					                                        DAMODAR VALLEY CORPORATION
                                     BOKARO„B‟THERMAL POWER STATION(O&M)
                              P.O.:BOKARO THERMAL, DIST.:BOKARO[JHARKHAND],PIN:829107
Ref.: No. BT/B(O&M)/T/09-10/WC/CM/MS-I/1999/ E-521                                                   Dated:31/10/2009

                                                  TENDER NOTICE
Sealed tenders in duplicate are invited for the under mentioned jobs from the experienced & eligible bidders:
1)           NAME OF WORK                    :: A)Annual Maintenance Contract (AMC) of Milling System in all the three
                                                 Units of DVC, BTPS‟B‟ &
                                               B) Overhauling of Coal Mills (10 Nos.) & Besta Coal feeders (15 Nos.).
2)          ESTIMATED VALUE       :: Rs.1,37,29,459/- only.
3)          EARNEST MONEY         :: Rs.2,74,590/- only.
4)          COST OF TENDER PAPERS :: Rs.1500/-only
             [NON-REFUNDABLE]
5)          DATE OF SALE OF TENDER PAPER :: Upto 14/12/2009
                                                                 nd
             (From 10:00 to 12:00 hrs. except for Sunday/Holiday/2    Saturdays)
6)       LAST DATE OF SUBMISSION OF TENDER PAPER:: 22/12/2009 (Upto 3:30 PM).
7)       DATE OF OPENING                                        :: 22/12/2009 (After 3:30 PM).
8)       QUALIFYING REQUIREMENTS:
        Bidders must enclose the documentary evidence in support of the following QR along with the offer, failing which
        their tender may be rejected:-
     i) The bidders must have experience of having executed annual maintenance contract involving running,
          routine, preventive, major break down maintenance, overhauling etc. of mechanical, electrical and C&I
          equipments of 8.5E9/8.5E10 Coal Milling systems in any large power stations (Unit Capacity 110 MW or
          above) for at least one year during last 07 years ending last day of month previous to the one in which offers
          are invited.
     ii) The firms should have completed similar works during last 7 years ending last day of month previous to the
          one in which offers are invited should be either of the following:
            a) Three similar completed works each costing not less than the amount equal to 40% of the total
                 estimated Cost of Rs.1,37,29,459/- only
                                                                       or
            b) Two similar completed works each costing not less than the amount equal to 50% of the total estimated
                 Cost of Rs.1,37,29,459/- only
                                                                       or
            c) One similar completed work costing not less than the amount equal to 80% of the total estimated Cost
                 of Rs.1,37,29,459/- only.
                      Similar works
                       Similar work means execution of AMC work involving running, routine, preventive, major break
                          down maintenance, overhauling etc. of mechanical, electrical and C&I equipments of coal milling
                          system of 8.5E9/8.5E10 Ball & Race mills/Bowl mills, coal feeders, PA fans & associated systems.
                      Completed works
                       Completed Work means the executed/completed portion of work orders for AMC work involving
                          running, routine, preventive, major break down maintenance, overhauling etc. of mechanical,
                          electrical and C&I equipments of coal milling system of 8.5E9/8.5E10 Ball & Race mills/Bowl mills,
                          coal feeders, PA fans & associated systems, even if the work has not been completed in totality
                          (subject to furnishing proof of executed value of the work in the form of certified copies of RA
                          bills).
                       Bidders should also furnish self certified photo copy/copies of orders together with successful
                          execution/completion certificate or documents like payment made through RA bills or any other
                          instruments in respect of furnished orders which can show the execution of the same, is required
                          for compliance of qualifying requirement.
     iii)    Valid Service tax Registration/VAT Registration & clearance Certificates,(as applicable).
     iv)     Company registration, article of association, Proprietorship or partnership deed, if any, as the case may be.
     v)      Annual Audited Accounts Report of preceding three years for determination of Working Capital position,
             Overall profitability, Debt equity Ratio, average annual turnover (AAT) etc. Average annual turnover during last
                                     st
             three years ending 31 March of the previous financial year should be at least 30% of the total estimated cost.
     vi)     A certificate from the Banker (other than Co-operative and Rural Bank) of the tenderer on financial soundness.
     vii)    A tolerance limit (say 5%) on the quantum of QR may be provided to take care of the marginal shortfall, if any.
     viii)   The indenting bidders must enclose the documentary evidence authenticated by the bidder with seal in
             support of fulfillment of qualifying requirement, as fixed above, along with their offer failing which their offer
             may not be considered.

SIGNATURE OF TENDERER
9)    Tenderer paper may be obtained by downloading the same from DVC‟s Website“dvctender.com” &
      “dvcindia.org” for submission.
10)   Tenderer in person or his authorized representative duly authenticated by notary may also obtain the tender
      paper from the office of the Suptdg.Engineer(Tech.), DVC, BTPS „B‟(O&M), P.O.:Bokaro Thermal, Dist.:Bokaro-
                                                                      nd
      829107 [JHARKHAND] on all working days(except Sunday, 2 Saturday & Holiday) between 10:00 hr to 12:00
      hrs.
11)   Self certified Xerox copies of all the documents related to QR should be brought at the time of purchase of
      tender paper.
12)   The tender documents may be issued to those intending tenderer who prima-facie meet the specified qualifying
      requirement and on endorsement on their application by the Suptdg. Engineer (Tech.), DVC, BTPS „B‟(O&M)
      and thereafter the cost of tender documents (Non refundable) is to be deposited in the office of the
      Sr.Addl.Chief Accounts Officer, DVC, BTPS. Tender paper will be issued by Suptdg. Engineer (Tech.), DVC,
      BTPS „B‟(O&M), against the receipt of the Accounts Dept. BTPS for such payment of cost of tender documents.
13)    Issuance of tender documents or downloading the same from DVC website shall not automatically
      imply qualification of the firm for bidding which shall be determined during bid evaluation.
14)   The cost of tender documents is to be deposited either in cash OR in the form of Demand Draft/Pay Order in
      favour of Sr.Addl.Chief Accounts Officer, DVC, BTPS payable at State Bank of India (Code 0045) or Bank
      of India, Bokaro Thermal Branch, P.O.-Bokaro Thermal, Dist-Bokaro-829107(Jharkhand)]. In case tender
      documents are downloaded from DVC‟s website, cost of tender paper is to be remitted only in the form of
      Demand Draft/Pay order in favour of Sr.Addl.Chief Accounts Officer, DVC, BTPS payable at State Bank of
      India (0045) or Bank of India, Bokaro Thermal Branch.
15)   If last date of sale of tender paper and/or date of submission & opening of tender is declared a holiday or there
      is unavoidable functional disruptions at our premises, due to unforeseen circumstances or administrative
      reasons, then that/those will be shifted to the next working day at the same time.
16)   Tenders received after scheduled time and date fixed for the purpose will not be considered. DVC will not
      accept any responsibility for delay in submission of tender beyond scheduled time and date fixed for the
      purpose.
17)   Request for Tender Document by post/fax/e-mail will not be entertained.
18)   No downloaded tender will be considered as valid if it is not accompanied with requisite Cost of tender
      document and Earnest Money.
19)   Instruction regarding submission of tender and other details will be available in the Tender Documents and
      should be followed strictly.
20)   Once a set of tender documents is purchased by a prospective tenderer, the price thereof will not be refunded
      on any circumstances. Tender documents issued in the name of a firm are not transferable.
21)   DVC reserves the right to amend the NIT/bidding document prior to deadline of submission of bid, for any
      reason whatsoever, including any change after pre-bid conference. Any amendment/addendum/
      corrigendum/extension, if required pertaining to NIT will be hoisted in DVC website only and will not be
      published in newspaper again.
22)   Intending tenderers are requested to visit the DVC‟s website regularly for any amendment/addendum/
      corrigendum/extension, if any, till opening of the NIT.
23)   DVC reserves the right not to issue/accept tender documents to any intending bidders with whom DVC has
      stopped entering into business by virtue of policy decision.
24)   In case any difficulties faced by the tenderers in submitting the tender within the specified date and time, the
      following two officers may be contacted:
               i) Shri B.D.Sahu, Superintending Engineer(Tech), DVC, BTPS-B
               ii) Shri R.K.Sahoo, SDE(Mech), Engg & Tech. Section, DVC, BTPS-B
25)   DVC reserves the right not to issue/accept tender documents even the lowest rate quoted by the tenderer and
      reject any or all the tenders and to split up and award the order to more than one tenderer without assigning
      any reason thereof.
26)   All tenderers would be bound by the terms and conditions as detailed in tender specifications by the DVC and
      enclosed GCC.




                                                                           SUPTDG. ENGINEER (TECH.)
                                                                              DVC, BTPS „B‟(O&M)
                                                             DECLARATION


Ref.: No. BT/B(O&M)/T/09-10/WC/CM/MS-I/1999/ E-521                                                                       Dated:31/10/2009

Sub:A)Annual Maintenance Contract (AMC) of Milling System in all the three Units of DVC, BTPS‟B‟                                      &
    B) Overhauling of Coal Mills (10 Nos.) & Besta Coal feeders (15 Nos.).
  ----------------------------------------------------------------------------------------------------------------------------------------------------

In response to the NIT No.BT/B(O&M)/T/09-10/WC/CM/MS-I/1999/E-521 Dated:31/10/2009 we hereby submit our
best offer for consideration.




We have gone through the “Terms & Condition” of the NIT No. BT/B(O&M)/T/09-10/WC/CM/MS-I/1999/E-521
Dated:31/10/2009 and its related tender documents very carefully and hereby declare that we agree to all the terms
and conditions stipulated therein.




          The information and documents as furnished in our tender are true to the best of our knowledge and belief.


                                                                          Signature :
                                                                          Full Name :
                                                                          Designation :

Place :
Dated :
                                                             (Seal of the Tenderer)


Enclo. :
a) Sealed „A‟ Envelope containing the required cost of tender documents (if downloaded from the website) and
    EMD.
b) Sealed „B‟ envelope containing the techno-commercial bid along with deviation schedule.
c) Sealed „C‟ envelope containing the price bid along with cost of withdrawal of deviation, if any.


Note
# This Declaration Form is to be signed and returned, by placing the same inside the „B‟ envelope, along with other
contents of the envelope.




              SIGNATURE OF TENDERER
                                                       -::1::-
                                                                                                    ANNEXURE-I
                                                                                             (Techno-Commercial)
Ref.: No. BT/B(O&M)/T/09-10/WC/CM/MS-I/1999/ E-521                                          Dated:31/10/2009

Sub:A)Annual Maintenance Contract (AMC) of Milling System in all the three Units of DVC, BTPS‟B‟      &
    B) Overhauling of Coal Mills (10 Nos.) & Besta Coal feeders (15 Nos.).
                                       INSTRUCTIONS TO THE BIDDERS
The offers are invited through open NIT in single stage, two bid, three envelope (all placed under a large main
envelope) mode comprising of the following:
1)MODE OF SUBMISSION OF TENDER :
Large Main Envelope: Bidders will be required to submit their best offer in duplicate in a large sealed envelope
superscribing on it “Enquiry No. and date”. Also indicate the name and address of the firm and due date of
opening on the envelope containing envelope A, B & C.
a) Envelope A : Envelope „A‟ superscribed on it “Earnest Money, cost of tender documents(if downloaded from
   DVC‟s website) against Tender Notice No. and Date” should contain Earnest Money, cost of tender documents
   as the case may be in the desired form.
b) Envelope B : Envelope „B‟ superscribed on it “Techno-commercial bid against Tender Notice No. and Date”
   shall contain supporting documents for Qualifying Requirement as asked in the NIT and techno-commercial
   offers along with declared „Deviation Schedule‟, if any, as per format given in the tender.
 Envelope B will contain the following:
   i)     Copy of the NIT duly signed with seal on each page of its body.
   ii)    Declaration by the tenderer (as per format).
   iii)   Annexure-I to VIII which should be duly filled in, wherever necessary, as well as the blank B/G format for
          EMD (Annexure-VIII) with the signature & seal of the tenderer at the respective indicated places on all the
          pages of the said annexure/s and to be enclosed along with the Techno-commercial bid.
   iv)    Techno-commercial Deviation schedule and/or with „NIL deviations‟ as applicable, with their signature and
          seal on all the pages (Annex.-VII).
   v.     Techno-commercial Deviations, if any, mentioned elsewhere and not brought out in the deviation schedule
          (Annexure-VII) of Techno-Commercial Part, placed under envelope „B‟ and cost of withdrawal of declared
          deviations (Annexure A of Price Part, placed under envelope „C‟), will not be considered.
c) Envelope C: Envelope „C‟ superscribed on it “Price Bid against Tender Notice No. and Date” should contain the
   Price Schedule along with the withdrawal prices for declared deviations in techno-commercial part, if any, as per
   the format given.
 Envelope „A‟ will be opened on the due date and contents of the envelope will be prima facie checked.
 Envelope „B‟ will be opened only after prima facie checking of the instruments for EMD and cost of tender
    documents, if downloaded from DVC‟s website, contained in the envelope „A‟.
 However, even after opening of the „B‟ envelope, a thorough scrutiny of EMD, cost of tender documents will be
    made. If the instruments for EMD, cost of tender documents submitted against the offer is/are found not in line
    with the enquiry, the same may not be accepted.
 Envelope „C‟ will be opened only for techno-commercially and QR complied bids at a date to be notified later on.
 There will be no scope for supplementary price bid. The original price bid submitted will be final.

2)COST OF TENDER DOCUMENTS (NON-REFUNDABLE) & EARNEST MONEY :
 a)COST OF TENDER DOCUMENTS: Rs.1500/-(Rs. One Thousand five hundred) only
i) If tender document is issued from the office of the Suptdg. Engineer(Tech.), DVC, BTPS „B‟(O&M), the cost of
tender documents(Non-refundable) is to be deposited either in cash OR in the form of Demand Draft/Bankers
Cheque in favour of the Sr. Addl. Chief Accounts Officer, DVC, BTPS payable at State Bank of India
(code:0045) or Bank of India, Bokaro Thermal, Dist-Bokaro-829107.
 ii) In case tender documents are downloaded from DVC‟s website, the cost of tender documents (Non-refundable)
is to be remitted in the form of Demand Draft/Bankers Cheque in favour of Sr. Addl.Chief Accounts Officer,
DVC, BTPS payable at State Bank of India (code: 0045) or Bank of India, P.O.-Bokaro Thermal, Dist-Bokaro:
829107(Jharkhand) and will be required to be placed in envelope „A‟.
b)EARNEST MONEY DEPOSITS:Rs.2,74,590/- (Rs. Two Lac Seventy four Thousand Five hundred Ninety)
only.
Earnest Money shall be deposited in any of the following mode :
National Saving Certificates endorsed in favour of Sr. Addl.Chief Accounts Officer, DVC, BTPS, fixed deposit
receipt issued by nationalized Bank, DVC Bonds endorsed in favour of DVC or Pay Order or Demand Draft in
favour of the SR. ADDL.CHIEF ACCOUNTS OFFICER, DVC, BTPS payable at SBI (code:0045) or Bank of India,
Bokaro Thermal or Bank Guarantee (as per Proforma & instruction given in ANNEXURE-VIII of Techno-commercial
bid) from a Nationalized/Scheduled Bank (except Rural/Co-operative Bank). No tender will be considered as valid
without acceptance of applicable EMD.

SIGNATURE OF TENDERER                                                                            Cont‟d... P/2
                                                        -::2::-
 In the event of submission of BG in lieu of Earnest Money, the B.G. shall not be accepted and bid shall
be rejected if: (a) The name of the NIT mentioned in the BG is different from the NIT for which bid have been
invited. (b) The firm/proprietor, on whose behalf the bank guarantee has been furnished, is different from the bidder.
(c) The Bank Guarantee is not of the prescribed value. (d) The validity of the Bank Guarantee is less than the
stipulated period. (e) The Non Judicial stamp paper has not been purchased in the name of the executing bank & (f)
The NJ stamp paper purchased more than six month earlier from the date of execution of the BG.
FORFEITURE OF EMD
The EMD may be forfeited
    In case the purchase order/work order is not executed by the vendor in full.
    In case a bidder withdraws his offer within the offer validity period specified by the bidder.
    If the bidder does not accept the arithmetical correction of its Bid Price.
    If the Bidder does not withdraw any deviation at the cost of withdrawal price indicated by him in „deviation
      schedule‟.
    If the bidder refuses to withdraw, without any cost to the owner, any deviation not listed in deviation
      schedule but found elsewhere in the bid.
    In the case of a successful bidder, if the bidder fails within the specified time limit as mentioned in the
      purchase order/contract to furnish the acceptance of contract.
    In case of a successful bidder, if the bidder fails to submit Security Deposit-cum-Performance BG within 30
      days from last day of the stipulated period mentioned in the Purchase Order/Work Order/LOA/LOI.
    For those tenderers who are found to be indulging in changing/adding or deleting the contents of the
      downloaded tender documents.
REFUND OF EMD:
      Earnest Money will be refunded to the unsuccessful tenderer after finalization of contract and no interest will
       be paid for the same.
    Earnest money will be refunded to the successful tenderer, after acceptance of their Security deposit-cum-
       performance B.G./successful completion of the order, as the case may be.
EXEMPTION OF COST OF TENDERS & EMD:
    Not applicable in the case of works.
 In addition to the above, other points to be noted and followed strictly for the purpose of the execution
   of the BG as stipulated under the instruction of submission of BG in Annexure-VIII.
1) All documents to be submitted shall be self-certified. However, the original documents in respect of the
    submitted one may be called at any stage of processing of the tender and during contract period. If any
    discrepancy is found between the original and self certified ones, the tender/contract shall be liable to be
    rejected.
2) A tender must accompany documentary evidence in support of qualifying requirement under envelope „B‟ and
    tender which does not comply with any of the conditions given in the NIT is likely to be rejected.
3) DVC shall not be responsible in any way for any delay/difficulties/ inaccessibility of downloading facility from the
    website for any reason whatsoever.
4) DVC does not own any responsibility for any alteration/omission in the contents of the tender documents
    downloaded from website.
5) The tenderers who are found to be indulging in changing/adding or deleting the contents of the downloaded
    tender documents will be liable to face necessary action as deemed fit including banning, suspension of
    business dealings etc.
6) Tenderers will be solely responsible for the correctness/genuineness of the downloaded tender documents
    from the website. If the offer submitted through the downloaded tender documents which are incomplete, or
    with changed contents, the offer is liable to be rejected.
7) In case of any discrepancies found between the downloaded documents and Master copy of the tender
    documents available in the office of tender issuing authority, the later shall prevail and will be binding on
    tenderer. No claim on this account will be entertained or given cognizance.
8) Tender submitted by the tenderers through Fax/Telegrams/e-mail will not be considered valid.
9) Ambiguous, conditional and unsigned tenders may not acceptable.
10) There should not be any marks of erasers. Alternation, if any, shall be initialed with date by the person signing
    the tender.
11) Canvassing in any form will render the tender liable to be rejected.
12) The intended bidders may visit the site & existing system with prior permission of the engineer-in–charge, MS-I,
    DVC, BTPS „B‟(O&M) at their own cost before submitting their offer.
13) The intending tenderers or their authorized representatives may attend the opening of tender.
14) Techno-commercial deviations, if any, mentioned elsewhere and not brought out in the deviation schedule
    (Annexure-VII of Techno-Commercial Part) and cost of withdrawal of declared deviations (Annexure A of Price
    Part), will not be considered.
15) The instruction herein should be followed carefully before filling up the tender and tenderer shall enclose the
    required documents as per NIT accordingly.
16) In submitting the tender, tenderer will be deemed to have understood and accepted the Terms & Conditions
    stated in the tender/tender document.
SIGNATURE OF TENDERER                                                                SUPTDG.ENGINEER(TECH.)
                                                      -::1::-

                                                                                                 ANNEXURE-II
                                                                                          (Techno-commercial)
Ref.: No. BT/B(O&M)/T/09-10/WC/CM/MS-I/1999/ E-521                                      Dated:31/10/2009

Sub:A)Annual Maintenance Contract (AMC) of Milling System in all the three Units of DVC, BTPS‟B‟   &
    B) Overhauling of Coal Mills (10 Nos.) & Besta Coal feeders (15 Nos.).

          THE INFORMATION AND STATUS OF SUBMISSION TO BE FURNISHED AS ENUMERATED
                 BELOW AND RESPECTIVE DOCUMENTS IN SUPPORT OF THOSE TO BE
                     ENCLOSED ALONG WITH THE TECHNO-COMMERCIAL BID


                                     TO BE FILLED IN BY THE TENDERER

1. Name of the firm :

  M/s. ____________________________________________________________


  Phone No. ____________________            Fax No.________________


  E-mail _________________________


2. Address of the firm :
(a) Head Office                                :




(b) Registered Office                          :




(c) Local/Branch Office                           :




(d) Works                                      :




3. Other necessary relevant information       :




SIGNATURE OF TENDERER                                                                   Cont‟d... P/2
                                                      -::2::-

                                                                                                   ANNEXURE-II
                                                                                            (Techno-Commercial)

        STATUS OF SUBMISSION OF COPIES OF STATUTORY PAPERS AND DOCUMENTS AS PER NIT
                    (Please write “SUBMITTED” OR “NOT SUBMITTED” as applicable)

1. Work Orders and proof of execution in respect                  : ------ OR ------
   of furnished orders
   (if SUBMITTED write the WO no. and proof of
   Execution of the furnished order Ref. No. in
   the table made in this annexure at the bottom)

2. Company Registration, Article of association,                  : ------ OR ------
    Proprietor-ship/partnership deed etc., if any,
    as the case may be
   (if SUBMITTED, write the ref. no. of the same)

3.    Audited Annual Accounts of preceding 03(three)              : ------ OR ------
     Years.
     (if “SUBMITTED ref. of the documents)

4.  A certificate from the Banker (except rural &                 : ------ OR ------
   Co-operative bank) of the tenderer on financial
   soundness.(if “SUBMITTED”, ref .no. of the same)
5. ISO certificate if holds the same                              : ------ OR ------
   (if “SUBMITTED”, write the certificate ref.)

6.    Valid STRC/ VATRC and STCC/VATCC                            : ------ OR ------
       (as applicable)
     (if “SUBMITTED”, write the certificate ref.)

7.   Agreed to accept DVC‟s Security-                             : -------OR-------
     Deposit-cum-Performance Guarantee Clause

8.   Agreed to accept DVC‟s Penalty Clause                        : -------OR------

09. Agreed to accept DVC‟s Payment Term                           :---------OR-------

10. Specific remarks, if any.:                                   :-----------------------



     Self certified copies of the above mentioned documents are to be enclosed.
     Original copies of certificates can be called for at any stage of the processing of the tender.
     If required, tenderer may enclose the extra sheet for furnishing any additional information.
The information as furnished above are true to the best of our knowledge and belief.




SIGNATURE OF TENDERER                                                                       Cont‟d... P/3
                                                 -::3::-
                                                                                                ANNEXURE-II
                                                                                         (Techno-Commercial)

            DETAILS OF WORK ORDERS AND PROOF/EXECUTION OF FURNISHED ORDERS:


 SL.              DETAIL OF W.O.                  Proof of WO, successful execution            REMARKS
 NO.                                           certificate in respect of furnished orders)
 01.


  02.


  03.


  04.


  05.


  06.


  07.


  08.



 The information as furnished above are true to the best of our knowledge.




                                                                    SUPTDG.ENGINEER(TECH.)
                                                                      D.V.C, Bokaro‟B‟(O&M)


SIGNATURE OF TENDERER
                                                          -::1::-
                                                                                                       ANNEXURE-III
                                                                                                TECHNO-COMMERCIAL
Ref.: No. BT/B(O&M)/T/09-10/WC/CM/MS-I/1999/ E-521                                               Dated:31/10/2009

Sub:A)Annual Maintenance Contract (AMC) of Milling System in all the three Units of DVC, BTPS‟B‟           &
    B) Overhauling of Coal Mills (10 Nos.) & Besta Coal feeders (15 Nos.).
                                                   SCOPE OF WORK
              ANNUAL MAINTENANCE CONTRACT OF MILLING SYSTEM (8.5E10 COAL MILLS)
MECHANICAL PART:
All routine, preventive, breakdown & maintenance of the milling plant shall be carried out as per the details given
hereunder by engaging well experienced site-in-charge, supervisors, skilled & semi – skilled technicians, unskilled
workers as required by the successful bidder and in close co- ordination with DVC, BTPS‟B‟ engineers, so as to
keep at least 6 mills available during operation of Boilers to have unrestricted generation on this account.

