					    The CMM Integration Project


Dr. Jack R. Ferguson   Dr. Rick Hefner
CMMI Project Manager   Assessment Team Co-Lead



                                        CMMI 1
                  Objectives

• Present the background and current status of
  the CMM Integration Project
• Discuss structure and sample content of the
  new maturity models
• Discuss timeline for public release of the
  models and pilot assessments
• Discuss transition from the current maturity
  models and assessment methods
                                               CMMI 2
                       Agenda

• Introduction                  Dr. Jack Ferguson (SEI)
• Background
• Design Approach

• Comparison to SW-CMM v1.1     Dr. Rick Hefner (TRW)
• Comparison to EIA IS 731
  (SECM)
• Assessment Methodology

• Comment Process               Dr. Jack Ferguson (SEI)
• Transition Process
• Discussion

                                                CMMI 3
                Background
               Dr. Jack Ferguson

Objectives
• Review project objectives
• Review key requirements and source material
• Discuss CMMI project team
• Compare and contrast current maturity models
  – CMM for Software, SECM, IPD-CMM
  – Staged, continuous

                                          CMMI 4
     What are Capability Maturity
              Models?
• Organized collections of best practices
• Based on work by Crosby, Deming, Juran,
  Humphrey...
• Systematic ordered approach to process
  improvement.
• Means of measuring organizational maturity.
• Have proven to bring significant return on
  investment in productivity and quality.
                                               CMMI 5
    How are
    CMMs used?
• Process
  Improvement
• Process Definition
• Competency
  Assessment
• Risk Management
• Communication
                       CMMI 6
  The Current Situation - every silver
       lining has a dark cloud
• Explosion of CMMs      • Multiple assessments
  and CMM-like models    • Multiple training
• Multiple models within • Multiple expenses
  an organization




                                           CMMI 7
                The Frameworks Quagmire
   PSP                         SDCCR                                 MIL-Q          MIL-STD-1679
                 SW-CMM                       SDCE                   -9858     DOD-
People
CMM                            SCE                                             STD-    DOD-STD
                                      IEEE Stds. 730,828                       2168    -2167A
                                                                   NATO
SA-CMM                                829, 830,1012,1016          AQAP1,4,9
                        ISO                                                                     DOD-STD
                                        1028,1058,1063
                        15504*                                                                  -7935A
                                                             EQA           MIL-STD-
                        (SPICE)
   FAA-         CMMI*                                                        498
   iCMM                                   Trillium       Baldrige    BS
                             IPD-                                                             EIA/IEEE
                             CMM*                                   5750
                                                           DO-                ISO/IEC         J-STD-016
                      SECM*            DOD                 178B               12207
      SE-CMM                           IPPD
                      (EIA/IS 731)

                     SECAM                      TickIT       ISO 9000             IEEE
    SSE-                             AF IPD                    Series             1074
    CMM          IEEE                Guide      Q9000
                                                                                            IEEE/EIA
                 1220 EIA/IS
                                                ISO 10011                                   12207
    MIL-STD            632                                          ISO 15288*
     -499B*                          EIA 632*

* Not yet released                                                                          Sheard, SPC
                                                                             Courtesy Sarah quag14d: 5 June 1998
                          Also see www.software.org/quagmire

                                                                                                 CMMI 8
         Why is This a Problem?

• Similar process improvement concepts, but...
  – Different model representations (e.g. staged,
    continuous, questionnaire, hybrid)
  – Different terminology
  – Different content
  – Different conclusions
  – Different appraisal methods



                                                    CMMI 9
    The Common Basis for Model-
     Based Process Improvement

Improvement in any discipline is a function of
  performing:
  – Implementing practices that reflect the
    fundamentals of a particular topic (e.g.
    configuration management)
  – Institutionalizing practices that lead to
    sustainment and improvement of an
    implementation

                                                CMMI 10
 All CMMI source models contain:

• Implementing practices grouped by affinity


• Institutionalizing practices that vary from
  model to model, however all models specify
  levels that describe increasing capability to
  perform
                                            CMMI 11
     Improvement Levels
                               Continuously
                               improving             Optimizing      (5)
                               process


                                       Quantitatively
                 Predictable                         (4)     (measured)
                                       Managed
                  process



         Standard,                                   (standard)
         consistent                Defined     (3)
         process


Disciplined             Managed      (2)     (planned and tracked)
 process


              Initial   (1)    (performed)


Not performed (0)
                                                                     CMMI 12
           The CMMI Project

• DoD sponsored
• Collaborative endeavor
  – Industry
  – Government
  – Academia
• Over 100 people involved



                              CMMI 13
                        CMM Integration Project
                             Steering Group
 Stakeholder/
                                Co-Chairs
  Reviewers
                            P. Babel / B. Rassa

                         Product Development Team
                                                            Chief Architect
                              Project Manager
                                                               R. Bate
                                 J. Ferguson

                             Coordinating IPT          Editors (CCB)
                               Team leads


                                          Training    Assessment
Architecture    PA Author     IPPD                                  Reqmts.
                                           Meth.        Meth.
    IPT          Groups        IPT                                   IPT
                                            IPT          IPT

