LEED Introduction by goodbaby

VIEWS: 62 PAGES: 89

									                               Naval Facilities Engineering Command
                             LEED for New Construction v3.0 Workbook
                                             Introduction



INTRODUCTION TO LEED / COST WORKBOOK

    In order to discuss with project users and provide a budget, team members must first understand t
    Green Building Council’s Leadership in Energy and Environmental Design (LEED) Green Building
    System.
    LEED was created to accomplish the following:
        A) Define “green building” by establishing a common standard of measurement.
        B) Promote integrated, whole-building design practices
        C) Recognize environmental leadership in the building industry
        D) Stimulate green competition
        E) Raise consumer awareness of green building benefits
        F) Transform the building market

    Points are earned for satisfying criterion designed to address specific environmental impacts. Diff
    levels of green building certification are awarded based on the total points earned.


    In 2009, a new version of LEED was introduced, known as LEED 2009 or LEED v.3.0. Several sig
    changes were made, including changes in credit weightings and the addition of Regional Priority C
    The section "Advancements in LEED NC 3.0" at the end of this Introduction describes the new fea
    LEED v.3.0 in more detail.


    For LEED-NC, there are four rating levels of certification – Certified (40-49 points), Silver (50-59 p
    Gold (60-79 points), and Platinum (80+ points). Each rating level is reached by achieving the man
    8 prerequisites and the necessary points noted in parenthesis from the available 110 points.


    There are Seven categories for points: Sustainable Sites, Water Efficiency, Energy and Atmosphe
    Materials and Resources, Indoor Environmental Quality, Innovation in Design and Regional Priorit


    For DOD projects, LEED for New Construction & Major Renovation (LEED-NC) is the primary gree
    building rating system used. There are also LEED green building rating systems for Existing Build
    Commercial Interiors, Core and Shell, Schools and Homes. In addition, LEED for Retails, Healthc
    Retail Interiors, Existing Schools, Portfolio Program and Neighborhood Development are under
    development or in pilot.
     For DOD projects, LEED for New Construction & Major Renovation (LEED-NC) is the primary gree
     building rating system used. There are also LEED green building rating systems for Existing Build
     Commercial Interiors, Core and Shell, Schools and Homes. In addition, LEED for Retails, Healthc
     Retail Interiors, Existing Schools, Portfolio Program and Neighborhood Development are under
     development or in pilot.

LEED CERTIFICATION - ADMINISTRATION

     LEED certification is typically handled as part of the contract requirements and the project costs. I
     v3.0, the project registration is undertaken through the Green Building Certification Institute (GBCI
     (http://www.gbci.org/). Project teams pursuing LEED certification: (1) must first register online the
     with the GBCI and then are required to use LEED-ONLINE which enables teams to submit 100%
     documentation online in an easy-to-use format, (2) use the LEED-ONLINE submittal templates an
     complete the templates to document fulfillment of the credit requirements for the project and (3) su
     the application for certification with the documentation for review by the GBCI.



     USGBC LEED Certification Costs. NAVFAC is a USGBC Corporate member. The costs provided
     discounted member fees. Registration fee is $450 - fixed rate for all projects regardless of square
     footage. Documentation Costs. As of April 2009, the approximate cost to complete and submit th
     ONLINE templates for a LEED Silver-level rating, 6-story BQ (100,000 SF) is $14,000. The
     documentation costs will vary on the building type and size, geographic location, credits pursuing a
     LEED experience of the contractor. Certification Fees. The certification fee has been changed in
     v 3.0. Use the new fees effective January 1, 2010. The certification fee is based on the rating s
     that the project is certifying under and the size of the project. The detailed certification rates can b
     at the following link:
                             http://www.gbci.org/DisplayPage.aspx?CMSPageID=127


     LEED certification requires Fundamental Commissioning as one of the prerequisites. As of Augus
     for Fundamental Commissioning on non-complex projects less than $20 M, the estimated cost is 1
     the primary facility cost. For complex buildings such as hospitals and laboratories and projects ov
     M, consider budgeting for Enhanced Commissioning at 0.5% of the primary facility cost. For proje
     between $20 M and $100 M, estimate the commissioning cost between 0.5 and 1% of the primary
     cost based on facility type, size, cost and geographic location.



     Sustainable design may require modeling that carefully considers the symbiotic relationships betw
     building and its subsystems. Examples of modeling and analyses: waterside economizer, air side
     economizer, high efficiency windows, day lighting, vegetative roof and strategies to optimize energ
     performance to comply with Federal Energy Acts. Two to four models/analyses may be required
     depending on credits pursuing. Approximate costs as of August 2008: $10,000 to $30,000 for this
     modeling. The modeling costs will vary on the number of analyses, building type/size and geograp
     location.
LEED PROJECT TEAM

    Ideally for all projects involving LEED budgeting, all key members such as Planners, Design Mana
    Cost Engineers / Estimators, the Customer, Base Representatives, Facility Managers as well as th
    multidiscipline design team should gather in workshops or teaming “charrettes” to evaluate points
    cycle benefits. It is valuable to have experts in LEED design and construction to facilitate or partic
    these sessions.

    These workshops / charrettes should happen at the earliest opportunity in programming phase as
    allow suitable time for a smooth transition of the selected points into the project’s programming an
    design documents. This should happen in the Installation / PWD Final 1391 submittal stage but m
    take place by the Region/FEC Team Final 1391. In-house teaming is encouraged, but for best res
    best that local design architects & discipline engineers who all have had LEED experience be invo
    Experts will cost on average $1000 per day and usually a three day minimum effort is required. Bu
    complexity, size and regional differences will impact the cost.



    Key Team Members will be typically: Planner during programming, Design manager during RFP
    preparation / Design, Mechanical Engineer and Cost Engineer / Estimator.

    A good checklist for Project Team Members who should be involved and have input:
        1) Asset Management (Real Estate & Planning)
        2) Environmental
        3) Capital Improvement (Program Management, Design/Engineering & Construction)
        4) Acquisition
        5) FEAD/ROICC (Construction Management)
        6) Public Works
        7) Facilities Management/O&M
        8) Facility Occupation & Use (customers/occupants)
        9) A/E Design (Private architects & engineers)
        10) Facility Construction (contractors)

POINTS & COST STRATEGY

    The key for planners and the design / cost engineering team is to (a) determine whether a particul
    is achievable for their particular project, and (b) evaluate what each valid point will cost.


    In order to determine whether a particular point is achievable, team members need to identify the
    potential for incorporation of each of the 110 points, the benefits to project mission, appropriatene
    application, worker productivity / worker benefit and potential life-cycle benefits.
Following the identification of the achievable points, the lead team member or cost engineer / estim
can begin to evaluate the cost implications of incorporating each point.

It is important to remember that the costs may either be pure additional costs, premium costs or m
have no cost implications.

For example: incorporating bicycle racks and showers would be a pure additional cost, using certif
wood in lieu of non-certified wood may be a premium cost, and proximity to mass transit will have
implications as this relates purely to the location of the Project site (unless of course the Project ha
options with regards to site location).

Higher certification rating levels could require more points that have additional cost and premium i
Initial cost vs. life-cycle costs/occupancy benefits will have to be weighed and carefully evaluated.


The strategy is to first seek the points that comply with the Federal mandates required in Navy pol
then those points that have no financial impact, followed by those that have either minimum premi
costs and/or minimum additional costs.


Certified- and Silver-level ratings can be achieved at minimal cost. Gold- and Platinum-level rating
typically have a significant cost impact.


The costs involved with writing specifications, identifying costs within subcontractor bids, filing and
management of necessary documentation for final application to the USGBC, etc. will have a cost


The cost of LEED certification depends upon: the level of certification sought, the particular projec
occupancy and requirements, and the economic benefits and pay-back.

LEED credits can be categorized into three areas for cost / value analysis strategy:
    Type 1 – Little or No Cost premium
    Type 2 – Cost premium but short term return on investment
    Type 3 – Cost premium with long term return on investment or no return

Type 1 (Site Dependent) - Little or No Cost premium
    SS Credit 1 - Site Selection
    SS Credit 2 - Development Density and Community Connectivity
    SS Credit 4.1 - Public Transportation Access (Potential limitations at remote sites)
    MR Credit 5 - Regional Materials (Potential limitations at remote sites)
     Type 1 (Not Site Dependent) - Little or No Cost premium
         MR Credit 4 - Recycled Content
         MR Credit 2 - Construction Waste Management (Potential limitations at remote sites)
         IEQ Credit 4.1-4.3 - Low Emitting Materials
         ID Credit 1 - Innovation in Design
         ID Credit 2 - LEED™ Accredited Professional

     Type 2 - Cost premium but short term return on investment
         WE Credit 1 (Reduce by 50%) - Water Efficient Landscaping
         EA Credit 1 - Optimize Energy Performance (lower target levels)
         IEQ Credit 1 - Outdoor Air Delivery Monitoring
         IEQ Credit 2 - Increased Ventilation
         EA Credit 3 - Enhanced Commissioning
         IEQ Credit 6.1 - Controllability of Systems (Lighting)
         IEQ Credit 5 - Indoor Chemical and Pollutant Source Control

     Type 3-    Cost premium with long term return on investment or no return
              EA Credit 6 - Green Power
              EA Credit 1.15 - Optimize Energy Performance 40% new, 36% existing
              IEQ Credit 8.1 - Daylight and Views - Daylight
              IEQ Credit 8.2 - Daylight and Views - Views

NAVY AND LEED CERTIFICATION

     The Navy has mandated that sustainable design principles and energy conservation will be planne
     programmed and integrated into the design, construction operation and maintenance of NAVY pro
     accordance with Energy Policy Act 2005, Executive Order 13423 (implements Federal Leadership
     Performance and Sustainable Buildings MOU), Energy Independence and Security Act 2007, NAV
     Engineering & Construction Bulletin 2008-01 and local directives. The project will be planned,
     programmed, designed and constructed to receive a minimum LEED Silver-level rating certified by
     USGBC.



     As part of the early programming & budgeting process for construction projects the key member is
     typically the planner; however, the design manager or cost engineer may be actively involved. Thi
     individual(s) may have to program and budget projects with sometimes minimal to no assistance a
     input from expert technical staff. This workbook is a tool which assists in preliminary program bud
     establishing a viable assessment of LEED credits to be incorporated into the project.
     This workbook will allow LEED credits to be assigned and determine a preliminary budget. It shou
     be used as a benchmark to assess basis of programming costs until further study, design & RFP
     development sessions and performance / prescriptive specifications are prepared by experienced
     professionals.

ADVANCEMENTS IN LEED NC 3.0

     LEED NC v3.0 includes three major enhancements to the LEED rating system: Harmonization, Cr
     Weighting, and Regionalization.


     Harmonization: Credits and prerequisites from all LEED commercial and institutional rating system
     been consolidated and aligned, drawing on their most effective common denominators, so that cre
     and prerequisites are consistent across all LEED 2009 rating systems.


     Credit Weighting: The second major advancement that comes with LEED 2009 is that credits will n
     different weightings depending on their ability to impact different environmental and human health
     With revised credit weightings, LEED now awards more points for strategies that will have greater
     impacts on what matters most – energy efficiency and CO2 reductions. Even with these changes
     rating system will continue to look very familiar - only the outcome has changed. Credit wei
     did not eliminate any credits. Only the point values have changed - the credits are all intact.


     Regionalization: In the LEED NC v3.0, regional bonus credits are introduced. For a project's spec
     location, six LEED credits have been prioritized because they address environmental issues of a h
     priority for that project location. The project will be awarded up to four extra points (one point per c
     for earning the priority credits. See the Regional Credit Worksheet tab for more information.
ok




must first understand the US
EED) Green Building Rating


surement.




nmental impacts. Different
arned.


EED v.3.0. Several significant
  of Regional Priority Credits.
 describes the new features of




oints), Silver (50-59 points),
 by achieving the mandatory
able 110 points.


Energy and Atmosphere,
n and Regional Priority.


C) is the primary green
ems for Existing Buildings,
D for Retails, Healthcare,
lopment are under
C) is the primary green
ems for Existing Buildings,
D for Retails, Healthcare,
lopment are under




nd the project costs. In LEED
 cation Institute (GBCI)
 irst register online their intent
eams to submit 100% of their
ubmittal templates and
  the project and (3) submit
 I.



 r. The costs provided are the
  regardless of square
omplete and submit the LEED-
  $14,000. The
 ion, credits pursuing and
  has been changed in LEED
 based on the rating system
 rtification rates can be found


ID=127


 quisites. As of August 2008,
 he estimated cost is 1% of
tories and projects over $100
 acility cost. For projects
and 1% of the primary facility




otic relationships between the
e economizer, air side
gies to optimize energy
ses may be required
000 to $30,000 for this
 type/size and geographic
 anners, Design Managers,
Managers as well as the
es” to evaluate points and life-
 n to facilitate or participate in


 ogramming phase as this will
 ect’s programming and/or
  submittal stage but must
 raged, but for best results it is
  D experience be involved.
m effort is required. Building




manager during RFP




& Construction)




 ne whether a particular point
 nt will cost.


s need to identify the
ission, appropriateness of
fits.
or cost engineer / estimator


s, premium costs or may even


 onal cost, using certified
mass transit will have no cost
 course the Project has


 al cost and premium impacts.
 d carefully evaluated.


s required in Navy policy and
either minimum premium



  Platinum-level ratings will



 tractor bids, filing and
C, etc. will have a cost impact.


