					                                                            Attachment to Item 4 Page 1 of 10
                                                            Director City Works Report 19.02.04


GRAFFITI

The schedule below provides details of the number of square metres of graffiti removed from
Council’s public facilities in the various suburbs by Graffiti Off Pty Ltd.

 Facility           July to    Oct to     Jan to       April to       July to      Oct to         Jan 2004

                    Sept 2002 Dec 2002    Mar 2003     June 2003 Sept 2003 Dec 2003
 Campbelltown       14         11         30           85             46           104            99
 Ruse               0          8          0            64             0            17             0
 Kentlyn            9          0          0            0              0            0              0
 Airds              0          4          0            48             42           2              2
 St Helens Park     0          0          0            0              0            0              11
 Rosemeadow         25         10         58           29             4            22             0
 Ambarvale          28         14         32           108            12           35             15
 Woodbine           6          9          0            16             46           5              8
 Claymore           6          0          16           0              15           11             0
 Eschol Park        9          4          17           44             19           72             0
 Kearns             1          0          0            3              0            0              0
 Raby               28         0          0            46             0            67             89

 St Andrews         0          7          0            11             0            0              15
 Bow Bowing         0          4          0            0              0            0              0
 Minto              91         118        94           52             221          492            24
 Ingleburn          204        78         117          35             81           47             21
 Macquarie Fields   367        227        43           130            93           24             0

 Glenfield          66         70         137          161            71           104            200
 Total m²           772        564        544          832            650          1002           484

BUILDING MAINTENANCE/IMPROVEMENT WORKS

• Building maintenance requests – A total of 257 maintenance requests were received through
  the City Works Operations section. All work has been programmed to be completed in order of
  priority.

• Kopper Log Repairs – There were a total of 22 sets repaired within various Parks and Reserves
  around the Campbelltown area.

• Gate Repairs – A total of 6 gates were repaired around the Campbelltown area.

General

   • Maintenance staff were involved in Project Works for the Horticulture Section in the following
     area: Raby Oval, Wood Park, Jackson Park and Eschol Park.

   • Maintenance staff also undertook work in the new Art Gallery Project.
                                                           Attachment to Item 4 Page 2 of 10
                                                           Director City Works Report 19.02.04




•   OPEN SPACE

The Open Space staff have been involved in:

        • The mowing of a number of the larger reserves at the following locations: Varroville
          Reserve, Eagle Farm Reserve, Flynn Reserve, Fullwood Reserve.

        • The slashing of the previously cleared hazard reduction areas is about to commence.
          The slashing will include such areas as the rear of Cudgegong Road, Nymboida
          Crescent, Leichhardt Street, Granite Place, Ironside Crescent, Cook Reserve, Bent Place
          and Corunna Avenue. The grass growth within these areas has been quite rapid since
          the recent storms.

HORTICULTURE

    •   Work for the Dole: The Work for the Dole crew have been involved in the ongoing hazard
        reduction activities in Bunbury Curran Reserve. The hazard reduction adjacent to Oro
        Place, Glenfield has been completed, and the area at the rear of Woodlark Place, Glenfield
        is approximately 70% complete.
    •   Weed Control: Council’s weed control contractor is currently involved in undertaking
        treatment of weed infestations within all of the community planting sites throughout the City
        area.
    •   Turfing of Playing Fields: Turfing at a number of playing fields has been carried out.
        These include the goal mouths at Eschol Park and the run ups to the Cricket pitches at both
        Jackson and Wood Parks.
    •   Appin Road Landscaping: The landscaping activities have commenced on the western
        side of the newly reconstructed section of the Appin Road between Woodlands Road and
        Fitzgibbon Lane. Subject to favourable weather conditions, this part of the landscaping
        should be completed in approximately two weeks.
    •   Tree Inspection Report
        23 contracted out
        133 inspections resulting in work for the tree maintenance section of Operational Services
        25 required no action
        4 inspections for termites – contracted out
        0 sewer chokes – contracted out
        Total requests approximately 255

        Several enquiries by telephone were attended to (branch pickups)
Attachment to Item 4 Page 3 of 10
Director City Works Report 19.02.04
                                                              Attachment to Item 4 Page 4 of 10
                                                              Director City Works Report 19.02.04


