US ITER Project Plans David Johnson Diagnostics Team Leader March 26, 2007 ITPA12 • • • • • Design Basis US Scope Port Plugs and Integration Assessment Studies Schedule/Milestones 1 ITPA12 Diagnostics - PPPL - 3/26-30/07 Scope Definition DWG Agreement Forms Basis for Sharing • 2004 DWG Sharing Agreement is basis for defining US diagnostic share at 16% – Features „port-based‟ repackaging - different arrangement of diagnostics from 2001 – Also places responsibility for integration of diagnostics with plug providers – Revision underway to accommodate India -Not yet fully endorsed When compared with 2001 Basis for determining ITER „credit‟, some scope ambiguity exists, e.g. – DWG added scope for MSE (2 vs 1 view) and for plug integration relative to 2001 Design – US scope/credit may change to accommodate India New procurement arrangements, incorporating „port-based packaging‟ need to be negotiated to remove ambiguity. USIPO will not be able to place large design contracts until ambiguities are better resolved. Party Package number 16 25 1 2 11 14 27 8 9 17 24 26 4 5 6 15 19(1) 23 29 3 10 12 13(2) 18 28 7 21 22 30(3) 20 31 32 Ports Lead Diagnostic CN EU E12 U1, U14 U3 E1 E10 U10 U11 L2 U6 U7, U2 U8 E11 L10 U5 U17 E3 E9 L8 U9 L16 L14 Visible Continuum Array Neutron Flux Monitors (ext) Plasma Position Reflectometer CXRS (core) Radial Neutron Camera Thomson Scattering (c ore) Thermocouples (div-outer) Polarimeter Thomson Scattering (e dge) Impurity Influx Monitor (div) Microfission Chambers Thermocouples (div-inner) VUV (Main Plasma) H Alpha Reflectom (main plas Š HFS) NPA Thomson Scattering ( X-point) Vertical Ne utron Camera CXRS (edge) Visible/IR Cameras (upper) Reflectom (main plas Š LFS) MSE ECE (main plasma) Interferometer (divertor) RGA X-ray Crystal Spectrometer Bolometers Magnetics, Thermocouples(invess) Diagnostic In- vessel services Reflectometer (divertor) Ex- Bioshield Elec Equipment Window assemblies Credit value % 2.0 1.3 2.7 1.2 5.6 6.0 0.1 4.0 3.6 5.3 1.2 0.1 3.3 2.1 1.2 3.3 4.8 1.3 1.0 1.8 2.5 2.4 4.6 2.5 2.1 2.0 5.7 2.2 Total % 3.3 15.6 T JA 14.2 • KO RF 3.3 13.6 US 16.0 • • Flex Host 7.8 4.4 Fund 2.2 4.3 2.3 4.7 Total Standard deviation from target 21.9 100 1% 2 ITPA12 Diagnostics - PPPL - 3/26-30/07 US Diagnostic Packages WBS 1.5.3.1 1.5.3.2 1.5.3.3 1.5.3.4 1.5.3.5 1.5.3.10 1.5.3.6 1.5.3.7 1.5.3.8 1.5.3.9 1.5.3.11 Instrume ntaton Package s i Upper IR/Visible Cameras Low Field Side Reflectometry Motional Stark Effect Electron Cyclotron Emission Divertor Interferometer Toroidal Interferometer/Polarimeter Residual Gas Analyzer Port Package s Upper Ports (U5, U17) Equatorial Ports (E3, E9) Lower Port Structures (L8) Diagnostic Management Packages inclu design, fabrication, de assembly and testing of US port plugs Preliminary integration assum to be ed done by IT – subject to IT approval. Oversight and coordination Scope Packages inclu ‘front-end’ viewing de optics, relayoptics or waveguides in the ports, along with additional relay systems to bri g signals to diagnostic n hall, and source and detector hardware in the diagnostic hall. Some have viewing systems in ports provided by other parties. Package includes oversight of testing on ports prior to shipment to ITER Requirements not well defined 3 ITPA12 Diagnostics - PPPL - 3/26-30/07 Diagnostic Front-End Integration • Design constraints – Intermingling of numerous labyrinths, many with precision optics – Provide access while limiting neutron streaming – Provide attachments and cooling to blanket shield modules • Plug E3 is a US responsibility (DWG Sharing Agreement) – Many other diagnostics need to be integrated into plug E3  > 2 visible/IR camera views (EU)  2 edge CXRS views (RF)  2 H arrays (RF)  X-ray crystal views (possible) (??) • The division of integration design responsibility between the IT and the parties has not been fully negotiated. 4 ITPA12 Diagnostics - PPPL - 3/26-30/07 Development of Radial Diagnostic Cassettes • Radial cassettes may make integration and testing easier. • May also make maintenance easier. 5 ITPA12 Diagnostics - PPPL - 3/26-30/07 Central Tube Development for Upper Ports • Metal seal, removable back plate gives access to central tubes. • Back plate has only windows. “Hard” feedthrus on side panels 6 ITPA12 Diagnostics - PPPL - 3/26-30/07 Developing Neutronics Capability with ATILLA Tetrahedral Mesh - 496k Cells • ATILLA, a discrete-ordinates, radiation transport code produced by Transpire, Inc., is being benchmarked for use on ITER. • In the US, this work is a joint PPPL/UCLA effort well connected to IO and EU efforts. (See Talk by R. Feder later today) • Potentially essential tool for qualifying diagnostic labyrinth designs. 