Kingwood SN #43
2008 Action Plan Projects
Submitted: January 2008 1 of 22
SUBMITTAL YEAR
Review /
PRIORITY
PROJECT DESCRIPTION LOCATION DEPT Project ID # Status
SNAP ITEMS
1 Conduct traffic study of area around Kingwood Park Include the following intersections:
High School. Due to the recent opening of this new high 2600 North Park/3700 Bassingham;
school the traffic in this area and through the specified 3700 Bassingham/2700 Tinechester;
intersections has increased significantly. We would like 2500 North Park/3900 Forest Bluff;
to determine if traffic configuration changes or 3900 Forest Bluff/2500 Tinechester;
installation of new traffic signals might help alleviate 2300 Tinechester/3900 Hermitage
this congestion. Hollow; 3900 Hermitage Hollow/2300
Chanay Lane; 2300 Chanay PWE 6531-43 2008 Ineligible
Lane/4000 Woodland Hills; 3800
Woodland Hills/2200-2300 North
Park; 2100 Chanay Lane/3900 Glade
Valley; 3900 Glade Valley/2000 North
Park; 1900 North Park/3800 Hidden
Pines.
2 Add street signs to the major streets in the Kingwood Roads included are:
Area to remind drivers that they should share the road 1 - Kingwood Dr between Woodland
with bicycles. The intent is to increase public safety Hills Dr. and Mills Branch Rd
2 - North Park Dr between Woodland
Hills Dr. and Mills Branch Rd 6749-Kingwood Drive
3 - West Lake Houston Parkway 6750-North Park Drive
2008 Ineligible
between North Park Dr. and Roy Lee 6751-W. Lake Houston
Schultz Bridge 6752-Mills Branch Rd
4 - Mills Branch Rd between
Kingwood Dr and Ford Rd
3 Clean drainage swales along neighborhood streets in Kings Forest Drive
Kingwood's Kings Forest Village. The village has open
drainage versus the under-street drainage. The
drainage ditches become overgrown, which causes PWE 2008
backup of water during heavy rains.
3 Clean drainage swales along neighborhood streets in 2600-3000 blocks of Royal Circle
Kingwood's Kings Forest Village. The village has open Drive
drainage versus the under-street drainage. The
Completed
drainage ditches become overgrown, which causes PWE 6532-43 2008
5/20/2008
backup of water during heavy rains.
ec2f8e30-00f9-48f8-b667-0f70f3c16d50.xls Page 1 of 22 Pages 4/29/2010 - 4:25 AM
Kingwood SN #43
2008 Action Plan Projects
Submitted: January 2008 2 of 22
SUBMITTAL YEAR
Review /
PRIORITY
PROJECT DESCRIPTION LOCATION DEPT Project ID # Status
3 Clean drainage swales along neighborhood streets in 2400 block of Shady Run Drive
Kingwood's Kings Forest Village. The village has open
drainage versus the under-street drainage. The
Completed
drainage ditches become overgrown, which causes PWE 6533-43 2008
7/14/2008
backup of water during heavy rains.
3 Clean drainage swales along neighborhood streets in 1800-2400 blocks of Wood Estates
Kingwood's Kings Forest Village. The village has open Drive
drainage versus the under-street drainage. The
drainage ditches become overgrown, which causes PWE 6534-43 2008 Ineligible
backup of water during heavy rains.
3 Clean drainage swales along neighborhood streets in 2500-2800 blocks of Valley Manor
Kingwood's Kings Forest Village. The village has open Drive
drainage versus the under-street drainage. The Completed
drainage ditches become overgrown, which causes PWE 6535-43 2008
7/28/2008
backup of water during heavy rains.
3 Clean drainage swales along neighborhood streets in 2700-2800 blocks of Rock Wood
Kingwood's Kings Forest Village. The village has open Drive.
drainage versus the under-street drainage. The
drainage ditches become overgrown, which causes Note: I believe this should be Rocky PWE 6537-43 2008 Ineligible
backup of water during heavy rains. Roads Drive
3 Clean drainage swales along neighborhood streets in 2600 block of Royal Trail Drive
Kingwood's Kings Forest Village. The village has open
Referred to 3-1-1
drainage versus the under-street drainage. The PWE 6538-43 2008 Completed
drainage ditches become overgrown, which causes 05/20/2008
backup of water during heavy rains.
