					SCHEDULE OF DESIGNATED SERVICES (Minimum)




                                                                                       Bidding/Negotiation Phase
                                                                                       Contract Document Phase
PLUMBING DESIGN DOCUMENTS




                                                                                       Schematic Design Phase




                                                                                       Contract Admin. Phase
PROJECT:




                                                                                       Design Develeopment
                                                                                       Site - Analysis Phase




                                                                                       Post Contract Phase
(Project Name)




                                                                                       Pre-Design Phase
(Building)


OFEO PROJECT NO:
DATE: (Insert Date)
Prepared By: (Insert Design Manager's Name)
Check List: Provide Services for items indcated with Solid Blocks                                                  Remarks and Exceptions
          Existing Facilities Survey consist of:
          Analysis of existing plumbing systems capabilities
          Analysis of existing plumbing systems capabilities
   PRE-DESIGN SERVICES




          Analysis of existing plumbing systems capabilities
          Existing plumbing systems to be used and necessary modifications-Narrative
          New plumbing systems-Narrative
          Analysis of existing fire protection systems capabilities
          Analysis of existign building security systems capabilities
          Analysis of existing building energy management systems capabilities
          Review of existing drawings for critical inaccuracies
          Development of updated existing conditions drawings
          Schematic concept design
          Economic Feasibility Studies
          Cost Estimate




                                                                                                                           Page 1 of 3
SCHEDULE OF DESIGNATED SERVICES (Minimum)




                                                                                               Bidding/Negotiation Phase
                                                                                               Contract Document Phase
PLUMBING DESIGN DOCUMENTS




                                                                                               Schematic Design Phase




                                                                                               Contract Admin. Phase
PROJECT:




                                                                                               Design Develeopment
                                                                                               Site - Analysis Phase




                                                                                               Post Contract Phase
(Project Name)




                                                                                               Pre-Design Phase
(Building)


OFEO PROJECT NO:
DATE: (Insert Date)
Prepared By: (Insert Design Manager's Name)
Check List: Provide Services for items indcated with Solid Blocks                                                          Remarks and Exceptions
          Submit documents that reflect:
          Accurate existing conditions at the project site
          Proposed new work identified in the SOW
   SCHEMATIC DESIGN PHASE SERVICES




          Design Development documents outline of the working drawing set
          Documents prepared at the scales and sheet size for Const. Documents
          Incorporate SI Schematic Design comments and approved decisions.
          Development of conceptual design solutions for:
                 PRE-DESIGN




          Energy solutions
          Energy conservation
          Equipment for each functional space
          Life cycle cost analysis
          Tentative location/sizes of mechanical equipment room, principal shafts for risers
          Block layout of plumbing equipment
          Plumbing system engineering calculations utilizing computer software spread sheets
          Sanitary and Waste Water Disposal system
          New or modified water treatment system-Narrative
          Areas of new irrigation system
          Invert elevations of sewers
          Fire & smoke partitions
          Domestic Hot and Cold Water distribution system
          Generation of domestic hot water demand
          Storm water disposal system
          Natural Gas service
          Other gases systems
          Fire protection system
          General space requirements for chases, risers, fire pump room, mechanical room etc




                                                                                                                                   Page 2 of 3
SCHEDULE OF DESIGNATED SERVICES (Minimum)




                                                                                              Bidding/Negotiation Phase
                                                                                              Contract Document Phase
PLUMBING DESIGN DOCUMENTS




                                                                                              Schematic Design Phase




                                                                                              Contract Admin. Phase
PROJECT:




                                                                                              Design Develeopment
                                                                                              Site - Analysis Phase




                                                                                              Post Contract Phase
(Project Name)




                                                                                              Pre-Design Phase
(Building)


OFEO PROJECT NO:
DATE: (Insert Date)
Prepared By: (Insert Design Manager's Name)
Check List: Provide Services for items indcated with Solid Blocks                                                         Remarks and Exceptions
          Submit Design drawings and outline specifications that establish:
  DESIGN DEVELOPMENT PHASE




          Building plumbing systems calculations utilizing standard computer software
          Approximate equipment sizes and capacities with supportive calculations
     PRE-DESIGN SERVICES




          Preliminary plumbing equipment layouts
        35% SUBMITTAL




          Required utility services capacities and service entrance location and sizes
          Required chases and clearances
          Visual impacts
          Energy conservation analysis indicating savings
          Domestic hot water generator sizing and calculations
          Plumbing fixtures locations
          Sanitary, domestic cold & hot water, storm water and risers locations and sizing
          fire protection risers locations and sizing
          Fire protection pump location and fire service entrance and sizing
          Project Cost estimate
          Submit Construction Drawings and Specifications that consist of:
  SUBMITTAL




          Documents (Drawings and Specifications complete and biddable in every respect)
          Response for all previous SI review comments and approval decisions
     95%




          Compiled Final Plumbing Engineering Calculations:
          including all equipment/fixtures catalogue cut sheets with sizes, capacities,
          model numbers, performance curves highlighted.
          Submit Final Design drawings and Specifications that consist of:
          Final Drawings - 100% complete
          Final Specifications - 100% complete
        FINAL SUBMITTAL




          Construction Submittal/Sample Schedule
          Final Project Cost Estimate - 100% complete
          Compiled Final Mechanical, Plumbing and Fire Protection Engineering Calculations:
          including all equipment catalogue cut sheets with sizes, capacities,
          model numbers, performance curves highlighted.
          Construction Schedule
          CD-rom contaning electronic files of Specifications
          CD-rom contaning electronic files drawings
          Responses to 95% submittal documents