					                       RECAPP Facility Evaluation Report
                                    Peace River School Div #10




                             Grace Shepherd Elementary School
                                             B3562A
                                           Hines Creek




Report run on: January 27, 2005 9:03 AM
                                             Hines Creek - Grace Shepherd Elementary School (B3562A)
                 Facility Details                                            Evaluation Details
   Building Name: Grace Shepherd Elementary             Evaluation Company: Lotus Architecture Ltd.
          Address: P. O. Box 540                             Evaluation Date: May 1 2004
         Location: Hines Creek
                                                             Evaluator Name: Mr. Tonu Mitra
       Building Id: B3562A
 Gross Area (sq. m): 3,492.09                                Evaluator Phone: (780) 413-9361
 Replacement Cost:   $6,791,322
  Construction Year: 0                                            Total Maintenance Events Next 5 years:           $72,000
                                                                  5 year Facility Condition Index (FCI):             1.06%
General Summary:
The facilty (now called Hines Creek Composite) is a one storey structure with a combination of flat and sloped roofs and
brick exterior. The facility accomodates K-12 grades and currently 200 students are enrolled. Total building area:
3,645.60 sq.m.
The school has building sections of three different ages, as follows:

1962 Building: Located to the north-west; is a wood structure with flat roof on concrete strip footing and foundation walls
with crawl space. It accomodates mostly classrooms. The roof was replaced in 1985. New flooring and new ceilings
were provided during the 2003 modernization. Existing doors and walls received new paint and some new casework
were added.
The roof is at the end of it's life and showing signs of failure. It should be replaced in the future. Windows are
deteriorating and also should be replaced in the future. This building is in acceptable condition.

1990 Addition: Located to the south-west portion of the facility; it is built out of steel frame structure on concrete piles,
perimeter beams and crawl space. It accomodates a Computer Lab., a Library, CTS and ECS classrooms. The roof
over Libray is sloped. New flooring and new ceilings were provided during 2003 modernization, along with new paint on
existing doors and walls and new casework in most area to compliment existing.
This building is in good condition.

The facility is fully spriklered and has three new portables.
2003 Addition: Located to the centre and west portion of the facility; it accomodates a Gymnasium and ancillary
spaces, a mezzanine Exercise Room, Administration section and three new portable classrooms to the east. The
structure is built on concrete grade beams and piles with crawl spaces (except under Gymnasium). The central annex
or the Main Entrance Lobby is a steel frame structure. The Administration and portables are wood frame structure and
the Gymnasium and ancillary areas are concrete and concrete block structure. Concrete tile sloped roofs provided
above Gymnasium and Mezzanine and the Entrance Lobby.
This building is in excellent condition and incorporate many innovative design features.


Structural Summary:
1962 Building: Concrete strip footings and foundation walls and wood pony walls. Wood floors and roof construction. Wood
stud loadbearing walls.

1990 Addition: Concrete piles and concrete steel beams . Steel joists and steel deck floor and roof construction. Wood stud
bearing walls.

2003: Concrete piles and grade beams and steel joists. Steel deck with concrete topping and concrete structural slab floor
construction. Structural slab on concrete block walls Mezzanine construction. Roof framing includes steel frame and steel
deck in the Main Lobby; TJI joists and OSB aheathing in Administration area and Gymnasium Storage; Glulam trusses and
glulam beam with steel decking in Gymnasium and Mezzanine roofs.

Structures of 1962 and 1990 buildings are in good condition and the 2003 building structure is in excellent condition.


Envelope Summary:
1962 Building: Exterior walls are made of loadbearing wood stud walls, batt insulation, vapour barrier, exterior plywood
sheathing and pan brick cladding. Wood windows with awning secions. Wood roof structure. Building was re-roofed with
asphalt and gravel roof in 1985.
Wood windows are deteriorating and should be replaced. The asphalt and gravel roof is at the end of it's life and showing

Report run on: January 27, 2005 9:03 AM                                                                           Page 2 of 31
                                              Hines Creek - Grace Shepherd Elementary School (B3562A)

signs of deterioration. It should be replaced in the future.