       Usability Team              Lotus Notes Team          Pilot Planning

                                                                   CMMI 14
The CMMI Development Team
• U.S. Air Force             •   Ericsson Canada
• U.S. Navy                  •   General Dynamics
                             •   Honeywell
• Federal Aviation
  Administration             •   Litton
                             •   Lockheed Martin
• National Security Agency
                             •   Northrop Grumman
• Software Engineering
                             •   Pacific Bell
  Institute (SEI)
                             •   Raytheon
• ADP, Inc.
                             •   Rockwell Collins
• Boeing
                             •   Thomson CSF
• Computer Sciences Corp.
                             •   TRW
                                                    CMMI 15
           CMMI Design Goals
• Integrate the models, eliminate
  inconsistencies, reduce duplication
• Reduce the cost of implementing model-
  based process improvement
• Increase clarity and understanding
  –   Common terminology
  –   Consistent style
  –   Uniform construction rules
  –   Common components
• Assure consistency with ISO 15504
• Be sensitive to impact on legacy efforts
                                             CMMI 16
                    Benefits
• Efficient, effective assessment and improvement
  across multiple process disciplines in an
  organization
• Reduced training and assessment costs
• A common, integrated vision of improvement for
  all elements of an organization
• A means of representing new discipline-specific
  information in a standard, proven process
  improvement context

                                              CMMI 17
                   The Challenge

• Extract the common or best
  features from the source models
• Provide users the ability to
  produce single- or multiple-
  discipline models, both
  continuous and staged, tailored
  to their organizational needs.
• Provide users the ability to
  assess and train based on these
  models.
                                    CMMI 18
         CMMI Source Models

• Capability Maturity Model for Software V2,
  draft C (SW-CMM V2C)
• EIA Interim Standard 731, System
  Engineering Capability Model (SECM)
• Integrated Product Development Capability
  Maturity Model, draft V0.98 (IPD-CMM)



                                         CMMI 19
          Staged Representations

• Key Process Areas are grouped in the stages
  (levels) from 2 to 5
• A Key Process Area contains specific
  practices (activities) to achieve the purpose of
  the process area.
• For a Key Process Area at a given stage,
  institutionalization practices are integral to the
  process area.
                                               CMMI 20
                 Staged Model
Level         Focus            Key Process Areas
               Continuous      Org Improvement Deployment
     5         process         Org Process and Tech Innovation
 Optimizing    improvement     Defect Prevention
      4                        Organization Process Performance
Quantitatively Quantitative    Statistical Process Management
  Managed      management      Org Software Asset Commonality
     3                         Peer Reviews
  Defined      Process         Project Interface Coordination
               Standardization Software Product Engineering
                               Organization Training Program
                               Organization Process Definition
                               Organization Process Focus
     2         Basic           Software Configuration Management
Repeatable     Project         Software Quality Assurance
               Management      Software Acquisition Management
                               Software Project Control
                               Software Project Planning
                               Requirements Management
     1       Competent people and heroics
   Initial
                                                                   CMMI 21
      Continuous Representations
• A process area contains specific practices to
  achieve the purpose of the process area.
• Generic practices are grouped in Capability
  Levels
• Generic practices are added to the specific
  practices of each process area to attain a
  capability level for the process area.
• The order in which Process Areas are
  addressed can follow a recommended staging.
                                            CMMI 22
              Continuous Model
CL5           GP
              GP
              GP
CL4           GP
              GP
              GP
CL3           GP
              GP
              GP
              GP
              GP
CL2           GP
              GP
              GP
              GP
              GP
Implemented              NI             NA           NR
Process Area NE RQ OS TR PM KM QA VS           …   SR FD IN

  PA - Process Area
  CLn - Capability Level n institutionalized
        (Level n GPs satisfied for PA)

  GP - Generic Practice
  Imp - Implemented Base Practices
  NI - Not Implemented
  NA - Not Applicable
  NR - Not Rated
                                                              CMMI 23
   Source Model Terminology

   SW-CMM              EIA IS 731             IPD-CMM
     V2C                 SECM                   V0.98
Staged              Continuous             Hybrid
Maturity Levels     Capability Levels      Maturity and
                    Categories             Capability Levels
Key Process Areas   Focus Areas            Process Areas
Key Process Area    Themes                 Capability and
Goals                                      Process Area Goals
Activities Common   Specific Practices     Base Practices
Feature
Common Features     Generic Practices      Generic Practices
                    Advanced Practices
                    Generic Attributes
                    (process effective-
                    ness, product value)
CBA IPI Method      SECM Appraisal
                    Method

                                                                CMMI 24
              Assessment Methods

• CBA IPI Method                 • SECM Assessment
                                   Method
  –   Rating of goals               –   Rating of practices
  –   Single digit rating           –   Granularity options
  –   Full goal satisfaction        –   Partial credit options
  –   More strict data              –   Less strict data
      validation requirement            validation requirement



        Both methods use the same basic set of activities

                                                            CMMI 25
          The CMMI Challenge

• Integrate three source models that have many
  differences
• Provide consistency with ISO 15504
• Maintain support from user communities
• Develop framework to allow growth to other
  disciplines


                                           CMMI 26
             Design Approach

Objectives
• Review design goals
• Discuss framework of CMMI models
• Describe CMMI terminology and components
• Outline CMMI products
• Discuss CMMI Schedule and current issues

                                        CMMI 27
               The CMMI Solution
             A Product Line Approach
  SW        SE
                         Industry
                                                CMMI
   IPPD     ...            SEI                Product Suite