A. JOBS UNDER MECHANICAL SEGMENT OF MILLS & AUXILIARIES:
(It consists of all Running/Routine Maintenance, Preventive Maintenance, Break-down Maintenance and on unit rate
basis pertaining to coal mills & auxiliaries under Mechanical Segment)

    1. RUNNING/ROUTINE MAINTENANCE SERVICES UNDER MECHANICAL SEGMENT:-
      a)Sub-System: Coal mill including PF pipes, coal chutes, turret cone with cover, Rejection gate etc.
        i) Arresting chute leakage by jacketing of coal chute with MS plates
        ii) Arresting P.F. pipe & Y-piece leakages (Size of patches will be 2‟X3‟).
        iii) Arresting Turret cone leakages by jacketing of curve trapezoidal portion by MS plates.
        iv) Removal of rejection passages ,chocking and cleaning of scrapper chambers
        v) Removal of foreign materials.
        vi) Arresting leakages through rejection doors, scrapper chamber doors & relief gates with replacement of
             gaskets & ropes wherever required immediately.
        vii) Cleaning of rejection passages of all running mills on daily/shift basis or when ever required.
      b) Sub-System: Coal mill loading units:
        i) Detection of oil /gas leakages and their rectification including replacement if needed.
        ii) Checking of hand pump and accumulator cylinder and rectification, as required.
        iii) Oil top up in the accumulator tank.
        iv) Replacement of wearing rubber part of defective accumulator cylinders.
        v) Replacement of loading cylinder seal kit of leaky cylinders withdrawn from position.
        vi) Attending walker seal leakages and providing packing in modified assembly.
        vii) Ramming of hand pump.
        viii) Boosting up of oil & gas pressures in loading cylinders as & when required.

      c) Sub- System: Coal mill gear box, including its lub. oil system
        i) Cleaning of accumulated coal dust & oil near gear box and lubricating oil system etc.
        ii) Checking of oil level of the Gear box and oil top up, as necessary.
        iii) Checking for oil leakages from Gear box and its rectification at earliest.
        iv) Filter & cooler cleaning and their replacement, as required.
        v) Greasing of Gear box labyrinth and dust seals & coupling greasing as and when required.
        vi) Checking for tightness of gear box foundation bolts on daily basis.
        vii) Cleaning of breather plug filter element.
        viii) Monitoring of lub. oil pressure and temperature constantly and cleaning of cooler, if required.
        ix) Checking & attending water leakage from cooler/lub oil lines and BCW header and cooling lines
        x) Replacement of damaged and corroded cooling water lines and header of G/B oil cooler.
        xi) Maintaining healthy seal air pressure and proper alignment of coal mill motor and gear box.
        xii) Cleaning of gear box nozzles on weekly basis or as desired.
      d)Sub- System: P.A. Fan including its Lub. oil System.
        i) Greasing of Motor bearing & fan-motor coupling.
        ii) Checking of oil pressure, oil level and topping up of oil to the oil tanks on daily basis.
        iii) Cleaning of filter elements and strainers and their replacement, as required.
        iv) Cleaning of oil cooler and its replacement, as required.


SIGNATURE OF TENDERER                                                                              Cont‟d... P/2
                                                       -::2::-
                                                                                                      ANNEXURE-III
                                                                                            TECHNO-COMMERCIAL
      v)      Continuous monitoring/checking of oil pressure & temperature and any abnormalities e.g. vibration,
              unusual sound and abnormal temperature rise. Vibration reading of each PA fan is to be recorded in a
              proper & sequential/ continuous manner to know the history of the equipment.
      vi)     Cleaning of coal dust accumulated on & around the fan bearings, lub.oil system etc. on daily basis.
      vii)    To ensure operation of both lub. oil pumps in healthy condition.
      viii)   Checking oil & water leakages in the lub oil system & their rectification.
      ix)     Replacement of corroded water lines and header of PA fan bearing cooling line and oil coolers.
      x)      Arresting hot air leakage from PA fans labyrinth seals by providing plates.
      xi)     Keeping healthiness of PA fans bearings by adequate water flow and oil flow.
      xii)    Matching of PA fan bearing with yoke and keeping two sets of re-babbited bearings in ready condition
              for replacement of PA fan bearings.
    e)Sub- System: Besta drag link coal feeder.
      i) Patching of side panels, bottom plates, coal feeder chutes etc. to arrest coal leakage.
      ii) Greasing of bearings of drive and tail end shafts.
      iii) Checking of drag link chain tension periodically.
      iv) Removal of arching /no coal flow.
      v) Reshuffling of spike rods at regular interval to maintain their easy operation.
      vi) Rectification of no coal flow mechanism.
      vii) Maintaining daily schedule for checking freeness of spike rods & cut-off gates.
    f) Sub-System: PIV and Radicon Gear Boxes.
       i) Checking & attending oil leakage from gear box and topping up proper grade of oil.
       ii) Maintaining proper feeder speed & adjustment of PIV chain, if necessary.
       iii) Cleaning of accumulated coal dust from gear box, coupling and motor.
       iv) Checking of oil levels of PIV and Radicon gear boxes and topping up of specified grade of oil.
       v) Resetting of Jib torque coupling as & when required.
       vi) Checking proper setting of clutch & pinion arrangement with feeder speed engagement w.r.t. the control
             room operation.
       vii) Maintaining proper alignment of PIV gear box- motor and radicon gear box.
       viii) Maintaining proper torque of AUTO GIB system.
    g)Sub-System: Coal Sampler.
      i) Removal of sampling line choking & replacement of sampling valves , if needed
      ii) To provide assistance in coal sampling from pulverized fuel pipes of coal mills on daily basis by
          isokinetic coal sampler or existing sampler.
    h)Sub-System: Hot and cold air dampers.
      i) Ensure proper open /close of dampers/link rod and their adjustment.
      ii) Greasing of bearings after proper cleaning.
      iii) Arresting leakages through the doors of dampers.
      iv) Replacement of Bulb seal gasket to arrest hot air leakage.
    i) Sub- System: Seal Air Fan.
       i) Continuous monitoring/checking for abnormal vibration, unusual sound, looseness of fastener.
       ii) Checking of seal air bellows & their replacement as needed etc.
       iii) Cleaning seal air suction filter on daily basis.
       iv) Removal of chocking of seal air pipes thoroughly.
    j) Sub- System: Coal Pipes /Bends and Johnson Coupling.
        i) Regular checking and repairing of leakage from coal pipes and bends by providing patches of size 2‟X3‟.
        ii) Replacement of coal pipes and bends as per direction of Engineer-in-charge/their representative,
        iii) Submission of weakly report for assessment of leaky bends/ coal pipe.

    k) Technological Waste:
       Removal of technological waste such as coal/coal dust generated in the process of maintenance or leakage,
       other scrap, debris generated during maintenance. Waste grease, oil etc. are to be removed regularly from
       mill area and its auxiliary equipments area on regular basis as per the instruction of Engineer-in-charge so
       that maintenance and monitoring are done properly. The process of removal will be as per direction of the
       Engineer-in-charge. Technological waste so generated is to be shifted at disposal yard/scrap yard or
       designated place within the plant premises as directed by the Engineer in charge/their authorized
       representatives. Coal dust accumulated from rejections & feeders during work must be shifted to disposing
       chutes near the rear coal mills. All scrap and debris in coal mill area, feeder floor and at burner floor to be
       sifted within 24 hours to scrap yard. A penalty of Rs.1000/- only will be imposed for any debris or scrap
       material in the mill area for each case and amount will be deducted from contractor‟s bill.

SIGNATURE OF TENDERER                                                                         Cont‟d... P/3
                                                         -::3::-
                                                                                                   ANNEXURE-III
                                                                                             TECHNO-COMMERCIAL
   2. PREVENTIVE MAINTENANCE UNDER MECHANICAL SEGMENT:
      a)Sub-System: Coal mill including Inlet pipe, chute, classifier, relief gate, rejection gate etc.
   Sl. No.                           Description of activity                                   Frequency/Tentative

     1.       Repairing/servicing of rack and pinion arrangement / replacement of      As and when required basis
              rejection gate with spares.
     2.       Replacement/repair of Relief gate                                        As and when required basis
     3.       Cleaning of scrapper chamber and replacement of plough brush and         As and when required basis
              its holder, if found necessary.
     4.       Checking throat gap and its adjustment, tightening of throat liner       During          preventive
              bolts                                                                    maintenance schedule/ As
                                                                                       and when required
     5.       Adjustment of air seal assembly (This includes removal of air seals,     Half yearly
              cleaning the passages, extraction of broken bolts/studs and refitting
              of air seals with proper adjustment of gap and change of gaskets of
              seal; air pipes etc.
     6.       Checking of mill body liners for erosion and replacement                 During PM schedule/As and
                                                                                       when required
     7.       Insertion of Filler ball / replacement of broken balls                   As and when required basis

     8.       Checking and adjustment of classifier vanes                              During   PM schedule/As
                                                                                       and when required
     9.       Replacement of broken classifier vane                                    As and when required basis

     10.      Measurement of Ball Diameter                                             During PM schedule
     11.      Ramming of hand pump & gas filling in loading system                     Daily basis


     b) Sub-System: Coal mill loading unit.
  Sl.no.                    Description of activity                               Frequency / tentative
    1.      Replacement of defective loading unit assemblies.           As and when required basis
    2.      Replacement of defective loading cylinders                  As and when required basis
    3.      Replacement /Servicing of hand pumps                        As and when required basis
    4.      Cleaning of accumulator tank with replacement of filter     Half yearly basis
   c) Sub-System: Gear Box including lubricating oil system
  Sl. No.                          Description of activity                             Frequency / tentative
     1.      Checking of gear box to motor alignment                                  As & when required basis
     2.      Checking of gear box foundation bolt tightening                          Daily basis
     3.      Checking bolt tightness of gear box input shaft housing                  During            Preventive
                                                                                      Maintenance
     4.      Checking of proper oil flow to different bearings                        Weekly basis

     5.      Checking oil leakages from lub. pumps, gear box doors, seal, and         Daily basis
             flanges of oil pipes
     6       Checking of oil level of gear box and topping up, if needed              Daily basis
     7.      Cleaning of lub. oil coolers                                             During            Preventive
                                                                                      Maintenance
     8.      Checking and cleaning of water lines of cooler                           As and when required
     9.      Greasing labyrinth seal of gear box                                      Within 15 days
    10.      Replacement of gear box oil                                              Half yearly basis
    11.      Replacement of input oil seal of gear box, and alignment of gear box     As and when required
             to motor
    12.      Greasing of coupling of motor and gear box                               During              Preventive
                                                                                      Maintenance
    13.      Tightening coupling bolts of gear box and yoke                           During              Preventive
                                                                                      Maintenance

SIGNATURE OF TENDERER                                                                           Cont‟d... P/4
                                                        -::4::-
                                                                                              ANNEXURE-III
                                                                                        TECHNO-COMMERCIAL
 d) Sub-System: PA fan including lubricating oil system.
 Sl. no.                            Description of activity                           Frequency / tentative
   1.      Cleaning of lubricating oil tank                                      Half yearly basis.
   2.      Checking bolt tightness of fan bearing housing, yoke and foundation   During             Preventive
           bolts                                                                 Maintenance.
   3.      Greasing of coupling of fan and motor                                 c
   4.      Alignment checking of fan and motor                                   As and when required basis
   5.      Balancing of PA fan                                                   As and when required basis
   6.      Checking of RVC operation with replacement of RVC links, bolts etc.   During             Preventive
                                                                                 Maintenance.
   7.      Replacement of defective lub. oil pump                                As and when required basis
   8.      Cleaning oil filter elements and strainers                            During Preventive Maint./as
                                                                                 and when required basis
   9.      Cleaning lub.oil coolers                                              During             Preventive
                                                                                 Maintenance.
  10.      Replacement of cooling disc, oil felt of fan bearings                 As and when required basis
  11.      Arresting oil leakages through fan bearings, pump discharge lines,    As and when required basis
           pump gland etc.
  12.      Arresting water leakages through bearing cooling lines of bearings    As and when required basis
  13.      Arresting hot air leakage from both sides of fan seals                Immediate

  (e) Sub-System: Babcock Drag link coal feeder
 Sl. no.                            Description of activity                            Frequency / tentative
    1.     Checking drive and tail end shaft bearings, greasing and replacement, if   During          Preventive
           any                                                                        Maintenance
   2.      Checking freeness of spike rods by taking out rods and again inserting     Weekly basis
   3.      Maintenance of Bed height mechanism                                        During          Preventive
                                                                                      Maintenance
   4.      Repairing/replacement of turn buckle                                       As and when required
                                                                                      basis
   5.      Checking the thickness of bottom and top plates                            Half yearly basis
   6.      Checking drag link chain tightness                                         During          Preventive
                                                                                      Maintenance
   7.      Oiling of driving chain after removing dirt and grease                     Weekly basis
  (f) Sub-System : PIV and Radicon Gear Boxes
 Sl.no.                         Description of activities                               Frequency/tentative
   1.      Replacement of PIV gear box ,if required                                   As and when required
                                                                                      basis
   2.      Repairing of removed gear box with replacement of defective spares         As and when required
                                                                                      basis
   3.      Checking of PIV chain tightness                                            Fortnightly
   4.      Checking of PIV bearing oil seals and replacement, if required             Weekly basis
   5.      Checking of PIV motor coupling bolts for proper tightness and              Weekly basis
           replacement, if required
   6.      Replacement of oil in PIV and Radicon gear boxes                           During          Preventive
                                                                                      Maintenance

  (g) Sub-System: Coal Pipe, Bends & Johnson coupling
 Sl.no                                Description of activities                        Frequency / tentative

   1.      Repairing of leaky coal pipe bends, straight coal pipes                    As and when required
                                                                                      basis
   2.      Arresting coal dust leakage through Johnson coupling                       As and when required
                                                                                      basis
   3.      Arresting coal dust leakage through Y- piece, Short piece and transition   As and when required
           piece                                                                      basis


SIGNATURE OF TENDERER                                                                      Cont‟d... P/5
                                                        -::5::-
                                                                                                   ANNEXURE-III
                                                                                             TECHNO-COMMERCIAL
   (h) Sub-System: Hot and Cold Air Dampers.
Sl.no.                             Description of activities                                Frequency / tentative
  1.      Checking for smooth operation of full opening & closing of dampers                  During Shutdown
          including adjustments of linkages
  2.      Replacement of gaskets at seating of damper to avoid passing                         During Shutdown

   (i) Sub-System: Seal Air Fan.
Sl.No.                              Description of activities                              Frequency / tentative
  1.      Static Balancing of the fan                                                      As and when required
                                                                                           basis
  2.      Replacement of canvas connector                                                  During          Preventive
                                                                                           Maintenance/As & when
                                                                                           required basis
  3.      Cleaning/Replacement of suction strainer                                         Daily    basis/    During
                                                                                           Preventive Maintenance
  4.      Replacement of motor bearing ( DE/NDE )                                          As and when required
                                                                                           basis


   (j)Keeping Records/Dimensions of Various Wear Components, Preparation of Equipment History
      Reports.

3) BREAK DOWN MAINTENANCE JOBS UNDER MECHANICAL SEGMENT (TIME- SCHEDULE) :
  a) Sub system: Coal mill
          Sl.                                Description of activity                          Duration (tentative)
          No.
           (i)          Repair / refixing of detached / worn out body liner (each )          02 Hrs.
          (ii)          Removal and replacement of body liner(complete set)                  08 Hrs.
          (iii)         Replacement / refixing of detached throat liner (each)               03 Hrs.
          (iv)          Removal and replacement of throat liner( Complete set )              08 Hrs.
           (v)          Welding of cap nut of U-bolt and replacement in position (each )     01 Hr.
           (vi)         Replacement of broken U-bolt ( each )                                04 Hrs.
          (vii)         Replacement of swivel balls                                          02 Hrs.
          (viii)        Cleaning of grinding zone from accumulated coal particles and        06 Hrs.
                        removal of foreign materials
          (ix)          Repair of cracks on bottom / top grinding ring                       08Hrs.
           (x)          Replacement of set of return skirt                                   04 Hrs.
           (xi)         Repair of turret cone and its cover                                  02 Hrs. per spot
          (xii)         Replacement of drop pipe                                             08Hrs.
          (xiii)        Replacement of classifier vane                                       04Hrs. per vane
          (xiv)         Repair / replacement of wear plates                                  Shut down
          (XV)          Removal of foreign material                                          1 Hour
         (XVI)          Repairing of loading block of spider                                 06 Hour


 (b) Sub-System: Coal mill loading system.
         Sl.No.                             Description of activity                           Duration(tentative)
           (i)         Replacement of damaged / worn out loading unit assemblies.            08Hrs. / assembly.
           (ii)        Replacement of defective loading cylinders                            01Hr./ cylinder
          (iii)        Restoration of defective oil / gas lines                              01 Hr. each
          (iv)         Replacement of Hand pump                                              01Hr.per pump

SIGNATURE OF TENDERER                                                                           Cont‟d... P/6
                                                       -::6::-
                                                                                                 ANNEXURE-III
                                                                                          TECHNO-COMMERCIAL
  (c) Gear Box including Lubricating oil system.
       Sl.No                                Description of activity                        Duration (tentative)
         (i)          Replacement of lub. oil pump motor                                  02 Hrs.
        (ii)          Replacement of oil cooler                                           02 Hrs.
        (iii)         Replacement of defective flexible hose and leaky pipe of lub.       03 Hrs.
                      system (each )
        (iv)          Refitting of coupling cover                                         02 Hrs.
        (v)           Replacement of grid spring, greasing of coupling and refitting of   02 Hrs.
                      coupling cover
        (vi)          Replacement of gear box / motor coupling cover (each )              06 Hrs.

        (vii)         Cleaning of lube oil filter                                         ½ Hour

 d) PA fan including lubricating oil system
      Sl.No.                              Description of activity                          Duration (tentative)
        (i)         Replacement of lub. oil cooler (each )                                03 Hrs
        (ii)        Replacement of Lub.oil filter (each)                                  01 Hr.
       (iii)        Replacement of lub.oil pump                                           02 Hrs.
       (iv)         Adjustment / setting of cooling disc.                                 02 Hrs.
       (iv)         Replacement of damaged bearing guard                                  04 Hrs.
       (vi)         Replacement of damaged coupling of fan / motor                        08 Hrs.
       (vii)        Replacement of grid member of coupling                                01 Hr.

 (e) Besta Drag link coal feeder
      Sl.No.                             Description of activity                          Duration (tentative)
        (i)         Replacement of drive end sprockets                                          08 Hrs.
        (ii)        Replacement of tail end sprockets                                           06 Hrs.
       (iii)        Removal of foreign materials from feeder                                    04 Hrs.
       (iv)         Removal, repair and refitting of damaged drag link chain                    08 Hrs.
        (v)         Repairing of damaged drag link chains for future use                            04 Hrs.
       (vi)         Removal of top plate after removing chain, replacing the plate,                 12 Hrs.
                    welding , refitting of chain and box up of feeder
       (vii)        Clearing of chute jamming / feeder overloading (each time)                      04 Hrs.

 (f) PIV and Radicon Gear Boxes
      Sl.No.                             Description of activities                        Duration (tentative)
        (i).        Replacement of broken chain of PIV gear box                                 02 Hrs.
        (ii)        Repair of shoe lever assembly of PIV gear box                               04 Hrs.
       (iii)        Replacement of PIV gear box complete                                        04Hrs.
       (iv)         Replacement of Radicon gear box                                              04Hrs
        (v)         Repair /replacement of gib torque coupling set                              04Hrs.

 (g) Seal Air Fan
      Sl.No.                               Description of activities                      Duration (tentative)
        (i).        Replacement of Seal air fan assembly                                        08 Hrs.
        (ii)        Replacement of suction strainer                                             ½ Hrs.
       (iii)        Replacement of canvass connector                                             01 Hr.
       (iv)         Refitting of seal air impeller & box up for future use                      12 Hrs
        (v)         Seal air fan motor bearing replacement                                      04 Hrs.




SIGNATURE OF TENDERER                                                                        Cont‟d... P/7
                                                         -::7::-
                                                                                                  ANNEXURE-III
                                                                                           TECHNO-COMMERCIAL
*4) Jobs to be undertaken on Unit Rate basis under Mechanical Segment:
 Sl.No                       Description of activities                       Frequency/     Estt. duration for
                                                                                Qty            each work
  4.1      Gear box replacement without forced lub. oil system                   8                4 days

  4.2      Replacement of forced lub oil system                                  8                 1 day
  4.3      Replacement/repair of loading block                                  12         Replacement- 3 days
                                                                                                     &
                                                                                              Repair- 6 hour
  4.4      Replacement PA fan impeller with bearings                             8                7 days
  4.5      Balancing of PA fan                                                  10                 1 day
  4.6      Removal of top plate of coal feeder                                  30                 5 Hrs.
  4.7      Removal of gear box foundation pad & refitting them after             8         4 nos. of pad- 5 days
           machining and replacement of face seal of gear box
   4.8     Coal mill gear box labyrinth greasing                                250              4Hours
   4.9     Gear box oil centrifuging                                            200               8 Hrs.
  4.10     Repair/replacement of loading cylinder                               200        Replacement- 2 Hrs.
                                                                                           & Repair- 4 Hrs. each
  4.11     Replacement of PF bends                                               50            8 Hrs. each
  4.12     Replacement of PF straight pipe(less than 4 mtr. length)             200            8 Hrs. each
  4.13     Replacement of PF straight pipe(more than 4 mtr. length)              40            10 Hrs. each
  4.14     Replacement of Johnson coupling gasket                               100            3 Hrs. each
  4.15     Replacement of Johnson coupling                                       50            6 Hrs. each
  4.16     Repairing loading assembly with repairing of external levers          80               1 day
  4.17     Replacement of broken top ring by other suitable ring                 5                 4 day
  4.18     Replacement of all 11 nos. of Grinding balls by balls of higher      10                 2 day
           dia.
                                                                                       2             2
  4.19     Insulation of PF pipes and bends                                   2000 M            30 m /day


SCOPE OF WORK TO BE CARRIED OUT ON UNIT RATE BASIS AS MENTIONED ABOVE at Sl.No.(4) ABOVE:
4.1. Gearbox replacement without forced lubricating system:
     a) Decoupling the gear box from Mill Motor and Mill yoke.
     b) Disconnection the lub. Oil lines from gearbox.
     c) Removal of stirrup bolts & lifting up of the turn table.
     d) Removal of gear box foundation bolts.
     e) Jacking up of the gear box & putting it on to gear box trolley.
     f) Taking out the gear box trolley & placing the gear box on structure with the help of proper tools & tackles.
     g) Transportation of damaged Gear box from site to the place provided by the Engineer-in-charge.
        Transportation will be arranged by the contractor.
     h) Shifting of repaired/new gear box from maintenance office site/ main stores to mill site. Complete Servicing
        of gear box to be fitted will be done before shifting it.
     i) Fitting the coupling to gearbox input shaft maintaining the defined tolerance and heating the coupling on
        induction heater & placing the gear box on trolley.
     j) Cleaning of gear box foundation pads & foundation bolts, rehabilitation of damaged threads of foundation
        pads as directed by Engineer-in-charge by re-threading or by dies, if necessary. Replacement of foundation
        pads if required.
     k) Blue matching the surface of foundation pads (95% blue matching to be achieved) and leveling of foundation
        pads by flat or straight edge.
     l) Cutting shims of proper size & shape.
     m) Placing the gear box in position on trolley, lowering down the gear box on foundation pads, leveling gear box
        by providing proper shims on foundation pad & tightening of foundation bolts.
     n) Jacking down the turn table & coupling the mill with gearbox. Foundation of gear box must be made rigid by
        providing locking bolts from side and lock washers.
     o) Alignment of gear box with mill motor and standard alignment values have to be achieved.
     p) Oil filling into the gearbox and commissioning of lub. oil system including oil filter cleaning.
     q) Removal of all scraps to scrap yard on daily basis.
     r) Installation & commissioning of lub. oil system.
     s) All transportation will be arranged by the party.