 , the particular project


 ategy:


eturn




 t remote sites)
es)
 s at remote sites)




ting




ervation will be planned,
ntenance of NAVY projects in
 s Federal Leadership in High
 ecurity Act 2007, NAVFAC
ct will be planned,
 evel rating certified by




cts the key member is
 actively involved. This
mal to no assistance and
eliminary program budgeting
 project.
minary budget. It should only
study, design & RFP
pared by experienced




 m: Harmonization, Credit



 itutional rating systems have
 ominators, so that credits




 09 is that credits will now have
 tal and human health concerns.
 that will have greater positive
n with these changes, the LEED
  changed. Credit weightings
credits are all intact.


 . For a project's specific
onmental issues of a high
points (one point per credit)
 ore information.
                              Naval Facilities Engineering Command
                            LEED for New Construction v3.0 Workbook
                                      Sources & References



Cost Data & Sources

   A) Cost data from GSA LEED Cost Study, supplemented by:
         NAVFAC HQ FY10 Cost Guidance
         Carnegie Institute of Technology Research Project
         Cost data estimated due to data considered soft costs

   B) Costs have been obtained from survey and developed costs. Costs are adjusted with inflation to
      October 2006 pricing.

References & Links

   Carnegie Institute of Technology Research Project
                        http://www.cmu.edu/greenpractices/greening-the-campus/green-
                        buildings/newhouse_report.pdf

   DOD Facilities Pricing Guide (Draft)
         Area Cost Factors - Table 4A
         Escalation Rates - Table 4B
                        http://www.uscost.net/costengineering/documents.htm

   GSA LEED Cost Study
                    www.wbdg.org/ccb/GSAMAN/gsaleed.pdf

   NAVFAC Presentation-2005 Dennis Talton R.A. LEED A.P & Brian Cooper P.E.
                    http://www.fedcenter.gov/_kd/Items/actions.cfm?action=Show&item_id=102
                    destination=ShowItem

   United States Green Building Council
                      www.usgbc.org/leed/

   USGBC LEED Reference Documents
                  https://www.usgbc.org/DisplayPage.aspx?CMSPageID=1762
   Whole Building Design Guide
                      www.wbdg.org

   Regional Priority Credits
                       http://www.usgbc.org/DisplayPage.aspx?CMSPageID=1984

Workbook Development Team Members - Original version August 2008

   Dennis Talton R.A. LEED A.P., NAVFAC LANT                     NAVFAC Sustainable Developme
   Joe Tomko, NAVFAC NW                                          Workbook Development
   Steve Letson, NAVFAC NW                                       Workbook Refinement / Beta Tes
   Joe Bonaparte CCE, NAVFAC SW                                  LEED Cost Data
   Stevenson Sparks R.A. LEED A.P. CCE, NAVFAC NW                LEED Introduction / Cost Data

LEED v.3.0 Revisions - August 2009

   Annie R. Pearce, Ph.D., LEED AP                               Virginia Tech
   Yong Han Ahn, Ph.D., LEED AP                                  East Carolina University
   Sandeep Langar, LEED AP                                       Virginia Tech
   Samantha Kurtz                                                Virginia Tech
d
ook




adjusted with inflation to




mpus/green-




tm




on=Show&item_id=10233&
C Sustainable Development Program Manager
ok Development
ok Refinement / Beta Test

troduction / Cost Data




 olina University
                                     Naval Facilities Engineering Command
                                   LEED for New Construction v3.0 Workbook
                                                   Instructions



Process Overview

   To use this tool in planning project costs, the following steps should be followed:

        1)   Save a working version of the tool under a new name reflecting the project title.
        2)   Complete the Workbook Cover Sheet tab to supply key project information.
        3)   Complete the Regional Credit Worksheet to identify relevant Regional Priorities to pursue.
        4)   Review suggested credits in LEED Checklist and change as necessary to reflect project-spe
             Prepare justifications for any mandated credits that will not be pursued in the project.
        5)   Review suggested strategies and costs in Cost Worksheet.
             Adjust as necessary to reflect project-specific requirements.
        6)   Update the EPG for the project by including supplied text and cost items as described in Wor
        7)   Upload Workbook Cover Sheet, LEED Checklist, and Cost Worksheet into EDMS
             as described in Worksheet Instructions.
        8)   Archive workbook for future reference.

Instructions

   A)        As part of the early programming & budgeting process for construction projects the key mem
             the planner; however, the design manager or cost engineer may be actively involved. This in
             may have to program and budget projects with sometimes minimal to no assistance and inpu
             technical staff. This workbook is a tool which assists in preliminary program budgeting, esta
             viable assessment of LEED credits to be incorporated into the project. This workbook will all
             points to be assigned and determine a preliminary budget. It should only be used as a bench
             assess basis of programming costs until further study, design & RFP development sessions a
             performance / prescriptive specifications are prepared by experienced professionals.



   B)        Complete the following sections of this workbook:

        Workbook Cover Sheet
           1) Under Project Information, enter the following information:
              a) Project Number
              b) Project Title
              c) Project Year
       d) Project Location
       e) Zip Code
    2) Select the most appropriate facility type from the dropdown menu.
       a) Facility types provided are:
               Academic Training Facility
               Administrative Building
               Airfield Pavement
               Air Traffic Control Facility and Tower
               Bachelor Quarters
               Child Development Center
               Communication Canters
               Fire Station
               Fitness Center
               Magazine
               Operation Training Facility
               Ordnance Operations
               Pier
               Vehicle Maintenance Facility
               Warehouse (High Bay)
       b) If none of the supplied facility types match the project facility type, use the facility typ
           "MOU Required Credits".
    3) Under Primary Facility Information, enter the following information:
       a) Cost of Primary Facility (in dollars)
       b) Size of Primary Facility (in square meters)
       c) Number of Occupants
    4) Under Additional Cost Information, enter the following information:
       a) Area Cost Factor
       b) Escalation Rate (as a percentage)
    5) Under LEED Checklist Prepared BY, enter the following information:
       a) Preparer of the Checklist

Regional Credit Worksheet
   1) Click the hyperlink to download the appropriate state spreadsheet from the Green Buildin
      Certification Institute. These spreadsheets contain a list of Regional Priority Credits by zip
      LEED credits determined to be a priority in each state.

    2) Identify the zip code for your project, or the nearest zip code to your project, and review t
       possible credits identified as priorities for your project location. Determine the four credits
       to be achieved for your project, or choose four credits using your best judgment.
   3) Set the values in Column B of the Regional Credit Worksheet to "Y" for your selected R
      Priority credits. These credits will automatically be transferred to the LEED Checklist for
      and the checklist will assign extra points to the project if these credits are achieved on the

   4) Be sure all other credits are set to "N". If more than four credits are set to "Y", the worksh
      only the first four. Then select the LEED Checklist tab.


LEED Checklist
   1) Based on the selected facility type in the Workbook Cover Sheet, the workbook will pre
      LEED Checklist with a recommended credit strategy for that facility type, based on Fede
      and Navy policy.
   2) The worksheet is color-coded to indicate which credits are recommended vs. required. LE
      Orange are equivalent to the "Guiding Principles" of the Federal Leadership in High Perfo
      Sustainable Buildings MOU which are required by Executive Order 13423 and Navy polic
      Engineering & Construction Bulletin 2008-01.

   3) The Prerequisites for each LEED Category have been pre-populated with "Y"
      a) Verify the prerequisite can be met; otherwise change the "Y" to "N".
      b) All prerequisites must be achieved to pursue LEED Certification for a project. If any p
         are not pursued for a project, written justification must be provided to support the dec
   4) For each LEED credit:
      a) Change the default values for the "Yes" and "No" columns based on project specifics
          drop-down menus. These cells are shaded in green. The "Maybe" values will self-adj
          accordingly.
          I) Default "Yes" and "No" values are provided for each facility type based on Navy
              recommendations and federal policy mandates and requirements.

           ii)   Credits indicated in green font are recommended based on Navy experience with
                 projects and represent credits that can typically be achieved with little or no cost
                 These credits can be changed based upon project specifics.

           iii) Credits indicated in orange font are based upon EO 13423 and ECB 2008-01. T
                are required and should be incorporated unless adequate justification can be pro
                that they are not life-cycle cost effective or not achievable due to geographic loca
                facility type.
       b) LEED Credits WE1, WE3, EA1, EA2, MR1.1, MR2, MR3, MR4, and MR5 have a ran
          available and are assigned points based upon the option selected. Default values are
          based on Navy recommendations and requirements.

           i) Choose a value in the drop-down menu in the yellow-shaded area to calculate th
              number of points.
   5) The total points are tallied at the bottom of the worksheet.
       a) The Navy policy is currently for all applicable projects to obtain a minimum LEED Silv
       b) Note that pre-approved or recommended credits may not total or provide all necessa
          achieve a LEED Silver Rating for a project. Additional credits/points may be need to
          that can be achieved for the project to achieve a minimum LEED Silver-level rating.

   7) Once the LEED Checklist is completed, select Cost Worksheet tab.



Cost Worksheet
   1) The Cost Worksheet provides a detailed listing of items available and the cost associate
      items for obtaining LEED credits. Not all items are required for obtaining the LEED credi
      items have a cost associated with obtaining the credit. Many LEED credits can be obtain
      or no additional cost.

   2) Under Include in 1391 column, select "Y" or "N":
      a) Select "Y" to include the specific cost item in the 1391
      b) Select "N" to not include the specific cost item in the 1391
   3) Cost calculations are automatically calculated based upon data in the Workbook Cover
      LEED Checklist, and the Cost Worksheet.
   4) The total cost of all the items to be included in the 1391 should be 2-4% of the primary fa
      Higher costs are justifiable if life-cycle cost effective. If the total cost exceeds 4% of the p
      cost, the selected credits with their costs should be included in the 1391. NAVFACHQ M
      review and decide on the total cost.

      a) For ease of review:
          i) If the Total LEED costs are less than 4% of the Primary Facility Cost, the followin
               will appear in Green on Line 8 of the Cost Worksheet: "LEED Total Cost Less T
               Primary Facility Cost".
          ii) If the Total LEED costs are greater than 4% but less than 9% of the Primary Fac
               following statement will appear in Orange on Line 8 of the Cost Worksheet: "LE
               Cost Exceeds 4% of Primary Facility Cost".
          iii) If the Total LEED costs are greater than 9% of the Primary Facility Cost, the follo
               statement will appear in Red on Line 8 of the Cost Worksheet: "LEED Total Co
               9% of Primary Facility Cost".
   5) Items that affect the calculations:
      a) If Quantity is "0"
          i) No points are assigned for the specific credit under the "Yes" column on the LEE

       b) If Unit Cost is "0"
          i) No cost premium identified with the specific credit
          ii) "N" is entered under the Include in 1391 column for the specifc cost item
                iii) Cost associated with the specifc cost item is captured under a different credit

C)      Once the workbook is completed, the planner must update the project documentation in Elec
        Procurement Generator (EPG).
D)      The user of this tool is to avoid duplicating costs and identify the additional sustainab
        investments or marginal costs as deltas. The unit costs provided for each system are f
        system as a whole - if the system replaces a conventional system, the cost of the conv
        system should be used as a baseline and the additional cost represented as a delta. Fo
        if the cost of a green roof is shown as $10 and the cost of a conventional roof is $8, the
        between the two ($2) should be shown as a green roof premium in the 1391.



     EPG Update
        1) From the Cost Worksheet, transfer those items identified with a "Y" under the Include in
           column that have a cost associated with them into the 1391 in EPG under Block 9.

            a) On the Cost Worksheet, under the Applicable Section of 1391 column, if the item is
               Federal Energy Acts Compliance", enter the cost item and associated cost data in th
               Feature Costs section associated with the "LEED and Federal Energy Acts Complia
               Feature Cost Type under the Special Features tab of Block 9.

            b) In EPG, create a new Supporting Cost Group titled "Site LEED and Federal Energy
               Compliance under the Supporting Facilities tab of Block 9.
               i) On the Cost Worksheet, under the Applicable Section of 1391 column, if the ite
                   "Site LEED and Federal Energy Acts Compliance", enter the cost item and assoc
                   data in the Supporting Costs section associated with the "Site LEED and Federa
                   Compliance" Supporting Cost Group, under the Supporting Facilities tab of Block


            c) Since the Cost Worksheet cost items include the area cost factor (ACF) and are es
               midpoint of construction, ensure that in the 1391 in EPG that the ACF and Escalation
               1.00 for the cost item that was transferred from the Cost Worksheet.

        2) Text required to be incorporated into the 1391 in EPG under Block 10 is:
           a) Sustainable design principles and energy conservation will be planned, programmed
              integrated into the design, construction operation and maintenance of NAVY project
              accordance with Energy Policy Act 2005, Executive Order 13423 (implements Federa
              in High Performance and Sustainable Buildings MOU), Energy Independence and Se
              2007, NAVFAC Engineering & Construction Bulletin 2008-01 and local directives. [T
              be planned, programmed, designed and constructed to receive a minimum LEED Sil
              rating certified by USGBC.] OR [The project will be planned, programmed, designed
              constructed to incorporate sustainable design strategies and features to the fullest ex
              balancing mission, budget and client requirements. LEED certification by USGBC is
            accordance with Energy Policy Act 2005, Executive Order 13423 (implements Federa
            in High Performance and Sustainable Buildings MOU), Energy Independence and Se
            2007, NAVFAC Engineering & Construction Bulletin 2008-01 and local directives. [T
            be planned, programmed, designed and constructed to receive a minimum LEED Sil
            rating certified by USGBC.] OR [The project will be planned, programmed, designed
            constructed to incorporate sustainable design strategies and features to the fullest ex
            balancing mission, budget and client requirements. LEED certification by USGBC is



     3) Upload the Workbook Cover Sheet, completed LEED Checklist, and Cost Workshee
        Electronic Document Management System (EDMS) in EPG as part of the project docume



D)   For assistance contact the local NAVFAC Asset Management Business Line (AM4).

