Docstoc

MO Inv Scenario

Document Sample
MO Inv Scenario Powered By Docstoc
					          Regional Priority                                                                                     MARC    Modified                                                                                                                                                          Cumulative       Project            Prioritization Comments
                                          Project ID        Organization              Project Name                                   State        Project City             Project Location                               Project Description                        Construction Cost
   Low         Medium         High                                                                              Score    Score                                                                                                                                                            Const Cost       Decade

                                                                                                                          See Sc.
Constrained LRTP Projects - Missouri                                                                                    Method Tab


State DOT Projects                        State DOT Projects
                                                                                 I-70 at I-435 -                                                                                                            This
                                                                                                                                                                                                            C project will rebuild the I-70 and I-435
                         MoDOT Belton
                            KCMO
                                             227       MoDOT                     Interchange                     75       80.0       MO      KANSAS CITY         Jackson County, I-70 at I-435.             a
                                                                                                                                                                                                            interchange. This project includes: new flyover            $135,499,000      $135,499,000     2010 Project Constrained in LRTP 2040 Project Listing.
                                                                                                                                                                                                            ramps, new bridges (including the Manchester
                                                                                                                                                                                                            p
                                                                                 Improvements                                                                                                               Bridge), and three continuous lanes in each
                                                                                                                                                                                                            a
                                                                                                                                                                                                            C
                                                                                 I-435 - N 48th St to                                                                                                       a                                                                                                            $161,758,391 can be used toward this
                                                                                 the Missouri River                                                              Clay County, I-435 from North      p
                                                                                                                                                                                                    Interchange, add lanes, loop ramp and add lanes on                                                                   project. This project is partially funded.
                KCMO     MoDOT Belton        157       MoDOT                                                     69       72.5       MO      KANSAS CITY                                                                                                               $170,504,000      $306,003,000     2020 Project
                                                                                 (Corridor                                                                       48th Street to the Missouri River. a
                                                                                                                                                                                                    bridge                                                                                                               A balance of $8,745,609 remains.
                                                                                                                                                                                                            c                                                                                                            Original cost = $170,504,000.
                                                                                 Improvements)                                                                                                              i
                                                                                                                                                                                                            t
                                                                                 US 71 - 155th St to                                                             Jackson County, US Route 71                Widening of US 71 to six lanes between North Cass
                                                                                                                                                                                                            C
   KCMO                  MoDOT Belton        147       MoDOT                     North Cass Pkwy                 69       69.9       MO      MULTIPLE CITIES     from 155th Street to North Cass            Parkway and 155th Street. Replacing bridge at
                                                                                                                                                                                                            a                                                           $34,641,000      $340,644,000     2020 Project Constrained in LRTP 2040 Project Listing.
                                                                                                                                                                                                            155th Street over US 71 with a new diamond
                                                                                                                                                                                                            p
                                                                                 (Corridor                                                                       Parkway.                                   interchange. This will Widening to future upgrade
                                                                                                                                                                                                            a
                         MoDOT Belton                                                                                                                                                                       Safety Improvements,be part of theaccommodate
                                                                                                                                                                                                            C
                                                                                 MO-92 - Leavenworth
   KCMO                  Leav. Co. City      653       Platte County                                             59       64.0       MO      PLATTE COUNTY       From Leavenworth to Smithville             a
                                                                                                                                                                                                            current capacity, Multi-modal shared use path, Park         $55,000,000      $395,644,000     2020 Project
                             Leav.                                               to Smithville                                                                                                              p Ride facility at MO-169.
                                                                                                                                                                                                            and
                                                                                                                                                                                                            a                                                                            $395,644,000
                                                                                 MO 210 - Eldon Rd to                                                                                                       C
                         MoDOT Belton                                                                                                                            Clay County, MO Route 210 from a project consists of widening MO Route 210
                                                                                                                                                                                                This
                            KCMO
                                             148       MoDOT                     MO 291 (Corridor                47       57.6       MO      KANSAS CITY                                                                                                                $19,603,000      $415,247,000     2010 Project Constrained in LRTP 2040 Project Listing.
                                                                                                                                                                 Eldon Road to MO Route 291.    from two lanes to 4 lanes using an urban section.
                                                                                                                                                                                                p
                                                                                 Improvements)                                                                                                              a
                                                                                 US 50 - Chipman Rd                                                              Jackson County, US 50 from                 Address congestion problems in the Lee’s Summit
                                                                                                                                                                                                            C
                KCMO     MoDOT Belton        163       MoDOT                     to MO 291 North                 73       75.7       MO      LEES SUMMIT         Chipman Road to MO 291 North               area by reconstructing US 50 from Chipman Rd. to
                                                                                                                                                                                                            a                                                          $176,249,000      $591,496,000     2020 Project Constrained in LRTP 2040 Project Listing.
                                                                                                                                                                                                            MO
                                                                                                                                                                                                            p 291 North and widen to six lanes including new
                                                                                 (Corridor                                                                       in the city of Lees Summit.                interchanges and auxiliary lanes.
                                                                                                                                                                                                            a
                                                                                 I-70 at I-470 -                                                                                                            C
                                                                                                                                                                                                            Interchange Improvements Limits are from Lees
                         MoDOT Belton
                            KCMO
                                             184       MoDOT                     Interchange                     67       73.6       MO      INDEPENDENCE        Jackson County, I-70 at I-470.             a
                                                                                                                                                                                                            Summit Road to Little Blue Parkway. Also includes          $167,515,000      $759,011,000     2020 Project Constrained in LRTP 2040 Project Listing.
                                                                                                                                                                                                            p limit on I-470 from US 40 to 39th Street.
                                                                                                                                                                                                            the
                                                                                 Improvements                                                                                                               a
                                                                                 I-35 Interchange at                                                             Jackson County, I-35 Interchange           N
                KCMO     MoDOT Belton        161       MoDOT                     US 169 (Northwest               70       73.3       MO      KANSAS CITY         at US 169 (Northwest Downtown              o
                                                                                                                                                                                                            Reconstruct I-35 Interchange at US 169.                     $80,036,000      $839,047,000     2020 Project Constrained in LRTP 2040 Project Listing.
                                                                                                                                                                                                            n
                                                                                 Downtown Loop) -                                                                Loop)                                      -
                                                                                 I-470 - US 50/MO 350 to                                                                                                    C
                                                                                                                                                                                                            Widen interstate to three lanes using median. Also
                         MoDOT Belton                                                                                                                            Jackson County, I-470 from US 50/MO
                                             188       MoDOT                     US 40 (Corridor                 66       72.8       MO      LEES SUMMIT                                                    a
                                                                                                                                                                                                            include interchange modifications, including the            $66,491,000      $905,538,000     2010 Project Constrained in LRTP 2040 Project Listing.
                            KCMO                                                                                                                                 350 to US 40.
                                                                                 Improvements)                                                                                                              p
                                                                                                                                                                                                            access point at Colbern Road.
                                                                                 Shoal Creek Parkway -                                                                                                      a
                                                                                                                                                                                                            C
                         MoDOT Belton                                                                                                                                                                       RECONSTRUCT EXISTING ROAD AND WIDEN TO 4
                                             646       City of Kansas City, MO Platte Purchase Dr to Oak         72       77.6       MO      KANSAS CITY         Platte Purchase Dr to Oak Tfrwy            a                                                           $25,670,800      $931,208,800
                            KCMO                                                                                                                                                                            LANES AND BUILD INTERCHANGE
                                                                                 Trfwy                                                                                                                      p
                                                                                                                                                                                                            a
                                                                                                                                                                                                            This
                                                                                                                                                                                                            C estimate is based on the initial scoping. The
                                                                                 US 50 at MO 291 South -                                                         Jackson County, US 50 and MO 291
                KCMO     MoDOT Belton        162       MoDOT                                                     69       72.5       MO      LEES SUMMIT                                                    a
                                                                                                                                                                                                            scope consists of replacing and raising MO 291              $13,577,000      $944,785,800     2010 Project Constrained in LRTP 2040 Project Listing.
                                                                                 Interchange Improvements                                                        South in the city of Lees Summit.
                                                                                                                                                                                                            bridge (A-1483) over US 50. The new bridge will
                                                                                                                                                                                                            p
                                                                                                                                                                                                            have sidewalks and an added left turn lane from
                                                                                                                                                                                                            a
                                                                                                                                                                                                            C
                                                                                                                                                                                                            a                                                                                                            $100,000,000 can be used toward this
                                                                                 I-70 - Blue Ridge Cutoff to                                                                                                p capacity by adding lane in each direction from
                                                                                                                                                                 Jackson County, I-70 from Blue Ridge       Add                                                                                                          project. This project is partially funded.
                KCMO     MoDOT Belton        191       MoDOT                     east of Lee's Summit Rd         69       72.5       MO      INDEPENDENCE                                                   a                                                          $137,344,000      $1,082,129,800   2030 Project
                                                                                                                                                                 Cutoff to east of Lee’s Summit Road.       Blue Ridge Cutoff to east of Lee’s Summit Road                                                               A balance of $37,344,000 remains.
                                                                                 (Corridor Improvements)                                                                                                    c                                                                                                            Original cost = $137,344,000.
                                                                                                                                                                                                            i
                                                                                                                                                                                                            t
                                                                                 I-435 - Manchester                                                              Jackson County, I-435 from Manchester      Add
                                                                                                                                                                                                            C one auxiliary Eastbound and Westbound from
   KCMO                  MoDOT Belton        160       MoDOT                     Interchange at 103rd St to      72       72.3       MO      KANSAS CITY         Interchange at 103rd Street to just west   a
                                                                                                                                                                                                            Holmes Rd. to 103rd St.; widen I-435 to 6 lanes             $33,207,000      $1,115,336,800   2030 Project Constrained in LRTP 2040 Project Listing.
                                                                                 West of US 71 (Corridor                                                         of US 71.                                  from 103rd St. to tie to the Three Trails Crossing
                                                                                                                                                                                                            p
                                                                                 Improvements)                                                                                                              a
                                                                                                                                                                                                            Interchange. each direction to I-70 in Jackson
                                                                                                                                                                                                            C new lane In addition, upgrade the Manchester
                                                                                                                                                                                                            Add
                                                                                                                                                                                                            aCounty from Tracy Ave. to Topping Ave. in order to                                                          $200,000,000 can be used toward this
                                                                                 I-70 - Tracy to Topping                                                                                                    pincrease general capacity. Estimate is mostly based
                         MoDOT Belton                                                                                                                            Jackson County, I-70 from Tracy to                                                                                                                      project. This project is partially funded.
                            KCMO
                                             192       MoDOT                     (Downtown to I-435              64       71.2       MO      KANSAS CITY                                                    a the I-70 First Tier EIS Cost Summary from May
                                                                                                                                                                                                             on                                                        $238,647,000      $1,353,983,800   2030 Project
                                                                                                                                                                 Topping.                                                                                                                                                A balance of $38,647,000 remains.
                                                                                 Corridor Improvements)                                                                                                     c2009 completed by HNTB. The limits described                                                                Original cost = $238,647,000.
                                                                                                                                                                                                            iabove are defined as the “urban” sub-area of that
                                                                                                                                                                                                            treport.
                                                                                 I-35 at Pleasant Valley Rd -                                                                                               NReduce interchange congestion and improve traffic
                                                                                                                                                                 Clay County, I-35 at Pleasant Valley
                KCMO     MoDOT Belton        146       MoDOT                     Interchange Improvements        67       70.9       MO      PLEASANT VALLEY                                                oflow. Realign I-35 to produce a more typical               $31,604,000      $1,385,587,800   2020 Project Constrained in LRTP 2040 Project Listing.
                                                                                                                                                                 Road.
                                                                                 (Cost includes projects 234                                                                                                nDiamond Type interchange.
                                                                                 and 631)                                                                                                                   -
                                                                                                                                                                                                            C
                                                                                                                                                                                                            a
                                                                                                                                                                                                            p
                                                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 4
MoDOT Belton                  KCMO           557       City of Kansas City, MO Front St - I-35 To Chouteau       77       70.9       MO      KANSAS CITY         I-35 TO Chouteau                           a                                                           $47,925,000      $1,433,512,800   2030 Project
                                                                                                                                                                                                            LANES.
                                                                                                                                                                                                            c
                                                                                                                                                                                                            i
                                                                                                                                                                                                            t
                                                                                 I-35 - I-29/I-35 split to US                                                                                               This
                                                                                                                                                                                                            C project consists of rebuilding and adding a third                                                        $200,000,000 can be used toward this
                         MoDOT Belton                                                                                                                            Clay County, I-35 from I-29/35 split to US
                                             156       MoDOT                     69/MO 33 (Corridor              63       70.4       MO      MULTIPLE CITIES                                                lane in both directions on Route I-35 from the I-29/I-
                                                                                                                                                                                                            a                                                          $277,444,000      $1,710,956,800   2020 Project project. This project is partially funded.
                            KCMO                                                                                                                                 69/MO 33.
                                                                                 Improvements)                                                                                                              35
                                                                                                                                                                                                            p split to MO 33 (Lightburne Road). It was                                                                 A balance of $77,444,000 remains.
                                                                                                                                                                                                            assumed all interchanges would need to be
                                                                                                                                                                                                            a
                                                                                                                                                                                                            C                                                                                                          Original cost = $277,444,000.
                                                                                 Front St - Chouteau To I-                                                                                                  RECONSTRUCT EXISTING ROAD AND WIDEN TO 6
MoDOT Belton                  KCMO           558       City of Kansas City, MO                                   76       70.1       MO      KANSAS CITY         Chouteau TO I-435                          a                                                           $30,615,200      $1,741,572,000   2030 Project
                                                                                 435                                                                                                                        LANES.
                                                                                                                                                                                                            p
                                                                                 US 71 - 155th St to North                                                                                                  a
                                                                                                                                                                                                            Widening of US 71 to six lanes between North Cass
                                                                                                                                                                                                            C
                                                                                                                                                                 Jackson County, US Route 71 from 155th
   KCMO                  MoDOT Belton        147       MoDOT                     Cass Pkwy (Corridor             69       69.9       MO      MULTIPLE CITIES                                                a
                                                                                                                                                                                                            Parkway and 155th Street. Replacing bridge at               $34,641,000      $1,776,213,000   2020 Project Constrained in LRTP 2040 Project Listing.
                                                                                                                                                                 Street to North Cass Parkway.
                                                                                 Improvements)                                                                                                              155th Street over US 71 with a new diamond
                                                                                                                                                                                                            p
                                                                                                                                                                                                            interchange. This will be part of the future upgrade
                                                                                                                                                                                                            a
          Regional Priority                                                                                        MARC    Modified                                                                                                                                                            Cumulative       Project           Prioritization Comments
                                             Project ID        Organization              Project Name                                   State        Project City             Project Location                                Project Description                         Construction Cost
   Low          Medium           High                                                                              Score    Score                                                                                                                                                              Const Cost       Decade

                                                                                                                             See Sc.
Constrained LRTP Projects - Missouri                                                                                       Method Tab


State DOT Projects                           State DOT Projects
                                                                                  I-29 - MO 210 (Armour Rd)                                                                                                    N
                                                                                                                                                                                                               Improve the I-29/I-35 corridor from north of
                                                                                                                                                                    Clay County, I-29 from MO 210 to US
               MoDOT Belton      KCMO           150       MoDOT                   to US 169 (Corridor               69       69.9       MO      MULTIPLE CITIES                                                o
                                                                                                                                                                                                               Armour Road (Route 210) Interchange to the Route              $92,000,000      $1,868,213,000   2020 Project Constrained in LRTP 2040 Project Listing.
                                                                                                                                                                    169.
                                                                                  Improvements)                                                                                                                n Interchange.
                                                                                                                                                                                                               169
                                                                                  INTERCHANGE ONLY                                                                                                             -
                                                                                                                                                                                                               C
                                                                                                                                                                                                               CAPACITY IMPROVEMENTS TO ROUTE 45/NW 64TH
                              MoDOT Belton                                        NW 64th St - Cosby to
                                                729       City of Kansas City, MO                                   61       68.8       MO      KANSAS CITY         Cosby to Roanridge                         a
                                                                                                                                                                                                               STREET AND I-29 INTERCHANGE INCLUDING OUTER                   $16,655,000      $1,884,868,000
                                 KCMO                                             Roanridge
                                                                                                                                                                                                               p
                                                                                                                                                                                                               ROAD RELOCATION
                                                                                                                                                                    Intersection of Todd George                a
                                                                                                                                                                                                               Reconstruct/widen the existing interchange at Todd
                                                                                                                                                                                                               C
                                                                                    Todd George at US 50 Hwy -
   KCMO                       MoDOT Belton      121       City of Lees Summit                                       67       68.3       MO      LEES SUMMIT         Parkway/Ranson Road and US 50              a
                                                                                                                                                                                                               George Parkway/Ranson Road and US 50 Highway.                 $18,000,000      $1,902,868,000   2020 Project
                                                                                    Interchange
                                                                                                                                                                    Highway                                    Capacity improvements will upgrade the existing 4-
                                                                                                                                                                                                               p
                                                                                    Raytown 350 Highway &                                                                                                      The arterial with / Blue Parkway Corridor 6-lane
                                                                                                                                                                                                               lane
                                                                                                                                                                                                               a
                                                                                                                                                                                                               N 350 Highway single left-turn lanes to a Plan was
                              MoDOT Belton
                                                604       City of Raytown           Raytown Rd. Intersection        59       67.2       MO      RAYTOWN             350 Hwy from Sterling to Maple             a
                                                                                                                                                                                                               o collaboration between Raytown, Kansas City, and             $36,988,517      $1,939,856,517   2010 Project
                                 KCMO
                                                                                    Alignment - 350 Hwy from                                                                                                   MoDOT. This study calls for the divided 350
                                                                                                                                                                                                               n
                                                                                    Sterling Ave to Maple
                                                                                    I-70 - west of Little Blue                                                                                                 highway through Raytown Improvements on I-70
                                                                                                                                                                                                               Widening and Interchange to be combined within
                                                                                                                                                                                                               -
                                                                                                                                                                                                               C
                                                                                                                                                                    Jackson County, I-70 from west of Little
   KCMO                       MoDOT Belton      182       MoDOT                     Parkway to Lafayette            64       65.9       MO      MULTIPLE CITIES                                                a
                                                                                                                                                                                                               from west of Little Blue Expressway to Lafayette              $45,000,000      $1,984,856,517   2010 Project Constrained in LRTP 2040 Project Listing.
                                                                                                                                                                    Blue Parkway to Lafayette County Line.
                                                                                    County Line (Corridor                                                                                                      County Line. This includes the addition of truck only
                                                                                                                                                                                                               p
                                                                                    Improvements) PHASE 1
                                                                                    Pleasant Valley Rd - I-35                                                                                                  lanes.
                                                                                                                                                                                                               a
                                                                                                                                                                                                               C
                              MoDOT Belton                                                                                                                          Pleasant Valley Road / I-35 / US-69        Interchange modifications at I-35 & Pleasant Valley
                                                631       City of Liberty         Interchange (Cost                 55       64.0       MO      LIBERTY                                                        a                                                                 $0           $1,984,856,517   2020 Project
                                 KCMO                                                                                                                               Interchange.                               Road & US-69
                                                                                  accounted for in MoDOT                                                                                                       p
                                                                                  project 146)                                                                                                                 a
                                                                                                                                                                                                               C
                                                                                  NW 96th St - US 169 to N
               MoDOT Belton      KCMO           619       City of Kansas City, MO                                   61       63.5       MO      KANSAS CITY         US 169 to Oak Tfrwy                        a
                                                                                                                                                                                                               NEW 4 LANE FACILITY AND INTERCHANGE                           $14,620,800      $1,999,477,317   2010 Project
                                                                                  Oak Trfwy
                                                                                                                                                                                                               p
                                                                                                                                                                                                               a
                                                                                                                                                                                                               The
                                                                                                                                                                                                               C extension of Blackwell Road from Shenandoah
                              MoDOT Belton                                          Blackwell Interchange at                                                        Intersection of Blackwell Road
                                                118       City of Lees Summit                                       54       63.2       MO      LEES SUMMIT                                                    a
                                                                                                                                                                                                               Drive to the extension of Oldham Parkway (approx.             $23,700,000      $2,023,177,317   2010 Project
                                 KCMO                                               US 50 Highway                                                                   (Extension) and US 50 Highway
                                                                                                                                                                                                               1
                                                                                                                                                                                                               p mile) with a diamond interchange at US 50
                                                                                                                                                                                                               Highway and auxiliary highway lanes between the
                                                                                                                                                                                                               a
                                                                                                                                                                                                               C
                                                                                    Tiffany Springs Pkwy -                                                                                                     NEW 4 LANE FACILITY AND INTERCHANGE
               MoDOT Belton      KCMO           689       City of Kansas City, MO                                   60       62.7       MO      KANSAS CITY         Amity to I-29                              a                                                             $15,336,000      $2,038,513,317   2010 Project
                                                                                    Amity to I-29                                                                                                              IMPROVEMENT
                                                                                                                                                                                                               p
                                                                                                                                                                    Missouri 350 Highway and Blue Ridge        a
                                                                                                                                                                                                               Modification of a limited access intersection to
                                                                                                                                                                                                               N
MoDOT Belton                                                                        350 Hwy & Blue Ridge Blvd
                                                654       City of Raytown                                           72       61.6       MO      RAYTOWN             Boulevard Intersection, Raytown,           provide full access in all directions to support
                                                                                                                                                                                                               o                                                             $20,000,000      $2,058,513,317   2010 Project
   KCMO                                                                             Intersection Improvements
                                                                                                                                                                    Missouri.                                  activity center, transit interconnectivity and metro
                                                                                                                                                                                                               n
                                                                                                                                                                                                               green connection.
                                                                                                                                                                                                               -
                                                                                                                                                                                                               C
                                                                                                                                                                    Clay County, MO Route 92 from Nation
                  KCMO        MoDOT Belton      174       MoDOT                     MO 92 - Nation Rd to I-35       55       61.3       MO      KEARNEY                                                        a
                                                                                                                                                                                                               Widening, grading, drainage and pavement                      $6,014,000       $2,064,527,317   2010 Project Constrained in LRTP 2040 Project Listing.
                                                                                                                                                                    Rd to I-35. MoDOT Project J4P1748.
                                                                                                                                                                                                               p
                                                                                                                                                                    This project is located on existing M-7    a
                                                                                                                                                                                                               The
                                                                                                                                                                                                               C M-7 Highway Improvements, Pink Hill Road to
                                                                                    MO 7 Hwy - Pink Hill Rd to
   KCMO                       MoDOT Belton      349       City of Independence                                      58       61.1       MO      INDEPENDENCE        Highway from its intersection with Pink    a 24 Highway, will improve approximately six
                                                                                                                                                                                                               U.S.                                                          $30,000,000      $2,094,527,317   2010 Project
                                                                                    U.S. 24 Hwy
                                                                                                                                                                    Hill Road, north to U.S. 24 Highway.       miles of M-7 Highway into a four lane street with
                                                                                                                                                                                                               p
                                                                                                                                                                                                               curbs and sidewalks between Pink Hill Road and U.S.
                                                                                                                                                                                                               a
                                                                                                                                                                                                               C
                              MoDOT Belton
                                                587       City of Liberty           I-35/M-152 Interchange          49       59.2       MO      LIBERTY             I-35 / M-152 interchange.                  a
                                                                                                                                                                                                               Interchange modifications to I-35 / M-152.                    $10,000,000      $2,104,527,317   2010 Project
                                 KCMO
                                                                                                                                                                                                               p
                                                                                                                                                                                                               a
                                                                                                                                                                                                               This
                                                                                                                                                                                                               C project will continue improvements already
                                                                                    MO 7 Hwy - Hwy 50 to                                                            M-7 Highway from 50 Highway to 163rd
   KCMO        MoDOT Belton      P. Hill        204       City of Pleasant Hill                                     58       58.4       MO      PLEASANT HILL                                                a
                                                                                                                                                                                                             made to M-7 Highway in south Blue Springs and in                $20,000,000      $2,124,527,317   2010 Project
                                                                                    163rd St                                                                        Street.
                                                                                                                                                                                                             Pleasant Hill south of 163rd Street. It will provide
                                                                                                                                                                                                             p
                                                                                                                                                                                                             a improved trafficU.S. 71 Interchange project is
                                                                                                                                                                                                             for
                                                                                                                                                                                                             C 211th Street & flow, reduce congestion, and
                                                                                                                                                                                                             The
                                                                                    211th Street & U.S. 71                                                          U.S 71 Highway at future 211th Street in
   KCMO        MoDOT Belton                     449       City of Peculiar                                          61       58.1       MO      PECULIAR                                                     a
                                                                                                                                                                                                             proposed in conjunction with a new 5-mile segment               $18,000,000      $2,142,527,317   2010 Project
                                                                                    Highway Interchange                                                             northern Peculiar
                                                                                                                                                                                                             of
                                                                                                                                                                                                             p 211th Street extending from State Route J to
                                                                                                                                                                                                             State Route Y. The roadway project will be a
                                                                                                                                                                                                             a
                                                                                                                                                                                                             C
                                                                                    Tiffany Springs Pkwy - I-435
               MoDOT Belton      KCMO           687       City of Kansas City, MO                                   53       57.1       MO      KANSAS CITY         I-435 to Amity Ave                         a
                                                                                                                                                                                                               NEW 4 LANE FACILITY AND INTERCHANGE                           $59,640,000      $2,202,167,317   2030 Project
                                                                                    to Amity Ave
                                                                                                                                                                                                               p
                                                                                                                                                                                                               a
                                                                                                                                                                                                               Interchange modifications at I-35 and M-291. By
                                                                                                                                                                                                               C
                              MoDOT Belton                                          I-35/M-291 Interchange
                                                585       City of Liberty                                           46       56.8       MO      LIBERTY             I-35 / M-291 Interchange                   replacing the aging bridge, eliminating traffic signals,
                                                                                                                                                                                                               a                                                             $12,500,000      $2,214,667,317   2010 Project
                                 KCMO                                               Improvements
                                                                                                                                                                                                               coordinating signals and expanding M291 with
                                                                                                                                                                                                               p
                                                                                                                                                                                                               additional lanes, the interchange improvements will
                                                                                                                                                                                                               a
                                                                                                                                                                                                               C
                                                                                    NW 72nd St - MO-9 to                                                                                                       RECONSTRUCT EXISTING ROAD AND WIDEN TO 3
MoDOT Belton                                    624       City of Kansas City, MO                                   66       56.8       MO      KANSAS CITY         MO-9 to Overland Drive                     a                                                             $12,840,000      $2,227,507,317   2020 Project leave on list - interchange improvements.
                                                                                    Overland Dr                                                                                                                LANES AND FIX INTERCHANGE
                                                                                                                                                                                                               p
                                                                                                                                                                    This project is located on existing M-78   a M-78 Highway Improvements, Speck to Truman
                                                                                                                                                                                                               The
                                                                                                                                                                                                               C
                                                                                    MO 78 Hwy - Speck to
   KCMO        MoDOT Belton                     361       City of Independence                                      59       56.5       MO      INDEPENDENCE        Highway from Speck Road northeast to       a
                                                                                                                                                                                                               Road, will improve the existing M-78 Highway from             $12,500,000      $2,240,007,317   2010 Project
                                                                                    Truman Rd
                                                                                                                                                                    Truman Road.                               two
                                                                                                                                                                                                               p lanes to four lanes in Eastern Independence.
                                                                                                                                                                                                               The
                                                                                                                                                                                                               a construction of curbs, sidewalks, and storm