                        Government
Assess

          Training                         CMMI- CMMI- CMMI-
                     •Team of Teams         SW    SE   SE/SW
                     •Modeling and
                      Discipline Experts      CMMI-
                                              SE/SW/
                                                          ...
                     •Collaborative
                      Process                  IPPD
                                                              CMMI 28
        The CMMI Product Line

The CMMI product line is a product suite sharing a
common, managed set of features that satisfy
specific needs of a selected domain.

               pertain to
                                       Domain

                                is satisfied by
               share an
                                    Architecture
   Products
                                guides development of
               are built from
                                    Components
                                                   CMMI 29
    CMMI Product Suite
     Framework
 Input          Transform
•Common         •Rules for    Output
content         generating     •Integrated
•Discipline     products       model(s)
content         -Model         •Assessment
•Criteria for   -Assessment    method(s)
content         -Training      •Training
                               materials


    Repository
                                    CMMI 30
                Framework

• Components
• Construction rules
• Conceptual architecture




                            CMMI 31
                       The CMMI Framework
                             Framework General
                             •Glossary
                             •Development Standards and Guidelines
                             •Document Templates
                             •Assessment Methodology
                             •Framework Training Materials
                                                                                Shared (Discipline X+Y)
                                                                            Discipline Y
Process Management                  Integration Core (IC)                 Discipline X (DX)
Core (PMC)                          IPPD Environment
PMC Generic Practices/Templates     IC Generic Practices/Templates        DX Amplifications
PMC Process Areas                   IC Process Areas                  +   DX Process Areas
                                                                          DX Assessment Material
PMC Assessment Material             IC Assessment Material
PMC Model Training Material         IC Model Training Material            DX Model Training Material
PMC Assessment Training Material    IC Assessment Training Material       DX Assessment Training Material




                                   Output
                                   Models
                                   Assessment Methods
                                   Model Training Materials
                                   Assessment Training Materials                                   CMMI 32
             CMMI Terminology
CMMI Models contain institutionalization (Generic)
  and implementation (Specific) parts:
• Front matter
• Process Areas that contain:
   – Generic and Specific Goals                  Required
   – Generic and Specific Practices              Expected
     (in Common Features in staged representation)
   – Subpractices                             Informative
   – Notes
   – Discipline-specific amplifications
• Glossary and tailoring guidelines
                                                  CMMI 33
     CMMI V0.2 Process Areas - 1
                     Maturity Level 2

Process Management Core            Engineering Shared (SE & SW)
• Project Planning                 Requirements Management
• Project Monitoring and Control
• Configuration Management
• Process & Product Quality
  Assurance
• Supplier Agreement Management
• Data Management
• Measurement & Analysis

                                                      CMMI 34
          CMMI V0.2 Process Areas - 2
                        Maturity Level 3

Process Management Core          Engineering Shared (SE & SW)
• Organizational Process Focus   • Customer & Product
• Organizational Process           Requirements
  Definition                     • Technical Solution
• Organizational Training        • Product Integration
• Integrated Project             • Product Verification
  Management
                                 • Validation
• Risk Management
• Decision Analysis &
  Resolution
                                                          CMMI 35
    CMMI V0.2 Process Areas - 3
               Maturity Levels 4 & 5

              Process Management Core
• Quantitative Management of Quality and Process
• Organizational Process Performance


• Causal Analysis and Resolution
• Organizational Process Technology Innovation
• Process Innovation Deployment


                                                   CMMI 36
             CMMI Products

• CMMI Models
• Assessment Material
• Training Material
• Model Developer Material




                             CMMI 37
                CMMI Models

• Staged and Continuous (with equivalent
  staging) versions of:
  –   Software Engineering
  –   Systems Engineering
  –   Systems Engineering + Software
  –   Systems Engineering + Software with IPPD
• Tailoring Guidance


                                                 CMMI 38
          Assessment Material

• Assessment requirements
• Assessment methodology
• Assessment data collection methods and tools
  (e.g., questionnaires, interviews)
• Assessment Team qualifications



                                          CMMI 39
             Training Material

• Model Training
• Assessment Training
  – Team Training
  – Lead Assessor Training




                                 CMMI 40
       Model Developer Material

• Glossary
• Framework and model content criteria
• Framework Training




                                         CMMI 41
             CMMI Schedule

• August 31, 1999     Release CMMI-SE/SW V0.2
                      for public review.
• Nov 30, 1999        Release CMMI-SE/SW/IPPD
                      for public review
• Nov 1999-May 2000   Pilot assessments
• Jun-Aug 2000        Publish models V1.0



                                            CMMI 42
              Issues Concerning
             Initial CMMI Drafts
• Size of model              • Equivalence between
• Complexity of model          staged and continuous
                               representations
• “Normative” model             – “Advanced” practices
• Goals and Themes              – Process area boundaries
                                – Generic practices
• Order of process areas
• ISO Consistency


CMMI team received 4000+ change requests from reviewers
                                                   CMMI 43
      CMMI-SE/SW compared to
         SW-CMM v1.1
               Dr. Rick Hefner
Objectives
• Philosophy
• Model Component Comparison
• Process Area Comparison
• Common Features Comparison


                                 CMMI 44
               Philosophy - 1

• SEI had completed updates to the SW-CMM
  when the CMMI project was started
  – SW-CMM v2 Draft C was used as the source
    model for CMMI
  – Adapted for compatibility with SE
• Most of the community is currently using
  SW-CMM v1.1
  – Detailed traceability matrices are being
    developed
                                               CMMI 45
                Philosophy - 2

