Requested State Government for    All DPCs has instructed for
               Rawat, Ajmer           labourers due to hot weather and     investigation on 11.05.2009 and   working hours 7 a.m. to 4 p.m. to
                                      scorching sunlight from 7am to       reminders sent on 27.05.09,       6 a.m. to 1 p.m. under NREGA.
                                      4pm to 6am to 1 pm under NREGA       21.08.2009 & 05.11.2009,
                                      in Rajasthan.                        16.12.09,08.02.10,03.03.10 and
                                                                           31.03.2010


307. Rajasthan Shri Nakku and         Irregularities and corruption made   Requested State Government for    Matter is pending at district level
               others, District       by ACEO Shri Tikamchand Vohra.       investigation on 30.04.2009 and   Reply is awaited
               Banswarha, Rajasthan                                        reminders sent on 27.05.09 ,
                                                                           21.08.2009 & 05.11.2009 ,
                                                                           16.12.09,08.02.10,03.03.10
308. Rajasthan Shri Amarchand             Against Sarpanch of Karansar           Requested State Government for     Reply is awaited
               Tiwari, Khijuria           Gram Panchayat and other persons.      investigation on 01.06.2009
               Village , Karansar         The complainant has alleged that       and reminder sent on
               Gram Panchayat,            Shri Ashok Mehta, assistant            21.08.2009 & 05.11.2009,
               Samarlake Panchayat        Secretary of the Gram Panchayat        16.12.09,08.02.10,03.03.10 and
               Samiti, Jaipur District,   has misappropriated money by           31.03.2010
               rajasthan.                 forging of muster rolls and job
                                          cards. He has submitted an affidavit
                                          regarding the illegal action of Sh.
                                          Ashok Mehta.
309. Rajasthan Shri Shobhang Singh        Use of low quality material,           Requested State Government for     It was got enquired by the SDO
               and others, Gram           improper measurement and               investigation on 23.06.2009 and    Degana the material used in
               Nond, Gram                 involvement of contractor in           reminders sent on 21.08.2009 &     Nrega works found quality wise
               Panchayat Langod,          NREGA works.( Wall construction        05.11.2009, 16.12.09,              only senctioned works were
               Tehsil Degana,             and road work)                         08.02.10,03.03.10 and 31.03.2010   conducting.
               District Nagore ,
               Rajasthan
310. Rajasthan Shri Moti Singh            The JE and Development Officer of      Requested State Government for     Reply is awaited
               Nimblana, Member           Panchayat samiti are interfering       investigation on 19.06.2009 and
               Panchayat samiti           with the execution of NREGA            reminder sent on 21.08.2009 &
               Sayala, District jalore    works and violating the instruction    05.11.2009, 16.12.09,
                                          of the State Government issued in      8.02.10,03.03.10 and 31.03.2010
                                          this regard.

311. Rajasthan Shri Manaram,              Use of contractors and making of       Requested State Government for     It was got enquired by committee
               Bijrasar, Bhiyasar and     false payments to fictitious persons   investigation on 19.06.2009 and    conducted by CEO Churu. All
               Ransisar Gram              for the use of tractors and low        reminder sent on 21.08.2009        the work found accordingly as
               Panchayat, Sardar          quality of execution.                  & 05.11.2009, 16.12.09,            proposed payment required
               sahar Panchayat                                                   08.02.10,03.03.10 and 31.03.2010   labour has given through their
                                                                                                                    Bank / Post Office Account no
               Samiti, jaipur District
                                                                                                                    irrigularities found.
               of Rajasthan.
312. Rajasthan Shri Raghuvir Singh   Forgery in muster roll& NREGA           Requested State Government for     Reply is awaited
               S/o Kanchan Singh,    road work remaining incomplete in       investigation on 23.06.2009 and
               Tribal- Jatav         Jharkai Gram Panchayat, District        reminder sent on 21.08.2009 &
                                     Bharatpur.                              05.11.2009 , 16.12.09,
                                                                             08.02.10,03.03.10 and 31.03.2010

313. Rajasthan Shri Devendar kumar   Misuse of NREGA funds by the            Requested State Government for     Mr. Bhardwaj requested to work
               Bharadwaj, Bhawar     Sarpanchs of Karoli District &          investigation on 23.06.2009 and    with this Department he has
               Vilas Road, Karoli-   forcing of the District                 reminder sent on 21.08.2009 &      intimated to apply as Department
               District              Administration by the Sarpanchs         05.11.2009, 16.12.09,              pulished for General requirement
                                     for not taking any action against       08.02.10,03.03.10 and 31.03.2010   no particular complaint in that
                                                                                                                letter.
                                     them.

314. Rajasthan Shri Ram Chandra      Issue of sanctioned order for           Requested State Government for     Reply is awaited
               Baikha, Panchayat     continuation of road work for           investigation on 23.06.2009 and
               Samiti Bhinay         provision of employment against         reminder sent on 21.08.2009 &
                                     DPC Ajmer                               05.11.2009, 16.12.09,
                                                                             08.02.10,03.03.10 and 31.03.2010

315. Rajasthan Jafar khan,           Entry of Ghost workers in the           Requested State Government for     It was got enquired by state level
               Bheemsar Gram         muster roll, non-availability of shed   investigation on 26.5.2009 and     monitor the surpanch secretary
               Panchayat, Churu      and first-aid kit at the worksite,      reminder sent on 21.08.2009 &      and Gram Rojgar Sahayak was
                                     children below 18 years of age          05.11.2009, 16.12.09,              found guilty to create irregularity.
                                     found working at the worksite and       08.02.10,03.03.10 and 31.03.2010   The District collector Churu has
                                                                                                                instructed to conducted
                                     forging of muster rolls. Serious
                                                                                                                disciplinary action against them.
                                     allegations on the Gram Rozgar
                                     Sahayak for keeping blank muster
                                     rolls at his house.
316. Rajasthan Natives of Gram         Misappropriation of funds through     Requested State Government for     Reply is awaited
               Panchayat Khedli,       forged muster rolls by the Sarpanch   investigation on 07.07.2009 and
               Panchayat Samiti        and the GP Secretary.                 reminder sent on 21.08.2009 &
               Hindon, karauli                                               05.11.2009, 16.12.09,
               District in Rajasthan                                         8.02.10,03.03.10 and 31.03.2010


317. Rajasthan Shri Ajay Saharan and   Sarpanch and Secretary have           Requested State Government for     It is got enquired and found that
               Others, Gram            showed the public funded sports       investigation on 09.07.2009 and    the work in school field
               Ramkaan, Tehsil         field under NREGA.                    reminder sent on 21.08.2009 &      commenced in April 2008 due to
               Rawatsar, District                                            05.11.2009, 16.12.09,              rain and Desert area the field
               Hanumangarh.                                                  8.02.10,03.03.10 and 31.03.2010    could maintained.

318. Rajasthan Shri Rampal s/o         Payment was not made to               Requested State Government for     Reply is awaited
               Kishanram, Gram         complainant for providing water       investigation on 09.07.2009 and
               Kaagal, Gram            tank under NREGA works.               reminder sent on 21.08.2009 &
               Panchayat Bhundara,                                           05.11.2009, 16.12.09,
               Tehsil Bhopalgarh,                                            08.02.10,03.03.10 and 31.03.2010
               District Jodhpur.

319. Rajasthan Hazari Ram Bishnoi,     Complaint against Gram Pradhan        Requested State Government for     It was got enquired by SLO and
               Gram Panchayat          regarding embezzlement in road        investigation on 16.07.2009 and    found that construction work
               Udsar, Tehsil Nokha,    construction and pond construction    reminder sent on 21.08.2009 &      were made as sanctioned in action
               District Bikaner        under NREGA. Use of tractor and       05.11.2009& 05.11.2009,            plan all the villagers of that area
                                       no shed and medical facilities on     16.12.09,08.02.10,03.03.10 and     were satisfied about Nrega work
                                                                                                                and facilities provided by the
                                       worksite                              31.03.2010
                                                                                                                Government.
320. Rajasthan Shri Papu Lal Meena    Misappropriation of funds under         Requested State Government for     It could not find out due to lack of
                                      NREGA by faking signatures &            investigation on 16.07.2009 and    proper address, so could not
                                      thumb impression on job cards and       reminder sent on 21.08.2009 &      enquired.
                                      pass book by local ward panch and       05.11.2009, 16.12.09,              Reply is awaited
                                      local school teacher in village         08.02.10,03.03.10 and 31.03.2010
                                      Kushalpura, Gram panchayat-
                                      Indragarh.
321. Rajasthan Smt. Mitileash         Untimely payment of wages,              Requested State Government for     It is got enquired by SLO the
               Sharma, Sarpanch,      signature of the Sarpanch not being     investigation on 16.07.2009 and    report under consideration.
               Panchgawon, Mobile-    obtained on muster rolls & pass         reminder sent on 21.08.2009 &      Reply is awaited
               09414206921,           book, failure to issue job cards,       05.11.2009, 16.12.09,
               09414027999, E-mail:   issue of bogus job cards arbitrary      08.02.10,03.03.10 and 31.03.2010
               pachgaonpanchayat@     selection of mates in Pachgaon
               gmail.com              Gram Panchayat of Dholpur
                                      District.
322. Rajasthan Shri Ram Lal and       Sub- standard material used in          Requested State Government for     Reply is awaited
               others                 graval roads & Khandvanja roads,        investigation on 16.07.2009 and
                                      misappropriation of funds, bogus        reminder sent on 21.08.2009 &
                                      job cards in Gram Panchayat             05.11.2009, 16.12.09,
                                      Sheraraw.                               08.02.10,03.03.10 and 31.03.2010


323. Rajasthan Shri Hajari Ram        Misappropriation of funds & poor        Requested State Government for     It was got enquired by SLO and
               Bishnoi, Ward Panch    quality of materials used in            investigation on 16.07.2009 and    found that construction work
               ward no. 3, Gram       different works such as                 reminder sent on 21.08.2009 &      were made as sanctioned in action
               Panchayat- Udsar,      construction of water body, roads       05.11.2009, 16.12.09,              plan all the villagers of that area
               Tehsil- Nokha,         etc., fake job cards, use of machines   08.02.10,03.03.10 and 31.03.2010   were satisfied about Nrega work
                                                                                                                 and facilities provided by the
               District- Bikaner      instead of labour.
                                                                                                                 Government.
324. Rajasthan Shri Shankar Singh,    Misappropriation in muster roll,       Requested State Government for     Reply is awaited
               Former Senior Deputy   embezzlement of NREGA fund by          investigation on 16.07.2009 and
               Director, District     Development Officer, fake payment      reminder sent on 21.08.2009 &
               Congress Committee,    of wages under NREGA funds.            05.11.2009, 16.12.09,
               Rajasmand                                                     08.02.10,03.03.10 and 31.03.2010


325. Rajasthan Smt. Chandrvati,       Misconduct by the Assistant            Requested State Government for     It was got enquired by the SLO
               Sarpanch, Gram         Secretary of the Panchayat- not        investigation on 30.06.2009 and    the working and behavior of
               Panchayat-             siging on the attendant register       reminder sent on 21.08.2009 &      Gram Rojgar Sahayak found
               Ganagvana, Panchayat   favouritism in engagement of           05.11.2009, 16.12.09,              better no irregularity and
               Samiti, Nandbai        mates & forgery in muster rolls,       08.02.10,03.03.10 and 31.03.2010   Partiality were seemed in the
                                                                                                                work the facts of complaint found
                                      disallowing work & wages on
                                                                                                                incorrect.
                                      Political & caste basis,
                                      obstruction in execution of work
                                      etc. This complaint has been
                                      made earlier to higher officials but
                                      the matter has not been dealt with
                                      properly
326. Rajasthan Shri Shankar Bhawani   Rowing of funds fraudulently           Requested State Government for     Reply is awaited
               S/o Shri Inderaj,      inconvenience with glorious            investigation on 30.06.2009 and
               Deepak Telecom, Tent   computer centre & harassment of        reminder sent on 21.08.2009 &
               Market, near Mamta     the complainant                        05.11.2009, 16.12.09,
               Tent House New                                                08.02.10,03.03.10 and 31.03.2010
               Mandi Gharsana,
               District-
               ShriGanganagar
327. Rajasthan Shri Mangturam            Manipulation in muster roll through   Requested State Government for     It could not find out due to lack of
               Malghat, Aadsar Baas,     entered the name of close relatives   investigation on 17.07.2009 and    proper address, so could not
               ward no 19,               of mates and JE, improper payment     reminder sent on 21.08.2009 &      enquired.
               Shridungargarh            of wages made to workers under        05.11.2009, 16.12.09,
                                         NREGA.                                08.02.10,03.03.10 and 31.03.2010


328. Rajasthan Shri Basanti Lal Hiraji   Manipulation in muster roll through   Requested State Government for     The matter is got enquired by
               Meena and others,         fake entries, Payment was made        investigation on 17.07.2009 and    SLO irregularities found in Gram
               Gram Panchayat            through fake signature, work was      reminder sent on 21.08.2009 &      Panchayat work secretary,
               Orvadia, Tehsil           not provided to job card holders.     05.11.2009, 16.12.09,              surpanch JTA, ETC were
               Salumber, District                                              08.02.10,03.03.10 and 31.03.2010   involved district collector
                                                                                                                  Udaipur has instructed to
               Udaipur
                                                                                                                  conducted disciplinary action
                                                                                                                  against them
329. Rajasthan Shri Pratap Fransis,      Regarding attack on NREGA             Requested State Government for     The copy of complaint not
               Sarpanch, Gram            worker at worksite by axe on          investigation on 17.07.2009 and    received.
               Panchayat Salavad         27.06.09 at 7:30 in Garam             reminder sent on 21.08.2009 &
               Khurd, Panchayat          Panchayat Salavad.                    05.11.2009, 16.12.09,
               Samiti Kherabad,                                                08.02.10,03.03.10 and 31.03.2010
               District Kota

330. Rajasthan Shri Bhaggo, Village      Payment was made through fake         Requested State Government for     Reply is awaited
               Korer, Tehsil Degg,       entries in muster roll under          investigation on 17.07.2009 and
               District Bharatpur        NREGA.                                reminder sent on 21.08.2009 &
                                                                               05.11.2009 , 16.12.09,
                                                                               08.02.10,03.03.10 and 31.03.2010

331. Rajasthan Shri Ramprasad,           Use of machinery in NREGA             Requested State Government for     Reply is awaited
               Village Pulasar, Tehsil   works, Manipulation in muster roll    investigation on 17.07.2009 and
               Sardarshahar, District    through fake entries, pure water      reminder sent on 21.08.2009 &
               Churu                     was not provided on worksite.         05.11.2009 , 16.12.09,
                                                                               08.02.10,03.03.10 and 31.03.2010
332. Rajasthan Shri Pamdichar s/o       Regarding not providing               Requested State Government for     All the District Collectors has
               Devilal Soni, Gram       information under Right to            investigation on 23.07.2009 and    already instructed to provide
               Panchayat Nachana,       Information Act                       reminder sent on 21.08.2009 &      information to which those who
               Tehsil Pokhran                                                 05.11.2009 , 16.12.09              request in prescribed manner.
                                                                              08.02.10,03.03.10 and 31.03.2010

333. Rajasthan Shri Lakhuram            Use of low quality material and       Requested State Government for     It was got enquired and found
               Kuldia and others,       machinary in graval road              investigation on 23.07.2009 and    irregularity were made in
               Gram Panchayat           construction under NREGA in           reminder sent on 21.08.2009 &      panchayat work. Surpanch,
               Bhimsar, Tehsil          Gram Panchayat Bhimsar of             05.11.2009, 16.12.09,              Secretary are responsible for that.
               Sujangarh,District       District Churu                        08.02.10,03.03.10 and 31.03.2010   District Collector instructed to
                                                                                                                 conducted disciplinary action
               Churu
                                                                                                                 against them.

334. Rajasthan Shri Ravindra Kumar,     Fake entries in muster roll in Gram   Requested State Government for     It was got enquired and facts of
               Gram and Post            Astawan, Tehsil Kumher, District      investigation on 23.07.2009 and    the complaint found true the
               Astawan, Tehsil          Bharatpur & physical assault on the   reminder sent on 21.08.2009 &      District Collector Bharatpur to
               Kumhere, District        complainant on making a               05.11.2009, 16.12.09,              Breach off the contract of Gram
               Bharatpur                complainant                           08.02.10,03.03.10 and 31.03.2010   Rojgar Sahayak and other work.