         SIGNATURE OF TENDERER                                                                           Cont‟d... P/8
                                                        -::8::-
                                                                                                    ANNEXURE-III
                                                                                             TECHNO-COMMERCIAL
4.2. Replacement of forced lubricating oil system:
     a) Transportation of forced lube oil system from main store / local site store to working place.
     b) All the necessary connection of lube oil line to cooler, pump and filters,
     c) Cleaning of complete system.
     d) Commissioning of system by starting lube oil pump to achieve all standard operating parameters.
     e) Any other work necessary to maintain the system as per the instruction of Engineer- in- charge.

4.3. Replacement of loading block spider:
     a) Dismantling damaged loading blocks by heating, hammering and pulling with high pressure hydraulic jack or
        standard pullers, one by one.
     b) Machining new loading blocks with proper interference fit to match their housings.
     c) Cleaning the block housings properly.
     d) Insertion of new blocks into their housings one by one and to ensure that swivel ball holders remain in
        vertical positions.
     e) Insertion of the cotter pins in the holes provided in the loading blocks.
     f) Covering cotter pin caps with their covers.

   Repairing of loading block of spider:
    a) Opening the manholes to access inside the mill.
    b) Inspection of the positioning of the broken loading block.
    c) Rotating the mill after dismantling all U bolts and draining gas and oil pressure of loading system in order to
       position the broken block in front the mill access door.
    d) Removing the broken block tactfully after removing the locking pin, by heating, welding and hammering,
    e) Insertion of one new loading block of suitable size in place and locking it properly with cotter pin,
    f) Assembling of U bolts and ramming oil and gas into the loading system,
    g) Removing all broken parts of the loading block carefully from the mill,
    h) Closing all the manholes, which were opened during execution of the work.

4.4. PA fan Impeller replacement with replacement of bearings:
     a) Transportation of new PA Fan assembly with stand from stores to site.
     b) Opening of RVC Link, Bolt and Ring.
     c) Opening and lowering of P.A. Fan top casing.
     d) Opening and lowering of rectangular portion of suction duct.
     e) Complete inspection and repairing of damaged portion of duct, casing and manhole.
     f) Lifting of Impeller and shaft assembly with RVC drum.
     g) Taking out RVC drum & fitting it to the new shaft assembly.
     h) Transportation of damaged assembly to the scrap yard.
     i) Checking for smooth operation of RVC and necessary rectification, if required.
     j) Placement of new Impeller & shaft assembly with RVC drum to its position.
     k) Replacement of new bearings with proper clearances.
     l) Placement of rectangular portion of duct and tightening of flange bolts with suitable gasket.
     m) RVC setting at lower half of drum.
     n) Placement of top casing and tightening of all bolts with suitable gaskets.
     o) Final RVC setting, fitting of ring & RVC link.
     p) Cleaning the site and disposal of scraps to the scrap yard.
     q) Transportation of material will be done by the party and no hot air leakage from casing, duct, inspection
        doors and bearing side must be insured by the party for the whole contract period.
     r) Balancing of rotor, if required, will be done by the party and vibration must be brought down below 40
        microns in all directions in both I/B and O/B bearings.
     s) Performance Guarantee for vibration level and no hot air leakage from casing, duct and inspection doors for
        the contract period.

4.5. Balancing of PA fans:
     a) All necessary machine and standard weight will be provided by the party.
     b) Balancing of PA fans will be done and vibration level must be brought down below 40 microns. Performance
        Guarantee for one year will have to be given by the party.
       Note: Though unit rate mentioned for complete balancing package of PA fans assistance in
        balancing will be a part of AMC and party will do all the necessary activities for assistance in
        balancing as per instruction of Engineer–in –charge.


         SIGNATURE OF TENDERER                                                                            Cont‟d... P/9
                                                       -::9::-
                                                                                                 ANNEXURE-III
                                                                                          TECHNO-COMMERCIAL
4.6. Removal and re- fitting of top plate of coal feeder:
     a) Closing the spike rods to stop coal flow.
     b) Cleaning the feeder and removal of coal from the feeder.
     c) Removal of drag link chain from coal feeder, its inspection and repairing.
     d) Removal of damaged/ old top plate from feeder.
     e) Fitting of 8 mm MS/ SAIL Hard Plates in feeder on rail and proper welding with good quality electrodes to be
        done.
     f) Inserting drag link chain into the feeder.
     g) Greasing all the bearings of feeder.
     h) Adjustment of chain for proper tension.
     i) Trial run of the feeder and box up.
     j) Disposing the scrap material generated during the process of repairing to scrap yard within 12 hours.
     k) All transportation will be arranged by the party.

4.7 Removal of foundation pads & refitting them after machining and replacement of fabric seal with „O‟
    Rings of Mill gear box:
    a. Decoupling the gear box from Mill Motor and Mill yoke.
    b. Disconnection of the lub. oil lines from gearbox.
    c. Removal of stir-up bolts & lifting up of the turn table.
    d. Removal of gear box foundation bolts.
    e. Jacking up of the gear box & placing it on gear box trolley.
    f. Removal of all four or six (as desired) foundation pads by grinding.
    g. Centering, boring and re-threading in opposite face of plate will be arranged by the party.
    h. Proper mounting of foundation pads by welding.
    i. Complete servicing of gear box by replacing oil and internal cleaning by cloth.
    j. Replacement of face (Fabric) seal with „O‟ ring by new one.
    k. Fitting coupling to gear box input shaft maintaining the defined tolerance and heating the coupling on
        induction heater/ oil bath heating & placing the gear box on trolley.
    l. Cleaning gear box foundation pads & foundation bolts.
    m. Blue matching the surface of foundation pads (95% blue matching to be achieved) and leveling of foundation
        pads by flat or straight edge.
    n. Cutting shims of proper size & shape.
    o. Placing the gear box in position on trolley, lowering down the gear box on foundation pads, leveling gear box
        by providing proper shims on foundation pad & tightening of foundation bolts.
    p. Jacking down the turn table & coupling the mill with gear box. Foundation of gear box must be made rigid by
        providing locking bolts from side and lock washers.
    q. Alignment of gear box with mill motor and standard alignment values have to be achieved.
    r. Oil filling into the gear box and commissioning of the lube oil system including lub oil filter cleaning.
    s. Removal of all scraps to the scrap yard on daily basis.
    t. Installation & commissioning of lube oil system.
    u. All transportation will be arranged by the party.

4.8.Mill Gear Box labyrinth greasing :
    a) Insertion of grease mouth into the greasing nipple of the gearbox.
    b) Pushing Servo Gem 3, Indian Oil grease into the labyrinth till old grease emerges out through top portion of
         the seal housing in the running condition of coal mill.
    c) Removal of the grease mouth after greasing is completed.
    d) Grease Mouth and proper grease guns will be arranged by the party.

4.9. Gear Box oil centrifuging:
     a) Transportation of portable oil centrifuge from site store to work place and back.
     b) Fitting of centrifuging attachment in gear boxes.
     c) Electric Connection to centrifuge from suitable point.
     d) Oil centrifuging by portable centrifuge till contamination level reaches 30 microns. Necessary arrangement
        will be done by party to check contamination level.
     e) Maintenance of portable centrifuge will be done by the party.


        SIGNATURE OF TENDERER                                                                         Cont‟d... P/10
                                                       -::10::-
                                                                                                  ANNEXURE-III
                                                                                           TECHNO-COMMERCIAL
4.10. Replacement/ Repairing of loading cylinder:
   A) Replacement of loading cylinder:
    a) Checking for leaky loading cylinder of the concerned mill / Checking of gas leakage through cylinders in gas
        and oil charged condition.
    b) Removal of leaky cylinder/s from the mill after detaching its/their oil and gas connection/s.
    c) Mounting repaired loading cylinder/s.
    d) Connecting oil and gas lines after inserting anchor pins with split pin and washer properly.
    e) Ensuring proper fitting of rubber bellows with clamps.
    f) Ramming oil up to 30 Kg/cm2.
    g) Arresting any oil leakage from union joints etc. after draining oil from header and ensure it by raising oil
        pressure again.
    h) Shifting the replaced cylinder/s to repair site within 6 hours.
    i) Transportation will be arranged by the party.
   B) Repairing of defective loading cylinder:
    a) Dismantling & cleaning of defective loading cylinder completely.
    b) Removing all old rubber seals and cleaning the seal grooves, cylinder inner bore and piston properly.
    c) Inspecting the piston for wear and tear carefully. Proper size of piston is to be selected for refitting for
        performance guarantee of 6 months.
    d) Inserting proper size rubber seals carefully with proper workmanship to insure performance guarantee of 6
        months.
    e) Assembling the cylinder with old /new piston.
    f) Servicing of ball sockets at both ends of the assembled cylinder.
    g) Placing the repaired cylinder in the proper bay.
    h) All transportation will be arranged by the party.

4.11. Replacement of PF bends:-
    a) Supply and erection of scaffoldings for execution of the job safely.
    b) Removal of glass wool insulation from old and damaged P.F. Bends and shifting of the same to a suitable
        place as directed by Engineer-in-charge within 12 hours.
    c) Removal of old P.F. Bends by dismantling nuts & bolts from the flange or by gas cutting wherever required.
    d) Shifting of new P.F. Bends from stores to site.
    e) Lifting and fitting of new P.F. Bends with cutting and fixing new asbestos gaskets.
    f) Fixing of brackets and supports to new bends at required places. Remaking insulation work on C.I. Bends
        wherever fitted.
    g) Shifting of old P.F. Bends within 12 hours to scrap yard or to a place assigned by Engineer-in-charge. Scrap
        to be removed from site immediately.
    h) Opening of other bends and / or straight pipe wherever required and refitting in position as per the site
        condition.
    i) Any other work required to carry out the job as per the direction of Engineer-in-charge.
    j) All transportation of material from main store/ site store and removal of scrap will be arranged by the party.

4.12. Replacement of worn out P.F. straight pipes of length less than four meters:
    a) Supply and erection of scaffolding for execution of the job safely.
    b) Removal of insulation & their disposal at a suitable place. Anchoring the pipes at both ends before
        dismantling the damaged portion.
    c) Dismantling straight pipes from the nearest flange joints or Johnson couplings.
    d) Repair of Johnson couplings (02 nos. per pipe) by cutting worn out pipes and welding the new pieces both
        from inside & outside wherever required along with replacement of adaptors.
    e) Lowering of worn out pipes, their shifting and disposal to a suitable place as directed by Engineer-in-charge.
    f) Shifting of new pipes from store to site and site to site as required.
    g) Cutting out of old flanges and welding with new pipes before lifting the same.
    h) Lifting of pipes and fitting in position along with change of gaskets.
    i) Providing brackets and proper supports to the pipes to ensure proper anchoring and thermal expansion
        along with fabrication of clamps and fitting them wherever required.

4.13. Replacement of worn out PF straight pipes of length more than 4 mtrs:
    a) Supply and erection of scaffoldings for execution of the job safely.
    b) Removal of insulation & their shifting to a suitable place as directed by the Engineer-in-charge. Anchoring
        the pipes & bends at both ends before dismantling the damaged portion.
    c) Dismantling of P.F. Pipes from the nearest flange joints or Johnson couplings or by cutting out the worn out
        span with sufficient margin at both ends.

        SIGNATURE OF TENDERER                                                                         Cont‟d... P/11
                                                       -::11::-
                                                                                                   ANNEXURE-III
                                                                                            TECHNO-COMMERCIAL


    d) Repair of Johnson couplings–02 nos. Per pipe by cutting out worn out portion of pipes and welding new pipe
       pieces both from inside and out side wherever required along with change of adapters.
    e) Lowering of worn out pipes, their shifting to a suitable place as directed by Engineer-in-charge.
    f) Shifting of new pipes from store to site & site to site as required.
    g) Cutting out the old flanged from damaged pipes and their welding with new pipes before lifting of the same.
    h) Lifting of pipes and fitting in position along with change of gaskets, adapters etc.
    i) Dismantling of other pipes and /or bends required for replacements of damaged pipes and their refitting in
       position suitably after replacement of fresh pipe.
    j) Providing brackets and proper supports to the pipes to ensure proper anchoring and thermal expansion
       along with fabrication of clamps and fitting them wherever required.
    k) Scrap from site to be removed immediately and all transportation will be arranged by the party.

4.14. & 4.15 Checking and replacement of Johnson coupling and its gasket:
    a) Supply & erection of scaffolding and their dismantling after completion of job.
    b) Dismantling of P.F. pipes from Johnson coupling by opening bolts & nuts.
    c) Removal of old and damaged gaskets, adapters and inspection of couplings for repair/replacement.
    d) If Johnson couplings and P.F. pipes found are healthy, adapters and gaskets are to be replaced.
    e) Refitting of Johnson couplings.
    f) Proper supports and anchoring to the coupling are to be provided.
    g) Supply and erection of scaffolding & their dismantling after work.
    h) Dismantling of P.F. pipes from the Johnson coupling by opening bolts & studs etc.
    i) Removal of old & damaged gaskets & adaptors for inspection of coupling for repair/replacement of the
        same.
    j) If the Johnson coupling and/or P.F. pipe found damaged - removal or worn out /damaged Johnson coupling
        set or the follower, whatever may be the case. Removal of worn out portion of P.F. pipes by gas cutting &
        welding of new M.S. Pipe of ID X OD = 603 mm X 627mm at the same place from inside & outside whatever
        may be the case.
    k) Fitting of new gaskets & adaptors in position & refitting of Johnson coupling after repair/replacement of the
        same.
    l) Proper supports to pipes & couplings are to be provided.
    m) Removal of debris from work site to scrap yard.
    n) Transportation & lifting of new pipes from stores to site & site to site.
    o) Any other work related to the jobs as per the direction of Engineer-in-charge.
4.16(A) REPAIR OF LOADING UNIT ASSEMBLY:
    a) Dismantling of following parts of loading assly. and their inspection:
             i.  Loading unit assly.nuts-02 nos.
            ii.  Outer end pad-02 nos.
           iii.  Thrust pad -02 nos.
          iv.    Silent Bush bearing -02 nos.
            v.   Inner end washer-02 nos.
          vi.    External levers (LH&RH)-02 Nos.
          vii.   Air seal housing-02 nos.
         viii.   Internal lever-01no.
          ix.    Shaft-01no.
    b) Repairing of old/worn out/broken parts by cutting, welding, grinding etc. and replacement of unserviceable
        parts by new one to be provided by DVC.
    c) Cleaning and making rust free all the dismantled parts by mechanical means like wire scrubber, emery
        paper, oil stone and compressed air etc. Hard facing of old internal lever worn out parts.
    d) Re-assembly of all these dismantled parts with replacement of air seals, distance pieces, silent bush
        bearings, thrust pad, lock washer, packing etc. wherever required to make the assembly leakage free as per
        the instruction of Engineer-in- charge.
    e) Making two coats of red oxide primers to the repaired assembly.
    f) Collection and to & fro transportation of loading assemblies from mill sites to repairing place, transportation
        of spares from stores to site and to and fro transportation of worn out external levers after welding two coats
        of low Hydrogen welding electrode on the surface to machine shop.
    g) Cleaning of scraps and their disposal to scrap yard after completion of work.
    h) Any other work required for trouble free and leakage free operation of loading assemblies as per the
        instruction of Engineer –in-charge.
    i) Any other work not specifically stated above but required to be undertaken to complete the work in totality.

        SIGNATURE OF TENDERER                                                                           Cont‟d... P/12
                                                         -::12::-
                                                                                                     ANNEXURE-III
                                                                                              TECHNO-COMMERCIAL

4.16. (B) REPAIR OF EXTERNAL LEVERS – As desired as instructed but inclusive in repairing.
        a)Metalling up of worn out external levers with 4 mm low hydrogen welding electrodes- 2 coats
        b)Machining the metal up parts of external levers to required dimension.
        c) To and fro transportation of external levers from work site to machine shop.
4.17. Replacement of broken top ring by other suitable ring: (5nos.)
        1. Removal of short pieces, coal inlet pipes, discharge line angular short pieces, classifier body, stirrup bolts,
           spider, top ring, coal chute, Relief gate etc.
        2. Placement of top grinding ring and its blue matching with respect to spider for at least 70% or more to be
           ensured.
        3. Replacement of hopper type coal chute.
        4. Repair / replacement of coal inlet pipes between feeder and coal inlet to mill.
        5. Repair /replacement of mill body liner and throat liners and their refitting.
        6. Repair/ replacement of plough brush carriers and plough brush.
        7. Fitting of stirrup bolts.
        8. Repairing of classifier housing components (like turret liners, classifier cone, classifier vane etc.)
        9. Placement of classifier body back to its position tightening of body bolts ( both at upper and lower body
           joints)
      10. Fitting of coal inlet pipes, discharge pipes/short pieces, railings, footsteps etc.
      11. Rehabilitation of other mill components like loading assembly and cylinders, gas and oil pipe lines etc.
          Commissioning and trial run of the mill.
4.18. Replacement of all 11 nos. of balls by balls of higher dia: (10 nos.)
        1. Opening the mill access door after decoupling the mill motor and gearbox.
        2. Depressurizing the loading cylinders by draining the gas.
        3. Removing the U bolts by cutting nuts.
        4. Lifting the Spider and Top ring from the mill top and to remove the balls one by one by rotating the mill
          Table.
        5. Filling in 11 nos. of large size grinding balls in place.
        6. Repairing of U- bolts by cleaning and repairing of threads and providing spare nuts. Fitting of nut and
          reconditioning of U- bolts must be ensured.
        7. Fixing U-bolts after placing the spider and top ring in position by welding.
        8. Closing the access door and to couple the mill after raising gas and oil pressure of loading system.
        9. Removal of scraps to scrap yard immediately after completion of work.

4.19. Insulation of PF pipes and bends (Insulation work with rock wool/ spintex cladding sheets)
        1. Making scaffolding and necessary platform to carry out the work.
        2. Removal of damaged insulation, cleaning of pipe / bend surfaces for clear exposure of surface.
        3. Fixing of rock wool mattress / spintex on the surfaces of pipes / bend by spiraling steel wire.
        4. Fixing of cladding sheets over the rock wool mattress/ spintex by preformed aluminum/GP sheets and
          screwing them on square plates.
        5. Site cleaning after the work is over including removal of scaffolding and scraps.




    NOTE: Jobs listed under running/routine, preventive & breakdown maintenance of mechanical segment
    as above are only illustrative but not exhaustive. Any type of running/routine, preventive & breakdown
    maintenance not specifically mentioned under Mechanical segment but required to be attended/rectified
    to keep the milling system available will be deemed to be inclusive in the scope of AMC of milling
    system. Any minor modification will be deemed to be included in the scope of work.




        SIGNATURE OF TENDERER                                                                              Cont‟d... P/13
                                                       -::13::-
                                                                                                   ANNEXURE-III
                                                                                            TECHNO-COMMERCIAL

B. JOBS UNDER ELECTRICAL SEGMENT OF MILLS & AUXILIARIES :
   Technical specification for general scope of electrical services for annual maintenance contract of milling plant of
   Bokaro „B‟ TPS
   a. Scope of Electrical works:
     1. Routine, preventive and breakdown maintenance of all motors (HT & LT) of total coal mill system and
        associated equipments, i.e. PA Fan motor, Mill motor, Seal air fan motor, Lub. oil pump motors are included
        in the scope , but not limited to the following:
          i. Lubrication, cleaning and replacement of motor bearings.
         ii. Regular cleaning of cooling ducts and general cleaning of motors.
       iii. Replacement, installation, alignment of motors in case of breakdown.
       iv. Replacement / repair of motor space heaters in case of breakdown
         v. Any other jobs found necessary for proper maintenance including earthing.
       vi. Necessary preventive maintenance measures have to be carried out as per direction of ES-I or his
             representatives.
     2. Repair / replacement of damaged cable of motors and actuators including cable termination and lagging.
     3. Periodic checking of any abnormality in vibration, unusual sound, abnormal temperature rise in the motor,
        actuator, gear boxes, couplings of the above system and taking corrective actions.
     4. Monitoring of vibration at regular intervals and taking corrective action.
     5. Site to site (within power house) transportation of materials / equipments including damaged HT motors.
     6. Electrical connection/ disconnection of motors including their coupling, de-coupling and alignment work.
     7. Running maintenance of motors including motor space heaters and shifting of LT motors form location to
        maintenance bay in the power house.
     8. Laying and termination of cable at motor end (LT / HT).
     9. Transportation of HT motors of milling system inside the plant premises.
   10. Making Canopy over motors to prevent ingress of water as and when required.
   11. Temporary lighting and localized illumination at Coal Mill /P.A fan area, Feeder floor, damper floor,
        area as per site requirement
   12. Monitoring and keeping proper record of parameters of 6.6 KV /415 Volt motors/dampers of milling
       systems.
   13. Daily Logging of Preventive & breakdown maintenance of electrical equipments.
   14. Greasing of motor bearings is to be done as per greasing schedule & to be recorded properly.
   15. Daily Monitoring of Motor temperature, vibration & abnormal sound etc. and same are to be recorded.
   16. All log sheets duly countersigned by DVC Engineers to be maintained in duplicate and a copy of the same is
        to be submitted to electrical dept.
   17. Earthing strips to individual electrical equipments need to insured properly connected as per original before
        restoration of equipments.
   18. Safety norms are to be followed strictly while working on electrical insulations, and no work shall be
        permitted on live equipments.
       Note: Any other work even if not specifically mentioned under the scope of work, as above, but essential for
       execution of AMC of milling system will be deemed to be included in the scope of work.
    b.EXCLUSIONS:
      The following works are excluded from the scope of AMC work:
   1. Carrying out all major renovation and modification works, overhauling not forming part of the running /
      preventive and breakdown maintenance of milling system is excluded from scope of work of AMC. However,
      planning and supervision of minor modifications as may be required to be done shall be deemed to be the
      part of scope of work.
   2. Maintenance of HT /LT Breakers /Modules, if any
   3. Rewinding of damaged motors.
   4. Damaged Rotor repairing.
   5. Core repairing / staggering.
   6. Overhauling of HT/LT motors.
   7. Any civil work.
   8. Spares and consumables, going permanently into the equipments.
   9. Statutory clearance, if any required for the work.
    NOTE: Jobs listed under electrical segment as above are only illustrative but not exhaustive. Any
      type of running/routine, preventive & breakdown maintenance not specifically mentioned under
      electrical segment but required to be attended/rectified to keep the milling system available will be
      deemed to be inclusive in the scope of AMC of milling system.

       SIGNATURE OF TENDERER                                                                            Cont‟d... P/14
                                                       -::14::-
                                                                                                   ANNEXURE-III
                                                                                            TECHNO-COMMERCIAL



C. JOBS UNDER C&I SEGMENT OF MILLS & AUXILIARIES :

  General scope of work for C & I activities of 8.5E-10 Milling System at 3x210 MW Bokaro „B‟ TPS:
  a. MINOR ACTIVITIES:
    1. Instrumentation:
      a)     Testing, Calibration, Replacement of pressure gauges/ temperature gauges ( local )
      b)     Testing, calibration ,Replacement of pressure switches / temperature switches (local )
      c)     Testing, Calibration, RTD replacement.
      d)     General cleaning of all the panels by vacuum cleaner / blower in presence of customer Engineer.
      e)     Field to JB - Cable checking in case of cable fault.
      f)     Calibration/Maintenance/ Replacement of UCB mounted indicator.
      g)     Replacement of copper tubing, ferrule to arrest air leakage in the pneumatic system.
      h)     Proper calibration with tags of pressure /temperature gauges, pressure switches of coal mill & PA fans
             lub. Oil systems, coal mill gas panels with its reports duly signed by the supervisors during preventive/
             opportunity maintenance of the equipments.

  b. MAJOR JOBS:
    1. Scope of work covers the following:
      i)   Dismantling, servicing and fixing of the all the field instruments, wherever necessary.
      ii)  Checking of impulse lines including PA fan system.
      iii) Calibration of all field instruments, wherever necessary.
      iv)  Laying and termination of control cable wherever necessary up to local JB.
      v)   Calibration and replacement of UCB mounted indicators from field Instruments. Servicing and calibration
           of all pneumatic actuators including their position feed back transmitters.
      vi) Replacement of copper tubes.
      vii) Cleaning of the panels.