• CMMI- SE/SW staged representation is similar
  to SW-CMM v1.1
  – Maturity Levels composed of Process Areas
  – Goals are required; implemented & institutionalized
  – Key practices are expected; alternative practices are
    acceptable if effective at meeting the goals
  – All else is informative
• CMMI- SE/SW continuous representation
  reflects the same info in a SPICE-like structure
                                                 CMMI 46
Model Component Comparison
CMMI Models                  SW CMM
Process Area                 Key Process Area
Generic Goal                 Planning Goal sometimes used v1.1,
                             Institutionalization Goal in 2.0
Specific Goal                KPA Goal
Generic Practice             Key practices from
                             institutionalization common features

Specific Practice            Key Practice from Activities Performed
                             Common Features
Subpractice                  Subpractice
Maturity Level               Maturity Level
Capability Level             None
Notes                        Explanatory Material
Work Products                Examples
“For Software Engineering”   Examples and explanatory materiel

                                                               CMMI 47
                   SW-CMM v1.1                             CMMI
 LEVEL 5     Defect prevention                       Causal Analysis and Resolution
OPTIMIZING   Technology change mgmt                  Org. Process Technology Innovation
             Process change mgmt                     Process Innovation Deployment

             Quantitative process mgmt               Org. Process Performance
  LEVEL 4    Software quality mgmt                   Quantitative Mgmt of Quality & Process
 MANAGED
             Organization process focus              Organization process focus
             Organization process definition         Organization process definition
             Training program                        Organizational training
             Integrated software mgmt                Integrated project management
                                                     Risk Management
 LEVEL 3     Software product engr                   Customer and Product Reqmts
 DEFINED                                             Technical Solution
                                                     Product Integration
             Intergroup coordination                 Product Verification
             Peer reviews                            Validation
                                                     Decision Analysis and Resolution

             Requirements management                 Requirements management
  LEVEL 2    Software project planning               Project planning
REPEATABLE   Software project tracking & oversight   Project Monitoring and Control
             Software subcontract mgmt               Supplier Agreement Management
             Software quality assurance              Product & Process Quality Assurance
             Software configuration mgmt             Configuration Management
                                                     Data Management
                                                     Measurement and Analysis CMMI 48
         Software Product Engineering
                    SW-CMM v1.1 Activities
1 Appropriate software engineering methods and tools
  are integrated into the project's defined software
  process.
                                                           Customer and
2 The software requirements are developed, maintained,    Product Req PA
  documented, and verified by systematically analyzing
  the allocated requirements according to the project's
  defined software process.
                                                            Technical
3 The software design is developed, maintained,            Solution PA
  documented, and verified, according to the project's
  defined software process, to accommodate the
  software requirements and to form the framework for
  coding.                                                   Technical
                                                           Solution PA
4 The software code is developed, maintained,
  documented, and verified, according to the project's
  defined software process, to implement the software        Product
  requirements and software design.                       Verification PA
      Software Product Engineering
             SW-CMM v1.1 Activities (continued)
6 Integration testing of the software is planned and          Product
  performed according to the project's defined software    Integration PA
  process.

7 System and acceptance testing of the software are
                                                              Product
  planned and performed to demonstrate that the
                                                           Verification PA
  software satisfies its requirements.

8 The documentation that will be used to operate and
  maintain the software is developed and maintained
  according to the project's defined software process.

9 Data on defects identified in peer reviews and testing
  are collected and analyzed according to the project's
  defined software process.

10 Consistency is maintained across software work
   products, including the software plans, process
   descriptions, allocated requirements, software
                                                               CMMI 50
   requirements, software design, code, test plans, and
        Common Feature Comparison
SW-CMM v1.1 Comm on Fe atures                 CMMI Com m on Featur es
Com m itm ent to Per for m                    Com m itm ent to Per for m
      Es tablis h an Organiz ational Policy         Es tablis h an Organiz ational Policy
Ability to Pe rform                           Ability to Pe rform
                                                    Plan the Proc ess
     Provide Resources                              Provide Resources
     Ass ign Res ponsibility                        Ass ign Res ponsibility
     Train People                                   Train People
                                              Directing Implem entation
                                                    Manage Conf igurations
                                                    Monitor and Control the Process
Activities Per for m ed                       Activities Per for m ed
      Plan the Proc ess
      Perf orm the Proc ess                        Perf orm the Proc ess
      Monitor and Control the Process
Meas urem ent & Analysis
                                                                           Handled by the
      Measurement the Proc ess
                                                                     Measurement and Analysis PA
      Analy ze the Measurements
Ver ifying Implem entation                    Ver ifying Implem entation
      Review w ith Org. Management
                                                   Review w ith Management
      Review w ith Project Management
      Objec tiv ely Verif y Adherence              Objec tiv ely Verif y Adherence
                                                                                            CMMI 51
                Conclusions

• Organizations using SW-CMM v1.1 should be
  able to smoothly transition to CMMI
  – Measurement and Analysis & Data Mgmt at L2
  – Risk Management & Decision Analysis and
    Resolution at L3
  – Expansion of Software Product Engineering
  – Configuration Management for all Process Areas



                                              CMMI 52
       Comparing CMMI-SE/SW
         to EIA IS 731-SECM
Objectives
• Philosophy
• Process Area Comparison
• Planned IPPD Extensions




