PowerPoint Presentation - Jericho Sailing Centre 2005 Volunteer

Shared by: rt3463df
-
Stats
views:
30
posted:
4/9/2010
language:
English
pages:
42
Document Sample
scope of work template
							 Jericho Sailing Centre
Annual General Meeting
President’s Report
President’s Report
Board Members

Brian Key, President, Alan Johnson; Vice-president; Mina Fung,
Treasurer; Deirdre Webster, Secretary; Dan Wallace, Ray
Douthwaite, Richard Spencer, Gail Owen, David Loutit, Ian Upright,
Norm Eldridge, Chris Stairs, Ashley Ford, Jim Quinn, Michael
Souster.
2006/07 Board Summary

Approved in principle the renewal of the Windsurfing School
Agreement with Windsure Adventure Sports.

Approved UBC Old Boys Rugby Club Agreement.

Approved Disabled Sailing Association Agreement.

Struck an Ad hoc Marginal Wharf Planning Committee to
consider the JSCA’s position regarding the future of the
Marginal Wharf.

Approved monthly budget reports.

Approved 2006 Audited Financial Statements.

Approved 2007 unaudited Financial Statements.

Approved 2008 JSCA operating budget.
Treasurer’s Report
JERICHO SAILING CENTRE ASSOCIATION
UNAUDITED
BALANCE SHEET
As of Sept 30, 2007

ASSETS
                                                 Unaudited     Audited
                                                   2007         2006
CURRENT ASSETS
      Cash and term deposits                         96,913       39,121
      Restricted Term Deposit-Contingency            58,552       56,739
      Accounts receivable                            40,268       33,632
      Prepaid expenses                                2,420        3,635

                                                    198,153      133,127

Capital Assets                                      835,905       939,923

                                                  1,034,058     1,073,050
LIABILITIES
CURRENT LIABILITIES
      Accounts payable and accrued liabilities      $12,261       $5,836
      Deferred revenue                               182,330      172,442
      Demand loan payable                            392,198      420,852

                                                   $586,789     $599,130

Deferred contributions related to fixed assets      104,874       107,906

                                                    691,663       707,036
               2007 UNAUDITED INCOME STATEMENT
                   JERICHO SAILING CENTRE ASSOCIATION
                                         REVENUE
                                                   UnAudited                Audited
DESCRIPTION                                                     2007          2006
General Revenue
Membership Dues                                    $      102,209      $    95,159
Boat Storage                                       $      252,764      $   248,073
Locker Rentals                                     $       33,980      $    34,082
Regatta Fees                                       $        1,710      $     1,835
Room Rentals                                       $       36,398      $    34,195
Bank Interest                                      $           42      $       197
Bailiff Fees & Services                            $        6,274      $     4,102
Misc Revenue                                       $       19,057      $     4,155
Key Membership                                     $        1,039      $     1,200
F&B Revenue                                        $       75,754      $    74,474
Sailing School Levy                                $       13,827      $    15,287
Windsurfing School Levy                            $       12,988      $    12,319
Kayaking School Levy                               $       11,501      $    14,678
Amortization of deferred contributions             $       64,064      $    73,775
TOTAL REVENUE:                                     $      631,607      $   613,531




                         PROGRAM M ES EXPENSE
                                                   UnAudited                Audited
DESCRIPTION                                                  2007             2006
Social Programmes                                  $        1,366      $     2,476
Regattas & Competitions                            $        5,629      $     4,146
New sletter                                        $          252      $     6,628
Promotions                                         $       16,000      $    18,059
Total Programmes Expenses:                         $       23,247      $    31,309