    2. The scope of services covered in this specifications described above includes the following field
         instruments:
       a. Pressure Switches
       b. Pressure Transmitters
       c. Pressure Gauges
       d. Temperature switches
       e. Temperature Gauges
       f. Temperature Transmitters
       g. Flow Transmitters
       h. Level Transmitters
       i. DP Transmitters
       j. Limit Switches
       k. Level Switches
       l. Position feed back Transmitters
       m. Flow Switches
       n. I/P Converters
       o. RTDs
       p. Thermocouples
    3. Following works are also to be covered under scope of services for C & I of milling system:
      a) Pneumatic Drives ( Maintenance of Hot / Cold air , Feeder , RVC drives and associated cables up to
           UCB
      b) Impulse line purging / replacement associated with all the instruments under sl. No.3 above
      c) Attending of gas line leakages/ loading cylinder oil leakages of the mill system- regulator NRV, Needle
           valves, Tubing etc.
      d) All the cables related with annunciation system from field to local JB.



     SIGNATURE OF TENDERER                                                                             Cont‟d... P/15
                                                       -::15::-
                                                                                                   ANNEXURE-III
                                                                                            TECHNO-COMMERCIAL
Special Terms & Conditions for C&I jobs:
Proper qualified & experienced technicians & other work forces in adequate nos. should be deployed to carry out the
C& I jobs. One no. supervisor is to be dedicated for C&I jobs separately.

NOTE: Jobs listed under C&I segment as above are only illustrative but not exhaustive. Any type of running/routine,
preventive & breakdown maintenance not specifically mentioned under C&I segment but required to be attended/
rectified to keep the milling system available will be deemed to be inclusive in the scope of AMC of milling system.
REPORTS:
Contractor will submit daily reports which will contain the details of work done for execution of AMC &
spares/consumables used. Protocols duly signed by DVC & Contractor representative in DVC format for critical
activities i.e. PA fan bearing replacement, PA fan balancing, PA fan rotor replacement & mill gear box replacement
have to be submitted immediately after completion of above jobs. Protocol for preventive maintenance of milling
system has also to be submitted on daily basis. Forecast for spares and consumables to be submitted by the
contractor before 3-4 months for its timely availability and procurement action.

NAME OF THE WORK: Overhauling of 8.5 E10 Coal mills - 10 nos. & Besta Coal feeders - 15 nos. of three
units of BTPS “B”.
                                               SCOPE OF WORK
A. OVERHAULING OF COAL MILLS
Coal mills are to be dismantled & inspected, worn out parts are to be replaced by new ones or repaired by patch
repairing, weld metal deposition and subsequent hard facing, as the case may be as detailed below :-

1. The parts shall be dismantled as follows (General):
        a) PF Bends, Short pieces. Discharge line angular short pieces
        b) Coal Chute
        c) Coal inlet pipes
        d) Classifier Body/Housing
        e) Stirrup bolts, Spider
        f) Upper Grinding Ring
        g) Grinding Balls
        h) Throat Plate
        i) Break removal of concrete seal
        j) Bottom Grinding Ring
        k) Relief gate
        l) Air seal ring/ seal air lines
        m) Loading Unit Assemblies and Loading Cylinders
        n) Throat liners, Body liners
     In addition to the above dismantling works the following dismantling work may be necessary on optional
      ground at the discretion of the Engineer in charge:
       Dismantling of mill table for repairing/replacement of air seal bracket, replacement of yoke & replacement
        of lower skirt.
2. Cleaning and inspection of parts dismantled, fitting the repaired part/parts or replacement of damaged
   parts in position as desired :-
     a) Repair/ replacement of raw coal chute & hopper and coal inlet pipe between feeder and coal inlet to mill:
             i.   Replacement of complete hopper including transition piece between feeder & coal inlet pipe.
            ii.   Replacement of transition piece by cutting & welding between coal chute hopper & coal inlet pipe.
                  Repair/replacement of worn out mill side liners, bottom and side liners of rejection chamber, Plough
                  Brush area liners (i.e. below plough brushes) turret cover liners /circular S.S. liner at the center.
                  Hard facing of liners as per requirements.
     b) Putting new bottom Grinding Ring in position and matching with yoke table with the help of blue to achieve
         more than 80% surface contact.(For this purpose one mill table and bottom ring has to kept in ready
         condition after blue matching to reduce the time of overhauling).
     c) Concreting the gap between flat cover plate of yoke bottom grinding ring. Siscast filling between Grinding
         rings and Turn table shall be made as per normal practice.
     d) Refitting of Throat plates after repair or replacement with new ones and adjustment of gap between throat
         plate and bottom Grinding ring as per requirement. New throat plates without tap holes to be machined
         before fitment as required.


        SIGNATURE OF TENDERER                                                                           Cont‟d... P/16
                                                          -::16::-
                                                                                                            ANNEXURE-III
                                                                                                  TECHNO-COMMERCIAL
    e) Placement of new grinding balls, Top grinding ring and Spider in position. Top grinding ring and its blue
          matching with respect to spider to be achieved more than 80% contact or as per requirements. (For this
          purpose, one spider and top ring have to be kept in ready condition after blue matching to reduce the time of
          overhauling).
    f) Fitting of new or old Air seal rings- upper outer, upper inner, lower outer, lower inner after necessary
          rectification as required and their proper adjustment.
    g) Repair/ replacement of plough brush carriers.
    h) Fitting of plough brush sets.
    i) Fitting of stirrup bolts.
    j) Repair/replacement of rack and pinion arrangement of pyrite door cut off gate along with repairing of
          rejection gate and replacement of pyrite door gasket repair of pyrite box cut off gear, if required.
    k) Repair/replacement of classifier vanes, classifier housing top cover liners. Top cover is to be removed, liner
          are to be repaired/ replaced and refitted again. Repairing of classifier body. Putting classifier assembly in
          position. Erection of MS & CI wear plates, turret top cover plate, CI pads & rings, classifier cone, Telescopic
          chutes, coal inlet pipe, return skirts, coal inlet discharge liner short pieces. SS lining in classifier body near
          the discharge short pieces.
    l) Classifier vane adjustment.
    m) Placement of loading unit assemblies by new one or after repair (ensuring leak proof joint) and positioning of
          loading cylinders. Repairing of loading unit assemblies will be under scope of work of overhauling of coal
          mills.
    n) Repair/replacement of damaged gas/oil pipe lines of loading cylinders and mill and mill surroundings leading
          to gas and oil feeding cubicles.
    o) Rehabilitation/restoration of loading unit assemblies, air seas lines etc.
    p) Renewal/ refitting of gaskets of doors, windows, joints etc. and boxing up the mill.
    q) Hard facing of worn out parts as per instruction of Engineer-in-charge by hard facing rods(Cobalarc-1m/
          743S).
    r) Any other activity required for complete overhauling of milling system.
3. Commissioning and trial run of the overhauled mill.
4. Ensuring coal fineness (more than 70% in 200 mesh), healthy seal air pressure and other milling parameters.
Optional jobs:
1. Fitting of scale and pointer arrangement for each vane to be fabricated at site and locking of each vane after
    initial adjustment of classifier.
2. Removal of Gear box for thorough cleaning of inner surface and inspection & replacement of face seals,
    foundation pads etc. if required.
B. OVERHAULING OF BESTA DRAG LINK COAL FEEDER:
    a) Internal checking of PIV gear box after removal of old oil, inspection of bearings/gears/shafts etc. and
          servicing or replacement of the same thoroughly.
    b) Inspection of radicon gear box with replacement of bearings if desired.
    c) Through alignment of complete train of motor, PIV gear box and radicon gear box.
    d) Inspection of Drive motor bearings, servicing or replacement of the same.
    e) Closing of spike rods to stop coal flow.
    f) Removal of drag link chain, top plate and bottom plates.
    g) Repair/replacement of body liner/inspection gates, repairing of body as per requirements.
    h) Replacement of bottom plate ( with 16 mm. M.S. plate ) and top plate ( either with 8 mm./ 10 mm M.S. plate
          or 6 mm./ 8 mm. Stainless steel plate )along with top and bottom rails at both levels. Hard facing of M.S.
          plates as per requirement with hard facing rods.
    i) Replacement of tail end shaft damaged sprocket and drive end shaft loose sprockets as per requirement,
    j) Refitting of drag link chain with proper tension.
    k) Replacement of damaged bearings.
    l) Repair and servicing of bed level controller mechanism.
    m) Commissioning of feeder and trial run of the same and ensuring correct feeder speed in respect to control
          room feeder position, correct bed height of coal and correct operation of gib torque coupling.
    n) Any other job required to achieve healthiness of coal feeders.

       Optional jobs: (as per decision of Engineer –in-charge)
    1) Removal of spike rods and their refitting after proper cleaning.
    2) Repair / servicing / replacement of cut off gates on both ends.
NOTE: Jobs listed under scope of „Overhauling of coal mills & feeders as above are only illustrative and not
exhaustive. Any type of job involved for coal mill/ feeder overhauling but not specifically mentioned above
are required to be attended/executed to do the overhauling of coal mills & coal feeders in totality.

        SIGNATURE OF TENDERER                                                                               Cont‟d... P/17
                                                      -::17::-
                                                                                                   ANNEXURE-III
                                                                                            TECHNO-COMMERCIAL

ARRANGEMENTS TO BE MADE OR FACILITIES TO BE PROVIDED BY THE CONTRACTOR FOR EXECUTION
OF JOB(AT THEIR COST):
1. The consumable like welding electrode, D/A and oxygen gas, grease, cotton waste, markin cloth etc. required
   for the job.
2. The scope of work shall not be limited to item as mentioned in detailed scope of work but shall include all such
   items which are not specifically mentioned in the scope of work but are essential for all successful performance
   unless other wise specifically excluded in the scope of work.
3. The detail indicated in the scope of work are tentative only and not exhaustive.
4. The contractor shall attend at his cost all the meetings with Engineer-in-Charge (EIC) and other official of DVC.
   The contractor shall attend such meetings as and when required and fully co-operate with persons and
   agencies involved.
5. The contractor will include all activities by deputing experienced and qualified supervisors, technical skilled,
   semi-killed workers for maintenance activities of milling system.
6. The contractor has to ensure the availability of standby equipments in good condition.
7. The contractor has to maintain proper register / record book of the work / computer records for services
   performed under their contract as advised by the EIC. The contractor shall maintain the following register at his
   own cost. Throughout the contract period i.e. job details register, material stock register (receipt and issue),
   daily inspection register and others as advised by EIC.
8. All tools, tackles viz. chain-pulley block, lifting equipment, winch wire rope, sling etc. shall have a valid test
   certificate from competent agency including welding machines and tested welders providing safety appliances
   as required as per statutory rules will have to be arranged by the contractor.
                                                                         st
9. The contractor should ensure the payment to his employees on 1 date of each month in presence of DVC
   representative/EIC.
10. It will be the responsibility of the contractor to make all his workmen familiar with all workers locations before
    starting the work.
11. Safety of workers employed under the contractor is entirely the responsibility of the contractor and in the event
    of any work accident, major or minor, the workmen can be admitted in DVC hospital, but the cost of treatment
    will be borne by the contractor.
12. The contractor will be fully liable for any direct or consequential damage of plant and machinery etc. The
    contractor will take full responsibility on such matters including the statutory requirement by law.
13. Contractor has to report to coal mill site daily in the morning during normal working day for the assignment of
    the work, all the work attended to be recorded in logbook and same to be maintained in good condition.
14. The workman like supervisor and technicians should be well acquainted with the system of milling system of
    BTPS „B‟.
15. The job will be executed round the clock basis by deputing adequate number of experienced technical
    personnel in such a manner that at a time work will be taken up at 03-04 fronts and any fault will be attended
    immediately. Preventive, routine and breakdown maintenance to be taken-up on time bound basis to make the
    system always available for uninterrupted generation on account of coal mills. A separate gang should be
    deployed for preventive maintenance of the equipments.
16. The contractor has to maintain close co-ordination with respective Engineer-in-charge and shift-in-charge.
17. The contractor has to follow house-keeping and maintenance program as scheduled by DVC or by jointly & has
    to comply with the same accordingly.
18. Tools required for Mechanical Maintenance work is to be provided by the contractor.
19. However, if there is chance of loss of generation to be judged by the Engineer-in-charge due to delay in
    execution of the assigned job/including delay in removal technological waste/incapability to set right any fault
    during execution of maintenance work attributable to the contractor, in such a situation, DVC reserves the right
    to engage some external agency/manufacturer as deemed fit to get done the incomplete/unsatisfactory
    executed job for which deduction @1.5 times the expenditure incurred for engagement of such outside agency
    will be made from the bill/security deposit. DVC may cancel the order completely or partly without prejudice to
    his right if the contractor fails repeatedly to execute the assigned job.

       SIGNATURE OF TENDERER                                                                           Cont‟d... P/18
                                                        -::18::-
                                                                                                            ANNEXURE-III
                                                                                                TECHNO-COMMERCIAL
20.   The contractor will have to follow all safety rules at the time of execution of work.All safety equipment such as
      Helmet of ISI mark, safety shoes, safety belt, dust mask, hand rubber gloves etc. required during execution of
      work shall be supplied by the contractor to his workmen without any extra cost to DVC. If the party fails to
      adhere to the safety norm items, a suitable penalty will be imposed by safety officer, DVC, BTPS‟B‟.
21.    Contractor has to provide separate group of manpower for preventive maintenance, breakdown maintenance,
      Running/Routine maintenance, shift wise man power for any emergency restoration of system.
22.   Contractor has to provide at least 1(one) Graduate Engineer(Mech), 4(four) Diploma Engineers(Mech),
      adequate nos. of technical persons and work force to take up the maintenance job at three to four fronts at a
      time on round the clock basis.
23.   Contractor has to provide adequate nos. of labours for house keeping and removal of technological waste on
      round the clock.
24.   Sufficient nos. of additional labour should be deployed during rainy season for proper house keeping and
      removal of arching in coal feeders.
25.   The contractor has to provide First Aid facility at work place for treatment of their workers at site.
26.   There should be no coal dust leakage or any type of leakage in the area. Any leakage will be attended
      immediately after noticing it.
27.   Optional jobs will be carried out as per requirement and additional charges will be paid as mentioned above.
      Charges for optional jobs and AMC jobs have to be mentioned separately in the bill.
28.   All tools and tackles required for AMC job and optional job as per scope of work will be arranged by the
      contractor. A list of tools and tackles will be submitted by the contractor to the engineer-in-charge.
29.   Welding rods and hard facing rods will be arranged by the contractor and it will be duly examined by engineer-
      in-charge. Ferroweld-1 welding rods to be used by the contractor and for hard facing of wear prone
      components, Cobalarc-1M to be used.
30.   Insurance of workers and payment of bonus to the workers will be the statutory requirement and contractor
      will have to take care of compulsorily.
31.   All local issues will be contractor‟s responsibility. Disciplined behaviour of workers will be contractor‟s
      responsibility.
32.   Transportation of materials from stores to site will be arranged by the contractor. Similarly, transportation of
      scrap from site to scrap yard will also be arranged by them.

  FACILITIES TO BE PROVIDED BY DVC (FREE OF COST):
1. HV testing equipment, 5 KV motorized megger with auxiliaries and necessary operation personnel for the
    above.
2. Slipper, packers and special lifting devices.
3. Special tools like heavy spanners, bearing pullers and other equipment.
4. Equipment lubricants, jointing compounds, gaskets etc. that goes into equipment.
5. All spares required for replacement jobs.
6. Workshop facilities together with experienced operators.
7. Electrical and C & I laboratory facilities as available at power station.
8. All special tools and handling equipments supplied with the equipment.
9. Electricity for power and lighting, compressed and water supply at conventional locations.
10. Equipment should be made available for starting the work duly disconnected from electrical and mechanical
    sources.
11. Office with electricity and potable water within plant premises.
12. Adequate illumination in the entire work area.
13. Full time coordinators.
14. Supply of all spares and materials which require replacement, insulating materials etc. at work spot.
15. Covered site store are to be given to the contractor / their sub-vendor within plant premises.
16. DVC telephone.
17. Entry pass as required.

      FACILITIES TO BE PROVIDED BY DVC (ON CHARGEABLE BASIS)
1. Service Engineers/Technicians of the contractor will be provided suitable accommodation as per availability
   and medical facilities as available at BTPS hospital on chargeable basis at the rate applicable to the
   contractor.
2. Suitable accommodation as per availability will be provided to personnel of contractors on chargeable basis at
   the rate applicable to the contractor.


         SIGNATURE OF TENDERER                                                                           Cont‟d... P/19
                                                     -::19::-
                                                                                                 ANNEXURE-III
                                                                                          TECHNO-COMMERCIAL
                                       SPECIAL TERMS AND CONDITIONS
1) Guidelines regarding performance of work:
    a) The contractor will perform the subject work in accordance with the guidelines contained in the work
          order and the instructions of the Engineer-in-charge keeping in mind the latest technical specifications
          and IS code in practice.
    b) Any deviation from scope of work without consent of the Engineer-in-Charge will not be allowed. Only
          the Engineer-in-charge will be empowered to change or modify the guidelines or instructions given or
          laid down earlier.
    c) All incidental items of work not shown or specified but reasonably implied and found to be necessary for
          successful completion of work shall be deemed to be included in the scope of work at no extra cost to
          DVC.
    d) In case of any doubt or contradiction the decision of Engineer-in-Charge will be final.
2) Supply and use of safety equipments:
    All the safety equipments and personnel protection equipments are to be provided by the contractor to his
    men at his own cost. The contractor‟s men must use the safety equipments as per the requirements without
    fail.
3) Test Certificate of safety equipments:
    a)The electrical safety equipments like electrician‟s shoes, HV insulated gloves and insulated materials etc.
       should be used only after getting them tested at National Testing Laboratory, Alipore, Kolkata.
    b)All other safety equipments like helmets, safety belts etc. must be purchased from standard companies
       and only after getting them tested.
    c) Tools used by electrician must be of electrical grade, properly insulated and tested.
4) Observance of safety rules:
    a)It is the responsibility of the contractor to comply with all the safety rules and regulations applicable in the
       plant area. Ignorance of safety rules will not be a valid excuse.
    b)The employees of the contractor will have to strictly observe safety rules and comply with statutory
       requirement concerning the safety. Any violation thereof by any employee will expose the contractor to
       penalty.
5) Medical fitness of the employees:
     The contractor will have to ensure proper medical fitness of the employees employed by him.
6) Work Accident:
    The contractor will be totally responsible for the safety of the workers employed by him. In the event of any
    work accident, minor or major, the contractor‟s representative must take care of the injured person
    immediately and provide him required treatment suggested by the doctor. The injured can be admitted at
    DVC hospital, BTPS also for treatment by paying the charges as applicable.
7) Work permit:
    As the area of work is highly sensitive with respect to safety hazards, the responsible supervisor/engineer of
    the contractor must take proper work permit, shut down clearance and other instructions from the Engineer-
    in-Charge/his representative daily before start of the work.
8) Penalty Clause:
   The job is required to be executed on round the clock basis and it is the responsibility of the contractor‟s part
   to depute adequate number of experienced technical personnel/Supervising staff to undertake the jobs on
   round the clock basis:
    a. If there is unsatisfactory cleaning due to negligence in execution of the assigned job for the reason
       attributable to the contract, in such situation, DVC reserve the right to deduct amount as detailed below:
   During daily inspection if the cleaning / house keeping is found unsatisfactory, the following penalty
    will be imposed on daily basis for 3 days. In case the party failed to clear/proper house keeping
                                                                          rd
    within 3 days a caution latter will be issued to the party on 3 day and outside agency will be
    engaged for cleaning / house keeping for which deduction @ 1.5 times the expenditure incurred for
    engagement of the outside party for cleaning / house keeping will be deducted from the bill / security
    deposit of the party in addition to imposing penalty.
   For unsatisfactory Cleaning Recovery will be imposed as per following table (for House
       keeping):
         Sl. No.                       I T E M                                    PENALTY PER CASE
            1.     Coal accumulated at feeder floor                          Rs.100/- Per Sq.M per day
            2.     Coal dust accumulated in coal mill and PA fan area        Rs.100/- Per Sq.M per day
            3.     Empty Oil drums in coal mill area                         Rs.50/- Per drum
            4.     Oil accumulation in coal mill and PA fan area             Rs 100 per case per day
            5.     Coal dust above mill top                                  Rs.50/- Per mill
            6.     Oil and dust surrounding coal mill gear box               Rs.100/- Per case
            7.     Oil accumulated below PIV and Radicon gear box            Rs.100/- Per case

    SIGNATURE OF TENDERER                                                                             Cont‟d... P/20
                                                   -::20::-
                                                                                                   ANNEXURE-III
                                                                                         TECHNO-COMMERCIAL
     b. The contractor will have to follow all safety rules at the time of execution of work. All safety equipment
        such as helmet of ISI mark, safety shoes, safety belt, dust mask, hand rubber gloves etc. required during
        execution of the contract shall be supplied by the contractor to the workmen without any extra cost to
        DVC. If the party fails to adhere to the safety norm items, a penalty as mentioned below will be imposed
        by safety officer, DVC, BTPS.
        Penalty clause for non adherence to safety norms/ items.
        Sl. No.                     I T E M                                 PENALTY PER CASE
           1.     Non-Adherence to safety rules/ violation             Rs.100/- per case
           2.     Delay of distribution of safety items to             Rs.50/- labour of one day
                  labours and supervisors
          3.      Non availability of safety items                     Rs.500/- per Case
          4.      Non-Adherence to Safety Norms                        Rs.50/- Per Person

     c. Non- submission of reports and protocols:
         Sl.                      I T E M                                   PENALTY PER CASE
         No.
          1.   Non- submission of daily report                          Rs.50/- per day
          2.   Non- submission of spare parts record and                Rs.100 per week
               forecast of spares
          3.   Non submission of protocols                              Rs.500/- per Case
          4.   Non- submission of equipment history                     Rs.1000 per month
          5.   Non- submission of PM report on schedule time            Rs.200 per day
          6.   Non- submission of PA fan vibration record               Rs.2000 per month

     d.Non-availability of manpower:
       Sl. No.          Category of manpower                               PENALTY PER CASE
          1.   Graduate    Service    Engineer/Diploma                 Rs. 10,000 per month
               supervisor




     e. Deduction of penalty for non- availability of other category of manpower will be done according to
        existing rates.




                                                                                 SUPTDG.ENGINEER(TECH.)
                                                                                   D.V.C, Bokaro‟B‟(O&M)

SIGNATURE OF TENDERER
                                                         -::1::-
                                                                                                      ANNEXURE-IV
                                                                                                (Techno-commercial)

Ref.: No. BT/B(O&M)/T/09-10/WC/CM/MS-I/1999/ E-521                                            Dated:31/10/2009

Sub:A)Annual Maintenance Contract (AMC) of Milling System in all the three Units of DVC, BTPS‟B‟         &
    B) Overhauling of Coal Mills (10 Nos.) & Besta Coal feeders (15 Nos.).