                                             Added to
                                               List at
                                                                                                                                                                    Includes multi-modal elements
                                             2/2/2010
                                                Mtg.
                                                                                                     See Sc.
Proposed LRTP Projects - Missouri                                                                    Method
                                                                                                       Tab

State DOT Projects
                                                                                                                                                                                                                                                                                                                                This project will rebuild the I-70 and I-435                                                                                                                                   This project relates to the Accessibility,
 227                                                                                                  80.0     15   5.0   100.0   20.0   60.0   80.0                                                                                                                                                                                                                                      200,000   260,000   6   8    Interstate           Current   46    20   Fair        2010 to 2019   Conceptual Plan                                                          $135,499,000   $150,000    2010
       MoDOT                     I-70 at I-435 - Interchange Improvements                 100   75                                                     MO   KANSAS CITY       Jackson County, I-70 at I-435.                         Roadway project                                      Roadway                Capacity       interchange. This project includes: new flyover                                                                                                                                Economic Vitality, Safety and Security and
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Project
                                                                                                                                                                                                                                                                                                                                ramps, new bridges (including the Manchester                                                                                                                                   System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                Bridge), and three continuous lanes in each                                                                                                                                    This project relates to the Accessibility,
 194                             Downtown Loop Improvements in Kansas City (I-35, I-                  76.0     15   5.0   100.0   20.0   56.0   76.0                          Jackson County, Downtown Loop in the city of                                                                                                      Improvements to downtown loop to include lane             275,000   360,000   6   6    Interstate           Current   72    20   Fair        2030 to 2039   Conceptual Plan                                                          $66,000,000    $400,000    2030
       MoDOT                                                                              100   70                                                     MO   KANSAS CITY                                                              Roadway project, Bicycle and pedestrian facility     Roadway                Non-Capacity                                                                                                                                                                                  Economic Vitality, Safety and Security and
                                 670 and US 71) PHASE 1                                                                                                                       Kansas City (I-35, I-670 and US 71).                                                                                                              balancing and access closings/adjustments                                                                                                                                                                                                                      Project
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                Address congestion problems in the Lee’s Summit                                                                                                                                This project relates to the Accessibility,
 163                             US 50 - Chipman Rd to MO 291 North (Corridor                         75.7     13   4.3   86.7    17.3   58.4   75.7                          Jackson County, US 50 from Chipman Road to MO                                                                                                                                                               90,000    120,000   4   6    Freeway/Expressway   Current   40    20   Good        2020 to 2029   Conceptual Plan                                                          $176,249,000   $130,000    2020
       MoDOT                                                                              87    73                                                     MO   LEES SUMMIT                                                              Roadway project, Bicycle and pedestrian facility     Roadway                Capacity       area by reconstructing US 50 from Chipman Rd. to                                                                                                                               Economic Vitality, Safety and Security and
                                 Improvements)                                                                                                                                291 North in the city of Lees Summit.                                                                                                                                                                                                                                                                                                                                                                            Project
                                                                                                                                                                                                                                                                                                                                MO 291 North and widen to six lanes including                                                                                                                                  System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                new interchanges and auxiliary lanes. from Lees
                                                                                                                                                                                                                                                                                                                                Interchange Improvements Limits are                                                                                                                                            This project relates to the Accessibility,
 184                                                                                                  73.6     15   5.0   100.0   20.0   53.6   73.6                                                                                                                                                                                                                                      160,000   210,000   4   6    Interstate           Current   43    20   Good        2020 to 2029   Conceptual Plan                                                          $167,515,000   $150,000    2020
       MoDOT                     I-70 at I-470 - Interchange Improvements                 100   67                                                     MO   INDEPENDENCE      Jackson County, I-70 at I-470.                         Roadway project, Bicycle and pedestrian facility     Roadway                Capacity       Summit Road to Little Blue Parkway. Also includes                                                                                                                              Economic Vitality, Safety and Security and
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Project
                                                                                                                                                                                                                                                                                                                                the limit on I-470 from US 40 to 39th Street.                                                                                                                                  System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               This project relates to the Accessibility,
 161                             I-35 Interchange at US 169 (Northwest Downtown                       73.3     13   4.3   86.7    17.3   56.0   73.3                          Jackson County, I-35 Interchange at US 169             Roadway project, Activity center/node, Bicycle and                                                                                                   100,000   120,000   6   6    Freeway/Expressway   Current   69    20   Poor        2020 to 2029   Conceptual Plan                                                          $80,036,000    $150,000    2020
       MoDOT                                                                              87    70                                                     MO   KANSAS CITY                                                                                                                   Roadway                Non-Capacity   Reconstruct I-35 Interchange at US 169.                                                                                                                                        Economic Vitality, Safety and Security and
                                 Loop) - Reconstruction                                                                                                                       (Northwest Downtown Loop)                              pedestrian facility                                                                                                                                                                                                                                                                                                                                       Project
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                Widen interstate to three lanes using median. Also                                                                                                                             This project relates to the Accessibility,
 188                             I-470 - US 50/MO 350 to US 40 (Corridor                              72.8     15   5.0   100.0   20.0   52.8   72.8                          Jackson County, I-470 from US 50/MO 350 to US                                                                                                                                                               80,000    120,000   4   6    Interstate           Current   29    20   Good        2010 to 2019   Conceptual Plan                                                          $66,491,000    $360,000    2010
       MoDOT                                                                              100   66                                                     MO   LEES SUMMIT                                                              Roadway project, Bicycle and pedestrian facility     Roadway                Capacity       include interchange modifications, including the                                                                                                                               Economic Vitality, Safety and Security and
                                 Improvements)                                                                                                                                40.                                                                                                                                                                                                                                                                                                                                                                                                              Project
                                                                                                                                                                                                                                                                                                                                access point at Colbern Road.                                                                                                                                                  System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                This estimate is based on the initial scoping. The                                                                                                                             This project relates to the Accessibility,
 162                                                                                                  72.5     13   4.3   86.7    17.3   55.2   72.5                          Jackson County, US 50 and MO 291 South in the                                                                                                                                                               80,000    125,000   4   6    Principal Arterial   Current   40    20   Very Poor   2010 to 2019   Conceptual Plan                                                          $13,577,000    $200,000    2010
       MoDOT                     US 50 at MO 291 South - Interchange Improvements         87    69                                                     MO   LEES SUMMIT                                                              Roadway project, Bicycle and pedestrian facility     Roadway                Capacity       scope consists of replacing and raising MO 291                                                                                                                                 Economic Vitality, Safety and Security and
                                                                                                                                                                              city of Lees Summit.                                                                                                                                                                                                                                                                                                                                                                                             Project
                                                                                                                                                                                                                                                                                                                                bridge (A-1483) over US 50. The new bridge will                                                                                                                                System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                have sidewalks and an added left turn lane from

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               This project relates to the Accessibility,
 157                             I-435 - N 48th St to the Missouri River (Corridor                    72.5     13   4.3   86.7    17.3   55.2   72.5                          Clay County, I-435 from North 48th Street to the                                                                                                  Interchange, add lanes, loop ramp and add lanes           82,000    100,000   4   6    Interstate           Current   41    20   Good        2020 to 2029   Conceptual Plan                                                          $170,504,000   $150,000    2020
       MoDOT                                                                              87    69                                                     MO   KANSAS CITY                                                              Roadway project, Bicycle and pedestrian facility     Roadway                Capacity                                                                                                                                                                                      Economic Vitality, Safety and Security and
                                 Improvements)                                                                                                                                Missouri River.                                                                                                                                   on bridge                                                                                                                                                                                                                                                      Project
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               System Performance goals in the plan.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               This project relates to the Accessibility,
 191                             I-70 - Blue Ridge Cutoff to east of Lee's Summit Rd                  72.5     13   4.3   86.7    17.3   55.2   72.5                          Jackson County, I-70 from Blue Ridge Cutoff to east                                                                                               Add capacity by adding lane in each direction from        120,000   160,000   6   8    Interstate           Current   44    20   Excellent   2030 to 2039   Conceptual Plan                                                          $137,344,000   $240,000    2030
       MoDOT                                                                              87    69                                                     MO   INDEPENDENCE                                                          Roadway project, Bicycle and pedestrian facility        Roadway                Capacity                                                                                                                                                                                      Economic Vitality, Safety and Security and
                                 (Corridor Improvements)                                                                                                                      of Lee’s Summit Road.                                                                                                                             Blue Ridge Cutoff to east of Lee’s Summit Road                                                                                                                                                                                                                 Project
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               System Performance goals in the plan.