3 Clean drainage swales along neighborhood streets in 2700-2800 blocks Laurel Gardens
Kingwood's Kings Forest Village. The village has open Drive
drainage versus the under-street drainage. The
drainage ditches become overgrown, which causes PWE 6539-43 2008 Ineligible
backup of water during heavy rains.
ec2f8e30-00f9-48f8-b667-0f70f3c16d50.xls Page 2 of 22 Pages 4/29/2010 - 4:25 AM
Kingwood SN #43
2008 Action Plan Projects
Submitted: January 2008 3 of 22
SUBMITTAL YEAR
Review /
PRIORITY
PROJECT DESCRIPTION LOCATION DEPT Project ID # Status
3 Clean drainage swales along neighborhood streets in Twin Grove Drive
Kingwood's Kings Forest Village. The village has open
drainage versus the under-street drainage. The
drainage ditches become overgrown, which causes PWE 2008
backup of water during heavy rains.
5 Install a new concrete culvert below a public street. The Beneath Butter Cup Lane in the 1200
current culvert has become blocked or partially block (between the addresses of 1220
collapsed causing water to back up during a heavy rain. and 1221 Butter Cup Lane).
6540-43 2008
PWE Ineligible
6119-43 2006
6 Install a new concrete culvert below a public street. The Culvert is beneath either Forest Cove
current culvert has become blocked or partially Drive or Mistletoe Lane. The closest
collapsed causing water to back up during a heavy rain. address to the problem culvert is
1201 Mistletoe Lane.
6542-43 2008
PWE Ineligible
4904-43 2006
7 Replace culvert covers along Chestnut Ridge Road with Drainage culverts along Chestnut
incline-designed covers. The current design causes Ridge Road located at 1100 Southern 6578-1100 Southern Hills
debris to be caught on the covers causing the water to Hills, 1000 Castle Hill Trail, 1000 6579-1000 Castle Hill
back up during a heavy rain. Fairway Farms Lane, 1000 Masters 6580-1000 Fairway Farms 2008
Way, 1100 Golden Bear, and 1000 St. PWE Ineligible
6581-1000 Masters Way 2006
Andrews Road (no bars are over 6582-1100 Golden Bear
culvert currently but please review) 6583-1000 St. Andrews
10 9 Re-stripe the intersection to allow for an optional dual Intersection of Kingwood Drive and
left turn from the southbound lanes of Green Oak Drive Green Oak Drive
onto the eastbound lanes of Kingwood Drive. This item 6569-43 2008 Ineligible
PWE
is included in the Kingwood Transportation Mobility 5767-43 2005
Area Study in Mitigation Measure Number 9.
13 Re-configure traffic light and/or intersection to allow for Intersection of Kingwood Drive and
a protected left turn for traffic travelling northbound and Royal Forest Drive
PWE 2009 Ineligible
southbound through this intersection.
ec2f8e30-00f9-48f8-b667-0f70f3c16d50.xls Page 3 of 22 Pages 4/29/2010 - 4:25 AM
Kingwood SN #43
2008 Action Plan Projects
Submitted: January 2008 4 of 22
SUBMITTAL YEAR
Review /
PRIORITY
PROJECT DESCRIPTION LOCATION DEPT Project ID # Status
14 Re-synchronize traffic light to allow traffic traveling Intersection of Kingwood Drive and
northbound and southbound more time to pass through Chestnut Ridge Road PWE 2009 Ineligible
intersection.
15 Re-stripe Chestnut Ridge Road at intersection and mark Chestnut Ridge Road northbound
right turn lane as a right turn only lane. and southbound at intersection with PWE 2009 Ineligible
Kingwood Drive
16 Install a new flashing school zone beacon on Kingwood 3500 Kingwood Drive
Drive eastbound to indicate the school zone for
Kingwood High School. Beacon would be located one PWE 2009 Ineligible
block east of Country Club Road.