                              CMMI 53
              Philosophy - 1

• EIA 731 was created as a merger of the SE-
  CMM and INCOSE SECM models
  – Used as a source model for CMMI
• CMMI-SE/SW merges software ideas
  – Staged representation of SE available
  – Continuous representation with “equivalent
    staging”


                                                 CMMI 54
CMMI-S E                                      EIA73 1/SECM                                  SE-CMM
Process Mana geme nt Co re
Proj ect Pl ann in g                          Pl an an d Org ani ze                         Pl an techni ca l effort
Proj ect Moni torin g and Contro l            Mon itor and Co ntro l                        Mon itor and control techni ca l effort
Co nfi gu ra ti on Ma nag emen t              Man age Co nfig uratio ns                     Man age confi gurati ons
Process and Prod uct Qua li ty Assurance      En sure Qua li ty                             En sure qu al ity
Su ppl ie r Ag re emen t Mana geme nt         Co ord in ate wi th Su ppl i ers              Co ord in ate wi th supp li ers
Da ta Man age ment                            Man age Da ta
Mea sureme nt a nd Ana lysi s                 Mea sure an d Imp ro ve
Organ izatio nal Proce ss Focu s                                                            Improve o rg ani za ti on 's SE proce ss
                                                 De fi ne an d Imp ro ve the SE Process
                                                                                            De fi ne orga ni zati on's S E p ro cesses
Organ izatio nal Proce ss Defini tio n
                                              Man age Su ppo rt Environ ment                Man age SE supp ort en vi ro nmen t
Organ izatio nal Trai nin g                   Man age Co mpeten cy                          Provid e ongo in g ski ll s an d kno wl edg e
Integrated Proj ect Man age ment              Integrate Di scip li ne s
Ri sk Mana gemen t                            Man age Ri sk                                 Man age ri sk
De ci si on An al ysis a nd Re sol uti on     Asse ss a nd Sel ect
Qua ntitati ve Mgmt of Qu al ity & Proce ss
Organ izatio nal Proce ss P erforman ce
Ca usa l An alysi s a nd Resol uti on
Org. P ro cess Te chn ol ogy Inn ova ti on    Man age Te chn ol ogy
Process In novatio n Depl oyment
En gin eeri ng Sh ared (S W & SE )
Re qui re ments Mg mt                                                                       De ri ve a nd al lo ca te requ ireme nts
Cu stomer & P ro duct Re qui rements          De fi ne Stakeho ld er a nd System Level Reqs Un derstan d customer n eed s & expect.
                                              De fi ne Te chn ical P ro bl em               Evol ve system archi tecture
Te chn ical So lu ti on
                                              De fi ne So lu ti on                          An alyze cand id ate sol uti ons
System In te gratio n                         Integrate System                              Integrate system
Produ ct Verifi cati on                       Ve ri fy Syste m
                                                                                            Ve ri fy & val id ate system
Va li dati on                                 Va li date System
Other
                                                                                            Man age p rod uct l in e e vo lu ti on
            EIA 731 Focus Areas - 1
• Technical Focus Areas                                   Causal Analysis and Resolution (PM)
                                                          Org Process Technology Innovation (PM)
  – Define Stakeholder and                                Process Innovation Deployment (PM)
    System Level Requirements
  – Define Technical Problem                          Quantitative Mgmt of Quality and Process (PM)
                                                      Organizational Process Performance (PM)
  – Define Solution
  – Assess and Select                           Organizational Process Focus (PM)
  – Integrate System                            Organizational Process Definition (PM)
  – Verify System                               Organizational Training (PM)
                                                Integrated Project Management (PM)
  – Validate System                             Risk Management (PM)
                                                Decision Analysis and Resolution (PM)
                                                Customer and Product Requirements (Eng)
                                                Technical Solution (Eng)
                                                Product Integration (Eng)
         Project Planning (PM)
                                                Product Verification (Eng)
         Project Monitoring and Control (PM)
                                                Validation (Eng)
         Configuration Management (PM)
         Product and Process Quality Assurance (PM)
         Supplier Agreement Management (PM)
         Data Management (PM)
         Measurement and Analysis (PM)
         Requirements Management (Eng)                                                 CMMI 56
         EIA 731 Focus Areas - 2
• Management Focus Areas                                 Causal Analysis and Resolution (PM)
                                                         Org Process Technology Innovation (PM)
  –   Plan and Organize                                  Process Innovation Deployment (PM)
  –   Monitor and Control
  –   Integrate Disciplines                          Quantitative Mgmt of Quality and Process (PM)
                                                     Organizational Process Performance (PM)
  –   Coordinate with Suppliers
  –   Manage Risk                               Organizational Process Focus (PM)
  –   Manage Data                               Organizational Process Definition (PM)
                                                Organizational Training (PM)
  –   Manage Configurations                     Integrated Project Management (PM)
  –   Ensure Quality                            Risk Management (PM)
                                                Decision Analysis and Resolution (PM)
                                                Customer and Product Requirements (Eng)
                                                Technical Solution (Eng)
                                                Product Integration (Eng)
           Project Planning (PM)                Product Verification (Eng)
           Project Monitoring and Control (PM) Validation (Eng)
           Configuration Management (PM)
           Product and Process Quality Assurance (PM)
           Supplier Agreement Management (PM)
           Data Management (PM)
           Measurement and Analysis (PM)
           Requirements Management (Eng)                                               CMMI 57
          EIA 731 Focus Areas - 3
• Environment Focus Areas                                Causal Analysis and Resolution (PM)
                                                         Org Process Technology Innovation (PM)
  – Define and Improve the                               Process Innovation Deployment (PM)