                                                                                                                                                                                                                                                                                                                                Add one auxiliary Eastbound and Westbound from                                                                                                                                 This project relates to the Accessibility,
 160                             I-435 - Manchester Interchange at 103rd St to West of                72.3     11   3.7   73.3    14.7   57.6   72.3                          Jackson County, I-435 from Manchester                  Roadway project, Activity center/node, Bicycle and                                                                                                   150,000   200,000   8   10   Interstate           Current   44    20   Good        2030 to 2039   Conceptual Plan                                                          $33,207,000    $100,000    2030
       MoDOT                                                                              73    72                                                     MO   KANSAS CITY                                                                                                                   Roadway                Capacity       Holmes Rd. to 103rd St.; widen I-435 to 6 lanes                                                                                                                                Economic Vitality, Safety and Security and
                                 US 71 (Corridor Improvements)                                                                                                                Interchange at 103rd Street to just west of US 71.     pedestrian facility                                                                                                                                                                                                                                                                                                                                       Project
                                                                                                                                                                                                                                                                                                                                from 103rd St. to tie to the Three Trails Crossing                                                                                                                             System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                Interchange. In addition, upgrade the Manchester
                                                                                                                                                                                                                                                                                                                                Add new lane each direction to I-70 in Jackson
                                                                                                                                                                                                                                                                                                                                County from Tracy Ave. to Topping Ave. in order to
                                                                                                                                                                                                                                                                                                                                increase general capacity. Estimate is mostly based                                                                                                                            This project relates to the Accessibility,
 192                             I-70 - Tracy to Topping (Downtown to I-435 Corridor                  71.2     15   5.0   100.0   20.0   51.2   71.2                                                                                                                                                                                                                                      114,000   130,200   6   8    Interstate           Current   44    20   Good        2030 to 2039   Conceptual Plan                                                          $238,647,000   $170,000    2030
       MoDOT                                                                              100   64                                                     MO   KANSAS CITY       Jackson County, I-70 from Tracy to Topping.            Roadway project, Bicycle and pedestrian facility     Roadway                Capacity       on the I-70 First Tier EIS Cost Summary from May                                                                                                                               Economic Vitality, Safety and Security and
                                 Improvements)                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 Project
                                                                                                                                                                                                                                                                                                                                2009 completed by HNTB. The limits described                                                                                                                                   System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                above are defined as the “urban” sub-area of that
                                                                                                                                                                                                                                                                                                                                report.
                                                                                                                                                                                                                                                                                                                                Reduce interchange congestion and improve traffic                                                                                                                              This project relates to the Accessibility,
 146                             I-35 at Pleasant Valley Rd - Interchange Improvements                70.9     13   4.3   86.7    17.3   53.6   70.9                                                                                                                                                                                                                                      80,000    120,000   6   6    Interstate           Current   50    20   Good        2020 to 2029   Conceptual Plan                                                          $31,604,000    $15,000     2020
       MoDOT                                                                              87    67                                                     MO   PLEASANT VALLEY   Clay County, I-35 at Pleasant Valley Road.             Roadway project, Bicycle and pedestrian facility     Roadway                Non-Capacity   flow. Realign I-35 to produce a more typical                                                                                                                                   Economic Vitality, Safety and Security and
                                 (Cost includes projects 234 and 631)                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Project
                                                                                                                                                                                                                                                                                                                                Diamond Type interchange.                                                                                                                                                      System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                This project consists of rebuilding and adding a
                                                                                                                                                                                                                                                                                                                                third lane in both directions on Route I-35 from the
                                                                                                                                                                                                                                                                                                                                I-29/I-35 split to MO 33 (Lightburne Road). It was                                                                                                                             This project relates to the Accessibility,
 156                             I-35 - I-29/I-35 split to US 69/MO 33 (Corridor                      70.4     15   5.0   100.0   20.0   50.4   70.4                          Clay County, I-35 from I-29/35 split to US 69/MO                                                                                                                                                            70,000    110,000   4   6    Interstate           Current   53    20   Good        2020 to 2029   Conceptual Plan                                                          $277,444,000   $550,000    2020
       MoDOT                                                                              100   63                                                     MO   MULTIPLE CITIES                                                          Roadway project, Bicycle and pedestrian facility     Roadway                Capacity       assumed all interchanges would need to be                                                                                                                                      Economic Vitality, Safety and Security and
                                 Improvements)                                                                                                                                33.                                                                                                                                                                                                                                                                                                                                                                                                              Project
                                                                                                                                                                                                                                                                                                                                reconstructed. The I-29/I-35, I-35/I-435 and                                                                                                                                   System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                Pleasant Valley Road Interchanges were not
                                                                                                                                                                                                                                                                                                                                included in the estimate. Also all overpass bridges
                                                                                                                                                                                                                                                                                                                                Widening of US 71 to six lanes between North Cass                                                                                                                              This project relates to the Accessibility,
 147                             US 71 - 155th St to North Cass Pkwy (Corridor                        69.9     11   3.7   73.3    14.7   55.2   69.9                          Jackson County, US Route 71 from 155th Street to                                                                                                                                                            50,000    110,000   4   6    Freeway/Expressway   Current   56    20   Good        2020 to 2029   Conceptual Plan                                                          $34,641,000    $210,000    2020
       MoDOT                                                                              73    69                                                     MO   MULTIPLE CITIES                                                          Roadway project, Bicycle and pedestrian facility     Roadway                Capacity       Parkway and 155th Street. Replacing bridge at                                                                                                                                  Economic Vitality, Safety and Security and
                                 Improvements)                                                                                                                                North Cass Parkway.                                                                                                                                                                                                                                                                                                                                                                                              Project
                                                                                                                                                                                                                                                                                                                                155th Street over US 71 with a new diamond                                                                                                                                     System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                interchange. This will corridor from future upgrade
                                                                                                                                                                                                                                                                                                                                Improve the I-29/I-35 be part of the north of                                                                                                                                  This project relates to the Accessibility,
 150                             I-29 - MO 210 (Armour Rd) to US 169 (Corridor                        69.9     11   3.7   73.3    14.7   55.2   69.9                                                                                                                                                                                                                                      75,000    120,000   4   4    Interstate           Current   53    20   Good        2020 to 2029   Conceptual Plan                                                          $92,000,000    $150,000    2020
       MoDOT                                                                              73    69                                                     MO   MULTIPLE CITIES   Clay County, I-29 from MO 210 to US 169.               Roadway project, Bicycle and pedestrian facility     Roadway                Non-Capacity   Armour Road (Route 210) Interchange to the Route                                                                                                                               Economic Vitality, Safety and Security and
                                 Improvements) INTERCHANGE ONLY                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                Project
                                                                                                                                                                                                                                                                                                                                169 Interchange.                                                                                                                                                               System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                Widening and Interchange Improvements on I-70                                                                                                                                  This project relates to the Accessibility,
 182                             I-70 - west of Little Blue Parkway to Lafayette County               65.9     11   3.7   73.3    14.7   51.2   65.9                          Jackson County, I-70 from west of Little Blue                                                                                                                                                               100,000   140,000   4   8    Interstate           Current   59    20   Good        2010 to 2019   Conceptual Plan                                                          $45,000,000    $750,000    2010
       MoDOT                                                                              73    64                                                     MO   MULTIPLE CITIES                                                          Roadway project, Bicycle and pedestrian facility     Roadway                Capacity       from west of Little Blue Expressway to Lafayette                                                                                                                               Economic Vitality, Safety and Security and
                                 Line (Corridor Improvements) PHASE 1                                                                                                         Parkway to Lafayette County Line.                                                                                                                                                                                                                                                                                                                                                                                Project
                                                                                                                                                                                                                                                                                                                                County Line. This includes the addition of truck                                                                                                                               System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                only lanes.                                                                                                                                                                    This project relates to the Accessibility,
 174                                                                                                  61.3     13   4.3   86.7    17.3   44.0   61.3                          Clay County, MO Route 92 from Nation Rd to I-35.                                                                                                                                                            19,000    46,000    2   4    Principal Arterial   Current   75    20   Fair        2010 to 2019   Preliminary Plan                                                          $6,014,000    $28,000     2010
       MoDOT                     MO 92 - Nation Rd to I-35                                87    55                                                     MO   KEARNEY                                                                  Roadway project, Bicycle and pedestrian facility     Roadway                Capacity       Widening, grading, drainage and pavement                                                                                                                                       Economic Vitality, Safety and Security and
                                                                                                                                                                              MoDOT Project J4P1748.                                                                                                                                                                                                                                                                                                                                                                                           Project
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               This project relates to the Accessibility,
 148                             MO 210 - Eldon Rd to MO 291 (Corridor                                57.6     15   5.0   100.0   20.0   37.6   57.6                          Clay County, MO Route 210 from Eldon Road to                                                                                                      This project consists of widening MO Route 210            15,000    30,000    2   4    Freeway/Expressway   Current   36    20   Good        2010 to 2019   Final Plan                                                               $19,603,000    $155,000    2010
       MoDOT                                                                              100   47                                                     MO   KANSAS CITY                                                              Roadway project                                      Roadway                Capacity                                                                                                                                                                                      Economic Vitality, Safety and Security and
                                 Improvements)                                                                                                                                MO Route 291.                                                                                                                                     from two lanes to 4 lanes using an urban section.                                                                                                                                                                                                              Project
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               This project relates to the Accessibility,
 194                             Downtown Loop Improvements in Kansas City (I-35, I-                  76.0     15   5.0   100.0   20.0   56.0   76.0                          Jackson County, Downtown Loop in the city of                                                                                                      Improvements to downtown loop to include lane             275,000   360,000   6   6    Interstate           Current   72    20   Fair        2030 to 2039   Conceptual Plan                                                          $248,550,000   $400,000    2030
       MoDOT                                                                              100   70                                                     MO   KANSAS CITY                                                              Roadway project, Bicycle and pedestrian facility     Roadway                Non-Capacity                                                                                                                                                                                  Economic Vitality, Safety and Security and
                                 670 and US 71) PHASE 2                                                                                                                       Kansas City (I-35, I-670 and US 71).                                                                                                              balancing and access closings/adjustments                                                                                                                                                                                                                      Project
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                For this project two existing loop ramps will be                                                                                                                               This project relates to the Accessibility,
 189                                                                                                  69.3     13   4.3   86.7    17.3   52.0   69.3                                                                                                                                                                                                                                      130,000   200,000   0   4    Interstate           Current   31    20   Good        2020 to 2029   Conceptual Plan                                                          $50,365,000    $650,000    2020
       MoDOT                     I-470 at US 50/MO 350 - Interchange Improvements         87    65                                                     MO   LEES SUMMIT       Jackson County, I-470 at US 50/MO 350.                 Roadway project, Bicycle and pedestrian facility     Roadway                Capacity       removed and replaced by two flyover exits in the I-                                                                                                                            Economic Vitality, Safety and Security and
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Project
                                                                                                                                                                                                                                                                                                                                470 & US 50/MO 350 Interchange. Also during this                                                                                                                               System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                project US 50 will be widened south section of
                                                                                                                                                                                                                                                                                                                                This project consists of changing thisto Chipman                                                                                                                               This project relates to the Accessibility,
 151                                                                                                  68.8     15   5.0   100.0   20.0   48.8   68.8                                                                                                                                                                                                                                      18,000    30,000    2   4    Principal Arterial   Current   73    20   Fair        2020 to 2029   Conceptual Plan                                                          $31,949,000    $140,000    2020
       MoDOT                     MO 291 - I-35 to I-435 (Corridor Improvements)           100   61                                                     MO   KANSAS CITY       Clay County, MO Route 291 from I-35 to I-435.          Roadway project, Bicycle and pedestrian facility     Roadway                Capacity       roadway from its current two lane configuration to                                                                                                                             Economic Vitality, Safety and Security and
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Project
                                                                                                                                                                                                                                                                                                                                a four lane facility using an urban typical section                                                                                                                            System Performance goals in the plan.
                                                                                                                                                                              Platte County, US Route 69 southbound bridge                                                                                                      with a 45 mph design speed. Left turn lanes and                                                                                                                                This project relates to the Accessibility,
 176                             US 69 Bridge Improvements - southbound structure                     67.5     11   3.7   73.3    14.7   52.8   67.5                                                                                                                                                                            Replace the structurally deficient Fairfax Bridge No.      7,500    10,000    2   0    Principal Arterial   Current   74    75   Poor        2020 to 2029   Conceptual Plan                                                          $39,543,000    $15,000     2020
       MoDOT                                                                              73    66                                                     MO   MULTIPLE CITIES   structure over the Missouri River Bridge (Fairfax      Roadway project, Bicycle and pedestrian facility     Roadway                Non-Capacity                                                                                                                                                                                  Economic Vitality, Safety and Security and
                                 over the Missouri River (Fairfax Bridge)                                                                                                                                                                                                                                                       K0456R, over the Missouri River                                                                                                                                                                                                                                Project
                                                                                                                                                                              Bridge)                                                                                                                                                                                                                                                                                                                          System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                Widening and Interchange Improvements on I-70                                                                                                                                  This project relates to the Accessibility,
 182                             I-70 - west of Little Blue Parkway to Lafayette County               65.9     11   3.7   73.3    14.7   51.2   65.9                          Jackson County, I-70 from west of Little Blue                                                                                                                                                               100,000   140,000   4   8    Interstate           Current   59    20   Good        2010 to 2019   Conceptual Plan                                                          $328,223,000   $750,000    2010
       MoDOT                                                                              73    64                                                     MO   MULTIPLE CITIES                                                          Roadway project, Bicycle and pedestrian facility     Roadway                Capacity       from west of Little Blue Expressway to Lafayette                                                                                                                               Economic Vitality, Safety and Security and
                                 Line (Corridor Improvements) PHASE 2                                                                                                         Parkway to Lafayette County Line.                                                                                                                                                                                                                                                                                                                                                                                Project
                                                                                                                                                                                                                                                                                                                                County Line. This includes the addition of truck                                                                                                                               System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                only project consists of rebuilding and adding a
                                                                                                                                                                                                                                                                                                                                This lanes.                                                                                                                                                                    This project relates to the Accessibility,
 155                             I-35 - US 69/MO 33 to Clinton County Line (Corridor                  65.9     11   3.7   73.3    14.7   51.2   65.9                          Clay County, I-29 from US 69/MO 33 to Clinton                                                                                                                                                               35,000    55,000    4   6    Interstate           Current   42    20   Excellent   2030 to 2039   Conceptual Plan                                                          $183,412,000   $660,000    2030
       MoDOT                                                                              73    64                                                     MO   CLAY COUNTY                                                              Roadway project, Bicycle and pedestrian facility     Roadway                Capacity       third lane in both directions on Route I-35 from the                                                                                                                           Economic Vitality, Safety and Security and
                                 Improvements)                                                                                                                                County Line.                                                                                                                                                                                                                                                                                                                                                                                                     Project
                                                                                                                                                                                                                                                                                                                                Clinton County Line to MO 33. It was assumed all                                                                                                                               System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                interchanges would of connecting the
                                                                                                                                                                                                                                                                                                                                This project consistsneed to be reconstructed. It                                                                                                                              This project relates to the Accessibility,
 187                             I-470 - Blue Ridge to US 50/MO 350 (Corridor                         63.7     7    2.3   46.7    9.3    54.4   63.7                          Jackson County, I-470 from Blue Ridge to US                                                                                                                                                                 100,000   140,000   6   8    Interstate           Current   40    20   Good        2020 to 2029   Conceptual Plan                                                          $84,702,000    $230,000    2020
       MoDOT                                                                              47    68                                                     MO   MULTIPLE CITIES                                                          Roadway project, Bicycle and pedestrian facility     Roadway                Capacity       acceleration/deceleration lanes into a continuous                                                                                                                              Economic Vitality, Safety and Security and
                                 Improvements)                                                                                                                                50/MO 350.                                                                                                                                                                                                                                                                                                                                                                                                       Project
                                                                                                                                                                                                                                                                                                                                auxiliary lane along I-470 between Blue Ridge                                                                                                                                  System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                Boulevard & the US 50 Interchange. This work will                                                                                                                              This project relates to the Accessibility,
 159                             Rte V (Noland Rd) - US 40 to MO 350 (Corridor                        63.7     13   4.3   86.7    17.3   46.4   63.7                                                                                                                                                                            Widen to 4 lanes; grading, paving and bridge              13,000    20,000    2   4    Principal Arterial   Current   74    20   Fair        2020 to 2029   Conceptual Plan                                                          $55,003,000    $150,000    2020
       MoDOT                                                                              87    58                                                     MO   KANSAS CITY       Jackson County, Route V from US 40 to MO 350.          Roadway project, Bicycle and pedestrian facility     Roadway                Capacity                                                                                                                                                                                      Economic Vitality, Safety and Security and
                                 Improvements)                                                                                                                                                                                                                                                                                  include pedestrian facilities at the intersections.                                                                                                                                                                                                            Project
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               System Performance goals in the plan.
                                                                                                                                                                              Platte County, MO Route 45 bridge over the Platte                                                                                                 The project consists of replacing Bridge No. K0266                                                                                                                             This project relates to the Accessibility,
 183                             MO 45 Bridge Improvements - over the Platte River                    62.4     16   4.0   80.0    16.0   46.4   62.4                                                                                                                                                                                                                                       5,000     6,000    2   2    Minor Arterial       Current   75    75   Poor        2010 to 2019   Preliminary Plan                                                         $10,017,000    $15,000     2010
       MoDOT                                                                              80    58                                                     MO   FARLEY            River near the city of Farley. MoDOT project           Roadway project, Bicycle and pedestrian facility     Roadway                Non-Capacity   over the Platte River. The existing bridge is                                                                                                                                  Economic Vitality, Safety and Security and
                                 near the city of Farley                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       Project
                                                                                                                                                                              J4P2203.                                                                                                                                          structurally deficient and functionally obsolete.                                                                                                                              System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                The project bridge is 548’ long, Route 45 from
                                                                                                                                                                                                                                                                                                                                This existing is to widen existing 22’ wide curb to                                                                                                                            This project relates to the Accessibility,
 168                                                                                                  58.8     14   3.5   70.0    14.0   44.8   58.8                          Platte County, Route 45 from I-435 to Route K.                                                                                                                                                               7,000    40,000    2   4    Principal Arterial   Current   76    20   Poor        2010 to 2019   Preliminary Plan                                                         $26,944,000    $50,000     2010
       MoDOT                     MO 45 - I-435 to Route K                                 70    56                                                     MO   PARKVILLE                                                                Roadway project, Bicycle and pedestrian facility     Roadway                Capacity       Route K to I-435 from 2-lane roadway to a 4-lane                                                                                                                               Economic Vitality, Safety and Security and
                                                                                                                                                                              MoDOT Project J4P1108C.                                                                                                                                                                                                                                                                                                                                                                                          Project
                                                                                                                                                                                                                                                                                                                                roadway. The project also includes multi-use trail,                                                                                                                            System Performance goals in the plan.
                                                                                                                                                                              Jackson/Clay Counties, MO Route 291 over the                                                                                                      retaining walls, guardrail, drainage structures,
                                                                                                                                                                                                                                                                                                                                Remove existing bridge on the northbound lanes                                                                                                                                 This project relates to the Accessibility,
 193                             MO 291 Bridge Improvements - over the Missouri                       56.8     16   4.0   80.0    16.0   40.8   56.8                                                                                                                                                                                                                                      10,000    16,000    2   2    Freeway/Expressway   Current   60    75   Very Poor   2010 to 2019   Conceptual Plan                                                          $23,613,000    $15,000     2010
       MoDOT                                                                              80    51                                                     MO   SUGAR CREEK       Missouri River (northbound structure). MoDOT           Roadway project, Bicycle and pedestrian facility     Roadway                Non-Capacity   and replace with new bridge over the Missouri                                                                                                                                  Economic Vitality, Safety and Security and
                                 River (Northbound Bridge over Missouri River)                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 Project
                                                                                                                                                                              project number J4P2286.                                                                                                                           river on MO 291.                                                                                                                                                               System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                A new 4 lane divided interstate/freeway facility                                                                                                                               This project relates to the Accessibility,
 149                             I-435 to I-35 - NE corner of I-435 east to I-35 -                    52.8     9    3.0   60.0    12.0   40.8   52.8                          Clay County, Perimeter Transportation Needs                                                                                                                                                                    0      20,000    0   4    Interstate           Future    0     20   Good        2030 to 2039   Conceptual Plan                                                          $305,100,600   $200,000    2030
       MoDOT                                                                              60    51                                                     MO   KANSAS CITY                                                              Roadway project, Bicycle and pedestrian facility     Roadway                Capacity       from the northeast corner of I-435 basically                                                                                                                                   Economic Vitality, Safety and Security and
                                 Construction of a new connecting corridor                                                                                                    Assessment (PTNA) Corridor I-435/I-35 Connector.                                                                                                                                                                                                                                                                                                                                                                 Project
                                                                                                                                                                                                                                                                                                                                straight east intersecting I-35 between Liberty and                                                                                                                            System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                Kearney. The of a new for the project
                                                                                                                                                                                                                                                                                                                                An extension estimate 4 lane divided will include                                                                                                                              This project relates to the Accessibility,
 456                             I-35 to US 69 - Construction of a new connecting                     47.7     7    2.3   46.7    9.3    38.4   47.7                                                                                                                                                                                                                                         0      16,000    0   4    Interstate           Future    0     20   Good        2030 to 2039   Conceptual Plan                                                          $103,736,000   $150,000    2030
       MoDOT                                                                              47    48                                                     MO   CLAY COUNTY       Clay County, new corridor connecting I-35 to US 69 Roadway project, Bicycle and pedestrian facility         Roadway                Capacity       interstate/freeway facility from I-435 to I-35. The                                                                                                                            Economic Vitality, Safety and Security and
                                 corridor                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Project
                                                                                                                                                                                                                                                                                                                                extension would proceed from the future system-                                                                                                                                System Performance goals in the plan.
                                                                                                                                                                              Various Counties, Various Locations. Improve                                                                                                      This project will improve I-35 and continue to in
                                                                                                                                                                                                                                                                                                                                to-system interchange at various intersections US                                                                                                                              This project relates to the Accessibility,
 212                             MoDOT - Various intersection improvements to                         43.5     11   3.7   73.3    14.7   28.8   43.5                                                                                 Management and operations program, Roadway           Management &                                                                                       0         0      0   0    Principal Arterial   Current   0     20   Fair        2010 to 2019   Conceptual Plan                                                          $10,000,000     $7,000     2010
       MoDOT                                                                              73    36                                                     MO   MULTIPLE CITIES   intersections in the region to improve traffic                                                                                     Non-Capacity   the region by constructing turn lanes and other                                                                                                                                Economic Vitality, Safety and Security and
                                 improve traffic flow                                                                                                                                                                                project, Activity center/node                        Operations                                                                                                                                                                                                                                                                                           Project
                                                                                                                                                                              control.                                                                                                                                          traffic flow improvements. This project is a                                                                                                                                   System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                general program that could be implemented by
                                                                                                                                                                                                                                                                                                                                This project will implement signal                                                                                                                                             This project relates to the Accessibility,
 216                             MoDOT - Various Corridor Improvements through                        28.5     7    2.3   46.7    9.3    19.2   28.5                          Various Counties, Various Routes on the state          Management and operations program, Roadway           Management &                                                                                       0         0      0   0    Principal Arterial   Current   0     20   Fair        2010 to 2019   Conceptual Plan                                                           $6,000,000     $7,000     2010
       MoDOT                                                                              47    24                                                     MO   MULTIPLE CITIES                                                                                                                                      Non-Capacity   coordination/synchronization systems on corridors                                                                                                                              Economic Vitality, Safety and Security and
                                 Signal Synchronization/Coordination                                                                                                          highway system.                                        project                                              Operations                                                                                                                                                                                                                                                                                           Project
                                                                                                                                                                                                                                                                                                                                on the state system. Example corridors that have                                                                                                                               System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                This project willare MO 7full depth pavement to
                                                                                                                                                                                                                                                                                                                                been identified provide from Pink Hill Road                                                                                                                                    This project relates to the Accessibility,
 211                             MoDOT - Various Corridors to perform full depth                      28.3     11   3.7   73.3    14.7   13.6   28.3                          Various Counties, Various State Highway Corridors      Roadway project, Management and operations                                                                                                              0         0      0   0    Interstate           Current   0     20   Poor        2020 to 2029   Conceptual Plan                                                          $242,200,000   $75,000     2020
       MoDOT                                                                              73    17                                                     MO   MULTIPLE CITIES                                                                                                               Roadway                Non-Capacity   replacement on various corridors in the urban                                                                                                                                  Economic Vitality, Safety and Security and
                                 pavement replacement                                                                                                                         in the urban Kansas City area                          program                                                                                                                                                                                                                                                                                                                                                   Project
                                                                                                                                                                                                                                                                                                                                Kansas City area. Potential corridors are I-70 from                                                                                                                            System Performance goals in the plan.
                                                                                                                                                                                                                                                                                                                                I-435 to I-470 and from MO 7 to the Jackson



Local Projects
                                                                                                                                                                                                                                     Activity center/node, Roadway project, Transit                                             IMPROVE CAPACITY OF EXISTING SIGNAL SYSTEM
 774                                                                                                  79.5     11   3.7   73.3    14.7   64.8   79.5                                                                                                                                                                                                                                      43,553    67,220    6   6    Principal Arterial   Current   70    50   Poor        2010 to 2019   Final Plan                                                                $3,556,000    $12,500     2010
       City of Kansas City, MO   Southwest Trafficway - Westport Rd to 43rd St            73    81                                                     MO   KANSAS CITY       Westport Road to 43rd Street                           project, Bicycle and pedestrian facility,            Activity Center/Node   Non-Capacity   AND RECONSTRUCT EXISTING FACILITIES OF                                                                                                                                         #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Project
                                                                                                                                                                                                                                     Management and operations program                                                          "WESTPORT TRIANGLE"

 646                                                                                                  77.6     15   5.0   100.0   20.0   57.6   77.6                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                   5,549    22,750    2   4    Minor Arterial       Current   51    30   Very Poor   2010 to 2019   Final Plan                                                               $25,670,800    $10,000     2010
       City of Kansas City, MO   Shoal Creek Parkway - Platte Purchase Dr to Oak Trfwy    100   72                                                     MO   KANSAS CITY       Platte Purchase Dr to Oak Tfrwy                        Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES AND BUILD INTERCHANGE                                                                                                                                                                                                                                    Project

                                 I-35 and Pleasant Valley Interchange Interim                                                                                                 I-35 and Pleasant Valley Road/South Liberty                                                                                                       The project area effects the Interstate 35 On- and
 234                                                                                                  76.0     15   5.0   100.0   20.0   56.0   76.0                                                                                                                                                                                                                                      28,000    43,000    4   6    Principal Arterial   Current   30    20   Fair        2010 to 2019   Preliminary Plan                                                             $0           $0        2010
       City of Liberty           Improvements (Cost accounted for in MoDOT project        100   70                                                     MO   LIBERTY           Parkway affecting the cities of:                    Roadway project                                         Roadway                Capacity       Off-Ramps at US Highway 69 and Pleasant Valley                                                                                                                                 #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Project
                                 146)                                                                                                                                         Liberty, Claycomo, Pleasant Valley and Kansas City,                                                                                               Road, US Highway 69 between proposed Flintlock
                                                                                                                                                                              Missouri                                                                                                                                          Road and Pleasant Valley Road, Pleasant Valley
 392                                                                                                  76.0     15   5.0   100.0   20.0   56.0   76.0                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                   4,233    12,000    2   4    Principal Arterial   Current   80    30   Poor        2010 to 2019   Final Plan                                                               $10,738,220    $10,000     2010
       City of Kansas City, MO   22nd/23rd St - Brooklyn to I-70                          100   70                                                     MO   KANSAS CITY       Brooklyn to I-70                                       Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 543                                                                                                  72.8     15   5.0   100.0   20.0   52.8   72.8                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                   1,154    17,030    2   4    Minor Arterial       Current   51    30   Very Poor   2010 to 2019   Final Plan                                                                $7,497,600    $10,000     2010
       City of Kansas City, MO   Congress - NW 112th St to Cookingham Dr                  100   66                                                     MO   KANSAS CITY       NW 112th Street to Cookingham Drive                    Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 550                                                                                                  72.8     15   5.0   100.0   20.0   52.8   72.8                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                   4,344    24,037    2   4    Minor Arterial       Current   60    30   Poor        2020 to 2029   Final Plan                                                               $13,951,500    $10,000     2020
       City of Kansas City, MO   Cookingham - Oak Trfwy To Woodland Ave                   100   66                                                     MO   KANSAS CITY       Oak Tfrwy TO Woodland Ave                              Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 547                                                                                                  72.8     15   5.0   100.0   20.0   52.8   72.8                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                   3,733    24,460    2   4    Minor Arterial       Current   60    30   Very Poor   2020 to 2029   Final Plan                                                               $19,820,000    $10,000     2020
       City of Kansas City, MO   Cookingham - Woodland Ave To I-435                       100   66                                                     MO   KANSAS CITY       Woodland Ave TO I-435                                  Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 578                                                                                                  71.2     15   5.0   100.0   20.0   51.2   71.2                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 3                   6,400    10,800    2   3    Minor Arterial       Current   51    30   Very Poor   2020 to 2029   Final Plan                                                               $11,498,095    $10,000     2020
       City of Kansas City, MO   Lees Summit Road - Lakewood Blvd to Phelps Rd            100   64                                                     MO   KANSAS CITY       Lakewood Blvd TO Phelps Road                           Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 577                                                                                                  71.2     15   5.0   100.0   20.0   51.2   71.2                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 3                   8,700    15,200    2   3    Minor Arterial       Current   51    30   Poor        2020 to 2029   Final Plan                                                               $12,833,250    $10,000     2020
       City of Kansas City, MO   Lees Summit Road - Phelps Rd to US 40                    100   64                                                     MO   KANSAS CITY       Phelps Road to US 40                                   Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 557                                                                                                  70.9     7    2.3   46.7    9.3    61.6   70.9                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                   7,909    21,742    2   4    Principal Arterial   Current   51    30   Very Poor   2030 to 2039   Final Plan                                                               $47,925,000    $10,000     2030
       City of Kansas City, MO   Front St - I-35 To Chouteau                              47    77                                                     MO   KANSAS CITY       I-35 TO Chouteau                                       Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 579                                                                                                  70.4     15   5.0   100.0   20.0   50.4   70.4                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 3                   5,500     7,100    2   3    Minor Arterial       Current   51    30   Poor        2020 to 2029   Final Plan                                                               $16,614,000    $10,000     2020
       City of Kansas City, MO   Lees Summit Rd - Gregory to Lakewood Blvd                100   63                                                     MO   KANSAS CITY       Gregoryto Lakewood Blvd                                Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 558                                                                                                  70.1     7    2.3   46.7    9.3    60.8   70.1                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 6                  17,212    41,235    4   6    Principal Arterial   Current   51    30   Very Poor   2030 to 2039   Final Plan                                                               $30,615,200    $10,000     2030
       City of Kansas City, MO   Front St - Chouteau To I-435                             47    76                                                     MO   KANSAS CITY       Chouteau TO I-435                                      Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 522                                                                                                  69.9     11   3.7   73.3    14.7   55.2   69.9                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                   6,526    19,060    2   4    Not Applicable       Current   51    30   Very Poor   2020 to 2029   Final Plan                                                               $13,206,000    $10,000     2020
       City of Kansas City, MO   Amity - MO-152 to Tiffany Springs Pkwy                   73    69                                                     MO   KANSAS CITY       MO-152 to Tiffany Springs Pkwy                         Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 562                                                                                                  69.6     15   5.0   100.0   20.0   49.6   69.6                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 3                   5,283    17,080    2   4    Minor Arterial       Current   51    30   Very Poor   2010 to 2019   Final Plan                                                                $8,660,500    $10,000     2010
       City of Kansas City, MO   Green Hills - NW 72nd St to Barry Rd                     100   62                                                     MO   KANSAS CITY       NW 72nd Street to Barry Road                           Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 621                                                                                                  69.6     15   5.0   100.0   20.0   49.6   69.6                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                   686      20,320    2   4    Minor Arterial       Current   51    30   Poor        2030 to 2039   Final Plan                                                               $17,980,000    $10,000     2030
       City of Kansas City, MO   NW 108th St - Skyview Ave to Platte Purchase Dr          100   62                                                     MO   KANSAS CITY       Skyview Ave to Platte Purchase Dr                      Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 582                                                                                                  68.8     15   5.0   100.0   20.0   48.8   68.8                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                   9,300    13,600    2   4    Minor Arterial       Current   51    30   Very Poor   2010 to 2019   Final Plan                                                               $13,216,650    $10,000     2010
       City of Kansas City, MO   Lees Summit Road - 85th St to Gregory                    100   61                                                     MO   KANSAS CITY       85th Street to Gregory                                 Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project

                                                                                                                                                                                                                                                                                                                                CAPACITY IMPROVEMENTS TO ROUTE 45/NW 64TH
 729                                                                                                  68.8     15   5.0   100.0   20.0   48.8   68.8                                                                                                                                                                                                                                      25,624    48,460    4   6    Principal Arterial   Current   45    50   Poor        2010 to 2019   Final Plan                                                               $16,655,000    $25,000     2010
       City of Kansas City, MO   NW 64th St - Cosby to Roanridge                          100   61                                                     MO   KANSAS CITY       Cosby to Roanridge                                     Roadway project                                      Roadway                Capacity       STREET AND I-29 INTERCHANGE INCLUDING OUTER                                                                                                                                    #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Project
                                                                                                                                                                                                                                                                                                                                ROAD RELOCATION

 339                                                                                                  68.3     5    1.7   33.3    6.7    61.6   68.3                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 3                   3,393     4,750    2   3    Principal Arterial   Current   51    30   Poor        2010 to 2019   Final Plan                                                                $5,738,220    $10,000     2010
       City of Kansas City, MO   135th St - MO 150 to Holmes Rd                           33    77                                                     MO   KANSAS CITY       MO-150 to Holmes                                       Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 546                                                                                                  68.3     11   3.7   73.3    14.7   53.6   68.3                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                   2,137    14,700    2   4    Minor Arterial       Current   51    30   Poor        2010 to 2019   Final Plan                                                                $7,497,600    $10,000     2010
       City of Kansas City, MO   Congress - Ambassador Dr To NW 108th St                  73    67                                                     MO   KANSAS CITY       Ambassador Dr TO NW 108th Street                       Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project