1990 Addition: Meatal stud exterior walls between steel columns. Batt insulation, vapour barrier, exterior sheathing and
pan brick cladding. Asphalt and gravel roof and SBS roof in sloped portion. Aluminum windows.
Building envelope is in satisfactory condition.

2003 Addition: Exterior walls are cavity wall system with brick skin, 75mm rigid insulation air barrier and concrete
block walls. SBS roof in flat portions and concrete tile roofing in higher sloped roof sections. Aluminum windows,
utilizing curtain wall sections.
Building envelope is in excellent condition.

All roofs have internal drains with rain water leaders discharging water at the base of the building. Water has caused
flooding and icing in the north courtyard. All windows now incorporate exterior rolling shutter, motor operated from
inside.


Interior Summary:
The facility was completely renovated in 2003 when Gymnasium and Administration wing was added.

Interior Walls: Concrete block, wood and steel stud walls with gypsum board cladding. Majority of surfaces are painted
or finished with ceramic tiles. In the new Gymnasium, the upper portions of Gymnasium walls are exposed acoustic
blocks. The Excercise Room in the Mezzanine is enclosed with tempered glass wall with large glass panels butted
together. Large MDF board mural in the Main Lobby wall and Gymnasium walls.

Interior Doors and Windows: Most existing and new doors are solid core wood on steel frames. Double leaf doors are
hollow metal onsteel frames. Most existing doors in 1962 and 1990 buildings have been refinished. Two interior
windows in 1962 building and one in new addition;all are in steel frame.

Floors: Majority of flooring is new sheet vinyl, including in 1962 and 1990 buildings. Other flooring materials include,
porcelain tiles in wet areas and entrance vestibules, carpet in Administration and offices, maple flooring in Gymnasium
and Tarkett flooring in Exrcise Room in Mezzanine.

Ceilings: Ceilings in most areas incorporate new suspended acoustic tiles, including in 1962 and 1990 buildings. Other
ceilings include gypsum board, painted in wet area and storage. Gypsum board ceilings in older buildings have been
repainted. The central portion of the Main Lobby ceiling incorporates wood slats as a decorative feature. Exposed
ceiling in Gymnasium.

All interior components and finishes are in very good condition.


Mechanical Summary:
Modernization project in 2003 replaced all mechanical systems in the building with new equipment, distribution and
controls. Essentially the building was mechanically gutted and redone. All mechanical systems are new.

Most plumbing fixtures and distribution systems were replaced. A new glycol heating boiler plant provides heating
glycol for new radiation elements, radiant ceiling panels, entrance force flow heaters, service space unit heaters, and air
handler heating coils. Two heating only air systems provide ventilation throughout the school. Domestic hot water is
provided by one natural draft tank type domestic water heater. A Direct Digital Control (DDC) system provides control of
all mechanical systems including space temperature controls. Fire protection is provided by a wet sprinkler system
and hand held fire extinguishers.


Electrical Summary:
School electrical modernization completed on 2003.
Underground electrical service to the school is 600 amps, 120/208 volts, 3 phase, 4 wires. 42 circuit panelboards were
strategically installed in the building to minimize voltage drop to all lighting, power receptacles and mechanical loads.
Motor Control Center in mechanical room feed majority of the motors and some loose starters located in the Electrical
Room. EMT conduit and wiring, some flexible armored cables and ladder type cable tray were used for raceways for
electrical loads and voice/ data communication cabling. T-8 lamps with electronic ballast were utilized throughout the
school for energy efficiency. Exterior lighting are metal halide on wall brackets and light standard poles. Combination
line voltage switch and motion sensors, low voltage relay switching and mechanical DDC control were utilized to
Report run on: January 27, 2005 9:03 AM                                                                          Page 3 of 31
                                                   Hines Creek - Grace Shepherd Elementary School (B3562A)

control lighting. Emergency battery packs and LED exit lights were provided in corridors and point of egress.
Addressable fire alarm system, intrusion alarms for school security, CAT 5e data cables underground telephone
service, and school paging system via ceiling speakers were part of the school modernization.