                      SAFETY & RACING EXPENSE
                                                   UnAudited                Audited
DESCRIPTION                                                     2007          2006
Racing Air Horns & Misc.                           $             870   $     1,131
Safety Signs & Supplies                            $             944   $       895
Anchors & lines                                    $             809   $       822
Rescue Team Equipment                              $             985   $       903
Boat Training Course                               $           1,883   $     1,442
Total Safety/Racing Expenses:                      $           5,490   $     5,193
              2007 UNAUDITED INCOME STATEMENT
                  JERICHO SAILING CENTRE ASSOCIATION
                             BOAT EXPENSE
                                                    UnAudited              Audited
DESCRIPTION                                                   2007           2006
Rack, Winch,Dolly R & M                             $        1,358
Boat Trailers R & M                                 $          661    $        -
Fuel Boats & Trailer                                $        4,069    $     4,544
Albatross Hull R&M                                  $        2,330    $     9,442
Albatross Motors R & M                              $        1,000    $        -
Marks Boat Hull R & M                               $          366    $       618
Marks Boat Motor R & M                              $        3,020    $       622
Hurricane Hull R & M                                $          856    $     1,656
Hurricane Motor R & M                               $        1,645    $     1,073
Zodiac Hull R & M                                   $           -     $          39
Zodiac Motor R & M                                  $          279    $        -
Total Boat Expenses:                                $       15,583    $    17,994




                                                    UnAudited              Audited
DESCRIPTION                                                   2007           2006
Phase V Reno Interest Cost                          $       31,969 $       10,415
Total Expenses:                                     $       31,969 $       10,415


                  FOOD AND BEVERAGE EXPENSE
                                                    UnAudited              Audited
DESCRIPTION                                                     2007         2006
Food & Beverage Misc.                               $           275 $       1,773
Total F&B Expenses:                                 $           275 $       1,773


                               OPERATIONS EXPENSE
                                                    UnAudited              Audited
DESCRIPTION                                                    2007           2006
Compound R & M                                      $       13,922    $    16,473
Building 13 Interior R & M                          $       23,094    $    20,860
Building 13 Exterior R & M                          $        3,008    $     3,694
Building 13 Roof R & M                              $           -     $        -
Building 13 Operation Cost                          $       23,317    $    29,345
Building 13 Hydro Expense                           $       21,350    $    28,170
Ramps R & M                                         $       24,230    $     8,745
Security Trailer R & M                              $          693    $     1,046
Depreciation                                        $      121,115    $    90,065
Total Operation Expenses:                           $      230,729    $   198,398
       2007 UNAUDITED INCOME STATEMENT
           JERICHO SAILING CENTRE ASSOCIATION
                                   ADM INISTRATION EXPENSE
                                                             UnAudited                  Audited
DESCRIPTION                                                             2007               2006
Postage/Office/Photocpy Supplies                             $        3,870     $        5,488
Copier Rental                                                $        3,611     $        5,529
Telephone                                                    $        8,611     $        8,537
Alarm System                                                 $          451     $          525
Computer R & M                                               $        2,606     $          624
Accounting Services                                          $           -      $           -
Audit                                                        $        8,000     $        8,000
Bank Charges/Interest Exp.                                   $        7,822     $        4,800
Insurance & Workers Comp.                                    $       20,936     $       20,180
Bad Debts                                                    $           -      $           -
Miscellaneous                                                $       12,859     $        3,896
Membership Decals & Cards                                    $       12,406     $       22,044
Board Meeting Costs                                          $          182     $             92
Legal Fees                                                   $           -      $        5,037
Staff Training                                               $             74   $          259
Wages/Benefits Manager                                       $       81,503     $       82,367
Wages/Benefits Admin. Assist.                                $       45,588     $       45,239
Wages/Benefits Clerical                                      $       13,654     $       13,075
Wages/Ben Safety & Racing                                    $       13,950     $       13,830
Wages/Ben Janitorial                                         $       17,979     $       15,677
Wages/Ben Maintenance                                        $       42,020     $       38,742
Wages/Ben Storage                                            $       38,287     $       37,880
Wages/Ben Storage II                                         $        8,106     $        9,189
Wages/Ben Security                                           $        7,231     $        6,555
Total Administration Expenses:                               $      349,744     $      347,565


TOTAL EXPENSES                                               $      657,038     $      612,647

EXCESS (DEFICIENCY)
OF REVENUE OVER EXPENSES                                     $       (25,432) $            884


           UNAUDITED INCOM E STATEM ENT SUM M ARY
                                                               UnAudited            Audited
                                                                 2007                2006
REVENUE                                                      $     631,607      $      613,531

EXPENSES
PROGRAM S                                                    $       23,247     $       31,309
SAFETY & RACING EXPENSE                                      $        5,490     $        5,193
BOAT EXPENSE                                                 $       15,583     $       17,994
Phase V Re no Inte re st Cost                                $       31,969     $       10,415
FOOD & BEVERAGE                                              $          275     $        1,773
OPERATIONS                                                   $      230,729     $      198,398
ADM INISTRATION                                              $      349,744     $      347,565