335. Rajasthan Villagers of Garm        Use of low quality material in        Requested State Government for     Reply is awaited
               Gilund, Panchayat        NREGA works forged records of         investigation on 23.07.2009 and
               Samiti Railmagra,        Gram Sabha proceedings.               reminder sent on 21.08.2009 &
               District Rajsamand                                             05.11.2009 , 16.12.09,
                                                                              08.02.10,03.03.10 and 31.03.2010

336. Rajasthan Villagers of Gran        Forgery in issuance of job cards,     Requested State Government for     In the enquiry Report most of the
               Hathijar, Tehsil Vair,   payment made for fictitious works     investigation on 23.07.2009 and    facts found true. District
               District Bharatpur                                             reminder sent on 21.08.2009 &      Collector Bharatpur has
                                                                              05.11.2009, 16.12.09,              instructed to conducted
                                                                              08.02.10,03.03.10 and 31.03.2010   disciplinary action against
                                                                                                                 Surpanch, Secretary, JTA etc.
337. Rajasthan Shri Balwant &          Regarding misbehavior with           Requested State Government for     It was got enquired by SLO. No
               others, Gram            workers & work being provided to     investigation on 21.07.2009 and    misbehavior were conducted
               Panchayat Bhompura,     only one member of the registered    reminder sent on 21.08.2009 &      against NREGA labour, work is
               District Hanumangarh    household, preparation of fake job   05.11.2009, 16.12.09,              providing to those who are
                                       cards, reduction of working hours.   08.02.10,03.03.10 and 31.03.2010   applying accordingly



338. Rajasthan Shri Ganga Ram and      Discrimination in providing work,    Requested State Government for     Reply is awaited
               Others, Gram            manipulation of job cards            investigation on 16.07.2009 and
               Panchayat Fathepur,                                          reminder sent on 21.08.2009 &
               Panchayat Samiti                                             05.11.2009, 16.12.09,
               Khamnaur                                                     08.02.10,03.03.10 and 31.03.2010

339. Rajasthan Shri Ram Lal and        Irregularities made by Panchayat     Requested State Government for     Reply is awaited
               others, Gram            Secretary                            investigation on 16.07.2009 and
               Panchayat Jugrajpura,                                        reminders sent on 21.08.2009 &
               Panchayat Samiti                                             05.11.2009 and 31.03.2010
               Shrimadhopur
340. Rajasthan Shri Ratanlal           Use of JCB machinery, sub            Requested State Government for     Reply is awaited
               Mandovra, A-445,        standard material by Secretary and   investigation on 16.07.2009 and
               Vijay singh             Sarpanch in Gram Panchayat           reminder sent on 21.08.2009 &
               Pathiknagar, District   Hamirgarh                            05.11.2009 , 16.12.09,
               Bhilwara                                                     08.02.10,03.03.10 and 31.03.2010

341. Rajasthan Shri Vijendra Singh     Illegal encroachment on the land     Requested State Government for     Stay order has been taken from
               and others, Gram        selected for construction of road    investigation on 16.07.2009 and    the additional district collector
               Musalpur, Tehsil        under NREGA in Gram Musalpur         reminder sent on 21.08.2009 &      Dholpur. After decision graval
               Sapau, District                                              05.11.2009, 16.12.09,              road has been constructed.
               Dholpur                                                      08.02.10,03.03.10 and 31.03.2010   Reply is awaited
342. Rajasthan Jafar khan             Entry of Ghost workers in the           Requested State Government for     It was got enquired by state level
                                      muster roll, non-availibility of shed   investigation on 26.05.2009 and    monitor the surpanch secretary
                                      and first-aid kit at the worksite,      reminder sent on 21.08.2009 &      and Gram Rojgar Sahayak was
                                      children below 18 years of age          05.11.2009, 16.12.09,              found guilty to create irregularity.
                                      found working at the worksite and       08.02.10,03.03.10 and 31.03.2010   The District collector Churu has
                                                                                                                 instructed to conducted
                                      forging of muster rolls. Serious
                                                                                                                 disciplinary action against them.
                                      allegations on the Gram Rozgar
                                      Sahayak for keeping blank muster
                                      rolls at his house.
343. Rajasthan The Indian Express,    “In Rajasthan, child labour under       Requested State Government for     Reply is awaited
               Delhi                  NREGA”                                  investigation on 31.07.2009 and
                                                                              reminder sent on 21.08.2009 &
                                                                              05.11.2009 and 31.03.2010
344. Rajasthan Reports received       Cement concrete roads are being         Requested State Government for     Reply is awaited
                                      taken up under NREGS in                 investigation on 10.08.2009 and
                                      Rajasthan                               reminder sent on 21.08.2009 &
                                                                              05.11.2009,
                                                                              16.12.09,08.02.10,03.03.10 and
                                                                              31.03.2010

345. Rajasthan Shri Seva Singh and    Less payment being given to the         Requested State Government for     In conducted enquiry the concern
               others, R/o Chak 21-   NREGA workers & discrimation in         investigation on 07.08.2009 and    JTA was found incompetent to
               23 Z, Gram             engagement of mates allocation of       reminder sent on 21.08.2009 &      measure worksite so district has
               Panchayat-             work and not given 100 days work        05.11.2009 and 31.03.2010          instructed to conduct disciplinary
               Sahebsingh wala        to the NREGA workers                                                       against him.


346. Rajasthan Villagers of Gram      Manipulation in muster roll, use of     Requested State Government for     Matter was got enquired the
               Panchayat Angari,      machinery, payment of wages in          investigation on 10.08.2009 and    surpanch was faound guilty to
               Tehsil Thanagazi,      the name of ghost workers.              reminder sent on 21.08.2009 &      issue Patta and to construct
               District Alwar                                                 05.11.2009, 16.12.09,              community centre, District
                                                                              08.02.10,03.03.10 and 31.03.2010   collector has instructed to do
                                                                                                                 disciplinary action all liable
                                                                                                                 persons.
347. Rajasthan                            Forge entries in muster roll,           Requested State Government for     The facts of the complaint were
                 Shri Ramswaroop          Irregularities in the issuance of job   investigation on 20.08.2009 and    not particular, complaint could
                 Agarwal, Near Pili       cards, use of machinery under           reminder sent on 21.08.2009 &      not found on mentioned address
                 Kothi, Naka Madar,       NREGA in District Ajmer                 05.11.2009, 16.12.09,              so the SLO recommended to file
                 Ajmer                                                            08.02.10,03.03.10 and 31.03.2010   this complaint.


348. Rajasthan                            Improper selection of worksite          Requested State Government for     Reply is awaited
                 Shri Shankar and
                                          under NREGA at Gram Panchayat           investigation on 20.08.2009 and
                 others, Datda chota ka
                                          Kishangarh in District Bhilwada.        reminder sent on 21.08.2009 &
                 Jhupda, Panchayat
                                                                                  05.11.2009, 16.12.09,
                 Kishangarh, Tehsil
                                                                                  08.02.10,03.03.10 and 31.03.2010
                 Kotdi, District
                 Bhilwada
349. Rajasthan                                                                    Requested State Government for     This work was conducted by
                                                                                  investigation on 20.08.2009 and    PWD Department payment of
                                          Non-payment of wages to the                                                concerned labour already paid to
                 Jai Shri Mewar Jagruk                                            reminder sent on 21.08.2009 &
                                          workers under NREGA at Gram                                                them. There is no complaint now
                 Samiti, Bhupalsagar,                                             05.11.2009,
                                          Panchayat Rampuria Khurd in                                                in this regard.
                 District Chittodgarh                                             16.12.09,08.02.10,03.03.10 and
                                          District Chittorgarh
                                                                                  31.03.2010

350. Rajasthan                                                                    Requested State Government for     The complaint appreciate the
                 Shri Dhanna Lal                                                  investigation on 20.08.2009 and    work of NREGA, he said that the
                 Sharma and others,       Irregularities in the implementation    reminder sent on 21.08.2009 &      sewerage and other pacca work
                 Gram Panchayat           of NREGA in Gram Panchayat              05.11.2009,                        which is done in other schemes is
                 Harota, Tehsil Chomu,    Harota                                  16.12.09,08.02.10,03.03.10 and     not proper.
                 District Jaipur                                                  31.03.2010
351. Rajasthan Shri Jogaram S/o        GP are not observing office hours       Requested State Government for      It was got enquired and found that
               Surja Ram Garg and      & mostly remain closed, works are       investigation on 11.08.2009 and     the office of the Gram Panchayat
               others, Gram- Panchu,   done physically, failure to pay         reminder sent on 21.08.2009 &       regularly remained open in office
               Tehsil- Nokha,          wages for the last 8 months, Use of     05.11.2009,                         hours. No other irregularities in
               Bikaner District of     poor quality of materials in the        16.12.09,08.02.10,03.03.10 and      development works.
               Rajasthan               construction of gravel roads, bogus     31.03.2010
                                       job cards, facilites at worksites not
                                       being provided
352. Rajasthan Shri Nand Lal           Alleging that unproductive works        Requested State Government for      Reply is awaited
               Sharma, President,      are being taken up resulting in         investigation on 31.08.2009 and
               Nagar Congress          waste of money and no inspection        reminder sent on 05.11.2009,
               Committee, Gram         is being done by the NREGA              16.12.09,08.02.10,03.03.10 and
               Panchayat, Tehsil –     officials in Gram Panchayat             31.03.2010
               Pandalgarh, Bilwara     Kachola.
               District, Kachola,      .
               Mobile- 9414393653
353. Rajasthan Shri Ashok Wald, S/o    Regarding under payment of wages        Requested State Government for      Reply is awaited
               Shri Aisi ram, R/o                                              investigation on 04.09.2009 and
               Chak 15A(B), Tehsil-                                            reminder sent on 05.11.2009,
               Anoopgarh, District-                                            16.12.09,08.02.10,03.03.10 and
               Shri Ganganagar                                                 31.03.2010


354. Rajasthan Shri Jeewan Lal         Payment was made in the name of         Requested State Government for      Reply is awaited
               Rathore, Gram           ghost workers at Gram Panchayat         investigation on 04.09.2009 and
               Panchayat Barantia,     Barantia in District Bhilwara           reminder sent on
               Panchayat Samiti,                                               05.11.2009,16.12.09,08.02.10,03.0
               Hurada, District                                                3.10 and 31.03.2010
               Bhilwara
355. Rajasthan                                                                 Requested State Government for    The matter was got enquired by
                                                                               investigation on 01.09.2009 and   SLO the fact in the complaint was
                 Shri Kishanram, Gram     Embezzlement, faking of pond                                           found false and baseless.
                                                                               reminder sent on 05.11.2009,
                 Panchayat Kudusu,        construction works, Fake job cards
                                                                               16.12.09,08.02.10,03.03.10 and
                 Tehsil Nokha, District   made under NREGA in Gram
                                                                               31.03.2010
                 Bikaner                  Panchayat Kudusu

356. Rajasthan                                                                Requested State Government for     Reply is awaited
                 Villagers of Gram        Low quality material used in works, investigation on 01.09.2009 and
                 kataar, Tehsil Aasind,   use of machinery under NREGA in reminder sent on 05.11.2009,
                 District Bhilwada        Gram Panchayat Kataar               16.12.09,08.02.10,03.03.10,
                                                                              31.03.2010
357. Rajasthan                                                                Requested State Government for     It was got enquired by SLO
                                                                              investigation on 01.09.2009 and    payment to the labours is giving
                 Shri Chaturbhuj                                              reminder sent on 05.11.2009 and    through their Bank/Post Office
                                          Non-payment of wages to the         31.03.2010                         Accounts in time, only four
                 Sharma, Nayana,
                                          workers under NREGA at Gram                                            labour are not getting their
                 District Nayana,                                                                                payment from their Post Office
                                          Panchayat Sirond
                 District Bharatpur                                                                              account willfully, other facts are
                                                                                                                 false and baseless.

358. Rajasthan Shri Rajvir Meena,         Use of poor quality material in      Requested State Government for    Reply is awaited
               Yuva Congress              NREGA projects                       investigation on 08.09.2009 and
               President, Gram                                                 reminder sent on 05.11.2009,
               Panchayat-                                                      16.12.09,08.02.10,03.03.10 and
               Savantgarh, Block-                                              31.03.2010
               Hidoli, District Bundi
359. Rajasthan shri Ram Singh Koli,   Corruption in NREGA tenders        Requested State Government for    Reply is awaited
               Pradhan, Panchayat                                        investigation on 08.09.2009 and
               Samiti- Thodabhim,                                        reminder sent on 05.11.2009,
               District Karauli                                          16.12.09,08.02.10,03.03.10 and
                                                                         31.03.2010


360. Rajasthan All NREGA workers,     Failure to fulfill the demand of   Requested State Government for    Reply is awaited
               Gram Panchayat- 17     Striking workers                   investigation on 08.09.2009 and
               K.N.D(Khanuwali),                                         reminder sent on 05.11.2009,
               Panchayat Samiti-                                         16.12.09,08.02.10,03.03.10 and
               Anupgarh, District-                                       31.03.2010
               Sri Ganganagar

361. Rajasthan Shri Debi Lal Sahu,    Unfair selection of NREGA mates    Requested State Government for    Reply is awaited
               Danik Nav Jyoti        and corruption in NREGA works.     investigation on 08.09.2009 and
               Reporter, Panchayat                                       reminder sent on 05.11.2009,
               Samiti- Madalgarh,                                        16.12.09,08.02.10,03.03.10 and
               Gram Panchayat-                                           31.03.2010
               Dholpura, District
               Bhilwara
362. Rajasthan Shri Badri Lal and      Fraudulent withdrawal of wages    Requested State Government for    Reply is awaited
               others, Panjikrit      from bank accounts of workers      investigation on 08.09.2009 and
               workers                                                   reminder sent on 05.11.2009,
               NREGA,Gram                                                16.12.09,08.02.10,03.03.10 and
               Panchayat- Samidhi,                                       31.03.2010
               Panchayat Samiti-
               Nainwa, District
               Bundi.
363. Rajasthan 10/56/VIP/PS to         Suggestion for welfare of Nishakat   Requested State Government for       In this matter commissioner
               MOS (RD-PJ)/2009        people under NREGA Act.              investigation on 30.09.2009 and      handicapped Rajasthan suggested
               Shri Khillimal Jain,                                         reminder sent on 05.11.2009.         to provide works in NREGA
               Commissioner                                                 Minister of State (RD –PJ) replied   work for handicapped Govt. of
               (Nishaktijan) ,Social                                        to the complainant on 19.11.2009     Rajasthan already directed all the
                                                                                                                 DPCs in this regard in the month
               Justice & Welfare
                                                                                                                 of November 2009 wide letter
               Department,                                                                                       No. F 16 (RD/NREGA/MAT-
               Rajasthan, Jaipur                                                                                 II/9-10 dated 12.11.2009.

364. Rajasthan                                                              Requested State Government for       Reply is awaited
                                                                            investigation on 14.10.2009 and
                 Villagers of Gram-    Misappropriation of funds ,
                                                                            reminder sent on 05.11.2009,
                 Nokhada, Tehsil-      threatening of workers, use of
                                                                            16.12.09,08.02.10,03.03.10 and
                 Koliyat, District     machines, fake job cards, and
                                                                            31.03.2010
                 Bikaner               forged muster rolls.

365. Rajasthan Shri Gopal Lal Balai,   Corruption in the work & money       Requested State Government for       Reply is awaited
               Mahamantri, Zila        relating to NREGA, no                investigation on 14.10.2009 and
               Saganthan, Block        investigation of works by District   reminder sent on 05.11.2009,
               Congress Committee,     Magistrate.                          16.12.09,08.02.10,03.03.10 and
               Gram Panchayat-                                              31.03.2010
               Dhanop, Tehsil
               Shahpura, District
               Bhilwara, Mobile-
               9950669451
366. Rajasthan                         Recording of fictitious workers in   Requested State Government for       Reply is awaited
                                       NREGA                                investigation on 14.10.2009 and
                 Shri Punjab Singh,                                         reminder sent on 05.11.2009,
                 Branch Post mater,                                         16.12.09,08.02.10,03.03.10 and
                 District- Dhaulpur                                         31.03.2010
367. Rajasthan                           Use of poor quality materials, no     Requested State Government for    Reply is awaited
                                         use of red soil and rollers in        investigation on 14.10.2009 and
                 Shri Ram Narayan and
                                         construction of Graval roads.         reminder sent on 05.11.2009,
                 others, Gram- Lavan,
                                                                               16.12.09,08.02.10,03.03.10 and
                 Tehsil & District-
                                                                               31.03.2010
                 Dausa

368. Rajasthan                           Issuance of false job cards, use of   Requested State Government for    It has got enquired by SLO report
                 Shri Rajender Kumar     fake muster roll & defalcation and    investigation on 14.10.2009 and   under process.
                 Meena, Up- Sarpanch,    corruption in funds                   reminder sent on 05.11.2009,
                 Gram Panchayat- Ghat                                          16.12.09,08.02.10,03.03.10 and    Reply is awaited
                 ka Barana, District-                                          31.03.2010
                 Bundi

369. Rajasthan                           Fake job cards, misuse of funds by    Requested State Government for    Reply is awaited
                 Shri Amir Khan,
                                         showing more attendance               investigation on 14.10.2009 and
                 Gram- Ghuriya,
                                                                               reminder sent on 05.11.2009 and
                 Panchayat- Sipla,
                                                                               31.03.2010
                 Post- Theda, Tehsil &
                 District- Jaisalmer
370. Rajasthan Shri Ashok Kumar          Violation of financial and accounts   Requested State Government for    It has got enquired by SLO mater
               Bajya, Rajasthan          rules by the Sarpanch and Sachiv of   investigation on 22.10.2009 and   under process.
               Pradesh Mahamantri,       Gram Panchayats under NREGA.          reminder sent on 05.11.2009,
               Suchnaadhikar Jan-        Eg. In Gram Panchayat Boraj,          16.12.09,08.02.10,03.03.10 and    Reply is awaited
               Jagran & Rashtriya        Panchayat Samiti Dudu, District       31.03.2010
               Vichar manch, Head        Jaipur.
               office –
               M.P.Kalyanpura,
               Tehsil Kishangarh,
               District Ajmer,
               Rajasthan.
371. Rajasthan Smt. Kameri Devi          Corruption and irregularities in the   Requested State Government for    It has got Enquired by SLO all
               Meena, Zila Pramukh,      implementation of NREGA in             investigation on 22.10.2009 and   the purchasing of NREGA items
               ZIla Parishad Dausa,      District Dausa                         reminder sent on 05.11.2009,      found in accordance the financial
               ajasthan.                                                        16.12.09,08.02.10,03.03.10 and    rules. No irregularities found in
                                                                                31.03.2010                        other matters.