                                                                                                                                                                                                                                                                                                                                Reconstruct/widen the existing interchange at
 121                                                                                                  68.3     11   3.7   73.3    14.7   53.6   68.3                          Intersection of Todd George Parkway/Ranson Road                                                                                                                                                             42,000    72,000    4   6    Freeway/Expressway   Current   15    40   Poor        2020 to 2029   Conceptual Plan                                                          $18,000,000     $3,700     2020
       City of Lees Summit       Todd George at US 50 Hwy - Interchange                   73    67                                                     MO   LEES SUMMIT                                                       Roadway project                                             Roadway                Capacity       Todd George Parkway/Ranson Road and US 50                                                                                                                                      #######################################
                                                                                                                                                                              and US 50 Highway                                                                                                                                                                                                                                                                                                                                                                                                Project
                                                                                                                                                                                                                                                                                                                                Highway. Capacity improvements will upgrade the
                                                                                                                                                                                                                                                                                                                                existing 4-lane arterial with single left-turn lanes to
 637                                                                                                  68.0     15   5.0   100.0   20.0   48.0   68.0                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 3                   2,387    16,700    2   3    Minor Arterial       Current   51    30   Poor        2020 to 2029   Final Plan                                                               $19,880,000    $10,000     2020
       City of Kansas City, MO   Pleasant Valley Rd - Route 1 to Searcy Creek Pkwy        100   60                                                     MO   KANSAS CITY       Route 1 to Searcy Creek Pkwy                           Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 617                                                                                                  68.0     15   5.0   100.0   20.0   48.0   68.0                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 3                   2,001    23,230    2   3    Minor Arterial       Current   51    30   Poor        2030 to 2039   Final Plan                                                                $9,372,000    $10,000     2030
       City of Kansas City, MO   NE 96th St - North Oak to Maplewoods Pkwy                100   60                                                     MO   KANSAS CITY       North Oak to Maplewoods Pkwy                           Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 549                                                                                                  67.7     13   4.3   86.7    17.3   50.4   67.7                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                   6,432    27,006    2   6    Minor Arterial       Current   60    30   Very Poor   2010 to 2019   Final Plan                                                               $14,910,000    $10,000     2010
       City of Kansas City, MO   Cookingham - Platte Purchase Dr To Oak Trfwy             87    63                                                     MO   KANSAS CITY       Platte Purchase Dr TO Oak Tfrwy                        Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 591                                                                                                  67.2     9    3.0   60.0    12.0   55.2   67.2                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                   3,905    21,800    2   4    Minor Arterial       Current   80    30   Very Poor   2030 to 2039   Final Plan                                                               $17,466,000    $10,000     2030
       City of Kansas City, MO   Line Creek Pkwy - I-29 to Bell St                        60    69                                                     MO   KANSAS CITY       I-29 to Bell Street                                    Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 776                                                                                                  67.2     9    3.0   60.0    12.0   55.2   67.2                                                                                                                                                                            RECONSTRUCT EXISTING ROADWAY AND WIDEN TO                  8,189    12,223    2   3    Minor Arterial       Current   50    30   Poor        2030 to 2039   Final Plan                                                               $33,655,050    $10,000     2030
       City of Kansas City, MO   Wornall Rd - Red Bridge to 135th St                      60    69                                                     MO   KANSAS CITY       Red Bridge Rd to 135th Street                          Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                3 LANES                                                                                                                                                                                                                                                        Project

                                                                                                                                                                                                                                                                                                                                The 350 Highway / Blue Parkway Corridor Plan was                                                                                                                               This project addresses 7 of the 9 goals set for
 604                             Raytown 350 Highway & Raytown Rd. Intersection                       67.2     15   5.0   100.0   20.0   47.2   67.2                                                                                 Activity center/node, Roadway project, Transit                                                                                                       27,006       0      4   4    Freeway/Expressway   Current   60    50   Very Poor   2010 to 2019   Preliminary Plan                                                         $36,988,517    $12,000     2010
       City of Raytown                                                                    100   59                                                     MO   RAYTOWN           350 Hwy from Sterling to Maple                                                                              Activity Center/Node   Non-Capacity   a collaboration between Raytown, Kansas City, and                                                                                                                              Transportation Outlook 2040. The project
                                 Alignment - 350 Hwy from Sterling Ave to Maple                                                                                                                                                      project, Bicycle and pedestrian facility                                                                                                                                                                                                                                                                                                                  Project
                                                                                                                                                                                                                                                                                                                                MoDOT. This study calls for the divided 350                                                                                                                                    addresses Accessibility, Climate Change & Energy
                                                                                                                                                                                                                                                                                                                                highway through Raytown to be combined within
 527                                                                                                  66.9     7    2.3   46.7    9.3    57.6   66.9                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 6                  31,500    52,300    4   6    Principal Arterial   Current   51    30   Very Poor   2020 to 2029   Final Plan                                                               $14,462,700    $10,000     2020
       City of Kansas City, MO   Blue Parkway - Elmwood to Eastwood                       47    72                                                     MO   KANSAS CITY       Elmwoodto Eastwood                                     Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 523                                                                                                  66.9     7    2.3   46.7    9.3    57.6   66.9                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 3                   5,668       0      2   3    Principal Arterial   Current   51    30   Very Poor   2030 to 2039   Conceptual Plan                                                          $23,962,500    $10,000     2030
       City of Kansas City, MO   Bannister Rd - Raytown Rd to Route 350                   47    72                                                     MO   KANSAS CITY       Raytown Road to Route 350                              Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 607                                                                                                  66.7     11   3.7   73.3    14.7   52.0   66.7                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                   414      14,556    2   4    Minor Arterial       Current   51    30   Very Poor   2030 to 2039   Final Plan                                                               $16,502,000    $10,000     2030
       City of Kansas City, MO   Manchester - Blue Pkwy to Coal Mine Rd                   73    65                                                     MO   KANSAS CITY       Blue Parkway to Coal Mine Road                         Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 569                                                                                                  66.4     9    3.0   60.0    12.0   54.4   66.4                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                   6,358    12,360    2   4    Principal Arterial   Current   51    30   Fair        2030 to 2039   Final Plan                                                                $5,644,500    $10,000     2030
       City of Kansas City, MO   Holmes - 135th St to Blue Ridge                          60    68                                                     MO   KANSAS CITY       135th TO Blue Ridge                                    Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 548                                                                                                  66.4     9    3.0   60.0    12.0   54.4   66.4                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 6                   1,470    24,037    2   4    Minor Arterial       Current   60    30   Poor        2030 to 2039   Final Plan                                                               $19,820,000    $10,000     2030
       City of Kansas City, MO   Cookingham - Skyview Ave To Platte Purchase Dr           60    68                                                     MO   KANSAS CITY       Skyview Ave TO Platte Purchase Dr                      Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project

                                                                                                                                                                                                                                                                                                                                Widen Lee’s Summit Road from a two-lane
 208                                                                                                  66.4     15   5.0   100.0   20.0   46.4   66.4                          Lee’s Summit Road from Colbern Road to Lee’s                                                                                                                                                                 8,800    31,300    2   5    Minor Arterial       Current   80    40   Very Poor   2010 to 2019   Conceptual Plan                                                           $8,660,000    $13,478     2010
       City of Lees Summit       Lees Summit Rd - Colbern to West City Limits             100   58                                                     MO   LEES SUMMIT                                                              Roadway project                                      Roadway                Capacity       unimproved road to a four-lane urban standard                                                                                                                                  #######################################
                                                                                                                                                                              Summit West City Limits                                                                                                                                                                                                                                                                                                                                                                                          Project
                                                                                                                                                                                                                                                                                                                                with turn lanes and traffic signal improvements
                                                                                                                                                                                                                                                                                                                                between the existing intersection of Colbern Road
 586                                                                                                  65.9     11   3.7   73.3    14.7   51.2   65.9                                                                                                                                                                                                                                         0       7,500    0   2    Freeway/Expressway   Current   0     50   Fair        2020 to 2029   Final Plan                                                               $63,800,000    $10,000     2020
       City of Kansas City, MO   Lewis & Clark Expressway - new 2 lane facility           73    64                                                     MO   KANSAS CITY       I-435 to Sugar Creek                                   Roadway project                                      Roadway                Capacity       NEW 2 LANE FACILITY                                                                                                                                                            #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Project


 526                                                                                                  65.9     11   3.7   73.3    14.7   51.2   65.9                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 3                   4,657    31,310    2   3    Minor Arterial       Current   51    30   Very Poor   2030 to 2039   Final Plan                                                                $6,390,000    $10,000     2030
       City of Kansas City, MO   Barry Road - Highland Ave to Indiana Ave                 73    64                                                     MO   KANSAS CITY       Highland Ave to Indiana Ave                            Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 769                                                                                                  65.6     9    3.0   60.0    12.0   53.6   65.6                                                                                                                                                                            RECONSTRUCT EXISTING ROADWAY AND WIDEN TO                  7,507    17,332    2   4    Principal Arterial   Current   50    30   Poor        2030 to 2039   Final Plan                                                               $11,233,650    $10,000     2030
       City of Kansas City, MO   Raytown Rd - 87th St to I-470                            60    67                                                     MO   KANSAS CITY       87th Street to I-470                                   Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                4 LANES                                                                                                                                                                                                                                                        Project

                                                                                                                                                                                                                                                                                                                                This project will replace an obsolete two lane
 202                             39th St Bridge Over the Little Blue River - eastern                  65.6     15   5.0   100.0   20.0   45.6   65.6                          On 39th Street at the Little Blue River in Eastern                                                                                                                                                          12,000    17,900    2   4    Minor Arterial       Current   30    50   Poor        2010 to 2019   Final Plan                                                                $3,000,000    $18,000     2010
       City of Independence                                                               100   57                                                     MO   INDEPENDENCE                                                             Roadway project                                      Roadway                Capacity       bridge on 39th Street over the Little Blue River. The                                                                                                                          #######################################
                                 Independence                                                                                                                                 Independence                                                                                                                                                                                                                                                                                                                                                                                                     Project
                                                                                                                                                                                                                                                                                                                                new bridge will have four through traffic lanes and
                                                                                                                                                                                                                                                                                                                                sidewalks. The existing bridge is the last part of
 726                                                                                                  65.1     11   3.7   73.3    14.7   50.4   65.1                                                                                                                                                                            RELOCATION OF STREET (LITTLE BLUE ROAD) AND                4,533    15,667    2   4    Minor Arterial       Current   51    30   Very Poor   2030 to 2039   Final Plan                                                               $21,554,300    $10,000     2030
       City of Kansas City, MO   Gregory Blvd - Noland Rd to Lees Summit Rd               73    63                                                     MO   KANSAS CITY       Noland Road to Lees Summit Road                        Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                NEW 4 LANE FACILITY                                                                                                                                                                                                                                            Project

                                                                                                                                                                                                                                                                                                                                This project will resurface Business 7 Highway,
 600                             Business 7 Hwy - in Pleasant Hill from 7 Hwy to 58                   64.8     16   4.0   80.0    16.0   48.8   64.8                          Business 7 Highway in Pleasant Hill from 7                                                                                                                                                                   2,884    10,000    2   2    Minor Arterial       Current   100   40   Fair        2010 to 2019   Conceptual Plan                                                           $2,000,000     $5,000     2010
       City of Pleasant Hill                                                              80    61                                                     MO   PLEASANT HILL                                                            Roadway project, Bicycle and pedestrian facility     Roadway                Non-Capacity   install bike lanes, and reconstruct sidewalks                                                                                                                                  #######################################
                                 Hwy                                                                                                                                          Highway to 58 Highway.                                                                                                                                                                                                                                                                                                                                                                                           Project
                                                                                                                                                                                                                                                                                                                                including ADA ramps. This is already a vital route in
                                                                                                                                                                                                                                                                                                                                Pleasant Hill, but usage is expected to greatly
 551                                                                                                  64.5     7    2.3   46.7    9.3    55.2   64.5                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                   1,711    31,174    2   4    Minor Arterial       Current   60    30   Very Poor   2020 to 2029   Final Plan                                                               $13,632,000    $10,000     2020
       City of Kansas City, MO   Cookingham - I-435 To Skyview Ave                        47    69                                                     MO   KANSAS CITY       I-435 TO Skyview Ave                                   Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 765                                                                                                  64.5     7    2.3   46.7    9.3    55.2   64.5                                                                                                                                                                            RECONSTRUCT EXISTING ROADWAY AND WIDEN TO                  636       5,355    2   3    Minor Arterial       Current   60    30   Very Poor   2030 to 2039   Final Plan                                                                $7,568,000    $10,000     2030
       City of Kansas City, MO   Hardesty Rd - 63rd St to Blue Pkwy                       47    69                                                     MO   KANSAS CITY       63rd Street to Blue Parkway                            Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                3 LANES                                                                                                                                                                                                                                                        Project


 521                                                                                                  64.3     5    1.7   33.3    6.7    57.6   64.3                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                  11,240    18,780    2   4    Principal Arterial   Current   51    30   Very Poor   2020 to 2029   Final Plan                                                               $10,576,160    $10,000     2020
       City of Kansas City, MO   85th St - Troost to Prospect                             33    72                                                     MO   KANSAS CITY       Troost to Prospect                                     Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 605                                                                                                  64.3     11   3.7   73.3    14.7   49.6   64.3                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                   1,621    17,600    2   4    Minor Arterial       Current   51    30   Very Poor   2020 to 2029   Final Plan                                                               $14,995,200    $10,000     2020
       City of Kansas City, MO   Little Blue Road - Woodson to Noland Rd                  73    62                                                     MO   KANSAS CITY       Woodson to Noland                                      Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project

                                                                                                                                                                                                                                                                                                                                Safety Improvements, Widening to accommodate
 653                                                                                                  64.0     21   4.2   84.0    16.8   47.2   64.0                                                                                 Roadway project, Activity center/node, Bicycle and                                                                                                      0         0      2   3    Principal Arterial   Current   50    50   Good        2020 to 2029   Conceptual Plan                                                          $55,000,000     $5,000     2020
       Platte County             MO-92 - Leavenworth to Smithville                        84    59                                                     MO   PLATTE COUNTY     From Leavenworth to Smithville                                                                              Roadway                Capacity       current capacity, Multi-modal shared use path,                                                                                                                                 #######################################
                                                                                                                                                                                                                                     pedestrian facility                                                                                                                                                                                                                                                                                                                                       Project
                                                                                                                                                                                                                                                                                                                                Park and Ride facility at MO-169.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Accessibility; Climate Change and Energy Use;
 631                             Pleasant Valley Rd - I-35 Interchange (Cost accounted                64.0     15   5.0   100.0   20.0   44.0   64.0                                                                                                                                                                            Interchange modifications at I-35 & Pleasant Valley       28,000    48,000    4   6    Interstate           Current   30    20   Fair        2020 to 2029   Conceptual Plan                                                              $0           $0        2020
       City of Liberty                                                                    100   55                                                     MO   LIBERTY           Pleasant Valley Road / I-35 / US-69 Interchange.       Roadway project                                      Roadway                Capacity                                                                                                                                                                                      Economic Vitality; Environment; Place Making;
                                 for in MoDOT project 146)                                                                                                                                                                                                                                                                      Road & US-69                                                                                                                                                                                                                                                   Project
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Public Heath; Safety and Security; System

 619                                                                                                  63.5     11   3.7   73.3    14.7   48.8   63.5                                                                                                                                                                                                                                       5,549    22,750    2   4    Principal Arterial   Current   51    30   Very Poor   2010 to 2019   Final Plan                                                               $14,620,800    $10,000     2010
       City of Kansas City, MO   NW 96th St - US 169 to N Oak Trfwy                       73    61                                                     MO   KANSAS CITY       US 169 to Oak Tfrwy                                    Roadway project                                      Roadway                Capacity       NEW 4 LANE FACILITY AND INTERCHANGE                                                                                                                                            #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Project


 620                                                                                                  63.5     11   3.7   73.3    14.7   48.8   63.5                                                                                                                                                                            NEW 4 LANE FACILITY TO REPLACE UNIMPROVED                  5,250    17,640    2   4    Minor Arterial       Current   51    30   Very Poor   2020 to 2029   Final Plan                                                                $8,990,000    $10,000     2020
       City of Kansas City, MO   NW 108th St - Congress Ave to Skyview Ave                73    61                                                     MO   KANSAS CITY       Congress Ave to Skyview Ave                            Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                ROAD                                                                                                                                                                                                                                                           Project


 567                                                                                                  63.2     9    3.0   60.0    12.0   51.2   63.2                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                   9,191    17,900    2   4    Principal Arterial   Current   51    30   Fair        2020 to 2029   Final Plan                                                               $11,991,900    $10,000     2020
       City of Kansas City, MO   Holmes - Martha Truman to 115th St                       60    64                                                     MO   KANSAS CITY       Martha Truman TO 115th                                 Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 545                                                                                                  63.2     9    3.0   60.0    12.0   51.2   63.2                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 3                   970       8,220    2   3    Minor Arterial       Current   51    30   Very Poor   2030 to 2039   Final Plan                                                               $11,715,000    $10,000     2030
       City of Kansas City, MO   N Brighton Ave - Barry Rd to Shoal Creek Pkwy            60    64                                                     MO   KANSAS CITY       Barry Road TO Shoal Creek Pkwy                         Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 594                                                                                                  63.2     9    3.0   60.0    12.0   51.2   63.2                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                   3,657    16,150    2   4    Minor Arterial       Current   80    30   Very Poor   2030 to 2039   Final Plan                                                               $17,182,000    $10,000     2030
       City of Kansas City, MO   Line Creek Pkwy - Bell St to NW 68th St                  60    64                                                     MO   KANSAS CITY       Bell Street to NW 68th Street                          Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 724                                                                                                  63.2     9    3.0   60.0    12.0   51.2   63.2                                                                                                                                                                            RECONSTRUCT EXISTING ROADWAY AND WIDEN TO                  6,185    12,360    2   4    Principal Arterial   Current   51    30   Very Poor   2030 to 2039   Final Plan                                                               $21,132,000    $10,000     2030
       City of Kansas City, MO   Bannister Rd - James A. Reed to Raytown Rd               60    64                                                     MO   KANSAS CITY       James A Reed to Raytown Road                           Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                4 LANES                                                                                                                                                                                                                                                        Project

                                                                                                                                                                                                                                                                                                                                The extension of Blackwell Road from Shenandoah
 118                                                                                                  63.2     15   5.0   100.0   20.0   43.2   63.2                          Intersection of Blackwell Road (Extension) and US                                                                                                                                                           42,000    72,000    4   6    Freeway/Expressway   Current   0     40   Very Poor   2010 to 2019   Final Plan                                                               $23,700,000    $18,720     2010
       City of Lees Summit       Blackwell Interchange at US 50 Highway                   100   54                                                     MO   LEES SUMMIT                                                              Roadway project                                      Roadway                Capacity       Drive to the extension of Oldham Parkway (approx.                                                                                                                              #######################################
                                                                                                                                                                              50 Highway                                                                                                                                                                                                                                                                                                                                                                                                       Project
                                                                                                                                                                                                                                                                                                                                1 mile) with a diamond interchange at US 50
                                                                                                                                                                                                                                                                                                                                Highway and auxiliary highway lanes between the
 642                                                                                                  62.9     7    2.3   46.7    9.3    53.6   62.9                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 3                   8,322    15,740    2   3    Minor Arterial       Current   70    30   Very Poor   2010 to 2019   Final Plan                                                               $23,004,000    $10,000     2010
       City of Kansas City, MO   Red Bridge Rd - Blue River to US 71                      47    67                                                     MO   KANSAS CITY       Blue River to US 71                                    Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 689                                                                                                  62.7     11   3.7   73.3    14.7   48.0   62.7                                                                                                                                                                            NEW 4 LANE FACILITY AND INTERCHANGE                       18,770    45,722    2   4    Minor Arterial       Current   30    30   Poor        2010 to 2019   Final Plan                                                               $15,336,000    $10,000     2010
       City of Kansas City, MO   Tiffany Springs Pkwy - Amity to I-29                     73    60                                                     MO   KANSAS CITY       Amity to I-29                                          Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                IMPROVEMENT                                                                                                                                                                                                                                                    Project


 608                             Maplewoods Parkway - NE 96th St to Shoal Creek                       62.7     11   3.7   73.3    14.7   48.0   62.7                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                   2,409    20,820    2   4    Minor Arterial       Current   51    30   Very Poor   2020 to 2029   Final Plan                                                               $23,288,000    $10,000     2020
       City of Kansas City, MO                                                            73    60                                                     MO   KANSAS CITY       NE 96th Street to Shoal Creek Pkwy                     Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                 Pkwy                                                                                                                                                                                                                                                                                           LANES.                                                                                                                                                                                                                                                         Project


 632                                                                                                  62.7     11   3.7   73.3    14.7   48.0   62.7                                                                                                                                                                                                                                       1,826    16,940    2   4    Minor Arterial       Future    30    50   Fair        2030 to 2039   Final Plan                                                               $51,758,000    $10,000     2030
       City of Kansas City, MO   Parvin Rd - Kentucky Ave to Route 210                    73    60                                                     MO   KANSAS CITY       Kentucky Ave to Route 210                              Roadway project                                      Roadway                Capacity       NEW 4 LANE FACILITY EXTENSION                                                                                                                                                  #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Project


 568                                                                                                  62.4     9    3.0   60.0    12.0   50.4   62.4                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                   4,739    10,420    2   4    Principal Arterial   Current   51    30   Fair        2030 to 2039   Final Plan                                                               $13,781,100    $10,000     2030
       City of Kansas City, MO   Holmes - Blue Ridge To Martha Truman                     60    63                                                     MO   KANSAS CITY       Blue Ridge TO Martha Truman                            Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 641                                                                                                  62.4     9    3.0   60.0    12.0   50.4   62.4                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                   2,485    15,430    2   4    Minor Arterial       Current   51    30   Very Poor   2030 to 2039   Conceptual Plan                                                          $14,949,050    $10,000     2030
       City of Kansas City, MO   Raytown Rd - I-435 to Blue Ridge Cut-Off                 60    63                                                     MO   KANSAS CITY       I-435 to Blue Ridge Cut-Off                            Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 571                                                                                                  62.4     9    3.0   60.0    12.0   50.4   62.4                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 3                   368      12,740    2   3    Minor Arterial       Future    80    30   Very Poor   2030 to 2039   Final Plan                                                               $28,116,000    $10,000     2030
       City of Kansas City, MO   Interurban - Cookingham to Route 92                      60    63                                                     MO   KANSAS CITY       Cookingham TO Route 92                                 Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 696                                                                                                  62.4     15   5.0   100.0   20.0   42.4   62.4                                                                                                                                                                                                                                       7,405    24,840    2   4    Minor Arterial       Current   45    50   Very Poor   2010 to 2019   Final Plan                                                                $9,230,000    $10,000     2010
       City of Kansas City, MO   Tiffany Springs Rd - Congress Ave to Skyview Ave         100   53                                                     MO   KANSAS CITY       Congress Ave to Skyview Ave                            Roadway project, Bicycle and pedestrian facility     Roadway                Capacity       NEW 4 LANE FACILITY ON NEW ALIGNMENT                                                                                                                                           #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Project


 555                                                                                                  62.1     7    2.3   46.7    9.3    52.8   62.1                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                   6,732    21,140    2   4    Minor Arterial       Current   51    30   Very Poor   2030 to 2039   Final Plan                                                               $13,632,000    $10,000     2030
       City of Kansas City, MO   Englewood - Waukomis Dr to US 169                        47    66                                                     MO   KANSAS CITY       Waukomis Drive TO US 169                               Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project