                                             TERMS AND CONDITIONS
1. TERMS OF PAYMENT:
    For AMC of Milling System:100% payment will be made on monthly basis after successful completion of AMC
     work in the preceding month against submission of bills, in triplicate, the original being pre-receipted with a one
     rupee revenue stamp affixed thereon alongwith a certificate from Sr. Personnel Manager/PM(A), BTPS
     regarding payment of wages to the concerned workers on the body of the bill before it is submitted to the
     Engineer-in-charge, MS-I, BTPS „B‟(O&M) who will pass the same on satisfactory completion of the executed
     jobs. However, 100% payment for optional jobs, executed if any, will be made on actual work done basis.
    For Overhauling of Coal Mills & Feeders: 100% payment will be made on per Mill & per Coal Feeder actually
     overhauled basis after satisfactory completion of the overhauling works.
          Payment against the works under AMC of Milling System and Overhauling of Coal Mills & Feeders will
             be subject to acceptance of 10% Security Deposit of the respective order values and after agreements
             of the same.
2. SECURITY DEPOSIT:
   The successful bidder, on placement of order, will be required to furnish security deposit against satisfactory
   execution of orders and guaranteed performance for their executed works for an amount equivalent to 10% of
   order values valid for a period of 12 months from the date of start of the work in case of AMC work and for a
   period of 12 months from the date of completion of overhauling work with a claim period of 06(six) months
   thereafter against any bad workmanship/poor performance and in case any deficiencies are found during the said
   period the same shall be rectified/repaired/attended free of cost as per the direction of Engineer-in-charge.
   Acceptable modes of Security Deposit are as follows:
     A. For order value upto Rs.5 lac, security deposit may not be applicable, if payment is accepted after
         satisfactory completion of work. But performance guarantee as stated above will be applicable.
     B. For order value upto Rs.100 lac, security deposit is to furnished in any one of the following modes:
         i) In the form of Bank draft in favour of Addl. Chief Accounts Officer, DVC, BTPS payable at SBI or Bank of
             India, Bokaro Thermal.
         ii) In the form of Bank Guarantee (in DVC‟s format) from any Nationalized/Scheduled Bank (except Rural/Co-
             operative Bank).
         iii) 90% payment against RA Bill(with EMD equivalent to 2% as initial SD) and balance 10% to be retained
             as security deposit and may be released after successful completion of guarantee period.
     C. For order value above Rs.100 lac, Sl.No (i & ii) as above will be applicable.
 If SD is opted in the form of BG, Validity of B.G. will be initially for 12(Twelve) months from the date of
      execution of bank guarantee with a claim period of six months thereafter. If required, validity of BG is to be
      extended suitably covering the entire guarantee period and claim period of six months thereafter.
 Acceptance of security deposit is essential and offers of the bidders who do not accept SD cum performance
      guarantee clause may not be considered.
 If no option is exercised in respect of Security Deposit by the quotationer, the same will be imposed as
      deemed fit in that case. No payment will be made unless Security Deposit is accepted.
 Any penalty for which the successful tenderer shall found liable shall be payable to the corporation in terms of
      the Work Order/Contract, shall have been recoverable from them and/or the corporation shall not have suffered
      any damages whatsoever, then security deposit shall be released, on receipt of a certificate from the consignee
      and/or indenting officer that there is no claim against the successful tenderer under the purchase order/contract.
 EXEMPTION OF SECURITY DEPOSIT: Will not be applicable as this is a work contract.

3. LIQUIDATED DAMAGE & RISK PURCHASE CLAUSES:
   Liquidated damage and Risk purchase clause will be operative as below:
   a)In case of any delay in the execution of the work orders beyond the stipulated period of completion/completion
     schedule, DVC reserves the right to recover from the vendor a sum equivalent to 0.5% of the values of the
     delayed portions of the works for each week of delay and part thereof subject to a maximum of 5% of the total
     order values for both the works as liquidated damage (LD).
   b)Alternatively, the owner reserves the right to get these works executed by other available agencies at the sole
     risk and cost of the successful bidder and recover all such extra costs incurred by the owner in procuring the
     services of other agencies by the above procedure.

         SIGNATURE OF TENDERER                                                                            Cont‟d... P/2
                                                        -::2::-
                                                                                                  ANNEXURE-IV
                                                                                            TECHNO-COMMERCIAL


  c) Alternatively the owner may cancel the Order/s completely or partly without prejudice to their right under the
     alternatives mentioned above.
  d)In the event of recourse to the alternatives above, the Owner will have the right to engage the agency, who are
     readily available to meet the urgency in requirement caused by vendor‟s failure to comply with the completion
     period/schedule of the two work orders irrespective of the fact whether the amount involved in execution of the
     work/s is/are same or not.

4. GCC is enclosed with the tender documents.

5. WORK COMPLETION SCHEDULE :
    For AMC of Milling System: 12 months from the date of start of the work.
    For Overhauling of Coal Mills & Feeders: To be taken up as & when required basis. Overhauling of each mill is
     to be completed within 15 days & each coal feeder to be completed within 7 days from the date of start of work.
     However, validity of the order will be for a period of one year from the first overhauling work taken up.

6. VALIDITY OF THE CONTRACT:
   Validity of contract for AMC of Milling system and Overhauling of Mills & Coal Feeders is for one year from the
   date of start of work. However, the same may be extended for one more year from the date completion of original
   contract at the same rates and terms & conditions of the original contract based on satisfactory execution of the
                  st
   contracts in 1 year and at the discretion of DVC.
7. VALIDITY OF OFFER: Validity of the offer will be 180 days from the date of opening of the bid. Offer with shorter
   validity will be considered as commercial deviation & may be treated accordingly.

8. AGREEMENTS:
   Successful bidder/s against the NIT will be required to enter into an agreement with DVC as per DVC norms.

9. BIDS- EVALUATION PROCEDURE :
   Item-wise rates are to be quoted against different jobs/activities as mentioned in the scope of Works/price format.
   However, bid will be evaluated on the basis of total amount involved for the subject jobs A) Annual Maintenance
   Contract (AMC) of Milling System in all the three Units of DVC, BTPS‟B‟ and B) Overhauling of Coal Mills
   (10 Nos.) & Besta Coal feeders (15 Nos.) taken together along with any other statutory charges as applicable.
   However, separate work orders may be placed for each of the job under A) & B) as above on the same firm.




                                                                            SUPTDG.ENGINEER(TECH.)
                                                                              D.V.C, Bokaro‟B‟ (O&M)
SIGNATURE OF TENDERER
                                                          -::1::-
                                                                                                        ANNEXURE-V
                                                                                                  (Techno-commercial)
Ref.: No. BT/B(O&M)/T/09-10/WC/CM/MS-I/1999/ E-521                                               Dated:31/10/2009

Sub:A)Annual Maintenance Contract (AMC) of Milling System in all the three Units of DVC, BTPS‟B‟           &
    B) Overhauling of Coal Mills (10 Nos.) & Besta Coal feeders (15 Nos.).

                                          GENERAL TERMS & CONDITIONS
1)The work is to be performed as per direction of the Engineer-in- charge, maintenance superintendent-I, DVC,
  BTPS‟B‟ (O&M).
2)Subletting of the contract may not be permitted without prior approval of DVC.
3)The Corporation reserves the right to terminate the job at any point of time without assigning any reason thereof.
4)In case of damage to any DVC property during execution of the job the Contractor shall have to repair/replace the
  same at their own cost & arrangement.
5)The Contractor will be responsible for all payment including minimum wages to their workers as per the Govt.
  rules.
6)Safety measures to be complied by the Contractor :
    i. All provisions of the Factory Act 1948, The Bihar/Jharkhand Factory Rules 1950, Indian Electricity rules 1956,
        and other rules and regulations should be strictly adhered to.
    ii. Contractor should provide all safety equipments to their workers such as safety shoes, helmets, goggles,
        welding screen, safety belts, appropriate hand gloves etc. Good and approved quality appliance shall be
        arranged and replaced by new ones as soon as worn out by Contractor at his cost.
    iii. Each and every portable tool is to be used with three plugs and three wire systems ONLY, so as to avoid
        electrical shock while working. Proper earthing to be checked BOTH at supply end at tools end by qualified
        electrician before commencement of work. Colour coding of three wire system should be as follows:
                    Red          : Live
                    Grey/Black : Neutral
                    Green        : Earth
    iv. Three wire sockets and properly insulated electrical boards with earth leakage circuit breakers (ELCB) are to
          be used by Contractor. ON/OFF switch should be connected in live wire and not in neutral wire. This should
          be ensured by qualified electrician.
    v. The Contractor will have to keep ready two buckets of water, while carrying out welding work. One bucket is
          to be used for quenching fire, if occurred. Second bucket with water is to be used for dropping the last bit of
          electrodes so that red hot tip does not cause any fire or injure to any person.
    vi. Cover/curtain is to be provided in hazardous area so that the hot spatters/molten metal do not cause fire.
          This is to be ensured before starting of work particularly when carrying out cutting, welding work at higher
           elevations, on grills, coal handling plants etc.
    vii. Single piece cable (without joints) to be used during welding work to avoid the fire through cable joint if at all
          a joints is unavoidable, proper connector be used.
    viii. Earthing should be done at a spot nearest to the welding work in hand. For this it is necessary to keep
          earthing cable as long as welding cable.
    ix. Hand lamp should be of 24 Volt only. No hand lamp should be there without protective grill and plastic cover.
          Hand lamps should be unbreakable and with isolation transformer.
    x. Proper house keeping is a must during entire work period. Hazardous material and inflammable material
          should be handled so as not to cause harm to the plant or people.
    xi. Contractor‟s work should not cause inconvenience to DVC/other contract works.
    xii. Adequate supervision must be ensured during execution for compliance of safety measures.
    xiii. Contractor should maintain a history register of their lifting tools and tackles such as chain pulley blocks,
          Slings etc. and these are to be tested by competent person as defined in The Jharkhand Safety Rules 1950.
          Copy of the test certificate should be submitted to Safety Section.
    xiv. In case of injury to person, the incidence is to be reported to concerned section without delay and all legal
          formalities completed at earliest by seeking help from Safety Section.
    xv. Contractor should deploy competent workers for the particular job and should authorize his workers for
        carrying out electrical works such as welding, grinding and other works carried out by electrical appliances.
        Contractor should submit the list of his workers deployed for the job and the list of workers who are authorized
        for carrying electrical works to the concerned Sectional Head for verification of competency of their workers
        starting the work as per IE Rules 1956.



SIGNATURE OF TENDERER
                                                                                                             Cont‟d... P/2
                                                       -::2::-
                                                                                                     ANNEXURE-VI
                                                                                               (Techno-commercial)


   xvi. If any of our supervisor or officer finds that Contractor is not following the Safety Rules and regulations
     including use of personal protective equipment at site, he is authorized to stop your work immediately. In case
     of violation of rules after issue of warning letter contractor shall be liable to penalty as decided by the
     concerned/safety section.
   xvii. For minor lapses by your workers and staff they shall be issued “Violation of Safety Rules” on the spot or
     through the section-in-charge. Your staff should be instructed to accept it and comply with it. For repeated
     violation of rules, the work order may be terminated & contractor may be declared debarred for further issue of
     work as per discretion of authorities.
   xviii. The Safety Terms and Conditions are only indicative and all precautions necessary for safety of worker
           should be taken.
   xix. Safety of the workers to be engaged in the job is Contractor‟s responsibility and DVC will not be responsible
     for any type of compensation to Contractor‟s worker, if any accident occurs during the work and Contractor will
     be liable for all payments, maintenance etc. to the worker/workers‟ family as per statute or rule in force in the
     State or the Country as a whole.
   xx. Unauthorized occupation/possession of Quarters/Shop/Plot of land of DVC by the bidder will be treated as a
     disqualification and tender submitted/ Contract awarded is liable to be rejected/cancelled, as the case may be,
     at any stage if the tenderer is found to be having such unauthorized occupation/possession.
   xxi. On demand, Contractor will be required to produce a certificate from the competent authority of DVC that
     he/they are not having such unauthorized occupation/possession. Non-compliance of this may lead to
     rejection/cancellation of your offer/contract.
   xxii. Any unskilled labour required for the work should be engaged from the locally available people.
   xxiii. E.P.F. Scheme will be applicable as per rule.
   xxiv. All taxes as applicable will be deducted from the bill.
   xxv. The Contractor will comply with the provisions of contract labour (Regulation & Abolition) Act. 1970 and
        rules made thereunder.
   xxvi. All suits arising out of the enquiry and subsequent Work Order, if any, are subject to the jurisdiction of the
     Court nearest to DVC, BTPS in India and no other Court, when resolution/settlement through mutual
     discussion fails.



                                                                      SUPTDG.ENGINEER(TECH.)
The all TERMS & CONDITIONS as stated in                                D.V.C, Bokaro‟B‟ (O&M)
  this ANNEXURE are acceptable



  SIGNATURE OF TENDERER
                                                        -::1::-

                                                                                                    ANNEXURE-VII
                                                                                               (Techno-commercial)

Ref.: No. BT/B(O&M)/T/09-10/WC/CM/MS-I/1999/ E-521                                            Dated:31/10/2009

Sub:A)Annual Maintenance Contract (AMC) of Milling System in all the three Units of DVC, BTPS‟B‟        &
    B) Overhauling of Coal Mills (10 Nos.) & Besta Coal feeders (15 Nos.).

Techno-Commercial Deviation Schedule:
Bidder should agree to all the techno-commercial terms and conditions of the bid documents. However, deviations, if
any, should be stated as per the following schedule and to be submitted along with the techno-commercial bid failing
which it will be presumed that all terms and conditions are acceptable to them. Deviations taken elsewhere and not
brought out in the following deviation schedule, the same will not be accepted. The owner reserves the right to reject
the offer on account of such deviation if the bidder, on advice of owner, does not withdraw the deviations.

Following are the deviations proposed by us relating to techno-commercial terms and conditions. We confirm that we
shall withdraw the deviations proposed by us at the cost of withdrawal indicated in the price bid failing which our bid
may be rejected and Bid Security forfeited.

   SL.NO.       CLAUSE NO.                                             DEVIATION




NOTE :
If there is no deviation, this deviation schedule shall be submitted along with the Techno-Commercial Bid duly signed
and stamped after stating “NIL DEVIATIONS”.




                                                                        SUPTDG.ENGINEER (TECH.)
                                                                          D.V.C, Bokaro‟B‟ (O&M)

The all TERMS & CONDITIONS as stated in this ANNEXURE are acceptable.



     SIGNATURE OF TENDERER
                                                         -::1::-
                                                                                                       ANNEXURE-VIII
                                                                                                  (Techno-commercial)
Ref.: No. BT/B(O&M)/T/09-10/WC/CM/MS-I/1999/ E-521                                             Dated:31/10/2009

Sub:A)Annual Maintenance Contract (AMC) of Milling System in all the three Units of DVC, BTPS‟B‟          &
    B) Overhauling of Coal Mills (10 Nos.) & Besta Coal feeders (15 Nos.).

                   PROFORMA OF BANK GUARANTEE IN LIEU OF EARNEST MONEY DEPOSIT
                 (On non-judicial stamp paper of appropriate value purchased in the name of the bank)
Ref. :

To
The Chief Engineer
Damodar Valley Corporation
Bokaro „B‟ Thermal Power Station,
P.O. : Bokaro Thermal,
Dist.: Bokaro 829 107
JHARKHAND.

Dear Sirs,

In       accordance        with      your       Notice         Inviting    Tender        for_______________________
___________________________________________________________                      under     your     specification     No.
______________________________ dated______________ M/s._____________________________ (Name and
full address of the firm) (hereinafter called the Tenderer) hereby submit the Bank Guarantee :


Whereas to participate in the said tender for the following:
         i)      _________________________________ (Name of the items to be supplied as per NIT)
         ii)     ___________________________
         iii)    ____________________________
It is a condition in the tender documents that the tenderer has to deposit Earnest Money amounting to
Rs.________________ in respect to the tender, with Damodar Valley Corporation(*) (hereinafter referred to as
“Corporation”) by a Bank Guarantee from a Nationalised Bank/Schedule Bank irrevocable and operative till the
validity of the offer (i.e. 180 days from the date of opening of tender) for the like amount which amount is likely to be
forfeited on the happening of contingencies mentioned in the tender documents.
And whereas the tenderer desires to secure exemption from deposit of Earnest Money and has offered to furnish a
Bank Guarantee for a sum of Rs.________________ to the Corporation as Earnest Money.

Now, therefore, we the __________________________ (Bank), a body corporate constituted under the Banking
Companies (Acquisition and Transfer of Undertaking) Act. 1969             and branch office at ___________________
(hereinafter referred to as the Guarantor) do hereby undertake and agree to pay forthwith on demand in writing by
the Corporation of the said guaranteed amount without any demur, reservation or recourse.
We, the aforesaid bank, further agree that the Corporation shall be the sole judge of and as to whether the tenderer
has committed any breach or breaches of any of the terms costs, charges and expenses caused to or suffered by or
that may be caused to or suffered by the Corporation on account thereof to the extent of the Earnest Money required
to be deposited by the Tenderer in respect of the said Tender Document and the decision of the Corporation that the
Tender has committed such breach or breaches and as to the amount or amounts of loss, damage, costs, charges
and expenses caused to or suffered by or that may be caused to or suffered by the Corporation shall be final and
binding on us.
                                                                                                              Cont‟d...P/2
SIGNATURE OF TENDERER
                                                                -::2::-

                                                                                                 ANNEXURE-VIII
                                                                                            (Techno-commercial)
We, the said Bank further agree that the Guarantee herein contained shall remain in full force and effect until it is
released by the Corporation and it is further declared that it shall not be necessary for the Corporation to proceed
against the Tenderer before proceeding against the Bank and the Guarantee herein contained shall be invoked
against the Bank, notwithstanding any security which the Corporation may have obtained or shall be obtained from
the Tenderer at any time when proceedings are taken against the Bank for whatever amount that may be
outstanding or unrealized under the Guarantee.


The     right    of    the   Corporation      to    recover       the     said    amount    of   Rs.____________         (Rupees
________________________) from us in manner aforesaid will not be precluded/affected, even if, disputes have
been raised by the said M/s. ________________________(Tenderer) and/or dispute or disputes are pending before
any authority, officer, tribunal, arbitrator(s) etc.


Notwithstanding       anything   stated    above,      our    liability   under   this   guarantee   shall   be     restricted   to
Rs.___________________ (Rupees_______________ ______________________) only and our guarantee shall
remain in force upto _________and unless a demand or claim under the guarantee is made on us in writing within
three months after the aforesaid date i.e. on or before the ___________ all your rights under the guarantee shall be
forfeited and we shall be relived and discharged from all liability thereunder.



Date _______________                 (Signature) ______________________

Place _______________
                   (Printed Name)____________________


                                                       (Designation)_____________________



                                                                  (Bank‟s common seal)




------------------
In presence of:

WITHNESSES (with full name, designation, address & official seal, if any)


1       ________________________

      ________________________


2       ________________________

      ________________________


                                                                                                     Cont‟d...P/3

SIGNATURE OF TENDERER
                                                       -::3::-
                                                                                                   ANNEXURE-VIII
                                                                                              (Techno-commercial)
Sub. : Instruction for Bank Guarantee in lieu of Earnest Money Deposit.
In the event of submission of BG in lieu of Earnest Money, the B.G. shall not be accepted and bid shall be
rejected if: (a) The name of the NIT mentioned in the BG is different from the NIT for which bids have been invited.
(b) The firm/proprietor, on whose behalf the bank guarantee has been furnished, is different from the bidder. (c) The
Bank Guarantee is not of the prescribed value. (d)The validity of the Bank Guarantee is less than the stipulated
period.
In addition to the above, following points to be noted and follow strictly for the purpose of the execution of
the BG :
1) The Bank Guarantee (B.G.) in lieu of Earnest Money Deposit shall be executed on the non-judicial stamp paper
     of the applicable value purchased in the name of the Bank.
2) The Executor (Bank Authorities) is required to mention the Power of Attorney No. and date of execution in
     his/her favour with authorization to sign the documents. The Power of Attorney is to be witnessed by two
     persons their full name and address.
3) The Bank Guarantee should be executed by a Nationalized Bank/Scheduled Commercial Bank. The Bank
     Guarantee from Co-operative Bank/Rural Banks are not acceptable.
4) The Bank Guarantee if executed on non-judicial stamp paper after six months of the purchase of such stamp
     paper, shall not be valid.
5) Each page of Bank Guarantee shall bear the signature and seal of the Bank & Bank Guarantee Number.
6) The contents of the Bank Guarantee shall be strictly as per Proforma prescribed by the DVC (the
     Owner/Purchaser) in line with the NIT and its related instructions in ANNEXURE-I and should contain all factual
     details.
7) Any correction, deletion etc. in the Bank Guarantee should be authenticated by the Bank Officials signing the
     Bank Guarantee.
N.B. :
i)        The Bank Guarantee furnished in lieu of Earnest Money Deposit shall be prepared with utmost care
          as per the format given at ANNEXURE-VIII (Techno-commercial) and the above guidelines. B.G.s not
          conforming to the above may not be acceptable and in that event the tender will be treated as non-
          responsive and rejected.
ii)       A word of caution : Doubly be sure with line by line scrutiny of Bank Guarantee to eliminate any
          deviations/errors before submission of the B.G. in lieu of EMD and should truly confirm to the format
          and guidelines of DVC so that the tender is not being rejected.
iii)      Consequent to above, the validity of EMDBG should be 180 days from the date of opening of tender.
iv)       The blank format of B.G. including its instruction under this ANNEXURE-VIII (Techno-commercial)
          should be returned along with the tender with the signature & official seal of the tenderer on all the
          pages.
SUBMISSION OF EARNEST MONEY IN THE FORM OF BANK GUARANTEE IS NOT THE SOLE MODE.
EARNEST MONEY MAY ALSO BE SUBMITTED IN ANY OF THE FOLLOWING FORMS :
1) PAY ORDER OR DEMAND DRAFT IN FAVOUR OF THE SR. ADDL. CHIEF ACCOUNTS OFFICER, DVC,
       BTPS.
2) FIXED DEPOSIT RECEIPT ISSUED BY NATIONALISED BANK ENDORSED TO THE SR. ADDL. CHIEF
       ACCOUNTS OFFICER, DVC, BTPS.
3) DVC BONDS ENDORSED TO THE ADDL. CHIEF ACCOUNTS OFFICER, DVC, BTPS.
4) POST OFFICE NATIONAL SAVINGS CERTIFICATE HAVING FACE VALUE EQUAL TO EMD VALUE AND
       DULY ENDORSED TO THE ADDL. CHIEF ACCOUNTS OFFICER, DVC, BTPS.



The all TERMS & CONDITIONS as stated in
  this ANNEXURE are acceptable.



  SIGNATURE OF TENDERER                                                      SUPTDG.ENGINEER(TECH.)
                                                        -::1::-
                                                      PRICE BID
 Ref.: No. BT/B(O&M)/T/09-10/WC/CM/MS-I/1999/ E-521                                             Dated:31/10/2009

 Sub:A)Annual Maintenance Contract (AMC) of Milling System in all the three Units of DVC, BTPS‟B‟       &
     B) Overhauling of Coal Mills (10 Nos.) & Besta Coal feeders (15 Nos.).


 The Price Part containing filled up Format for Price Bid will be submitted under the sealed cover of envelope „C‟
 marked (Price Bid)".
 This Price Bid envelope should be superscribed with NIT number and will be submitted under sealed cover of a
 third common envelope with NIT number and date of opening.
 Enclo. : i) Format for Price Bid.
                                               FORMAT FOR PRICE BID
  (Detailed in scope of work).
X. JOBS UNDER MECHANICAL SEGMENT OF COAL MILLING SYSTEM as mentioned in sl. No. (1), (2) &(3)

 1. Running/routine, Preventive & Breakdown maintenance (Sl no. 1,2& 3 as per scope of work above)
                    Description                       Quantity          PERIOD       Rate per unit    Amount (for 12
                                                                                      per month         months &
                                                                                                       three units)

 Entire jobs under scope of works for Mechanical
 segment(Running/routine,      Preventive         &   03 units          12 months         Rs.               Rs.
 Breakdown maintenance etc for Unit #I, II & III)

Y. JOB UNDER ELECTRICAL SEGMENT OF COAL MILLING SYSTEM :
              DESCRIPTION              QUANTITY     PERIOD                               Rate            AMOUNT
                                                                                          Per         (for 12 months
                                                                                      Unit/Month       & three units)

 Entire job for scope of works                         03 units        12 months         Rs.                Rs.
 Under Electrical Segment

Z.JOB UNDER C&I SEGMENT OF COAL MILLING SYSTEM :

                   DESCRIPTION                        QUANTITY           PERIOD          Rate           AMOUNT
                                                                                          Per        (for 12 months
                                                                                      Unit/Month      & three units)
 Entire job for scope of works                         03 Units        12 months          Rs.              Rs.
 Under C&I Segment

P. Jobs to be undertaken on unit rate basis under mechanical segment ( Sl. No.-4 as per scope of work
     above):

                         Description                    Expected yearly             Unit Rate           Amount
 Sl.No.
                                                           Quantity                   (Rs.)              (Rs.)
   4.1.   Gear box replacement without forced                 8
          lub. Oil system
   4.2.   Replacement of forced lub oil system                     8
   4.3.   Replacement/repair of loading block                     12
   4.4.   Replacement of PA fan impeller with                      8
          bearings
   4.5.   Balancing of PA fan                                     10
   4.6.   Removal of top plate of coal feeder                     30
   4.7.   Removal of gear box foundation pad &                    08
          refitting them after machining &
          replacement of face seal of gear box

                                                                                                     Cont‟d...P/2
 SIGNATURE OF TENDERER
                                                       -::2::-

                                                     PRICE BID

 4.8.    Coal mill gear box labyrinth greasing                   250
 4.9.    Gear box Oil centrifuging                               200
4.10.    Repair/replacement of loading cylinder                  200
4.11.    Replacement of PF bends                                  50
4.12.    Replacement of PF straight pipe (less                   200
         than 4 mtrs. length)
4.13.    Replacement of PF straight pipe (more                   40
         than 4 mtrs. length)
4.14.    Replacement of Johnson coupling                         100
         gasket
4.15.    Replacement of Johnson coupling                         50
4.16.    Repairing loading assembly with                         80
         repairing of external levers
4.17.    Replacement of broken top ring by                        5
         other suitable ring
4.18.    Replacement of all 11 nos. of balls by                  10
         balls of higher dia
                                                                       2
4.19.    Insulation of PF pipes and bends                   2000 M

*Unit rates for above items are to be quoted, however payment for the same will be made on actual work
done basis.