372. Rajasthan 452/APS/M(RD)/09          Making Suggestions for bringing        Requested State Government for    Reply is awaited
               Dr. Sandhya               improvement in the quality of work     investigation on 09.11.2009 and
               Choudhury,                undertaken under NREGA                 reminder sent on and 31.03.2010
               Pindbarha, District
               Serohi, Rajasthan
373. Rajasthan                           Duplication in issuance of job cards   Requested State Government for    Reply is awaited
                                         in Gram Panchayat Cipla in District    investigation on 06.11.2009 and
                 Villagers of Gram
                                         Jaisalmer                              reminder sent on
                 Panchayat Cipla,
                                                                                16.12.09,08.02.10,03.03.10 and
                 District Jaisalmer
                                                                                31.03.2010

374. Rajasthan                           Use of low quality material and no     Requested State Government for    In this matter the quality of
                 Shri Bhagirath Prasad   proper measurement done in             investigation on 06.11.2009 and   material used in NREGA works
                 Guru, Member            construction of road under NREGA       reminder sent on                  found according norms, public of
                                         in Gram Panchyat Balera in Distrivt    16.12.09,08.02.10,03.03.10 and    that Gram Panchayat appreciate
                 Panchayat Samiti
                                         Churu                                  31.03.2010                        the scheme and constructed works
                 Suzangarh, District                                                                              also, Charge of the complaint
                 Churu                                                                                            found false and baseless.

375. Rajasthan                           Asking money by Gram Secretary         Requested State Government for    Reply is awaited
                 Shri Puran Lal and      for entering name and issuing          investigation on 06.11.2009 and
                 Others, Gram            muster roll under NREGA in Gram        reminder sent on
                 Panchayat Konder,       Panchayat Konder in District Churu     16.12.09,08.02.10,03.03.10 and
                 District Karauli                                               31.03.2010
376. Rajasthan Shri Bhanwaruram           Fake entries in muster roll, use of    Requested State Government for    In the enquiry report charges
               Nayak, Zila Parishad       low quality material, payment not      investigation on 06.11.2009 ,     against Gram Panchayat work
                                          made by Bank Accounts at Gram          16.12.09,08.02.10, 03.03.10 and   found false and baseless. In the
               Member, Gram
                                          Panchayat Gothda, Panchayat            31.03.2010                        social audit campaign all the
               Bhadana, District                                                                                   works and other activities were
               Nagaur                     samiti Mundwa in District Nagaur
                                                                                                                   appreciated by local public
377. Rajasthan                            Fake entries in muster roll, use of    Requested State Government for    Reply is awaited
                                          machinery and involvement of           investigation on 06.11.2009 and
                 Shri Malaram s/o Shri
                                          contractor at Gram Panchayat           reminder sent on
                 Momtaji Garg, Gram
                                          Tadwa, District Jalore                 16.12.09,08.02.10,03.03.10 and
                 Tadwa, District Jalore
                                                                                 31.03.2010

378. Rajasthan                            Payment made to ghost workers,         Requested State Government for    this matter was got enquired by
                 Shri Dungraram and       fake entries in muster roll under      investigation on 06.11.2009 and   BDO parbatsar constructed work
                 others, Gram             NREGA at Gram Panchayat Peeh,          reminder sent on                  found as sanctioned in the action
                                          Panchayat Samiti Pabatsar, District    16.12.09,08.02.10,03.03.10 and    plan, wages to the labour duly
                 Panchayat Peeh,
                                          Nagaur                                 31.03.2010                        submitted through their Bank /
                 Panchayat Samiti                                                                                  Post office account, No
                 Pabatsar, District                                                                                irregularities found in panchayat
                 Nagaur                                                                                            works.

379. Rajasthan                            Fake entries in muster roll, payment   Requested State Government for    The matter got enquired by CEO
                 Shri Sher Singh and      made to ghost workers under            investigation on 06.11.2009 and   Nagour issue raised in complaint
                 others, Gram             NREGA at Gram Panchayat                reminder sent on                  found false, works under NREGA
                 Panchayat Dantina,       Dantina, District Nagaur               16.12.09,08.02.10,03.03.10 and    are conducting as proposed and
                 District Nagaur                                                 31.03.2010                        sanctioned in action plan.


380. Rajasthan                            Use of low quality material under      Requested State Government for    It was got enquired by SLO some
                 Villagers of Gram        NREGA at Gram Panchayat                investigation on 06.11.2009 and   irregularities found in Panchayat
                 Panchayat Todgarh,       Todgarh, Panchayat Jawaja, District    reminder sent on                  records, So district collector has
                 Panchayat Jawaja,        Ajmer                                  16.12.09,08.02.10,03.03.10 and    directed to take disciplinary
                 District Ajmer                                                  31.03.2010                        action against culprits.
381. Rajasthan                           Fake entries in muster roll, payment   Requested State Government for    It was got enquired by SLM
                 Shri Jawahar Singh      made in name of dead persons,          investigation on 06.11.2009 and   irregularities regarding supply of
                 and others, Gram        ghost workers at Gram Panchayat        reminder sent on                  material, to calling of tenders
                                         Hatizar, Panchayat Samiti Vaer,        16.12.09,08.02.10,03.03.10 and    overwriting and cutting in
                 Panchayat Hatizar,
                                         District Bharatpur                     31.03.2010                        mustrolls etc. The surpanch
                 Panchayat Samiti                                                                                 Secretary JTA and others are
                 Vaer, District                                                                                   liable for that district collector has
                 Bharatpur                                                                                        instructed to take disciplinary
                                                                                                                  action against them
382. Rajasthan                           Fake entries in muster roll, payment Requested State Government for      Reply is awaited
                                         made in name of ghost workers in     investigation on 06.11.2009 and
                 Shri Harjilal and
                                         District Bikaner                     reminder sent on
                 others , District
                                                                              16.12.09,08.02.10,03.03.10 and
                 Bikaner
                                                                              31.03.2010

383. Rajasthan                           Fake entries in muster roll,           Requested State Government for    This matter was got enquired by
                                         embezzlement by using fake bill,       investigation on 06.11.2009 and   district level officer and SLO also
                                         payment made in the name of ghost      reminder sent on                  in both the reports 9 issues out of
                                         workers at Gram Panchayat Kot,         16.12.09,08.02.10,03.03.10 and    11 found false and baseless in
                 Shri Shanker Lal                                                                                 remaing2 issues about fake
                                         Panchayat Girwa, District Udaipur      31.03.2010
                 Patel, Gram Panchayat                                                                            entries in muster rolls and
                 Kot, Panchayat Girwa,                                                                            interruption by the peoples of
                 District Udaipur                                                                                 Surpanch found true for which
                                                                                                                  district Collector Udaipur has
                                                                                                                  instructed to take disciplinary
                                                                                                                  action against them.

384. Rajasthan Villagers of Suberi       Irregularities in construction of      Requested State Government for    Reply is awaited
               Gram Panchayat,           Village road and bridges.              investigation on 17.11.2009 and
               Panchayat Samity                                                 reminder sent on
               Kherwara, District                                               16.12.09,08.02.10,03.03.10 and
               Udaipur, Rajasthan                                               31.03.2010
               (From office of MOS-
               RD-SA)
385. Rajasthan Article in „Times of    One person named Shri Ram            Requested State Government for     Reply is awaited
               India‟ dated            Khiladi was killed during a bloody   investigation on 24.11.2009 and
               07.11.2009              clash between NREGA workers in       reminder sent on
                                       Chandanpura Village under            16.12.09,08.02.10,03.03.10 and
                                       Sarmathura Police Station in         31.03.2010
                                       Dholpur.
386. Rajasthan Villegers, Gram         Monopoly of sarpanch, Up             Forwarded to the State             Reply is awaited
               Panchayat Jasuri        Sarpanch,gram sewak and some         Government on 08.01.2010 and
               Baya, Makrana-          ward member,Scam in use of           reminder sent on
               341505, District        material ,using of cheap materials   08.02.10,03.03.10 and 31.03.2010
               Nagor, dated:           and mishandling of muster rolls.
               10/12/2009
387. Rajasthan Investigation team,     Duplicating 450 job cards and        Forwarded to the State             Reply is awaited
               NREGA, Village          misuse of NREGA fund by Shri         Government on 13.01.2010 and
               Himmatsar (Nokha)       Prakash Bhatnagar B.D.O. Nokha       reminder sent on
                                                                            08.02.10,03.03.10 and 31.03.2010
388. Rajasthan Shri Tarachand          Corruption & Miss-utilisaation of    Forwarded to the State             Reply is awaited
               Bhambu, S/o Shri        MGNREGA fund by Shri Rajendra        Government on 13.01.2010, and
               Rugharam, c/o Diya      Goarh, BDO, Churu Panchayat          reminder sent on
               Finance(Front side of   Samity                               08.02.10,03.03.10 and 31.03.2010
               the rest house)
               Kothbarh, District
               Churu, Rajasthan,
               dated: 16/12/2009
389. Rajasthan Hinustan Times, delhi.   Starvation death of a MGNREGA   Forwarded to the State             It is reported that by the state
               Thursday, Page No. 8,    worker                          Government on 14.01.2010, and      Govt. District Collector,
               dated: 7/1/2010                                          reminder sent on                   Chitorgarh, has mention in her
                                                                        08.02.10,03.03.10 and 31.03.2010   reports are as follows:
                                                                                                             1. There is a RD Account (No.
                                                                                                                 378002674122) for Rs.200
                                                                                                                 p.m. in “Sahara India‟‟ in the
                                                                                                                 name of Shri Kishan Singh in
                                                                                                                 which Rs. 3200/- has been
                                                                                                                 found to be deposited till 14 th
                                                                                                                 December,2009
                                                                                                             2. There exists a job card of
                                                                                                                 NREGA of the family in
                                                                                                                 which the household has
                                                                                                                 worked for 27 days.
                                                                                                             3. There exist a Ration Card in
                                                                                                                 the name of the family in
                                                                                                                 which 5kg of wheatand 3lit.
                                                                                                                 of kerosene for month of
                                                                                                                 Nov-Dec were obtained.
                                                                                                             4. The report further mentions
                                                                                                                 that food was cooked twice a
                                                                                                                 day in the family of Kishan
                                                                                                                 Singh and that relatives had
                                                                                                                 come to ailing Kishan Singh
                                                                                                                 prior to his demise.
                                                                                                                 It is evident from the the
                                                                                                                 report of collector, that the
                                                                                                                 death of Shri Kishan Singh
                                                                                                                 cannot be linked to starvation
                                                                                                                 under any circumstances.
                                                                                                                 The matter looking to the
                                                                                                                 purely humanitarian.
390. Rajasthan Dr. Sudhir Krishna,      Various problems faced by local     Forwarded to the State             Reply is awaited
               Additional Secretary,    farmers and making suggestions      Government on 28.01.2010, and
               Ministry of Panchayat    regarding MGNREGA                   reminder sent on
               Raj, Government of                                           08.02.10,03.03.10 and 31.03.2010
               India, District
               Sriganganagar dated:
               8/1/2010
391. Rajasthan Shri Hariram, shri       Corruption, irregularities and      Forwarded to the State             Reply is awaited
               Amar singh               issuance of false job cards         Government on 28.01.2010, and
               choudhury and                                                reminder sent on
               Villegers, Gram                                              08.02.10,03.03.10 and 31.03.2010
               panchayat Rajlani,
               panchayat Samity
               Bhupalgarh, District
               jodhpur, Rajasthan
               dated: 6/10/2009
392. Rajasthan Zilla Sangathan          Irregularities and Misuse of        Forwarded to the State             Reply is awaited
               Muntri, Congress         MGNREGA fund by Panchayat           Government on 28.01.2010and
               Sewadal, Gram & Post     official.                           reminder sent on
               Shibarh, District                                            08.02.10,03.03.10 and 31.03.2010
               Sawai Madhopur,
               Rajasthan
393. Rajasthan Shri Ramshwarup          Corruption, Issuence of job cards   Forwarded to the State             Reply is awaited
               Rajpurahit, Prisedent,   and fake muster rolls               Government on 28.01.2010,
               Suchanadhikar Jan-                                           reminder sent 08.02.10,03.03.10
               Gagaran and Rashtriya                                        and 31.03.2010
               Bichar Manch, district
               Ajmer, dated:
               17/12/2009
394. Rajasthan Shri Abdul Latif S/o     Corruption and Misuse of fund on    Forwarded to the State             Reply is awaited
               Shri Rashid, 1- R.S.M.   the project of Grebal Road under    Government on 28.01.2010 and
               Ahduri, Tehsil Pugal,    Mahatma Gandhi NREGA                reminder sent on
               District Bikaner,                                            08.02.10,03.03.10 and 31.03.2010
               dated: 18/12/2009
395. Rajasthan Shri Ratanlal , Gram     Issuence of false job cards and     Forwarded to the State             Reply is awaited
               Dariyati District        misutilisation of fund by faking    Government on 04/03/2010 by Fax
               Dungarpur, Rajasthan     muster rolls                        and Post and 31.03.2010

396. Rajasthan Mahatma Gandhi           Recuritment of computer operator    Forwarded to the State             Reply is awaited
               NREGA Computer           at Gram Panchayat level under       Government on 04/03/2010 by Fax
               oparetor Sangha,         Mahatma Gandhi NREGA                and Post and reminder sent on
               District Shri-                                               31.03.2010
               Ganganagar
397. Rajasthan Shri Vijay Kumar         Complaining worng                   Forwarded to the State             Reply is awaited
               Gupta, Rashtriya         implementation of Mahatma           Government on 04/03/2010 by Fax
               Saha-Sangojak, Akhil     Gandhi NREGA                        and Post and reminder sent on
               Bharatia Gogamori                                            31.03.2010
               Vikash Samity, Gram
               Gogamori, Thesil
               Nohar, district
               Hanumangarh
398. Rajasthan Villegers, Gram          Irregular work to construction of   Forwarded to the State             Reply is awaited
               Vhimgang, Gram           Anikat and using poor quality       Government on 04/03/2010 by Fax
               Panchayat Sisola,        materials & toools                  and Post and reminder sent on
               Panchayat Samity                                             31.03.2010
               Nainba, District Bundi
399. Rajasthan Shri Shankar Ajnabee,    Regarding corruption, Missuse of    Forwarded to the State             Reply is awaited
               S/o Shri Hanuman         fund and some suggestion to         Government on 04/03/2010 by Fax
               Prashad Kumabat,         improve the Mahatma Gandhi          and Post and reminder sent on
               District Sikar           NREGA                               31.03.2010
400. Rajasthan Shri Pratap Singh,        Corruption and Misuse of fund by    Forwarded to the State         Reply is awaited
               Gram Borkheda,Teha        faking muster rolls under Mahatma   Government on 16/03/2010 and
               Bouli, District Sawai     Gandhi NREGA and requesting to      reminder sent on 31.03.2010
               Madhopur, Rajasthan.      stop NREGA Works.
401. Rajasthan All NREGA workers,        Withdrawl the NREGA fund by         Forwarded to the State         Reply is awaited
               Gram Panchayat            utilizing died NREGA workers        Government on 16/03/2010 and
               Sahaba, Teshil            Hazra w/o Kherdin Jati Khumbar,     reminder sent on 31.03.2010
               Taranagar, District       Job cards No. 986. Under Mahatma
               Churu, Rajasthan          Gandhi NREGA.
402. Rajasthan Smt. Lila, Board          Late payment of wages under         Forwarded to the State         Reply is awaited
               Panch (Board No. 11),     Mahatma Gandhi NREGA.               Government on 16/03/2010 and
               Gram Panchayat                                                reminder sent on 31.03.2010
               Mandaba, Panchayat
               samity Kothra, District
               Udaipur, Rajasthan
403. Rajasthan Shri Shankarlal and       Issuence of false job cards and     Forwarded to the State         Reply is awaited
               villagers, Gram           corruption by Sarpanch and Gram     Government on 16/03/2010 and
               Panchayat Jalubala,       Sewak.                              reminder sent on 31.03.2010
               Tehsil Pokran, District
               Jaisalmer, Rajasthan.
404. Rajasthan Shri Ratanlal , Gram      Issuence of false job cards and     Forwarded to the State         Reply is awaited
               Dariyati District         misutilisation of fund by faking    Government on 11/03/2010 and
               Dungarpur, Rajasthan      muster rolls                        reminder sent on 31.03.2010