17 Add street signs along Hamblen Road to indicate shared Hamblen Road from Highway 59 east
use of roadway by vehicles and bicycles. to its terminus PWE 2009 Rejected
18 Plant trees in esplanade of Kingwood Drive between Kingwood Drive esplanade between
Chestnut Ridge Road and Green Oak Drive Chestnut Ridge Road and Green Oak PARKS 7012 2009 Accepted
Drive
19 Provide water for the landscaping on City property near 6400 Kingwood Drive
the City of Houston water well PARKS 2009 Reviewing
20 Replace existing culvert under a public street with a Culvert beneath Sycamore Lane at its
larger diameter pipe. The current pipe is not large current location between the
enough to efficiently carry off the large volume of water properties numbered 1311 and 1401
during a heavy rain on the north, and properties 6567-43 2008
PWE Ineligible
numbered 1310 and 1400 on the 4904-43 2006
south.
Restripe streets located in the Forest Cove Subdivision. Bounded by Kingwood Drive on the
The streets of Forest Cove Subdivision were resurfaced north side, San Jacinto River on the
by the city, but wer not restriped after the resurfacing south side, the west branch of the
was completed. Ben's Branch Drainage Ditch on the Completed
PWE 6573 2008
east side and Loop 494 on the west 1/1/2008
side.
ec2f8e30-00f9-48f8-b667-0f70f3c16d50.xls Page 4 of 22 Pages 4/29/2010 - 4:25 AM
Kingwood SN #43
2008 Action Plan Projects
Submitted: January 2008 5 of 22
SUBMITTAL YEAR
Review /
PRIORITY
PROJECT DESCRIPTION LOCATION DEPT Project ID # Status
Add a bike lane along Hamblen Road Between Highway 59 east to its
terminus (dead-end)
PWE 7013 2009 Pending
Stripe street along Chestnut Ridge Road Between Rockmead to St. Andrews
PWE 7011 2009 Ineligible
Install equipment that would allow for remote Along Kingwood Drive from Loop 494
sychronization of Kingwood Drive traffic signals from to Willow Terrace
the TranStar office. Project ID is 5458-43.
PWE 6584 2008 Ineligible
CIP ITEMS
1 15 Construct additional two lanes on North Park Drive Northpark Drive from east of West
Lake Houston Parkway to existing PWE 502-43 2001 Accept
four-lane section near Maple Park.
2 Acquire a recreational community center in the Kingwood/Forest Cove Area
Kingwood/Forest Cove Area 3681-43
PRK 2002 Accept
CIP# F-0504C
3 Construct additional fire station Kingwood Area located between Hwy
59, San Jacinto River, North Park
BSD 2007
Drive and Mills Branch Drive
4 Construct additional fire station West side of Highway 59 in area near
the Lonestar College-Kingwood or
BSD 2008
the Kingwood Medical Center
ec2f8e30-00f9-48f8-b667-0f70f3c16d50.xls Page 5 of 22 Pages 4/29/2010 - 4:25 AM
Kingwood SN #43
2008 Action Plan Projects
Submitted: January 2008 6 of 22
SUBMITTAL YEAR
Review /
PRIORITY
PROJECT DESCRIPTION LOCATION DEPT Project ID # Status
5 Connect the Kingwood Area with Lake Houston Park South end of Lake Houston Park that
with a footbridge across Caney Creek and expand the is bordered by Caney Creek
natural trail system into the southern half of Lake PRK 2008
Houston Park.
6 Establish a linear park containing hike and bike trails in Designated flood prone areas located
designated flood prone areas in Forest Cove Subdivision by the
San Jancinto River. Closest street is PRK 5670-43 2004
Aqua Vista (Key Map 336J)
7 Install back-up generators for 32 of the Kingwood waste Kingwood waste water lift stations
water lift stations that do not currently have a back-up located throughout the Kingwood
generator. Area. Svern Trent has specific 2009
locations.
8 Connect the two segments of Green Oak Drive across Green Oak Drive where it intersects
the Harris County Flood Control District drainage ditch. with Stonehollow Drive. PWE 2008
9 Conduct a study of the electrical grid that provides Kingwood Area located between Hwy
power to the Kingwood Area and implement any 59, San Jacinto River, North Park
identified improvements that would prevent catatrophic Drive and Mills Branch Drive 2009
power outages.
10 N Replace asphalt on North Park Drive with concrete and North Park Drive between US 59 and
rebar. Loop 494 PWE CIP# N-1316 2005 Accept
11 3 Extend NB right turn storage by 100' Kingwood Dr. & Loop 494
PWE 5768-43 2005 Reject
12 Replace asphalt on Woodland Hills Drive with concrete 4302 Woodland Hills Drive. Portion of
and rebars. Woodland Hills Drive that extends
between the Kingwood Park High
School north parking lot entrance PWE 2009
and the entrance to North Park
Recreation Area.