E)   Points of Contact

     1) NAVFAC SUSTAINABLE DEVELOPMENT PROGRAM MANAGER

        Dennis Talton R.A. LEED A.P., NAVFAC LANT
        Phone: (757)322-4211                Email:

     2) Questions/Comments Regarding LEED Cost Data

        Ellsworth Spicher, NAVFAC LANT
        Phone: (757) 322-4322                    Email:

        Joe Bonaparte CCE, NAVFAC SW
        Phone: (619)532-3713                     Email:

     3) Questions/Comments Regarding LEED Workbook

        Joe Tomko, NAVFAC NW
        Phone: (360)396-5059                     Email:
es Engineering Command
Construction v3.0 Workbook
 Instructions




 wing steps should be followed:

 a new name reflecting the project title.
ab to supply key project information.
 et to identify relevant Regional Priorities to pursue.
 klist and change as necessary to reflect project-specific requirements.
 redits that will not be pursued in the project.
n Cost Worksheet.
 cific requirements.
 ng supplied text and cost items as described in Worksheet Instructions.
 Checklist, and Cost Worksheet into EDMS




eting process for construction projects the key member is typically
er or cost engineer may be actively involved. This individual(s)
s with sometimes minimal to no assistance and input from expert
which assists in preliminary program budgeting, establishing a
 incorporated into the project. This workbook will allow LEED
 eliminary budget. It should only be used as a benchmark to
 urther study, design & RFP development sessions and
 are prepared by experienced professionals.




 ollowing information:
pe from the dropdown menu.




es match the project facility type, use the facility type indicated by

nter the following information:




nter the following information:


enter the following information:




ppropriate state spreadsheet from the Green Building
heets contain a list of Regional Priority Credits by zip code for
rity in each state.

or the nearest zip code to your project, and review the six
 for your project location. Determine the four credits most likely
oose four credits using your best judgment.
gional Credit Worksheet to "Y" for your selected Regional
omatically be transferred to the LEED Checklist for your project,
nts to the project if these credits are achieved on the project.

". If more than four credits are set to "Y", the worksheet will use
ED Checklist tab.



 the Workbook Cover Sheet, the workbook will pre-populate the
ed credit strategy for that facility type, based on Federal mandates

 ate which credits are recommended vs. required. LEED credits in
g Principles" of the Federal Leadership in High Performance and
e required by Executive Order 13423 and Navy policy,
 008-01.

egory have been pre-populated with "Y"
t; otherwise change the "Y" to "N".
d to pursue LEED Certification for a project. If any prerequisites
ten justification must be provided to support the decision.


 "Yes" and "No" columns based on project specifics using the
re shaded in green. The "Maybe" values will self-adjust
 s are provided for each facility type based on Navy
al policy mandates and requirements.

nt are recommended based on Navy experience with green
s that can typically be achieved with little or no cost premium.
 d based upon project specifics.

ont are based upon EO 13423 and ECB 2008-01. These credits
ncorporated unless adequate justification can be provided to show
st effective or not achievable due to geographic location, site or

EA2, MR1.1, MR2, MR3, MR4, and MR5 have a range of points
s based upon the option selected. Default values are supplied
s and requirements.

own menu in the yellow-shaded area to calculate the associated

om of the worksheet.
 l applicable projects to obtain a minimum LEED Silver-level
mended credits may not total or provide all necessary points to
  a project. Additional credits/points may be need to be selected
ect to achieve a minimum LEED Silver-level rating.

ted, select Cost Worksheet tab.




ailed listing of items available and the cost associated with those
t all items are required for obtaining the LEED credit, nor do all
 aining the credit. Many LEED credits can be obtained with little



  "Y" or "N":
 cost item in the 1391
cific cost item in the 1391
alculated based upon data in the Workbook Cover Sheet, the
ksheet.
cluded in the 1391 should be 2-4% of the primary facility cost.
e cost effective. If the total cost exceeds 4% of the primary facility
osts should be included in the 1391. NAVFACHQ MILCON will




ess than 4% of the Primary Facility Cost, the following statement
8 of the Cost Worksheet: "LEED Total Cost Less Than 4% of

reater than 4% but less than 9% of the Primary Facility Cost, the
ar in Orange on Line 8 of the Cost Worksheet: "LEED Total
 Facility Cost".
reater than 9% of the Primary Facility Cost, the following
on Line 8 of the Cost Worksheet: "LEED Total Cost Exceeds




e specific credit under the "Yes" column on the LEED Checklist


 ith the specific credit
ude in 1391 column for the specifc cost item
cifc cost item is captured under a different credit

nner must update the project documentation in Electronic

ating costs and identify the additional sustainable
as. The unit costs provided for each system are for that
aces a conventional system, the cost of the conventional
and the additional cost represented as a delta. For instance,
 $10 and the cost of a conventional roof is $8, the difference
  as a green roof premium in the 1391.




 those items identified with a "Y" under the Include in 1391
with them into the 1391 in EPG under Block 9.

 he Applicable Section of 1391 column, if the item is "LEED and
 ", enter the cost item and associated cost data in the Special
d with the "LEED and Federal Energy Acts Compliance" Special
ecial Features tab of Block 9.

 Cost Group titled "Site LEED and Federal Energy Acts
g Facilities tab of Block 9.
der the Applicable Section of 1391 column, if the item is listed as
 gy Acts Compliance", enter the cost item and associated cost
 section associated with the "Site LEED and Federal Energy Acts
t Group, under the Supporting Facilities tab of Block 9.


 items include the area cost factor (ACF) and are escalated to
  hat in the 1391 in EPG that the ACF and Escalation are set to
ansferred from the Cost Worksheet.

the 1391 in EPG under Block 10 is:
d energy conservation will be planned, programmed and
uction operation and maintenance of NAVY projects in
ct 2005, Executive Order 13423 (implements Federal Leadership
 able Buildings MOU), Energy Independence and Security Act
onstruction Bulletin 2008-01 and local directives. [The project will
 ed and constructed to receive a minimum LEED Silver-level
The project will be planned, programmed, designed and
nable design strategies and features to the fullest extent practical
 ent requirements. LEED certification by USGBC is not required.]
ct 2005, Executive Order 13423 (implements Federal Leadership
 able Buildings MOU), Energy Independence and Security Act
onstruction Bulletin 2008-01 and local directives. [The project will
 ed and constructed to receive a minimum LEED Silver-level
The project will be planned, programmed, designed and
nable design strategies and features to the fullest extent practical
 ent requirements. LEED certification by USGBC is not required.]



 completed LEED Checklist, and Cost Worksheet into the
ystem (EDMS) in EPG as part of the project documentation.



 Asset Management Business Line (AM4).




MENT PROGRAM MANAGER

FAC LANT
            dennis.talton@navy.mil

ED Cost Data



            ellsworth.spicher@navy.mil



            joseph.bonaparte@navy.mil

ED Workbook


            joseph.tomko@navy.mil
                                  Naval Facilities Engineering Command
                                LEED for New Construction v3.0 Workbook
                                                Cover Sheet



Purpose

   The Navy LEED for New Construction v3.0 Workbook is a planning tool to assist the area planners in
   adjusting primary facility unit costs to account for acquiring LEED Certification credits by facility type. This
   workbook is a tool which assists in preliminary program budgeting establishing a viable assessment of
   LEED credits to be incorporated into the project. This workbook will allow LEED points to be assigned
   and determine a preliminary budget. It should only be used as a benchmark to assess basis of
   programming costs until further study, design & RFP development sessions and performance /
   prescriptive specifications are prepared by experienced professionals.



Project Information

   Project Number:      P-001                Project Title:            Test Project

   Project Year:        2008                 Project Location:         NAS Anywhere, Some City, XX

   Zip Code:            24060                Facility Type:            MOU Required Credits

Primary Facility Information

   Cost of Primary Facility ($):                    $19,000,000

   Size of Primary Facility (m2):                             13,860

   Number of Occupants:                                         396


Additional Cost Information

   Area Cost Factor:                                 1.18

   Escalation Rate (%):                             3.23%


LEED Checklist Prepared By:                  I.M. Someone
                                                            LEED for New Construction v3.0
                                                              Regional Credits Worksheet
                             Click here to visit the USGBC site containing information on regional credits for your project.

                          Search the database by zip code to identify which LEED credits are regional priorities for your
                          project. If your zip code does not exist in the database, find the nearest large city to determine
                          appropriate regional credits. Indicate which credits are a priority for your region using the drop
                          down menus in the pink cells and setting the four most likely credits to "Y". These will then be
                          factored into your expected building score on the project's LEED Checklist. If you set more than
                          four credits to "Y", the worksheet will only use the first four credits indicated.

                          Project Title:         Test Project                                Project Number:
                          Project Location:      NAS Anywhere, Some City, XX                 Prepared by:
                          Facility Type:         MOU Required Credits                        Zip Code:

Regional
Priority?


                 Sustainable Sites
            SS Prereq 1   Construction Activity Pollution Prevention
   N        SS Credit 1   Site Selection
   N        SS Credit 2   Development Density & Community Connectivity
   N        SS Credit 3   Brownfield Redevelopment
   N        SS Credit 4.1Alternative   Transportation - Public Transportation Access
   N        SS Credit 4.2Alternative   Transportation - Bicycle Storage & Changing Rooms
   N        SS Credit 4.3Alternative   Transportation - Low-Emitting and Fuel-Efficient Vehicles
   N        SS Credit 4.4Alternative   Transportation - Parking Capacity
   N        SS Credit 5.1Site   Development - Protect or Restore Habitat
   N        SS Credit 5.2Site   Development - Maximize Open Space
   N        SS Credit 6.1Stormwater    Design - Quantity Control
   N        SS Credit 6.2Stormwater    Design - Quality Control
   N        SS Credit 7.1Heat   Island Effect -Nonroof
   N        SS Credit 7.2Heat   Island Effect - Roof
   N        SS Credit 8   Light Pollution Reduction

                 Water Efficiency
            WE Prereq 1 Water Use Reduction
   N        WE Credit 1 Water Efficient Landscaping
   N        WE Credit 2 Innovative Wastewater Technologies
   N        WE Credit 3 Water Use Reduction


                 Energy & Atmosphere
            EA Prereq 1   Fundamental Commissioning of the Building Energy Systems
            EA Prereq 2   Minimum Energy Performance
    EA Prereq 3   Fundamental Refrigerant Management
N   EA Credit 1   Optimize Energy Performance
N   EA Credit 2   On-Site Renewable Energy
N   EA Credit 3   Enhanced Commissioning
N   EA Credit 4   Enhanced Refrigerant Management
N   EA Credit 5   Measurement & Verification
N   EA Credit 6   Green Power



         Materials & Resources
    MR Prereq 1 Storage  & Collection of Recyclables
N               Building
    MR Credit 1.1         Reuse, Maintain Existing Walls, Floors & Roof
N               Building Reuse, Maintain Interior Nonstructural Elements
    MR Credit 1.2
N   MR Credit 2 Construction Waste Management
N   MR Credit 3 Materials Reuse
N   MR Credit 4 Recycled Content
N   MR Credit 5 Regional Materials
N   MR Credit 6 Rapidly Renewable Materials
N   MR Credit 7 Certified Wood


         Indoor Environmental Quality
    EQ Prereq 1   Minimum Indoor Air Quality Performance
    EQ Prereq 2   Environmental Tobacco Smoke (ETS) Control
N   EQ Credit 1   Outdoor Air Delivery Monitoring
N   EQ Credit 2   Increased Ventilation
N   EQ Credit 3.1Construction    Indoor Air Quality Management Plan - During Construction
N   EQ Credit 3.2Construction    Indoor Air Quality Management Plan - Before Occupancy
N   EQ Credit 4.1Low-Emitting    Materials - Adhesives & Sealants
N   EQ Credit 4.2Low-Emitting    Materials - Paints & Coatings
N   EQ Credit 4.3Low-Emitting    Materials - Flooring Systems
N   EQ Credit 4.4Low-Emitting    Materials - Composite Wood & Agrifiber Products
N   EQ Credit 5   Indoor Chemical & Pollutant Source Control
N   EQ Credit 6.1Controllability   of Systems - Lighting
N   EQ Credit 6.2Controllability   of Systems - Thermal Comfort
N   EQ Credit 7.1Thermal    Comfort - Design
N   EQ Credit 7.2Thermal    Comfort - Verification
N   EQ Credit 8.1Daylight   & Views - Daylight
N   EQ Credit 8.2Daylight   & Views - Views
n v3.0
heet
gional credits for your project.

e regional priorities for your
earest large city to determine
or your region using the drop-
its to "Y". These will then be
hecklist. If you set more than
s indicated.