405. Rajasthan Mahatma Gandhi            Recuritment of computer operator    Forwarded to the State         Reply is awaited
               NREGA Computer            at Gram Panchayat level under       Government on 11/03/2010 and
               oparetor Sangha,          Mahatma Gandhi NREGA                reminder sent on 31.03.2010
               District Shri-
               Ganganagar
406. Rajasthan Shri Vijay Kumar         Complaining wrong                   Forwarded to the State         Reply is awaited
               Gupta, Rashtriya         implementation of Mahatma           Government on 11/03/2010 and
               Saha-Sangojak, Akhil     Gandhi NREGA                        reminder sent on 31.03.2010
               Bharatia Gogamori
               Vikash Samity, Gram
               Gogamori, Thesil
               Nohar, district
               Hanumangarh
407. Rajasthan Villegers, Gram          Irregular work to construction of   Forwarded to the State         Reply is awaited
               Vhimgang, Gram           Anikat and using poor quality       Government on 11/03/2010 and
               Panchayat Sisola,        materials & toools                  reminder sent on 31.03.2010
               Panchayat Samity
               Nainba, District Bundi
408. Rajasthan Shri Shankar Ajnabee,    Regarding corruption, Missuse of    Forwarded to the State         Reply is awaited
               S/o Shri Hanuman         fund and some suggestion to         Government on 11/03/2010 and
               Prashad Kumabat,         improve the Mahatma Gandhi          reminder sent on 31.03.2010
               District Sikar           NREGA
409. Rajasthan Shri shankarlal s/o      Corruption, using poor quality      Forwarded to the State         Reply is awaited
               Shri Vikhalal and        materials and misuse of fund and    Government on 29/03/2010 and
               Mangilal s/o Shri        do not provide any information      reminder sent on 31.03.2010
               Ramlal and Villagers,    under RTI Act to villagers.
               Gram Post Jalubala,
               District Jaisalmer,
               Rajasthan
410. Rajasthan Shri Rajesh Kumawat,     Failure to pay minimum wages and    Forwarded to the State         Reply is awaited
               Deputy Secretary,        misue of Mahatma Gandhi NREGA       Government on 29/03/2010 and
               Rajasthan Pradesh        fund by Gram Pradhan and Roggar     reminder sent on 31.03.2010
               Youth Congress,          Sewak.
               Gram Nimaz,
               Panchayat Samity
               Jaitaran, Rajasthan
411. Rajasthan All Villagers, Gram         Failure to pay minimum wages,        Forwarded to the State           Reply is awaited
               Panchayat Chorri,           using machinary like JCB and         Government on 29/03/2010 and
               District Banswara,          Tractor and misuse of fund under     reminder sent on 31.03.2010
               Rajasthan                   Mahatma Gandhi NREGA.
412. Rajasthan Rajasthan Gram              Failure to provide work to the job   Forwarded to the State           Reply is awaited
               Sewak Sangha,               cards holder, using machinaries,     Government on 29/03/2010 and
               Upasakha,                   poor seleection of worksite and      reminder sent on 31.03.2010
               Hanumangarh,                misuse of Mahatma Gandhi
               Rajasthan.                  NREGA fund.
413. Rajasthan Mr. Manoj Sharma            The complaint is about the closure   Forwarded to the State           Reply is awaited
               from village Balunda;       of work due to unsocial elements     Government on 31/03/2010
               block Jaitaran in Pali,     and corrupt officers.
               Rajasthan.
414. Tamil     Shri M. Sasi Kumar,         Use of machinery, forgery of         Requested State Government for Reply is awaited.
     Nadu      Secretary,                  muster rolls and misappropriation    investigation on 27.10.2009 and
               Konangipatti                of funds by village Panchayat        reminder sent on 05.11.2009
               Consumer       Council,     Official Smt. K.Chandra, her
               Namakkal        District,   husband Shri K. Kathirvel and her
               Tamil Nadu                  father Shri Ganesan under NREGA
415. Tamil     Sh. Dhanraj, Anna           Alleged irregularities in NREGS in   Requested State Government for   Reply is awaited
     Nadu      Street, Thervai village,    Thervai village                      investigation on 5.2.2010
               Gummidipoondi,
               Thiruvallur, Tamil
               Nadu
                 (forwarded by Prime
                 Minister’s Office)
416. Tamil     „Medical‟ K.                Wage payment to the labourers by Requested State Government for         Reply is awaited
     Nadu      Paramasivam,                 recording the false and bogus investigation on 5.2.2010
               Chairman                     measurement.
               Thirumoorthy                Non disbursement of wages
               Resevoir Project             through Banks/Post office.
               Committee,
               Coimbatore district
               (forwarded by Prime
               Minister’s Office)
417. Uttar     Shri F Bahadur Singh     Regarding corruption and misuse of   Forwarded to State Government          Complaint not received.
     Pradesh   Yadav, village           funds under NREGA                    7.5.08 and reminders sent on
               Bankut, block                                                 23.5.08, 29.5.08, 5.06.08 ,23.1.09 ,
               chitrakut, district                                           27.05.09 , 21.08.2009 &
               Banda                                                         05.11.200916.12.09,08.02.10,03.0
                                                                             3.10 and 31.03.2010

418. Uttar     Shri Rajesh chammar,      Misuse of NREGA funds              Forwarded to State Government          Investigating procedure is
     Pradesh   vill. Sonegarha Halia,    Payment of low wages               7.5.08 and reminders sent on           going on by State Quality
               district Mirzapur         Non- issuance of job cards         23.5.08, 29.5.08, 5.06.08 ,23.1.09 ,   Monitor.
                                                                             27.05.09 , 21.08.2009 &                Reply is awaited
                                                                             05.11.2009
                                                                             16.12.09,08.02.10,03.03.10 and
                                                                             31.03.2010

419. Uttar     Shri Bhuvaneshwar        Improper implementation of           Forwarded to the State                 Reply is awaited.
     Pradesh   Prasad Mehta, MP         NREGA Lakhimpur Khiri                Government on 4.7.08 and
               (LS)                                                          reminders sent on 23.1.09 ,
                                                                             27.05.09 , 21.08.2009 &
                                                                             05.11.2009
                                                                             16.12.09,08.02.10,03.03.10 and
                                                                             31.03.2010
420. Uttar     Dainik Jagran           Sonia Gandhi‟s visit to Raibarely    Forwarded to the State             Reply is awaited.
     Pradesh   May 15/08               disclosed many loopholes in the      Government on 15.5.08 and
                                       functioning of NREGA.                reminders sent on 5.06.08,
                                                                            23.1.09, 27.05.09, 21.08.2009
                                                                            .09 & 05.11.2009 16.12.09,
                                                                            08.02.10, and 03.03.10
                                                                            Proposal sent on 15.5.08 to NLM
                                                                            division for appointment of an
                                                                            NLM. Report received. Copy
                                                                            sent to the State Government for
                                                                            necessary action/ comments.
421. Uttar     Shri Harish Chander     Misuse of funds under the NREGA.    Forwarded to the State              Investing Committee had been
     Pradesh   (Advocate), Village                                         Government on 8.9.2008 and          formed second time by the
               Mahawalpur, Post                                            reminders sent on 23.1.09 ,         order of District Magistrate.
               Dulhipur, District                                          27.05.09 , 21.08.2009 &
               Chanduali                                                   05.11.2009,                         Reply is awaited
                                                                           16.12.09,08.02.10,03.03.10 and
                                                                           31.03.2010

422. Uttar     Shri Sanatosh Singh        Misuse of funds                 Forwarded to the State              Investigating procedure is
     Pradesh   Village or Kothi           Corruption                      Government on 8.9.2008 and          going on by State Quality
               Dhokal Singh, Block        Use of sub standard material    reminders sent on 23.1.09 ,         Monitor.
               Haliya, District           Fake bill under the NREGA.      27.05.09 , 21.08.2009 &
               Mirazapur                                                   05.11.2009 ,                        Reply is awaited
                                                                           16.12.09,08.02.10,03.03.10 and
                                                                           31.03.2010

423. Uttar     Article in the Indian   Cong. files complaint, says Babus   Forwarded to the State              Reply is awaited
     Pradesh   Express                 siphoned off NREGS funds            Government on 22/09/2008 and
               22 September 2008                                           reminders sent on 23.1.09 ,
                                                                           27.05.09 , 21.08.2009 &
                                                                           05.11.2009 and 31.03.2010
424. Uttar     Ms. Annie Raja,          Non-payment of honorarium to          Forwarded to the State           According to the report of
     Pradesh   Member CEGC              Rozgar Sevak in Allahabad district    Government on 30.9.08 and        Chief Development Officer;
                                        of Uttar Pradesh                      reminders sent on 23.1.09 ,      the payment of Rozgar Sevak
                                                                              27.05.09 , 21.08.2009 &          has been done.
                                                                              05.11.09 ,
                                                                              16.12.09,08.02.10,03.03.10 and
                                                                              31.03.2010

425. Uttar     Shri P.L. Punia, State   Alleging misappropriation of funds    Forwarded to the State           NLM deputed and allegations
     Pradesh   Incharge, Public         and manipulation of job cards by      Government on 12.12.08 and       are found to be false.
               Grievance Redressal,     Gram Pradhan, BDO and Panchayat       reminders sent on 23.1.09 ,
               UP Congress              Secretary in village Sisouna, block   27.05.09 , 21.08.2009 &
               Committee                Dariyabad, district Barabanki of      05.11.2009, 16.12.09,08.02.10
                                        Uttar Pradesh.                        and 31.03.2010

426. Uttar     Shri Veer Singh, VPO     Misuse of funds of Rs. 100,000/-      Forwarded to the State           Investigation is going on at
     Pradesh   Hazipur, district        by withdrawing money in the           Government on 1.01.09 and        District Level.
               Jalaun                   name of person who has not            reminders sent on 23.1.09 ,
                                        worked by BDO                         27.05.09 , 21.08.2009 &          Reply is awaited
                                                                              05.11.2009,
                                                                              16.12.09,08.02.10,03.03.10 and
                                                                              31.03.2010


427. Uttar     Shri Shaliender Singh,   Misuse of funds Rs. 26 Lakh under     Forwarded to the State           Reply is awaited
     Pradesh   Village Koiladar, Post   NREGA.                                Government on 27.02.09 and
               Dhani Bazaar, District                                         reminders sent on 27.05.09 ,
               Maharajganj                                                    21.08.2009 & 05.11.2009 ,
                                                                              16.12.09,08.02.10,03.03.10 and
                                                                              31.03.2010
428. Uttar     Shri Behafoo Ram and      Failure to provide work on      Forwarded to the State             As per report called from State
     Pradesh   others, Village            demand                          Government on 3.3.2009 and         Government action has been
               Shriganj, Block           Non-payment of unemployment     reminders sent on 27.05.09 ,       taken against guilty person and
               Karnda, Tehsil &           allowance under NREGA           21.08.2009 & 05.11.2009,           final report will be sent.
               District Ghazipur                                          16.12.09,08.02.10,03.03.10 and
                                                                          31.03.2010


429. Uttar     Article in               No money, no land, no             Forwarded to the State             Reply is awaited
     Pradesh   www.expressindia.co      food….couple says no to life      Government on 16/03/2009 and
               m                                                          reminders sent on 27.05.09 ,
               On 14th March 2009                                         21.08.2009 & 05.11.2009,
                                                                          16.12.09,08.02.10,03.03.10 and
                                                                          31.03.2010

430. Uttar     Grievances received      No work provided to the workers   Forwarded to the State             Reply is awaited
     Pradesh   via e-mail from Mr.      who demanded for work and cases   Government on 20/03/2009 and
               Vinod Kumar and Mr.      of Non- Payment of wages.         reminders sent on 27.05.09,
               Kumar Shiralakar                                           21.08.2009 & 05.11.2009
431. Uttar     Ms. Arundhati Dhuru,     Violation of NREGA norms in GO    Forward to the State Government    Reply is awaited
     Pradesh   Advisor to               175/38-7-2009-377 NREGA 108       on 22.04.2009 and reminders sent
               commissioners            dated 21st January 2009,          on 27.05.09 , 21.08.2009 &
               appointed by the         Department of Rural Development   05.11.2009 ,
               Supreme Court of         - Government of Uttar Pradesh     16.12.09,08.02.10,03.03.10 and
               India in Right to food                                     31.03.2010
               Case,
432. Uttar     Mohan Lal s/o           Use of poor quality material and    Forward to the State Government    According to the report of
     Pradesh   Premraj, Gram Kaser     construction was held at wrong      on 30.04.2009 and reminders sent   Joint District Project
               Panota, Block           place.                              on 27.05.09 , 21.08.2009 &         Coordinator Complaint had not
               Vazirganj, Badaun                                           05.11.2009 ,                       been found true. Please dispose
                                                                           16.12.09,08.02.10,03.03.10 and     this matter from the pending
                                                                           31.03.2010                         list of complaints.

433. Uttar     Shri Girish Pratap         Corruption                      Requested State Government for     As per report called from State
     Pradesh   Singh, Gram                Fraud of funds by Gram          investigation on 01.05.2009 and    Government notice has been
               Panchayat Member,           Pradhan and Gram                reminders sent on 27.05.09 ,       issued to the Gram Pradhan
               Village Kotha, Post         Development officer under       21.08.2009 & 05.11.2009 ,          and final report will be sent
               Sohanpur, Vikas             NREGA.                          16.12.09,08.02.10,03.03.10 and     after complete enquiry.
               Khand Vankata,                                              31.03.2010
               District Deoria,

434. Uttar     Shri Brijpal, Gram       Use of machinery.                 Requested State Government for     According to the report of
     Pradesh   Panchayat Tissa,         Misuse of NREGA funds             investigation on 04.05.2009 and    Additional District Project
               Tehsil Jansath,                                             reminders sent on 27.05.09 ,       Coordinator Complaint had not
               District Muzaffar                                           21.08.2009 & 05.11.2009,           been found true. Please dispose
               Nagar , U.P                                                 16.12.09,08.02.10,03.03.10 and     this matter from the pending
                                                                           31.03.2010                         list of complaints

435. Uttar     Sh Phool Singh, S/o.    Corruption and anarchy created by   Requested State Government for     According to the report of
     Pradesh   Late Ramswarup          Pardhan under NREGA scheme.         investigation on 14.05.2009 and    Joint District Project
               Singh, Gram Allipur,                                        reminders sent on 27.05.09 ,       Coordinator Complaint had not
               Vikash Khand                                                21.08.2009 & 05.11.2009,           been found true. Please dispose
               Airayan, Tehsil                                             16.12.09,08.02.10,03.03.10 and     this matter from the pending
               Khaga, Janpad                                               31.03.2010                         list of complaints.
               Fatehpur, Hal Mukam
               Nahar Colony, Sinchai
               Vibhag, Fatehpur
436. Uttar     Sh. Jai Singh, Member   Use of machines under NREGA            Requested State Government for     Reply is awaited
     Pradesh   gram Panchayat          works and tampering of fund by         investigation on 14.05.2009 and
               Behgaon, Block          Pramukh Sh. Roshan Singh.              reminders sent on 28.05.09 and
               Govardhan, Tehsil or                                           reminder sent on 27.05.09 ,
               Zanpad Mathura                                                 21.08.2009 & 05.11.2009,
                                                                              16.12.09,08.02.10,03.03.10 and
                                                                              31.03.2010

437. Uttar     Shri Ram Kirpal         Misappropriation of NREGA funds        Requested State Government for     According to the report of
     Pradesh   Tripathi, Gram          by Gram Pradhan & Gram                 investigation on 08.05.2009 and    Additional District Project
               Pachoha, District       Panchayat Secretary under NREGA        reminders sent on 27.05.09 ,       Coordinator Complaint had
               Ghorakpur, Uttar                                               21.08.2009 & 05.11.2009,           been found partially true.
               Pradesh                                                        16.12.09,08.02.10,03.03.10 and     Please dispose this matter from
                                                                              31.03.2010                         the pending list of complaints.