13 Add left turn lane on Hamblen Road eastbound. Intersection of Hamblen Road and
Burning Tree PWE 2009
14 Add left turn lane on Hamblen Road eastbound. Intersection of Hamblen Road and
Laurel Springs PWE 2009
15 13 Improve the geometrics of the Oakwood Forest Drive Oakwood Forest Dr. and Sandy Forks
and Sandy Forks Drive intersections with West Lake Dr. @ West Lake Houston Pkwy.
Houston Pkwy as designed in the Kingwood PWE 506-43 2001 Accept
Transportation Mobility Study.
ec2f8e30-00f9-48f8-b667-0f70f3c16d50.xls Page 6 of 22 Pages 4/29/2010 - 4:25 AM
Kingwood SN #43
2008 Action Plan Projects
Submitted: January 2008 7 of 22
SUBMITTAL YEAR
Review /
PRIORITY
PROJECT DESCRIPTION LOCATION DEPT Project ID # Status
16 6 Extend NB left turn storage by 150' and extend EB left Kingwood Dr & West Lake Houston
turn storage by 75' Pkwy
PWE 5766-43 2005 Accept
17 16 Add NB right turn lane on West Lake Houston Parkway West Lake Houston Pkwy & Brook
Shadow Dr.
PWE 5771-43 2005 Accept
18 17 Add second NB left turn lane; extend NB and WB left North Park Dr. & Woodland Hills Dr.
turn storage by 100' and extend EB left turn storage by PWE 5770-43 2005 Accept
150'
19 10 Extend all left turn storage lanes by 75' Kingwood Drive @ Woodland Hills
Drive PWE 497-43 (Revise) 2001 Accept
20 11 Extend NB left turn storage by 75 feet North Park Dr. & West Lake Houston
Pkwy. PWE 5764-43 2005 Accept
21 Work with railroad company to completely redo the Hamblen Road near Highway 59.
railroad crossing on Hamblen Road including improving
2009
the approach on both sides of the tracks.
22 Construct additional two lanes on Milld Branch Drive Mills Branch Drive between
Kingwood Drive and Dogwood Acres PWE 6406-43 2007 Pending
SAFE SIDEWALK PROGRAM
1 Construct a sidewalk The south side of Mills Branch Drive
from North Park Drive to connect to Approved for
an existing greenbelt north of Clover PWE 2006 Safe Sidewalk
Valley Drive. Program
2 Extend a sidewalk On the north side of Kingwood Drive
from Kings Crossing Apartments Approved for
east to existing greenbelt near Forest PWE 2007 Safe Sidewalk
Garden. Program
Construct a sidewalk North side of Sandy Forks Drive from
Woodbridge to connect to an existing
sidewalk that leads to Creekwood PWE 2006
Middle School.
ec2f8e30-00f9-48f8-b667-0f70f3c16d50.xls Page 7 of 22 Pages 4/29/2010 - 4:25 AM
Kingwood SN #43
2008 Action Plan Projects
Submitted: January 2008 8 of 22
SUBMITTAL YEAR
Review /
PRIORITY
PROJECT DESCRIPTION LOCATION DEPT Project ID # Status
Construct a sidewalk Hidden Pines from Wilderness Point
northbound to Aspen Glade to
connect to an existing greenbelt on PWE 2006
the south side of North Park Drive.
Extend a sidewalk On Lake Creek to connect to an
existing greenbelt leading to the
PWE 2006
Woodland Hills Elementary School.
Construct a sidewalk From the existing greenbelt on the
south side of North Park Drive across
the median on the west side of Glade
Valley to connect with existing PWE 2006
sidewalk leading to Chanay Lane and
Kingwood Park High School.
Extend a sidewalk Extend the sidewalk on the west side
of Plum Valley to connect to an
existing greenbelt on North Park PWE 2006
Drive.
Extend a sidewalk Extend the new sidewalk northbound
on the west side of Havenbrook to PWE 2006
Sandy Forks Drive.