    Systems Engineering Process                   Quantitative Mgmt of Quality and Process (PM)
  – Manage Competency                             Organizational Process Capability (PM)

  – Manage Technology
  – Manage Systems                              Organizational Process Focus (PM)
                                                Organizational Process Definition (PM)
    Engineering Support                         Organizational Training (PM)
    Environment                                 Integrated Project Management (PM)
                                                Risk Management (PM)
                                                Decision Analysis and Resolution (PM)
                                                Customer and Product Requirements (Eng)
                                                Technical Solution (Eng)
                                                Product Integration (Eng)
          Project Planning (PM)                 Product Verification (Eng)
          Project Monitoring and Control (PM)   Validation (Eng)
          Configuration Management (PM)
          Product and Process Quality Assurance (PM)
          Supplier Agreement Management (PM)
          Data Management (PM)
          Measurement and Analysis (PM)
          Requirements Management (Eng)                                               CMMI 58
                          What’s New?
• Not a EIA 731 Focus Area                                 Causal Analysis and Resolution (PM)
                                                           Org Process Technology Innovation (PM)
  (but in the content)                                     Process Innovation Deployment (PM)

  – Causal Analysis and Resolution                Quantitative Mgmt of Quality and Process (PM)
  – Process Innovation Deployment                 Organizational Process Performance (PM)

  – Quantitative Process and                    Organizational Process Focus (PM)
    Quality Mgmt                                Organizational Process Definition (PM)
                                                Organizational Training (PM)
  – Organizational Process                      Integrated Project Management (PM)
    Performance                                 Risk Management (PM)
                                                Decision Analysis and Resolution (PM)
                                                Customer and Product Requirements (Eng)
                                                Technical Solution (Eng)
          Project Planning (PM)                 Product Integration (Eng)
          Project Monitoring and Control (PM)   Product Verification (Eng)
          Configuration Management (PM)         Validation (Eng)
          Product and Process Quality Assurance (PM)
          Supplier Agreement Management (PM)
          Data Management (PM)
          Measurement and Analysis (PM)
          Requirements Management (Eng)                                              CMMI 59
                 Conclusions

• EIA 731 users should be able to smoothly
  transition to the CMMI-SE/SW model
  – Continuous representation (+ “equivalent” staged
    representation)
  – Some lower level differences
• Integrated Product and Process Development
  (IPPD) will be added
  – Based on IPPD-CMM practices

                                                CMMI 60
      Assessment Methodology
            Dr. Rick Hefner (TRW)
     Assessment Methodology Team Co-lead


Objectives
• Assessment approach
• Assessment Requirements for CMMI (ARC)
• SCAMPI assessment method
• Lead Assessor program, transition plan

                                           CMMI 61
              Assessment Methods

• CBA IPI Method                • SECM Method
  –   Rating of goals               –   Rating of practices
  –   Single digit rating           –   Granularity options
  –   Full goal satisfaction        –   Partial credit options
  –   More strict data              –   Less strict data
      validation requirement            validation requirement




      Essentially the same activities in the two methods

                                                           CMMI 62
  Assessment Requirements for CMMI
               (ARC)
• Similar to the current CMM
  Appraisal Framework (CAF) V1.0
  – Specifies the minimum
    requirements for full, comprehensive
    assessment methods, e.g., SCAMPI

• Other assessment methods may be defined
  for situations not requiring a comprehensive
  assessment
  – initial assessment, quick-look, process improvement
    monitoring, etc.
                                                          CMMI 63
Standard CMMI Assessment Method
for Process Improvement (SCAMPI)
• Similar to CBA IPI method
• Led by authorized Lead Assessor
• Tailorable to organization and model scope
• Artifacts:
  – SCAMPI Method description document
  – Maturity questionnaire, work aids, templates

• Current activities
  – Merger of SECM appraisal method features
                                                   CMMI 64
   CMMI Lead Assessor Program
• Similar to existing SEI Lead Assessor
  and Lead Evaluator programs
• Grandfather current Lead Assessors
• Under consideration
  – Delineate by discipline, e.g., SW Lead Assessors,
    SE Lead Assessors?
  – Details of transition process for current Lead
    Assessors and other assessment leaders
  – Required training in CMMI models

                                                        CMMI 65
            Comment Process
                Dr. Jack Ferguson

• Release CMMI-SE/SW v0.2 August 31
  – Available at http://www.sei.cmu.edu
  – Public comments due November 30
• Release CMMI-SE/SW/IPPD November 30
  – Comments due February 28
• Hold Focus Group discussions
  – SEI Transition
  – Assessors for both communities
  – SPINs                                 CMMI 66
                  Pilot Assessments
• Nine initial assessments (desired)
   – Supported by 3 Product Development Team (PDT) members,
   – Covering all CMMI models, staged and continuous representations
   – Nine organizations (4 DoD & 5 industry) volunteered to participate
       •   1 - CMMI SE/SW with IPPD, staged or continuous representation
       •   4 - CMMI SE/SW, staged representation
       •   2 - CMMI SE/SW, continuous representation
       •   1 - CMMI SE, continuous representation
       •   1 - CMMI SW, staged representation

• Product Development Team (PDT) member roles
   – CMMI Product Suite Training
   – Coaching and structured observation
• Structured feedback from assessment participants
   – Assessors and Sponsors, and
   – Participating organization members