                                                                                                                                                                                                                                                                                                                                Modification of a limited access intersection to                                                                                                                               This project addresses 7 of the 9 goals set for
 654                             350 Hwy & Blue Ridge Blvd Intersection                               61.6     3    1.0   20.0    4.0    57.6   61.6                          Missouri 350 Highway and Blue Ridge Boulevard          Activity center/node, Roadway project, Transit                                                                                                       27,006       0      8   8    Freeway/Expressway   Current   40    50   Poor        2010 to 2019   Conceptual Plan                                                          $20,000,000    $10,000     2010
       City of Raytown                                                                    20    72                                                     MO   RAYTOWN                                                                                                                       Activity Center/Node   Non-Capacity   provide full access in all directions to support                                                                                                                               Transportation Outlook 2040. The project
                                 Improvements                                                                                                                                 Intersection, Raytown, Missouri.                       project, Bicycle and pedestrian facility                                                                                                                                                                                                                                                                                                                  Project
                                                                                                                                                                                                                                                                                                                                activity center, transit interconnectivity and metro                                                                                                                           addresses Accessibility, Climate Change & Energy
                                                                                                                                                                                                                                                                                                                                green connection.
 771                                                                                                  61.3     7    2.3   46.7    9.3    52.0   61.3                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 3                   8,816    19,810    2   3    Principal Arterial   Current   50    30   Poor        2020 to 2029   Final Plan                                                               $17,556,000    $10,000     2020
       City of Kansas City, MO   Red Bridge Rd - State Line to Holmes St                  47    65                                                     MO   KANSAS CITY       State Line to Holmes                                   Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 723                                                                                                  61.3     7    2.3   46.7    9.3    52.0   61.3                                                                                                                                                                            RECONSTRUCT EXISTING ROADWAY AND WIDEN TO                  4,578     6,523    2   3    Minor Arterial       Current   51    30   Poor        2030 to 2039   Final Plan                                                               $12,335,000    $10,000     2030
       City of Kansas City, MO   107th St - Hillcrest Rd to Raytown Rd                    47    65                                                     MO   KANSAS CITY       Hillcrest Rd to Raytown Rd                             Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                3 LANES                                                                                                                                                                                                                                                        Project

                                                                                                                                                                              This project is located on existing M-7 Highway                                                                                                   The M-7 Highway Improvements, Pink Hill Road to
 349                                                                                                  61.1     11   3.7   73.3    14.7   46.4   61.1                                                                                                                                                                                                                                      10,000    18,000    2   4    Principal Arterial   Current   50    30   Poor        2010 to 2019   Conceptual Plan                                                          $30,000,000    $120,000    2010
       City of Independence      MO 7 Hwy - Pink Hill Rd to U.S. 24 Hwy                   73    58                                                     MO   INDEPENDENCE      from its intersection with Pink Hill Road, north to    Roadway project                                      Roadway                Capacity       U.S. 24 Highway, will improve approximately six                                                                                                                                #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Project
                                                                                                                                                                              U.S. 24 Highway.                                                                                                                                  miles of M-7 Highway into a four lane street with
                                                                                                                                                                                                                                                                                                                                curbs and sidewalks between Pink Hill Road and
 541                                                                                                  60.5     7    2.3   46.7    9.3    51.2   60.5                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                   4,021    18,450    2   4    Minor Arterial       Current   51    30   Poor        2020 to 2029   Final Plan                                                               $14,049,125    $10,000     2020
       City of Kansas City, MO   N Brighton Ave - Pleasant Valley Rd to NE 76th St        47    64                                                     MO   KANSAS CITY       Pleasant Valley Road to NE 76th Street                 Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project


 618                             Northwood Rd - City Limits (Riverside) to Prairie View               60.3     11   3.7   73.3    14.7   45.6   60.3                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 3                   1,673    11,480    2   3    Minor Arterial       Current   51    30   Very Poor   2020 to 2029   Final Plan                                                                $7,668,000    $10,000     2020
       City of Kansas City, MO                                                            73    57                                                     MO   KANSAS CITY       City Limits (Riverside) to Prairie View Drive          Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                 Dr                                                                                                                                                                                                                                                                                             LANES.                                                                                                                                                                                                                                                         Project

                                                                                                                                                                                                                                                                                                                                The 39th Street, West City limits to Crysler Avenue,
 225                                                                                                  59.7     13   4.3   86.7    17.3   42.4   59.7                          This project will be along existing 39th Street from                                                                                                                                                         8,000    12,000    2   3    Minor Arterial       Current   50    30   Fair        2010 to 2019   Conceptual Plan                                                           $4,000,000    $15,000     2010
       City of Independence      39th St - West City Limits to Crysler                    87    53                                                     MO   INDEPENDENCE                                                             Roadway project                                      Roadway                Capacity       Project will improve the last section of 39th Street                                                                                                                           #######################################
                                                                                                                                                                              the West City limits east to Crysler Avenue.                                                                                                                                                                                                                                                                                                                                                                     Project
                                                                                                                                                                                                                                                                                                                                from two lanes to three lanes. The roadway will be
                                                                                                                                                                                                                                                                                                                                widened on the existing alignment with striping for
 609                                                                                                  59.2     9    3.0   60.0    12.0   47.2   59.2                                                                                                                                                                            RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                   601      20,753    2   4    Minor Arterial       Current   51    30   Very Poor   2020 to 2029   Final Plan                                                               $23,856,000    $10,000     2020
       City of Kansas City, MO   Maplewoods Parkway - M 1 to Brighton Ave                 60    59                                                     MO   KANSAS CITY       M-1 to Brighton Ave                                    Roadway project                                      Roadway                Capacity                                                                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                LANES.                                                                                                                                                                                                                                                         Project

                                                                                                                                                                                                                                                                                                                                The project will include improvements to N.
                                 N. Broadway Street Improvement - Englewood to 76th                                                                                                                                                                                                                                                                                                                                                                                                                            Project will improve driver safety, improve                                      2010
 316   City of Gladstone                                                                  100   49    59.2     15   5.0   100.0   20.0   39.2   59.2   MO   GLADSTONE         N. Broadway- Englewood Road to NW 76th Street          Roadway project, Bicycle and pedestrian facility     Roadway                Non-Capacity   Broadway from Englewood Road to NW 76th                   16,000    23,000    2   2    Principal Arterial   Current   50    50   Poor        2010 to 2019   Preliminary Plan                                                          $7,000,000    $10,000
                                 St                                                                                                                                                                                                                                                                                                                                                                                                                                                                            pedestrian safety, and replace an aging roadway.                                Project
                                                                                                                                                                                                                                                                                                                                Street. Portions of the existing roadway are 2 lane
                                                                                                                                                                                                                                                                                                                                in each direction.                                                                                                                                                             This project will maximize the accessibility of the
 587                                                                                                  59.2     15   5.0   100.0   20.0   39.2   59.2                                                                                                                                                                                                                                      100,000   140,000   4   6    Interstate           Current   30    50   Fair        2010 to 2019   Conceptual Plan                                                          $10,000,000    $30,000     2010
       City of Liberty           I-35/M-152 Interchange                                   100   49                                                     MO   LIBERTY           I-35 / M-152 interchange.                              Roadway project                                      Roadway                Capacity       Interchange modifications to I-35 / M-152.                                                                                                                                     Kansas City and Liberty residents across the I-35
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Project
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               corridor. Currently, the M152 crossing of the

 420                                                                                                  58.9     7    2.3   46.7    9.3    49.6   58.9                                                                                                                                                                                                                                         0      45,750    0   4    Minor Arterial       Future    0     30   Fair        2010 to 2019   Final Plan                                                               $17,863,600    $10,000     2010
       City of Kansas City, MO   Ambassador - Cookingham Dr to NW 128th St                47    62                                                     MO   KANSAS CITY       Cookingham Drive to NW 128th Street                    Roadway project                                      Roadway                Capacity       NEW 4 LANE FACILITY                                                                                                                                                            #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Project

                                                                                                                                                                                                                                                                                                                                Widen Pryor Road from a two-lane interim road
 122                                                                                                  58.9     13   4.3   86.7    17.3   41.6   58.9                                                                                                                                                                                                                                       3,000    22,000    2   4    Minor Arterial       Current   10    40   Poor        2020 to 2029   Conceptual Plan                                                          $14,250,000    $36,000     2020
       City of Lees Summit       Pryor Rd - Longview Rd to M-150                          87    52                                                     MO   LEES SUMMIT       Pryor Road from Longview Road to M-150 Highway Roadway project                                              Roadway                Capacity       standard to a four-lane urban standard with turn                                                                                                                               #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Project
                                                                                                                                                                                                                                                                                                                                lanes and warranted traffic signals between
                                                                                                                                                                              This project is located on existing Winner Road                                                                                                   Longview Road and M-150 Highway (approx. 3.5
 372   City of Independence      Winner Rd - US 24 Hwy to Sterling Ave                    60    58    58.4     9    3.0   60.0    12.0   46.4   58.4   MO   INDEPENDENCE      from U.S. 24 Highway southeast to Sterling             Roadway project, Bicycle and pedestr
                                                                                                                                                                              Avenue.
                                                                                                                                                                                This project is on existing Bundschu Road from                                                                                                    The Bundschu Road Improvements, Susquehanna
338                               Bundschu Road Improvements - Susquehanna Ridge                        55.7   7    2.3   46.7    9.3    46.4   55.7                                                                                                                                                                                                                                      5,000    10,000   2   3   Principal Arterial   Future           50    30    Poor        2010 to 2019   Conceptual Plan                                                          $18,800,000    $70,500     2010
      City of Independence                                                                   47    58                                                  MO   INDEPENDENCE        Susquehanna Ridge to M-7 Highway. Bundschu             Roadway project                                      Roadway                Capacity       Ridge to M-7 Highway, will improve existing                                                                                                                                       #######################################
                                  to M-7 Hwy                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        Project
                                                                                                                                                                                Road is a collector street from Susquehanna Ridge                                                                                                 Bundschu Road from Susquehanna Ridge to M-7
                                                                                                                                                                                to Jackson Drive. Bundschu Road from Jackson                                                                                                      Highway to a three lane road. The roadway will be
566                                                                                                     54.9   4    1.3   26.7    5.3    49.6   54.9                                                                                                                                                                              RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                4,011    19,750   2   4   Minor Arterial       Current          51    30    Very Poor   2020 to 2029   Final Plan                                                               $17,750,000    $10,000     2020
      City of Kansas City, MO     Green Hills - MO-152 To NW 108th St                        27    62                                                  MO   KANSAS CITY         MO-152 TO NW 108th Street                              Roadway project                                      Roadway                Capacity                                                                                                                                                                                         #######################################
                                                                                                                                                                                                                                                                                                                                  LANES.                                                                                                                                                                                                                                                            Project


403                                                                                                     54.9   7    2.3   46.7    9.3    45.6   54.9                                                                                                                                                                                                                                        0      45,750   0   4   Minor Arterial       Future           0     50    Fair        2020 to 2029   Final Plan                                                               $12,525,000    $10,000     2020
      City of Kansas City, MO     Ambassador - NW 128th St to Mexico City Ave                47    57                                                  MO   KANSAS CITY         NW 128th Streetto Mexico City Ave                      Roadway project                                      Roadway                Capacity       NEW 4 LANE FACILITY                                                                                                                                                               #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project


553                                                                                                     54.9   7    2.3   46.7    9.3    45.6   54.9                                                                                                                                                                                                                                        0      17,560   0   4   Principal Arterial   Future           0     30    Fair        2020 to 2029   Final Plan                                                               $22,436,000    $10,000     2020
      City of Kansas City, MO     East Longview Pkwy - Bannister to MO 350                   47    57                                                  MO   KANSAS CITY         Bannister TO MO-350                                    Roadway project                                      Roadway                Capacity       NEW 4 LANE FACILITY                                                                                                                                                               #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project


614                                                                                                     54.7   5    1.7   33.3    6.7    48.0   54.7                                                                                                                                                                              RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                2,269    29,340   2   4   Minor Arterial       Current          51    30    Poor        2020 to 2029   Final Plan                                                               $14,413,000    $10,000     2020
      City of Kansas City, MO     NE 108th St - I-435 to Eastern Ave                         33    60                                                  MO   KANSAS CITY         I-435 to Eastern Avenue                                Roadway project                                      Roadway                Capacity                                                                                                                                                                                         #######################################
                                                                                                                                                                                                                                                                                                                                  LANES.                                                                                                                                                                                                                                                            Project


656                                                                                                     54.7   11   3.7   73.3    14.7   40.0   54.7                                                                                                                                                                                                                                        0      21,800   0   4   Minor Arterial       Current          0     50    Fair        2010 to 2019   Final Plan                                                               $11,246,400    $10,000     2010
      City of Kansas City, MO     Shoal Creek Parkway - N Oak to Maplewoods Pkwy             73    50                                                  MO   KANSAS CITY         North Oak to Maplewoods Pkwy                           Roadway project                                      Roadway                Capacity       NEW 4 LANE FACILITY                                                                                                                                                               #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    These project would achieve performance,
417                                                                                                     54.7   11   3.7   73.3    14.7   40.0   54.7                                                                                                                                                                              Reconstruction of a Minor Arterial roadway from 3       30,000   55,000   3   5   Minor Arterial       Current          60    30    Poor        2010 to 2019   Preliminary Plan                                                         $15,000,000    $125,000    2010
      City of Blue Springs        Woods Chapel Rd - 40 Hwy to Pink Hill Rd                   73    50                                                  MO   BLUE SPRINGS        Blue Springs and Independence, Mo.                     Roadway project, Bicycle and pedestrian facility     Roadway                Capacity                                                                                                                                                                                         condition, safety, place, economic and energy
                                                                                                                                                                                                                                                                                                                                  to 5 lanes with sidewalk and bike facilities.                                                                                                                                                                                                                     Project
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    use.
                                                                                                                                                                                                                                                                                                                                  The Kentucky Road, River Blvd. to U.S. 24 Highway,
340                                                                                                     54.1   7    2.3   46.7    9.3    44.8   54.1                            This project is located on existing Kentucky Road                                                                                                                                                         9,000    15,000   2   4   Minor Arterial       Current          50    30    Fair        2010 to 2019   Conceptual Plan                                                          $19,000,000    $76,000     2010
      City of Independence        Kentucky Rd - River Blvd to US 24 Hwy                      47    56                                                  MO   INDEPENDENCE                                                               Roadway project                                      Roadway                Capacity       Project will improve the existing Kentucky Road                                                                                                                                   #######################################
                                                                                                                                                                                from River Boulevard East to U.S. 24 Highway.                                                                                                                                                                                                                                                                                                                                                                       Project
                                                                                                                                                                                                                                                                                                                                  two lanes to a four lane minor arterial street. New
                                                                                                                                                                                                                                                                                                                                  curb and gutters Improvements, Vista Avenue
                                                                                                                                                                                                                                                                                                                                  The Truman Roadwill be installed and the storm to
357                                                                                                     53.9   5    1.7   33.3    6.7    47.2   53.9                            This project is located on existing Truman Road                                                                                                                                                           8,000    15,000   2   4   Minor Arterial       Current          50    30    Fair        2010 to 2019   Conceptual Plan                                                          $25,000,000    $100,000    2010
      City of Independence        Truman Rd - Vista Ave to M-7 Hwy                           33    59                                                  MO   INDEPENDENCE                                                               Roadway project                                      Roadway                Capacity       M-7 Highway, will improve the existing Truman                                                                                                                                     #######################################
                                                                                                                                                                                from Vista Avenue east to M-7 Highway.                                                                                                                                                                                                                                                                                                                                                                              Project
                                                                                                                                                                                                                                                                                                                                  Road from two lanes to a four lane major arterial
                                                                                                                                                                                                                                                                                                                                  Improve safety of State Highway FF, provide storm
                                                                                                                                                                                                                                                                                                                                  street. The construction of curbs, sidewalks, access                                                                                                                              This is a regional project that reconstructs
732                                                                                                     53.9   11   3.7   73.3    14.7   39.2   53.9                            State Highway FF From Union Chapel Road/River                                                                                                                                                             10,000   20,000   2   3   Minor Arterial       Future           40    50    Very Poor   2020 to 2029   Conceptual Plan                                                          $27,878,500    $25,000     2020
      City of Parkville           MO FF - Union Chapel Rd/River Rd to MO 9                   73    49                                                  MO   PARKVILLE                                                                  Roadway project                                      Roadway                Capacity       to Missouri River Front Trail and increase safety                                                                                                                                 Highway FF, realigns portions of FF Highway and
                                                                                                                                                                                Road to Missouri State Highway 9                                                                                                                                                                                                                                                                                                                                                                                    Project
                                                                                                                                                                                                                                                                                                                                  within English Landing Park by adding a railroad                                                                                                                                  adds two overpasses.
                                                                                                                                                                                                                                                                                                                                  grade separation in the form of an overpass.
775                               West Longview Parkway (James A Reed) - 87th St to I-                  53.6   3    1.0   20.0    4.0    49.6   53.6                                                                                                                                                                                                                                        0      12,335   2   4   Minor Arterial       Future           50    30    Poor        2030 to 2039   Final Plan                                                               $12,665,000    $10,000     2030
      City of Kansas City, MO                                                                20    62                                                  MO   KANSAS CITY         87th Street to I-470                                   Roadway project                                      Roadway                Capacity       RELOCATION OF STREET AND NEW 4 LANE FACILITY                                                                                                                                      #######################################
                                  470                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Project


680                                                                                                     53.6   9    3.0   60.0    12.0   41.6   53.6                                                                                                                                                                                                                                        0      21,340   0   4   Minor Arterial       Current          0     50    Fair        2010 to 2019   Final Plan                                                                $8,520,000    $10,000     2010
      City of Kansas City, MO     Tiffany Springs Pkwy - Skyview Ave to Green Hills Rd       60    52                                                  MO   KANSAS CITY         Skyview Ave to Green Hills Road                        Roadway project                                      Roadway                Capacity       NEW 4 LANE FACILITY                                                                                                                                                               #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project


683                                                                                                     53.6   15   5.0   100.0   20.0   33.6   53.6                                                                                                                                                                                                                                        0      26,630   0   4   Minor Arterial       Current          0     50    Fair        2010 to 2019   Final Plan                                                               $11,363,550    $10,000     2010
      City of Kansas City, MO     Tiffany Springs Pkwy - Platte Purchase Dr to US 169        100   42                                                  MO   KANSAS CITY         Platte Purchase Dr to US 169                           Roadway project                                      Roadway                Capacity       NEW 4 LANE FACILITY                                                                                                                                                               #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project


552                                                                                                     53.3   7    2.3   46.7    9.3    44.0   53.3                                                                                                                                                                                                                                        0      22,150   0   4   Principal Arterial   Current          0     30    Fair        2020 to 2029   Final Plan                                                               $32,716,800    $10,000     2020
      City of Kansas City, MO     East Longview Pkwy - I-470 to Bannister                    47    55                                                  MO   KANSAS CITY         I-470 TO Bannister                                     Roadway project                                      Roadway                Capacity       NEW 4 LANE FACILITY                                                                                                                                                               #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project

                                  Markey Parkway - from Prospect @ M-58 North and                                                                                               Future Markey Parkway is a planned 4-lane divided                                                                                                 Future Markey Parkway will serve as a major east-                                                                                                                                 Accessibility, Economic Vitality, Place Making,
636                                                                                                     53.1   11   3.7   73.3    14.7   38.4   53.1                                                                                                                                                                                                                                      14,405   27,033   2   4   Not Applicable       Future           50    50    Fair        2010 to 2019   Preliminary Plan                                                         $35,000,000     $5,000     2010
      City of Belton              east to Westover, to North Scott, Y Highway and            73    48                                                  MO   BELTON              primary arterial roadway that will serve as a major Roadway project, Bicycle and pedestrian facility        Roadway                Capacity       west route in northern Belton to relive the                                                                                                                                       Public Health, Safety & Security, and System
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project
                                  Southeast to Mullen Rd and M-58                                                                                                               east-west corridor in northern Belton to relieve M-                                                                                               congestion on M-58 Highway which is currently                                                                                                                                     Condition and performance
                                                                                                                                                                                58 Highway which is currently the City's only east                                                                                                the City's only east-west corridor. The purpose of
610                                                                                                     53.1   11   3.7   73.3    14.7   38.4   53.1                                                                                                                                                                                                                                        0      19,870   0   4   Minor Arterial       Current          0     50    Fair        2020 to 2029   Final Plan                                                               $15,336,000    $10,000     2020
      City of Kansas City, MO     Maplewoods Parkway - Brighton Ave to I-435                 73    48                                                  MO   KANSAS CITY         Brighton Ave to I-435                                  Roadway project                                      Roadway                Capacity       NEW 4 LANE FACILITY                                                                                                                                                               #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project

                                                                                                                                                                                The proposed parkway alignment is located at 70th                                                                                                 During the planning stages of the Downtown
131                               Gladstone 68th St. Pkwy - 70th St and N Oak to 68th                   52.3   11   3.7   73.3    14.7   37.6   52.3                                                                                                                                                                                                                                        0      12,000   0   2   Minor Arterial       Future           0     50    Very Poor   2010 to 2019   Conceptual Plan                                                          $10,000,000     $5,000     2010
      City of Gladstone                                                                      73    47                                                  MO   GLADSTONE           and N. Oak Trafficway and heads southwest         Roadway project, Bicycle and pedestrian facility          Roadway                Capacity       Village Center Master Plan, the 68th St. Parkway                                                                                                                                  #######################################
                                  St and Broadway                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   Project
                                                                                                                                                                                terminating at 68th and Broadway St. in                                                                                                           concept was identified as a "gateway" opportunity
                                                                                                                                                                                Gladstone.                                                                                                                                        for new development options. After the planning
616                                                                                                     52.0   3    1.0   20.0    4.0    48.0   52.0                                                                                                                                                                              RECONSTRUCT EXISTING ROAD AND WIDEN TO 4                 701     24,567   2   4   Minor Arterial       Current          25    30    Poor        2020 to 2029   Final Plan                                                               $22,116,500    $10,000     2020
      City of Kansas City, MO     NE 76th St - Brighton Ave to Shoal Creek Pkwy              20    60                                                  MO   KANSAS CITY         Brighton Ave to Shoal Creek Pkwy                       Roadway project                                      Roadway                Capacity                                                                                                                                                                                         #######################################
                                                                                                                                                                                                                                                                                                                                  LANES.                                                                                                                                                                                                                                                            Project

                                                                                                                                                                                                                                                                                                                                  Reconstruct existing deteriorated Birmingham
575                                                                                                     52.0   9    3.0   60.0    12.0   40.0   52.0                            Birmignham Road from M-291 to South Liberty                                                                                                                                                               1,521      0      2   3   Minor Arterial       Future           50    50    Poor        2020 to 2029   Conceptual Plan                                                           $8,200,000    $30,000     2020
      City of Liberty             Birmingham Rd - from M-291 to South Liberty Pkwy           60    50                                                  MO   LIBERTY                                                                    Roadway project                                      Roadway                Capacity       Road, upgrading it from a collector to a minor                                                                                                                                    #######################################
                                                                                                                                                                                Parkway.                                                                                                                                                                                                                                                                                                                                                                                                            Project
                                                                                                                                                                                                                                                                                                                                  arterial.

