MOUNTING AVANTA PLUS Please read the instructions given on this

Reviews
Shared by: guy24
Stats
views:
16
rating:
not rated
reviews:
0
posted:
1/10/2009
language:
UNKNOWN
pages:
0
MOUNTING AVANTA PLUS Please read the instructions given on this template before installing the Avanta Plus. WITH STANDARD MOUNTINGFRAME 158 mm Flue / Air inlet connection Ø 60 / 100 mm 1 Check box contents. Ensure that all components are included. Report incomplete delivery to Broag. 3x 3x Copper tails Nylon plugs and screws for fixing mounting frame Installation and service manual This document contains useful and important information for the correct installation, operation and maintenance. Keep the Installation and service manual in a safe place together with the other boiler documents. Users guide Reed the instructions carefully and keep the document in a safe place. DHW inlet (cold) valve set Short users guide Filling loop 3x Instructie service AvantaPlus Avanta Plus (including pressure gauge and safety valve) Mounting frame (including isolation valve set and washers) Boiler Log Book and warranty card. See that the Boiler Logbook has been completed by the engineer at each service and keep it in a safe place. 2 Mounting Avanta Plus Based on the guidelines and the required installation space, determine where to mount the Remeha Avanta Plus. In determining the boiler position, consider carefully the flue outlet position and any pluming consequences. Read the Installation and service manual for more details and regulations for mounting the Avanta Plus. 1 2 3 2x ø10 mm ø8 mm ø10 mm 1x 4 1. Using the template determine and mark the position of the three mounting holes, making sure the plate is absolutely level. 2. Drill the (Ø 10 mm) holes; Fit the (Ø 10 mm) plugs; Fit (Ø 8 mm) screws into the plugs; Check the mounting plate is level and tighten the screws; Fit the DHW inlet (cold) valve set to the mounting plate. 3. Fit fibre Washers on HTG Valves. Suspend the boiler on mounting plate. 4. Connect the valves to the boiler remembering to fit fibre washers supplied. Connect the supplied copper tails to the isolating valves. 3 Connecting external controls 4 Hang up the Short users guide 8 7 X9 X2 Connecting OpenTherm room controls (e.g. the Remeha Celcia 15 or 20): Mount the control in a reference room (usually the living room). Connect the two-wire interface cables to connectors 7 and 8 of the X9 terminal strip. When using the Celcia 20 it is possible to add the outside sensor to provide weather compensation with room adjustment. Connect the outside sensor to connectors 1 and 2 of the X9 terminal strip. Connecting the (optional) two channel time clock. • Live 230 V supply for the time clock - connect to connectors 1 (N) and 2 (L) on X2 terminal strip. • For HTG - connect the 230 V output from time clock to connector 5 and remove exist link between connectors 1 and 4 of the X2 terminal strip. • For DHW - connect the 230 V output from time clock to connector 3 remove exist link between connectors 3 and 4 of the X2 terminal strip. Hang this card underneath or close to the boiler. condensate drain connection 3/4" (standard overflow pipe size) pipe safety valve Ø 15 mm Flow connection Ø 22 mm DHW outlet (hot) Ø 15 mm gas connection Ø 22 mm DHW outlet (cold) Ø 15 mm return connection Ø 22 mm 113031-0406 LTALW7H000101b MOUNTING AVANTA PLUS Please read the instructions given on this template before installing the Avanta Plus. WITH OPTIONAL STAND OFF FRAME 158 mm Flue / Air inlet connection ø 60 / 100 mm 1 Check box contents. Ensure that all components are included. Report incomplete delivery to Broag. 4x 4x Copper tails Nylon plugs and screws for fixing mounting frame Installation and service manual This document contains useful and important information for the correct installation, operation and maintenance. Keep the Installation and service manual in a safe place together with the other boiler documents. Users guide Reed the instructions carefully and keep the document in a safe place. 4x Instructie service AvantaPlus DHW inlet (cold) valve set Short users guide Filling loop Avanta Plus (including pressure gauge and safety valve) Mounting frame + Stand off frame (including isolation valve set and washers) Boiler Log Book and warranty card. See that the Boiler Logbook has been completed by the engineer at each service and keep it in a safe place. 2 Mounting Avanta Plus Based on the guidelines and the required installation space, determine where to mount the Remeha Avanta Plus. In determining the boiler position, consider carefully the flue outlet position and any pluming consequences. Read the Installation and service manual for more details and regulations for mounting the Avanta Plus. O this PT tem ION pla AL te S be TA fore N D ins O tall FF ing FR the AM Av E an ta 8m m 15 Plu s 1 2 3 ø10 mm ø8 mm ø10 mm 4 LTA LW7 H00 010 2a 1. Using the template determine and mark the position of the four mounting holes, making sure the plate is absolutely level. • Transfer the isolation valves and angle piece ( if applicable) from the mounting frame to the stand off frame • Throw away the mounting frame 2. Drill the (Ø 10 mm) holes; Fit the (Ø 10 mm) plugs; Fit (Ø 8 mm) screws into the plugs; Check the stand off frame is level and tighten the screws; Fit the DHW inlet (cold) valve set to the mounting plate. 3. Fit fibre Washers on HTG Valves. Suspend the boiler on mounting plate. 4. Connect the valves to the boiler remembering to fit fibre washers supplied. Connect the supplied copper tails to the isolating valves. * shown pipework is optional 3 Connecting external controls 4 Hang up the Short users guide 8 7 X9 X2 Connecting OpenTherm room controls (e.g. the Remeha Celcia 15 or 20): Mount the control in a reference room (usually the living room). Connect the two-wire interface cables to connectors 7 and 8 of the X9 terminal strip. When using the Celcia 20 it is possible to add the outside sensor to provide weather compensation with room adjustment. Connect the outside sensor to connectors 1 and 2 of the X9 terminal strip. Connecting the (optional) two channel time clock. • Live 230 V supply for the time clock - connect to connectors 1 (N) and 2 (L) on X2 terminal strip. • For HTG - connect the 230 V output from time clock to connector 5 and remove exist link between connectors 1 and 4 of the X2 terminal strip. • For DHW - connect the 230 V output from time clock to connector 3 remove exist link between connectors 3 and 4 of the X2 terminal strip. Hang this card underneath or close to the boiler. condensate drain connection 3/4" (standard overflow pipe size) pipe safety valve ø 15 mm Flow connection ø 22 mm DHW outlet (hot) ø 15 mm gas connection ø 22 mm DHW outlet (cold) ø 15 mm return connection ø 22 mm

Related docs
Other docs by guy24
Agreement-Accounting Retainer Agreement
Views: 1596  |  Downloads: 56
Service providers business plan
Views: 772  |  Downloads: 56
Sexual Harassment Policy
Views: 289  |  Downloads: 3
Goodrich Corp Ammendments and Bylaws
Views: 209  |  Downloads: 1
Evolution and Ethics
Views: 478  |  Downloads: 4
Application to Extend Time
Views: 179  |  Downloads: 0
Drugstorecom Inc Ammendments and By laws
Views: 285  |  Downloads: 1
Loan Application Bank Review Form
Views: 550  |  Downloads: 10
Duke ECE 163 Lab Manual
Views: 1103  |  Downloads: 30
Board Resolution Suspending an Officer
Views: 182  |  Downloads: 2