438. Uttar     Shri Najeem Ansari,     Failure to provide work on time to     Requested State Government for     Investigating procedure is
     Pradesh   Mahamantri,             job cards holders, use of machinery    investigation on 08.05.2009 and    going on by State Quality
               Asangathit Karmkar      instead of labour and ratio of 60:40   reminders sent on 27.05.09 ,       Monitor.
               Shramik Union           not maintained under NREGA.            21.08.2009 & 05.11.2009 ,          Reply is awaited
               (AKSU) District                                                16.12.09,08.02.10,03.03.10 and
               Allahabad, Uttar                                               31.03.2010
               Pradesh

439. Uttar     Shri Bhailal Kaul,      Complaining against Sh. Jaswant        Requested State Government for     Investigating procedure is
     Pradesh   Member of               Singh, Chief Development Officer,      investigation on 28.05.2009. and   going on by State Quality
               Parliament(LS)          Mirzapur, Uttar Pradesh about his      reminders sent on 21.08.2009 &     Monitor.
                                       arbitrary manner of functioning.       05.11.2009,
                                                                              16.12.09,08.02.10,03.03.10 and     Reply is awaited
                                                                              31.03.2010
440. Uttar     Shri Rajesh Dwivedi,      Irregularities and corruption under    Requested State Government for     Investigation is going on at
     Pradesh   Member, Uttar             NREGA by Shri Sanjay                   investigation on 04.06.2009 and    District Level.
               Pradesh Congress          Pandey,BDO, Meorpur and Dr.            reminders sent on 21.08.2009 &
               Committee.                K.D.Ram,CDO in Meorpur Block           05.11.2009 ,                       Reply is awaited
                                         of Sonbhadra District                  16.12.09,08.02.10,03.03.10 and
                                                                                31.03.2010

441. Uttar     Shri Ramavadh Yadav       Gram Pradhan Sh. Arun Singh was        Requested State Government for     According to the report of
     Pradesh   and others,               misappropriated money under            investigation on 16.06.2009 and    Joint District Project
               Sabhsudipur Gram          various projects like digging of       reminders sent on 21.08.2009 &     Coordinator Complaint had not
               Panchayat, tehsil         ponds, constriction of primary         05.11.2009,                        been found true. Please dispose
               Sahaganj, Jaunpur         schools, Children‟s mid-day meal       16.12.09,08.02.10,03.03.10 and     this matter from the pending
               District, Uttar Pradesh   and construction of hand pump,         31.03.2010                         list of complaints.
                                         road etc. The complainant has
                                         submitted an affidavit regarding the
                                         illegal action of Gram Pradhan.
442. Uttar     Shri Sandeep Pandey,      Forcible and illegal withdrawal of     Requested State Government for     Action is being taken by State
     Pradesh   Indira Nagar,             money by the husband of the            investigation on 22.06.2009 and    Government.
               Lucknow, Uttar            Pradhan of GP Aira Kake Mau,           reminders was sent on 25.08.2009
               Pradesh                   Block Bharawan, District Hardoi,       , 21.08.2009 & 05.11.2009 ,        Reply is awaited
                                         U.P                                    16.12.09,08.02.10,03.03.10 and
                                                                                31.03.2010
443. Uttar     04/VIP/M(RD)/09          Duplication of works and               Requested State Government for    Investigation is going on by
     Pradesh   Shri Pradeep             dishonesty in payment of wages in      investigation on 22.06.2009 and   Technical Audit Cell.
               Mathur, MLA, Uttar       Gram Sabha Pyarepur, Block             reminders sent on 21.08.2009 &
               Pradesh Legislative      Fakharpur, District Bahriach, Uttar    05.11.2009 ,                      Reply is awaited
               Assembly, Vidhan         Pradesh. Same road project,            16.12.09,08.02.10,03.03.10 and
               Bhawan, Lucknow.         Saradpara link road to Khaira in       31.03.2010
                                        Block Fakharpur has been taken up
                                        under different Schemes including
                                        NREGA. The wage amount has
                                        been fraudulently paid to the
                                        worker and same has been
                                        misappropriated in Gram Sabha
                                        Pyarepur , Block Fakharpur.
444. Uttar     Shri Sheetla Prasad      The misbehavior and non-               Requested State Government for    According to the report of
     Pradesh   Pandey, Zilla Mantri,    cooperation of the Branch Manager      investigation on 22.06.2009 and   Joint District Project
               Panchayat Raj Sewa       and others of Harhua Branch of         reminders sent on 21.08.2009 &    Coordinator Complaint had not
               Parishad Uttar           Union Bank of India in Varanasi        05.11.2009 ,                      been found true. Please dispose
               Pradesh.                 District in the operation of NREGS     16.12.09,08.02.10,03.03.10 and    this matter from the pending
                                        accounts.                              31.03.2010                        list of complaints.

445. Uttar     Shri Krishan Kant        Against Gram Pradhan of Akoda          Requested State Government for    According to the report of
     Pradesh   Tripathi S/o Sh.         Gram Panchayat and other persons.      investigation on 16.06.2009 and   Additional District Project
               Ramkaran Tripathi,       Gram Pradhan has misappropriated       reminders sent on 21.08.2009 &    Coordinator Complaint had
               Akoda Gram               money under NREGA in various           05.11.2009 ,                      been found partially true.
               Panchayat, Rohi Post,    projects, and not given full           16.12.09,08.02.10,03.03.10 and    Please dispose this matter from
               Gyanpur- Vikas           information to the people.             31.03.2010                        the pending list of complaints.
               Khand, Sant Ravidas      He has submitted his affidavit as
               Nagar, Bhadoi District   well as affidavit of two other
               of U.P.                  persons regarding the illegal action
                                        against the Pradhan.
446. Uttar     Shri Amarnath             Requested to done the excavation      Requested State Government for    According to the report of
     Pradesh   Kshatriya (e-mail),       work of Taal at village Suralia,      investigation on 25.06.2009 and   Joint District Project
               Village Suralia, tehsil   Tehsil Kerakat, District Jaunpur      reminders sent on 21.08.2009 &    Coordinator, the renovation of
               kerakat, District         under NREGA.                          05.11.2009,                       the Pond will be done either
               Jaunpur.                                                        16.12.09,08.02.10,03.03.10 and    from NREGS Fund or from
                                                                               31.03.2010                        any other source of Fund.

447. Uttar     Shri Raj Bahadur          Misappropriation of funds in Gram     Requested State Government for    Investigation is going on at
     Pradesh   Yadav, Member of          Panchayats namely Kotakadala,         investigation on 19.06.2009 and   District Level.
               State Working             Uchadih, Sakroha, Curahkashrova       reminders sent on 21.08.2009 &
               Committee Party,          by Gram Vikas officer Sh.             05.11.2009 ,                      Reply is awaited
               Janpad Chitrakoot,        Chandrabhan Singh Patel. No           16.12.09,08.02.10,03.03.10 and
               Vikas Khand               estimation and measurement for the    31.03.2010
               Manikpur, Lucknow         work. There has been duplication of
               District, Uttar Pradesh   works and misappropriation of
                                         funds by Raj Bahadur yadav by
                                         forging the signature of the
                                         Pradhan.
448. Uttar     Ramvan & others,U.P       Poor quality of work, lack of         Requested State Government for    Due to incomplete
     Pradesh                             transparency in execution of work     investigation on 23.6.2009 and    information, the Complaint
                                         and connivance of the                 reminders sent on 21.08.2009 &    had been send back to the GOI.
                                         Pradha,B.D.O. and J.E.                05.11.2009 ,                      Reply is awaited
                                                                               16.12.09,08.02.10,03.03.10 and
                                                                               31.03.2010

449. Uttar     Vijay Mani Tripathi,      Irregurities in purchase of camera    Requested State Government for    Action is being taken by State
     Pradesh   District President,       of Rs. Fifty Lakhs, taking of bribe   investigation on 23.6.2009 and    Government.
               Chitrakoot, UP            of Rs. Five Lakhs                     reminders sent on 21.08.2009 &
                                                                               05.11.2009 and 31.03.2010         Reply is awaited
450. Uttar     Pramod,Hitendra and       Complaint against gram Pradhan       Requested State Government for   According to the report of
     Pradesh   others, Gram Panchayt     for not providing work to job card   investigation on 23.4.2009 and   Additional District Project
               Narhai, Block             holders                              reminders sent on 21.08.2009 &   Coordinator Complaint had
               Mithwil,                                                       05.11.2009 ,                     been found true. Action is
               Siddharth Nagar                                                16.12.09,08.02.10,03.03.10 and   being taken at District Level.
                                                                              31.03.2010
                                                                                                               Reply is awaited
451. Uttar     Godhan Lal s/o            Use of poor quality material and     Requested State Government for   According to the report of
     Pradesh   Premraj,                  constructions was held at wrong      investigation on 30.4.2009 and   Joint District Project
               Gram Kaser Panota,        place.                               reminder sent on 21.08.2009,     Coordinator Complaint had not
               Block Vazirganj,                                               16.12.09,08.02.10,03.03.10 and   been found true. Please dispose
               Badaun                                                         31.03.2010                       this matter from the pending
                                                                                                               list of complaints.

452. Uttar     Zubair Ahmad Khan,        Regarding corruption in BDO          Requested State Government for   Reply is awaited
     Pradesh   Former state secretary    office Risia Bazar, District         investigation on 8.5.2009 and
               (UP Congress              Bahriach                             reminders sent on 21.08.2009 &
               committee)                                                     05.11.2009,
                                                                              16.12.09,08.02.10,03.03.10 and
                                                                              31.03.2010

453. Uttar     Shri Amarnath             The complainant has requested to     Requested State Government for   According to the report of
     Pradesh   Kshatriya,                renovation of a Taal at village      investigation on 26.6.2009 and   Joint District Project
               village Suraila, Tehsil   Suraila, Tehsil Kerakat, District    reminders sent on 21.08.2009 &   Coordinator, the renovation of
               Kerakat, District         Jaunpur                              05.11.2009,                      the Pond will be done either
               Jaunpur                                                        16.12.09,08.02.10,03.03.10 and   from NREGS Fund or from
                                                                              31.03.2010                       any other source of Fund.
454. Uttar     Shri Ram Kishor      Not providing Bill, Vouchers and          Requested State Government for   According to the report of
     Pradesh   Diwakar, Member Zila related documents of NREGA to             investigation on 1.7.2009 and    Joint District Project
               Panchayat, Kathethi, Zila Panchayat Office.                    reminders sent on 21.08.2009 &   Coordinator Complaint had not
               Kanpur Dehat                                                   05.11.2009 ,                     been found true. Please dispose
                                                                              16.12.09,08.02.10,03.03.10 and   this matter from the pending
                                                                              31.03.2010                       list of complaints.

455. Uttar     Smt. Jamuna devi and     Misappropriation of funds through     Requested State Government for   Investigation is going on at
     Pradesh   Others, Gram Sabha       spurious work and forgery in job      investigation on 7.7.2009 and    District Level.
               Nari Khera, Block        cards.                                reminders sent on 21.08.2009 &   Reply is awaited
               Sumerpur, District                                             05.11.2009 and 31.03.2010
               Unnao.
456. Uttar     Sh. Brijesh Pandey,      Misuse of NREGA funds, purchase       Requested State Government for   Reply is awaited
     Pradesh   State coordinator , UP   of materials without quotation,       investigation on 16.7.2009 and
               congress committee       improper release of funds, against    reminders sent on 21.08.2009 &
                                        CDO& other officers in Gonda          05.11.2009,
                                        district.                             16.12.09,08.02.10,03.03.10 and
                                                                              31.03.2010

457. Uttar     Sh. Arvind Kumar         No development work took place,       Requested State Government for   According to the report of
     Pradesh                            misappropriation of funds in          investigation on 16.7.2009 and   Additional District Project
                                        fictitious wells, road work, use of   reminders sent on 21.08.2009 &   Coordinator Complaint had not
                                        JCB machines instead of labour        05.11.2009 ,                     been found true. Please dispose
                                        against Gram Pradhan and secretary    16.12.09,08.02.10,03.03.10 and   this matter from the pending
                                        of panchayat- Chirora Bujurag,        31.03.2010                       list of complaints.
                                        Block Gursarain, Jhansi.
458. Uttar     Shri Saket Bihari        Fictitious plantation work in         Requested State Government for   Reply is awaited
     Pradesh   Mishra, President,       Kamasin & Narayani blocks of          investigation on 15.7.2009 and
               District Congress        Banda district                        reminders sent on 21.08.2009 &
               Committee, Banda                                               05.11.2009,
                                                                              16.12.09,08.02.10,03.03.10 and
                                                                              31.03.2010
459. Uttar     Shri Sharwan Kumar        Alleging that the orders of Hon'ble     Requested State Government for      Reply is awaited
     Pradesh   and Others , District     High Allahbad High Court,               investigation on 06.07.2009 and
               Gonda                     Lucknow Bench in WP no.                 reminders sent on 21.08.2009 &
                                         1860/55/09 & 2001/55/09 &               05.11.2009,
                                         2001/55/09 are not being                16.12.09,08.02.10,03.03.10 and
                                         implemented and their salary for        31.03.2010
                                         the month of April 2009 has not
                                         been paid.
460. Uttar     Shri Umesh Bhadur         Misuse of funds in plantation           Requested State Government for      According to the report of
     Pradesh   Singh (Bablu), District   during last 4 years in Raibareli by     investigation on 07.07.2009 and     District Development Officer
               Coordinator, Phone:       procurement of planting materials       reminders sent on 21.08.2009 &      Complaint has not been found
               09450168573               at higher rates & plantation if fewer   05.11.2009,                         true. Please dispose this matter
                                         saplings than what was purchased        16.12.09,08.02.10,03.03.10 and      from the pending list of
                                         & use of low quality planting           31.03.2010                          complaints.
                                         materials
461. Uttar     Dr. Girish, State         Misappropriation of NREGA funds         Requested State Government for      According to the report of
     Pradesh   Secretary, Communist      & low payment to job card holders       investigation on 07.07.2009 and     Additional District Project
               Party of India, Phone-    & in institution of false F.I.R.        reminders sent on 21.08.2009 &      Coordinator Complaint had
               05222624943               against Shri Prakash S/o Shri Gaya      05.11.2009,                         been found true. Please dispose
                                         Prasad                                  16.12.09,08.02.10,03.03.10 and      this matter from the pending
                                                                                 31.03.2010                          list of complaints.

462. Uttar     Shri R.C. Singh           Complaining of sanitation and           Requested State Government for      Investigation is going on at
     Pradesh   (Advocate), Gangotri      water drainage system in gram           investigation on 09.07.2009 same    District Level.
               Vihar Colony,             sabha Barbara, Janpad Gajipur,          letter has received on 17.08.2009
               Kathvaitha, Shivpur,      Uttar Pradesh under RTI Act, 2005.      and reminders sent on 21.08.2009    Reply is awaited
               Varanasi, Uttar                                                   , 03.09.2009 & 05.11.2009,
               pradesh                                                           16.12.09,08.02.10,03.03.10 and
                                                                                 31.03.2010
463. Uttar     Villagers from village   Use of Machinery and death of a         Requested State Government for    Reply is awaited
     Pradesh   Davsaresh, Block         laborer, keeping job cards in his       investigation on 23.07.2009 and
               Govardhan , District     custody by Gram Pradhan.                reminders sent on 21.08.2009 &
               Mathura , U.P.                                                   05.11.2009 ,
                                                                                16.12.09,08.02.10,03.03.10 and
                                                                                31.03.2010

464. Uttar     Shri Nasir Ahmed,        Underpayment of wages to women          Requested State Government for    According to the report of
     Pradesh   Block President, Uttar   workers, manipulation in muster         investigation on 17.07.2009 and   Joint District Project
               Pradesh Youth            roll under NREGA.                       reminders sent on 21.08.2009 &    Coordinator Complaint had
               Congress, Gram                                                   05.11.2009,                       been found true. Action is
               Duboli, Post Savrahi,                                            16.12.09,08.02.10,03.03.10 and    being taken.
               District Kushinagar,                                             31.03.2010                        Reply is awaited
               Ph. 9695149254
465. Uttar     Shri Ramesh kumar,       Regarding not providing work to         Requested State Government for    According to the report of
     Pradesh   Gram Manjharia,          Gram Rozgar Sewak and NREGA             investigation on 17.07.2009 and   Additional District Project
               District Gajipur         job cards holders.                      reminders sent on 21.08.2009 &    Coordinator Complaint had not
                                                                                05.11.2009,                       been found true. Please dispose
                                                                                16.12.09,08.02.10,03.03.10 and    this matter from the pending
                                                                                31.03.2010                        list of complaints.

466. Uttar     Shri Dharamraj           Irregularities in the issuance of job   Requested State Government for    Reply is awaited
     Pradesh   Singh, Gram              cards, manipulation in job cards.       investigation on 23.07.2009 and
               Panchayat Barahmafi,                                             reminders sent on 21.08.2009 &
               Block Manikpur,                                                  05.11.2009 and 31.03.2010
               District Chitrakoot
467. Uttar     Shri Ghanashyam         Irregularities by the Pradhanpati    Requested State Government for    Reply is awaited
     Pradesh   Singh & others, Gram    Shri Ramkripal and Gram Vikas        investigation on 10.08.2009 and
               Panchayat Basti,        Adhikari.                            reminders sent on 21.08.2009 &
               District Barabanki                                           05.11.2009,
               forwarded by Shri                                            16.12.09,08.02.10,03.03.10 and
               Mazhar Aziz Khan,                                            31.03.2010
               Zilla Prabharai of
               NREGA Vigilance
               Committee, District
               Barabanki, Uttar
               Pradesh

468. Uttar     Shri Brijesh Pandey,    Misappropriation in the allotment    Requested State Government for    According to the report of
     Pradesh   State Coordinator, UP   of the NREGA funds in District       investigation on 18.08.2009 and   Joint District Project
               NREGA vigilance &       Gonda.                               reminders sent on 21.08.2009 &    Coordinator Complaint had
               monitoring                                                   05.11.2009,                       been found partially true.
               Committee, 132, Patel                                        16.12.09,08.02.10,03.03.10 and    Please dispose this matter from
               Nagar,near Gonda                                             31.03.2010                        the pending list of complaints.
               Medical Centre. Ph
               9918491464
469. Uttar     Villagers of Gram       Embezzlement of NREGA funds,         Requested State Government for    According to the report of
     Pradesh   Panchayat Vardwari,     forcefully capturing of bank         investigation on 18.08.2009 and   Joint District Project
               Block Mursan,Tehsil     passbooks and job cards, faking of   reminders sent on 21.08.2009 &    Coordinator Complaint had not
               Hathras, District       works.                               05.11.2009,                       been found true. Please dispose
               Mahamaya Nagar                                               16.12.09,08.02.10,03.03.10 and    this matter from the pending
                                                                            31.03.2010                        list of complaints.

