FARM LICENSING / REGISTRATION GUIDELINES
PROPOSED GRADE A Application and $15.00 fee Plan Submittal Form Acceptable Water Sample Facility Inspection
NAME CHANGE ON GRADE A Application and $15.00 fee Acceptable Water Sample Facility Inspection
PROPOSED MANUFACTURE – CAN Application and $15.00 fee Acceptable Water Sample Facility Inspection
NAME CHANGE ON MFG. FARM Application and $15.00 fee Acceptable Water Sample Facility Inspection
PROPOSED MANUFACTURE – BULK Application and $15.00 fee Plan Submittal Form Acceptable Water Sample Facility Inspection
MANUFACTURE CANS TO BULK Plan Submittal Form Acceptable Water Sample Facility Inspection
MANUFACTURE UPGRADE TO GRADE A Application and $15.00 fee Plan Submittal Form Acceptable Water Sample Facility Inspection
*ALL ABOVE CRITERIA MUST BE MET PRIOR TO PRODUCER SHIPPING MILK* ** WATER SAMPLE REQUIRED IN THE ABOVE CRITERIA SHALL BE TAKEN BY THE MARKETING ORGANIZATION ** ***ANY FARM THAT HAS BEEN OUT OF BUSINESS FOR MORE THAN 6 MONTHS WILL BE TREATED AS A NEW START, i.e. FULL SET OF INFORMATION AS DESCRIBED ABOVE***