Land Development Code Compliance
                                                                                         City of Phoenix
___ Meets Requirements                                                                          Permit Fee $65.00
____ Does Not Meet Requirements
                                                            APPLICATION FOR A NOISE PERMIT
_______________________________________
Signature of Planning Official
                                                            TO ALLOW CONSTRUCTION, REPAIR
Date: __________________________________                             OR EXCAVATION NOISES

  Pursuant to the Phoenix Municipal Code, Chapter 8, upon application to the City Manager, and approval
  from the Public Works Director and the Chief of Police, the City Manager may grant permits to
  contractors for construction or repair noise or excavation of streets and highways beyond the hours of 7
  am to 7 pm. The City Manager’s decision shall be final.

  NOTE: SPECIAL CONDITIONS: IF THIS CONSTRUCTION, REPAIR OR EXCAVATION IS
  TO BE CONDUCTED ON A STATE HIGHWAY, YOU MUST ALSO OBTAIN PERMISSION
  FROM ODOT, 200 ANTELOPE ROAD, WHITE CITY, OR 97503 (541) 774-8184. In addition, the
  applicant must contact residents in the immediate are that may be affected by the noise and advise
  them in advance of any amplification (NOTIFICATION TO SURROUNDING RESIDENTS OF
  INTENTION TO CREATE CONSTRUCTION OR REPAIR NOISES – form attached for your
  convenience.) If the noise is too loud, the contractor should be contacted directly by the affected person.
  In the event the Police Department has to intervene, the permit will be voided at the time of the
  construction, repair or excavation and noise shall not be allowed to continue. Please be considerate of the
  neighborhood.

  By signing this application, you are agreeing to the time allotted by the Public Works Director and Chief
  of Police for the construction, repair noise or excavation noise to operate and take responsibility to seeing
  that the information on this form is followed, including notifying surrounding residents in advance of an
  upcoming construction, repair or excavation event.

  Name of Applicant:____________________________________ Phone___________________________

  Address of Applicant:___________________________________________________________________

  Type of Construction/Repair or Excavation:_________________________________________________

  Location of Construction:________________________________________________________________

  Date of Construction:__________________________ Time of Construction:_______________________

  Reason for Construction:________________________________________________________________
                                    (Noise: No later than 9:30 pm Sun-Thurs and 10:30 pm Fri & Sat)
  Signature of
  Contractor:___________________________________________Date:____________________________

  When signed by the Chief of Police, Public Works Director, and City Manager, this application will act as
  your permit for this event:

  Chief of Police:______________________ Date:_____________
                                                                                          _____ Permit Approved
  Public Works Director:________________ Date:_____________
                                                                                          _____ Not Approved
  City Manager:_______________________ Date:_____________

  PERMIT RENEWED:______________________ City Manager:________________ Date:___________
   (Less than three (3) days in duration)
                             Copies to File, Police Department, Public Works Department, Fire Department and ODOT (if on State highway)
     INSTRUCTIONS FOR COMPLETION OF APPLICATION
                  FOR NOISE PERMIT
Fill in the details on the form and then either send it or take it by the Police Department (114 W 2nd
Street) for the Chief of Police’s signature, the Public Works Department for the Public Works Director’s
signature (100 S “B” Street) and the Planning Department (112 W 2nd Street) for the Planning Official’s
signature. It will then be forwarded to the City Manager for approval and signature. The completed and
signed application will act as your permit and will be forwarded to you once the signatures are received.

It is your responsibility to notify residents in the immediate area that may be affected by the construction,
repair or excavation noise. A form entitled “Notification to Surrounding Residents of Intention to
Construct, Repair or Excavate” is attached for your convenience and may be used if you wish. Please feel
free to duplicate the form for your use. Although it is not necessary to use the form, it is important for
surrounding residents to be aware of the event and to be in possession of a telephone number so they
know where to contact you if necessary.

By notifying surrounding residents in advance of the event, it is the intention of the City of Phoenix that
you will have an opportunity to correct noise levels if you are contacted directly by a resident. In the
event the Police Department has to intervene, the permit will be voided at the construction and repair will
not be allowed to continue.




City Code, Chapter 8, Noises Prohibited: Construction or Repair of Buildings, Excavation of Streets and
Highways: The construction, demolition, alteration or repair of any building or the excavation of streets
and highways other than between the hours of 7:00 am to 7:00 pm, on weekdays. In cases of emergency,
construction or repair noises are exempt from this provision. In non-emergency situations, the City
Manager may issue a permit, upon application, if the City Manager determines that the public health and
safety, as affected by loud and raucous noise caused by construction or repair of buildings or excavation
of streets and highways between the hours of 7:00 pm and 7:00 am will not be impaired, and if the City
Manager further determines that loss or inconvenience would otherwise result. The permit shall grant
permission in non-emergency cases for a period of not more than three days. The permit may be renewed
once for a period of three days or less.
        NOTIFICATION TO SURROUNDING RESIDENTS
    OF INTENTION TO CONSTRUCT, REPAIR, OR EXCAVATE
                 WITH AMPLIFIED NOISE

I, _______________________________, of __________________________________________
          (Name)                                      (Address)

Intend to construct or repair a building or excavate a street and highway located at ___________

____________________________, between the hours of ________ and ____________. I have

made application to the City of Phoenix for a Noise Permit and as a requirement of the permit,

residents in the immediate area that may be affected by the noise are advised in advance there

will be amplified noise on the dates and times set forth above.



If the noise is too loud, it is requested you contact me directly at _______________________
                                                                       (Tel # of contractor)

so we may correct the situation should the need arise.




Signature:____________________________________________             Date:_____________________

				
DOCUMENT INFO
Shared By:
Categories:
Stats:
views:34
posted:4/12/2010
language:English
pages:3