7 ITPA12 Diagnostics - PPPL - 3/26-30/07 Assessment Studies • For the US instrument development, near-term priorities were • • • • • presented to the community and widely distributed last Spring. Priorities stressed better definition of instrument front-end configurations, performance assessments, consideration of alternate approaches and tool development. ~ 40 discussions with experts concerning these priority issues and relevant capabilities were documented. Awards for a total of 14 studies (including 2 cost studies) were made in summer and fall. Results will be presented at this meeting. All studies are completed or nearing completion  75% of reports have been submitted. Final reports will be placed on ITER IDM system. • 8 ITPA12 Diagnostics - PPPL - 3/26-30/07 Assessment Studies Diagnostic Package Upper Visible/IR Camera MSE MSE MSE LFS Reflectometer ECE ECE Divertor Interferometer RGA Tang. Interfer./Polarimeter First Mirror R&D Neutronics Analysis Task Summary assess optical design, central tube concept assess usefulness of |B| determination performance simulation of conventional polarimetry approach optimization of optical design determine optimum frequency bands and polarizations investigate non-thermal issues, use of oblique view review reference design develop conceptual design develop conceptual design optimize reference design model erosion/deposition on 1st mirrors benchmark neutronics models for plug integration using ATILLA Institution(s) LLNL NOVA PPPL LLNL UCLA PPPL U. Texas-U. MdMIT GA-UCLA ORNL UCLA-GA ANL UCLA-PPPL Personnel C. Lasnier, M. Fenstermacher, M. Groth, L. Seppala, K. Morris, E. Synakow ski F. Levinton, H. Yuh, J. Foley S. Scott, B. Stratton Steve Allen, J. Jayakumar, S. Lerner, M. Makow ski, C. Holcomb, N. Wong, E. Synakow ski T. Peebles, E. Doyle, T. Rhodes, L. Schmitz, L. Zeng, S. Kubota, P. Gourdain, G. Wang G. Taylor, P. Efthimion M. Austin, P. Phillips, R. Ellis, A. Hubbard, Bill Row an T. Carlstrom, D. Brow er, Rejean Boivin, M. VonZeeland, B. Deng, W. Ding W. Gardner, D. Hillis D. Brow er, T. Carlstrom, M. VonZeeland, Rejean Boivin, W. Ding, B. Deng J. Brooks, J. P. Allain, A. Hassanein, M. Nieto M. Youssef, R. Feder, R. Shaefer, M. Dagher 9 ITPA12 Diagnostics - PPPL - 3/26-30/07 Next Round of Studies • Large procurements to design and fabricate US ITER diagnostics will begin in FY08. • To advance front-end design and integration, there will be a second round of studies, beginning this Summer. • Plan discussions over the next month regarding new design tasks and potential R&D areas. – These will be documented as before in „Records of Discussion‟. • As designs become better defined, also plan to fund costing studies to improve confidence as Project Cost Baseline is established. 10 ITPA12 Diagnostics - PPPL - 3/26-30/07 Schedule/Milestones IO Activities (Near-Term) Prelim/Final DWG Sharing Port Engineering Task Force Ongoing ITER Design Review ITER Diagnostic Design Review Issuance of First US Procurement Arrangement Coordinate Integration Between DAs FY04 FY05 FY06 Need Date for 1st PP PETF FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 CD-2 Baseline Target US Activities Assessment Studies 1 Assessment Studies 2 First Major Instrument Procurement Ex-cryostat Components First Instrument Front-end Components design R&D design complete integration Diagnostic Modules First Port Plug Generic Structure design R&D design fab fab test d test fab test d fab test CD-4 C ompletion Target d to ITER PETF to ITER d • • • A prerequisite for major diagnostic design effort is the renegotiation of new procurement arrangements to resolve existing scope ambiguities and clarify stakeholder roles. Definition of mutually agreeable integration of front-end components within the plugs will facilitate many parallel detailed design efforts. FY2014 delivery of qualified port plugs is consistent with top level IO schedule – Detailed plan will likely feature plug delivery phased over a multi-year period. 11 ITPA12 Diagnostics - PPPL - 3/26-30/07

Related docs
Other docs by a leitner