					Stand-alone Power System Quotation
RE INDUSTRY GUIDE


1. Quote document
The following information should be provided …

Date of quotation and quotation reference ( number )
Business name, address and contact details
CEC Accreditation number

Client name, address and contact details
Installation location
Estimate of start date ( e.g. X weeks from receipt of order )
Completion estimate ( e.g. X days from start )
Installation warranty statement

Reference to standard Terms and Conditions ( e.g. reverse side of quote sheet )
Deposit required with order
Final payment terms
Period for which quotation is valid ( e.g. 30 days from date of quotation )

Design and System performance details ( AS4509.2 Section 5 - 5.1 (a) to (h) )
  Design load energy
  Load management strategies and/or usage limitations
  Maximum and surge demand
  Expected daily energy contribution from each RE source ( % )
  Nominal generator runtimes
       ( Note variation due to abnormal usage and/or prevailing weather conditions )
   Renewable energy resource data used for design              … including site conditions and design
                                    parametres such as, PV array tilt and orientation, wind turbine height, etc.
   System voltage ( nominal d.c. battery voltage)

Existing SPS equipment

SPS components provided ( AS4509.2 Section 5 - 5.1 (i) ratings of major components)
Make, model/type, electrical specification, quantity, Price and GST of …
   RE generators ( e.g. PV modules, Wind generator, micro-Hydro generator )
   Input regulators and controllers
   Batteries
   Inverter
   Battery Charger
   Generator
   Design and Installation labour
   Other major equipment items
   Installation material ( e.g. cable, conduit and accessories )
   Transport and traveling costs
   $ Totals including GST

Where the client must engage other contractors
( e.g. electricians or licenced comms installers )   to complete the installation,
the scope of their involvement should be specified.

Room for the signature of the authorised company representative and where the form is used
as a Contract Acceptance, room for the client’s signature and date. Some State regulations
require a more formal contract for work over $X,000 – check the requirements for your State.




Issue 1.1 - 23 April, 2004                                                                                    Page 1 of 3
 8 November 2009 UPDATE
Stand-alone Power System Quotation
RE INDUSTRY GUIDE



Statements along the lines of …
The Business Council for Sustainable Energ is the association representing business involved
in the renewable energy industry around Australia.
All accreditees are bound by a code of ethics.
They are required to design and install power systems in accordance with all relevant
Australian Standards and BCSE design and installation guidelines.
For more information refer to the BCSE web-site www.bcse.org.au
The BCSE National Office can be contacted on (03) 9349 3077
and
As an accredited power system designer / installer I must abide by this code of ethics.
The code is available from the CEC website www.cleanenergycouncil.org.au



2. Additional documentation
There are areas where RE business needs to better protect their own interests when
dealing with some customers. If potential problems are anticipated before they arise
then a very much smoother relationship with the customer will follow.

The quotation should include all of the detail specified above.
( see section 1. Quote document )

The quotation, quotation attachments or covering letter could provide …

Statements along the lines of …

   System Design and Installation will be performed in accordance with Industry guidelines
   and all relevant Australian Standards. The applicable primary standards are …
              AS 4509     Stand-alone Power Systems
              part 1   Safety requirements
              part 2   Design guidelines
              part 3   Installation and maintenance
              AS 4086     Secondary batteries for SPS
              part 2   Installation and maintenance
              AS/NZS 5033 PV Array Installation

   All on-site work will be carried out in accordance with Workplace Health and Safety
   regulations, State and Local government requirements.
   All design, installation work and documentation complies with the requirements of our
   Quality Management system [ where a QA system is implemented ]

Scope of Work statements like …

The Stand-alone Power System comprises the equipment and components listed in the quotation.
All Design and Installation work will conform with the requirements of AS 4509 and AS 4086.
All Extra Low Voltage ( ELV ) d.c. wiring and connection will be completed in accordance
with Industry guidelines and applicable Australian Standards ( AS/NZS 3000:2007 )
Appended sketches, drawings or material schedules form part of the specification of works.




Issue 1.1 - 23 April, 2004                                                                 Page 2 of 3
 8 November 2009 UPDATE
Stand-alone Power System Quotation
RE INDUSTRY GUIDE



Inclusions statements like …

All hardware, cable and accessories are provided for the mounting, wiring
and connection of the equipment specified in quotation and any appended material
schedules.

Testing and commissioning will be performed in accordance with AS 4509.3
Testing and commissioning documentation will be provided in accordance with
AS 4509.3 recommendations and Quality Assurance guidelines.

A System Manual will be provided in accordance with AS 4509.3 recommendations.

LV d.c. accessories, wiring and installation has been included in this quotation.
Communication cabling between the equipment supplied and a 'communications network
connection point' has been included in this quotation.

Exclusions statements like …

Suitable battery and equipment areas are to be provided by the customer. These areas must
be readily accessible, well ventilated, lockable and should be vermin-proof.
For this installation a floor area of approximately XXm² is required.

All LV a.c. ( 240V ) wiring and connection must be completed
by an Electrical Contractor.
This will normally include … Inverter output to the AC Switchboard
and Generator to Battery Charger GPO or Inverter-Charger and/or supplied AC Contactor

The cost of LV a.c. accessories, wiring and installation has NOT been included in this quotation.
All LV d.c. ( >120V open circuit ) wiring must be installed, inspected and approved by an
electrical contractor.
Final test and connection of LV d.c. must also be performed by the electrical contractor.

Communications connection must be completed by an appropriately licenced data-cabling
contractor. A 'communications network connection point' must be provided adjacent to the
installed equipment. The cost of 'network' accessories, wiring and installation has NOT been
included in this Quotation.

Warranty statements like …

A X year 'workmanship' warranty applies to this Stand-alone Power System installation.

The major equipment items supplied carry manufacturers' warranties that vary between 12
months, for some equipment and limited 25 year ( eg. PV modules ). These will normally require
that the cost of return of faulty equipment is the responsibility of the equipment owner.
Costs incurred by INSERT your BUSINESS NAME for the transport, disconnection and
re-connection of repaired equipment will be invoiced to the equipment owner.




Issue 1.1 - 23 April, 2004                                                                 Page 3 of 3
 8 November 2009 UPDATE

				
DOCUMENT INFO
Shared By:
Categories:
Stats:
views:38
posted:4/5/2010
language:English
pages:3
Description: Stand-alone Power System Quotation