Extend a sidewalk Extend the sidewalk on the south
side of Rockmead Drive from where it
currently ends east of Chestnut PWE 2009
Ridge Road westbound to Royal
Forest Drive.
Construct a sidewalk On the east side of Royal Forest
Drive from Rockmead Drive south to
PWE 2009
Kingwood Drive.
Construct a sidewalk On the south side of Kingwood Drive
from Chestnut Ridge Road
PWE 2009
westbound to Loop 494
Extend a sidewalk Extend the sidewalk north of
Kingwood Drive from where it ends
east of Royal Forest Drive westbound PWE 2009
to Loop 494.
ec2f8e30-00f9-48f8-b667-0f70f3c16d50.xls Page 8 of 22 Pages 4/29/2010 - 4:25 AM
Kingwood SN #43
2008 Action Plan Projects
Submitted: January 2008 9 of 22
SUBMITTAL YEAR
Review /
PRIORITY
PROJECT DESCRIPTION LOCATION DEPT Project ID # Status
Construct a sidewalk Along north side of Kingwood Drive
from Chestnut Ridge to Lone Star
College - Kingwood.
ITEMS REPORTED ON 311
NON-CITY ITEMS
1 Extend the left turn lane on Kingwood Drive westbound Kingwood Drive from Loop 494 to
from Loop 494 all the way to Royal Forest Drive. Royal Forest Drive TxDOT 2007
495-43 2001 Referred
CIP# N-0644
2 Clean drainage ditch that runs under North Park behind North Park Drive west of North
North Woodland Hills Village. Woodland Hills Village
3 Build pedestrian bridge across Harris County Flood Forest Cove-East end of masters way
Control Ditch OTA 4910-43 2003 Evaluate
4 Analyze options for preventing flooding along the San Lake Houston and San Jancinto River
Jacinto River in Lake Houston Area (e.g. modify spillway areas
HCFC 5671-43 2004 Reject
for early release).
ec2f8e30-00f9-48f8-b667-0f70f3c16d50.xls Page 9 of 22 Pages 4/29/2010 - 4:25 AM
Kingwood SN #43
2008 Action Plan Projects
Submitted: January 2008 10 of 22
Notes
2008: This requiest has been entered as 08-00149078 on
05/23/08 for Modify Existing Signal. This request has a set
duration of 30 days. Cost estimate: $10,000 for the entire
study. Current budget does not allow for such a study.
2008: Not eligible as a SNAP item. These requests have
been referred to the Bikeway Program.
5/20/2008: Complete 2008: Requests for ditch regrades are
not a SNAP item, however, this request will be handled
through our normal 3-1-1 process. The ditch willl be evaluated
within 21 days and regraded if needed within 90 days. The
requestor can contact 3-1-1 to check the status of this request
(08-00142053). May 20, 2008.
ec2f8e30-00f9-48f8-b667-0f70f3c16d50.xls Page 10 of 22 Pages 4/29/2010 - 4:25 AM
Kingwood SN #43
2008 Action Plan Projects
Submitted: January 2008 11 of 22
Notes
2008: Requests for ditch regrades are not a SNAP item,
however, this request will be handled through our normal 3-1-1
process. The ditch willl be evaluated within 21 days and
regraded if needed within 90 days. The requestor can contact
3-1-1 to check the status of this request (08-00142051). July
14, 2008.
2008: Requests for ditch regrades are not a SNAP item,
however, this request will be handled through our normal 3-1-1
process. The ditch willl be evaluated within 21 days and
regraded if needed within 90 days. The requestor can contact
3-1-1 to check the status of this request (08-00142050). Aug
15, 2008. There was no ditch at this location; investigated
8/15/08.
2008: Requests for ditch regrades are not a SNAP item,
however, this request will be handled through our normal 3-1-1
process. The ditch willl be evaluated within 21 days and
regraded if needed within 90 days. The requestor can contact
3-1-1 to check the status of this request (08-00142048).July
28, 2008.
2008: Requests for ditch regrades are not a SNAP item,
however, this request will be handled through our normal 3-1-1
process. The ditch willl be evaluated within 21 days and
regraded if needed within 90 days. The requestor can contact
3-1-1 to check the status of this request (08-00142047).June
17, 2008. The ditch was on grade; no work needed;
investigated 6/17/08.
2008: Item referred to 3-1-1. Right of Way Maintenance
completed regrading 590 feet of ditch at this location (08-
00142054).