                                                                  Rating Guide
 Condition Rating   Performance
     1 - Critical   Unsafe, high risk of injury or critical system failure.
      2 - Poor      Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.
   3 - Marginal     Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.
  4 - Acceptable    Meets present requirements, minor deficiencies. Average operating/maintenance costs.
      5 - Good      Meets all present requirements. No deficiencies.
   6 - Excellent    As new/state of the art, meets present and foreseeable requirements.




Report run on: January 27, 2005 9:03 AM                                                                                             Page 4 of 31
                                            Hines Creek - Grace Shepherd Elementary School (B3562A)
S1 STRUCTURAL
A1010 Standard Foundations*

1962: Concrete strip footings and foundation walls.
1990: Concrete piles and grade beams.
2003: Concrete piles and grade beams.
New and existing weeping tile drains all around the facility except new Gymnasium.
1500mm deep crawl spaces under all buildings except new Gymnasium and new CTS addition on the west side. Perimeter
beams are typically 1200mm deep.
Wood stud wall on concrete foundation wall in crawlspace under 1990 building to sub divide the crawlspace.

Rating       Installed Design Life     Updated
5            0         100             September 2004

A1030 Slab on Grade*

2003: 125mm reinforced concrete slab on grade in Gymnasium and CTS addition.

Rating       Installed Design Life     Updated
6            0         100             September 2004

B1010.01 Floor Structural Frame*(Building Frame)

1962: 38 x 304 mm fir joists and built-up beams on concrete foundation walls and 38 x 89 mm wood stud pony walls.
1990: Open web steel joists on concrete pears and steel beams.
2003: Open web steel joists on concrete beams under the Main Lobby and Administration areas. Concrete beams under
Change Rooms and Corridor.
Crawl space access with steel ladder, one each on existing and new areas.

Rating       Installed Design Life     Updated
5            0         100             September 2004

B1010.02 Structural Interior Walls Supporting Floors*

1962: Load bearing wood stud Corridor and exterior walls.
2003: Concrete block walls.

Rating       Installed Design Life     Updated
             0         100             September 2004

B1010.03 Floor Decks, Slabs, and Toppings*

1962: Plywood subfloors.
1990: Steel decking and concrete topping.
2003: Steel decking and concrete topping in the Main Lobby and Administration areas and 200mm thick structural slab
between grade beams in Change Rooms and Corridor..
Floors, at the meeting point between 1962 / 1990 buildings and between 1990 / 2003 buildings appear to move.

Rating       Installed Design Life     Updated
             0         100             September 2004

B1010.05 Mezzanine Construction*

2003: Mezzanine above Change Rooms and Corridor is made of 200mm thick concrete structural slab supported by
concrete block walls.

Rating       Installed Design Life     Updated
6            0         80              September 2004




Report run on: January 27, 2005 9:03 AM                                                                 Page 5 of 31
                                           Hines Creek - Grace Shepherd Elementary School (B3562A)

B1010.09 Floor Construction Fireproofing*



Rating       Installed Design Life    Updated
5            0         50             September 2004

B1010.10 Floor Construction Firestopping*



Rating       Installed Design Life    Updated
5            0         50             September 2004

B1020.01 Roof Structural Frame*

1962: 38x304mm fir roof joist on wood stud walls.
1990: Open web steel joists and steel channel sections in Corridor. Steel columns and steel beams. Glulam beams for
sloped roof above library.
2003: The high sloped roof section in the Main Lobby is framed with steel tubular sections supported by steel beams and
columns. Flat roofs above Administration areas is framed with 660mm deep TJI joists supported by concrete block walls.
The Gymnasium roof is framed with custom made glulam trusses, supported by concrete block walls and the roof over
Mezzanine is framed with glulam beams on block walls.