TOTAL EXPENSES                                               $      657,038     $      612,647

EXCESS (DEFICIENCY) OF REVENUE OVER EXPENSES                 $       (25,432) $            884
Programmes Committee
Members

Chair: Andy Hunt, Chris Stairs, Richard Spencer, Brian Key
2006/07 Programmes Summary

Planned, organized and conducted Jericho Racing Programs and
Regattas including:

Annual Fleet Planning Meeting
Penguin Cup Fall and Spring Series
Sunday Racing and       Tuesday Night Racing Series
Jericho Classic Regatta
Rookie Racing Program
Jericho Race Management Training Program

JSCA Marketing Sub-committee:

Explored funding and sponsorship opportunities.
Explored possibility of JSCA hosting BC 2010 Legacy events-
Jericho Sailing Centre added to the available space inventory for
Olympic support.
Developed JSCA wish list from each committee.
In addition, the J.S.C.A. provided resources and support to the
following events and groups at Jericho:

JOCC Winter Solo Race
Jericho Hobie Classic Regatta
D.S.A. Integration Regatta
Tasar BC’s
Flights of Spring Regatta
Swift Solo North American Championships
Canadian Laser Masters Championships
Jericho Outrigger Iron Race
B.C. Marine Trail/Ecomarine Ocean Kayak Marathon
Ecomarine Thursday Night Paddling Races
Jericho Oceanman
Vancouver International Half Iron Triathlon
Vancouver Open Water Swim Association Race Series
Celebration of Light Fireworks
Big Brothers Discovery Sail
U.B.C. Intramural Sports “Day of the Longboat”
Jericho Folk Club
Vancouver Boat Show Display.
DSA Kid’s Day
Reflexion Fun Run
MacSailing Jr. Team Racing
DSA Cascadia Regatta
Mobility Cup Regatta
Jericho Park Stewardship Group
Jericho Boat Show Open House & Sailpast
the Centreboard newsletter.
www.jsca.bc.ca website development
Operations Committee
Members

Chair: Norm Eldridge, Brian Key, Deirdre Webster, Andy Hunt,
Gail Owen, Ian Upright, Richard Spencer, Mark Scott, Randy
Clarke. Honourable Mention: Mark Daigle
2006/07 Operations Summary

Recommended changes to the Late Payment policy intended to
induce late payers to pay on time.

Improved compound water drainage.

Approved Memorial Bench for Syd Butler.

Completed emergency and regular launch ramp repairs.

Replaced old Laser racks and built new ones.

Added new specialty kayak storage rack.

Volunteer workparties including beach & compound cleanup,
gardening and landscaping.
Re-keyed member and other locks for improved security.

Planned for second floor flooring replacement.

Joint Planning & Operations Meeting to consider the
implementation of longer term planning into annual action plans.

Installation of new grass in rigging area.

New rigging and rinsing area at SW corner of building.

Commissioned the construction of new design launch dollies.

Commissioned an energy audit to seek more efficient and
alternative energy sources for the Jericho Sailing Centre.
Safety/Boat Committee
Members

Chair, Ray Douthwaite, Gail Owen, Jim Quinn, Ashley Ford,
Andrei Bredin, Stephen Chessor, Chris Stairs, Fred Wu, Andy
Hunt, David Loutit, Josee Menard, Mark Daigle.
2006/07 Safety/Boat Summary

Monitored and coordinated volunteer Jericho Rescue Team
program.

Monitored and coordinated volunteer and professional
maintenance for Jericho craft and equipment including annual refit.

Organized and conducted the Jericho Rescue Team Training
Courses and ongoing training and drills.

New Rescue Team Equipment purchased.