627                                                                                                     52.0   15   5.0   100.0   20.0   32.0   52.0                            South Liberty Parkway from Withers Road to M-                                                                                                                                                             5,793    10,000   0   4   Minor Arterial       Future           0     50    Fair        2010 to 2019   Preliminary Plan                                                         $18,000,000    $30,000     2010
      City of Liberty             South Liberty Parkway - Withers Rd to M-291                100   40                                                  MO   LIBERTY                                                                    Roadway project                                      Roadway                Capacity       New 4-lane facility                                                                                                                                                               #######################################
                                                                                                                                                                                291.                                                                                                                                                                                                                                                                                                                                                                                                                Project

                                                                                                                                                                                                                                                                                                                                  This project ties the Tiffany Springs Parkway
639                                                                                                     51.2   9    3.0   60.0    12.0   39.2   51.2                                                                                                                                                                                                                                        0      20,000   0   4   Minor Arterial       Future           0     50    Fair        2030 to 2039   Preliminary Plan                                                         $37,500,000    $10,000     2030
      Platte County               Tiffany Springs West Expansion - MO-45 to I-435            60    49                                                  MO   PLATTE COUNTY       MO-45 to I-435                                         Roadway project                                      Roadway                Capacity       interchange to MO-45; completing the east/west                                                                                                                                    #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project
                                                                                                                                                                                                                                                                                                                                  corridor from Leavenworth to KCI

622                                                                                                     50.7   5    1.7   33.3    6.7    44.0   50.7                                                                                                                                                                              WIDEN EXISTING FACILITY AND IMPROVE                     12,335   37,556   4   6   Minor Arterial       Current          30    30    Poor        2020 to 2029   Final Plan                                                               $12,240,000    $10,000     2020
      City of Kansas City, MO     NW 112th St - Amity to Congress                            33    55                                                  MO   KANSAS CITY         Amity to Congress                                      Roadway project                                      Roadway                Capacity                                                                                                                                                                                         #######################################
                                                                                                                                                                                                                                                                                                                                  INTERCHANGE                                                                                                                                                                                                                                                       Project


773                                                                                                     50.7   5    1.7   33.3    6.7    44.0   50.7                                                                                                                                                                              RECONSTRUCT EXISTING ROADWAY AND WIDEN TO                673     3,655    2   3   Minor Arterial       Future           50    30    Very Poor   2030 to 2039   Conceptual Plan                                                          $13,216,650    $10,000     2030
      City of Kansas City, MO     Rhinehart Rd - Gregory Blvd to Unity Village               33    55                                                  MO   KANSAS CITY         Gregory Blvd to Unity Village                          Roadway project                                      Roadway                Capacity                                                                                                                                                                                         #######################################
                                                                                                                                                                                                                                                                                                                                  3 LANES                                                                                                                                                                                                                                                           Project

                                                                                                                                                                                                                                                                                                                                  This project would address traffic congestion, poor
463                                                                                                     50.7   11   3.7   73.3    14.7   36.0   50.7                            Mechanic Street from Commercial Street to Elm                                                                                                                                                             14,302   14,660   2   3   Minor Arterial       Current          80    20    Poor        2010 to 2019   Conceptual Plan                                                           $8,590,000    $40,000     2010
      City of Harrisonville       Mechanic Street - Commercial St to Elm St                  73    45                                                  MO   HARRISONVILLE                                                              Roadway project                                      Roadway                Capacity       pavement conditions, pedestrian access, and                                                                                                                                       #######################################
                                                                                                                                                                                Street in Harrisonville, Cass County, Missouri                                                                                                                                                                                                                                                                                                                                                                      Project
                                                                                                                                                                                                                                                                                                                                  safety. Upgrade consists of the widening to three
                                  Ararat Drive - road diet, bike lanes, pedestrian and                                                                                                                                                                                                                                            lanes thus transit stop enhancements (2 both
                                                                                                                                                                                                                                                                                                                                  Sidewalks, allowing a full turning lane for stops),
780                                                                                                     50.4   3    1.0   20.0    4.0    46.4   50.4                            Ararat Drive from Sni-a-bar Road to Eastwood           Activity center/node, Roadway project, Transit                                                                                                       0        0      4   3   Not Applicable       Not Applicable   0     0     Good        2010 to 2019   Conceptual Plan                                                           $1,500,000      $0        2010
      City of Kansas City, MO     transit improvements from Sni-a-Bar to Eastwood            20    58                                                  MO   KANSAS CITY                                                                                                                     Activity Center/Node   Non-Capacity   bike lanes, road diet, pedestrian crossings and a                                                                                                                                 #######################################
                                                                                                                                                                                Trafficway                                             project, Bicycle and pedestrian facility                                                                                                                                                                                                                                                                                                                     Project
                                  Trfwy                                                                                                                                                                                                                                                                                           roundabout at Sni-a-bar Road intersection.

612                               Mexico City Avenue (Terminal Drive) - Rte 152 to                      50.1   7    2.3   46.7    9.3    40.8   50.1                                                                                                                                                                              NEW 4 LANE FACILITY AND INTERCHANGE                       0      42,120   0   4   Freeway/Expressway   Future           0     50    Fair        2020 to 2029   Final Plan                                                               $310,000,000   $10,000     2020
      City of Kansas City, MO                                                                47    51                                                  MO   KANSAS CITY         Route 152 to Cookingham Drive                          Roadway project                                      Roadway                Capacity                                                                                                                                                                                         #######################################
                                  Cookingham Dr                                                                                                                                                                                                                                                                                   PARALLEL TO CHILDRESS                                                                                                                                                                                                                                             Project


767                                                                                                     50.1   7    2.3   46.7    9.3    40.8   50.1                                                                                                                                                                                                                                       200     26,555   2   4   Minor Arterial       Future           80    30    Very Poor   2030 to 2039   Final Plan                                                               $27,556,300    $10,000     2030
      City of Kansas City, MO     NW 126th St - US 169 to Skyview Ave                        47    51                                                  MO   KANSAS CITY         US 169 to Skyview Ave                                  Roadway project                                      Roadway                Capacity       NEW 4 LANE FACILITY AND INTERCHANGE                                                                                                                                               #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project

                                                                                                                                                                                This project is located on existing R. D Mize Road                                                                                                The R.D. Mize Road Improvements, Eureka Road to
366                                                                                                     49.6   3    1.0   20.0    4.0    45.6   49.6                                                                                                                                                                                                                                      6,000    11,000   2   4   Minor Arterial       Current          50    30    Fair        2010 to 2019   Conceptual Plan                                                          $11,500,000    $45,000     2010
      City of Independence        R D Mize - Eureka Rd to Woods Chapel Rd                    20    57                                                  MO   INDEPENDENCE        from Eureka Road southeast to Wood’s Chapel            Roadway project, Bicycle and pedestrian facility     Roadway                Capacity       Wood’s Chapel Road, will improve the remainder                                                                                                                                    #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project
                                                                                                                                                                                Road just North of Interstate 70.                                                                                                                 of R.D. Mize Road in Independence to a major
                                                                                                                                                                                                                                                                                                                                  Currently, USas planned in the Comprehensive
                                                                                                                                                                                                                                                                                                                                  arterial road 71 through Grandview is functionally
784                               US 71 Interchange Access Improvement Project -                        49.3   7    2.3   46.7    9.3    40.0   49.3                            US 71 between Blue Ridge Blvd. and Harry Truman                                                                                                                                                           70,000     0      6   6   Freeway/Expressway   Current          40    50    Fair        2010 to 2019   Conceptual Plan                                                          $30,000,000      $0        2010
      City of Grandview                                                                      47    50                                                  MO   GRANDVIEW                                                                  Roadway project                                      Roadway                Non-Capacity   classified as a freeway/expressway. Prior to 1981,                                                                                                                                #######################################
                                  between Blue Ridge Blvd and Harry Truman Dr                                                                                                   Drive                                                                                                                                                                                                                                                                                                                                                                                                               Project
                                                                                                                                                                                                                                                                                                                                  US 71 had operated with a two-way frontage road
                                                                                                                                                                                                                                                                                                                                  system with a series of mid-interchange slip ramps
596                                                                                                     49.3   7    2.3   46.7    9.3    40.0   49.3                                                                                                                                                                                                                                        0      17,060   0   2   Minor Arterial       Current          0     50    Fair        2030 to 2039   Final Plan                                                               $25,773,000    $10,000     2030
      City of Kansas City, MO     Line Creek Pkwy - NW 68th St to Barry Rd                   47    50                                                  MO   KANSAS CITY         NW 68th Street to Barry Road                           Roadway project                                      Roadway                Capacity       NEW 2 LANE FACILITY                                                                                                                                                               #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project

                                                                                                                                                                                                                                                                                                                                  Unimproved two lane roadway with ditch section.
376                                                                                                     49.3   13   4.3   86.7    17.3   32.0   49.3                                                                                                                                                                                                                                      2,500    10,000   2   2   Minor Arterial       Future           50    30    Very Poor   2030 to 2039   Preliminary Plan   Improves the safety, condition, performance and        $3,000,000    $35,000     2030
      City of Blue Springs        Adams Dairy Parkway - Roanoke to Pink Hill Rd              87    40                                                  MO   BLUE SPRINGS        Blue Springs, Mo.                                      Roadway project, Bicycle and pedestrian facility     Roadway                Non-Capacity   Roadway would be improved to current standards
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    place.                                                                          Project
                                                                                                                                                                                                                                                                                                                                  and provide for sidewalk and bike facilities.
                                                                                                                                                                                This project is located on existing 35th Street from                                                                                              The 35th Street, West City limits to Kiger Road,
342                                                                                                     49.1   5    1.7   33.3    6.7    42.4   49.1                                                                                                                                                                                                                                      7,000    10,500   2   3   Minor Arterial       Current          50    30    Poor        2010 to 2019   Conceptual Plan                                                          $16,000,000    $60,000     2010
      City of Independence        35th St - West City Limits to Kiger Road                   33    53                                                  MO   INDEPENDENCE        West City limits east to Kiger Road. The roadway     Roadway project                                        Roadway                Capacity       Project will improve the existing 35th Street from                                                                                                                                #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project
                                                                                                                                                                                improvements are approximately 4 miles in length.                                                                                                 two lanes to three lanes. The roadway will be
                                                                                                                                                                                                                                                                                                                                  widened on the existing alignment with striping for
625                                                                                                     48.8   3    1.0   20.0    4.0    44.8   48.8                                                                                                                                                                              RECONSTRUCT EXISTING ROAD AND WIDEN TO 3                2,065    12,850   2   3   Minor Arterial       Current          51    30    Poor        2020 to 2029   Final Plan                                                                $4,052,110    $10,000     2020
      City of Kansas City, MO     N Oak - NW 111th St to Cookingham Dr                       20    56                                                  MO   KANSAS CITY         NW 111th Street to Cookingham Drive                    Roadway project                                      Roadway                Capacity                                                                                                                                                                                         #######################################
                                                                                                                                                                                                                                                                                                                                  LANES.                                                                                                                                                                                                                                                            Project

                                                                                                                                                                                Identified road improvements and alignment for                                                                                                    The purpose of the improvements will be to                                                                                                                                        Accessibility: The current Pleasant Valley Rd.
129                                                                                                     48.8   9    3.0   60.0    12.0   36.8   48.8                                                                                                                                                                                                                                      13,000   15,000   2   3   Minor Arterial       Current          50    50    Fair        2010 to 2019   Final Plan                                                                $6,000,000     $5,000     2010
      City of Gladstone           Pleasant Valley Rd - 64th St and Indiana to I-435          60    46                                                  MO   GLADSTONE           Pleasant Valley Rd. are from NE 64th St. and N.        Roadway project                                      Roadway                Capacity       expand the current roadway to a three-lane section                                                                                                                                alignment is limited on safe accessibility. The
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project
                                                                                                                                                                                Indiana Avenue in Gladstone to Interstate 435 in                                                                                                  with curb and gutter and to improve roadway                                                                                                                                       new roadway improvement will create increased
                                                                                                                                                                                Kansas City.                                                                                                                                      safety throughout the corridor.
222                                                                                                     48.0   3    1.0   20.0    4.0    44.0   48.0                                                                                                                                                                              Construct interchange as well as extend 16th            45,000   60,000   6   8   Interstate           Current          40    30    Fair        2010 to 2019   Conceptual Plan                                                          $16,000,000    $100,000    2010
      City Of North Kansas City   16th Ave Interchange - I-29 / I-35 in North Kansas City    20    55                                                  MO   NORTH KANSAS CITY   I-29/35 at 16th Avenue in North Kansas City            Roadway project                                      Roadway                Capacity                                                                                                                                                                                         #######################################
                                                                                                                                                                                                                                                                                                                                  Avenue north and east to Taney Avenue.                                                                                                                                                                                                                            Project




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              Unconstrained - Local municipality proposed funding target is$1,503,871,745 for LRTP 2040 Plan.
                                                                                                                                                                                                                                                                                                                                  This project is Phase 4 of the US 71 Frontage Road                                                                                                                                Climate Change and Energy Use policy goal
792                               US 71 and 140th St Interchange Access Improvement                     47.7   7    2.3   46.7    9.3    38.4   47.7                                                                                                                                                                                                                                      70,000     0      6   6   Freeway/Expressway   Current          40    50    Fair        2020 to 2029   Conceptual Plan                                                          $10,000,000      $0        2020
      City of Grandview                                                                      47    48                                                  MO   GRANDVIEW           US 71 and 140th Street                                 Roadway project, Activity center/node                Roadway                Non-Capacity   Study Recommended Strategy. This project would                                                                                                                                    Economic Vitality policy goal
                                  Project (Green Project)                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Project
                                                                                                                                                                                                                                                                                                                                  entail the construction of the final U-turn bridge on                                                                                                                             Place Making policy goal
                                                                                                                                                                                                                                                                                                                                  the north side of 140th Street (completing 5 U-
606                                                                                                     47.7   7    2.3   46.7    9.3    38.4   47.7                                                                                                                                                                                                                                        0      21,200   0   4   Minor Arterial       Future           0     50    Fair        2020 to 2029   Final Plan                                                               $22,495,200    $10,000     2020
      City of Kansas City, MO     Little Blue Road - Noland Rd to Lee's Summit Rd            47    48                                                  MO   KANSAS CITY         Noland to Lees Summit Road                             Roadway project                                      Roadway                Capacity       NEW 4 LANE FACILITY                                                                                                                                                               #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project


611                                                                                                     47.7   7    2.3   46.7    9.3    38.4   47.7                                                                                                                                                                                                                                        0      22,690   0   2   Minor Arterial       Current          0     50    Fair        2030 to 2039   Final Plan                                                                $8,520,000    $10,000     2030
      City of Kansas City, MO     Maplewoods Parkway - Agnes Ave to Barry Rd                 47    48                                                  MO   KANSAS CITY         Agnes Ave to Barry Road                                Roadway project                                      Roadway                Capacity       NEW 2 LANE FACILITY                                                                                                                                                               #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project

                                                                                                                                                                                                                                                                                                                                  Reconstruction of two lane roadway with ditch
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    This project would achieve goals place, safety,                                  2030
410   City of Blue Springs        Pink Hill Rd - west of 7 Hwy to Adams Dairy Pkwy           87    38   47.7   13   4.3   86.7    17.3   30.4   47.7   MO   BLUE SPRINGS        Blue Springs, Mo.                                      Roadway project, Bicycle and pedestrian facility     Roadway                Non-Capacity   section. Roadway will be designed to current            7,500    15,000   2   2   Minor Arterial       Future           50    30    Very Poor   2030 to 2039   Conceptual Plan                                                           $8,000,000    $75,000
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    condition and performance.                                                      Project
                                                                                                                                                                                                                                                                                                                                  standards making it safer and accessible to bike
                                                                                                                                                                                This project will be located just north of M-78                                                                                                   and pedestrians.
                                                                                                                                                                                                                                                                                                                                  The Jackson Drive, M-78 Highway to Bundschu
359                                                                                                     46.7   5    1.7   33.3    6.7    40.0   46.7                                                                                                                                                                                                                                        0      17,000   0   4   Minor Arterial       Future           0     30    Very Poor   2010 to 2019   Conceptual Plan                                                          $15,000,000    $60,000     2010
      City of Independence        Jackson Dr - M-78 Hwy to Bundschu Rd                       33    50                                                  MO   INDEPENDENCE        Highway, curving Northeast then Northwest and     Roadway project, Bicycle and pedestrian facility          Roadway                Capacity       Road, project will create a new undivided four lane                                                                                                                               #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project
                                                                                                                                                                                connecting with Bundschu Road at existing Jackson                                                                                                 minor arterial street in Eastern Independence. The
                                                                                                                                                                                Drive.                                                                                                                                            This project is Phase 3 storm sewers, five footRoad
                                                                                                                                                                                                                                                                                                                                  construction of curbs, of the US 71 Frontage
790                               US 71 and 135th St Access Point Improvement                           46.1   7    2.3   46.7    9.3    36.8   46.1                                                                                                                                                                                                                                      70,000     0      6   6   Freeway/Expressway   Current          40    50    Fair        2020 to 2029   Conceptual Plan    Climate Change and Energy Use policy goal             $21,000,000      $0        2020
      City of Grandview                                                                      47    46                                                  MO   GRANDVIEW           US 71 and 135th Street                                 Roadway project                                      Roadway                Non-Capacity   Study Recommended Strategy. This project would
                                  (Orange Project)                                                                                                                                                                                                                                                                                                                                                                                                                                                                  System Performance policy goal                                                  Project
                                                                                                                                                                                                                                                                                                                                  entail the construction of a bridge across US 71
                                                                                                                                                                                                                                                                                                                                  Unimproved roadway with ditch section. existing
                                                                                                                                                                                                                                                                                                                                  connecting the east and west portions of
377                                                                                                     45.9   11   3.7   73.3    14.7   31.2   45.9                                                                                                                                                                                                                                      7,500    15,000   2   2   Minor Arterial       Future           60    30    Poor        2030 to 2039   Conceptual Plan    Project achieves the place, safety, condition and      $7,500,000    $25,000     2030
      City of Blue Springs        Duncan Rd - 7 Hwy to RD Mize Rd                            73    39                                                  MO   BLUE SPRINGS        Blue Springs, Mo.                                      Roadway project, Bicycle and pedestrian facility     Roadway                Non-Capacity   Reconstruct road to current standards along with
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    performance goals substantially.                                                Project
                                                                                                                                                                                                                                                                                                                                  sidewalk and bike facilities.

676                                                                                                     45.6   3    1.0   20.0    4.0    41.6   45.6                                                                                                                                                                                                                                      1,770    30,770   2   4   Minor Arterial       Current          20    30    Fair        2030 to 2039   Final Plan                                                                $5,623,200    $10,000     2030
      City of Kansas City, MO     Skyview - Tiffany Springs Pkwy to NW 108th St              20    52                                                  MO   KANSAS CITY         Tiffany Springs Pkwy to NW 108th Street                Roadway project                                      Roadway                Capacity       WIDEN TO 4 LANES                                                                                                                                                                  #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project


615                                                                                                     45.6   3    1.0   20.0    4.0    41.6   45.6                                                                                                                                                                                                                                        0      19,660   0   4   Minor Arterial       Current          0     50    Fair        2030 to 2039   Final Plan                                                               $18,460,000    $10,000     2030
      City of Kansas City, MO     NW 132nd St - US 169 to Woodland Ave                       20    52                                                  MO   KANSAS CITY         US 169 to Woodland Ave                                 Roadway project                                      Roadway                Capacity       NEW 4 LANE FACILITY AND INTERCHANGE                                                                                                                                               #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Accessibility; Place Making; Safety and Security;
629                                                                                                     45.3   7    2.3   46.7    9.3    36.0   45.3                                                                                                                                                                                                                                      24,000     0      4   4   Interstate           Current          50    50    Fair        2010 to 2019   Conceptual Plan                                                           $8,000,000    $40,000     2010
      City of Liberty             I-35/M-33 Interchange                                      47    45                                                  MO   LIBERTY             I-35 / M-33 Interchange                                Roadway project                                      Roadway                Non-Capacity   Long term interchange improvements with transit                                                                                                                                   System Condition; System Performance - The
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ultimate expansion of this interchange will
                                                                                                                                                                                                                                                                                                                                  This project calls for improving and widening of
421                                                                                                     45.1   5    1.7   33.3    6.7    38.4   45.1                                                                                   Roadway project, Transit project, Activity                                                                                                         3,000    12,000   2   4   Minor Arterial       Current          40    20    Very Poor   2010 to 2019   Conceptual Plan                                                           $6,000,000     $2,000     2010
      City of Raymore             School Road - Hubach Hill Rd to 203rd St                   33    48                                                  MO   RAYMORE             Hubach Hill Road to 203rd Street                                                                            Roadway                Capacity       School Road between Hubach Hill Road and 203rd                                                                                                                                    #######################################
                                                                                                                                                                                                                                       center/node, Bicycle and pedestrian facility                                                                                                                                                                                                                                                                                                                 Project
                                                                                                                                                                                                                                                                                                                                  Street. This project will provide significant safety
                                                                                                                                                                                                                                                                                                                                  improvements by eliminating lane edge drop offs
                                                                                                                                                                                                                                                                                                                                  This project involves construction of minor arterial
399                                                                                                     44.8   3    1.0   20.0    4.0    40.8   44.8                            This project runs south of Hubach Hill to 195th        Roadway project, Activity center/node, Bicycle and                                                                                                   0      20,000   0   4   Minor Arterial       Current          0     20    Very Poor   2010 to 2019   Conceptual Plan                                                           $2,500,000     $2,000     2010
      City of Raymore             Dean Ave - south of Hubach Hill to 195th St                20    51                                                  MO   RAYMORE                                                                                                                         Roadway                Capacity       roadway with bike/pedestrian alternatives serving                                                                                                                                 #######################################
                                                                                                                                                                                Street.                                                pedestrian facility                                                                                                                                                                                                                                                                                                                                          Project
                                                                                                                                                                                                                                                                                                                                  regional commercial, residential, and employment
                                                                                                                                                                                Tullison Road (south Outer Road to Route 9)in                                                                                                     centers.                                                                                                                                                                          This project will provide increased capacity for
448                               Tullison Rd - south Outer Rd to Rte 9 in Riverside west               44.8   9    3.0   60.0    12.0   32.8   44.8                                                                                                                                                                              Reconstruct Tullison Road, adding left turn lanes in    3,500    4,100    2   2   Minor Arterial       Current          30    25    Fair        2010 to 2019   Conceptual Plan                                                           $6,000,000    $30,000     2010
      City of Riverside, MO                                                                  60    41                                                  MO   RIVERSIDE           Riverside, MO west from Briarcliff Parkway to the      Roadway project                                      Roadway                Non-Capacity                                                                                                                                                                                     traffic along the route. It will improve the
                                  from Briarcliff Pkwy to the west terminus near I-635                                                                                                                                                                                                                                            certain locations, also adding sidewalks.                                                                                                                                                                                                                         Project
                                                                                                                                                                                west terminus near I-635.                                                                                                                                                                                                                                                                                                           system condition significantly. Because it is
                                                                                                                                                                                                                                                                                                                                  This would be Phase 2 of the US 71 Frontage Road
                                  US 71 and Main St Interchange Improvement Project                                                                                                                                                                                                                                                                                                                                                                                                                                 Climate Change and Energy Use policy goal                                        2010
787   City of Grandview                                                                      47    44   44.5   7    2.3   46.7    9.3    35.2   44.5   MO   GRANDVIEW           US 71 at Main Street and the East Outer Road           Roadway project                                      Roadway                Non-Capacity   Study Recommendation. This project would entail         70,000     0      6   6   Freeway/Expressway   Current          40    50    Fair        2010 to 2019   Conceptual Plan                                                          $10,000,000      $0
                                  (Blue Project)                                                                                                                                                                                                                                                                                                                                                                                                                                                                    System Performance policy goal                                                  Project
                                                                                                                                                                                                                                                                                                                                  the addition of a U-turn bridge over US 71 on the
                                                                                                                                                                                                                                                                                                                                  south side of Main project is to widen of a U-turn
                                                                                                                                                                                                                                                                                                                                  The purpose of the Street, the additionCountry
217                               Country Club Widening Project - between M-7 Hwy                       44.0   8    2.0   40.0    8.0    36.0   44.0                            Country Club Drive between M-7 Highway and             Roadway project, Activity center/node, Bicycle and                                                                                                 2,837    14,000   2   3   Minor Arterial       Current          100   20    Poor        2010 to 2019   Preliminary Plan                                                          $2,500,000     $2,000     2010
      City of Pleasant Hill                                                                  40    45                                                  MO   PLEASANT HILL                                                                                                                   Roadway                Capacity       Club Drive to three lanes, install curb, gutter, bike                                                                                                                             #######################################
                                  and Mulberry in Pleasant MO                                                                                                                   Mulberry in Pleasant, Missouri                         pedestrian facility                                                                                                                                                                                                                                                                                                                                          Project
                                                                                                                                                                                                                                                                                                                                  lanes, and sidewalks.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Accessibility; Economic Vitality; Placemaking;
630                               Rush Creek Parkway Flyover - Bridge over I-35 at Rush                 44.0   9    3.0   60.0    12.0   32.0   44.0                            Bridge over I-35 at Rush Creek Parkway from Glenn                                                                                                                                                           0        0      0   3   Minor Arterial       Future           0     50    Fair        2020 to 2029   Conceptual Plan                                                           $8,000,000    $30,000     2020
      City of Liberty                                                                        60    40                                                  MO   LIBERTY                                                               Roadway project                                           Roadway                Capacity       Bridge over I-35 at Rush Creek Parkway.                                                                                                                                           Public Health; System Performance - This project
                                  Creek Pkwy from Glenn Hendren to west side of I-35                                                                                            Hendren to west side of I-35.                                                                                                                                                                                                                                                                                                                                                                                       Project
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    will connect across I-35 corridor with a planned
                                                                                                                                                                                                                                                                                                                                  Construction of a four lane minor arterial including
432                                                                                                     43.7   7    2.3   46.7    9.3    34.4   43.7                            163rd Street between Foxridge Drive on the east                                                                                                                                                             0      12,000   0   4   Minor Arterial       Current          0     20    Very Poor   2010 to 2019   Conceptual Plan                                                           $3,000,000     $1,000     2010
      City of Raymore             163rd St - Fox ridge Dr to Kentucky Rd                     47    43                                                  MO   RAYMORE                                                                    Roadway project, Bicycle and pedestrian facility     Roadway                Capacity       off street multi-use path and sidewalk.                                                                                                                                           #######################################
                                                                                                                                                                                and Kentucky Road on the west.                                                                                                                                                                                                                                                                                                                                                                                      Project