2008: Requests for ditch regrades are not a SNAP item,
however, this request will be handled through our normal 3-1-1
process. The ditch willl be evaluated within 21 days and
regraded if needed within 90 days. The requestor can contact
3-1-1 to check the status of this request (08-00142044).June
17, 2008. The ditch was on grade; no work needed;
investigated 6/17/08.
ec2f8e30-00f9-48f8-b667-0f70f3c16d50.xls Page 11 of 22 Pages 4/29/2010 - 4:25 AM
Kingwood SN #43
2008 Action Plan Projects
Submitted: January 2008 12 of 22
Notes
2006: Item identified during the evaluation of drainage and
flooding problems in the Forest Cove area.
2008: Right of Way Maintenance investigated this request
and determined the ditch to be on grade and found no
collapsed culvert that is preventing water flow (08-00142036)
May 21, 2008.
2006: Item identified during the evaluation of drainage and
flooding problems in the Forest Cove area. Project ID# 4904-
43)
2008: Right of Way Maintenance investigated this request
and determined the ditch to be on grade and found no
collapsed culvert that is preventing water flow (08-00142041)
May 30, 2008.
2008: Right-of-Way & Fleet Maintenance investigated this
requrest in the past. The current grate design is within the
city's design specifications as stated in Chapter 9 of the
Design Manual. There are no plans to replace the ring grates.
08-00142182, June 2, 2008.
2005: Part of the Kingwood Mobility Study. (Study #9)
2008: Per SR # 08-00148966 completed on 05/23/08. Due to
the gometrical layout of the intersection and turning radius of a
dual left turn lane, this request cannot be recommended.
This request was deemed to be a 311 request.
ec2f8e30-00f9-48f8-b667-0f70f3c16d50.xls Page 12 of 22 Pages 4/29/2010 - 4:25 AM
Kingwood SN #43
2008 Action Plan Projects
Submitted: January 2008 13 of 22
Notes
This request was deemed to be a 311 request.
This request was deemed to be a 311 request.
This request was deemed to be a 311 request.
The City does not add signs for bicycles on streets that are not
designated as part of the bikeway program.
Scheduled; estimated start date of 10/1/09; estimated
completion date of 2/1/10.
Need to research to determine parameters of the request
CIP item identified during the evaluation of drainage and
flooding problems in the Forest Cove area. Project ID# 4904-
43)
Right of Way Maintenance investigated this request and
determined that the property owner is responsible for repairing
his driveway culvert. (08-00142060) May 21, 2008.
TTD will coordinate with ROW & Maintenance to plan the
restriping of these streets. Cost per linear foot is approx.
$1.50.
ec2f8e30-00f9-48f8-b667-0f70f3c16d50.xls Page 13 of 22 Pages 4/29/2010 - 4:25 AM
Kingwood SN #43
2008 Action Plan Projects
Submitted: January 2008 14 of 22
Notes
We will evaluate this request as part of the update of the City
Bikeway Master Plan. The update of the master plan is
currently underway and a draft will be made available to the
public in October 2009.
Per service request 09-00069196: An investigation was
conducted on 3/17/09 by 12:00 pm at 2900 Chestnut between
Rockmead and St. Andrews in reference to Lane Lines. This
is a 27' wide residential street. Investigation revealed existing
double yellow center line with white buttons on Chestnut from
the 1900 (Chestnut @ St. Andrews) to the 2300 block. There
are also continuing existing white buttons center line from the
2300 block to where Chestnut intersects with Rockmead. No
mobility or visibility of this project is in
The estimated cost problem was noted.excess of
$1,000,000.00. The customer has been notified that this
project would have to be funded as a CIP project.
Part of Kingwood Mobility Study. (Study #15)
Site purchased construction set for FY06
On CIP list; New library to be built on purchased site; Old
library to be renovated into a Community Center.