            P-001
            I.M. Someone
            24060




                          26 Points
                            Required
                                   1
                                   5
                                   1
                                   6
                                   1
                                   3
                                   2
                                   1
                                   1
                                   1
                                   1
                                   1
                                   1
                                   1


                          10 Points
                            Required
                               2 to 4
                                   2
                               2 to 4


                          35 Points
                            Required
                            Required
  Required
    1 to 19
     1 to 7
         2
         2
         3
         2
continued…


14 Points
  Required
     1 to 3
         1
     1 to 2
     1 to 2
     1 to 2
     1 to 2
         1
         1


15 Points
  Required
  Required
         1
         1
         1
         1
         1
         1
         1
         1
         1
         1
         1
         1
         1
         1
         1
                                                  LEED for New Construction v3.0
                                                         Project Checklist

                              Project Title:        Test Project                               Project Number: P-001
                              Project Location:     NAS Anywhere, Some City, XX                Prepared by:    I.M. Someone
                              Facility Type         MOU Required Credits                       Zip Code:       24060

Yes   ?    No

2     24   0         Sustainable Sites                                                                                    26 Points
Y               SS Prereq 1  Construction Activity Pollution Prevention                                                       Required
0     1    0    SS Credit 1 Site Selection                                                                            0              1
0     5    0    SS Credit 2 Development Density & Community Connectivity                                              0              5
0     1    0    SS Credit 3 Brownfield Redevelopment                                                                  0              1
0     6    0    SS Credit 4.1Alternative Transportation - Public Transportation Access                                0              6
0     1    0    SS Credit 4.2Alternative Transportation - Bicycle Storage & Changing Rooms                            0              1
0     3    0    SS Credit 4.3Alternative Transportation - Low-Emitting and Fuel-Efficient Vehicles                    0              3
0     2    0    SS Credit 4.4Alternative Transportation - Parking Capacity                                            0              2
0     1    0    SS Credit 5.1Site Development - Protect or Restore Habitat                                            0              1
0     1    0    SS Credit 5.2Site Development - Maximize Open Space                                                   0              1
1     0    0    SS Credit 6.1Stormwater Design - Quantity Control                                                     1              1
1     0    0    SS Credit 6.2Stormwater Design - Quality Control                                                      1              1
0     1    0    SS Credit 7.1Heat Island Effect -Nonroof                                                              0              1
0     1    0    SS Credit 7.2Heat Island Effect - Roof                                                                0              1
0     1    0    SS Credit 8 Light Pollution Reduction                                                                 0              1
Yes   ?    No

2     8    0         Water Efficiency                                                                                     10 Points
Y               WE Prereq 1 Water   Use Reduction                                                                             Required
2     2    0             Water Efficient Landscaping
                WE Credit 1                                                                                           2          2 to 4
                           2 Reduce by 50%
0     2    0 WE Credit 2 Innovative Wastewater Technologies                                                           0              2

0     4    0    WE Credit 3   Water Use Reduction                                                                     0          2 to 4
                               0 Not Pursued
Yes   ?    No

11 24      0         Energy & Atmosphere                                                                                  35 Points
Y               EA Prereq 1   Fundamental Commissioning of the Building Energy Systems                                        Required

Y               EA Prereq 2   Minimum Energy Performance                                                                      Required

Y               EA Prereq 3   Fundamental Refrigerant Management                                                              Required
6     13   0             Optimize Energy Performance
                EA Credit 1                                                                                           6         1 to 19
                          6 Improved by 22% for New Buildings or 18% Existing Building Renovations
0     7    0 EA Credit 2 On-Site Renewable Energy                                                                     0          1 to 7
                          0 Not Pursued
0     2    0 EA Credit 3 Enhanced Commissioning                                                                       0              2
2     0    0    EA Credit 4   Enhanced Refrigerant Management                                                         2              2

3     0    0    EA Credit 5   Measurement & Verification                                                              3              3

0     2    0    EA Credit 6   Green Power                                                                             0              2


Yes   ?    No

4     10   0         Materials & Resources                                                                                14 Points
Y               MR Prereq 1 Storage    & Collection of Recyclables                                                            Required

0     3    0                Building
                MR Credit 1.1          Reuse, Maintain Existing Walls, Floors & Roof                                  0          1 to 3
                               0   Not Pursued                                                                                       3
0     1    0                Building
                MR Credit 1.2          Reuse, Maintain Interior Nonstructural Elements                                0              1
1     1    0             Construction Waste Management
                MR Credit 2                                                                                           1          1 to 2
                          1 50% Recycled or Salvaged                                                                                 2
0     2    0 MR Credit 3 Materials Reuse                                                                              0          1 to 2
                          0 Not Pursued                                                                                              2
 1    1    0             Recycled Content
               MR Credit 4                                                                                             1         1 to 2
                          1 10% of Content                                                                                           2
 0    2    0 MR Credit 5 Regional Materials                                                                            0         1 to 2
                          0 Not Pursued                                                                                              2
 1    0    0 MR Credit 6 Rapidly Renewable Materials                                                                   1             1
 1    0    0   MR Credit 7   Certified Wood                                                                            1             1
Yes   ?   No

 6    9    0         Indoor Environmental Quality                                                                           15 Points
 Y                       Minimum Indoor Air Quality Performance
               EQ Prereq 1                                                                                                    Required
 Y                       Environmental Tobacco Smoke (ETS) Control
               EQ Prereq 2                                                                                                    Required
 0    1    0 EQ Credit 1 Outdoor Air Delivery Monitoring                                                               0             1
 0    1    0 EQ Credit 2 Increased Ventilation                                                                         0             1
 0    1    0 EQ Credit 3.1Construction Indoor Air Quality Management Plan - During Construction                        0             1
 0    1    0 EQ Credit 3.2Construction Indoor Air Quality Management Plan - Before Occupancy                           0             1
 1    0    0 EQ Credit 4.1Low-Emitting Materials - Adhesives & Sealants                                                1             1

 1    0    0 EQ Credit 4.2Low-Emitting Materials - Paints & Coatings                                                   1             1

 1    0    0 EQ Credit 4.3Low-Emitting Materials - Flooring Systems                                                    1             1

 1    0    0 EQ Credit 4.4Low-Emitting Materials - Composite Wood & Agrifiber Products                                 1             1

 0    1    0 EQ Credit 5 Indoor Chemical & Pollutant Source Control                                                    0             1

 0    1    0 EQ Credit 6.1Controllability of Systems - Lighting                                                        0             1
 0    1    0 EQ Credit 6.2Controllability of Systems - Thermal Comfort                                                 0             1
 1    0    0   EQ Credit 7.1Thermal    Comfort - Design                                                                1             1

 0    1    0 EQ Credit 7.2Thermal Comfort - Verification                                                               0             1

 1    0    0 EQ Credit 8.1Daylight & Views - Daylight                                                                  1             1
 0    1    0   EQ Credit 8.2Daylight   & Views - Views                                                                 0             1
Yes   ?   No

 3    3    0       Innovation in Design                                                                                      6 Points
 2    3    0 ID Credit 1 Innovation in Design                                                                                    1 to 5
                           1 Innovation in Design: Moisture Control Plan                                                             1
                           1 Innovation in Design: Bio-Based Products                                                                2
                           0 Innovation in Design: Provide Specific Title                                                            3
                           0 Innovation in Design: Provide Specific Title                                                            4
                           0 Innovation in Design: Provide Specific Title                                                            5
 1    0    0 ID Credit 2 LEED® Accredited Professional                                                                               1
Yes   ?   No

## ##      0         Regional Priority                                                                                       4 Points
## ##          Credit 1      Regional Priority                                                                                   1 to 4
                             ###       #N/A                       #N/A                                                               1
                             ###       #N/A                       #N/A                                                               2
                             ###       #N/A                       #N/A                                                               3
                             ###       #N/A                       #N/A                                                               4


Yes   ?   No

## ##      0         Project Totals (Pre-certification estimates)                                                          110 Points
               Certified: 40-49 points, Silver: 50-59 points, Gold: 60-79 points, Platinum: 80+ points
Notes: 0




Legend: Credits in ORANGE are required to be met at some level by policy or Federal mandate and must be achieved on all projects
        unless adequate justification can be provided to show that they are not life-cycle cost effective or not achievable due to
        geographic location, site or facility type.

          Credits in GREEN are strategies recommended based on past NAVFAC project experience and can be changed based on
          project specifics.

          Credits in BLACK are not mandated or recommended but should be considered for projects on a case-by-case basis.
                                                                     LEED for New Construction v3.0
                                                            Project Cost Worksheet -

                      Note: All costs are editable in this worksheet based on specific project information and re
                            directly in Column P for unit costs or Column R if a lump sum cost is known.


                              Project Title:      Test Project
                              Project Number:     P-001
                              Project Location:   NAS Anywhere, Some City, XX
                              Prepared By:        I.M. Someone
                                                                     LEED Total Cost Less Than 4% of Primary Facility

Sustainable Sites

Prereq 1     Construction Activity Pollution Prevention
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 1     Site Selection
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 2     Development Density & Community Connectivity
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 3     Brownfield Redevelopment
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 4.1   Alternative Transportation, Public Transportation Access
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms
                 Cost Premiums Captured By GUC
Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 4.4   Alternative Transportation, Parking Capacity
                 Carpool and Vanpool Preferred Parking
Credit 5.1   Site Development, Protect of Restore Habitat
                 Native Drought Resistant Plants
Credit 5.2   Site Development, Maximize Open Space
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 6.1   Stormwater Design, Quantity Control
                 Increased Landscape Area
                 Vegetated Roofs
                 Pervious Surfaces
Credit 6.2   Stormwater Design, Quality Control
                 Subsurface Sand Filter System
                 Sustainable Design Strategies: Low Impact Development
Credit 7.1   Heat Island Effect, Nonroof
                 Improved Design Reducing Heat Islands
                 High Albedo Material
                 Vegetated Roofs
                 Pervious Surfaces
Credit 7.2   Heat Island Effect, Roof
              Highly Reflective Energy Star Roof Material
Credit 8   Light Pollution Reduction
              Improved Design Reducing Light Pollution
              Light Pollution Reducing Fixtures

Water Efficiency

Pereq 1    Water Use Reduction, 20% Reduction
              Low Flow Plumbing Fixtures
Credit 1   Water Efficient Landscaping, Reduce by 50%
              Native Drought Resistant Plants
Credit 1   Water Efficient Landscaping, No Potable Use or No Irrigation
              No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 2   Innovative Wastewater Technologies
              Innovative Wastewater Technologies
Credit 3   Water Use Reduction, 30% Reduction
              Low Flow Plumbing Fixtures
Credit 3   Water Use Reduction, 35% Reduction
              Low Flow Plumbing Fixtures
Credit 3   Water Use Reduction, 40% Reduction
              Low Flow Plumbing Fixtures

Energy and Atmosphere

Prereq 1   Fundamental Commissioning of the Building Energy Systems
              Fundamental Building Systems Commissioning
Prereq 2   Minimum Energy Performance: 10% New Bldgs or 5% Existing Bldg Renovations
              No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Prereq 3   Fundamental Refrigerant Management
              No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 1   Optimize Energy Performance
              Daylight Dimming Systems
              Occupancy Sensor Controls
              Premium Efficiency Motors
              Modulating Condensing Boilers
              High - Efficiency Chillers
              Variable Frequency Drive Cooling Tower Fans
              Energy Recovery Units
              Domestic Solar Hot Water
              Air Barrier Construction
Credit 2   On-Site Renewable Energy
              Photovoltaics
Credit 3   Enhanced Commissioning
              Enhanced Building Systems Commissioning
Credit 4   Enhanced Refrigerant Management
              No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 5   Measurement & Verification
              Continuous Metering Equipment
              Measurement and Verification Plan
Credit 6     Green Power
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed

Materials and Resources

Prereq 1     Storage & Collection of Recyclables
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 1.1   Building Reuse, Maintain 50% of Existing Walls, Floors & Roof
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 1.1   Building Reuse, Maintain 95% of Existing Walls, Floors & Roof
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 1.2   Building Reuse, Maintain 50% of Interior Non-Structural Elements
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 2     Construction Waste Management, Divert 50% from Disposal
                 Waste Management Plan
Credit 2     Construction Waste Management, Divert 75% from Disposal
                 Waste Management Plan with additional measures
Credit 3     Materials Reuse, 5%
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 3     Materials Reuse, 10%
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 4     Recycled Content, 10% (post-consumer + ½ pre-consumer)
                 Materials with Recycled Content
Credit 4     Recycled Content, 20% (post-consumer + ½ pre-consumer)
                 Materials with Recycled Content at a higher level
Credit 5     Regional Materials, 10% Extracted, Processed & Manufactured Regionally
                 Materials Manufactured Regionally
Credit 5     Regional Materials, 20% Extracted, Processed & Manufactured Regionally
                 Materials Manufactured Regionally
Credit 6     Rapidly Renewable Materials
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 7     Certified Wood
                 Certified Wood Materials**

Indoor Environmental Quality

Prereq 1     Minimum Indoor Air Quality Performance
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Prereq 2     Environmental Tobacco Smoke (ETS) Control
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 1     Outdoor Air Delivery Monitoring
                 Carbon Dioxide Sensors
Credit 2     Increased Ventilation
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 3.1   Construction IAQ Management Plan, During Construction
                 Construction IAQ Management Plan
Credit 3.2   Construction IAQ Management Plan, Before Occupancy
                Pre-Occupancy IAQ Management Plan
Credit 4.1   Low-Emitting Materials, Adhesives & Sealants
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 4.2   Low-Emitting Materials, Paints & Coatings
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 4.3   Low-Emitting Materials, Flooring Systems
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products
                Composite Wood & Agrifiber Products
Credit 5     Indoor Chemical & Pollutant Source Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 6.1   Controllability of Systems, Lighting
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 6.2   Controllability of Systems, Thermal Comfort
                Thermal and Humidity Monitoring Systems
Credit 7.1   Thermal Comfort, Design
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 7.2   Thermal Comfort, Verification
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 8.1   Daylight & Views, Daylight
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 8.2   Daylight & Views, Views
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed

Innovation & Design Process

Credit 1     Innovation in Design: Moisture Control Plan
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 1     Innovation in Design: Bio-Based Products
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 1     Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 1     Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 1     Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 2     LEED® Administration Costs
                LEED Project Registration
                LEED Certification*
                LEED Documentation

*Note:
             Users should go directly to the GBCI web site to obtain the latest cost for LEED Certification releva
                            http://www.gbci.org/DisplayPage.aspx?CMSPageID=127
             Cost values can be substituted directly into the appropriate rows in Column P to adjust project cos
r New Construction v3.0
        MOU Required Credits

ecific project information and requirements; changes can be made
lump sum cost is known.