                                                                                                                                                                                This project is located between the Adams Dairy                                                                                                   The purpose of this project is to provide the most
                                                                                                                                                                                                                                                                                                                                  The City of Grain Valley has been one of access to
782                               Sni-A-Bar Interchange - I-70 between Adams Dairy                      43.7   7    2.3   46.7    9.3    34.4   43.7                                                                                                                                                                                                                                        0      13,000   0   4   Interstate           Future           0     40    Very Poor   2010 to 2019   Conceptual Plan                                                          $71,000,000     $5,000     2010
      City of Grain Valley                                                                   47    43                                                  MO   GRAIN VALLEY        Parkway exit and Grain Valley exit 24 off of I-70 in   Roadway project                                      Roadway                Capacity       rapidly growing communities in the Kansas City                                                                                                                                    #######################################
                                  Pkwy and Grain Valley exit                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        Project
                                                                                                                                                                                Grain Valley, MO. This will line up Sni-A-Bar                                                                                                     Metropolitan area over the past 15 years. The City
                                                                                                                                                                                Boulevard and Tyer Road.                                                                                                                          has been working with MoDOT for roughlyof N.
                                                                                                                                                                                                                                                                                                                                  This project will involve the improvement four
416                                                                                                     42.4   3    1.0   20.0    4.0    38.4   42.4                                                                                   Roadway project, Activity center/node, Bicycle and                                                                                                 2,500    12,000   2   3   Minor Arterial       Future           40    20    Poor        2020 to 2029   Conceptual Plan                                                           $900,000       $2,000     2020
      City of Raymore             N. Madison - Gore Rd to 155th St                           20    48                                                  MO   RAYMORE             N. Madison between Gore Road and 155th Street.                                                              Roadway                Capacity       Madison Street from Gore Road (163rd Street) to                                                                                                                                   #######################################
                                                                                                                                                                                                                                       pedestrian facility                                                                                                                                                                                                                                                                                                                                          Project
                                                                                                                                                                                                                                                                                                                                  155th Street from a two lane rural section to a
                                                                                                                                                                                This project is located on existing Holke Road from                                                                                               three lane urban section including off-street
                                                                                                                                                                                                                                                                                                                                  The Holke Road Improvements, M-78 Highway to
369                                                                                                     41.1   5    1.7   33.3    6.7    34.4   41.1                                                                                                                                                                                                                                      8,000    11,000   2   3   Not Applicable       Current          50    30    Fair        2010 to 2019   Conceptual Plan                                                           $6,000,000    $22,500     2010
      City of Independence        Holke Rd - M-78 Hwy to Jackson Dr                          33    43                                                  MO   INDEPENDENCE        M-78 Highway east to its intersection with Jackson Roadway project                                          Roadway                Capacity       Jackson Drive, will improve Holke Road from a two                                                                                                                                 #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project
                                                                                                                                                                                Drive.                                                                                                                                            lane road to a three lane road with a center turn
                                                                                                                                                                                This project is located on existing Salisbury Road                                                                                                The Salisbury Road Improvements, Athleticon the
                                                                                                                                                                                                                                                                                                                                  lane. The existing roadway will be widened
367                                                                                                     40.8   3    1.0   20.0    4.0    36.8   40.8                                                                                                                                                                                                                                      8,000    12,000   2   3   Not Applicable       Current          50    30    Poor        2010 to 2019   Conceptual Plan                                                           $5,200,000    $19,500     2010
      City of Independence        Salisbury Road - Athletic Complex to Jones Rd              20    46                                                  MO   INDEPENDENCE        from the existing Athletic Complex entrance east to Roadway project, Activity center/node                   Roadway                Capacity       Complex to Jones Road, will improve the last                                                                                                                                      #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project
                                                                                                                                                                                Jones Road.                                                                                                                                       section of Salisbury Road to be widened from two
                                                                                                                                                                                                                                                                                                                                  The Truman Road Improvements, M-7be widened
                                                                                                                                                                                                                                                                                                                                  lanes to three lanes. The roadway will Highway to
348                                                                                                     40.8   3    1.0   20.0    4.0    36.8   40.8                            This project is located on existing Truman Road                                                                                                                                                           8,000    14,000   2   4   Principal Arterial   Future           50    30    Fair        2010 to 2019   Conceptual Plan                                                          $15,000,000    $60,000     2010
      City of Independence        Truman Rd - M-7 Hwy to East City Limits                    20    46                                                  MO   INDEPENDENCE                                                               Roadway project                                      Roadway                Capacity       East City Limits, will improve the existing Truman                                                                                                                                #######################################
                                                                                                                                                                                from M-7 Highway east to the East City Limits.                                                                                                                                                                                                                                                                                                                                                                      Project
                                                                                                                                                                                                                                                                                                                                  Road from two lanes to a four lane major arterial
                                                                                                                                                                                Northwood Road North of Route 9 to South of                                                                                                       Reconstruct Northwood of curbs,improved 2-3 lane
                                                                                                                                                                                                                                                                                                                                  street. The construction Road to sidewalks, storm
390                               Northwood Rd - North of Route 9 to South of                           40.3   11   3.7   73.3    14.7   25.6   40.3                                                                                                                                                                                                                                      3,836    4,500    2   2   Minor Arterial       Future           30    25    Fair        2010 to 2019   Final Plan                                                                $9,000,000    $25,000     2010
      City of Riverside, MO                                                                  73    32                                                  MO   RIVERSIDE           Prairieview Road in Riverside, Kansas City, and        Roadway project, Bicycle and pedestrian facility     Roadway                Non-Capacity   urban roadway with 12 foot lanes, roundabouts,                                                                                                                                    #######################################
                                  Prairieview Rd                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project
                                                                                                                                                                                Platte County                                                                                                                                     sidewalks and bicycle/pedestrian trail. Project also
                                                                                                                                                                                                                                                                                                                                  will project began through management system
                                                                                                                                                                                                                                                                                                                                  The construct storm wateran advocacy group and
266                                                                                                     40.0   3    1.0   20.0    4.0    36.0   40.0                            Vivion Road from Old Pike Road to approximately        Bicycle and pedestrian facility, Roadway project,                                                                                                  14,000   22,000   4   4   Principal Arterial   Current          50    50    Fair        2010 to 2019   Final Plan                                                                $2,000,000     $5,000     2010
      City of Gladstone           Vivion Rd Improvement - Old Pike Rd to 169 Hwy             20    45                                                  MO   GLADSTONE                                                                                                                       Bicycle/Pedestrian     Non-Capacity   received funding by the Missouri Department of                                                                                                                                    #######################################
                                                                                                                                                                                169 Highway in Gladstone                               Transit project                                                                                                                                                                                                                                                                                                                                              Project
                                                                                                                                                                                                                                                                                                                                  Transportation. A vision was created by area
                                                                                                                                                                                                                                                                                                                                  residents, businesses, civic leaders, planning
                                                                                                                                                                                                                                                                                                                                  The project will consist of the reconstruction of the
314                                                                                                     40.0   3    1.0   20.0    4.0    36.0   40.0                                                                                                                                                                                                                                      8,000    12,000   2   2   Not Applicable       Current          50    50    Poor        2010 to 2019   Final Plan                                                                $4,000,000     $5,000     2010
      City of Gladstone           NE 76th St Improvement - Troost to Olive                   20    45                                                  MO   GLADSTONE           NE 76th Street from N. Troost Avenue to N. Olive       Roadway project, Bicycle and pedestrian facility     Roadway                Non-Capacity   existing roadway, new sidewalks, and an on-road                                                                                                                                   #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project
                                                                                                                                                                                                                                                                                                                                  bike lanes.
                                                                                                                                                                                                                                                                                                                                  Widen M-33 to 36 arterial from M-291 to Rush
383                                                                                                     40.0   3    1.0   20.0    4.0    36.0   40.0                                                                                                                                                                                                                                      9,100      0      2   4   Minor Arterial       Current          50    50    Poor        2020 to 2029   Conceptual Plan                                                          $10,500,000    $15,000     2020
      City of Liberty             MO 33 Hwy/Lightburne Rd - M-291 to US-69 Hwy               20    45                                                  MO   LIBERTY             M-33 Highway from M-291 to US-69 Highway.              Roadway project                                      Roadway                Capacity       Creek Parkway.                                                                                                                                                                    #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project
                                                                                                                                                                                                                                                                                                                                  Widen M-33 to 52 arterial from Rush Creek
                                                                                                                                                                                                                                                                                                                                  Parkway to US-69.
                                                                                                                                                                                                                                                                                                                                  Unimproved two lane road with ditch section.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    This project would achieve safety, performance,                                  2030
471   City of Blue Springs        Jefferson St - Shaw Pkwy to Adams Dairy Rd                 47    38   39.7   7    2.3   46.7    9.3    30.4   39.7   MO   BLUE SPRINGS        Blue Springs, Mo.                                      Roadway project, Bicycle and pedestrian facility     Roadway                Non-Capacity   Reconstruct to current standards with sidewalk          5,000    10,000   2   2   Minor Arterial       Future           50    30    Poor        2030 to 2039   Conceptual Plan                                                           $5,000,000    $75,000
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    condition and place.                                                            Project
                                                                                                                                                                                                                                                                                                                                  and bike facilities.
                                                                                                                                                                                                                                                                                                                                  Unimproved two lane roadway with ditch sections
                                                                                                                                                                                Primary roadway between Blue Springs and Grain                                                                                                                                                                                                                                                                                      Improve the safety, condition and performance                                    2020
375   City of Blue Springs        AA Hwy - 40 Hwy to eastern city limits                     20    44   39.2   3    1.0   20.0    4.0    35.2   39.2   MO   BLUE SPRINGS                                                               Roadway project, Bicycle and pedestrian facility     Roadway                Non-Capacity   and hilly profile. Project would bring the roadway      12,500   25,000   2   2   Minor Arterial       Future           75    40    Very Poor   2020 to 2029   Conceptual Plan                                                           $7,500,000    $100,000
                                                                                                                                                                                Valley                                                                                                                                                                                                                                                                                                                              of the roadway.                                                                 Project
                                                                                                                                                                                                                                                                                                                                  to current standards and dramatically improve the
                                                                                                                                                                                                                                                                                                                                  safety and capacity along with bike and pedestrian
                                                                                                                                                                                                                                                                                                                                  Expand Missouri State Highway 9 from the                                                                                                                                          This project is along a planned development
737                               MO 9 Expansion -from Hwy 45 to the                                    38.4   8    2.0   40.0    8.0    30.4   38.4                            State Highway 9 from Highway 45 to the                                                                                                                                                                    10,000   20,000   2   3   Minor Arterial       Current          30    50    Good        2010 to 2019   Conceptual Plan                                                           $9,781,250    $15,000     2010
      City of Parkville                                                                      40    38                                                  MO   PARKVILLE                                                                  Roadway project, Activity center/node                Roadway                Capacity       Parkville/Riverside city limit border to the                                                                                                                                      called Parkville Connections. Along this
                                  Riverside/Parkville city limit                                                                                                                Riverside/Parkville city limit border.                                                                                                                                                                                                                                                                                                                                                                              Project
                                                                                                                                                                                                                                                                                                                                  intersection of Missouri State Highway 45. The                                                                                                                                    development the improvements would include
                                                                                                                                                                                                                                                                                                                                  expansion would be from two to three lanes and
                                                                                                                                                                                                                                                                                                                                  The existing KC Southern overpass of Blue Ridge
528                                                                                                     37.3   7    2.3   46.7    9.3    28.0   37.3                                                                                                                                                                                                                                      12,000   20,000   2   4   Not Applicable       Not Applicable   70    100   Very Poor   2010 to 2019   Conceptual Plan                                                           $5,000,000      $0        2010
      City of Grandview           KC Southern Overpass - RR crossing at Blue Ridge Blvd      47    35                                                  MO   GRANDVIEW           KC Southern RR crossing at Blue Ridge Blvd             Roadway project                                      Roadway                Capacity       Blvd has a clear horizontal opening of less than 30                                                                                                                               #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project
                                                                                                                                                                                                                                                                                                                                  ft, not enough for two lanes of traffic & a sidewalk.
                                                                                                                                                                                                                                                                                                                                  A new overpass would allow 4 lanes plus sidewalk
665                                                                                                     36.3   11   3.7   73.3    14.7   21.6   36.3                                                                                                                                                                                                                                      1,500    3,000    2   2   Not Applicable       Current          50    50    Poor        2010 to 2019   Preliminary Plan                                                          $750,000       $5,000     2010
      Platte County               MO-N & 136th - Intersection                                73    27                                                  MO   PLATTE COUNTY       136th Street Intersection                              Roadway project                                      Roadway                Non-Capacity   Safety                                                                                                                                                                            Addresses an identified safety hot spot.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project

                                  Graham Francy Arterial - Cass County east of Pleasant                                                                                         Rural Cass County east of Pleasant Hill along the                                                                                                 This project entails joining four rural Cass County
789                                                                                                     35.6   6    1.5   30.0    6.0    29.6   35.6                                                                                   Roadway project, Activity center/node, Bicycle and                                                                                                   0      2,000    0   2   Not Applicable       Future           75    40    Very Poor   2020 to 2029   Conceptual Plan                                                           $4,500,000     $2,000     2020
      City of Pleasant Hill       Hill along the routes of Graham, Sloan, Carnes, and        30    37                                                  MO   PLEASANT HILL       routes of Graham, Sloan, Carnes, and Francey                                                                Roadway                Capacity       roads and converting them into a single                                                                                                                                           #######################################
                                                                                                                                                                                                                                       pedestrian facility                                                                                                                                                                                                                                                                                                                                          Project
                                  Francey Rds                                                                                                                                   Roads.                                                                                                                                            north/south arterial between Highway 58 and
                                                                                                                                                                                                                                                                                                                                  163rd Street. A new arterial is needed in this area
                                                                                                                                                                                                                                                                                                                                  Two lane arterial with multi-use accommodations,
647                                                                                                     35.2   3    1.0   20.0    4.0    31.2   35.2                                                                                                                                                                                                                                      2,500    15,000   2   2   Minor Arterial       Future           50    50    Fair        After 2040     Conceptual Plan                                                          $75,778,500     $5,000     2030
      Platte County               Interurban - Cookingham to the Buchanan County Line        20    39                                                  MO   PLATTE COUNTY       Cookingham to the Buchanan County Line                 Roadway project, Bicycle and pedestrian facility     Roadway                Non-Capacity   including bike lanes. Approx 15 miles. Multi-                                                                                                                                     #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project
                                                                                                                                                                                                                                                                                                                                  jurisdictional.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    The 19th Street Interchange at I-35 will improve
786                                                                                                     34.9   7    2.3   46.7    9.3    25.6   34.9                            Interstate 35 and 19th Street, approximately 1                                                                                                    The City of Kearney's access is currently restricted      0      15,000   0   5   Minor Arterial       Future           0     25    Fair        2010 to 2019   Conceptual Plan                                                          $15,000,000     $2,000     2010
      City of Kearney             I-35/19th Street Interchange                               47    32                                                  MO   KEARNEY                                                                    Roadway project                                      Roadway                Capacity                                                                                                                                                                                         traffic flow and mitigate congestion by providing
                                                                                                                                                                                mile south of Route 92                                                                                                                            to a single interchange on I-35 at Route 92                                                                                                                                                                                                                       Project
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    alternative routes the Route 92 interchange,
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    The project will improve driver safety and
317                                                                                                     34.4   3    1.0   20.0    4.0    30.4   34.4                                                                                                                                                                              Project will consist of the installation of curb,       10,000   15,000   2   2   Not Applicable       Current          50    50    Fair        2010 to 2019   Preliminary Plan                                                          $5,500,000    $10,000     2010
      City of Gladstone           N Antioch Road- Shoal Creek to N Indiana                   20    38                                                  MO   GLADSTONE           N. Antioch Road- Shoal Creek to N. Indiana             Roadway project, Bicycle and pedestrian facility     Roadway                Non-Capacity                                                                                                                                                                                     encourage alternative forms of transportation
                                                                                                                                                                                                                                                                                                                                  gutter, sidewalk, and bike trail.                                                                                                                                                                                                                                 Project
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    such as biking and walking.

711                                                                                                     33.9   11   3.7   73.3    14.7   19.2   33.9                                                                                                                                                                              Construct a complete interchange at the overpass        1,443    11,300   2   2   Interstate           Future           41    30    Fair        2010 to 2019   Preliminary Plan                                                          $7,165,173     $1,000     2010
      Cass County                 US 71 & Rock Haven Road Interchange                        73    24                                                  MO   HARRISONVILLE       US71 & Rock Haven Road Cass County                     Roadway project                                      Roadway                Non-Capacity                                                                                                                                                                                     consistent with the policy goals
                                                                                                                                                                                                                                                                                                                                  of US71 & Rock Haven Road in Cass County                                                                                                                                                                                                                          Project

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Safety and capacity improvements will increase
669                                                                                                     33.3   7    2.3   46.7    9.3    24.0   33.3                                                                                                                                                                                                                                        0        0      2   2   Minor Arterial       Future           0     100   Fair        2020 to 2029   Conceptual Plan                                                          $10,000,000      $0        2020
      Platte County               MO-K - MO-45 Hwy to MO-152 Hwy                             47    30                                                  MO   KANSAS CITY         MO-45 Highway to MO-152 Highway                        Roadway project, Bicycle and pedestrian facility     Roadway                Non-Capacity   Safety and multi-use                                                                                                                                                              the roadways safety and functionality. This
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    project is multi-modal. Bicycling and walking

730                                                                                                     33.1   11   3.7   73.3    14.7   18.4   33.1                                                                                                                                                                              Align North Crooked Road and South Crooked Road         20,000   40,000   2   4   Principal Arterial   Current          20    50    Good        2010 to 2019   Conceptual Plan                                                           $3,806,250    $15,000     2010
      City of Parkville           MO 45 and Crooked Rd - Alignment                           73    23                                                  MO   PARKVILLE           Highway 45 and Crooked Road in Parkville, MO.          Roadway project, Activity center/node                Roadway                Capacity                                                                                                                                                                                         This project realigns existing roads.
                                                                                                                                                                                                                                                                                                                                  along Highway 45.                                                                                                                                                                                                                                                 Project

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Increased accessibility and safety associated                                    2020
590   City of Liberty             RTE H - from Mill St to Route B                            20    35   32.0   3    1.0   20.0    4.0    28.0   32.0   MO   LIBERTY             RTE H from Mill Street to Route B                      Roadway project                                      Roadway                Capacity       Widen from 2 to 3 lanes                                 11,120     0      2   3   Minor Arterial       Current          50    50    Fair        2020 to 2029   Conceptual Plan                                                           $3,100,000     $5,000
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    with the improvements.                                                          Project