ROADS AND DRAINAGE

  A. ROADS & FOOTPATHS

  • Heavy Patching. 75 tonne of AC was used
  • Minor Patching. Completed in areas 1 – 4. A total of 15 tonne AC was used.
  • Restorations. Nil.
  • Concrete Maintenance and Saw Cuts were carried out in Areas 1- 4.
  Footpath Maintenance

  • Glenfield CBD pit adjustment repairs, garden pending

  • 10 trip hazards attended to in Areas 1 – 4
  Kerb & Gutter Reconstruction Program
  • Kerb & gutter reconstruction on Macleay Street, Bradbury completed. Laybacks in progress
  • Kerb & gutter reconstruction on Barcoo Avenue, Leumeah in progress

  B. ROADS RESERVE ASSETS – Areas 1 – 4
             Vehicle Crossings (149 certificates) inspected                      275
             Vehicle Crossings constructed                                        40
             Telstra Inspections                                                  50
             Water Board Inspections                                              15
             Integral Inspections                                                   6
             Gas Inspections                                                      25
             Customer Requests                                                    82


  C. DRAINAGE & STREET ACCESSORIES

  •   Drainage Teams areas 1 – 4:
             Cleaning of Gross Pollutant Traps/Trash Racks                          3
             Pits cleaned by hand or suction                                     120
             Pit inspections (inclusive of pits cleaned)                          85
             Tail out drains                                                        2
             Securing of grated pits                                              10
                                                                                     3
             Removal of waste matter                                           12m
             Flushing of stormwater lines                                         42
                                                           Attachment to Item 4 Page 5 of 10
                                                           Director City Works Report 19.02.04


  •   Community Response Team areas 1 – 4
          Trip hazards attended                                                   3
          Syringes picked up at various locations                                 8
          Dead animals removed                                                   26
          Pits made safe by locking lids and gates                               14
          Deliver, pick up of barricades from various locations                   6
          Miscellaneous rubbish                                                   5
          Sign retrievals                                                         5
          Oil spills                                                              2
          Glass pick up                                                           3


  •   Multifunctional Verge Maintenance Areas 1 – 4
         1. Team split due to annual leave, acting in various roles
         2. Assist sign installation teams
         3. Traffic Control in various areas
         4. Assist with bridge maintenance program.
         5. Mowed Ingleburn Main Drain at Gordon & James Streets
         6. Traffic Facility cleaning in progress

D. STREET ACCESSORIES

  •   Signwriter Manufacture Areas 1 – 4

          Traffic Works Orders                                                    6
          Street Signs                                                            4
          Skate Park Signs                                                        7
          Challenge Walk sign changes                                            25
          Clallenge Walk new signs                                               16
          “Don’t be a Tosser” signs                                              14
          Council Election signs                                                  8


  •   Sign Erection Team Areas 1 – 2
          Works Orders                                                            0
          Linemarking Harrow Road & flags                                        20
          Bollard replacement                                                    15
          RTA signs                                                               5
          Street signs                                                            5
          CBD Maintenance                                                        15
          Refix handrail at James Street                                          1
Attachment to Item 4 Page 6 of 10
Director City Works Report 19.02.04
                                                        Attachment to Item 4 Page 7 of 10
                                                        Director City Works Report 19.02.04




     •   Sign Erection Team Areas 3 – 4
             Works Orders                                                      1
             Bollard replacement                                              16
             RTA signs                                                        12
             Street signs                                                     73
             Regulatory Signs Bradbury Oval (pending)                          4
             Parking Signs                                                    12
             Straighten bent signs                                            18


     •   Carpenter – Rotated between areas 1-4 due to annual leave and rehabilitation issues
             Routed Sign at Trobriand Park, Glenfield
             Baulk Installations at Badgally Road, Campbelltown,
             Georgina Crescent, Ambarvale & Harold Street, Macquarie
             Fields
             Glenquarie foot bridge maintenance

E.   LINEMARKING

     •   Maintenance Program at Areas 1 – 4 in progress – also line marking of stabilisation
         projects continuing.

F. BRIDGE AND CULVERT MAINTENANCE
     •   Bridge and culvert contract maintenance program 90 % completed.

G. PIT RECONSTRUCTION
     •   Program Areas 1 – 4 in progress 95% complete.

H. CAPITAL WORKS

     •   Leumeah Car Park (West) - Backfilling and further vegetation works in progress.