                           Year of Project:                                                   2008
                           Cost of Primary Facility:                                    19,000,000
                           Size of Primary Facility (m2):                                   13,860
                           Number of Occupants:                                                396
t Less Than 4% of Primary Facility Cost
                                                                                                       1.30
            Include in                                      Modifications to Project 1391
               1391                  Applicable Section of 1391                UM      Quantity      Unit Cost

                 Y         None                                                m2           13,860        0.00

                 N         None                                                m2               0         0.00

                 N         None                                                m2               0         0.00

                 N         None                                                m2               0         0.00

                 N         None                                                m2               0         0.00

                 N         None                                                m2               0         0.00

                 N         None                                                m2               0         0.00

                 N         Site LEED and Federal Energy Acts Compliance        m2               0         0.00

                 N         Site LEED and Federal Energy Acts Compliance        m2               0         0.00

                 N         None                                                m2               0         0.00

                 N         Site LEED and Federal Energy Acts Compliance        m2           13,860        0.00
                 N                                                             m2
                 Y         Site LEED and Federal Energy Acts Compliance        m2           13,860        8.80

                 Y         Site LEED and Federal Energy Acts Compliance        m2           13,860        5.31
                 N                                                             m2

                 N         Site LEED and Federal Energy Acts Compliance        m2               0         0.00
                 N         Site LEED and Federal Energy Acts Compliance        m2               0         0.00
                                                                               m2
                 N         Site LEED and Federal Energy Acts Compliance        m2               0         0.00
    N        LEED and Federal Energy Acts Compliance            m2               0         0.00

    Y        Site LEED and Federal Energy Acts Compliance       m2               0         0.43
    Y        Site LEED and Federal Energy Acts Compliance       m2               0         0.43

Include in                                   Modifications to Project 1391
   1391                Applicable Section of 1391               UM      Quantity      Unit Cost

    Y        LEED and Federal Energy Acts Compliance            m2           13,860        3.35

    Y        Site LEED and Federal Energy Acts Compliance       m2           13,860        5.87

    N        Site LEED and Federal Energy Acts Compliance       m2               0         0.00

    N        Site LEED and Federal Energy Acts Compliance       m2               0         0.00

    N        LEED and Federal Energy Acts Compliance            m2               0         0.00

    N        LEED and Federal Energy Acts Compliance            m2               0         0.00

    N        LEED and Federal Energy Acts Compliance            m2               0         0.00

Include in                                   Modifications to Project 1391
   1391                Applicable Section of 1391               UM      Quantity      Unit Cost

    Y        LEED and Federal Energy Acts Compliance            m2           13,860      10.48

    Y        LEED and Federal Energy Acts Compliance            m2           13,860        0.00

    Y        LEED and Federal Energy Acts Compliance            m2           13,860        0.00

    Y        LEED and Federal Energy Acts Compliance            m2               0        5.23
    N        LEED and Federal Energy Acts Compliance            m2               0        0.00
    Y        LEED and Federal Energy Acts Compliance            m2               0        0.47
    Y        LEED and Federal Energy Acts Compliance            m2               0        3.57
    Y        LEED and Federal Energy Acts Compliance            m2               0        6.41
    Y        LEED and Federal Energy Acts Compliance            m2               0        5.70
    Y        LEED and Federal Energy Acts Compliance            m2               0       13.08
    N
    N

    N        LEED and Federal Energy Acts Compliance            m2               0         0.00

    N        LEED and Federal Energy Acts Compliance            m2               0         0.00

    Y        LEED and Federal Energy Acts Compliance            m2           13,860        0.00

    N        LEED and Federal Energy Acts Compliance            m2           13,860        0.00
    Y        LEED and Federal Energy Acts Compliance            m2           13,860        2.34
    N        None                                               m2               0         0.00

Include in                                   Modifications to Project 1391
   1391                Applicable Section of 1391               UM      Quantity      Unit Cost

    Y        None                                               m2           13,860        0.00

    Y        None                                               m2               0         0.00

    Y        None                                               m2               0         0.00

    Y        None                                               m2               0         0.00

    Y        None                                               m2               0         0.00

    Y        LEED and Federal Energy Acts Compliance            m2           13,860        2.79

    Y        LEED and Federal Energy Acts Compliance            m2               0         1.40

    N        None                                               m2               0         0.00

    N        None                                               m2               0         0.00

    Y        LEED and Federal Energy Acts Compliance            m2           13,860        4.19

    Y        LEED and Federal Energy Acts Compliance            m2               0         4.19

    N        LEED and Federal Energy Acts Compliance            m2               0         0.00

    N        LEED and Federal Energy Acts Compliance            m2               0         0.00

    Y        None                                               m2           13,860        0.00

    Y        LEED and Federal Energy Acts Compliance            m2           13,860        3.92

Include in                                   Modifications to Project 1391
   1391                Applicable Section of 1391               UM      Quantity      Unit Cost

    Y        None                                               m2           13,860        0.00

    Y        None                                               m2           13,860        0.00

    N        LEED and Federal Energy Acts Compliance            m2               0         0.00

    N        LEED and Federal Energy Acts Compliance            m2               0         0.00

    N        LEED and Federal Energy Acts Compliance            m2               0         0.00
                  N        LEED and Federal Energy Acts Compliance             m2                 0         0.00

                  Y        LEED and Federal Energy Acts Compliance             m2           13,860          0.00

                  Y        LEED and Federal Energy Acts Compliance             m2           13,860          0.00

                  Y        LEED and Federal Energy Acts Compliance             m2           13,860          0.00

                  Y        LEED and Federal Energy Acts Compliance             m2           13,860          0.95

                  N        LEED and Federal Energy Acts Compliance             m2                 0         0.00

                  N        LEED and Federal Energy Acts Compliance             m2                 0         0.00

                  N        LEED and Federal Energy Acts Compliance             m2                 0         0.00

                  Y        LEED and Federal Energy Acts Compliance             m2           13,860          0.00

                  N        LEED and Federal Energy Acts Compliance             m2                 0         0.00

                  Y        LEED and Federal Energy Acts Compliance             m2           13,860          0.00

                  N        LEED and Federal Energy Acts Compliance             m2                 0         0.00

             Include in                                     Modifications to Project 1391
                1391                  Applicable Section of 1391               UM      Quantity        Unit Cost

                  Y        LEED and Federal Energy Acts Compliance             m2           13,860          0.00

                  Y        LEED and Federal Energy Acts Compliance             m2           13,860          0.00

                  N        None                                                m2                 0         0.00

                  N        None                                                m2                 0         0.00

                  N        None                                                m2                 0         0.00

                  Y        LEED and Federal Energy Acts Compliance             ea                 1      450.00
                  Y        LEED and Federal Energy Acts Compliance             ea                 1     4000.00
                  Y        LEED and Federal Energy Acts Compliance             ea                 1    14000.00


ost for LEED Certification relevant for their project:                                      Total Marginal Cost =
PageID=127
 Column P to adjust project costs.
   0.035




 Cost

        0

        0

        0

        0

        0

        0

        0

        0

        0

        0

        0

121,981

 73,584


        0
        0

        0
        0

        0
        0



 Cost

 46,418

 81,321

        0

        0

        0

        0

        0



 Cost

145,190

        0

        0

        0
        0
        0
        0
        0
        0
        0




        0

        0

        0

      0
 32,384
       0



Cost

       0

       0

       0

       0

       0

38,681

       0

       0

       0

58,112

       0

       0

       0

       0

54,334



Cost

       0

       0

       0

       0

       0
       0

       0

       0

       0

13,134

       0

       0

       0

       0

       0

       0

       0



Cost

       0

       0

       0

       0

       0

   450
 4,000
14,000


 3.60%
                LEED for New Construction v3.0
                   Unit Cost Lookup Table
                Comments: All unit costs are per square meter. Costs are assumed to be for the entire system,
                          Double-counting for strategies used for multiple LEED credits is removed in the for
                          All unit costs are in 2006 dollars; escalation and location factors are adjusted in "C
                          Cost sources under development. Adjust unit costs on this worksheet.
                              Comments to be added to provide an audit trail for unit costs.

Sustainable Sites

Prereq 1     Construction Activity Pollution Prevention
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 1     Site Selection
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 2     Development Density & Community Connectivity
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 3     Brownfield Redevelopment
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 4.1   Alternative Transportation, Public Transportation Access
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 4.2   Alternative Transportation, Bicycle Storage & Changing Rooms
                 Cost Premiums Captured By GUC
Credit 4.3   Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 4.4   Alternative Transportation, Parking Capacity
                 Carpool and Vanpool Preferred Parking
Credit 5.1   Site Development, Protect of Restore Habitat
                 Native Drought Resistant Plants
Credit 5.2   Site Development, Maximize Open Space
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 6.1   Stormwater Design, Quantity Control
                 Increased Landscape Area
                 Vegetated Roofs
                 Pervious Surfaces
Credit 6.2   Stormwater Design, Quality Control
                 Subsurface Sand Filter System
                 Sustainable Design Strategies: Low Impact Development
Credit 7.1   Heat Island Effect, Nonroof
                 Improved Design Reducing Heat Islands***
                 High Albedo Material
                 Vegetated Roofs
                 Pervious Surfaces
Credit 7.2   Heat Island Effect, Roof
                 Highly Reflective Energy Star Roof Material
Credit 8     Light Pollution Reduction
                 Improved Design Reducing Light Pollution*
                 Light Pollution Reducing Fixtures*
Water Efficiency

Pereq 1    Water Use Reduction, 20% Reduction
              Low Flow Plumbing Fixtures
Credit 1   Water Efficient Landscaping, Reduce by 50%
              Native Drought Resistant Plants
Credit 1   Water Efficient Landscaping, No Potable Use or No Irrigation
              No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 2   Innovative Wastewater Technologies
              Innovative Wastewater Technologies***
Credit 3   Water Use Reduction, 30% Reduction
              Low Flow Plumbing Fixtures
Credit 3   Water Use Reduction, 35% Reduction
              Low Flow Plumbing Fixtures
Credit 3   Water Use Reduction, 40% Reduction
              Low Flow Plumbing Fixtures

Energy and Atmosphere

Prereq 1   Fundamental Commissioning of the Building Energy Systems
              Fundamental Building Systems Commissioning
Prereq 2   Minimum Energy Performance: 10% New Bldgs or 5% Existing Bldg Renovations
              No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Prereq 3   Fundamental Refrigerant Management
              No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 1   Optimize Energy Performance
              Daylight Dimming Systems
              Occupancy Sensor Controls
              Premium Efficiency Motors
              Modulating Condensing Boilers
              High - Efficiency Chillers
              Variable Frequency Drive Cooling Tower Fans
              Energy Recovery Units
              Domestic Solar Hot Water
              Air Barrier Construction
Credit 2   On-Site Renewable Energy
              Photovoltaics
Credit 3   Enhanced Commissioning
              Enhanced Building Systems Commissioning
Credit 4   Enhanced Refrigerant Management
              No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 5   Measurement & Verification
              Continuous Metering Equipment*
              Measurement and Verification Plan***
Credit 6   Green Power
              No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Materials and Resources

Prereq 1     Storage & Collection of Recyclables
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 1.1   Building Reuse, Maintain 50% of Existing Walls, Floors & Roof
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 1.1   Building Reuse, Maintain 75% of Existing Walls, Floors & Roof
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 1.1   Building Reuse, Maintain 95% of Existing Walls, Floors & Roof
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 1.2   Building Reuse, Maintain 50% of Interior Non-Structural Elements
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 2     Construction Waste Management, Divert 50% from Disposal
                 Waste Management Plan
Credit 2     Construction Waste Management, Divert 75% from Disposal
                 Waste Management Plan
Credit 3     Materials Reuse, 5%
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 3     Materials Reuse, 10%
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 4     Recycled Content, 10% (post-consumer + ½ pre-consumer)
                 Materials with Recycled Content
Credit 4     Recycled Content, 20% (post-consumer + ½ pre-consumer)
                 Materials with Recycled Content
Credit 5     Regional Materials, 10% Extracted, Processed & Manufactured Regionally
                 Materials Manufactured Regionally
Credit 5     Regional Materials, 20% Extracted, Processed & Manufactured Regionally
                 Materials Manufactured Regionally
Credit 6     Rapidly Renewable Materials
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 7     Certified Wood
                 Certified Wood Materials**