MODE OF BID EVALUATION FOR THE MECHANICAL SEGMENT OF AMC PACKAGE (Q):
  The bid for mechanical segment will be evaluated taking into account of the running/routine, preventive &
   breakdown maintenance(Sl.No.1,2 & 3 as per scope of work) under (X) above & quantities for the jobs quoted on
   unit basis(Sl.No.4 as per scope of work) under (P) above for mechanical segment. Total value of (1, 2 & 3) and
   (4) will constitute the value of work under mechanical segment will be (X) + (P).
MODE OF BID EVALUATION FOR THE AMC WORK (A)[(Q)+(Y)+(Z)]:
  The bid will be evaluated for the complete package of AMC of Coal milling system for three units on yearly basis
   i.e considering offered prices of (Q)Mechanical(alongwith jobs on unit rate basis), (Y)Electrical & (Z) C&I
   systems taken together.

Overhauling of Coal mills & feeders of Bokaro „B‟TPS.

SL         DESCRIPTION OF OVERHAULING                 QUANTITY              UNIT-RATE           AMOUNT
NO.                  WORKS

 01     Overhauling of 8.5E10 Coal mills of the        10 Nos.                  Rs.                Rs.
        three units of DVC/Bokaro-„B‟ TPS

 02     Overhauling of Besta Coal feeders of the       15 Nos.                  Rs.                Rs.
        three units of DVC/Bokaro-„B‟ TPS


 OPTIONAL JOBS: (For Overhauling of Coal Mills)
SL      DESCRIPTION OF OVERHAULING                    QUANTITY              UNIT-RATE           AMOUNT
                    WORKS
NO.
        Fitting of Scale and Pointer arrangement.
        For each vane to be fabricated at site and
 a                                                        10               Rs.(Lump Sum)     Rs.(Lump sum)
        locking of each vane will be made after
        initial adjustment of classifier


 b      Removal of Gear Box for thorough                  10               Rs.(Lump Sum)     Rs.(Lump sum)
        cleaning & replacement of face seals etc.


                                                                                            Cont‟d...P/3
SIGNATURE OF TENDERER
                                                         -::3::-
                                                        PRICE BID

 OPTIONAL JOBS: (For Overhauling of Coal Feeders)
SL      DESCRIPTION OF OVERHAULING              QUANTITY                     UNIT-RATE                 AMOUNT
                    WORKS
NO.
 a      Removal of spike rods and their refitting            15            Rs.(Lump Sum)            Rs.(Lump sum)
        after proper cleaning
 b      Repair/servicing/replacement of      cut off         15            Rs.(Lump Sum)            Rs.(Lump sum)
        gates on both sides




(B) Total amount involved in overhauling of Coal mills & coal feeders of desired nos. in the three units
[(01)+(02) including optional jobs under overhauling of Coal mills & coal feeders as above]:
Rs------------------------------- only.

MODE OF BID EVALUATION FOR THE COMPLETE PACKAGE INCLUDING AMC & OVERHAULING OF MILLS
& FEEDERS BOTH [(A)+(B)]:

The bid will be evaluated for the complete package including AMC of milling system of the three units for one year &
Overhauling of mills & feeders in required nos. of three units i.e. [(A) +(B)] as above.

        Service Tax (If applicable)::
     (Please furnish proof of service tax registration no. Service tax will be paid extra at actual against documentary
     evidence.).

 Payment of Service Tax, if applicable, is the sole responsibility of the contractor. If applicable and not mentioned
     separately, the quoted rate will be deemed to be inclusive of Service Tax.
 There should not be any marks of erasers. Alteration, if any, shall be initialed with date by the person signing on
     behalf of the tenderer.
 Rates to be quoted both in words & figures. If there is discrepancy in tender in respect of words & figures, the
     amount in words will prevail.
 If there is discrepancy in unit price & the total price which is obtained by multiplying unit rate with quantity of any
  item or between sub-total price & total price, the unit or sub-total price will prevail and total price will be corrected
  accordingly.
 Bidders will have to accept the correction, if any as per methodology otherwise there bid may be rejected.
 If there is any discrepancy between tendered quantity and offered quantity, the tender quantity will be accepted.
 Price will be quoted in Indian Rupees.




The above TERMS & CONDITIONS
       are acceptable                                       SUPTDG.ENGINEER(TECH.)
                                                             D.V.C, Bokaro‟B‟ (O&M)



SIGNATURE OF TENDERER
                                                    PRICE BID
                                                   ANNEXURE-A

Ref.: No. BT/B(O&M)/T/09-10/WC/CM/MS-I/1999/ E-521                                           Dated:31/10/2009

Sub:A)Annual Maintenance Contract (AMC) of Milling System in all the three Units of DVC, BTPS‟B‟       &
    B) Overhauling of Coal Mills (10 Nos.) & Besta Coal feeders (15 Nos.).



                                   COST OF WITHDRAWAL OF DEVIATIONS :

Following are the deviations as proposed by us relating to techno-commercial terms and conditions. We are also
furnishing below the cost of withdrawal for the deviations proposed by us. We confirm that we shall withdraw the
deviations proposed by us at the cost of withdrawal indicated in this attachment failing which our bid may be rejected
and Bid Security forfeited.

    SL.NO.       CLAUSE NO.                         DEVIATION                           COST OF WITHDRAWL
                                                                                              IN Rs.




NOTE :
Bidders may note that bids containing deviations without the cost of withdrawal price shall be considered as
unresponsive offer and will be out rightly rejected. This schedule indicating the cost of withdrawal price for such
deviations should be submitted along with the price bid only and will be taken into consideration for the purpose of
bid evaluations.


SIGNATURE OF TENDERER
                                                 SECTION-2:GCC
                                     DAMODAR VALLEY CORPORATION
                                              DVC Towers VIP Road
                                                 Kolkata – 700 054


                     GENERAL CONDITIONS OF CONTRACT


1.   Definition
     The following terms and expressions used herein shall have the meaning as indicated therein :-
     Purchase Order/The Contract: Shall mean the documents forming the tenders and acceptance thereof
     together with the documents referred to therein including the conditions, specifications/Scope of Work,
     designs, drawings and instructions issued from time to time by the Purchaser/ Owner and all these
     documents taken together shall be deemed to form one contract and shall be complementary to one
     another.
     Applicable Law : This contract including all matters connected with this Contract shall be governed and
     construed in accordance with the Indian Law both substantive and procedural and shall be subject to the
     exclusive jurisdiction of Indian courts at Kolkata (India).
     Contract Price : It means the total price to be paid for the supply of materials/goods/services to the
     consignee in accordance with the payment terms stipulated in the contract.
     Supplier/Vendor/Contractor : Shall mean the registered individual firm, Company or Corporation whether
     incorporated or otherwise to whom the Purchase Order/Work Order/LOA/LOI is addressed and shall include
     its permitted assigns and successors.
     Purchaser/Owner : Shall mean Damodar Valley Corporation, a statutory body established under Act No.
     XIV of 1948 of GOI having its Corporate Office at DVC Towers, VIP Road, Kolkata – 700 054.
     Party : It means the owner or the bidder, as the case may be, and „Parties‟ means both of them.
     Sub-Vendor/Sub Contractor : Shall mean the person/organization/firm named in the Purchase
     Order/Contract for any part of the material/works to whom that part of the Purchase Order/Contract has
     been sublet by the vendor with the consent in writing of the „Owner‟ and will include the legal
     representatives, successors and permitted assigns of such person.
     Equipment/Stores/ Materials : Shall mean and include equipment, stores & materials to be supplied by the
     vendor under the contract.
     Specification/Scope of Work : Shall mean the Specifications and Bidding documents forming a part of the
     contract and also such other schedules and drawings furnished by purchaser/owner and or as may be
     mutually agreed upon.
     Guarantee/Warranty Period : Shall mean the period during which the vendor shall remain liable to repair or
     replacement of any defective part of the Stores/Equipment/Materials supplied/works executed under the
     contract.


2.   Reference
     The number of the concerned Purchase Order/Work Order/LOA/LOI must appear on all correspondence,
     drawings, invoices, packing and shipping documents and on all documents or papers connected with the
     Contract.
3.        Specifications and Drawings
3.1       Any information, details etc. called for in the specification and not shown in the drawings and vice-versa
          shall have the same effect and meaning as if called for and shown both in the specification and drawings. In
          case of conflict between the specifications and drawings, the decision of the Purchaser/owner or his duly
          authorized representative shall be final and binding.
3.2       Standards :
          The goods/materials supplied under this contract shall conform to the standards mentioned in the Technical
          Specification, and, when no applicable standard is mentioned, the authoritative standard appropriate to the
          goods/materials issued by the concerned institution and such standard shall be the latest.
      4. EARNEST MONEY DEPOSIT (IF APPLICABLE) :
          Every tender must accompany „ Earnest Money ‟ as mentioned in the Tender Notice/Enquiry in desired form
          as mentioned below without which the tender will not be accepted. The Earnest Money should be deposited
          in any of the following forms:-
          a)      Pay Order or Demand Draft in favour of the Chief Accounts Officer, DVC, Kolkata-54 from any
                  Nationalised or scheduled bank.
          b)      Bank Guarantee from a Nationalised Bank/Scheduled Bank/Foreign Banks, irrevocable and
                  operative till the validity of the offer as per standard Proforma.
          c)      Fixed Deposit Receipt issued by Nationalised Bank endorsed in favour of DVC.
          d)      DVC Bonds duly endorsed in favour of DVC.
          e)      Post Office National Savings Certificate having face value equal to the EMD value and duly
                  endorsed in favour of DVC.
          No Bank Guarantee shall be accepted for EMD amount upto Rs. 10,000/-. However, EMD exceeding Rs.
          10,000/- may be accepted in any of the above forms.
          The offer accompanied by B.G. against EMD will only be considered valid on acceptance of the Bank
          Guarantee. The offer not accompanied by EMD or specified EMD in proper form as defined above shall not
          be considered as valid tender for opening provided necessary stipulations are made in the NIT.

           i)Earnest Money will only be refunded to the unsuccessful Tenderer within 15 days after finalisation of
             Tender and no interest will be paid for the same.
           ii)The amount of Earnest Money will be refunded to the successful tenderer, after acceptance of their
              Security Deposit-cum-Performance B.G./successful completion of the order.
          iii)Small Scale Industries registered with NSIC shall be exempted from the payment of Earnest Money. Small
              Scale Industries seeking such exemption must enclose valid registration certificate from the appropriate
              Govt. authority giving details such as validity, stores etc., failing which exemption will not be granted.

5.        CONDITIONS FOR FORFEITURE OF EMD :
The EMD may be forfeited
         In case the purchase order/work order is not executed by the vendor in full.
         In case a bidder withdraws his offer within the offer validity period specified by the bidder.
         If the bidder does not accept the arithmetical correction of its Bid Price.
         If the Bidder does not withdraw any deviation at the cost of withdrawal price indicated by him in „deviation
          schedule‟.
         If the bidder refuses to withdraw, without any cost to the owner, any deviation not listed in deviation
          schedule but found elsewhere in the bid.
         In the case of a successful bidder, if the bidder fails within the specified time limit as mentioned in the
          purchase order/contract to furnish the acceptance of contract.
         In case of a successful bidder, if the bidder fails to submit Security Deposit-cum-Performance BG within 30
          days from last day of the stipulated period mentioned in the Purchase Order/Work Order/LOA/LOI.
         For those tenderers who are found to be indulging in changing /adding or deleting the contents of the
          downloaded tender documents.
6.   Price Basis
             Price mentioned in the Purchase Order/Work Order/Turnkey Project Contracts shall normally
     be firm till execution of the contract unless stated otherwise.

            The contractor/vendor shall furnish the following certificate to the Paying Authority along with each
              invoice/bill against payment for supplies made against any supply order/RC with longer completion
              period (more than a year), if the same is placed on firm price basis.
     „I/we certify that there has been no reduction in the sale price of the stores of description identical to this
     item, supplied to any person/organization and such stores have not been offered/sold by me/us to any
     person/organization at a price lower than the price charged under this contract upto the date of this bill.‟


     The bids may be invited either on „firm price basis‟ or on „variable price basis‟, but not on both. Tender
     Inviting Authority may invite any or all the items/components in supply/works/turnkey project tenders on
     ‟variable price basis‟ i.e. few items/components of a NIT may be on „variable price‟ basis and remaining
     items/components of the same NIT may be on „firm price basis‟.


     The bids may be invited on variable price basis in respect of transmission lines packages, supply of tower
     members and different conductors and major equipments like power and instrument and distribution
     transformers, HV circuit breakers, EHV grade transformer oil or any other materials/packages at the
     discretion of TIA. In such cases Standard Price Variation Formula, based on PV formula published by
     IEEMA/CACMAI or similar recognised sources or adopted by power utilities like NTPC/PGCIL etc shall be
     prepared by TIA for the purpose of price variation of equipments/materials and shall be indicated in the bid
     document.    Bid   document      shall   also   indicate   the   standard   source   of   different   indices   (for
     labour/material/exchange rate etc.) used in the PV formula for purpose of calculation of variable component.
     The base date for different indices for the purpose of calculating price variation will normally be considered
     30 days prior to the last date of submission of price bid or as decided by TIA for this purpose and shall also
     to be indicated in the bid document. The cut off date for different indices in the PV formula for the purpose of
     calculating price variation may be considered as 2 to 4 months ahead of scheduled delivery period or as
     decided by TIA. The same shall also to be indicated component-wise in the bid document. The PV formula
     shall be stipulated in the bid document with or without any ceiling limit as decided by Tender Inviting
     Authority. In case of non-publication of applicable indices on a particular date, which happens to be
     applicable date for price adjustment purposes, the published indices prevailing immediately prior to the
     particular date will be applicable.
     Such bids shall be evaluated on the basis of offered price without any loading on account of price variation.
     In case a specific ceiling limit is mentioned in the bid document, payment shall, however, be restricted to the
     actual extent of variation that would take place limited to the ceiling limit. For bids on variable price basis
     without any ceiling limit, payment will also be effected on actuals as per PV formula without any ceiling limit.
     No price variation beyond scheduled contractual delivery/completion period will be allowed. There shall also
     be no price variation on the advance payment component, if any.
     In case of any bidder offering firm price against NIT stipulation of variable price basis or variable price
     against NIT stipulation of firm price basis, it will be considered as deviation and bidder shall declare the cost
     of withdrawal of the same alongwith the price bid, failing which the offer will be considered unresponsive and
     to be rejected.
7.   Taxes, Levies and Duties
     Manufacturers shall quote statutory taxes and duties (Sales Tax, Excise Duty, Customs Duty, Service Tax,
     Municipal Tax, Octroi, Levies and any other duties) as applicable on the date of bid opening and shall be
     shown separately in the offer. This shall be to the account of the Purchaser/Owner against documentary
     evidence, unless otherwise mentioned in the Purchase Order. Any variation in statutory taxes and duties
     after bid opening and upto the scheduled delivery period shall be to the purchaser‟s account. However, any
     decrease in this respect shall be passed on to DVC. Any upward variation in statutory taxes and duties
     beyond the contractual delivery period will not be paid by DVC if the reasons of the delay is attributable to
     the vendor.
     Changes in the tax rate dependant on the volume of turn over shall not come under the purview of
     reimbursement and should be spelt out in the bid documents itself.
     Bidders, other than manufacturers shall quote all-inclusive price upto the consignee‟s end, clearly indicating
     the quantum of CST/VAT, if applicable and F&I Charges embedded in all-inclusive FOR Destination Price.
     For turnkey contracts/any other similar contracts, the bidder shall quote price of all the items manufactured
     by them and to be directly supplied to DVC with ruling rates of taxes and duties which would be reimbursed
     at actual including variations, if any, against documentary evidence at the time of supply, upto contractual
     completion period. All taxes and duties applicable on materials/equipment supplied as finished goods to
     DVC through Sub-vendor/Sub-contractor as bought out items are to be included in the price quoted by the
     bidder for such items, which will remain firm throughout the pendency of the contract. This will also cover
     raw material, component, special assembly procured for manufacturing finished goods, material/equipment
     to be supplied to DVC either directly by the contractor or through Sub Vendor. However, taxes and duties
     charged by the concerned State govt./local statutory body for entry into the destination state/site viz., (a)
     Octroi, (b) Entry/Exit Tax (c) Additional Toll Tax (d) Special Toll Tax (e) Turnover tax etc. or any other taxes
     and duties having the same spirit and purpose shall be reimbursed at actual against documentary evidence.
     The reimbursement will, however, be subject to a ceiling of total amount of Taxes and Duties worked out on
     the basis of ruling rate of such items.
     Service Tax as applicable on service that are provided directly by the contractor to the owner (DVC) shall be
     indicated separately in the bid price schedule with the ruling rate and will be reimbursed at actual including
     variation, if any, upto contractual completion period, on production of documentary evidence. However,
     Service Tax on services that is not provided directly by the contractor to DVC viz., transportation, insurance
     etc. shall be included in the bid price itself and shall not be considered separately.
     Works Contract Tax (WCT) at the admissible rate wherever applicable will normally be included in bid price.
     DVC will, however, deduct WCT from the vendor‟s bill/invoice and deposit the same to the concerned
     authorities as per statutory provisions.
     Beyond contractual completion period, DVC will normally accept lower of the tax liability either on the
     scheduled or actual date of completion unless the contractor is not responsible for the delay and/or it is
     otherwise decided by the authority granting the extension of time. Changes in the tax rate dependant on the
     volume of turn over shall not come under the purview of reimbursement and should be spelt out in the bid
     documents itself.
     For reimbursement of Sales/VAT/Service Tax, self-attested/notarized copy of registration certificate will
     normally be accepted as documentary evidence.
     In case of change of source of supply from Sub Vendor to bidder or Sub Vendor to contractor (if approved
     by DVC), no additional payment shall be made by DVC towards reimbursement of taxes and duties as they
     are deemed to be included in the contract price.
     In the event of change of source of supply from bidder/contractor to Sub Vendor (if approved by DVC), taxes
     and duties will be reimbursed at actual against documentary evidence restricted to the amount of taxes and
     duties as originally payable to the bidder in terms of the contract.
8.   DISCREPANCIES IN THE BID & OFFER VALIDITY:
     The bids shall also be checked for computational error, if any, to arrive at the computed price, as per
     provisions in the following:
            In case of discrepancy between the original and copies of bid, the original bid will be considered correct.
            If there is a discrepancy between the unit price and the total price, which is obtained by multiplying the unit
             price and quantity of any item, or between sub-total and the total price, the unit or sub-total price shall
             prevail, and the total price shall be corrected accordingly.
            If there is a discrepancy between words and figures, the amount in words will prevail.
            If there is a discrepancy between the quantity specified by DVC in the bidding document and that indicated
             by the bidder in his bid, the former shall be taken to arrive at the computed price on pro-rata basis.
            In case the unit rate of an item is not quoted but the total price is indicated, the same shall be taken to arrive
             at the computed price. The computed price arrived at, as above, shall be considered for the purpose of
             award also.
            If the bidder does not accept the correction of errors as worked out by above methodology, its bid will be
             rejected.
             Quotation must be kept valid for at least 90/180 days or as decided by Tender Inviting Authority from the
             date of opening of the Enquiry/Tender and to be indicated in the NIT. If any bidder offers bid having validity
             shorter than that asked in the NIT, bid should not be rejected outrightly. Bidder should be persuaded to
             accept NIT stipulation.
           The materials which are to be procured on single tender propriety basis, the vendor must submit a Proprietary
           Article Certificate (PAC) and Price Reasonability Certificate (PRC) stating that the prices charged are
           reasonable and the same as being charged to all the Govt./semi Govt. Organizations/PSUs including D.G.S. &
           D. wherever applicable and shall be submitted along with the offer with documentary evidence. Where agency
           commission is involved, the same in percentage invariably be indicated and in such cases document required
           to be furnished.
      9.      CLARIFICATIONS ON BID DOCUMENT
             Bidder may seek clarifications on the bidding documents (GCC + SCC, if any + Technical Specification
             Booklet + NIT {Tender Notice} along with annexure + Proforma & Check List of BG against EMD), if
             required, upto 7 days before the scheduled bid opening date. Any clarification sought by the bidders must be
             sent in writing to the Tender Issuing Authority.
             Besides this, a Pre-bid Conference may also be held at the Tender Issuing Office at the discretion of Tender
             Inviting Authority. If agreed by Tender Inviting Authority, date, time and place for holding the Pre-bid
             Conference to be mentioned in the bidding document (NIT).
10.          AMENDMENT OF BIDDING DOCUMENTS :
             At any time prior to the deadline for submission of bids, the owner may, for any reason, whether at its own
             initiative, or in response to a clarification requested by a prospective Bidder, amend the bidding documents.
             The amendment will be notified in writing or by cable to all prospective Bidders that have received the
             bidding documents and will be binding on them. Bidders are required to immediately acknowledge receipt of
             any such amendment, and it will be assumed that the information contained therein will have been taken into
             account by the Bidder in its bid.
             In order to afford prospective Bidders reasonable time in which to take the amendment into account in
             preparing their bid, the owner may, at its discretion, extend the deadline for the submission of bids.
11.          COST COMPENSATIONS FOR DEVIATIONS :
             Deviations specifically declared by the bidders in the respective Deviation Schedules of as per Annexure C
             (to be submitted along with techno-commercial offer) and respective cost of withdrawal of such deviation as
             per Annexure D (to be submitted along with the price bid) only will be taken into account for the purpose of
             evaluation. The bidders are required to declare the prices for the withdrawal of the deviations declared by
             them in the Deviation Schedules. Such prices declared by the bidders for the withdrawal of the deviations in
             the Deviation Schedules shall be added to the bid price to compensate for these deviations. In case prices
             for the withdrawal for declared deviations are not furnished by the bidder, their offer will be considered as
             unresponsive and will be rejected. In case the bidder refuses to withdraw the deviations at the cost of
       withdrawal indicated by the bidder in the Deviation Schedules, the bid Security/EMD of the bidder may be
       forfeited.


