					This Drainage Subcontractor Agreement is between a general contractor and a
subcontractor for the provision of drainage services. This document contains the
material terms and conditions of the agreement including the scope of the services, the
compensation arrangement and the term of the agreement. It includes numerous
standard provisions that are commonly found in these types of agreements and may be
customized to address the specific needs of the contracting parties. This document
should be used by a contractor or a subcontractor when entering into an agreement for
drainage services.
                      DRAINAGE SUBCONTRACTOR AGREEMENT

THIS AGREEMENT (the “Agreement) is effective as of the        ___ day of ______________,
20___ [Instruction: Insert Date] (the “Effective Date”), by and between
___________________ [Instruction: Insert Name of Contractor], _____________________
[Instruction: Insert Address] (the “Contractor”), and ____________________ [Instruction:
Insert Name of Subcontractor], _____________________ [Instruction: Insert Address] (the
"Subcontractor").

WHEREAS, the Contractor desires to obtain the services of the Subcontractor for the purposes
of providing drainage services to the Contractor;
WHEREAS, the Subcontractor desires to provide Subcontractor’s drainage services to the
Contractor pursuant to the terms and conditions contained herein.

NOW, THEREFORE, for good and valuable consideration of the mutual covenants and
agreements contained herein, the receipt and adequacy of which is hereby acknowledged, the
Contractor and the Subcontractor hereby covenant and agree as follows:

1. TERM

   A. The term of this Agreement shall weeks commence upon the Effective Date and conclude
upon completion of the Work (as such term is defined in paragraph Error! Reference source
not found.2 hereof) on the Premises (as such term is defined in paragraph Error! Reference
source not found.2 hereof) (the “Term”), unless otherwise terminated pursuant to paragraph
Error! Reference source not found.1(Error! Reference source not found.B) hereof.

    B. This agreement may be terminated by either party upon written notice if:

      i.   Either party breaches a material provision or defaults on its obligations under this
agreement, and upon written notification by the other party, fails to remedy such breach within
(30) days;

     ii. If any representation or warranty made herein shall be found to be false, incorrect or
misleading in any material respect, by omission or otherwise.

     iii.   In the event of insolvency, bankruptcy, liquidation, death, or disability of the other
party.

2. SERVICES

    A. The Subcontractor shall provide drainage services, labour, materials and equipment to the
Contractor for the performance of the work (the “Work”) to be completed by the Subcontractor
in accordance with the Contractor’s specific plans and specifications and pursuant to the terms
and conditions contained on Schedule “A” annexed hereto.




                                                2
  B. The Subcontractor shall perform the Work at __________________ [Instruction: Insert
Address] (the “Premises”) or at such other location as the Contractor may direct.

    C. The Subcontractor agrees that it shall not deliver any material or equipment to the
Premises or commence the Work until the Subcontractor receives written notice from the
Contractor to do so. The Subcontractor will commence the Work upon receiving such written
notification from the Contractor and shall perform the Work on Work Days. “Work Days” shall
mean the days commencing Monday through ____________ [Instruction: Insert Day of the
Week] between the hours of _______ a.m. [Instruction: Insert Time] and _______ p.m.
[Instruction: Insert Time].

    D. Subject to the condition that each of the parties hereto and their servants, agents and
subcontractors shall at all material times have the necessary qualifications, each of the Contractor
and the Subcontractor agrees to use and contract exclusively with the other party for the drainage
services to be performed at the Premises.

3. COMPENSATION

The Contractor hereby agrees that it shall pay to the Subcontractor the sum of [Instruction:
Insert Amount] (the “Fee”) in consideration of Subcontractor’s Work at the Premises.
__________________ percent (___%) of the Fee shall become due payable upon execution of
this Agreement, and the remainder shall become due and payable upon the completion of the
Work at the Premises, provided said Work is done in a manner that is satisfactory to the
Contractor.

4. REPRESENTATIONS, WARRANTIES, INDEMNIFICATION AND REMEDIES

    A. The Subcontract represents and warrants that:

      i.    The Subcontractor has the complete power and authority to enter into this Agreement
and that this Agreement constitutes a valid and legally binding agreement enforceable against the
Contracted Party.

      ii. The Subcontractor shall undertake and complete in a timely and good and
workmanlike manner the drainage services required at the Premises by the Contractor to the
same extent and in the same manner as if the Subcontractor had been c
				
DOCUMENT INFO
Description: This Drainage Subcontractor Agreement is between a general contractor and a subcontractor for the provision of drainage services. This document contains the material terms and conditions of the agreement including the scope of the services, the compensation arrangement and the term of the agreement. It includes numerous standard provisions that are commonly found in these types of agreements and may be customized to address the specific needs of the contracting parties. This document should be used by a contractor or a subcontractor when entering into an agreement for drainage services.
Customize This Document Instantly download your personalized document Guided Fill-in-the-Blank Process
This document is also part of a package General & Subcontractor Agreements 22 Documents Included