                                                                     CMMI 67
             CMMI Transition Plan
• Development Phase
   – Development of CMMI products
   – Verification and Validation of CMMI products
• Transition Phase
   – Approval of a CMMI Product for public release
   – Evidence of sufficient use
   – Transition planning to help organizations use CMMI products
• Sustainment Phase
   – Upkeep & continuous improvement of the product suite
   – Additional evidence of adoption and use
                                               Sustainment Phase

                            Transition Phase
    Development Phase
                                                                   CMMI 68
    Transitioning to Use of CMMI

• Understand how models are used:
  – Steps to enterprise-wide process improvement
• Apply Lessons Learned in transitioning from
  single-discipline models
  – Federal Aviation Administration’s experiences
    with iCMM
  – US Air Force experiences with transitioning
    between models
  – Others...
                                               CMMI 69
                                                        Steps to Enterprise-wide
                                                        Organizational Maturity                                                                                                                                                                                                                                                                                                                                       Org name
1. Vision, Goals, Buy-in
                                                                                                                                                                                                                                                                                 Section name                                                                   Section name                                                                     Section name                          Section name

                                                                                                                                                                                                                                                                                                                USED AT:      AUTHOR: Joel Van Berkum                           DATE: 10/21/98            WORKING                 READER            DATE CONTEXT:
                                                                                                                                                                                                                                                                                                                              PROJECT: MWSSS SOFTWARE PROCESS                   REV: 10/22/98             DRAFT
                                                                                                                                                                                                                                                                                                                                                                                                          RECOMMENDED


                                                                                Organization
             USED AT:        AUTHOR: Joel Van Berkum                             DATE: 9/18/98    WORKING             READER           DATE   CONTEXT:
                             PROJECT: MWSSS SOFTWARE PROCESS                     REV:   11/2/98   DRAFT                                                                                                                                                                                                                       NOTES: 1 2 3 4 5 6 7 8 9 10                                                 PUBLICATION                                        2
                                                                                                  RECOMMENDED
                             NOTES: 1 2 3 4 5 6 7 8 9 10                                          PUBLICATION                                 -0                                                                                                                                                                Validated     OASB minutes     OARB minutes
                                                                                                                                                                                                                                                                                                                                                                                             21ST SW
                                                                                                                                                                                                                                                                                                                RCP                                                                                                                                     CCB package template
                                                                                                                                                                                                                                                                                                                                                                                             21-10401




2. Process    RCP


                                                                                 Processes
                                                                                                                                       MWSSS OI 21-7                                                                                                                                                            Delayed
                                                                                                                                                                                                                                                                                                                CCB                PERFORM VCN
                                                                                                                                                                                                                                                                                                                                                                                                                          Best
                                                                                                                                                                                         3. Gap Analysis
                     PROCESS RCP         Vali dated
                       PHASE 1           RCP                                                                                                                                                                                                                                                                    package              ANALYSIS
                                     1
                                                                                                                                                                                                                                                                                                                                                     Releas e Factors
                                               PLAN, COORDINATE
                                                                                                                                                                                                                                                                                                                Rejected
                                                AND APPROVE A            Fi nal CCB package                                                                                                                                                                                                                     contractor
                                                 MAINTENANCE
                                              SOFTWARE PROJECT
                                                   PACKAGE
                                                                                                                                                                                                                                                                                                                cos t
                                                                                                                                                                                                                                                                                                                propos al
                                                                                                                                                                                                                                                                                                                                             2.1.1
                                                                                                                                                                                                                                                                                                                                                            CONSULT WITH
                                                                                                                                                                                                                                                                                                                                                            SOFTWARE IPT
                                                                                                                                                                                                                                                                                                                                                                                Informal as s es s ment
                                                                                                                                                                                                                                                                                                                                                                                of Releas e Factors
                                                                                                                                                                                                                                                                                                                                                                                                                          Practices
  Capture
                                                   PHASE 2
                                                                2                  PUT THE                                                                                                                                                                                                                                                                              2.1.2
                                                                                MAINTENANCE           Awarded
                                                           CCB VCN            SOFTWARE PROJECT        Contract
                                                           approval             ON CONTRACT                                                                                                                                                                                                                                                                                          PREPARE
                                                                                   PHASE 3                                                                                                                                                                                                                                                                                             CCB                                                                           CCB package
                                                      Rej ected                                              MANAGE THE
                                                      contractor cos t                            3          EXECUTION OF          Operational acceptance m es s age                                                                                                                                                                                                                 PACKAGE
                                                      propos al                                            THE MAINTENANCE                                                                                                                                                                                                                                                               2.1.3
                                                                                                          SOFTWARE PROJECT
                Contractor                                                                                      PHASE 4                       CAT2 Deficiencies
                Reports
                                                                                                                         4

                                                                                                                                     CLOSEOUT THE
                                                                                                                                      MAINTENANCE                                                                                                                                                                                                                                          PREPARE ACQUISITION
                                                                                                                                   SOFTWARE PROJECT                                                                                                                                                                                                                                         STRATEGY BRIEFING
                                                                                                                                        PHASE 5
                                                                                                                                                           5
                                                                                                                                                                                                                                                                                                                                                                                                                  2.1.4