       Bidders may note that deviations, variations and additional conditions etc. found elsewhere in the bid other
       than those stated in the Deviation Schedules, save those pertaining to any rebates, shall not be given effect
       to in evaluation and it will be assumed that the bidder complies to all the conditions of Bidding Documents.
       In case bidder refuses to withdraw, without any cost to the Owner, those deviations which the bidder did not
       state in the Deviation Schedules, the bid security of the bidder may be forfeited and the bid is liable for
       rejection.
12.    Inspection/Checking/Testing
       All materials/equipments manufactured/supplied by the vendor against the Purchase Order/contract shall be
       subject to inspection, check and/or test by the Purchaser or his authorised representative. All these tests
       shall be carried out in the presence of Owner and/or his authorized representative. Vendor shall notify the
       Purchaser at least 15 days in advance when the material/equipment is ready for inspection. If upon delivery
       the material/equipment does not meet the specifications/samples, the material/equipment/spares shall be
       rejected and vendor to be intimated for necessary repairs/modification etc. or for replacement. In such cases
       all expenses including to-and-fro freight, repacking charges etc., if required, shall be to the account of the
       vendor.
       Inspection by Purchaser and/or his authorized representative or failure by the Purchaser and/or his
       authorized representative to inspect the material/equipment shall neither relieve the Vendor of any
       responsibility or liability under this Purchase Order/contract in respect of such material/ equipment nor be
       interpreted in any way to imply acceptance thereof by the Owner.
       Whenever specifically asked for by the Owner/Purchaser and/or his authorized representative, the Vendor
       shall arrange for inspection/testing by the Owner or third party authorised agencies as stipulated in the
       Purchase Order/contract. In such cases Vendor shall adhere to the inspection/testing procedure laid down
       by such agencies. All expenses including inspection fees shall be to the Purchaser account unless agreed to
       the contrary and specified in the Purchase Order/contract.
13.    Access to Vendor‟s Premises
       The Owner and/or his authorized representative shall be provided access to Vendor‟s and/or his sub-
       vendor‟s premises at any time during the pendency of the Order/contract for expediting inspection, checking
       etc. of work.
14.    Transit Insurance & Removal of Rejected Goods and Replacement
       The items to be supplied have to be covered by Insurance during transit from vendors work site upto the
       consignee store. However, the vendor may have the option to avail DVC‟s Open Insurance Policy for this
       purpose. Alternatively, vendor may arrange transit insurance coverage at his own risk and cost. The
       insurance charge as claimed by the vendor will be payable by DVC on actuals against production of
       documentary evidence.
       In Turnkey Project Contracts, the bidders have to supply materials/ equipments from the vendors approved
       by DVC (which may also include the bidder as manufacturer of the product), which is normally firmed up
       after placement of order. The quoted freight & insurance charges for this purpose are, therefore, irrespective
       of the vendors and geographical locations of their works. The bidder is, therefore, entitled to the fixed freight
       & insurance charges and no documentary evidence in support of the claim may be insisted upon.
14.1   If upon delivery to consignee‟s go-down, whether inspected and approved earlier or otherwise, the
       material/equipment is not found in conformity with the specifications, the same shall be rejected by the
       Purchaser or his duly authorized representative and notification to this effect will be issued to the Vendor
       normally within 30 days from the date of Receipt of the material at the Works/Site/consignee‟s end.
         The Vendor on receipt of notification shall arrange removal of the rejected items within 15 days from the
         date of notification at his own cost. In the event the Vendor fails to lift the materials within the said 15 days,
         the Owner without any further notice or information to the vendor, shall be at liberty to dispose of such
         rejected items in any manner as he may think fit. All expenses shall be recoverable from the Vendor.
14.2     In the event, the equipment and materials or any portion thereof are damaged or lost during transit, the
         owner shall give notice to the Supplier/vendor detailing the particulars of such equipments & materials
         damaged or lost during transit. The replacement of such equipment and materials to be effected by the
         supplier/vendor free of costs including handling and transportation charges upto site, within a reasonable
         time.
15       Terms of Payment

         For purchase order involving supply only, payment terms will be as below:
         100% payment alongwith full taxes & duties will normally be made by the purchaser/Owner to the Vendor
         through A/C Payee Cheque within 15 working days from the date of receipt of material at site and after
         inspection & acceptance thereof or from date of receipt of invoice whichever is later. The consignee would
         arrange for inspection of the supplied items. All documents relating to payment would be checked and
         verified and to be passed by the concerned Accounts Office before effecting payment, with reference to the
         P.O./LOI/LOA.

       However, payment terms for POs placed directly on manufacturer may also be done as below:

       90% of the ordered value to be paid against despatch documents through bank subject to prior acceptance of
       SDBG, if applicable. Balance 10% of the ordered value to be paid after receipt of materials at site and
       acceptance thereof.


       Provision of part payment against part supply of consignment at consignee‟s end may be incorporated in
       Purchase order on the merit of the case (only if the part consignment can be used independently), provided
       necessary stipulation is made in the bid document.

The payment terms for any works/service contract may be regulated as below:

90% of contract price for works/service contract against RA bills.               This also includes initial advance, if any.
Remaining 10% after completion of the contract.

The payment terms for supply and erection & commissioning for any Turnkey contracts/packages may be
regulated as follows:

                 1)      Supply portion only:

                         70% of the Ex-works price /ordered value of supply (of bought out items) with full taxes and
                         duties as applicable after adjustment of advance, if any, will be paid against proof of despatch
                         (viz. R/R, receipted L/R) , detailed invoice / packing list, warranty certificate, test certificate
                         ,insurance policy / certificate, dispatch clearance .

                         20%of the Ex-works price / ordered value of supply (in case of bought out items) after receipt of
                         the materials and inspection and acceptance at site. However, for spares, balance 30% shall be
                         paid after receipt of materials and inspection & acceptance at site.

                      Remaining 10% after complete erection and commissioning & testing and handing over.

                 2)      Erection & Commissioning:

                         90% of contract price for Erection & commissioning against RA bills. This also includes initial
                         advance, if any. Remaining 10% after complete erection and commissioning & testing and
                         handing over.
Payment terms in respect of imports will be regulated as below:

100% FOB price less Indian Agency Commission in Rs, if any, shall be paid against presentation of shipping
documents as called for in the purchase order through irrevocable LC.          The Indian Agency Commission in Rs., if
any, shall be paid within 30 days of receipt of material at the consignee end.
        The payment of advance is normally discouraged. The advance payment, in exceptional cases, may be
given to the extent of 10% of total order value only which will be interest bearing commensurate with the market rate
against submission of a Bank Guarantee of equivalent amount (on amount of advance) and the same should have
sufficient validity covering the full delivery period / full completion period and final payment thereof.
16.     Additions / Alterations / Modifications
        The Owner reserves the right to make additions/ alterations/ modifications to the quantity of the items in the
        Purchase Order. The Vendor shall supply such quantities also at the same rate as originally agreed to and
        incorporated in the Purchase Order. If, however, the additional supply is at variance with design, size and
        specifications and not already covered by the Purchase Order or the amendments therein, the rates for such
        additional supply shall be negotiated and mutually agreed upon.
17.     Delivery Schedule/Completion Period
        Time is the essence of this contract and normally no variation shall be permitted in the completion
        time/delivery schedule mentioned in the Order/contract unless an amendment in this regard is issued by
        DVC. Time extension may be issued on specific request/reason provided such request is communicated to
        the Order Issuing Authority before the expiry of the stipulated delivery schedule/completion period. Such
        extension, however, can be accorded as per provisions in DFP. Date of delivery of materials/goods is to be
        reckoned as the date of receipt of same by the consignee.
18.     Liquidated Damages for Delay in Delivery
18.1    The time remains the essence of any contract/ purchase order awarded by DVC and all supply under a
        Purchase Order/all deliverables under a Work Order needs to be completed within the stipulated time
        schedule. Therefore, the provision has been kept in the contract that in case of delay in completion/delivery,
        for the reasons attributable to the contractor/ vendor, owner reserves the right to recover from the
        contractor/vendor, a sum equivalent to 0.5% of the value of the delayed materials / equipment/ spares/work
        for each week of delay and part thereof subject to maximum of 5% of the total value of the order as
        Liquidated Damage (LD).
        In cases, where the works/supply/services extend beyond the contractual completion schedule/delivery
        period and provisional extension order is issued without deciding on the application of LD, no amount from
        the RA bill will be deducted as “withheld LD” amount in case where adequate retention payment (over and
        above SD) remains with DVC as per terms of the contract
18.2 Alternatively, the Purchaser reserves the right to purchase the material/spares/equipment from elsewhere at the
        sole risk and cost of the Vendor and recover all such extra cost incurred by the Purchaser in procuring the
        material by the above procedure.
18.3    Alternatively, the Purchaser may cancel the Order/contract completely or partly                 without prejudice
        to his right under the alternatives mentioned above.
18.4    In the event of recourse to alternative 22.2 and 22.3 above, the Purchaser will have the right to re-purchase
        the stores, to meet urgency in requirement caused by Vendor‟s failure to comply with the schedule of
        delivery irrespective of the fact whether the materials/equipments are similar or not.
19.     SECURITY DEPOSIT-CUM-PERFORMANCE GUARANTEE :
              No Security Deposit-cum-Performance Guarantee is required for contract value upto Rs. 5 lacs
                 when 100% payment is released after full execution/ completion of the contract.
              Security Deposit in the form of BG of 10% ordered value/10% ordered value in Advance Bank
                 Draft/Pro-rata deduction @ 10% from the running bill/submitted invoice may be allowed at the
                 discretion of Tender Inviting Authority for any site packages upto Rs. 100 lacs (Rs. 25 lacs for HQ
                 package/procurement) with EMD equivalent (2% of total order value) as initial SD.
           Pro-rata deduction @ 10% is also allowed as SD for scheduled upward variation on account of
              variation of scope/quantity/price for any value of contract irrespective of instrument used for original
              SD.


              The amount so deducted /accepted as SD to be refunded to the bidder after completion of
      warranty/guarantee period as mentioned in the contract.


      For all other cases, the successful tenderer will have to deposit as security, for satisfactory execution of the
      order, and for guaranteed performance of the supplied item/executed works or services for an amount
      equivalent to 10%of the ordered value in the form of Bank Guarantee (as per DVC format) within 30 days
      from the date of issuance of Purchase Order/Work Order, from any Nationalised /Scheduled Bank and it
      should have validity initially for 18 months from the date of execution of BG plus 6 months claim period
      thereafter. The said BG should be extended suitably covering the entire warranty period plus 6 months claim
      period after despatch of materials.
      For turnkey projects/project contracts, this SDBG should have the validity covering the entire
      warranty/guarantee period plus six months claim period thereafter and to be submitted within 30 days of
      issuance of W.O./LOA/LOI.
              No payment, whatsoever will be made till the acceptance of SDBG/deposit of initial SD as the case
      may be as per the terms of the contract.
      In case banks refuse to issue BGs having Claim Period separately, the validity period of those BGs may be
      taken as warranty period plus six months.
              However, for ordered value above Rs. 25 lakhs at Headquarter and for ordered value above RS.
      100 lakhs at site, Security Deposit in the form of Bank Guarantee shall only be acceptable.

      SSI Units registered with NSIC, under its single point registration scheme, are exempted from depositing
      Security Deposit for ordering value upto the monetary limit for which the unit is registered. Small-scale
      industries seeking such exemption must enclose valid registration certificate from appropriate Govt.
      Authority giving details such as validity, stores, monetary limit etc. failing which exemption will not be
      granted.

      However, these SSI units will have to submit Performance Guarantee for the materials to be supplied as per
      DVC norms and to be submitted before the despatch of materials and no payment will be effected till the
      acceptance of the same.
20.   PURCHASE PREFERENCE:

      At present DVC, an autonomous body under Ministry of Power, GOI is granted exemption from Purchase
      Preference Policy vide GOI OM dated 18-07-2005. However, any change in Govt. Policy/Directives on this
      subject will be applicable.
21.   Source of Supply
      The Vendor shall ensure that the indigenous capacity is utilized to the fullest extent possible in execution of
      the order. Where the imports are unavoidable, the Vendor shall import all such items in good time against
      his own import licence without affecting the contractual delivery schedule.
22.   Patent Rights
      Royalties and fees for patents covering materials/equipments/ spares or processes used in executing the
      work shall be to the account of the Vendor. The Vendor shall satisfy all demands that may be made at any
      time for such royalties and fees and he alone shall be liable for damages, infringement and shall keep the
      Purchaser indemnified in that regard in the event of any equipment/spares/material or part thereof supplied
      by the Vendor is involved any suit or other proceedings held to constitute infringement and its use is
      enjoyed, the Vendor shall, at his own expenses, either procure for the Purchaser the right to continue the
       use of such equipment/spares/material replace it with a non-infringing material/ spares/equipment or modify
       it so it become non-infringing.

23.    Force Majeure

       Vendor shall not be considered in default if delay in delivery occurs due to causes beyond his control such
       as acts of God, natural calamities, civil wars, fire, strike, frost, floods, riot and acts of unsurpassed power.
       Only those causes which have duration of more than seven (7) days shall be considered cause of force /
       calendar majeure. A notification to this effect duly certified by the statutory authorities shall be given by the
       Vendor to the Owner within 10 days from the date of such Force Majeure condition by registered letter. In
       the event of delay due to such causes, the delivery schedule will be extended for a length of time equal to
       the period of force majeure or at the option of the Owner the order may be cancelled. Such cancellation
       would be without any liability whatsoever on the part of the Owner. In the event of such cancellation, the
       Vendor shall refund any amount advanced or paid to the Vendor by the Purchaser and deliver back any
       materials issued to him by the Purchaser and release facilities, if any, provided by the Purchaser. However,
       applicability of Force Majeure Clause in respect to a particular contract in the above backdrop is to be
       decided by Tender Accepting Authority/Director/HOD.
24.    Cancellation/Short Closure
       The Owner may terminate/short close the contract, by not less than 30 days‟ written notice to the bidder, to
       be given after occurrence any of the events specified in the Sl. No. (a) to (e) of this clause and 60 days in
         the case of the event referred to Sl. No. (g), (h) & (f) below.
         a)      The Vendor fails to comply with any of the terms of the Order or the bidder do not remedy a
failure in the performance of their obligations under the Contract, within thirty (30) days after being notified
or within any further period as the Owner may have subsequently approved in writing.
       b)      The Vendor becomes bankrupt or goes into liquidation.
        c)     If as a result of Force Majeure, the Bidder is unable to supply a material for a period of not
less than 60 days.
      d)       If the Bidder, in the judgment of the Owner has engaged in corrupt or fraudulent practices in
competing or in executing the Contract. For the purpose of this clause:
        e)     “Corrupt Practice” means the offering, giving, receiving or soliciting of any thing of value to
influence the action of a public official in the selection process or in contract execution.
       f)      “Fraudulent Practice” means a misrepresentation of facts in order to influence a selection
process or the execution of a contract to the detriment of the Owner.
      g)       The vendor is otherwise precluded from complying with any of the terms of the order on
account of any directives of any lawful authority.

         h) If the Owner, at its sole discretion, decides to terminate this Contract.
       DVC reserves the right not to issue tender documents to any intending bidders with whom DVC has stopped
       entering into business by virtue of policy decision.
25.    Owner Supplied Materials (OSM)
       In   turnkey   contracts/Work     contracts,   there   are   occasions   where   DVC   supply    some    of   the
       materials/equipment to the contractor free of cost, for erection. The contractor shall arrange proper storing
       and insure against all risks for such OSM. The contractor shall furnish indemnity bond for the total value of
       OSM.
       Recovery of excess consumption
        Rate of recovery (for excess consumption of OSM exceeding allowable wastage) for OSM may be
       determined on the basis of latest PO with storage charge (wherever incurred)/15% service charge and price
       variation, wherever applicable (only positive variation to be considered without any ceiling) as on date of
       commissioning of OSM after erection.
       The contractor may be allowed to replenish the excess consumed materials from the sources approved by
       DVC. However, if the OSM has to be issued through additional procurement on demand of the contractor
       because of excess consumption of his/their part, replacement of such additional quantity may not be allowed
      at the discretion of DVC and the same will be recovered as per procedure described above. In case penal
      recovery is considered to be expedient in respect of any critical equipment, the same shall be provided in
      the contract/bid document only after obtaining approval of HOD/Director.
26.   Eligibility Criteria of Joint Venture companies in Turnkey Contract:
      a) The participating Joint Venture companies formed by two or more firms shall have one firm as a „lead
           partner‟ and one or more firms as „other partner(s)‟.
      b) The lead partner shall meet all the eligibility criteria in respect of similar executed works and their
           performance. The lead partner shall also meet not less than 40% of the minimum financial requirement
           specified for participation in the job.
      c) The other partner(s) shall meet not less than 50% of the minimum credential of similar executed work
           and their performance and 25% of the financial requirement for the job.
                        The firm satisfying the credential by way of manufacturing, type testing and supplying major
      substation equipment/line materials (as the case may be) which are in satisfactory operation for a minimum
      period of two years will also be eligible.


      d) The financial credential of each of the partners of the joint Venture Firms added together shall comply
           with minimum qualifying requirement as stated in the NIT.
      e) The lead partner shall be authorised to incur liabilities and receive instruction for and/or on behalf of
           partners of Joint Venture and the entire execution of the contract including receipt or payment shall be
           done exclusively through lead partners. The authorisation shall be authenticated by submitting power of
           attorney signed by the legally authorised signatories of all the partners as per approved proforma of
           DVC.
      f)   All the partners of the Joint Venture Companies shall be liable jointly and severally for the execution of
           the contract, if awarded, in accordance with the settled terms & conditions and a copy of agreement
           entered into by the Joint Venture partners having such provision shall be submitted with the bid. A
           statement to this effect shall be included in the authorisation mentioned under (e) above.
      g) The Joint Venture of the firms shall furnish all the required information as asked for in the
           NIT/GCC/Specification in respect of each of their partners in their bid. In case of successful bid, the form
           of agreement shall be signed so as to be legally binding on all the partners.
                   The format of the power of attorney and other documents to be submitted by Joint Venture
           Partners as indicated in (d), (e) & (f) may be suitably structured by our Legal Department.
27.   Selection of Sub Vendors for Turnkey Contracts/Packages:
      Approved list of Sub-vendors will be indicated in the bidding documents for QR and non-QR items of supply.
      For non-critical items, there may not be enlisted Sub-vendors for every item and the supply shall be
      accepted as per related standards, approved sample, and satisfactory inspection, wherever applicable.
      The bidders are, however, permitted to propose new/different Sub Vendor for approval of DVC in the pre
      and post bid stage.
      For QR related supply items, if any new sub-vendor is proposed by the bidder, it may be approved if it is
      found to meet the QR and is acceptable on consideration that the proposed Sub Vendor made previous
      supplies to DVC or is included in the approved list in any other DVC/PGCIL/NTPC Project for similar supply.
      In case the proposed Sub Vendor is found to meet the QR and is neither in the approved list nor has made
      any previous supply to DVC, appropriate decision may be taken by the concerned Chief Engineer in
      consideration of documents furnished by the sub-vendor and further assessment, if required, may be done
      in the pre-award/post award stage.
               For non-QR items of supply, if new Sub Vendor is proposed by the bidder, it will be obligatory on the
      part of bidder to furnish the details/documents in support of their claim which would be reviewed and
      appropriate decision taken. In the event of further assessment of credential of Sub Vendor being felt
      necessary beyond the document furnished by the bidders, it shall be dealt with during post award stage.
               Normally no separate QR may be stipulated for sub-contracting of erection works. In cases, where
      Sub-contractor for erection job is proposed by the bidder, the qualification of the proposed Sub-Contractor
      may be examined keeping in view the qualification requirement applicable for the quantum of job proposed
         to be sub-contracted and other relevant aspects related to the site condition and overall responsibility of the
         contractor.
                 The Sub Vendor/ vendors shall be approved by the Tender Accepting Authority/concerned CEs.
28. Changes in Constitution of Business
         In the event of change in constitution of business of the contractor after issuance of contract due to
         merger/acquisition/any other reasons, the newly formed entity shall be equally held responsible to fulfil the
         contractual obligation. This is notwithstanding anything contained in NIT or subsequent LOI/LOA/GCC or
         any other document issued or provisions contained in any other Rules/Acts/Legislation.
29.      Waiver
         Any waiver by the Owner of any breach of the terms and conditions of the Order shall not constitute any
         subsequent breach of the waiver of any other right or conditions.
30.      Compliance of Regulations
         The Vendor shall warrant that all Goods and/or services covered by this Purchase Order/ contract shall have
         been produced, sold, dispatched, delivered, tested and commissioned in strict compliance with all applicable
         laws, regulations including industries (Development & Regulations) Act, 1951 & Industrial Dispute Act, 1947
         and any amendments there under, labour agreements, working conditions and technical codes and
         requirement as applicable from time to time.
         All laws, rules and regulations required to be followed in execution of the order/ contract, must be complied
         with. The Vendor should execute and deliver such documents as may be needed by the Purchaser/ owner in
         evidence of compliance. Any liability arising out of contravention of any of the laws on executing this order
         shall be the sole responsibility of the Vendor and the Owner shall not be responsible in any manner
         whatsoever.
31.      Sub-Letting & Assignment
         The Vendor shall not sub-let or assign any part of this Purchase Order/ contract to any other vendor/agency
         without the prior written consent of the Purchaser/owner. Such assignments or sub-letting or transfer shall
         not relieve the Vendor from any obligation, duty and responsibility under this Purchase Order/contract. Any
         assignment, transfer or sub-letting without the prior written approval of the Owner shall be void. The
         Purchaser/ owner shall have the right to cancel the order/contract and to purchase the goods/services from
         elsewhere and the supplier/vendor shall be liable to the Purchaser/owner for any loss or damage which the
         Purchaser/owner may sustain in consequence or arising out of such purchase and the Vendor shall
         indemnify such loss or damage to the Owner.




      32. Vendors Drawing & Data
         All Drawings, data and documentation in respect of the ordered items are an integral part of the Purchase
         Order/contract. The Vendor will furnish all such drawings, data and documentation to the Purchaser/owner.
         Purchaser/owner will specify the schedule for submission of these documents by the Vendor and the
         required number of copies. The vendor shall ensure strict compliance to this schedule.
33.      Information provided by the Purchaser
         All Drawings, data and documentation that are given to the vendor by the Purchaser/owner for the execution
         of the Order/contract shall be the property of the Purchaser/owner and shall be returned by the Vendor on
         demand by the Purchaser/owner. The Vendor shall not make use of any of the above documents for any
         purpose at any time except for the purpose of executing the Order/contract of the Purchaser/owner. The
         Vendor shall not disclose any of the information given by the Purchaser/owner to any person, firm, corporate
         body or authority and shall make all endeavours to ensure that the above information is kept confidential. All
         such information shall also remain the absolute property of the Purchaser/owner.
34.      Spare Parts, Oils & Lubricants
        Wherever applicable, the Vendor shall furnish item wise price list of spare parts required for two years
        operation of the equipment ordered. The Vendor shall also provide the necessary instructions and drawings
        to identify the spare part numbers and their location as well as an interchangeability chart. The Vendor shall
        recommend the quality of oils and lubricants required to be used to the operation of the equipment supplied
        under this Order for a continuous operation for a period of at least one year.
35.     Vendors Liability
        Vendor hereby accepts full responsibility and indemnifies the Purchaser/owner and shall hold the
        Purchaser/owner harmless from all acts of omissions and commissions on the part of the vendor, his agents,
        his subcontractors and employees in execution of the Order. The Vendor also agrees to defend and hereby
        undertakes to indemnify the Purchaser/owner and also hold him harmless from any and all claims of injury to
        or death of any and all persons including but not limited to employees and for damage to the property arising
        out of or in connection with the performance of the work under the Purchase Order/contract.
36.     Packing and Marking
        All goods shall be securely packed in cases, bundles, crates etc. suitable for Rail/Road/Air/Sea transport. All
        exposed services/connections, protrusions shall be properly protected. All unexposed parts shall be packed
        with due care and the packages should bear the words “Handle with Care”. The packing of the goods to be
        transported by Rail/Road/Air/Sea shall be as per the conditions laid down by the appropriate authorities and
        the Vendor shall obtain clean railway / goods receipts without any qualifying remark.