This project will require CIP funding and will be included in the
Planning database for consideration in a future CIP. Not
included in the 2007-2011 CIP Budget.
ec2f8e30-00f9-48f8-b667-0f70f3c16d50.xls Page 14 of 22 Pages 4/29/2010 - 4:25 AM
Kingwood SN #43
2008 Action Plan Projects
Submitted: January 2008 15 of 22
Notes
Design FY04 and Construct FY06. In conjunction with TXDOT
project
Included in TxDOT's reconstruction of Loop 494 in FY08. Part
of Kingwood Mobility Study. (Study #3)
Construction estimated to begin in FY08 - Part of Kingwood
Mobility Study. (Study #13)
ec2f8e30-00f9-48f8-b667-0f70f3c16d50.xls Page 15 of 22 Pages 4/29/2010 - 4:25 AM
Kingwood SN #43
2008 Action Plan Projects
Submitted: January 2008 16 of 22
Notes
Design funded during FY06. Funding of construction to be
considered during FY07. 11/15/05 - 75% of design completed.
1/12/06 - Construction estimated to begin 10/31/07. - Part of
the Kingwood Mobility Study. (Study #6)
1/12/06 - Construction estimated to begin 1/1/09. - Part of the
Kingwood Mobility Study. (Study #16)
1/12/06 - Construction estimated to begin 1/1/09. - Part of the
Kingwood Mobility Study. (Study #17)
1/12/06-Construction estimated to begin 10/31/07. Part of
Kingwood Mobility Study. (Study #10)
1/12/06 - Construction estimated to begin 10/31/07. - Part of
the Kingwood Mobility Study. (Study #11)
2007: This project will require CIP funding and will be included
in the Planning database for consideration in a future CIP. Not
included in the 2007-2011 CIP Budget.
Specific sidewalk request for evaluation of admissibility into
the City's safe sidewalk program. (Project ID# 3684-43)
Specific sidewalk request for evaluation of admissibility into
the City's safe sidewalk program. (Project ID# 3684-43)
Specific sidewalk request for evaluation of admissibility into
the City's safe sidewalk program. (Project ID# 3684-43)
ec2f8e30-00f9-48f8-b667-0f70f3c16d50.xls Page 16 of 22 Pages 4/29/2010 - 4:25 AM
Kingwood SN #43
2008 Action Plan Projects
Submitted: January 2008 17 of 22
Notes
Specific sidewalk request for evaluation of admissibility into
the City's safe sidewalk program. (Project ID# 3684-43)
Specific sidewalk request for evaluation of admissibility into
the City's safe sidewalk program. (Project ID# 3684-43)
Specific sidewalk request for evaluation of admissibility into
the City's safe sidewalk program. (Project ID# 3684-43)
Specific sidewalk request for evaluation of admissibility into
the City's safe sidewalk program. (Project ID# 3684-43)
Specific sidewalk request for evaluation of admissibility into
the City's safe sidewalk program. (Project ID# 3684-43)
ec2f8e30-00f9-48f8-b667-0f70f3c16d50.xls Page 17 of 22 Pages 4/29/2010 - 4:25 AM
Kingwood SN #43
2008 Action Plan Projects
Submitted: January 2008 18 of 22
Notes
Reported at Councilperson Mike Sullivan's town hall meeting
on October 13, 2009. It will be constructed by the City of
Houston.
Submitted as input for project to reconstruct Loop 494
Refer to Kingwood Mobility Study
Contact Army Corp of Engineers
ec2f8e30-00f9-48f8-b667-0f70f3c16d50.xls Page 18 of 22 Pages 4/29/2010 - 4:25 AM
Kingwood SN #43
2008 Action Plan Projects
Submitted: January 2008 19 of 22
SUBMITTAL YEAR
PRIORITY
PROJECT DESCRIPTION LOCATION DEPT Project ID # Review
COMPLETED / CANCELLED
3 1 Mobility Improvements at Kingwood High School: A) Kingwood Drive from Valley Manor PWE 498-43 2001 Completed in 2007
Close first median cut east of Valley Manor on to Kingwood Golf Course private 4906-43 2003
Kingwood Dr. B) Convert high school west driveway drive 4907-43
into a right-out only configuration. C) Convert the high (Revise)
school central driveway into a right-in only
configuration. D) Reconstruct the second median cut
east of Valley Manor on Kingwood Dr. to allow for
eastbound left turns and U-turns only. E) Signalize and
widen the third median cut east of Valley Manor on
Kingwood Dr. F) Create a right turn lane on Kingwood
Drive westbound at the high school east driveway using
existing curb lane and shift the two through lanes into
the median. G) Construct an eastbound left turn lane at
third median cut east of Valley Manor.