                                                                                                                                                         Dis tri buted                                                                                                                                                                                                                                                         CONDUCT
                                                                                                                                                         s igned                                                                                                                                                                                                                                                              ACQUISITION
                                                                                                                                                         project                                                                                                                                                                                                                                          Acquis ition         STRATEGY
                                                                                                                                                         closeout
                                                                                                                                                                                                                                                                                                                                                                                                          strategy briefing
                                Pers onnel
                                                                                                                                                         report                                                                                                                                                                                                                                                                      2.1.5


                                                                                                                                                                                                                                                                                                                                                                                                                              Validated RCP               PREPARE AND Draft VCN
             NODE:                           TITLE:                                                                          NUMBER:
                                                       MAINTAIN AIR FORCE SPACE COMMAND                                                                                                                                                                                                                                                                                                                                                                    COORDINATE
                         0                                     SENSOR SOFTWARE                                                                                                                                                                                                                                                                                                                                                                              DRAFT VCN
                                                                                                                                                                                                                                                                                                                                                                                                                                         Approved                  2.1.6
                                                                                                                                                                                                                                                                                                                                                                                                                                         acquis ition
                                                                                                                                                                                                                                                                                                                        Sens or IPT                                                                                                      s trategy
                                                                                                                                                                                                                                                                                                                                               Mys tic Algorithms



                                                                                                                                                                                                                                                                                                                NODE:                        TITLE:                                                                                      NUMBER:
                                                                                                                                                                                                                                                                                                                                                                                PLAN PROJECT
                                                                                                                                                   USED AT:         AUTHOR: Joel Van Berkum                         DATE: 9/23/98        WORKING                   READER           DATE CONTEXT:
                                                                                                                                                                    PROJECT: MWSSS SOFTWARE PROCESS                 REV:   10/23/98      DRAFT                                                                               2.1
                                                                                                                                                                                                                                         RECOMMENDED
                                                                                                                                                                    NOTES: 1 2 3 4 5 6 7 8 9 10                                          PUBLICATION                                        2

                                                                                                                                                                                                                SSM

                                                                                                                                                   Draft of VCN                                                                                                         Cus tomer               PM
                                                                                                                                                   staff s ummary




             4. Process
                                                                                                                                                   sheet                 GET DRAFT VCN                                                Draft VCN approval
                                                                                                                                                                           APPROVAL
                                                                                                                                                                                   2.3.1
                                                                                                                                                      CCB
                                                                                                                                                      package
                                                                                                                                                                                           REVIEW
                                                                                                                                                                                         CCB PACKAGE
                                                                                                                                                                                                2.3.2




                Transformation                                                                                                                                                               Proposed
                                                                                                                                                                                             CCB agenda
                                                                                                                                                                                                          DRY-RUN
                                                                                                                                                                                                            CCB

                                                                                                                                                                                                             2.3.3
                                                                                                                                                                                                                       Delayed CCB package


                                                                                                                                                                                                                              Conditionally
                                                                                                                                                                                                                              approved CCB
                                                                                                                                                                                                                              package
                                                                                                                                                                                                                                                                                                                                             From Process,
                                                                                                                                                                                                                                                                                                                                              all good things flow!
                                                                                                                                                                                                                                 MODIFY
                                                                                                                                                                           Configuration                                          CCB                                                             Delayed CCB
                                                                                                                                                                           Management                                            SLIDES                             Final CCB                     package
                                                                                                                                                                                                                                    2.3.4              REVIEW       agenda
                                                                                                                                                                                                               Approved
                                                                                                                                                                                                               CCB                                      CCB
                                                                                                                                                                                                               package                                PACKAGE
                                                                                                                                                                                                                                                           2.3.5
                                                                                                                                                                                                                                                                                                Final CCB package
                                                                                                                                                                                                                                Configuration Management
                                                                                                                                                                                                                                                                            REVIEW VCN
                                                                                                                                                                                                                                                                              BY CCB                       CCB
                                                                                                                                                                                                                                                                                            Dis approved
                                                                                                                                                                                                                                                                                                           minutes
                                                                                                                                                                                                                                                                                            CCB
                                                                                                                                                                                                                                                                                            package
                                                                                                                                                                            Pers onnel

                                                                                                                                                                                                                                                                                    2.3.6       CCB VCN
                                                                                                                                                                                                                                                                                                approval
                                                                                                                                                   NODE:                            TITLE:                                                                               NUMBER:
                                                                                                                                                                                                                    APPROVE VCN
                                                                                                                                                                  2.3




                                                                                           Process                                                                                                                                                                                                                                           Activity
    Project                                                                                                                                                                                                 Metrics
                                                                                            Level                                                                                                                                                                                                                                             Based                                                                                                                            Simulation
  Management                                                                              Evolution                                                                                                         Capture
                                                                                                                                                                                                                                                                                                                                             Costing
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   CMMI 70
          CMMI Benefits

• CMMI product users can expect to:
  – Efficiently and effectively improve and
    assess multiple disciplines across their
    organization
  – Reduce costs (including training) associated
    with improving and assessing processes
  – Deploy a common, integrated vision of
                                              Improved
    process improvement that can be used       Processes

    as a basis for enterprise-wide process
    improvement efforts.
                                               CMMI 71
                       The promise...
• CMMI team is working to
  assure the CMMI Product
  Suite addresses needs of
  software and systems
  engineering communities
  of practice
• Use of an integrated model
  to guide enterprise process
  improvement promises to
  be one of the more
  sustainable & profitable
  initiatives that any
  organization might pursue
                                        CMMI 72