        All packages and unpacked materials shall be marked on at least two places indicating the name of the
        Purchaser/ Consignee, Purchase Order No., gross & net weights and dimensions with indelible paint in
        English. In case of bundles, metallic plates marked with the above details shall be tagged.
        All goods should be despatched as per the relevant terms of the Purchase Order. In case any mode of
        transports has to be resorted to other than that mentioned in the Purchaser Order, the same should be done
        only after obtaining prior approval in writing from the Purchaser. All movement sanctions, loading
        permissions etc. from the railway or other authorities shall be obtained by the Vendor. The Vendor shall
        communicate the relevant dispatch particulars immediately on dispatch by telex/telegram to the consignee
        as specified in the Purchase Order.
        The Vendor shall also forward original and copies of dispatch documents to the concerned authorities as
        required in the Purchase Order within two days from the date of despatch, failing which the Vendor shall be
        responsible for any delay in payments of consignment for want of documents and consequent demurrage,
        detention charges, etc.
37.     Modifications
        This order constitutes an entire agreement between the parties hereto. Any modifications to this Order shall
        become binding only upon the same being confirmed in writing duly signed by both the parties.
38.     Guarantee/Warranty

38.1.   The Vendor shall warrant that all material/equipment/ services supplied under this Order/contract shall be
        new, unused and conform to the Purchasers/owners requirements and specifications. The Vendor shall
        guarantee the material/ equipment/services under this Order for a period of 18 months from the date of
        delivery or 12 months from the date of commissioning whichever is earlier.

                 For turnkey contracts, Guarantee/Warranty period is to be considered as 12 months from the date
        of commissioning of the same irrespective of date of delivery. The date of delivery to be reckoned as the
        date of receipt of the material by the consignee. The Vendor shall agree to replace any material, which has
        been proved defective or fails to conform to the desired specifications free of cost to the Purchaser within
        the Guarantee/Warranty Period. The guarantee period for such replaced part shall be the same as that of
        equipments/materials specified earlier.
38.2 Checking/approval of vendors drawings, inspection and acceptance of material/spares/equipment/furnishing to
        effect shipment and/or work done for erection, installation and commissioning of the equipment by the
        Purchaser/owner or any other agency on behalf of the Purchaser/owner shall not in any way relieve the
        Vendor from the responsibility for proper performance during the guarantee period.

38.3 Service contracts like hiring of vehicle/Insurance/consultancy/Clearing & Forwarding services etc and other
      consumable items like stationeries, printing of matter etc. are beyond the purview of Warranty Clause.

                 Also Medicines/Chemicals/Liveries & Dungrees/Petrol/Diesel/LDO/FO etc. are generally covered
        with limited warranty and it should be decided before floating enquiry at the discretion of TIA.

        Performance Bank Guarantee for above items to be asked accordingly.

39.     Mode of Despatch

        Vendor shall despatch the materials as per schedule mode of despatch as indicated in the purchase
        order/contract and any violations to this effect without taking prior written approval from the purchaser/owner
        is not permissible.

40.     Demurrage / Wharfage

        In   cases   where    documents     are   negotiated    through   Bank,    any   consequential     charges   e.g.
        demurrage/wharfage charges, due to late retirement of documents on account of (i) violation of the
        inspection clause, (ii) material despatched after expiry of delivery period without obtaining approval in
        advance for extension of delivery period (iii) despatch of materials not as per schedule mode of despatch by
        approved transporters as per P.O/contract. (iv) late receipt of invoice or due to violation of any other
        clause/clauses of the purchase order will be to the Vendors account. Supplier would also be responsible for
        all such payment due to late receipt of RR/LR and other documents.

41.     Grafts/Commission

        Any graft, commission, gift or advantage given, promised or offered by or on behalf of the Supplier or his
        partner, agent officers, director, employee or servant or any one on his or their behalf in relation to the
        obtaining or to the execution of this or any other Contract with the Owner, shall in addition to any criminal
        liability which it may incur, subject the Supplier to the cancellation of this and all other Contracts and also to
        pay for any loss or damage to the Owner resulting from such cancellation. The Owner shall then be entitled
        to deduct the amount so payable from any money otherwise due to supplier.

42.   Acceptances

        The Vendor shall return the duplicate copy of the Purchase Order/contract /Work Order and the other
        enclosed documents duly signed with seal and date as a mark of acceptance, within 15 days from the date
        of issuance of the order to the Order Issuing Authority.

43.     Settlement of disputes & Arbitration

        Any dispute(s) or difference(s) arising out of or in connection with the contract shall, to the extent possible,
        be settled amicably between the owner and supplier.

        In the event of any dispute or difference whatsoever arising under the contract or in connection therewith
        including any question relating to existence, meaning and interpretation of the contract or any alleged
        breach thereof, the same shall be referred to the Secretary, CEO of Damodar Valley Corporation, Kolkata-
        54 or to a person nominated by him for arbitration. The Arbitration shall be conducted in accordance with the
provisions of arbitration and conciliation law 1996 or latest and the decision/ judgment of
Arbitrator/Arbitrators shall be final and binding on both the parties.

However, in case the contractor is a Central Public Sector Enterprise/ Govt. Department, the dispute
arising between the „Owner‟ and the „Contractor‟ shall be settled through Permanent Arbitration
Machinery (PAM) of the Department of Public Enterprise, Govt. of India as per prevailing rules.

All suits arising out of this enquiry and subsequent purchase order/contract, If any, are subject jurisdiction of
Court in the City of Kolkata only and no other Court, when resolution/settlement through mutual discussion
and arbitration fails.
                                ( On non-judicial stamp paper of appropriate value)
                 PROFORMA OF BANK GUARANTEE IN LIEU OF EARNEST MONEY DEPOSIT
To
*DAMODAR VALLEY CORPORATION                              BG No. :
DVC TOWERS: VIP ROAD                                     Date :
KOLKATA-54.
Dear Sir.
In     accordance        with      your      Notice      Inviting     Tender         for    ……………………………
………………………...………………………………………under                                                 your                   specification
No………………………dated…………………M/s. ……(Name& full address of the firm) (Hereinafter called the
Tenderer) hereby submit the Bank Guarantee:


Whereas to participate in the said tender for the following:
1.      ……………………………………………………(Name                                   of         the         items        to        be
        supplied as per NIT)
2.      ……………………………………………………
3.      ……………………………………………………
It is a condition in the tender documents that the tenderer has to deposit Earnest Money amounting to Rs.
…………… in respect to the tender, with Damodar Valley Corporation(*) (hereinafter referred to as “Corporation”) by
a Bank Guarantee from a Nationalised Bank/ Schedule Bank/Foreign Bank irrevocable and operative till the validity
of the offer(i.e. …………days from the date of opening of tender) for the like amount which amount is likely to be
forfeited on the happening of contingencies mentioned in the tender documents.


And whereas the tenderer desires to secure exemption from deposit of Earnest Money and has offered to furnish a
Bank Guarantee for a sum of Rs……………… to the Corporation as Earnest Money.
Now, therefore, we the …………………………… (Bank), a body corporate constituted under the Banking Companies
(Acquisition and Transfer of Undertaking) Act. 1969 (delete, if not applicable) and branch Office at………….
(Hereinafter referred to as the Guarantor) do hereby undertake and agree to pay forthwith on demand in writing by
the Corporation of the said guaranteed amount without any demur, reservation or recourse.


We, the aforesaid bank, further agree that the Corporation shall be the sole judge of and as to whether the tenderer
has committed any breach or breaches of any of the terms costs, charges and expenses caused to or suffered by or
that may be caused to or suffered by the Corporation on account thereof to the extent of the Earnest Money required
to be deposited by the Tenderer in respect of the said Tender Document and the decision of the Corporation that the
Tender has committed such breach or breaches and as to the amount or amounts of loss, damage, costs, charges
and expenses caused to or suffered by or that may be caused to or suffered by the Corporation shall be final and
binding on us.
We, the said Bank further agree that the Guarantee herein contained shall remain in full force and effect until it is
released by the Corporation and it is further declared that it shall not be necessary for the Corporation to proceed
against the Tenderer before proceeding against the Bank and the Guarantee herein contained shall be invoked
against the Bank, notwithstanding any security which the Corporation may have obtained or shall be obtained from
the Tenderer at any time when proceedings are taken against the Bank for whatever amount that may be
outstanding or unrealised under the Guarantee.


The right of the Corporation to recover the said amount of Rs. …………..…… (Rupees………………….) from us in
manner aforesaid will not be precluded/affected, even if, disputes have been raised by the said
M/S………………(Tenderer) and/or dispute or disputes are pending before any authority, officer, tribunal,
arbitrator(s) etc.
Notwithstanding anything stated above, our liability under this guarantee shall be restricted to Rs. ………(Rupees
………………) only and our guarantee shall remain in force upto …………… and unless a demand or claim under
the guarantee is made on us in writing within three months after the aforesaid date i.e. on or before the
……………… all your rights under the guarantee shall be forfeited and we shall be relieved and discharged from all
liability there under.


Date …………………                                  (Signature) ………………………………


Place …………………                                 (Printed Name) …………………………
„
                                              (Designation) …………………………..


                                          (Bank‟s common seal) …………………



In presence of:


WTTNESS(with full name, designation, address & official seal, if any)


    (1) ………………………………………
         ………………………………………


    (2) ………………………………………
         ………………………………………


* Please indicate the name and address of the projects/stations/offices where the B.G. is to be executed.
(on non-judicial stamp paper of appropriate value to be purchased in the name of executing Bank)
                PROFORMA OF BG FOR SECURITY DEPOSIT-CUM- PERFORMANCE GUARANTEE
Ref……………………                                            Bank Guarantee No………….
Date………………….
PROFORMA OF B.G. FOR SECURITY DEPOSIT/100% PAYMENT
 (1)     KNOW ALL MEN BY THESE PRESENTS that in consideration of Damodar Valley Corporation,                                                          a
         Corporation constituted and established under the Damodar Valley Corporation Act being Act No. XIV of
         1948     and     having        its     Headquarters     at      D.V.C.       Towers,       V      I    P   Road,         Kolkata-700       054
         (hereinafter          called           “The        Corporation”)             having          agreed                to       accept        from
         ______________________________(hereinafter                       called       “The       Contractor”),         a     Bank    Guarantee      for
         Rs._________________ in lieu of Cash Security Deposit for the due fulfillment by the Contractor of the
         terms & conditions of the *Purchase Order/Letter of Intent/Letter of Acceptance/ work order
         No.__________________________                            issued                by                the                Corporation             for
         (Name & Description of the work/material) _________________________ ______________(hereinafter
         called    “the       said      *Purchase         Order/Letter         of    Intent/Letter        of     Acceptance/             work    order”)
         we______________________ ______________(hereinafter called “the Guarantor”) do hereby undertake to
         indemnify      and      keep          indemnified     the    Corporation            to     the        extent        of   Rs.____________
         (Rupees____________________________________ ______________________________) only against
         any loss or damage caused to or suffered by the Corporation by reason of any breach by the Contractor of
         any of the terms and conditions contained in the said * Purchase Order/Letter of Intent/Letter of Acceptance/
         work order of which breach the opinion of the Corporation shall be final and conclusive.

  (2)    AND WE,_____________________________DO HEREBY Guarantee and undertake to pay forthwith on
         demand         to      the           Corporation      such       sum          not        exceeding             the       said      sum       of
         ______________________________________ (Rupees_______________________________) only as
         may be specified in such demand, in the event of the Contractor failing or neglecting to execute fully
         efficiently and satisfactorily the order for ____________ PLACED WITH IT (the work tendered for by it)
         within the period stipulated in the said *Purchase Order/Letter of Intent/Letter of Acceptance/work order in
         accordance with terms and conditions contained or referred to in the said *Purchase Order/Letter of
         Intent/Letter of Acceptance/work order in the event of the Contractor refusing or neglecting to maintain
         satisfactory operation of the equipment or work or to make good any defect therein or otherwise to comply
         with and conform to the design, specification, terms and conditions contained or referred to in the said
         *Purchase Order/Letter of Intent/Letter of Acceptance/ work order.


 (3)     WE___________________________ further agree that the guarantee herein contained shall remain in full
         force and effect during the period that would be taken for the performance of the said order as laid down in
         the said *Purchase Order/Letter of Intent/Letter of Acceptance/work order including the warranty obligations
         and that it shall continue to be enforceable till all the dues of the Corporation under or by virtue of the said *
         Purchase Order/Letter of Intent/Letter of Acceptance/work order have been fully paid and its claims satisfied
         or discharged or till the Corporation or its authorized representative certified that the terms and conditions of
         the said * Purchase Order/Letter of Intent/Letter of Acceptance/ work order have been fully and properly
         carried out by the said contractor and accordingly discharged the Guarantee.
   (4)    WE______________, the Guarantor undertake to extend the validity of Bank Guarantee at the request of
          the Contractor for further period or periods from time to time beyond its present validity period failing which
          we shall pay the Corporation the amount of Guarantee.
 (5)     The      liability     under           this     guarantee        is        restricted       to         Rs._____________                (Rupees
         ___________________________________) only and will expire on ____________and unless a claim in
         writing is presented to us or an action or suit to enforce the claim is filed against us within 6 months
         from________________ all your rights will be forfeited and we shall be relieved of and discharged from all
         our liabilities (thereinafter).
  (6)    The Guarantee herein contained shall not be determined or effected by liquidation or winding up or
         insolvency or closure of the Contractor.
   (7)    The executants has the power to issue this guarantee on behalf of the Guarantor and holds full and valid
          power of Attorney granted in his favour by the Guarantor authorizing him to execute the Guarantee.
  (8)    Notwithstanding anything contained herein above, our liability under this guarantee is restricted to
         Rs.___________ (Rupees___________________ _________________________) only and our guarantee
         shall remain in force upto _________________and unless a demand or claim under the guarantee is made
         on us in writing on or before _______________ all your rights under the guarantee shall be forfeited and we
         shall be relieved and discharged from all liabilities there under.
WE, _____________________ Bank lastly undertake not to revoke this guarantee during the currency except with
the previous consent of the Corporation in writing. In witness whereof we ______________________have set and
subscribed our hand on this ________________________day of _________________________.



                                                                    SIGNED, SEALED AND DELIVERED
    WITNESSES
    1)_________________________                                          (Stamp of the executants)
    2)_________________________



    (Names & addresses in full with Rubber Stamp)
* Mention the relevant along with reference number.
                       The non – judicial stamp paper should be in the name of issuing Bank.
                                 PROFORMA BANK GUARANTEE FOR ADVANCE
                                   ( To be stamped in accordance with Stamp Act)
Ref : ………………………………………                        Bank Guarantee No……………
                                             Date : ………………………….
To
*Damodar Valley Corporation.
Address of the Plant
Know all men by these presents that in the consideration of the Damodar Valley Corporation ( herein after referred to
as the „Owner‟, which expression shall unless repugnant to the context or meaning thereof include its successors,
administrators and assigns) having awarded to M/s……………………………………….. …With its Registered / Head
Office at……………………………………………………. hereinafter referred to as „Contractor „ which expression shall
unless repugnant to the context or meaning thereof, include its successors, administrators, executors, and assigns)
a contract by issue of Owner‟s Letter of Award No.__________________ dated _______________and the same
having been unequivocally accepted by the Contractor, resulting into a Contract bearing No. ________dated
_______    valued at _____________ for _______________( scope of work) contract (hereinafter called „Contract‟)
and the owner having agreed to make an advance payment to the Contractor for performance of the above Contract
amounting to ____________________________________(in words and figures) as an Advance against Bank
Guarantee to be furnished by the Contractor.
We __________________ (name of the Bank) having its head Office at_______________(address) (hereinafter
referred to as the „ Bank‟ which expression shall unless repugnant to the context or meaning thereof, include its
successors, administrators, executors and assigns) do hereby guarantee and undertake to pay the owner
immediately on demand any or all money payable by the Contractor to the extent of ________________________(in
words and figures) at any time upto _____________ without any demur, reservation, recourse, contest or protest
and or without any reference to the contractors. Any such demand made by the owner on the bank shall be
conclusive and binding notwithstanding any difference between the owner and contractor or any dispute pending
before any court, Tribunal, arbitrator or any other authority. We agree that the Guarantee herein contained shall be
irrecoverable and shall continue to be enforceable till the owner discharges this Guarantee.
The owner shall give the fullest liberty without affecting in any way the liability of the Bank under the Guarantee from
time to time to vary the advance or to extend the time for performance of the Contract by the Contractor. The owner
shall have the fullest liberty without affecting this Guarantee, to postpone from time to time the exercise of any
powers vested in them or of any right which they might have against the contractor, and to exercise the same at any
time in any manner, and either to enforce or to forebear to enforce any covenants contained or implied in the
Contract between the Owner and the Contractor or any other course or remedy or security available to the Owner.
The Bank shall not be released of its obligations under these presents by any exercise by the Owner of its liberty
with reference to matters aforesaid or any of them or by reason of any other act or forbearance or other acts of
omission or commission on the part of the law would but for this provision have the effect of relieving the Bank.
The Bank also agrees that on certification of the Owner the amount of the Bank Guarantee shall stand reduced to
the extent so notified by the Owner semi-annual. It is further agreed that the reduction so notified by the Owner shall
be conclusive and binding on the bank without any reservation.
The Bank also agrees that the Owner at its option shall be entitled to enforce this Guarantee against Bank as a
Principal debtor in first instance without proceeding against the Contractor and notwithstanding any security or other
Guarantee that the Owner may have in relation to the Contractor‟s liabilities.
Notwithstanding    anything   contained         hereinabove,    our     liability   under    this     guarantee   is   limited   to
______________________and          it   shall    remain   in    force     upto      and   including    _____________________
@_____________________and shall be extended from time to time for such period (not exceeding one year) as
may be desired by M/s._______________on whose behalf this Guarantee has been given.


Dated this______________day of ________200_____________at____________


Witness
____________________                                           (Signature)
Signature                                                      Name
                                                     Designation with Bank Stamp
Witness
______________________
Signature


Official Address


* Strike out whichever is not applicable
@ the date will be 90 days after the date of completion of the contract.


Note : * Please mention the full address of project/office where the Bank Guarantee is to be submitted.
                  (on non-judicial stamp paper of appropriate value to be purchased in the name of the Bank)
                                      FORM OF EXTENSION OF BANK GUARANTEE
Ref. No. :                                                                            Date……….


*Damodar Valley Corporation,
Sub :    Extension of Bank Guarantee No………………Dated ……… for                        Rs………………              Favouring
              yourselves, expiring on ………………on account of M/s. ………………………………in respect of P.O. No.
              ……………………………….Dated……………….
     (Hereinafter called original Bank Guarantee)
Dear Sirs,
         At the request of M/s.………………………………                      We……………………………… Bank Branch Office at
……………………………………………and having its head office at ………………………………….do hereby extend
the validity of the above mentioned Bank Guarantee No………………………………………………… dated…………by
another ---------------months/years and will now expire on………………… with claim period upto ………………….
Except       as     provided   above,   all   other   terms   and   conditions   of   the   original   Bank    Guarantee
No……………Dated…………………shall remain unaltered and binding.
Please treat this as an integral part of the original guarantee to which it would be attached.


Yours faithfully,


For……………………………………….
Manager/Agent/Accountant
Dated…………………………………..
SEAL OF BANK
Note : * Please mention the full address of project/office where the Bank Guarantee is to be submitted.
                        INSTRUCTIONS FOR FURNISHING BANK GUARANTEE
  1. Bank Guarantee (B.G.) for Advance Payment, Mobilization Advance, B.G. for Security Deposit-cum-
     Performance Guarantee, Earnest Money should be executed on the Non-Judicial Stamp Paper of the
     applicable value and to be purchased in the name of the Bank.
  2. The Executor (Bank authorities) may mention the Power of Attorney No. and date of execution in
     his/her favour with authorization to sign the documents.
     The Power of Attorney is to be witnessed by two persons mentioning their full name and address.
  3. The B.G. should be executed by a Nationalised Bank/Scheduled Commercial Bank. B.G. from Co-
     operative Bank/Rural Banks are not acceptable.
  4. A Confirmation Letter of the concerned Bank must be furnished as a proof of genuineness of the
     Guarantee issued by them.
  5. Any B.G. if executed on Non-Judicial Stamp paper after 6(six) months of the purchase of such
     stamp paper shall be treated as Non-valid.
  6. Each page of the B.G. must bear signature and seal of the Bank and B.G. Number.
  7. The contents of the B.G. shall be strictly as Proforma prescribed by D.V.C. in line with Purchase
     Order/LOI/Work Order etc. and must contain all factual details.
  8. Any correction, deletion etc. in the B.G. should be authenticated by the Bank Officials signing the
     B.G.
  9. In case of extension of a Contract, the validity of the B.G. must be extended accordingly.
 10. B.G. must be furnished within the stipulated period as mentioned in Purchase Order/L.O.I./Work
     Order etc.
 11. Issuing Bank/The Vender are requested to mention the Purchase Order/Contract/Work Order
     reference along with the B.G. No. for making any future queries to D.V.C.
12. Address given in the proforma of BG are applicable for DVC-HQ only. For the purpose of this tender
     please address to the Chief Engineer, DVC, Bokaro „B‟ Thermal Power Station ,Bokaro Thermal,Bokaro-
     829107,JHARKHAND.
                                           (On non judicial stamp paper of appropriate value).


PROFORMA FOR INDEMNITY BOND TO BE EXECUTED BY THE VENDOR/CONTRACTOR IN CONFIRMATION
OF RECEIPT OF MATERIAL HANDED OVER BY DVC FOR REPAIR/RECTIFICATION AT THEIR PREMISES AND
SUBSEQUENT RETURN OF THE SAME IN SAFE AND ACCEPTANCE CONDITIONS.


This             Indemnity          Bond           is            made           this……………day                        ………………….by
M/s………………………………………………………….                                             having          its           registered          office       at
………………………………….………………(hereinafter called vendor/contractor which expression shall include its
successors and permitted assigns) in favour of DVC ………………… having its Headquarter at DVC Towers, Kolkata
–54 and its project/station at ………………………………….…….. (Hereinafter called the “DVC” which expression
shall include its successors and assigns).

Whereas DVC has awarded P.O./Letter of intent/award letter/contract No………… dated ……….. to the
vendor/Contractor and its amendment No………….. Dated …………. Amendment No……………. dated
………………….. applicable when amendments have been issued (hereinafter called contract) and against which the
materials   supplied     by   the    vendor/contractor,         was   on   inspection,       found    to   be      not   confirming   to
specification/drawing/sample as per contract and/or received in damaged condition and hence rejected.

And whereas by virtue of clause No………. of the said contract, the vendor/Contractor is required to execute an
Indemnity Bond in favour of DVC for the purpose of free replacement/repair./rectification of the rejected consignment
if so required.

Now, therefore, this indemnity Bond witnessed as follows :

The vendor/contractor is under obligation and shall remain absolutely responsible for the safe transit/protection and
custody     of     the   materials/equipments       till   it    is   handed    over         to   DVC      after    doing    necessary
replacement/repair/rectification as envisaged in the above clause.

The DVC is and shall remain the exclusive owner of the materials/equipments free from all encumbrances, charges
or fines of any kind, whatsoever.

That this Indemnity Bond is irrevocable.

Now the conditions of this bond is that if the vendor/contractor shall duly and punctually comply with the terms and
conditions of this bond till the receipt and acceptance of the material/equipment, then the above bond shall be void,
but otherwise it shall remain in full force and virtue.

In witness whereof the vendor/contractor has here-unto set the hand through its authorized representative under the
common seal of the company, the day, month and year first above mentioned.
SCHEDULE


Particulars of the       Qty.          Despatch           particulars    Value     of     the   Sign. Of Attorney
material/equipment                     RR/GR        No.       carrier,   equipment              in     token       of
handed over                            date/Bill of loading                                     receipt.




Witness I
1. Signature                               For and on behalf of M/s……………
2. Name                                    Name
3. Address                                 Signature
  with seal                                Designation with seal
                                           Common seal of Company
Witness II
1. Signature                               Authorized representatives
2. Name
3. Address with seal


        Note : * Indemnity Bonds are to be executed by the authorised persons and (i) In case of contracting
Company under common seal of the Company or (ii) having the power of attorney issued under common seal of the
company withy authority to execute Indemnity Bonds, (iii) In case, (ii) the original Power of Attorney if it is specifically
for our contract or a Photostat copy of the Power of Attorney if it is a General Power of Attorney and such documents
should be attached to Indemnity Bond.

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:47
posted:4/15/2010
language:English
pages:65