Improve the timing of the traffic signal at the Intersection of Russell Palmer Road Mont- 2008 Completed
intersection of Russell Palmer Road and North Park and North Park Drive gomery
Drive. County
Construct a dog park Kingwood/Forest Cove Area PRK 2006 Cancelled
Repair intersection. Complete full-depth repairs of Loop 494 and Kingwood Drive 311 4908-43 2003 Cancelled
roadway with concrete and rebar.
Repair intersection. Complete full-depth repairs of Loop 494 and North Park Drive 311 4909-43 2003 Cancelled
roadway with concrete and rebar.
4 Increase the number of times during the year, from 4 to Main thoroughfares include PWE 2008 Cancelled
6 times, that a street sweeper sweeps the main Kingwood Drive, North Park Drive,
thoroughfares in the Kingwood Area. The large amount Woodland Hills Drive, and West Lake
of leaves and grass clippings that fall in the street, if not Houston Parkway
swept up, end up in the street drains causing water to
back up during heavy rains.
Raise and/or replace an existing culvert with a larger Culvert beneath Sweet Gum Lane at PWE
diameter pipe. its current location between the
properties numbered 1311 and 1401
2007
on the north, and properties 6402-43 Complete
2006
numbered 1310 and 1400 on the
south.
ec2f8e30-00f9-48f8-b667-0f70f3c16d50.xls Page 19 of 22 Pages 4/29/2010 - 4:25 AM
Kingwood SN #43
2008 Action Plan Projects
Submitted: January 2008 20 of 22
SUBMITTAL YEAR
PRIORITY
PROJECT DESCRIPTION LOCATION DEPT Project ID # Review
Raise and/or replace an existing culvert with a larger Culvert beneath Walnut Lane at its PWE
diameter pipe. current location between the
properties numbered 1311 and 1401 2007
on the north, and properties 6403-43 Complete
2006
numbered 1310 and 1400 on the
south.
Raise and/or replace an existing culvert with a larger Culvert beneath Magnolia Lane at its PWE
diameter pipe. current location between the
properties numbered 1311 and 1401
2007
on the north, and properties 6404-43 Complete
2006
numbered 1310 and 1400 on the
south.
12 Install left turn lane westbound on North Park Drive @ Northpark & Hidden Pines Dr.
Hidden Pines (major thoroughfare)
PWE 6415-43 2007 Complete
ec2f8e30-00f9-48f8-b667-0f70f3c16d50.xls Page 20 of 22 Pages 4/29/2010 - 4:25 AM
Kingwood SN #43
2008 Action Plan Projects
Submitted: January 2008 21 of 22
Notes
Part of Kingwood Mobility Study.11/1/05 - Signals constructed
and operational. Design is 90% complete; construction funded
for FY06. (Study #1)
Request cancelled by SNC
We were advised that this is not a SNAP item. Street
Sweeping is a finance issue. The City of Houston PWE Dept.
is only budgeted to sweep major thoroughfares in the City of
Houston four times per year. To alter this program is getting
more funding put in the budget to do more sweeping. PWE
has briefed Council Member Mike Sullivan on this issue.
2006: CIP item identified during the evaluation of drainage
and flooding problems in the Forest Cove area.
2008: This request has been investigated and determined that
property owners are responsible for upgrading and maintaining
their culverts (07-001030005)
ec2f8e30-00f9-48f8-b667-0f70f3c16d50.xls Page 21 of 22 Pages 4/29/2010 - 4:25 AM
Kingwood SN #43
2008 Action Plan Projects
Submitted: January 2008 22 of 22
Notes
2006: CIP item identified during the evaluation of drainage
and flooding problems in the Forest Cove area.
2008: This request has been investigated and determined that
property owners are responsible for upgrading and maintaining
their culverts (07-001030009)
2006: CIP item identified during the evaluation of drainage
and flooding problems in the Forest Cove area.
2008: This request has been investigated and determined that
property owners are responsible for upgrading and maintaining
their culverts (07-001030022)
2008: Per service request 07-00104699 completed on
04/20/2007, the pavement markings are visible and in good
condition. No further action is needed at this time
ec2f8e30-00f9-48f8-b667-0f70f3c16d50.xls Page 22 of 22 Pages 4/29/2010 - 4:25 AM