									       Mission & Observatory
    Critical Design Review (CDR)


            SECTION 10
CARMEN-1 Instruments Status
         Eric Lorfèvre; CNES



        July 21 - 24, 2008
     Buenos Aires, ARGENTINA
                                                         Outline

                                1.    CARMEN-1 Overview & Objectives
                                2.    Development Status
                                3.    Required Resources & Interfaces with SAC-D S/P
                                4.    Integration and Test
                                5.    Product assurance
                                6.    Schedule
                                7.    Concerns




Section 10 – CARMEN-1 Instruments Status – E. Lorfèvre                                 2 of 15
Mission & Observatory CDR                                                                 2008
                                                         CARMEN-1 Overview

CARMEN-1 is the mission name for an “instrument” composed by ICARE-NG,
3 SODAD units and their interconnection data harness aboard SAC-D satellite.
                                                           CARMEN-1
                                            ICARE-NG                                SODAD 1-3



                                             Component Test Bed (MEX)

                                              Acquisition Chains
                            Detectors




                                                                           RS422
                                        CPU, Data processing and TM/TC
                                               DC/DC Converter
                                        Power Supply        MIL-1553         Power Supply




                                                                   SAC-D


CARMEN-2 is the mission name for an other ICARE-NG is aboard JASON-2.
MEDET is the mission name for one SODAD aboard ISS.
Section 10 – CARMEN-1 Instruments Status – E. Lorfèvre                                          3 of 15
Mission & Observatory CDR                                                                          2008
                                                     CARMEN-1 Objectives

• ICARE-NG is a dedicated instrument to study the influence of space radiation
on advanced components :
  – to measure e-, p+ fluxes respectively in 250keV – 4 MeV and 8 – 120 MeV ranges
  – to measure associated effects on test components (MEX) (dose drifts & single events)

• SODAD detectors are dedicated instruments to study micrometeoroids and
micro orbital debris in space environment.




Section 10 – CARMEN-1 Instruments Status – E. Lorfèvre                                     4 of 15
Mission & Observatory CDR                                                                     2008
                                                    Development Status 1/2

• Development philosophy is based on a representative EM and a FM at
  instrument level.

• SM of ICARE-NG and the 3 SODAD have been delivered in December 2007.

• Tests between ICARE-NG and SODAD EM have been achieved (to insure
  dialog compatibility).

• 1553 bus validation with the SP simulator provided by CONAE is in progress.
  CARMEN-1 flight Software and 1553 protocol development should be finished
  at the end of August.
• CARMEN-1 1553 Interface Electrical Simulator should be delivered just after.

• SODAD and ICARE-NG Flight hardware have been achieved.

• GSE have been already developed for CARMEN-2 and MEDET functional
  tests.
Section 10 – CARMEN-1 Instruments Status – E. Lorfèvre                       5 of 15
Mission & Observatory CDR                                                       2008
                                                    Development Status 2/2

• SODAD acceptance tests and ground calibration have been achieved and
  successful. For ICARE-NG, these tests should be performed in Sept. 2008.

• Vibration, Thermal cycling qualification tests have been performed on
  CARMEN-2 and MEDET models and are successful (No shocks, no ESD
  have been performed).
• An EMC qualification test of the should be performed in Oct. 2008 on entire
  CARMEN-1 FM (ICARE-NG FM and the 3 SODAD FM with the FM of their
  interconnection data harness) according to SAC-D specification.

• CARMEN-1 FM should be ready to be delivered in Dec. 2008 (Data harness
  FM in Nov.)

• Previous PFMs of ICARE-NG and SODAD have been achieved, integrated
  and fly respectively aboard JASON-2 and ISS with full success.
Section 10 – CARMEN-1 Instruments Status – E. Lorfèvre                       6 of 15
Mission & Observatory CDR                                                       2008
                                                         Required Resources




     • Volume                                             ICARE-NG                 SODAD
                                                  205 x 138 x 95.8 mm3      142 x 120 x 92.5 mm3

     • Mass (without data                                 ICARE-NG                 SODAD           CARMEN-1 Allocation
       harness)                                            2.38 kg                 1 kg (x3)              8 kg


     • Power Consumption                                  ICARE-NG                 SODAD           CARMEN-1 Allocation
                                                         6.3 to 11.5 W             1 W (x3)               16 W

     • Data Volume                                                     CARMEN-1                    CARMEN-1 Allocation
                                                         422 bits/s (mean) to 528 bits/s (max)         20 MB / day


     • In Flight Temperature                              ICARE-NG                 SODAD              CARMEN AFT
       Ranges                                            -20 / +50°C              -30 / +60°C          -15 / +45°C

Section 10 – CARMEN-1 Instruments Status – E. Lorfèvre                                                               7 of 15
Mission & Observatory CDR                                                                                               2008
                                                         Mechanical Interfaces

• ICARE-NG location is ok
     – Inside satellite on a wall near SAC-D upper deck,
     – laying implantation with a window in satellite wall for insuring
       detector FoV.
• SODAD locations are ok
     – Outside satellite, in three different directions of SAC-D
       satellite
     – FOVs are reasonably free excepted for one module but the
       proximity of some antennas could be interesting for the study
       of “particles cloud".