Indoor Environmental Quality

Prereq 1     Minimum Indoor Air Quality Performance
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Prereq 2     Environmental Tobacco Smoke (ETS) Control
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 1     Outdoor Air Delivery Monitoring
                 Carbon Dioxide Sensors*
Credit 2     Increased Ventilation
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 3.1   Construction IAQ Management Plan, During Construction
                 Construction IAQ Management Plan*
Credit 3.2   Construction IAQ Management Plan, Before Occupancy
                 Pre-Occupancy IAQ Management Plan*
Credit 4.1   Low-Emitting Materials, Adhesives & Sealants
                 No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 4.2   Low-Emitting Materials, Paints & Coatings
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 4.3   Low-Emitting Materials, Flooring Systems
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 4.4   Low-Emitting Materials, Composite Wood & Agrifiber Products
                Composite Wood & Agrifiber Products**
Credit 5     Indoor Chemical & Pollutant Source Control
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 6.1   Controllability of Systems, Lighting
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 6.2   Controllability of Systems, Thermal Comfort
                Thermal and Humidity Monitoring Systems*
Credit 7.1   Thermal Comfort, Design
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 7.2   Thermal Comfort, Verification
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 8.1   Daylight & Views, Daylight
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 8.2   Daylight & Views, Views
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed

Innovation & Design Process

Credit 1     Innovation in Design: Moisture Control Plan
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 1     Innovation in Design: Bio-Based Products
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 1     Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 1     Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 1     Innovation in Design: Provide Specific Title
                No Identified Cost Premiums - Identify Feature and Add Cost Premiums If Needed
Credit 2     LEED® Accredited Professional
                LEED Project Registration
                LEED Certification
                LEED Documentation
Construction v3.0                                                       NOTE - THIS WORKSHEET WILL BE HIDDEN IN
Lookup Table
 costs are per square meter. Costs are assumed to be for the entire system, not just the margin between the green system
-counting for strategies used for multiple LEED credits is removed in the formulas in "Cost Worksheet". Comments are hidd
 costs are in 2006 dollars; escalation and location factors are adjusted in "Cost Worksheet" in cell P$9 (currently hidden in
urces under development. Adjust unit costs on this worksheet.
ents to be added to provide an audit trail for unit costs.



                                                                             Unit Cost
llution Prevention
miums - Identify Feature and Add Cost Premiums If Needed                                 0

miums - Identify Feature and Add Cost Premiums If Needed                                 0
Community Connectivity
miums - Identify Feature and Add Cost Premiums If Needed                                 0

miums - Identify Feature and Add Cost Premiums If Needed                                 0
on, Public Transportation Access
miums - Identify Feature and Add Cost Premiums If Needed                                 0
on, Bicycle Storage & Changing Rooms
                                                                                         0
on, Low-Emitting & Fuel-Efficient Vehicles
miums - Identify Feature and Add Cost Premiums If Needed                                 0
on, Parking Capacity
Preferred Parking                                                                  27.36
ct of Restore Habitat
                                                                                    4.52
mize Open Space
 miums - Identify Feature and Add Cost Premiums If Needed                                0

                                                                                   10.76

                                                                                    6.78

                                                                                    4.09
 rategies: Low Impact Development

ucing Heat Islands***                                                               1.35
                                                                                    9.68

                                                                                    6.78

 gy Star Roof Material                                                             20.38

ucing Light Pollution*                                                              0.33
                                                                                    0.33
                                                           Unit Cost
% Reduction
                                                                  2.58
ping, Reduce by 50%
                                                                  4.52
ping, No Potable Use or No Irrigation
miums - Identify Feature and Add Cost Premiums If Needed               0
 echnologies
r Technologies***                                                 2.05
 % Reduction
                                                                  1.29
% Reduction
                                                                  0.65
% Reduction
                                                                  0.65



                                                           Unit Cost
oning of the Building Energy Systems
 Systems Commissioning                                            8.07
mance: 10% New Bldgs or 5% Existing Bldg Renovations
miums - Identify Feature and Add Cost Premiums If Needed               0
t Management
miums - Identify Feature and Add Cost Premiums If Needed               0

                                                                 4.03
                                                                 2.73
                                                                 0.36
                                                                 2.75
                                                                 4.94
rive Cooling Tower Fans                                          4.39
                                                                10.08




                                                                  32.4

stems Commissioning                                               2.69

miums - Identify Feature and Add Cost Premiums If Needed               0

                                                                    18
ification Plan***                                                  1.8

miums - Identify Feature and Add Cost Premiums If Needed               0
                                                            Unit Cost

 miums - Identify Feature and Add Cost Premiums If Needed               0
 50% of Existing Walls, Floors & Roof
 miums - Identify Feature and Add Cost Premiums If Needed               0
 75% of Existing Walls, Floors & Roof
 miums - Identify Feature and Add Cost Premiums If Needed               0
 95% of Existing Walls, Floors & Roof
 miums - Identify Feature and Add Cost Premiums If Needed               0
 50% of Interior Non-Structural Elements
 miums - Identify Feature and Add Cost Premiums If Needed               0
nagement, Divert 50% from Disposal
                                                                   2.15
nagement, Divert 75% from Disposal
                                                                   1.08

 miums - Identify Feature and Add Cost Premiums If Needed               0

 miums - Identify Feature and Add Cost Premiums If Needed               0
 post-consumer + ½ pre-consumer)
                                                                   3.23
 post-consumer + ½ pre-consumer)
                                                                   3.23
 Extracted, Processed & Manufactured Regionally
 d Regionally                                                      4.74
 Extracted, Processed & Manufactured Regionally
 d Regionally                                                      4.74

 miums - Identify Feature and Add Cost Premiums If Needed               0

                                                                   3.02



                                                            Unit Cost
 lity Performance
 miums - Identify Feature and Add Cost Premiums If Needed               0
 Smoke (ETS) Control
 miums - Identify Feature and Add Cost Premiums If Needed               0

                                                                        4

 miums - Identify Feature and Add Cost Premiums If Needed               0
 ement Plan, During Construction
 agement Plan*                                                     9.52
 ement Plan, Before Occupancy
Management Plan*                                                   4.47
 Adhesives & Sealants
 miums - Identify Feature and Add Cost Premiums If Needed               0
Paints & Coatings
miums - Identify Feature and Add Cost Premiums If Needed                0
Flooring Systems
miums - Identify Feature and Add Cost Premiums If Needed                0
Composite Wood & Agrifiber Products
grifiber Products**                                                0.73
tant Source Control
miums - Identify Feature and Add Cost Premiums If Needed                0

 miums - Identify Feature and Add Cost Premiums If Needed               0
ms, Thermal Comfort
 Monitoring Systems*                                                2.5

 miums - Identify Feature and Add Cost Premiums If Needed               0

 miums - Identify Feature and Add Cost Premiums If Needed               0

 miums - Identify Feature and Add Cost Premiums If Needed               0

 miums - Identify Feature and Add Cost Premiums If Needed               0



                                                            Unit Cost
oisture Control Plan
miums - Identify Feature and Add Cost Premiums If Needed                0
o-Based Products
miums - Identify Feature and Add Cost Premiums If Needed                0
ovide Specific Title
miums - Identify Feature and Add Cost Premiums If Needed                0
ovide Specific Title
miums - Identify Feature and Add Cost Premiums If Needed                0
ovide Specific Title
miums - Identify Feature and Add Cost Premiums If Needed                0

                                                                   450
                                                                  4000
                                                                 14000
HIS WORKSHEET WILL BE HIDDEN IN THE FINAL VERSION



ust the margin between the green system and a
 in "Cost Worksheet". Comments are hidden in Column T to explain logic.
orksheet" in cell P$9 (currently hidden in white font)




                             Comments




           Duplicate with row 55; only counted once.




           Duplicate with row 42; no value
           Duplicate with row 43; only counted once.




           Duplicate with row 34; no value
           Duplicate with row 35; only counted once.
                  Comments




Duplicate with row 29; only counted once.




Duplicate with row 53; additional cost premium assumed to be 1.29 for each additional 10% and 0.65 for each

Duplicate with row 53; additional cost premium assumed to be 1.29 for each additional 10% and 0.65 for each

Duplicate with row 53; additional cost premium assumed to be 1.29 for each additional 10% and 0.65 for each



                  Comments
                  Comments




Duplicate with Row 110; assumed to have additional premium and never undertaken without smaller percenta
Not sure what the logic is here; ask Dennis.
Changed "Include in 1391?" to a Yes to add an additional increment of half the original increment (1.08).




Duplicate with Row 120; again, not sure what the logic is here.
Going to assume that each increment has its own cost margin.
Changed "Include in 1391?" to a Yes to add an additional increment.




Duplicate with Row 122; going to assume that each increment has its own cost margin.




                  Comments
                   Comments




In the instructions, this item is stated to have minor or no additional costs. The value included in the spreadsh
h additional 10% and 0.65 for each additional 5%.

h additional 10% and 0.65 for each additional 5%.

h additional 10% and 0.65 for each additional 5%.
ndertaken without smaller percentage.

the original increment (1.08).




cost margin.
The value included in the spreadsheet doesn't make sense on this basis, nor can we find justification in the referenced stu
tion in the referenced studies for this amount.
Notes: These tables contain recommended default values for each of the building types based on NAVFAC ex
       (indicated by a green font) and/or MOU requirements (indicated by a red font). Note that font colors d
       propagate to the final worksheet at this point. These values are populated into the LEED checklist whe
       selects a building type on the cover sheet. Values can then be user-adjusted based on the specific pro
       "Maybe" values in the LEED checklist are calculated by subtracting the number of yes points and no p
       the maximum number possible for each credit.




                                                         Default Yes Points




                                                                                                                                                                                                                 Air Traffic Control Facility and Tower


                                                                                                                                                                                                                                                                                                                   Child Development Center
                                                                                Academic Training Facility




                                                                                                                                                                                                                                                                                                                                                               Communication Centers
                                                                                                                              Administrative Building




                                                                                                                                                                                                                                                                             Bachelor Quarters
                                                                                                                                                                           Airfield Pavement




                                                                                                                                                                                                                                                                                                                                                                                                       Fire Station
              LEED Credit
              Sustainable Sites
SS Prereq 1 Construction  Activity Pollution Prevention                          Y                                                      Y                                          Y                                          Y                                                      Y                                      Y                                          Y                                 Y
SS Credit 1 Site Selection                                                       0                                                      0                                          1                                          1                                                      1                                      1                                          1                                 1
SS Credit 2 Development Density & Community Connectivity                         0                                                      0                                          0                                          0                                                      0                                      5                                          5                                 5
SS Credit 3 Brownfield Redevelopment                                             0                                                      0                                          1                                          1                                                      0                                      0                                          1                                 1


                                                                                                                                                                                                                 Air Traffic Control Facility and Tower Facility and Tower
            Alternative Transportation - Public Transportation Access
SS Credit 4.1                                                                    0                                                      0                                          0                                          0                                                      0                                      6                                          6                                 0
            Alternative Transportation - Bicycle Storage & Changing Rooms
SS Credit 4.2                                                                    1                                                      1                                          0                                          1                                                      1                                      0                                          0                                 0
            Alternative Transportation - Low-Emitting and Fuel-Efficient Vehicles0
SS Credit 4.3                                                                                                                           0                                          0                                          3                                                      0                                      0                                          0                                 0


                                                                                                                                                                                                                                                                                                                   Child DevelopmentChild Development Center
                                                                                Academic TrainingAcademic Training Facility




            Alternative Transportation - Parking Capacity
SS Credit 4.4                                                                    0                                                      0                                          0                                          2                                                      2                                      2                                          2                                 2


                                                                                                                                                                                                                                                                                                                                                                               Communication Centers
            Site Development - Protect or Restore Habitat
SS Credit 5.1                                                                    1                                                      1                                          1                                          1                                                      0                                      1                                          1                                 1
                                                                                                                                                 Administrative Building




            Site Development - Maximize Open Space
SS Credit 5.2                                                                    1                                                      1                                          1                                          1                                                      1                                      1                                          1                                 1
                                                                                                                                                                                                                                                                             Bachelor Quarters Bachelor Quarters
                                                                                                                                                                           Airfield Pavement Airfield Pavement
                                                                                                                                                                                                                                     Air Traffic Control




            Stormwater Design - Quantity Control
SS Credit 6.1                                                                    1                                                      1                                          1                                          1                                                      1                                      1                                          1                                 1
            Stormwater Design - Quality Control
SS Credit 6.2                                                                    1                                                      1                                          1                                          1                                                      1                                      1                                          1                                 1
                                                                                                                                                                                                                                                                                                                                                                                                       Fire Station
            Heat Island Effect -Nonroof
SS Credit 7.1                                                                    0                                                      0                                          0                                          1                                                      1                                      0                                          0                                 0
            Heat Island Effect - Roof
SS Credit 7.2                                                                    0                                                      0                                          0                                          1                                                      1                                      1                                          1                                 1
                                                                                                                                                                                                                                                                                                                                     Center
                                                                                                 Facility