                                                                                                                                                                                                                                                                                                                                  The City of Grain Valley has been one of the most                                                                                                                                 This project will relieve congestion at the current
795                                                                                                     31.5   5    1.7   33.3    6.7    24.8   31.5                            This project is located approximately 1.5 miles east                                                                                                                                                        0      6,000    2   4   Interstate           Future           0     40    Very Poor   2020 to 2029   Conceptual Plan                                                          $30,000,000     $5,000     2020
      City of Grain Valley        Lefholtz Interchange - 1.5 miles east of exit 24 on I-70   33    31                                                  MO   GRAIN VALLEY                                                             Roadway project                                        Roadway                Capacity       rapidly growing suburbs in the Kansas City                                                                                                                                        Grain Valley Interchange by giving residents of
                                                                                                                                                                                exit 24 off of I-70 in Grain Valley, Missouri.                                                                                                                                                                                                                                                                                                                                                                      Project
                                                                                                                                                                                                                                                                                                                                  metropolitan area during the past 15 years. Future                                                                                                                                eastern Grain Valley and Jackson County another
                                                                                                                                                                                                                                                                                                                                  growth in the area is expected to be focused
                                                                                                                                                                                                                                                                                                                                  The project would include intersection geometric                                                                                                                                  This project will improve mobility through the
426                                                                                                     28.8   3    1.0   20.0    4.0    24.8   28.8                            The intersection of Route 9 and Mattox Road in                                                                                                                                                            16,700   18,500   4   4   Minor Arterial       Current          20    20    Fair        2010 to 2019   Conceptual Plan                                                           $1,000,000    $20,000     2010
      City of Riverside, MO       MO 9 and Mattox Road - Intersection                        20    31                                                  MO   RIVERSIDE                                                                  Roadway project, Bicycle and pedestrian facility     Roadway                Non-Capacity   improvements, as well as signalization of the                                                                                                                                     intersection using signalization, also improve
                                                                                                                                                                                Riverside, MO.                                                                                                                                                                                                                                                                                                                                                                                                      Project
                                                                                                                                                                                                                                                                                                                                  intersection of Mattox Road and Route 9 in                                                                                                                                        safety by providing protected access to Mattox
                                                                                                                                                                                                                                                                                                                                  Project will extend Sterling also include pedestrian
                                                                                                                                                                                                                                                                                                                                  Riverside, MO. Project will Ave North and over a
318                               Lewis & Clark Expressway - extend Sterling Ave north                  27.7   7    2.3   46.7    9.3    18.4   27.7                                                                                                                                                                                                                                        0        0      0   2   Principal Arterial   Current          0     30    Poor        2010 to 2019   Final Plan                                                               $17,000,000      $0        2010
      City of Sugar Creek                                                                    47    23                                                  MO   SUGAR CREEK         City of Sugar Creek                                    Roadway project                                      Roadway                Capacity       grade separated rail crossing. Includes a
                                  and connect with Cement City Rd                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   Project
                                                                                                                                                                                                                                                                                                                                  connection extend east to Cement City Road.
                                                                                                                                                                                                                                                                                                                                  The goal of this project is to increase safety,                                                                                                                                   Increase the number of transportation modes
664                                                                                                     27.2   3    1.0   20.0    4.0    23.2   27.2                                                                                                                                                                                                                                        0        0      2   2   Minor Arterial       Future           0     100   Good        2020 to 2029   Conceptual Plan                                                          $10,000,000      $0        2020
      Platte County               MO-D - Running Horse to MO-N Hwy                           20    29                                                  MO   PLATTE COUNTY       Running Horse to MO-N Highway                          Roadway project, Bicycle and pedestrian facility     Roadway                Non-Capacity   carrying capacity, preserve and enhance the                                                                                                                                       directly integrated while promoting increased
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project
                                                                                                                                                                                                                                                                                                                                  natural beauty of the area, and provide pedestrian                                                                                                                                non-motorized travel. Also addressing increase
                                                                                                                                                                                                                                                                                                                                  trails.
                                                                                                                                                                                                                                                                                                                                  Continuation of Little Blue Parkway from 24 Hwy
226   Jackson County Public                                                                             27.2   2    1.0   20.0    4.0    23.2   27.2                                                                                                                                                                                                                                        0        0      0   2   Not Applicable       Not Applicable   0     30    Fair        2020 to 2029   Conceptual Plan                                                          $12,000,000    $60,000     2020
                                  Jackson County Expressway - 24 Hwy to M-291                20    29                                                  MO   INDEPENDENCE        24 Hwy to M 291 Hwy                                    Roadway project                                      Roadway                Capacity       north to M-291. Project in expected to be a two                                                                                                                                   Generally in conformance.
      Works                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         Project
                                                                                                                                                                                                                                                                                                                                  lane facility with curb and gutter, sidewalk on one
                                                                                                                                                                                                                                                                                                                                  side and multiuse path on the other.                                                                                                                                              Addresses an identified safety spot; Increases
670                               MO-152 Freeway Lane Additions - from I-435 to MO                      27.2   9    3.0   60.0    12.0   15.2   27.2                                                                                                                                                                              Capacity and Safety.                                      0        0      4   6   Freeway/Expressway   Future           0     0     Excellent   2030 to 2039   Conceptual Plan                                                          $150,000,000     $0        2030
      Platte County                                                                          60    19                                                  MO   KANSAS CITY         From I-435 to MO-169                                   Roadway project                                      Roadway                Capacity                                                                                                                                                                                         efficiency of existing system and reduces current
                                  169                                                                                                                                                                                                                                                                                             Additional eastbound and westbound lanes                                                                                                                                                                                                                          Project
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    congestion
                                                                                                                                                                                                                                                                                                                                  Multi phase project to widen Blue Ridge Blvd from                                                                                                                                 The area has a 5 large low income apartment
462                               Blue Ridge Blvd West Improvements - Grandview Rd                      26.9   7    2.3   46.7    9.3    17.6   26.9                                                                                                                                                                                                                                      12,000   20,000   2   4   Minor Arterial       Current          75    75    Fair        2020 to 2029   Conceptual Plan                                                           $6,500,000    $20,000     2020
      City of Grandview                                                                      47    22                                                  MO   GRANDVIEW           Blue Ridge Blvd: Grandview Rd to West City Limits      Roadway project                                      Roadway                Capacity       2/3 lanes to 4 lanes & add sidewalks. KC Southern                                                                                                                                 complex that require a safe pedestrian way to
                                  to West City Limits                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               Project
                                                                                                                                                                                                                                                                                                                                  RR bridge must be replaced by separate project.                                                                                                                                   commercial area east of proposed projects.
                                                                                                                                                                                                                                                                                                                                  Construction of 3lanes roadway, to 4 lanes with
                                                                                                                                                                                                                                                                                                                                  First phase would widen 2 lanes capable of being                                                                                                                                  The project will provide a safe, dependable,
469                               140th St Extension Project - new alignment from                       26.7   11   3.7   73.3    14.7   12.0   26.7                                                                                                                                                                                                                                        0      7,000    0   3   Minor Arterial       Future           0     50    Very Poor   2020 to 2029   Conceptual Plan                                                           $7,200,000     $8,500     2020
      City of Grandview                                                                      73    15                                                  MO   GRANDVIEW           New Alignment from Botts Rd to Arrington Rd            Roadway project                                      Roadway                Capacity       widened to 4 lanes with a bridge over KC Southern                                                                                                                                 shorter route connecting the industrial area west
                                  Botts Rd to Arrington Rd                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          Project
                                                                                                                                                                                                                                                                                                                                  Railroad lines to connect the west portion of                                                                                                                                     of the RR tracks with US 71 Hwy. The project
                                                                                                                                                                                                                                                                                                                                  Streetscapewith the east improvements on 135th
                                                                                                                                                                                                                                                                                                                                  Grandview and roadway
688                               135th St Streetscape (Martin City) - Inverness Dr to                  26.1   7    2.3   46.7    9.3    16.8   26.1                            135th Street between Inverness Drive and Holmes                                                                                                                                                             0        0      2   3   Principal Arterial   Current          0     0     Poor        2010 to 2019   Conceptual Plan                                                           $4,968,000      $0        2010
      City of Kansas City, MO                                                                47    21                                                  MO   KANSAS CITY                                                                Roadway project, Activity center/node                Roadway                Capacity       Street in Martin City. As recommended in the                                                                                                                                      #######################################
                                  Holmes Rd                                                                                                                                     Road                                                                                                                                                                                                                                                                                                                                                                                                                Project
                                                                                                                                                                                                                                                                                                                                  martin City Area Plan (adopted 2008)
                                                                                                                                                                                                                                                                                                                                  The purpose of this project is to widen Route 9                                                                                                                                   This project will increase mobility through the
560                                                                                                     26.1   7    2.3   46.7    9.3    16.8   26.1                            Route 9 in Riverside from Mattox Rd to Parkville                                                                                                                                                          16,800   19,300   2   4   Minor Arterial       Current          20    25    Fair        2020 to 2029   Conceptual Plan                                                          $10,000,000    $50,000     2020
      City of Riverside, MO       MO-9 -Mattox Rd to Parkville city limits                   47    21                                                  MO   RIVERSIDE                                                                  Roadway project                                      Roadway                Capacity       from 2 to 4 lanes allowing for improved capacity                                                                                                                                  corridor allowing for greater capacity, less delay,
                                                                                                                                                                                city limits.                                                                                                                                                                                                                                                                                                                                                                                                        Project
                                                                                                                                                                                                                                                                                                                                  and safety. Also include stormwater                                                                                                                                               and improved air quality.
                                                                                                                                                                                                                                                                                                                                  improvements to better manage storm water
321                               Lewis & Clark Expressway - between I-435 and Sterling                 25.6   3    1.0   20.0    4.0    21.6   25.6                            City of Sugar Creek City of Kansas City of                                                                                                        2 Lane Expressway between I-435 and Sterling Ave.         0        0      0   2   Freeway/Expressway   Future           0     30    Poor        2010 to 2019   Final Plan                                                               $29,000,000      $0        2010
      City of Sugar Creek                                                                    20    27                                                  MO   SUGAR CREEK                                                                Roadway project                                      Roadway                Capacity
                                  Ave extension                                                                                                                                 Independence                                                                                                                                      Extension                                                                                                                                                                                                                                                         Project

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Improvements to this roadway would improve
589                                                                                                     25.6   3    1.0   20.0    4.0    21.6   25.6                                                                                                                                                                                                                                      4,400      0      2   3   Minor Arterial       Current          50    50    Fair        2020 to 2029   Conceptual Plan                                                           $7,500,000    $10,000     2020
      City of Liberty             RTE B - from RTE H to US-69                                20    27                                                  MO   LIBERTY             RTE B from RTE H to US-69                              Roadway project                                      Roadway                Capacity       Widen from 2 to 3 lanes.                                                                                                                                                          the economic viability of the areas on the east
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    side of Liberty.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    This roadway would provide new capacity and
400                                                                                                     25.6   3    1.0   20.0    4.0    21.6   25.6                                                                                                                                                                              Construct a new two lane roadway with sidewalk            0      10,000   0   2   Not Applicable       Current          0     30    Very Poor   2030 to 2039   Conceptual Plan                                                           $3,500,000    $25,000     2030
      City of Blue Springs        Roanoke Rd - Adams Dairy Pkwy to NE 23rd St                20    27                                                  MO   BLUE SPRINGS        Blue Springs, Mo.                                      Roadway project, Bicycle and pedestrian facility     Roadway                Capacity                                                                                                                                                                                         achieve goals: Safety, condition and
                                                                                                                                                                                                                                                                                                                                  and bike facilities.                                                                                                                                                                                                                                              Project
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    performance.
                                  Ranson Rd - Rebuild North Ranson Rd from Highway                                                                                                                                                                                                                                                Rebuild North Ranson Road from Highway 150                                                                                                                                        This project supports Creating Quality Places by
721                                                                                                     25.3   7    2.3   46.7    9.3    16.0   25.3                                                                                                                                                                                                                                      1,000    1,000    2   2   Not Applicable       Current          50    30    Very Poor   2010 to 2019   Conceptual Plan                                                           $1,200,000     $5,000     2010
      City of Greenwood           150 (West Main St) North to the City Limit (Browning       47    20                                                  MO   GREENWOOD           North Ranson Road, Greenwood Missouri                  Roadway project                                      Roadway                Non-Capacity   (West Main Street) North to the City Limit                                                                                                                                        significantly improving a major traffic route
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project
                                  Rd)                                                                                                                                                                                                                                                                                             (Browning Road). This project will improve the                                                                                                                                    to/from the City of Greenwood.
                                                                                                                                                                                                                                                                                                                                  This project calls for grade changes withHwy south
                                                                                                                                                                                                                                                                                                                                  existing roadway from a rural road to J ditches to
412                                                                                                     22.1   7    2.3   46.7    9.3    12.8   22.1                                                                                                                                                                                                                                      3,700    20,000   2   2   Minor Arterial       Current          40    40    Poor        2020 to 2029   Conceptual Plan                                                           $600,000       $1,000     2020
      City of Raymore             J Hwy - south of Hubach Hill Rd                            47    16                                                  MO   RAYMORE             J Hwy south of Hubach Hill Road                        Roadway project, Activity center/node                Roadway                Non-Capacity   of Hubach Hill Road for a distance of approximately                                                                                                                               #######################################
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project
                                                                                                                                                                                                                                                                                                                                  one half mile to improve sight distance.

531                               Lewis & Clark Expressway - 2 Lane expressway                          20.5   7    2.3   46.7    9.3    11.2   20.5                                                                                                                                                                              2 Lane expressway between Sterling Ave and M-             0        0      0   2   Freeway/Expressway   Future           0     30    Poor        2020 to 2029   Conceptual Plan                                                          $35,000,000      $0        2020
      City of Sugar Creek                                                                    47    14                                                  MO   SUGAR CREEK         City of Sugar Creek                                    Roadway project                                      Roadway                Capacity
                                  between Sterling Ave and M-291 Hwy                                                                                                                                                                                                                                                              291 Hwy.                                                                                                                                                                                                                                                          Project


643                               Lewis & Clark Expressway - adds two lane between I-                   18.9   7    2.3   46.7    9.3    9.6    18.9                            City of Kansas, Sugar Creek, Independence and                                                                                                                                                               0        0      0   4   Freeway/Expressway   Future           0     0                 2020 to 2029                                                                            $70,000,000      $0        2020
      City of Sugar Creek                                                                    47    12                                                  MO   SUGAR CREEK                                                                Roadway project                                      Roadway                Capacity       Adds two lane between I-435 and US 24 Highway
                                  435 and US 24 Hwy                                                                                                                             Unincorporated Jackson County                                                                                                                                                                                                                                                                                                                                                                                       Project

                                  MO 291 Hwy West Outer Rdwy - Extension of the                                                                                                                                                                                                                                                   Extension of the west outer Roadway from
535                                                                                                     18.1   7    2.3   46.7    9.3    8.8    18.1                                                                                                                                                                                                                                        0        0      0   2   Minor Arterial       Current          0     30    Poor        2020 to 2029                                                                             $2,000,000      $0        2020
      City of Sugar Creek         west outer roadway from Courtney Rd to Grade               47    11                                                  MO   SUGAR CREEK         City of Sugar Creek                                    Roadway project                                      Roadway                Capacity       Courtney Road to Grade intersection on M-291
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Project
                                  intersection on M-291 Hwy                                                                                                                                                                                                                                                                       Hwy.
                                  MO 291 Hwy East Outer Rdwy - Extension of M-291
534                                                                                                     17.3   7    2.3   46.7    9.3    8.0    17.3                                                                                                                                                                              Extension of M-291 Hwy East outer roadway from            0        0      0   2   Minor Arterial       Future           0     30                2020 to 2029   Conceptual Plan                                                           $2,000,000      $0        2020
      City of Sugar Creek         Hwy East outer roadway from Baker Rd to Kentucky           47    10                                                  MO   SUGAR CREEK         City of Sugar Creek                                    Roadway project                                      Roadway                Capacity
                                                                                                                                                                                                                                                                                                                                  Baker Road to Kentucky Road                                                                                                                                                                                                                                       Project
                                  Rd
                                                                                                                                                                                                                                                                                                                                  Extend Brush Creek Parkway from Brink Myers
731                               Brush Creek Parkway Extension - from Brink Myers Rd                   17.1   5    1.7   33.3    6.7    10.4   17.1                            Brush Creek Parkway from Brink Myers Road to                                                                                                                                                                0      10,000   3   3   Minor Arterial       Future           1     50    Excellent   2020 to 2029   Conceptual Plan    This project will extend development in the I-435     $12,619,907    $25,000     2020
      City of Parkville                                                                      33    13                                                  MO   PARKVILLE                                                                  Roadway project                                      Roadway                Non-Capacity   Road to River Road in Parkville, MO. This project
                                  to River Rd in Parkville                                                                                                                      River Road in Parkville, MO                                                                                                                                                                                                                                                                                                         corridor.                                                                       Project
                                                                                                                                                                                                                                                                                                                                  will help development along the I-435 corridor in
                                                                                                                                                                                                                                                                                                                                  Parkville
                                                                                                                                                                                                                                                                                                                                  Complete engineering & Design for Expressway
465                               Lewis & Clark Expressway - Complete engineering and                   11.2   3    1.0   20.0    4.0    7.2    11.2                                                                                                                                                                                                                                        0        0      0   0   Freeway/Expressway   Not Applicable   0     0                 2010 to 2019                                                                             $4,600,000      $0        2010
      City of Sugar Creek                                                                    20    9                                                   MO   SUGAR CREEK         Sugar Creek, Unincorporated Jackson County             Roadway project                                      Roadway                Non-Capacity   between US 24 Hwy. & M-291 Hwy., and M-291
                                  design                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            Project
                                                                                                                                                                                                                                                                                                                                  Hwy to Sterling Ave.

434                               Lewis & Clark Expressway - 2 Lane expressway                          8.0    3    1.0   20.0    4.0    4.0    8.0                             City of Sugar Creek                                                                                                                               2 Lane expressway between ZM-291 Highway and              0        0      0   2   Freeway/Expressway   Future           0     30    Poor        2010 to 2019   Conceptual Plan                                                          $30,000,000      $0        2010
      City of Sugar Creek                                                                    20    5                                                   MO   SUGAR CREEK                                                                Roadway project                                      Roadway                Capacity
                                  between ZM-291 Hwy and Us 24 Hwy                                                                                                              Unincorporated Jackson County                                                                                                                     Us 24 Hwy.                                                                                                                                                                                                                                                        Project
Kansas Highway Projects LRTP 2040
                                                                                                                                                      Remaining            Proposed Project
              Year                    Total Revenue           O&M Cost           CMAQ & TE Cost            Sub Total             TIP Cost                                                       Difference
                                                                                                                                                       Revenue                  Cost
          2010 - 2020                 $2,233,326,008         $779,792,731           $37,159,896         $1,416,373,381         $367,289,680         $1,049,083,701          $3,447,633,330    ($2,398,549,629)
          2021 - 2030                 $2,494,613,455        $1,047,976,224          $41,989,960         $1,404,647,271              $0              $1,404,647,271           $870,204,000      $534,443,271
          2031 - 2040                 $3,020,066,788        $1,573,498,969          $52,873,579         $1,393,694,240              $0              $1,393,694,240           $675,491,300      $718,202,940
             Total                    $7,748,006,250       $3,401,267,924         $132,023,435         $4,214,714,891         $367,289,680         $3,847,425,211          $4,993,328,630     ($1,145,903,419)



Missouri Highway Projects LRTP 2040
                                                                                                                                                      Remaining            Proposed Project
              Year                    Total Revenue           O&M Cost           CMAQ & TE Cost            Sub Total             TIP Cost                                                       Difference
                                                                                                                                                       Revenue                  Cost
          2010 - 2020                 $2,558,027,205        $1,241,247,881          $39,899,514         $1,276,879,810         $692,851,490          $584,028,320           $1,736,600,130    ($1,152,571,810)
          2021 - 2030                 $3,006,179,158        $1,668,133,358          $55,732,756         $1,282,313,043              $0              $1,282,313,043          $2,866,712,322    ($1,584,399,279)
          2031 - 2040                 $3,853,291,928        $2,504,642,814          $81,924,342         $1,266,724,772              $0              $1,266,724,772          $2,321,576,475    ($1,054,851,703)
             Total                    $9,417,498,292       $5,414,024,054         $177,556,612         $3,825,917,627         $692,851,490         $3,133,066,137          $6,924,888,927     ($3,791,822,790)

Total Revenue minus O&M Cost minus CMAQ & TE Cost equals Sub Total.
Sub Total minus TIP Cost equals Remaining Revenue.
Remaining Revenue minus Proposed Project Cost equals Difference.
Proposed Project Cost field and Difference field include revised listing of LRTP 2040 Roadway Projects. Duplicates, overlaps, and ineligible projects have been removed.

Example Funding Targets                                                         Example Funding Targets
                       KDOT Target                                                       KS Local Project Target
               2010                    $545,523,524                                     2010             $503,560,176
               2020                    $730,416,581                                     2020             $674,230,690
               2030                    $724,721,005                                     2030             $668,973,235
               Total                  $2,000,661,110                                    Total           $1,846,764,102

Example Funding Targets                                                         Example Funding Targets
                       MoDOT Target                                                      MO Local Project Target
               2010                    $303,694,727                                     2010             $280,333,594
               2020                    $666,802,782                                     2020             $615,510,261
               2030                    $658,696,881                                     2030             $608,027,891
               Total                  $1,629,194,391                                    Total           $1,503,871,745

                                         Revenues              % of Total
KS Remaining Revenue                    $3,847,425,211           55.1%
MO Remaining Revenue                    $3,133,066,137           44.9%
Total Roadway Revenue                   $6,980,491,347          100.0%
LRTP 2040 - Roadway Projects

       Kansas: 2010 - 2040
                                                                                                                                                         construction cost of   cost share of funded   construction cost of
               2010 - 2040       total # of projects      # of projects funded   % of projects funded   # of projects unfunded total construction cost
                                                                                                                                                           funded projects            projects          unfunded projects

       state projects                    10                       7.36                  73.6%                    2.64                            #REF!         $2,000,661,110          52.0%                           #REF!
       local projects                   164                     164.00                 100.0%                    0.00                            #REF!         $1,846,764,102          48.0%                           #REF!
       total                            174                     171.36                 98.5%                    2.64                            #REF!        $3,847,425,212           100.0%                          #REF!




       Missouri: 2010 - 2040
                                                                                                                                                         construction cost of   cost share of funded   construction cost of
               2010 - 2040       total # of projects      # of projects funded   % of projects funded   # of projects unfunded total construction cost
                                                                                                                                                           funded projects            projects          unfunded projects

       state projects                    34                      14.80                  43.5%                   19.20                  $3,540,732,600          $1,629,194,391          52.0%                 $1,911,538,209
       local projects                   192                      89.09                  46.4%                  102.91                  $3,384,156,327          $1,503,871,745          48.0%                 $1,880,284,582
       total                            226                     103.89                 46.0%                   122.11                 $6,924,888,927         $3,133,066,136           100.0%               $3,791,822,791

notes: both KDOT and MoDOT have a cap in this scenario.
Scoring Methodology                                                      Sorting Methodology
Steps:                                                                   Steps:
1. The scoring system for the MARC Highway Committee Survey of           1. The MARC LRTP 2040 project submissions were sorted as follows.
LRTP 2040 Roadway Projects worked as follows. Initial scores were        Nominated projects were placed within one of the following five
assigned based on feedback received directly from committee              categories: 1. Roadway Projects, 2. Transit Projects, 3. Activity
members: Score values were: 1 = low regional priority, 3 = medium        Centers/Nodes, 4. Regional Bicycle and Pedestrian Facilities, and 5.
regional priority, and 5 = high regional priority. Totals from each of   Management and Operations Programs. A total of 600 projects
the three priority categories were summed. * If a project only           were submitted during the call for projects period from August 5 -
received 1 comment from the Highway Committee than the project           September 4, 2009. The Roadway Project category included 456
received a medium regional priority score of 3. An average score (3)     projects with a roadway related element.
was given so as not to skew the score by accepting only one review.



2. The summed committee score for each project was divided by            2. The 456 Roadway Projects were first sorted by state.  203
the number of inputs used to calculate the sum in order to create a      projects were submitted on the Kansas side of the state line. 253
set of project scores with values ranging from 1 to 5 points.            projects were submitted on the Missouri side of the state line.


3. The scores for each project were then multiplied by 20 in order       3. The Roadway Projects were then reviewed for eligibility.
to achieve a 100 point scale that could be used for direct               Potentially ineligible projects were removed from the Roadway
comparison to the MARC Staff score.                                      Project listing and have been flagged for MARC staff / Highway
                                                                         Committee discussion.

4. Finally, a weighted average was used to determine a modified          4. The remaining eligible projects were then sorted in the following   *- Note about Kansas State Roadway Projects (KDOT) . LRTP 2040
score that would contain both feedback from MARC Highway                 order: 1. by modified score (see scoring methodology) in descending
                                                                                                                                                State Project funds have been assigned in accordance with KDOT
Committee members and quantitative analysis conducted by MARC            order, 2. by MARC score in descending order, 3. by original project
                                                                                                                                                officials. Kansas State Projects have been sorted using the same
staff. The weighted average was set up as follows: 20% weight            decade from lowest to highest, and 4. by proposed construction cost
                                                                                                                                                methodology as all other LRTP 2040 Roadway Projects. All Kansas
placed on MARC Highway Committee score and 80% weight placed             from lowest to highest. Multiple categories were used in the sorting
                                                                                                                                                State Projects were assigned either partial or total funding (using the
on MARC staff score. ex. (0.20)(Committee Score) + (0.80)(MARC           process in an attempt to order the projects logically and
                                                                                                                                                proposed financial targets) to allow all Kansas State submitted projects
Staff Score) = Final Modified Score.                                     systematically. The multiple category approach assisted in
                                                                                                                                                to remain on the DRAFT financially constrained project listing.
                                                                         determining project placement in the case of a tie score.

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:20
posted:4/7/2010
language:English
pages:7