Table6
Document Sample


Table 6: Information on Possible Future Plant Changes (10 MW or Greater)
Commissioning
Owners/Operators Plant name
year1
Contact Energy Otahuhu C
Contact Energy Stratford Peaking Plant
Genesis Energy Rodney
2
Contact Energy Te Mihi 2011
Contact Energy Poihipi Rd (Steam field) 2009
Contact Energy Centennial Drive (Taupo) 2009
Genesis Energy Nga Tamariki
Geotherm Group Tukairangi Road
Mighty River Power Kawerau 2008
Mighty River Power Nga Awa Purua (Rotokawa 2)
Top Energy Ngawha Expansion 2008
Bay of Plenty Energy Upper Kaituna Hydroelectric
Contact Energy Hawea Gates 2012
Meridian Energy Mokihinui
Meridian Energy North Bank Tunnel
TrustPower Arnold River / Dobson Dam
TrustPower Wairau River 2010
Crest Energy Kaipara Harbour
Allco Wind Energy Motorimu
Allco Wind Energy Waverly Windfarm
Genesis Energy Awhitu
Hawke's Bay Wind Farm Ltd Te Pohue Wind Farm 2008
Mainpower Mt Cass
Meridian Energy West Wind 2008
Meridian Energy Project Hayes
Meridian/Windcorp Mill Creek
New Zealand Windfarms Te Rere Hau Wind Farm3 Stage Two 2008/2009
Taharoa C Taharoa Wind Farm
Taharoa C Taharoa
TrustPower Kaiwera Downs
TrustPower Mahinerangi
Unison Te Waka
Unison Titiokura
Unison/Hydro Tasmania Titiokura Wind Farm Stage 1 (Te Pohue) 2009
Ventus Energy (NZ) Taumatatotara West Road 2008
WEL Energy Te Uku
Notes:
1
All commissioning years are subject to change and are only indications based on the best information publicly available.
2
To be built in stages to replace Wairakei and enhance use of field.
3
Te Rere Hau wind farm is being commissioned in stages. The first 5 turbines (2.5MW) were installed and operational from 2006 w
nt Changes (10 MW or Greater)
Max Capacity
Fuel type
MW
Gas 400
Gas 200
Gas 480
Geothermal 220
Geothermal 25
Geothermal 20
Geothermal 80
Geothermal 60
Geothermal 90
Geothermal 132
Geothermal 15
Hydro 14
Hydro 17
Hydro 85
Hydro 210
Hydro 46
Hydro 70
Marine 200
Wind 110
Wind 135
Wind 18
Wind 225
Wind 63
Wind 198
Wind 630
Wind 71
Wind 49
Wind 100
Wind 100
Wind 240
Wind 200
Wind 102
Wind 48
Wind 48
Wind 44
Wind 84
sed on the best information publicly available.
nes (2.5MW) were installed and operational from 2006 with a further 14 turbines (7 MW) due for commissioning in late 2007. The wind farm will generate a
mmissioning in late 2007. The wind farm will generate a total of 48.5 MW when complete.
Get documents about "