470. Uttar     Shri Satya Bhagwan      Failure to provide work on time,     Requested State Government for    Reply is awaited
     Pradesh   S/o Late Ram Lal,       wages not being paid to the          investigation on 14.08.2009 and
               Gram Post- Gausganj,    NREGA workers and information        reminders sent on 21.08.2009 &
               Janpad- Hardoi          sought under RTI Act 2005 not        05.11.2009,
                                       being provided by the BDO            16.12.09,08.02.10,03.03.10
                                       Kachona.
471. Uttar     Shri Bharat Singh,       Allegation of corruption,             Requested State Government for    According to the report of
     Pradesh   Village Hardhan Juda,    irregularities and manipulation       investigation on 24.08.2009 and   Additional District Project
               Block Chahnia,           under NREGA                           reminder sent on 05.11.2009,      Coordinator Complaint had not
               District Chandauli,                                            16.12.09,08.02.10,03.03.10 and    been found true. Please dispose
               Uttar Pradesh (As                                              31.03.2010                        this matter from the pending
               desired by S(RD) a                                                                               list of complaints.
               team of NLMs
               should be sent and
               they should be speak
               to and get the input
               from complainant)
472. Uttar     Shri Khemchand and       Nonpayment of wages to workers        Requested State Government for    Reply is awaited
     Pradesh   others, Gram             under NREGA                           investigation on 24.08.2009 and
               Bambavad Police                                                reminder sent on 05.11.2009 ,
               Station Badalpur,                                              16.12.09,08.02.10,03.03.10 and
               Tehsil Dadri, District                                         31.03.2010
               Gautam Budh Nagar
473. Uttar     Shri Ram Kumar           Excavation work of pond not done      Requested State Government for    Reply is awaited
     Pradesh   Sahu, Gram               and non- payment of wages to          investigation on 24.08.2009 and
               Kodrajeet, Block         workers under NREGA.                  reminder sent on 05.11.2009,
               Bihar, Tehsil Kunda,                                           16.12.09,08.02.10,03.03.10 and
               District Pratapgarh                                            31.03.2010

474. Uttar     Shri Santosh Kumar,      Failure to provide work to job card   Requested State Government for    According to the report of
     Pradesh   Gram Bakhtar, Gram       holders, embezzlement done by         investigation on 24.08.2009 and   Joint District Project
               Panchayat Kalua          Gram Pradhan, asking money for        reminder sent on 05.11.2009,      Coordinator Complaint had not
               Bakhtar, Block           sanction works under NREGA            16.12.09,08.02.10,03.03.10 and    been found true. Please dispose
               Mauranipur, District                                           31.03.2010                        this matter from the pending
               Jhansi                                                                                           list of complaints.
475. Uttar     Shri Sherab Khan,         Not completing the pond digging      Requested State Government for      According to the report of
     Pradesh   Gram Ninora, Block        work under NREGA.                    investigation on 24.08.2009 and     Additional District Project
               Bangra, District Jhansi                                        reminder sent on 05.11.2009,        Coordinator Complaint had not
                                                                              16.12.09,08.02.10,03.03.10 and      been found true. Please dispose
                                                                              31.03.2010                          this matter from the pending
                                                                                                                  list of complaints.
476. Uttar     Shri Bhai Ramlal          Regarding not sanction of funds to   Requested State Government for      According to the Chief
     Pradesh   Yadav, Gram Mudila        NREGA works.                         investigation on 24.08.2009 and     Development Officer of Jhansi
               Tiwari, Post kota                                              reminder sent on 05.11.2009,        the report had not been found
               Mukundpur, District                                            16.12.09,08.02.10,03.03.10 and      true. Please dispose this matter
               Maharajganj. Ph.                                               31.03.2010                          from the pending list of
               9415643943                                                                                         complaints.
477. Uttar     Shri Sandeep Pandey,      Lathi charge by the Gram Pradhan     Requested State Government for      Action is being taken by State
     Pradesh   Indira Nagar,             and his men on the workers while     investigation on 25.08.2009 and     Government.
               Lucknow, Uttar            asking for their pending wages on    request was sent to NLM division.
               Pradesh                   14 th January ,2009                  And reminder sent on 05.11.2009     Reply is awaited
                                                                              , 16.12.09,08.02.10,03.03.10 and
                                                                              31.03.2010

478. Uttar     All Villagers of Gram     Alleging misbehaviour of Block       Requested State Government for      Investigation is going on at
     Pradesh   Panchayat-                Development Officer with NREGA       investigation on 16.09.2009 and     District Level.
               Sarhanbujurg, Vikas       workers                              reminder sent on 05.11.2009,        Reply is awaited
               Khand- Amoli,                                                  16.12.09,08.02.10,03.03.10 and
               District Fatehpur                                              31.03.2010

479. Uttar     Shri Khushi Ram and       Gram Sabha meetings are not being    Requested State Government for      According to the Chief
     Pradesh   others, Gram              held & failure to provide work       investigation on 16.09.2009 and     Development Officer of
               Panchayat-                                                     reminder sent on 05.11.2009,        Kashiram Nagar the report had
               Khargatipur, Vikas                                             16.12.09,08.02.10,03.03.10 and      not been found true. Please
               Khand- Sidpura,                                                31.03.2010                          dispose this matter from the
               Tehsil- Patiyali,                                                                                  pending list of complaints.
               District Kashiram
               Nagar
480. Uttar     Shri Sultan Singh,       Complain regarding use of fake          Requested State Government for    According to the Chief
     Pradesh   Gram Panchayat-          attendance, to keep job cards in        investigation on 16.09.2009 and   Development Officer of
               Viran Khera, Block-      custody of Sarpanch,                    reminder sent on 05.11.2009,      Kanpur Nagar the report had
               Bhitargaon, Tehsil-      misappropriation of funds under         16.12.09,08.02.10,03.03.10 and    not been found true. Please
               Chhadampur, District     various projects & from the             31.03.2010                        dispose this matter from the
               Kanpur Nagar             workers bank accounts, demanding                                          pending list of complaints.
                                        bribe for making job cards
481. Uttar     Shri Udaybhan Singh       Works are done physically,             Requested State Government for    According to the chief
     Pradesh   S/o shri Inder Bahadur   Corruption &, embezzlement and          investigation on 16.09.2009 and   development officer of Gonda
               Singh, Gram- Rajapur,    misuse of funds and threatens to        reminder sent on 05.11.2009,      the report had been found
               Block- Paraspur,         workers in Gram- Rajapur, Block-        16.12.09,08.02.10,03.03.10 and    partially true and remedial
               Tehsil- Karnailganj,     Paraspur, Tehsil- Kasalganj,            31.03.2010                        action is being taken.
               District- Ginda          District- Gonda.
482. Uttar     Shri Satnam Singh,       Misuse of funds , denial of             Requested State Government for    Investigation is going on at
     Pradesh   Advocate, Former         registration to eligible applican       investigation on 16.09.2009 and   District Level.
               Secretary, Mobile-       Etah ts and issuance of false job       reminder sent on 05.11.2009,      Reply is awaited
               94352888523              cards, recording of fictitious works.   16.12.09,08.02.10,03.03.10 and
                                                                                31.03.2010

483. Uttar     Shri Magan Lal s/o       Corruption, embezzlement, under         Requested State Government for    Reply is awaited
     Pradesh   Shri Sarpati, Gram       payment of wages, misuse of funds       investigation on 16.09.2009 and
               Sagauli, Block           in Karuadihi, Bela, Vajti, Raipur       reminder sent on 05.11.2009,
               Bamaur, District         Gram Panchayats in Block Pratapur       16.12.09,08.02.10,03.03.10 and
               Jhansi                   of District Allahabad                   31.03.2010

484. Uttar     All villagers of Gram-   Misuse of funds and many                Requested State Government for    Investigation is going on at
     Pradesh   Emeliya,Pargana          incomplete projects under NREGS         investigation on 16.09.2009 and   District Level
               Muskara, Tehsil-         not completed by Gram Pradhan           reminder sent on 05.11.2009,      Reply is awaited
               Modha, District                                                  16.12.09,08.02.10,03.03.10 and
                                                                                31.03.2010
485. Uttar     Shri Ram Kakar          Embezzlement done by Pradhan            Requested State Government for    Investigation is going on at
     Pradesh   Bundwar, Gram-          and Gram Vikas Officer in NREGA         investigation on 16.09.2009 and   District Level
               Budwar, District-       projects. The complainant alleged       reminder sent on 05.11.2009,      Reply is awaited
               Lalitpur                that there are many schemes that        16.12.09,08.02.10,03.03.10 and
                                       are still incomplete like               31.03.2010
                                       construction of drains, afforestation
                                       etc. The complainant has requested
                                       to investigate the irregularities and
                                       corruption in NREGS.
486. Uttar     Shri Indermani Dubey,   Embezzlement and corruption in          Requested State Government for    According to the Chief
     Pradesh   Chief Secretary, Zila   the NREGA funds, issuance of job        investigation on 16.09.2009 and   Development Officer of
               Congress Committee,     cards to dead persons, bogus job        reminder sent on 05.11.2009 ,     Jaunpur the report had not
               Gram Sabha-             cards, wages not paid to workers,       16.12.09,08.02.10,03.03.10 and    been found true. Please dispose
               Ghughuri Sultanpur,     failure to provide muster roll at the   31.03.2010                        this matter from the pending
               Block- Khuthan,         worksite in Jaunpur District.                                             list of complaints.
               Jaunpur District

487. Uttar     Shri Ranvijay Singh,    Manipulation in muster rolls,           Requested State Government for    Investigation is going on at
     Pradesh   District Deoria         issuance of fake job cards, payment     investigation on 16.09.2009 and   District Level
                                       made in the name of ghost workers       reminder sent on 05.11.2009,      Reply is awaited
                                       at Lar, Bhatpar Rani, Bankata,          16.12.09,08.02.10,03.03.10 and
                                       Bhagalpur Blocks in District            31.03.2010
                                       Deoria
488. Uttar     Shri Wahid Ali and      Job cards kept with the Gram            Requested State Government for    Investigation is going on at
     Pradesh   others, Gram            Pradhan, work was not provided          investigation on 16.09.2009 and   District Level
               Panchayat Barpar,       under NREGA                             reminder sent on 05.11.2009,      Reply is awaited
               Nyaya Panchayat                                                 16.12.09,08.02.10,03.03.10 and
               Parsia, District                                                31.03.2010
               Gorakhpur
489. Uttar     Shri Buddhu Raidas,      Discrimination in the selection of     Requested State Government for    Reply is awaited
     Pradesh   Gram Panchayat           the worksite under NREGA               investigation on 16.09.2009 and
               Hasnapur Paharpur,                                              reminder sent on 05.11.2009,
               Thana Masoli, District                                          16.12.09,08.02.10,03.03.10 and
               Barabanki                                                       31.03.2010

490. Uttar     Shri Hari Singh, Gram    Corruption and Embezzlement            Requested State Government for    Investigation is going on at
     Pradesh   Panchayat Bansari,       under NREGA at Gram Panchayat          investigation on 16.09.2009 and   District Level
               Block Chagar             Bansari, Block Chakarnagar,            reminder sent on 05.11.2009,      Reply is awaited
               Nagar,District Etawah    District Etawah                        16.12.09,08.02.10,03.03.10 and
                                                                               31.03.2010

491. Uttar                                                                  Requested State Government for       Reply is awaited
               Shri Chhote Lal, Gram
     Pradesh                                                                investigation on 25.09.2009 and
               Sabha- Amiliya
                                        Misuse of funds & fake muster rolls reminder sent on 05.11.2009 ,
               Tarhar, Block-
                                        in various projects under NREGA     16.12.09,08.02.10,03.03.10 and
               Shankargarh, District-
                                                                            31.03.2010
               Allahabad
492. Uttar                                                                     Requested State Government for    According to the Chief
     Pradesh   Shri Arun Jayaswal,                                             investigation on 25.09.2009 and   Development Officer of
                                        Misappropriation & irregularities in
               Gram Panchyat- Mad,                                             reminder sent on 05.11.2009,      Chandauli,the complaint has
                                        funds, use of fake muster rolls &
               Block- Chakiya,                                                 16.12.09,08.02.10,03.03.10 and    not been found true, Please
                                        job cards
               District- Chandauli                                             31.03.2010                        dispose this matter from the
                                                                                                                 pending list of complaints.
493. Uttar     Shri Munir Ahmed,                                               Requested State Government for    According to the Chief
     Pradesh   Gram- Mukimpur-                                                 investigation on 25.09.2009 and   Development Officer of
                                        Rejoining of suspended Panchayat
               Judhora, Post-                                                  reminder sent on 05.11.2009,      Sitapur,the complaint has been
                                        Adhikari which found guilty in
               Akohara, Tehsil-                                                16.12.09,08.02.10,03.03.10 and    found true, The remedial
                                        misappropriation of funds
               Sidhauli, District-                                             31.03.2010                        action has been taken
               Sitapur
494. Uttar                                                                    Requested State Government for     According to the Chief
               Shri Sahidul Hassan
     Pradesh                            Use of fake job cards & fake          investigation on 25.09.2009 and    Development Officer of
               S/o Nazir, Gram
                                        signatures, recording of fictitious   reminder sent on 05.11.2009,       Sitapur,the complaint has been
               Panchayat- Ulra,
                                        workers, keep pass book in custody    16.12.09,08.02.10,03.03.10 and     solved, Please dispose this
               Block- Bisawa,
                                        of Gram Pradhan                       31.03.2010                         matter from the pending list of
               District- Sitapur
                                                                                                                 complaints.
495. Uttar                                                                    Requested State Government for     According to the Chief
               Shri Puran S/o Shri
     Pradesh                            Failure to provide works, non –       investigation on 25.09.2009 and    Development Officer of
               Narayan Singh and
                                        payment of wages, defalcation and     reminder sent on 05.11.2009 ,      Mathura the report had not
               others of Gram- Jeit,
                                        corruption in funds, use of           16.12.09,08.02.10,03.03.10 and     been found true. Please dispose
               Block & District-
                                        machines instead of labour            31.03.2010                         this matter from the pending
               Mathura
                                                                                                                 list of complaints.
496. Uttar     584(15)/ MOS             Fraudulent withdrawl of money         Requested State Government for     According to the Chief
     Pradesh   (RD)/09                  from his account no.11286 page no.    investigation on 30.09.2009 and    Development Officer of
               Shri Raghuraj Singh,     388/43 dated 23.6.2009 by the         reminder sent on 05.11.2009.       Mainpuri the report was found
               Gram Panchayat           Bank Manager, Gram Pradhan. and       MOS(RD-PJ) replied to the          true. and remedial action is
               Tigwan, Gram             Gram Panchayat Officer by faking      complainant on 13.11.2009,         being taken
               Madhonagar, Vikas        his signatures.                       16.12.09,08.02.10,03.03.10 and
               Khand Bewar, Tehsil                                            31.03.2010
               Bhogaon, District
               Mainpuri forwarded
               by Shri JitinPrasada,
               MOS fro (P&NG)
497. Uttar     269/APS/M(RD)/09         Manipulation in job cards and         Requested State Government for     Investigation is going on at
     Pradesh   Shri Asha Ram, Gram      misuse of NREGA funds by Gram         investigation on 30.09.2009 and    District Level
               Peria Kodar, Thana       Pradhan.                              reminder sent on
               Machreta, District                                             05.11.200916.12.09,08.02.10,03.0   Reply is awaited
               Sitapur, Uttar Pradesh                                         3.10 and 31.03.2010
498. Uttar     Shri Sanjay Dixit,       Alleged murder of a NREGA            Requested State Government for    Reply is awaited
     Pradesh   Member, Central           worker Shri Puttilal in Gram         investigation on 06.10.2009 and
               Employment                Panchayat Narayanpur Jaisingh,       reminders send on 23.10.2009.
               Guarantee Council         Block Paraspur, Gond District for    and 05.11.2009
               (CEGC) addressed to       making complaint against delayed     16.12.09,08.02.10,03.03.10 and
               Union Minister, Rural     payment of wages.                    31.03.2010
               Development.             Irregularities and violation of
                                         NREGA guidelines in Mehoba
                                         District of Uttar Pradesh.
499. Uttar     Smt. Maneka             Corruption in Tree Plantation          Requested State Government for    According to the Chief
     Pradesh   Gandhi, MP(LS)          scheme under NREGA in District         investigation on 09.10.2009 and   Development Officer of
                                       Bareli, Uttar Pradesh and              reminder sent on 05.11.2009 &     Bareilly the report had not
                                       requesting for investigation through   11.12.2009                        been found true. Please dispose
                                       Technical Audit Cell                   16.12.09,08.02.10,03.03.10 and    this matter from the pending
                                                                              31.03.2010                        list of complaints.