     •   Kooringa Reserve, Raby - Turf in place and maintenance period in progress. Carpark
         – minor works in progress – footpath, gate installation.
     •   Minto Basin – Basin area completed with turf now laid. Watering program in progress
         for turf to be established.
     •   Lynwood Tip – commencement of environmental control to tip in progress – 20%
         completed.

I. ROAD MAINTENANCE WORKS

     •   Briar Road – completed
     •   Patrick Street – completed
     •   Nardoo Street – completed. Pending line markings
     •   Road Seal Works program – in progress
     •   Eagleview Road – Mill & Fill completed. Seal pending
                                                       Attachment to Item 4 Page 8 of 10
                                                       Director City Works Report 19.02.04




J.   MINOR WORKS
     •   Carlisle Street – medians & line marking completed
     •   Georges River Road – line marking completed
     •   Additional car parking bays at Civic Centre completed
     •   Surface drainage works on Eaglevale Drive completed
     •   Wedderburn Gorge – Report submitted to consultant pending Consultant’s
         recommendations degree and timings of works to be advised
     •   Lithgow Street Mall - Paving restoration in progress. Awaiting approved drawings and
         works order to continue
     •   Victoria Park – pipeworks in open drain in progress
     •   Merino Crescent Airds – construction of median island in progress
     •   Milgate Lane – PAMPS program – construction of pram ramps
     •   Redfern Road – construction of pram ramps and footpath in progress
     •   Kingsclare Street - mountable island completed
     •   Brady Cycleway Stage No 2 – construction of cycleway in progress
     •   Works Depot Minto – environmental control improvements and security gate installation
         in progress

K. MAJOR WORKS

     •   Treelands Walk - Pipe baulks and line markings in progress

L. PUBLIC ENQUIRIES
    Maintenance issues for the period 29 January 2004 to 17 February 2004 have been received
    from the community, these included:
         •   Parks and trees maintenance        192
         •   Stormwater pits & pipelines         14
         •   Roads, potholes/signs etc           55
         •   Safety and amenity issues          112
         •   Footpath, restoration               33


CONTRACTS AND SUPPLY SECTION

1.   Contract and Tender Status
     Issued 7 tenders, recommended 6 to Council
     Issued 2 quotations, finalised 4

     Estimated savings on previous contracts for Electricity and Gas $85,000 per annum

     Purchasing
     2132 Purchase orders raised

     Stores
     Stores Inventory Balances
     2,505 active Stock Items
                                                                  Attachment to Item 4 Page 9 of 10
                                                                  Director City Works Report 19.02.04




2.     Plant Workshop and Fleet

       Plant Servicing, workshop activity for equipment with abnormal downtime

     Plant No        Item                    Reason                     Repairer                    Down Time
                                                                                                    Hrs

     719             Vermeer Chipper         Injector pump               CCC Workshops &         120hrs
                                                                         parts

     096             Nissan Bus              Injector Pump               CCC Workshops &         48hrs
                                                                         parts

     622             Caterpillar Grader      3 leaking Hydraulic         CCC Workshops &         80hrs
                                             rams                        parts

     913             Toro Trailer            Broken Axle                 CCC Workshops &         40hrs
                                                                         parts

     909             Toro Trailer            Broken Chassis              CCC Workshops &         80hrs
                                                                         parts

     708             Ford Tractor            Gearbox                     CCC Workshops &         48hrs
                                                                         parts

     726             Hino Truck              Broken ignition             CCC Workshops &         24hrs
                                                                         parts

     All other equipment and plant previously reported is back in service.

     The following is a breakdown of the work performed since the last report

     23 repairs to           52 repairs to         26 repairs to         68 tyre repairs
     Tractors                trucks                implements

     31 services             7 repairs to          43 mower              19 repairs to small plant at leisure
     carried out             backhoes              repairs               centres and parks

     12 RFS repairs          3 SES repairs         26 trailer repairs    16 heavy plant repairs

     10 repairs to           4 Bus repairs         4 repairs to          16 fleet vehicle repairs
     Sweepers                                      rollers

     Of the repairs reported above, 62 of them were carried out, ‘in the field’.