Planning for Marks Boat replacement.
Thanks for the assist!
2006/2007 Jericho Rescue Team Members

Andrei Bredin • Ray Douthwaite • Jim Quinn • Fred Wu • Gail Owen
• Stephen Chessor • Ashley Ford • Philip McIlvenna• Elizabeth
Buxbaum • Tegan Peacock • Josee Menard • Michael Souster
Chris Stairs • Tony Wood • Mark Daigle • David Loutit • David
Evans • David Pazlawski • Waldek Trafidlo • Anne Tichbourne •
Tim Collins • Cindy Kampmeinert • Mike Parks • Arash Masbough •
Tim Wright • Liz Spence • Jennifer Weterling • Nadine Soukoreff •
Alan Spence • Nigel Cornwall • Mike Harris • John Wyndham •
Jonas Abersbach • Lucas Kott • Sabrina Schwanebeck • Andy Hunt
Gary Parsons • Elisha Bandal • Marion Lewandowski • James
Lewandowski

368 mariners rescued.
Many more assisted by instructing self rescue techniques and
preventative safety measures.
90 on water event days supported by the Jericho Rescue
Team.
Planning Committee
Members

Chair: Dan Wallace, Brian Key, Mark Scott, Chris Stairs, Gail
Owen, Andy Hunt, Deirdre Webster, Sanja Bacon, Michael Souster,
Dave Thomas.
2006/07 Planning Summary

Discussed a 20 year phased building development plan.

Completed installation of a new sewer mainline.

Sailing Centre Compound Development Plan including:
South side building additions: locker storage units, a new cold
storage unit plan for the JSCA’s food and beverage service.
Developing new deck space. Better organizing storage by craft.
Improved compound drainage. Concepts for an expanded
Compound.
Initial discussion of the Jericho Sailing Centre Phase 6 Building
Renovation and what that might include.

Initial discussion of the future of the Marginal Wharf with regard to
the Jericho Sailing Centre prior to the Board forming a dedicated
Marginal Wharf Planning Committee.

Met with the Operations Committee to facilitate Planning goals to:
Maximize Space; Improve Efficiency of Storage; Improve Security;
Improve Ocean Access; Improve Traffic Flow Within Compound
and Improve Aesthetics.
  Marginal Wharf
Planning Committee
Members
Co-Chairs: David Loutit & Richard Spencer; Dan Wallace, Brian
Key, Mark Scott, Gail Owen, Chris Stairs, Duane Geddes, Kirk
Duncan, Peter Wall, Andy Hunt.
2006/07 Summary
The Committee developed the following 3 key objectives and
supporting objectives:
I. Increase the beach area available for small, naturally
powered craft.
a.) Increase launching capacity to accommodate a growing user
base.
b.) Reduce congestion to improve safety near the shoreline.
c.) Remove all or most of the existing structure.
II. Increase the Jericho Sailing Centre compound to the east
with a gate to access the “Marginal” area.
a.) Increase arc of compound to accommodate growing demand for
small, naturally powered craft storage.
b.) Provide compound access to new shoreline launch area.
III. A more effective facility to support the Disabled Sailing
Association and other JSCA groups.
a.) Develop a low impact, environmentally sensitive structure which
includes a minimum of 200 lineal feet of dock space with a
minimum of 6’ of depth at 0 foot tide level.
b.) Develop a new building within the expanded compound area to
provide public washrooms and space for the DSA, schools and
other user groups.
Conceptual Drawing: Peter Wall
Conceptual Drawing: Peter Wall
Conceptual Drawing: Peter Wall
General Manager’s Report
  Finite Resources
          VS.
Infinite Opportunities
2007 J.S.C.A Memberships

          2006     2007
 Family    568      606
Single    1416     1479
Juniors   96         106
Total     2080     2191
  Dinghy Sailing School
      Participants

          2006      2007
 Adults   359       314
Juniors   1519      1342
Total     1878      1656
Windsurfing/Standpaddling/
   skimboarding School
       Participants

          2006       2007
 Adults   517        458
Juniors   1343       1677
Total     1860       2135
Kayaking School Participants

           2006      2007
 Adults    1199        967
Juniors    818         1023
Total      2017        1990
      Web Site Traffic
2006 Total Hits     - 120551
2007 Total Hits YTD - 169569
Other Business
 Jericho Sailing Centre
Annual General Meeting

						
Related docs
Other docs by rt3463df
2. Atom History
Views: 12  |  Downloads: 0
SAMPLE HEADLINE
Views: 3  |  Downloads: 0
RFCs and White Papers
Views: 7  |  Downloads: 0
Open Economy Macroeconomics
Views: 501  |  Downloads: 2
Chapter 10 Review States of Matter
Views: 128  |  Downloads: 0