500. Uttar     Shri Munnalal and       Work not provided for 100 days,        Requested State Government for    Investigation is going on at
     Pradesh   others, Gram Sabha      payment through fake entries in        investigation on 08.10.2009 and   District Level
               Kudar, Tehsil           muster roll under NREGA at Gram        reminder sent on 05.11.2009
               Charkhari, District     sabha Kudar, Tehsil Charkhari,         16.12.09,08.02.10,03.03.10 and    Reply is awaited
               Mahoba                  District Mahoba.                       31.03.2010

501. Uttar     Shri K.R.               Delay in payment of wages from         Requested State Government for    Investigation is going on at
     Pradesh   Yadav,President,        the bank                               investigation on 08.10.2009 and   District Level
               Gram Pradhan                                                   reminder sent on 05.11.2009 and
               Welfare Association,                                           31.03.2010                        Reply is awaited
               2/91 Jankipuram
               Vistar,Mobile-
               9415774832,
               9936411463 , District
               Lucknow
502. Uttar     Shri Satish Kumar &      Failure to provide work, To keep       Requested State Government for     According to the Chief
     Pradesh   Shri Ram Kumar,          job cards in custody of Pradhan.       investigation on 08.10.2009 and    Development Officer of Unnao
               Gram Sabha- Behta,                                              reminder sent on                   the report had not been found
               Block- Hiloli, Tehsil-                                          05.11.200916.12.09,08.02.10,03.0   true. Please dispose this matter
               Purva, Thana- Asoha,                                            3.10 and 31.03.2010                from the pending list of
               Post- Kanchanpur,                                                                                  complaints.
               District Unnao
503. Uttar     Shri Rajbahadur and                                             Requested State Government for     Investigation is going on at
                                        Work not provided payment of
     Pradesh   others, Gram                                                    investigation on 14.10.2009 and    District Level
                                        wages being not made, non-
               Pyarepur, Post Karora,                                          reminder sent on 05.11.2009 and    Reply is awaited
                                        issuance of job cards under
               Block Sujanganj,                                                31.03.2010
                                        NREGA.
               District Jaunpur
504. Uttar     Shri B.R.Verma, B-                                       Requested State Government for            According to the Chief
     Pradesh   133, New Ashok           Work not provided to job        investigation on 14.10.2009 and           Development Officer of
               Nagar, Delhi-1100096     cardholders under NREGA in Gram reminder sent on 05.11.2009 and           Mathura the report had not
                                        Panchayat Thok Kamal, Block     31.03.2010                                been found true. Please dispose
                                        Raya in Distrct Mathura                                                   this matter from the pending
                                                                                                                  list of complaints.
505. Uttar     Shri Kallan Siddiqui,                                           Requested State Government for     According to the Chief
     Pradesh   Gram Panchayat                                                  investigation on 14.10.2009 and    Development Officer of
                                        Payment made in the name of ghost
               Kandela, Tehsil                                                 reminders on 05.11.2009 &          Behraich the report had not
                                        workers in Gram Panchayat
               Kaisarganj, District                                            06.11.09,                          been found true. Please dispose
                                        Kandela, Tehsil Kaisarganj, District
               Bahriach                                                        16.12.09,08.02.10,03.03.10 and     this matter from the pending
                                        Bahriach.
                                                                               31.03.2010                         list of complaints.

506. Uttar     Shri Ramprasad Gupta     Manipulation in muster roll,           Requested State Government for     According to the Chief
     Pradesh   and others, Gram         Payment of wages being not made,       investigation on 14.10.2009 and    Development Officer of
               Panchayat Kanhara,       use of machinary, use of low           reminder sent on 05.11.2009,       Sonebhadra the report had not
               Block Chopan, Tehsil     quality material under NREGA in        16.12.09,08.02.10,03.03.10 and     been found true. Please dispose
               Robartsganj, District    Gram Panchayat Kanhara, Block          31.03.2010                         this matter from the pending
               Sonbhadra                Chopan, Tehsil Robertsganj,                                               list of complaints
                                        District Sonbhadra
507. Uttar     Shri Bani Singh, Gram                                          Requested State Government for     According to the Chief
     Pradesh   Panchayat Barauli,                                             investigation on 14.10.2009 and    Development Officer of
                                     Underpayment of wages in Gram
               Tehsil Shikarpur,                                              reminder sent on                   Bulandshahr the report had not
                                     Panchayat Barauli, Tehsil
               District BulandShahr                                           05.11.200916.12.09,08.02.10,03.0   been found true. Please dispose
                                     Shikarpur, District BulandShahr
                                                                              3.10 and 31.03.2010                this matter from the pending
                                                                                                                 list of complaints.
508. Uttar     Shri Zakir Ali and                                             Requested State Government for     According to the Chief
                                      Job cards kept with the Gram
     Pradesh   others, Gram Sabha                                             investigation on 14.10.2009 and    Development Officer of
                                      Pradhan, payment of wages not
               Jaitapur, Block                                                reminder sent on 05.11.2009,       Behraich the report had not
                                      being made under NREGA in Gram
               Fakhrpur, Tehsil                                               16.12.09,08.02.10,03.03.10 and     been found true. Please dispose
                                      Sabha Jaitapur, Block Fakhrpur,
               Mahsi, Distrct                                                 31.03.2010                         this matter from the pending
                                      Tehsil Mahsi, Distrct Bahriach
               Bahriach                                                                                          list of complaints.
509. Uttar     Shri Rajaram, Gram                                             Requested State Government for     Investigation is going on at
     Pradesh   Panchayat Atwa,                                                investigation on 14.10.2009 and    District Level
                                      Work not provided under NREGA
               Block Amrodha,                                                 reminder sent on 05.11.2009,
                                      in Gram Panchayat Atwa, Block
               Distrct Kanpur-Dehat                                           16.12.09,08.02.10,03.03.10 and     Reply is awaited
                                      Amrodha, Distrct Kanpur-Dehat
                                                                              31.03.2010

510. Uttar     Shri Kammoda s/o       Use of machinery, misappropriation      Requested State Government for     Reply is awaited
     Pradesh   Shri Khumna, Gram      of funds by fraudulent withdrawal       investigation on 14.10.2009 and
               Kururra, Post and      of money from the Bank Account          reminder sent on
               Block Mehrauni,        of NREGA workers. in Gram               05.11.200916.12.09,08.02.10,03.0
               District Lalitpur      Sabha Kurrura, Block Mahoni,            3.10 and 31.03.2010
                                      District Lalitpur
511. Uttar     Shri Devi Prasad       Corruption, fake muster roll & job      Requested State Government for     Investigation is going on at
     Pradesh   Dubey, gram            cards and financial irregularities by   investigation on 14.10.2009 and    District Level
               Panchayat              Smt. Shyam Kumari, Gram                 reminder sent on
               Khamahariya            Pradhan, Sh. Suresh Dutt Mishar,        05.11.200916.12.09,08.02.10,03.0   Reply is awaited
               Damuan, Thana          Gram Panchayat Adhikari and the         3.10
               Vidhyanachal, Tehsil   Junior Engineer under NREGA
               sadar, District
               Mirzapur
512. Uttar     Shri Govind Singh s/o     Discrimination in the issuance of    Requested State Government for     Investigation is going on at
     Pradesh   Shri Bhagwan Singh,       job cards and payment made in fake   investigation on 14.10.2009 and    District Level
               Gram Sabha Nahi           pond excavation work under           reminder sent on
               Juenia, Block             NREGA at Gram Sabha Nahi             05.11.200916.12.09,08.02.10,03.0   Reply is awaited
               Sarwankheda, District     Juenia, Block Sarwankheda,           3.10 and 31.03.2010
               Kanpur                    District Kanpur

513. Uttar                               Social Audit not being done in       Requested State Government for     Investigation is going on at
     Pradesh   Shri Awadh Bihari         Lucknow.                             investigation on 14.10.2009 and    District Level
               Lal, Coordinater,                                              reminder sent on
               NREGA Task Force,                                              05.11.200916.12.09,08.02.10,03.0   Reply is awaited
               Lucknow                                                        3.10 and 31.03.2010

514. Uttar                               NREGA funds not being to Block       Requested State Government for     According to the Chief
     Pradesh                             Madawara in District Lalitpur        investigation on 14.10.2009 and    Development Officer of
               Shri Sunil Sighai,                                             reminder sent on                   Lalitpur the report had not
               District Lalitpur                                              05.11.200916.12.09,08.02.10,03.0   been found true. Please dispose
                                                                              3.10 and 31.03.2010                this matter from the pending
                                                                                                                 list of complaints.
515. Uttar                               Corruption and Irregularities at     Requested State Government for     Investigation is going on at
     Pradesh                             Gram Kurrahi in Banda                investigation on 14.10.2009 and    District Level
               Shri Ishrat Raies. Zila
                                                                              reminder sent on 05.11.2009
               Panchayt Member,
                                                                              16.12.09,08.02.10,03.03.10 and     Reply is awaited
               District Banda
                                                                              31.03.2010

516. Uttar     Shri Raies Ahmed          Corruption in purchase of plants     Requested State Government for     Investigation is going on at
     Pradesh   Khan, Secretary, Uttar    and plantation work under NREGA      investigation on 14.10.2009 and    District Level
               Pradesh Congress          in District Banda                    reminder sent on
               Committee, Lucknow                                             05.11.200916.12.09,08.02.10,03.0   Reply is awaited
                                                                              3.10 and 31.03.2010
517. Uttar     Shri Ashok Kumar,         Payment made through fake            Requested State Government for     Investigation is going on at
     Pradesh   Gram Basratpur, Post      attendance in muster roll under      investigation on 14.10.2009 and    District Level
               Dhavria, Block            NREGA in Gram Bisratpur, Block       reminder sent on
               Kopaganj, District        Kopaganj,District Mau                05.11.200916.12.09,08.02.10,03.0   Reply is awaited
               Mau                                                            3.10 and 31.03.2010

518. Uttar     Shri Shesh Narayan        Underpayment of wages,               Requested State Government for     According to the Chief
     Pradesh   Ojha, Gram Bairamad       duplication of works under           investigation on 14.10.2009 and    Development Officer of
               Karari, Post Basuhar,     NREGA at Gram Bairamad Karari,       reminder sent on                   Kaushambi; the report was
               District Kaushambi        District Kaushambi                   05.11.200916.12.09,08.02.10,03.0   found true. and remedial action
                                                                              3.10 and 31.03.2010                is being taken
                                                                                                                 Reply is awaited
519. Uttar     Shri Denanath             Fake muster rolls & job cards,       Requested State Government for     Investigation is going on at
     Pradesh   Srivastava (President),   misappropriation of NREGA fund       investigation on 22.10.2009 and    District Level
               Zila Kisan Sangharash     of Rs. 3 crore in the pond digging   reminder sent on
               Samity, District          work by Shri Suprabhat Singh (       05.11.200916.12.09,08.02.10,03.0   Reply is awaited
               Chandoli, Uttar           Shayak Abiyanta) and Shri C.B.       3.10 and 31.03.2010
               Pradesh                   Ram (Awar Abiyanta)
520. Uttar     Shri Gopal Prashad        Manipulation in job card and         Requested State Government for     Investigation is going on at
     Pradesh   Gupt, Ex President,       NREGA funds                          investigation on 22.10.2009 and    District Level
               District Congress                                              reminder sent on 05.11.2009
               Committee, District                                            16.12.09,08.02.10,03.03.10 and     Reply is awaited
               Sonbhadra, Uttar                                               31.03.2010
               Pradesh
521. Uttar     Shri Sunil Jain, Purv     Fake payment to 16 labourers in      Requested State Government for     According to the Chief
     Pradesh   Parshad and               Kheragarh Tehsil, Agra by Gram       investigation on 22.10.2009 and    Development Officer of Agra;
               Mahamantri, Member        Pradhan.                             reminder sent on                   the report was found true and
               Pradesh Karykarene,                                            05.11.200916.12.09,08.02.10,03.0   remedial action has been taken
               NREGA Nigrani                                                  3.10 and 31.03.2010
               Samity, Uttar Pradesh                                                                             Reply is awaited
               Congress Committee,
               Lucknow
522. Uttar     Shri Nagender Shukla,      Corruption, Manipulation in job      Requested State Government for      According to The Chief
     Pradesh   deputy Chairman &          cards, and fake payments under       investigation on 22.10.2009 and     Development Officer, the
               Prabhari, Gram and         NREGA by Gram Pradhan and            reminder sent on                    complaint has not been found
               Post Piparpati, District   Secretary in Vikas Khand Pathreva,   05.11.200916.12.09,08.02.10,03.0    true. Please dispose this matter
               Deoria, Uttar Pradesh      Gram Panchayat Mundera Jagdish       3.10 and 31.03.2010                 from the pending list of
                                          District Deoria.                                                         complaints.
523. Uttar     Smt. Anju Bala,            Corruption , fake muster rolls,      Requested State Government for      Investigation is going on at
     Pradesh   Member, Kshetra            repetition of works and misuse of    investigation on 27.10.2009 and     District Level
               Panchayat Belhari,         NREGA fund by the Block              reminder sent on
               District Ballia, Uttar     Pramukh, B.D.O. and other            05.11.2009,16.12.09,08.02.10,03.0   Reply is awaited
               Pradesh                    officials under NREGA in District    3.10 and 31.03.2010
                                          Ballia

524. Uttar     55(55)/VIP/MOS/(R          Corruption and fraudulent        Requested State Government for          Investigation is going on at
     Pradesh   D-PJ)/09                   withdrawal of NREGA funds by the investigation on 10.11.2009,            District Level
               Shri Jitin Prasada,        Gram Panchayat Adhikari.         16.12.09,08.02.10,03.03.10 and
               Minister of State of                                        31.03.2010                              Reply is awaited
               Petroleum and Natural
               Gas forwarding a
               letter of Shri
               Ramendra Shukla,
               Tehsil Incharge,
               Nigrani Samiti,
               Khamria, District
               Lakhimpur khiri, Uttar
               Pradesh
525. Uttar     50(55)/VIP/MOS/RD         Corruption, Partiality in work        Requested State Government for   Investigation is going on at
     Pradesh   -PJ/09                    provision to job card holders and     investigation on 10.11.2009      District Level
               Shri Jitin Prasada        misuse of NREGA fund by Gram          reminder sent on
               Minister of State of      Pradhan‟s son by fake signature of    16.12.09,08.02.10,03.03.10 and   Reply is awaited
               Petrolium and Natural     his father                            31.03.2010
               Gas forwarding a
               letter of Shri Rajendra
               Prasad Mishra, Gram
               Devri, Vikash Khand
               Behajam, District
               Lakhimpur Khiri,
               Uttar Pradesh
526. Uttar     Shri Rajendra S/o Shri    Embezzlement and corruption           Requested State Government for   Investigation is going on at
     Pradesh   Hakesh Singh and          under NREGA by using fake names       investigation on 11.11.2009      District Level
               Others, Gram Nogava       on job cards & fake road              reminder sent on
               Taga, Block- Amroha,      construction.                         16.12.09,08.02.10,03.03.10 and   Reply is awaited
               Tehsil Dhanora                                                  31.03.2010