     Other Workshop Welding Activities

     Staff manufactured and fitted the following:-

           •       Gates for the Tip, Spitfire Drive, Raby and Georges River Road, Kentlyn
           •       A shopping trolley rack at Ingleburn
           •       A Christmas tree and a handrail were made for the Civic Centre
           •       Repaired the fence at Ingleburn High School and carried out various pit repairs
                                                        Attachment to Item 4 Page 10 of 10
                                                        Director City Works Report 19.02.04




     Fleet Purchases

     New vehicle deliveries:
            3 Rangers 4WD Toyota utilities & 10 Commodore sedans total $357,791
     Auction sales:
            10 vehicle total return $161,100
3.    Asset Management Section

      Asset Information Data Collection Progress:

      Stormwater:
      36 catchments 100% completed
      2 catchments in progress, 25% and 10% completed.

      Channels:      39.545Km
      Pipe:          499.317Km
      Culverts:     147
      Headwalls:    741
      Pits:         17815

      Roads:
      Pavement Investigation, Design and Spec completed for Campbelltown LGA :

           Aero Road                                Junction Road
           Allman Street                            Kellicar Road
           Briar Road                               Leumeah Road
           College Road                             Macleay Road
           Crispsparkle Drive                       Nardoo Street
           Eagleview Road                           Patrick Street
           Englorie Park Drive                      Railway Parade
           Eschol Park Drive                        Saywell Road
           Eucalyptus Drive                         Swettenham Road
           Georges River Road                       Wedderburn Road
           Gilchrist Drive
           Harrow Road
           Johnson Road
      Rehabilitation Progress from 2003-2004 Program:

           Aero Road                                Greco Place
           Allman Street                            Harrow Road
           Briar Road                               Johnson Road
           College Road                             Juntion Road
           Cordelia Place                           Kellicar Road
           Crispsparkle Drive                       Leumeah Road
           Eagleview Road                           Macleay Street
           Englorie Park Drive                      Patrick Street
           Eschol Park Drive                        Saywell Road
           Eucalyptus Drive                         Swettenham Road
           Gilchrist Drive
                                                    Attachment to Item 4 Page 11 of 10
                                                    Director City Works Report 19.02.04


 Work orders have been issued for sealing program, footpath reconstruction program,
 bridge maintenance program and rejuvenation.

 Roads from HSS Program have been completed (Wyangala Crescent, Tabourie Street,
 Townson Avenue, Kimberley Street, Leicester Street, Thirlmere Street and Wyndham
 Street, Leumeah)

 The rehabilitation work on Airds Road Bridge is completed.

 Footpaths Data Collection:

 Condition assessment has been carried out for 11 km Footpaths Sections as mentioned
 below:

 Footpaths on Allman Street, Broughton Street, Lindesay Street, George Street, Raby
 Playing Field, Mawson Park, Walkways between Hurricane Drive and Raby Playing Field

 Bridges:
 Condition Inspection (level 2) completed for all bridges, Level 3 inspection by consultant for
 Ben Lomond, Airds Road Bridges and Wood Park pedestrian bridge are also completed.
 The design of creek bank protection for Woodpark pedestrian bridge is in progress.

 Public Spaces Data Collection:
 All Council parks and reserves have been inspected (324 in total) and data placed in M-
 Plan database. All data has now been transferred to Excel to be reformatted to go into
 Conquest. Several corrections are required to be made to ensure that all material being
 installed into Conquest is accurate. Priority 1 to 5 rating will now be established for all
 assets and be introduced for 2005 - 2006 budget.

 Buildings:
 Building review has commenced, with the following facilities having been reassessed and
 any required adjustments to scheduled works have been noted:

Bow Bowing Community Centre                     East Campbelltown Hall
Glen Alpine Community Hall                      Glenfield Hall & Amenities
Minto Community Centre                          Glenfield Hall & Amenities
Rosemeadow Neighbourhood Centre                 Hurley Park Hall
St Andrews Community Centre                     Macquarie Fields Hall
St Helens Park Community Hall                   Menangle Park Hall
Bradbury Hall                                   Oswald Reserve and Toilets & Amenities
                                                Rosemeadow Oval Toilets & Amenities