                                                                                                                                                                                                                                                                                                                                                               Communication Centers




SS Credit 8 Light Pollution Reduction                                            1                                                      1                                          1                                          1                                                      1                                      1                                          1                                 1
                                                                                                                              Administrative Building




              Water Efficiency
WE Prereq 1Water  Use Reduction                                                 Y Y Y Y Y Y Y Y
                                                                                                                                                                                                                                                                                                                                                                                                       Fire Station




WE Credit 1 Water Efficient Landscaping                                                   by Reduce100% No water use
                                                                                  Reduce100% - No No- potable- potable- pota
                                                                                                 by Reduce100%use No
                                                                                                    by Reduce100%
                                                                                                        by by
                                                                                              by Reduce100% No No wat
                                                                                      by Reduce100% No water bywater u
                                                                               Reduce Reduce100% - potable- potable- potable-
                                                                                                                      100%
WE Credit 2 Innovative Wastewater Technologies                                  0 0 0 2 2 2 2 2
WE Credit 3 Water Use Reduction                                                       by Pursuedby Not Pursued
                                                                                          by 30%    by by 30%
                                                                                  Reduce Reduce Reduce30%
                                                                               Reduce Not30%Reduce30%Reduce by 30%

              Energy & Atmosphere
EA Prereq 1 Fundamental  Commissioning of the Building Energy Systems                     Y                                             Y                                          Y                                          Y                                                      Y                                      Y                                          Y                                 Y
EA Prereq 2 Minimum   Energy Performance                                                  Y                                             Y                                          Y                                          Y                                                      Y                                      Y                                          Y                                 Y
                                                                                                                                                      Air Traffic Control Facility and Tower Traffic Control Facility and Tower


                                                                                                                                                                                                                                                      Child Development Center
                                                                           Academic Training Facility




                                                                                                                                                                                                                                                                                 Communication Centers
EA Prereq 3 Fundamental   Refrigerant Management                            Y Y Y Y Y Y Y Y




                                                                                                        Administrative Building
EA Credit 1   Optimize Energy Performance                                              Improved for for for for 22%New
                                                                               Improved by 22%Newby 22%Newbyor Buil
                                                                                               Improved Buildings 18%
                                                                                                   Improved Buildings Ex
                                                                                                       Improved 18%
                                                                                           Improved Buildings Building
                                                                                   Improved for by 22%Newbyorfor 22%N
                                                                           Improved by 22% by 22%Newby 22%New foror




                                                                                                                                                                                                                                  Bachelor Quarters
                                                                                                                                  Airfield Pavement
EA Credit 2   On-Site Renewable Energy                                             PursuedPursued
                                                                               Pursued             Pursued
                                                                                       PursuedPursued  Pursued
                                                                           Not Not Not Not Not Not Not Not Pursued
EA Credit 3   Enhanced Commissioning                                        0 0 0 2 0 0 2 0




                                                                                                                                                                                                                                                                                                         Fire Station
EA Credit 4   Enhanced Refrigerant Management                               2 2 2 2 2 2 2 2
EA Credit 5   Measurement & Verification                                    3 3 3 3 3 3 3 3
EA Credit 6   Green Power                                                   0 0 0 2 0 0 0 0




                                                                                                                                                                                         Air
              Materials & Resources
MR Prereq 1 Storage  & Collection of Recyclables                            Y Y Y Y Y Y Y Y




                                                                                                                                                                                                                                                      Child Development Center
                                                                           Academic Training Facility
MR Credit 1.1 uilding
            B         Reuse, Maintain Existing Walls, Floors & Roof                    PursuedPursued
                                                                                   Pursued
                                                                               Pursued Not Not Pursued Pursued
                                                                           Not Not Not Reuse 95% Not Not Pursued




                                                                                                                                                                                                                                                                                 Communication Centers
            B
MR Credit 1.2 uilding Reuse, Maintain Interior Nonstructural Elements       0 0 0 1 0 0 0 0




                                                                                                        Administrative Building
MR Credit 2 Construction Waste Management                                          75% Recycled orRecycled or Salvaged
                                                                                       75% Salvaged 75% Salvaged
                                                                                          75% Salvaged
                                                                                               75% Salvaged
                                                                                                   75% Salvaged
                                                                               75% Recycled orRecycled orRecycled or S
                                                                           75% Recycled orRecycled orRecycled or Salva




                                                                                                                                                                                                                                  Bachelor Quarters
                                                                                                                                  Airfield Pavement
MR Credit 3 Materials Reuse                                                        Pursued
                                                                                       PursuedPursued
                                                                               Pursued Not Reuse 10%   Reuse 10%
                                                                           Not Not Not Reuse 10% Reuse 10%
MR Credit 4 Recycled Content                                                       20% of 20% of 20% of of
                                                                                       20% of 20% of 20%
                                                                               20% of ContentContentContentContent
                                                                           20% of ContentContentContentContent




                                                                                                                                                                                                                                                                                                         Fire Station
MR Credit 5 Regional Materials                                                     20% of Materials of Materials
                                                                                       20%
                                                                               20% of Materials of Materials of Materials
                                                                                          20%
                                                                           20% of Materials of Materials of Materials
                                                                                               20% 20% 20%
MR Credit 6 Rapidly Renewable Materials                                     1 1 1 1 1 1 1 1
MR Credit 7 Certified Wood                                                  1 1 1 1 1 1 1 1

              Indoor Environmental Quality
EQ Prereq 1 Minimum   Indoor Air Quality Performance                        Y Y                                                       Y                                Y                                                              Y                    Y                          Y                    Y
EQ Prereq 2 Environmental   Tobacco Smoke (ETS) Control                     Y Y                                                       Y                                Y                                                              Y                    Y                          Y                    Y
EQ Credit 1 Outdoor Air Delivery Monitoring                                 1 1                                                       0                                1                                                              1                    1                          1                    1
EQ Credit 2 Increased Ventilation                                           1 1                                                       0                                1                                                              0                    1                          1                    1
            Construction Indoor Air Quality Management Plan - During Construction
EQ Credit 3.1                                                               1 1                                                       0                                1                                                              0                    1                          1                    1
            Construction Indoor Air Quality Management Plan - Before Occupancy 1
EQ Credit 3.2                                                               1                                                         0                                1                                                              0                    1                          1                    1




                                                                                                                                                      Air Traffic Control Facility and Tower
            Low-Emitting Materials - Adhesives & Sealants
EQ Credit 4.1                                                               1 1                                                       1                                1                                                              1                    1                          1                    1
            Low-Emitting Materials - Paints & Coatings
EQ Credit 4.2                                                               1 1                                                       1                                1                                                              1                    1                          1                    1
            Low-Emitting Materials - Flooring Systems
EQ Credit 4.3                                                               1 1                                                       1                                1                                                              1                    1                          1                    1




                                                                                                                                                                                                                                                      Child Development Center
                                                                           Academic Training Facility



            Low-Emitting Materials - Composite Wood & Agrifiber Products
EQ Credit 4.4                                                               1 1                                                       1                                1                                                              1                    1                          1                    1




                                                                                                                                                                                                                                                                                 Communication Centers
EQ Credit 5 Indoor Chemical & Pollutant Source Control                      1 1                                                       0                                1                                                              1                    1                          1                    1
                                                                                                        Administrative Building




            Controllability of Systems - Lighting
EQ Credit 6.1                                                               1 1                                                       0                                1                                                              1
                                                                                                                                                                                                                                  Bachelor Quarters        1                          1                    0
                                                                                                                                  Airfield Pavement




            Controllability of Systems - Thermal Comfort
EQ Credit 6.2                                                               1 1                                                       0                                1                                                              1                    0                          1                    0
            Thermal Comfort - Design
EQ Credit 7.1                                                               1 1                                                       1                                1                                                              1                    1                          1                    1

                                                                                                                                                                                                                                                                                                         Fire Station
            Thermal Comfort - Verification
EQ Credit 7.2                                                               1 1                                                       0                                1                                                              1                    0                          1                    0
            Daylight & Views - Daylight
EQ Credit 8.1                                                               1 1                                                       1                                1                                                              1                    1                          1                    1
            Daylight & Views - Views
EQ Credit 8.2                                                               1 1                                                       0                                1                                                              1                    0                          0                    0

              Innovation in Design
ID Credit 1   Innovation in Design                                                2                            2                       2                                    2                                                          2                     2                         2                    2
ID Credit 2   LEED® Accredited Professional                                       1                            1                       1                                    1                                                          1                     1                         1                    1




                                                          Default No Points
                                                                                                                                                                                                                 Air Traffic Control Facility and Tower


                                                                                                                                                                                                                                                                                                                                                      Child Development Center
                                                                                Academic Training Facility




                                                                                                                                                                                                                                                                                                                                                                                                  Communication Centers
                                                                                                                              Administrative Building




                                                                                                                                                                                                                                                                                                                Bachelor Quarters
                                                                                                                                                                           Airfield Pavement




                                                                                                                                                                                                                                                                                                                                                                                                                                          Fire Station
              LEED Credit
              Sustainable Sites
SS Prereq 1 Construction  Activity Pollution Prevention
SS Credit 1 Site Selection
SS Credit 2 Development Density & Community Connectivity
SS Credit 3 Brownfield Redevelopment




                                                                                                                                                                                                                 Air Traffic Control Facility and Tower Traffic Control Facility and Tower Facility and Tower
            Alternative Transportation - Public Transportation Access
SS Credit 4.1
            Alternative Transportation - Bicycle Storage & Changing Rooms
SS Credit 4.2
            Alternative Transportation - Low-Emitting and Fuel-Efficient Vehicles
SS Credit 4.3




                                                                                                                                                                                                                                                                                                                                                      Child DevelopmentChild Development Center
                                                                                Academic TrainingAcademic Training Facility
            Alternative Transportation - Parking Capacity
SS Credit 4.4




                                                                                                                                                                                                                                                                                                                                                                                                                  Communication Centers
            Site Development - Protect or Restore Habitat
SS Credit 5.1




                                                                                                                                                 Administrative Building
            Site Development - Maximize Open Space
SS Credit 5.2




                                                                                                                                                                                                                                                                                                                Bachelor Quarters Bachelor Quarters
                                                                                                                                                                           Airfield Pavement Airfield Pavement
                                                                                                                                                                                                                                                                        Air Traffic Control
            Stormwater Design - Quantity Control
SS Credit 6.1
            Stormwater Design - Quality Control
SS Credit 6.2




                                                                                                                                                                                                                                                                                                                                                                                                                                          Fire Station
            Heat Island Effect -Nonroof
SS Credit 7.1
            Heat Island Effect - Roof
SS Credit 7.2




                                                                                                                                                                                                                                                                                                                                                                        Center
                                                                                                 Facility




                                                                                                                                                                                                                                                                                                                                                                                                  Communication Centers
SS Credit 8 Light Pollution Reduction
                                                                                                                              Administrative Building



              Water Efficiency
WE Prereq 1Water  Use Reduction




                                                                                                                                                                                                                                                                                                                                                                                                                                          Fire Station
WE Credit 1 Water Efficient Landscaping
WE Credit 2 Innovative Wastewater Technologies
WE Credit 3 Water Use Reduction
                                                                                                                                                                                                                                                    Air




              Energy & Atmosphere
EA Prereq 1 Fundamental Commissioning of the Building Energy Systems
                                                                                                                                                                                                                                                                                                                                                      Child Development Center
                                                                                Academic Training Facility




EA Prereq 2 Minimum  Energy Performance
                                                                                                                                                                                                                                                                                                                                                                                                  Communication Centers




EA Prereq 3 Fundamental Refrigerant Management
                                                                                                                              Administrative Building




EA Credit 1 Optimize Energy Performance
                                                                                                                                                                                                                                                                                                                Bachelor Quarters
                                                                                                                                                                           Airfield Pavement




EA Credit 2 On-Site Renewable Energy
EA Credit 3 Enhanced Commissioning
                                                                                                                                                                                                                                                                                                                                                                                                                                          Fire Station




EA Credit 4 Enhanced Refrigerant Management
EA Credit 5 Measurement & Verification
EA Credit 6 Green Power


              Materials & Resources
                                                                                                                                                      Air Traffic Control Facility and Tower
MR Prereq 1 Storage  & Collection of Recyclables




                                                                                                                                                                                                                   Child Development Center
                                                                           Academic Training Facility
            B
MR Credit 1.1 uilding Reuse, Maintain Existing Walls, Floors & Roof




                                                                                                                                                                                                                                              Communication Centers
            B
MR Credit 1.2 uilding Reuse, Maintain Interior Nonstructural Elements




                                                                                                        Administrative Building
MR Credit 2 Construction Waste Management




                                                                                                                                                                                               Bachelor Quarters
                                                                                                                                  Airfield Pavement
MR Credit 3 Materials Reuse
MR Credit 4 Recycled Content




                                                                                                                                                                                                                                                                      Fire Station
MR Credit 5 Regional Materials
MR Credit 6 Rapidly Renewable Materials
MR Credit 7 Certified Wood


              Indoor Environmental Quality
EQ Prereq 1 Minimum   Indoor Air Quality Performance
EQ Prereq 2 Environmental   Tobacco Smoke (ETS) Control
EQ Credit 1 Outdoor Air Delivery Monitoring
EQ Credit 2 Increased Ventilation
            Construction Indoor Air Quality Management Plan - During Construction
EQ Credit 3.1
            Construction Indoor Air Quality Management Plan - Before Occupancy
EQ Credit 3.2