527. Uttar     Shri Shyam Kumar          Corruption of funds by using fake     Requested State Government for   Investigation is going on at
     Pradesh   Dohare, S/o Shri          job cards.                            investigation on 11.11.2009      District Level
               Buddhalal Dohare,                                               reminder sent on
               Gram Panchayat                                                  16.12.09,08.02.10,03.03.10 and   Reply is awaited
               Sanda, Block Umarda,                                            31.03.2010
               District Kannuj
528. Uttar     Shri Arshafi Lal and      Discrimination in the issuance of     Requested State Government for   Investigation is going on at
     Pradesh   others, Gram              job cards and allotment of work,      investigation on 11.11.2009      District Level
               Panchayat- Gauri,         under payment of wages,               reminder sent on
               Block-                    manipulation in muster roll in Gram   16.12.09,08.02.10,03.03.10 and   Reply is awaited
               Safipur,District-         Panchayat- Gauri, Block Safipur,      31.03.2010
               Unnao                     District Unnao
529. Uttar     Shri Ramotar Singh        Payment of wages not made under    Requested State Government for     Investigation is going on at
     Pradesh   and others, Gram-         NREGA in Gram Ekoda, Tehsil        investigation on 11.11.2009        District Level
               Ekoda, Tehsil-            Amroha, Block Joya, District       reminder sent on
               Amroha, Block- Joya,      Jyotiba Phule Nagar                16.12.09,08.02.10,03.03.10 and     Reply is awaited
               District- Jyotiba Phule                                      31.03.2010
               Nagar
530. Uttar     Email dated 10.12.09      Misappropriation of NREGA funds Requested State Government for        Reply is awaited
     Pradesh   received from Shri        in Gonda district               investigation and 31.03.2010
               Sanjay Dixit, Member,
               CEGC
531. Uttar     Shoskumar Verma,          To investigate irregularity work   Forwarded to the State             Reply is awaited
     Pradesh   GP Badoba, Vikash         under NREGA by Gram Pradhan        Government on 07.01.2010
               Khand Dhobia,             and Other Official                 reminder sent on
               District Gonda, dated:                                       08.02.10,03.03.10 and 31.03.2010
               10/12/2009
532. Uttar     Shri Ramratan Rajvar,     Corruption & irregular work to     Forwarded to the State             Reply is awaited
     Pradesh   S/o Rambrush Rajvar,      NREGA workers                      Government on 07.01.2010
               Gram Banjha, Post-                                           reminder sent on
               Jahanagang , District                                        08.02.10,03.03.10 and 31.03.2010
               Ajamgarh, dated:
               12/10/2009
533. Uttar     Shri Indramani Dube,      Corruption, Misuse of NREGA        Forwarded to the State             Reply is awaited
     Pradesh   Principle Secretary,      fund                               Government on 07.01.2010
               District Congress                                            reminder sent on
               committee, dated:                                            08.02.10,03.03.10 and 31.03.2010
               4/12/2009
534. Uttar     Shri Abdul Kadir,         Corruption, Misuse of NREGA        Forwarded to the State             Reply is awaited
     Pradesh   Gram Padri, Nawga,        fund                               Government on 07.01.2010
               Sonvadra, dated:                                             reminder sent on
               14/12/2009                                                   08.02.10,03.03.10 and 31.03.2010
535. Uttar       Shri Prabhudayal, S/o   Corruption, Misuse of NREGA            Forwarded to the State             Reply is awaited
     Pradesh     Banmari Lal Gram        fund by Grameen Sahayak & SBI          Government on 07.01.2010
                 Kinharpur, PS.          Manager                                reminder sent on
                 Matsena, District                                              08.02.10,03.03.10 and 31.03.2010
                 Firozabad, dated:
                 23/12/2009
536.             Shri Brijesh Pandey,    To investigate irregularity work       Forwarded to the State             Reply is awaited
                 State coordinator, UP   under NREGA                            Government on 07.01.2010
       Uttar     NREGA Nigrani                                                  reminder sent on
       Pradesh   Samity, dated:                                                 08.02.10,03.03.10 and 31.03.2010
                 17/12/2009
537. Uttar       Media report of Amar    Corruption, Misuse of NREGA            Forwarded to the State             Reply is awaited
     Pradesh     Ujala, Lucknow,         fund                                   Government on 07.01.2010
                 Tuesday, dated:                                                reminder sent on
                 16/12/2009, District:                                          08.02.10,03.03.10 and 31.03.2010
                 Gonda
538. Uttar       Media report of         Irregularities work under NREGA        Forwarded to the State             Reply is awaited
     Pradesh     Awam-A-Hind, JP         by Gram Panchayat                      Government on 07.01.2010
                 Nagar,Amroha, dated:                                           reminder sent on
                 25/11/2009                                                     08.02.10,03.03.10
539. Uttar       Smt Debanti W/o Shri    Issuence of false job cards and late   Forwarded to the State             Reply is awaited
     Pradesh     Delip, Lalita Devi      payment of wages by panchayat          Government on 08.01.2010
                 W/o Shri Ramnath,       official/member                        reminder sent on
                 Sabitri W/o Shri                                               08.02.10,03.03.10 and 31.03.2010
                 Harishankar, Gita W/o
                 Shri Bechu, Villege
                 Chandrabar Dugeli,
                 Bikashkhand Rashra,
                 Janpad Balia, dated:
                 20/11/2009
540. Uttar     Shri Devmani             Worng distribution of job cards,        Forwarded to the State             Reply is awaited
     Pradesh   Gupta,NREGA              Fake muster rolls, Irregularities and   Government on 12.01.2010
               monitoring committee,    missuse of MGNREGA fund                 reminder sent on
               Gram Prabhari, Gram                                              08.02.10,03.03.10 and 31.03.2010
               Panchayat Bhattolia,
               Shetra Panchayat
               Ghorabal, Janpad
               Sonbhadra, dated:
               13/10/2009 &
               12/10/2009
541. Uttar     Shri Rajbahadur          Corruption, Irregular work and          Forwarded to the State             Reply is awaited
     Pradesh   Singh, Former District   misuse of NREGA fund by Shri            Government on 08.01.2010
               President Samajbadi      Chandravan Singh Patel, VDO             reminder sent on
               Party, Civil line,                                               08.02.10,03.03.10 and 31.03.2010
               Allhabad Road,
               Karbi,Janpad
               Chitrakut,dated:
               30/11/2009
542. Uttar     Shri Rameshwar           Recruitment and payment of Gram         Forwarded to the State             Reply is awaited
     Pradesh   Prasad                   Roger Sewak by State Government         Government on 19.01.2010
               Pandey,Chairman,                                                 reminder sent on
               Gram Vikash Adhikari                                             08.02.10,03.03.10 and 31.03.2010
               Sangha, Uttar Pradesh,
               dated: 20/11/2009
543. Uttar     Shri Pankaj Mishra       Corruption, Manipulation of job         Forwarded to the State             Reply is awaited
     Pradesh   S/o Shri Sattyadev       cards, and Missuse of MGNREGA           Government on 19.01.2010
               Mishra, Gram             by Gram Pradhan                         reminder sent on
               Panchayat Dhouli,                                                08.02.10,03.03.10 and 31.03.2010
               District Balia, dated:
               12/01/2010
544. Uttar     MGNREGA workers,         Corruption, Fake muster rolls,      Forwarded to the State             Reply is awaited
     Pradesh   Gram Amnabad,            Failure to pay minimum wages and    Government on 28.01.2010
               Basantnagar,             misuse of MGNREGA fund.             reminder sent on
               Ramnagar and                                                 08.02.10,03.03.10 and 31.03.2010
               Bhabanipur, Thesil
               Bilsi, Janpad Badaun,
               dated: 01/01/2010
545. Uttar     Mr. Surendra Prasad,     Regarding forge payment through     Forwarded to the State             Reply is awaited
     Pradesh   Ballia, Uttar Pradesh    fake vouchers                       Government on and 31.03.2010

546. Uttar     Shri Mabashiram, S./o    Mis-utilisation of Mahatma Gandhi   Forwarded to the State             Reply is awaited
     Pradesh   Shri Payrelal, village   NREGA fund.                         Government on 15/02/2010
               Tetali Nagla Mahadev,                                        reminder sent on 03.03.10 and
               Block Tundla, Thana                                          31.03.2010
               and Thesil Tundla,
               Firozabad, Uttar
               Pradesh
547. Uttar     Smt. Shila W/o Shri      Delay Payment of wages under        Forwarded to the State             Reply is awaited
     Pradesh   Ramesh Chandra,          Mahatma Gandhi NREGA                Government on 03/03/2010 by Fax
               Gram Chakoty, Bikash                                         and Post and reminder sent on
               Khand Kurara, Tehsil                                         31.03.2010
               and district Hamirpur,
               Uttar Pradesh
548. Uttar     Shri Mehabub Ali S/o     Misuse of Mahatma gandhi            Forwarded to the State             Reply is awaited
     Pradesh   Shri Mehmud Ali ,        NREGA fund by Gram Pradhan          Government on 03/03/2010 by Fax
               Gram Sabha Rasulpur      and Secretary                       and Post and reminder sent on
               Sikroda, Thana                                               31.03.2010
               Masuree, District
               Gaziabad, Uttar
               Pradesh
549. Uttar     Shri Birendra Singh,     Irregularities work under Mahatma      Forwarded to the State            Reply is awaited
     Pradesh   Gram sathoy, Block       Gandhi NREGA by Gram Pradhan           Government on 03/03/2010 by Fax
               Dibai, District                                                 and Post and reminder sent on
               Bulandshar, Uttar                                               31.03.2010
               Pradesh
550. Uttar     Workers, Gram            Coruption and Miss-utilisation of      Forwarded to the State          Reply is awaited
     Pradesh   panchayat Kundi,         Mahatma gandhi NREGA fund by           Government on 03/03/2010 by Fax
               Shetra Panchayat         faking muster rolls by Gram            and Post and reminder sent on
               Moop-Nigang, District    pradhan                                31.03.2010
               Jaunpur
551. Uttar     Shri Lakhan Singh,       Corruption and Mis-utilisation of      Forwarded to the State            Reply is awaited
     Pradesh   Dr. Ambedkar Jan,        Mahatma Gandhi NREGA fund by           Government on 16/03/2010 and
               Mahila, Bikalanga,       Gram Pradhan and BDO                   reminder sent on 31.03.2010
               kalyan Samity
               Daniapur,Dak Sefni,
               District Rampur, Uttar
               Pradesh.
552. Uttar     Villagers, Gram          Misutilisation of Mahatma Gandhi       Forwarded to the State            Reply is awaited
     Pradesh   Panchayat                NREGA fund by faking muster            Government on 16/03/2010 and
               Damodarpur, Amouly,      rolls and using poor materials for     reminder sent on 31.03.2010
               Janpad Fatehpur          the construction of road and cannel.
553. Uttar     Shri Chandrasen and      Corruption and Misuse of fund by       Forwarded to the State            Reply is awaited
     Pradesh   villagers, Gram          Gram Pradhan Secretary & BDO           Government on 16/03/2010 and
               Panchayat Hidelpura,     and withdrawl about Rs. 900000 by      reminder sent on 31.03.2010
               gram Galampura,          using fake muster rolls and
               Block &Tehsil            signature.
               Moumogarh, Janpad
               Jalaun, Uttar Pradesh
554. Uttar       Shri Shivnarayan s/o       Issuance of false Job Cards and      Forwarded to the State         Reply is awaited
     Pradesh     Shri Nandulal Ahrbar       delay payment of wages.              Government on 16/03/2010 and
                 and villagers, Jaraboli,                                        reminder sent on 31.03.2010
                 post Marouli, block
                 Baar, Tehsil
                 Mahoroni, District
                 Lalitpur, Uttar
                 Pradesh.
555.             Shri Kalyan singh, s/o     Corruption, irregular and issuance   Forwarded to the State         Reply is awaited
                 Shri Lalit Singh,          of false job cards under Mahatma     Government on 16/03/2010 and
       Uttar     Block Maau, Janpad         Gandhi NREGA.                        reminder sent on 31.03.2010
       Pradesh   Chitrakut, Uttar
                 Pradesh.
556. Uttar       Shri Emamuddin, s/o        Mis-utilisation of Mahatma Gandhi    Forwarded to the State         Reply is awaited
     Pradesh     Shri Mohd. Ishak,          NREGA fund by Secretary and          Government on 15/03/2010 and
                 Gram Sabha Meerpur,        Gram Pradhan.                        reminder sent on 31.03.2010
                 Karba, District
                 Bahraich, Uttar
                 Pradesh
557. Uttar       Shri Harendra Pratap       Corruption, irregular work and       Forwarded to the State         Reply is awaited
     Pradesh     Singh, Gram + Post-        misuse of fund by faking signature   Government on 15/03/2010 and
                 Dendasai, district         under Mahatma Gandhi NREGA.          reminder sent on 31.03.2010
                 Fatehpur, Uttar
                 Pradesh
558. Uttar       Shri Esrat Raies,          Corruption, irregular, fake muster   Forwarded to the State         Reply is awaited
     Pradesh     Member, Zilla              rolls and misuse of fund under       Government on 19/03/2010 and
                 Panchayat Banda            Mahatma Gandhi NREGA.                reminder sent on 31.03.2010
                 Uttar Pradesh,
                 Gram+Post- Kurehi,
                 District Banda, Awas
                 Allahabad-179, Uttar
                 Pradesh
559. Uttar      Dr. Arabind Singh      Corruption and misutilisation of        Forwarded to the State           Reply is awaited
     Pradesh    Kannajiya, Zilla       fund for the project of construction    Government on 19/03/2010 and
                Prabhari, NREGA        of ''Sauchalay'' under Sanitation       reminder sent on 31.03.2010
                Nigrani Samity,        Programme and Delay Payment of
                Janpad Hardoi, Uttar   wages failure to provide
                Pradesh. And Shri      employment under Mahatma
                Subash Chandra         Gandhi NREGA.
                Tiwari, NREGA
                Nigrani Samity, Gram
                Sabha Sokhpur
                Nagria, Bikash Khand
                Harpalpur, Hardoi.
560. Uttar      Shri Arbind Kumar      Failure to provide work and fake        Forwarded to the State           Reply is awaited
     Pradesh    Dixit s/o Shri Ram     muster rolls under Mahatma              Government on 29/03/2010 and
                Manohar Dixit,         Gandhi NREGA                            reminder sent on 31.03.2010
                Gram+post- Mobai,
                Vikash Khand -
                Vitora, Janpad-
                Fatehpur, Uttar
                Pradesh.
561. Uttar      Shri Ashok Kumar,      Misuse of fund by faking muster         Forwarded to the State           Reply is awaited
     Pradesh    Satantra Patrakar,     rolls and other issue under             Government on 29/03/2010 and
                Sadbhabna Bhawan,      Mahatma Gandhi NREGA                    reminder sent on 31.03.2010
                Naugarh, Janpad
                Chandoli, Uttar
                Pradesh-232111.
562. Uttarakha Shri Bindu Prasad       NREGS workers are not getting wages     Requested State Government for Reply is awaited
     nd        Routela,District        in time and the execution of the        investigation on 30.07.2009 and
                Cooperative Bank,      programme is beset with difficulties.   reminders sent on     21.08.2009
                Almora.                                                        & 05.11.2009
563. Uttarakha Shri Yugal Kishore,      Non – issuance of job cards, work not   Requested State Government for        Reply is awaited
     nd        Gram- Thunar, Post-      provided and discrimination against     investigation on 31.08.2009 and
                Bhriguklal, Garhwal     people in allotting of work in the      reminder sent on 05.11.2009
                District.               NREGS.

564. Uttarakha All workers of           Non- payment of remuneration from       Requested State Government for        Reply is awaited
     nd        MGNREGA District         July, 2009 under MGNREGA                investigation on 17.2.2010
                Champabat,
                Uttarakhand.
565. Uttarakha Sh. Sagat Singh Jeena,   Alleging manipulation of job cards,     Forwarded to the State                Reply is awaited
     nd        Member, Common           work not provided and                   Government on 31.3.2010
               cause/I.E.S.L. V.P.O     misappropriation of mahatma
               Simalkha, District       Gandhi NREGA fund.
               Nanitel, UA
566. West      Bali Tudu, vill.          Failure to provide work on time       Forwarded to State Government         Reply is awaited
     Bengal    Joypur, district          Favoring or discriminating            on 8.5.2008. Reminders sent on
               Hooghly, (Forwarded       against people allocating of job       23.5.08, 29.05.08, 5.06.08 ,
               by Prime Minister‟s       card under NREGA.                      23.1.09 , 27.05.09 21.08.2009 &
               Office)                                                          05.11.2009
567. West      Villager‟s of Magra-I    Embezzlement of funds                   Forwarded to State Government         Reply is awaited
     Bengal    Gram Panchayat,          Workers in worksite are children        on 8.5.2008. Reminders sent on
               block Chinsurah,         below 18 years of age in Magra-I        23.5.08, 29.05.08, 5.06.08, 23.1.09
               district Hooghly         GP                                      , 27.05.09 , 21.08.2009 &
                                                                                05.11.2009
568. West       Article in Statesman    NREGS Scam come under Scanner             Forwarded to the State              On the basis of the enquiry in
     Bengal     August 4, 2008                                                    Government on 4/08/2008 and         respect of the complaint
                                                                                  reminders sent on 23.1.09           Programme Officer and Block
                                                                                  ,27.05.09 , 21.08.2009 &            Development Officer,
                                                                                 05.11.2009                           Manikchak has lodged a
                                                                                                                      complaint at Manickchak
                                                                                                                      Police Station vide G.D. No.
                                                                                                                      1474 against paymaster
                                                                                                                      Humayun Kabir. ATR is
                                                                                                                      awaited
569. West     Article in The        Former CPM Pradhan charged              Forwarded to the State           Reply is awaited
     Bengal   Statesman             with misuse of funds                    Government on 26/08/2008 and
              August 25, 2008                                               reminders sent on 23.1.09 ,
                                                                            27.05.09 , 21.08.2009 &
                                                                            05.11.2009
570. West     Article in The        Police Say Poverty led to death in a    Forwarded to the State           Reply is awaited
     Bengal   Telegraph             family                                  Government on 18/08/2008 and
              August 14, 2008                                               reminder sent on 23.1.09 ,
                                                                            27.05.09 & 21.08.2009
571. West     Article in The        Death from hunger                      Forwarded to the State            Reply is awaited
     Bengal   Statesmen                                                    Government on 5.1.09 and
              Dated 30 December                                            reminders sent on 23.1.09 ,
              2008                                                         27.05.09, 21.08.2009 &
                                                                           05.11.2009
572. West     Article in The        Employment hard to come by as           Forwarded to the State           Reply is awaited
     Bengal   Statesman             crores lie unused                       Government on 13.02.09 and
              Dated 13th Feb 2009                                           reminders sent on 27.05.09 ,
                                                                            21.08.2009 & 05.11.2009
573. West     Shri Debashish        Fraud of Rs. 67,239/- and fake         Requested State Government for    On the basis of the enquiry the
     Bengal   Mahanta and Smt       muster rolls by Pradhan and            investigation on 11.05.2009 and   Programme Officer, Snamukhi
              Sunanda Saha, Gram    Nirman Sahayak in the construction     reminders sent on 27.05.09 ,      has lodged FIR against
              Panchayat Member,     of kachha Jore Bundh by earth at       21.08.2009 & 05.11.2009           delinquent persons. ATR is
              Pathar Mora Booth &   Tantir Bandh, Baltalardanga, Bara                                        awaited.
              Post Office Nutan     sanko, Ghat Muan, Moutala in
              Balan Rampur, Gram    Gram Panchayat Kochindi under
              Panchayat Kochdihi,   NREGA
              Block Sonamukhi,
              District Bankura
574. West     Shri.     Debashish corruptions in the work of          Requested State Government for   Allegation was largely been
     Bengal   Mahanta and Sunanda construction of kachha jore Bundh   investigation on 11.5.2009 and   substantiated in the enquiry.
              Saha,                by earth                           reminders sent on 21.08.2009 &   FIR has been lodged against
              Gram       Panchayat                                    05.11.2009                       delinquent persons, Smt Mala
              Kochdihi,                                                                                Mondal, Prodhan, Kochidi
              Bankura                                                                                  Gram Panchayat, Shri Dilip Kr
                                                                                                       Mukherjee, supervisor of the
                                                                                                       said scheme, Rajib Kr. Bid
                                                                                                       Nierman Sahayak, Kochidi
                                                                                                       Gram Panchayat at Sonamukhi
                                                                                                       Police Station vide FIR No.
                                                                                                       49/09 dated 24.08.2009. ATR
                                                                                                       is awaited.

								