                                                         Zenith face of the SAC-D structural model (you can see the
                                                         two GPS choke rings and the antennae (X and S bands
                                                                                   2
                                                         redundant), and SODAD n° structural model.
Section 10 – CARMEN-1 Instruments Status – E. Lorfèvre                                                        8 of 15
Mission & Observatory CDR                                                                                        2008
                                                         Integration and Tests

                                                                                                                                    Experience Module
• CARMEN-1 Stand Alone Tests before integration
                                                           Top
                                                                                                                                           ICARE-NG
                                                                              PPS Simulator                                             SPECTROMETER
                                                         Generator



                                                                                                                                    J2 DAT   J4 TST        J3 EXT   J1 PWR




                                                            PC Laptop       USB
                                                                            link      MIL-STD-1553                          (Long stub)
                                                                                     BC INTERFACE




                                                         Impact Simulator




                                                                                                     J2




                                                                                                                       J2




                                                                                                                                                      J2
                                                                                    J3




                                                                                                          J3




                                                                                                                               J3
                                                                                         SODAD                 SODAD                SODAD                                    POWER SUPPLY

                                                                                           #1                    #2                   #3




                                                                                                     J1




                                                                                                                       J1




                                                                                                                                                      J1
                                                                                                                                                                             POWER SUPPLY

• No specific GSE during SAC-D I&T
     – After integration, It is not possible any more to perform Irradiation and/or dust accelerator tests
       on the CARMEN-1 sensors,
     – Even if we have the possibility to activate an event simulator on ICARE-NG acquisition chains,
       only aliveness or health check tests can be perform on CARMEN-1 during SAC-D I&T.

• I&T constraints :
     – SODAD protection covers have to be removed before flight, during Thermal Vaccum and
       Vibration tests.

Section 10 – CARMEN-1 Instruments Status – E. Lorfèvre                                                                                                                                  9 of 15
Mission & Observatory CDR                                                                                                                                                                  2008
                                                         Assurance Product

• No risk of failure propagation has been identified
• Some analysis have been performed :
     –   ICARE-NG FMEA (ING-1000-AN-01-ERM-1C),
     –   ICARE-NG WCA (ICA-0000-AN-02-ERM-1A)
     –   ICARE-NG PSA (ICA-0000-AN-01-ERM-1A),
     –   SODAD FMEA (FBM-PA-PC-7-DB-5540-CNS).


• New release of the CARMEN-1 ICD is available

• No RFA is open

• Some points from Technical Interface Meeting are still open




Section 10 – CARMEN-1 Instruments Status – E. Lorfèvre                       10 of 15
Mission & Observatory CDR                                                        2008
                                                         Schedule

  Aug. 08             End of CARMEN-1 flight Software and 1553 protocol validation.

  Sept. 08            Delivery of CARMEN-1 1553 Interface Electrical Simulator.
                      ICARE-NG acceptance tests and ground calibration.

  Oct. 08             CARMEN-1 EMC qualification test

  Nov. 08             CARMEN-1 data harness FM delivery

  Dec. 08             CARMEN-1 FM delivery

  Feb. 09             CARMEN-1 FM integration on SAC-D




Section 10 – CARMEN-1 Instruments Status – E. Lorfèvre                            11 of 15
Mission & Observatory CDR                                                             2008
                                                         Concerns

• Delivery to CONAE of V&V, ATLO and I&T plans documents            Sept. 08
• Ripple voltage specification from CONAE to perform CARMEN-1
  EMC tests                                                         Sept. 08

• New version of Sinter software (including CARMEN-1 TM/TC
  sub addresses)                                                    asap
• New version of SPS software (1.04)                                asap
• Delivery to CONAE of CARMEN-1 simulator                           Aug. 08

• Data harness definition from CONAE                                asap




Section 10 – CARMEN-1 Instruments Status – E. Lorfèvre                     12 of 15
Mission & Observatory CDR                                                      2008
                                                             MEDET and CARMEN-2




                                                                                       High Speed Counters
                                                    300000


                                                                     SAA Pass on JASON-2 orbit                       A1 Chanel (Single)
                                                    250000                                                           A2 Chanel (Coincidence)
                                                                                                                     B1 Chanel (Single)
                                                                                                                     C1 Chanel (Single)
                                                                                                                     C2 Chanel (Coincidence)
                                                                                                                     Single Event Latchup
                                                    200000                                                                                                1
                                           Counts




                                                    150000


Some events have been
   observed on ISS                                  100000




                                                     50000




                                                      0                                                                                                   0
                                               30/06/2008 22:00:00          01/07/2008 2:00:00         01/07/2008 6:00:00                      01/07/2008 10:00:00