                                                                                                                                                      Air Traffic Control Facility and Tower
            Low-Emitting Materials - Adhesives & Sealants
EQ Credit 4.1
            Low-Emitting Materials - Paints & Coatings
EQ Credit 4.2
            Low-Emitting Materials - Flooring Systems
EQ Credit 4.3




                                                                                                                                                                                                                   Child Development Center
                                                                           Academic Training Facility
            Low-Emitting Materials - Composite Wood & Agrifiber Products
EQ Credit 4.4




                                                                                                                                                                                                                                              Communication Centers
EQ Credit 5 Indoor Chemical & Pollutant Source Control




                                                                                                        Administrative Building
            Controllability of Systems - Lighting
EQ Credit 6.1




                                                                                                                                                                                               Bachelor Quarters
                                                                                                                                  Airfield Pavement
            Controllability of Systems - Thermal Comfort
EQ Credit 6.2
            Thermal Comfort - Design
EQ Credit 7.1




                                                                                                                                                                                                                                                                      Fire Station
            Thermal Comfort - Verification
EQ Credit 7.2
            Daylight & Views - Daylight
EQ Credit 8.1
            Daylight & Views - Views
EQ Credit 8.2


              Innovation in Design
ID Credit 1   Innovation in Design
ID Credit 2   LEED® Accredited Professional
                                                                                                                                                      Air Traffic Control Facility and Tower


                                                                                                                                                                                                                   Child Development Center
                                                                           Academic Training Facility




                                                                                                                                                                                                                                              Communication Centers
                                                                                                        Administrative Building




                                                                                                                                                                                               Bachelor Quarters
                                                                                                                                  Airfield Pavement




                                                                                                                                                                                                                                                                      Fire Station




              Comments by Building Type                                                                                                               This sheet combined the credits lis
pes based on NAVFAC experience
 ). Note that font colors do not
 o the LEED checklist when the user
 based on the specific project.                                                                                                                                                                                                                                      NOTE - THIS WORKSHEET WILL BE HIDDEN IN THE FINAL VER
er of yes points and no points from
                                                                                                                                      Vehicle Maintenance Facility
                                        Operation Training Facility




                                                                                                                                                                                      Warehouse (High Bay)
                                                                                                                                                                                                                             MOU Required Credits
                                                                                        Ordnance Operations
            Fitness Center
                             Magazine




                                                                                                                               Pier




               Y              Y                   Y                                             Y                              Y                Y                                             Y                                      Y
               1              1                   1                                             1                              1                1                                             1                                      0
               5              0                   0                                             0                              0                0                                             0                                      0
               1              1                   1                                             1                              1                1                                             1                                      0
               6              0                   0                                             0                              0                0                                             0                                      0
               1              1                   1                                             1                              0                1                                             1                                      0
               0              3                   3                                             3                              0                3                                             3                                      0
                                                                                                                                                       Vehicle Maintenance Facility
                                        Operation TrainingOperation Training Facility




               2              2                   2                                             2                              0                2                                             2                                      0
               1              1                   1                                             1                              1                1                                             1                                      0
                                                                                                                                                                                                      Warehouse (High Bay)
                                                                                                                                                                                                                             MOU Required Credits Required Credits
                                                                                                         Ordnance Operations




               1              1                   1                                             1                              1                1                                             1                                      0
               1              1                   1                                             1                              1                1                                             1                                      1
            Fitness Center




               1              1                   1                                             1                              1                1                                             1                                      1
               0              1                   1                                             1                              0                1                                             1                                      0
                                                                                                                                      Vehicle Maintenance Facility
                             Magazine




               1              1                   1                                             1                              0                1                                             1                                      0
                                                          Facility




               1              1                   1                                             1                              1                1                                             1
                                                                                                                                                                                                                                            MOU




                                                                                                                                                                                                                                     0
                                                                                                                                                                                      Warehouse (High Bay)
                                                                                                                               Pier
                                                                                        Ordnance Operations
            Fitness Center




             Y Y Y Y Y Y Y Y
            Reduce Reduce100% - potable- potable- potable potable water use
               Reduce100% - No No- potable- potable- potable water use
                   by Reduce100% No water bywater use use use
                      by Reduce100% No water use water
                          by Reduce100% No No water
                             by Reduce100%use No
                                 by Reduce100%
                                     by by         50%
                             Magazine




             2 2 2 2 0 2 2 0
               Reduce30%Not30%Reduce Pursued
                   by Reduce Pursuedby by 30%
                      by by by 30%
            Reduce Reduce30%Reduce Not30%
                                                                                                                               Pier




               Y              Y                   Y                                             Y                              Y                Y                                             Y                                      Y
               Y              Y                   Y                                             Y                              Y                Y                                             Y                                      Y
                                                                                       Vehicle Maintenance Facility
                            Operation Training Facility
 Y Y Y Y Y Y Y Y




                                                                                                                      Warehouse (High Bay)
                                                                                                                                             MOU Required Credits
                                                          Ordnance Operations
Improved by 22% by 22%Newby 22%New fororforor Buildings ExistingExisting Building Renovations
    Improved by 22%Newby 22%Newbyor Buildings Existing or 18% Building Renovations
        Improved for by 22%Newbyorfor 22%New 18% ExistingExistingExisting Building Renovations
            Improved for for for for 22%New Buildings or 18% or 18% Building Renovations
                Improved Buildings Buildings Existing BuildingBuilding Renovations
                    Improved Buildings 18% New Buildings Renovations
                        Improved Buildings Existing or 18% Building Renovations
                            Improved 18%     18% Building Renovations
    Pursued
        Pursued
            Pursued
                Pursued
                    Pursued
                        Pursued
                            Pursued
Not Not Not Not Not Not Not Not Pursued
Fitness Center




 0 2 2 2 0 2 2 0
 2 2 2 2 2 2 2 2
                 Magazine




 3 3 3 3 3 3 3 3
 0 2 2 2 0 2 2 0
                                                                                Pier




 Y Y Y Y Y Y Y Y
                                                                                       Vehicle Maintenance Facility
                            Operation Training Facility




    Pursued 95% Reuse 95% Pursued
       Reuse
           Reuse Pursued    Not
Not Reuse 95% Not95% Reuse 95%
 0 1 1 1 0 1 1 0
                                                                                                                      Warehouse (High Bay)
                                                                                                                                             MOU Required Credits
                                                          Ordnance Operations




    75% Recycled orRecycled orRecycled or Salvaged
       75% Recycled orRecycled or Salvaged
           75% Salvaged 50% Salvaged
               75% Salvaged
                    75% Salvaged
                        75% Salvaged
75% Recycled orRecycled orRecycled or Salvaged
    Reuse 10% Reuse 10% Not Pursued
       Reuse 10% Reuse 10%
Reuse 10% Reuse 10% Reuse 10%
Fitness Center




    20% of ContentContentContentContent
       20% of 20% of 20% of of
           20% of 20% of 10%
20% of ContentContentContentContent
    20% of Materials of Materials
       20% of Materials of Materials
           20% 20%  20% 20% Not Pursued
20% of Materials of Materials of Materials
                 Magazine




 1 1 1 1 1 1 1 1
 1 1 1 1 1 1 1 1
                                                                                Pier




   Y              Y               Y                           Y                 Y            Y                            Y                      Y
   Y              Y               Y                           Y                 Y            Y                            Y                      Y
   1              1               1                           1                 0            1                            1                      0
   1              1               1                           1                 0            1                            1                      0
   1              1               1                           1                 0            1                            1                      0
   1              1               1                           1                 0            1                            1                      0
   1              1               1                           1                 1            1                            1                      1
   1              1               1                           1                 1            1                            1                      1
   1              1               1                           1                 1            1                            1                      1
                                                                                       Vehicle Maintenance Facility
                            Operation Training Facility




   1              1               1                           1                 1            1                            1                      1
   1              1               1                           1                 0            1                            1                      0
                                                                                                                      Warehouse (High Bay)
                                                                                                                                             MOU Required Credits
                                                          Ordnance Operations




   0              0               0                           0                 0            0                            0                      0
   0              0               0                           0                 0            0                            0                      0
Fitness Center




   1              1               1                           1                 1            1                            1                      1
   1              0               0                           0                 0            0                            0                      0
                 Magazine




   1              0               1                           0                 1            1                            1                      1
   0              0               0                           0                 0            0                            0                      0
                                                                                Pier




    2              2                2                          2                 2             2                            2                      2
    1              1                1                          1                 1             1                            1                      1
Fitness Center                 Fitness Center    Fitness Center                Fitness Center
Magazine                       Magazine          Magazine                      Magazine
Operation Training Facility                      Facility
                               Operation TrainingOperation Training Facility   Operation Training Facility
Ordnance Operations                             Ordnance Operations
                               Ordnance Operations                             Ordnance Operations
Pier                           Pier              Pier                          Pier
Vehicle Maintenance Facility                    Vehicle Maintenance Facility
                               Vehicle Maintenance Facility                    Vehicle Maintenance Facility
Warehouse (High Bay)                           Warehouse (High Bay)
                               Warehouse (High Bay)                            Warehouse (High Bay)
MOU Required Credits                          MOU
                               MOU Required Credits Required Credits           MOU Required Credits
                                                                                                                                         Fitness Center                 Fitness Center                 Fitness Center




                                                                                                                                                                           1
                                                                                                                                                                           1
                                                                                                                                         Magazine                       Magazine                       Magazine
                                                                                                                                         Operation Training Facility    Operation Training Facility    Operation Training Facility




                                                                                                                                                                           1
                                                                                                                                                                           1
                                                                                                                                         Ordnance Operations            Ordnance Operations            Ordnance Operations
                                                                                                                                         Pier                           Pier                           Pier
                                                                                                                                         Vehicle Maintenance Facility   Vehicle Maintenance Facility   Vehicle Maintenance Facility
                                                                                                                                         Warehouse (High Bay)           Warehouse (High Bay)           Warehouse (High Bay)
                                                                                                                                         MOU Required Credits           MOU Required Credits           MOU Required Credits




                          OP5, Para 8-3.1.11 states: states: Design and in explosives operating buildings or any buildings encumbered
heet combined the creditsNAVSEA OP5, "Air Force Sustainable "The use of windows in explosivesand the "Seattle Terminal Radar Approachb
                NAVSEAlist in both the Para 8-3.1.11 "The use of windowsDevelopment Policy" operating buildings or any buildings encum
DEN IN THE FINAL VERSION
dings or any buildings encumbered by inhabited building ESQD arcs should be avoided." It further states "Skylights shall not be used in build
ghts shall not be used in buildings where explosives or ammunition are processed or any buildings encumbered by inhabited building distanc
by inhabited building distance ESQD arcs." IEQ Credits 8.1 and 8.2 should not be pursued.
NOTE - THIS WORKSHEET WILL BE HIDDEN IN THE FINAL VERSION

WATER EFFICIENCY MENUS

WE Credit 1           WE Credit 3
Not Pursued         0 Not Pursued           0
Reduce by 50%       2 Reduce by 30%         2
                    potable water use
Reduce by 100% - No 4 Reduce by 35%         3
                      Reduce by 40%         4




ENERGY & ATMOSPHERE MENUS

EA Credit 1            EA Credit 2
                     3 Not Pursued
Improved by 16% for New Buildings or 12% Existing Building Renovations
                                           0
                     4 1% Renewable Energy 1
Improved by 18% for New Buildings or 14% Existing Building Renovations
                     5 3% Renewable Energy 2
Improved by 20% for New Buildings or 16% Existing Building Renovations
                     6 5% Renewable Energy 3
Improved by 22% for New Buildings or 18% Existing Building Renovations
                     7 7% Renewable Energy 4
Improved by 24% for New Buildings or 20% Existing Building Renovations
                     8 9% Renewable Energy 5
Improved by 26% for New Buildings or 22% Existing Building Renovations
                     9 11% Renewable Energy6
Improved by 28% for New Buildings or 24% Existing Building Renovations
                    New Buildings or 26% Existing Building Renovations
Improved by 30% for 10 13% Renewable Energy7
                    New
Improved by 32% for 11 Buildings or 28% Existing Building Renovations
                    New
Improved by 34% for 12 Buildings or 30% Existing Building Renovations
                    New
Improved by 36% for 13 Buildings or 32% Existing Building Renovations
                    New
Improved by 38% for 14 Buildings or 34% Existing Building Renovations
                    New
Improved by 40% for 15 Buildings or 36% Existing Building Renovations
                    New
Improved by 42% for 16 Buildings or 38% Existing Building Renovations
                    New
Improved by 44% for 17 Buildings or 40% Existing Building Renovations
                    New
Improved by 46% for 18 Buildings or 42% Existing Building Renovations
                    New
Improved by 48% for 19 Buildings or 44% Existing Building Renovations




MATERIALS & RESOURCES MENUS

MR Credit 1.1          MR Credit 2           MR Credit 3           MR Credit 4        MR Credit 5
Not Pursued          0 Not Pursued         0 Not Pursued         0 Not Pursued      0 Not Pursued
Reuse 55%                                  1 Reuse 5%
                     1 50% Recycled or Salvaged                  1 10% of Content   1 10% of Materials
Reuse 75%                                  2 Reuse 10%
                     2 75% Recycled or Salvaged                  2 20% of Content   2 20% of Materials
Reuse 95%            3
0
1