INSTALLATION THE REMAINDER OF THE APPROACH 15. IF IT IS NOT PRACTICABLE TO 7. CHECK FOR EXCESSIVE EROSION ON
RAMPS ONLY WHEN ADEQUATE STABILISE THE ACCESS RAMPS AGAINST THE APPROACH ROADS.
1. PRIOR TO COMMENCING ANY WORKS, DRAINAGE AND SEDIMENT CONTROLS EROSION, THEN INSTALL FLOW
OBTAIN ALL NECESSARY APPROVALS AND ARE IN PLACE. DIVERSION BANKS ACROSS THE WIDTH 8. CHECK THE CONDITIONS OF ANY FLOW
PERMITS REQUIRED TO CONSTRUCT THE OF EACH ACCESS RAMP ADJACENT THE DIVERSION CHANNELS/BANKS AND THE
TEMPORARY WATERCOURSE CROSSING, 7. IF FLOW DIVERSION SYSTEMS CANNOT TOP OF THE CHANNEL BANK, AND AT OPERATING CONDITIONS OF ASSOCIATED
INCLUDING PERMITS FOR THE BE INSTALLED, THEN CONDUCT BANK REGULAR INTERVALS DOWN THE RAMPS SEDIMENT TRAPS.
DISTURBANCE OF BANK VEGETATION, EXCAVATIONS BY PULLING THE SOIL (AS REQUIRED) TO PREVENT OR
AQUATIC VEGETATION (e.g. MANGROVES) AWAY FROM THE CHANNEL. MINIMISE SEDIMENT-LADEN RUNOFF REMOVAL
AND ANY TEMPORARY INSTREAM FLOW FLOWING DIRECTLY INTO THE
DIVERSION BARRIERS OR SEDIMENT 8. WHERE PRACTICABLE, CONSTRUCT WATERCOURSE. 1. TEMPORARY WATERCOURSE
CONTROL MEASURES. THE WATERCOURSE CROSSING CROSSINGS SHOULD BE REMOVED AS
PERPENDICULAR TO THE CHANNEL. 16. STABILISE ALL DISTURBED AREAS SOON AS POSSIBLE AFTER ALTERNATIVE
2. REFER TO APPROVED PLANS FOR THAT ARE LIKELY TO BE SUBJECTED TO ACCESS IS ACHIEVED OR THE BRIDGE IS
LOCATION AND CONSTRUCTION DETAILS. 9. WHERE PRACTICABLE, THE APPROACH FLOWING WATER, INCLUDING BYPASS NO LONGER NEEDED.
IF THERE ARE QUESTIONS OR PROBLEMS RAMPS SHOULD BE STRAIGHT FOR AT AND OVERFLOW AREAS, WITH ROCK OR
WITH THE LOCATION OR METHOD OF LEAST 10m AND SHOULD BE ALIGNED OTHER SUITABLE MATERIALS. 2. REMOVE ALL SPECIFIED MATERIALS
INSTALLATION, CONTACT THE ENGINEER WITH THE CROSSING. AND DISPOSE OF IN A SUITABLE MANNER
OR RESPONSIBLE ON-SITE OFFICER FOR MAINTENANCE THAT WILL NOT CAUSE AN EROSION OR
ASSISTANCE. 10. WHERE PRACTICABLE, DIRECT POLLUTION HAZARD.
STORMWATER RUNOFF FROM THE 1. TEMPORARY WATERCOURSE
3. ENSURE THAT THE LOCATION OF THE APPROACH RAMPS INTO STABLE DRAINS, CROSSINGS SHOULD BE INSPECTED 3. RESTORE THE WATERCOURSE
CROSSING WILL NOT INTERFERE WITH ADJACENT VEGETATION, OR WEEKLY AND AFTER ANY SIGNIFICANT CHANNEL TO ITS ORIGINAL
FUTURE CONSTRUCTION WORKS. APPROPRIATE SEDIMENT TRAPS TO CHANGE IN STREAM FLOW. CROSS-SECTION, AND SMOOTH AND
MINIMISE THE RELEASE OF SEDIMENT APPROPRIATELY STABILISE AND
4. PRIOR TO SIGNIFICANT LAND INTO THE WATERCOURSE. 2. DEBRIS TRAPPED ON OR UPSTREAM REVEGETATE ALL DISTURBED AREAS.
CLEARING OR CONSTRUCTION OF THE OF THE CROSSING SHOULD BE
APPROACH RAMPS AND BRIDGE 11. TAKE ALL REASONABLE MEASURES REMOVED.
ABUTMENTS, ESTABLISH ALL NECESSARY TO PREVENT DEBRIS AND
SEDIMENT CONTROL MEASURES AND CONSTRUCTION MATERIAL FROM 3. REPAIR ANY DAMAGE CAUSED BY
FLOW DIVERSION WORKS (INSTREAM ENTERING THE WATERCOURSE, CONSTRUCTION TRAFFIC. IF TRAFFIC
AND OFF-STREAM AS REQUIRED), ESPECIALLY ANY STILL OR FLOWING HAS EXPOSED BARE SOIL, STABILISED AS
CLEARING ONLY THOSE AREAS WATER. APPROPRIATE.
NECESSARY FOR INSTALLATION OF
THESE MEASURES. 12. IF HIGHLY EROSIVE SOILS ARE 4. CHECK FOR EROSION OF ABUTMENTS,
DETECTED, THEN APPROPRIATELY CHANNEL SCOUR, OR ROCK
5. TO THE MAXIMUM DEGREE STABILISE SUCH SOILS AS SOON AS DISPLACEMENT.
PRACTICABLE, CONSTRUCTION PRACTICABLE.
ACTIVITIES AND EQUIPMENT MUST NOT 5. MAKE ALL NECESSARY REPAIRS
OPERATE WITHIN OPEN FLOWING 13. APPROPRIATELY STABILISE ALL IMMEDIATELY.
WATERS. DISTURBED WATERCOURSE BANKS.
Catchments & Creeks Pty Ltd
6. CHECK THE BYPASS FLOODWAY
6. MAINTAIN CLEARING AND EXCAVATION 14. APPROPRIATELY STABILISE THE MAKING SURE THE BANKS ARE STABLE.
OF THE WATERCOURSE BED AND BANKS APPROACH ROADS INCLUDING THE
TO A MINIMUM. INITIALLY CLEAR ONLY APPROACH RAMPS EACH SIDE OF THE Drawn: Date:
THE AREA NECESSARY TO ALLOW BRIDGE CROSSING.
ACCESS FOR CONSTRUCTION. CLEAR GMW Dec-09 Temporary Bridge Crossing TBC-01