Rating       Installed Design Life    Updated
5            0         100            September 2004

B1020.03 Roof Decks, Slabs, and Sheathing

1962: Plywood decking.
1990: Steel decking.
2003: Administration area and Gym Storage roofs 16mm T&G OSB decks. All other areas steel decking.

Rating       Installed Design Life    Updated
5            0         0              September 2004

B1020.04 Canopies*

1990: West entrance canopy is framed with wood.
2003: Small sloped canopy at the main entrance is framed with tubular steel members. East entrance canopy is framed
with wood.

Rating       Installed Design Life    Updated
             0         50             September 2004

B1020.06 Roof Construction Fireproofing*



Rating       Installed Design Life    Updated
5            0         25             September 2004




Report run on: January 27, 2005 9:03 AM                                                                   Page 6 of 31
                                            Hines Creek - Grace Shepherd Elementary School (B3562A)
S2 ENVELOPE
B2010.01.02.01 Brick Masonry: Ext. Wall Skin*

1962 / 1990: Pan brick cladding system. Isolated minor spalling and chipping - being repaired as regular maintenance.
Cracks along brick joints in 1962 building wall ( near Main Lobby north-west wall junction) should be monitored for further
development.
2003: Red brick to match existing pan bricks.

Rating        Installed Design Life     Updated
5             0         75              September 2004

B2010.01.06 Siding Panels

2003: Red colour fibre cement lap siding with white trims on the walls of Main Emntrance Lobby structure.

Rating        Installed Design Life     Updated
6             0         0               September 2004

B2010.01.06.03 Metal Siding*

1962 / 1990: White prefinished metal siding on facia canopy.
2003: White prefinished metal siding on facia canopy to match existing.

Rating        Installed Design Life     Updated
5             0         40              September 2004

B2010.01.09 Expansion Control: Exterior Wall Skin*



Rating        Installed Design Life     Updated
5             0         0               September 2004

B2010.01.11 Joint Sealers (caulking): Ext. Wall*



Rating        Installed Design Life     Updated
5             0         20              September 2004

B2010.02.03 Masonry Units: Ext. Wall Const.*

2003: 200 mm standard concrete block and 300 mm SKB type concrete block back up walls in the cavity wall system.
Block walls incorporate concrete filled pilasters and bond beams.

Rating        Installed Design Life     Updated
6             0         0               September 2004

B2010.02.04 Metal Studs: Ext. Wall*

1990: Metal studs between steel columns with exterior plywood sheathing and interior drywall.
2003: The new CTS addition back-up exterior walls are 38x 140mm steel studs between steel columns.

Rating        Installed Design Life     Updated
5             0         100             September 2004




Report run on: January 27, 2005 9:03 AM                                                                       Page 7 of 31
                                              Hines Creek - Grace Shepherd Elementary School (B3562A)

B2010.02.05 Wood Framing*: Ext. Wall Const.

1962: 38 x 89 mm wood stud loadbearing walls with plywood exterior sheathing and drywall interior finish.
2003: Exterior walls in Administration area are built with 38x140mm wood stud back-up wall.

Rating        Installed Design Life      Updated
5             0         100              September 2004

B2010.03 Exterior Wall Vapor Retarders, Air Barriers, and Insulation*

1962: Vapour barrier assumed provided. Batt insulation. Building paper over sheathing.
1990: Same as in 1962 construction.
2003: Air Barrier membrane. 75 mm rigid insulation.

Rating        Installed Design Life      Updated
5             0         30               September 2004

B2010.06 Exterior Louvers, Grilles, and Screens*

2003: Mechanical intake louvre on the west wall of Mezzanine.

Rating        Installed Design Life      Updated
6             0         30               September 2004

B2010.09 Exterior Soffits*

1962 / 1990: Continuous roof canopy, rigid insulation and air barrier. Prefinished metal facia and soffits.
2003: Continuous roof canopy to match existing also incorporate 75mm rigid insulation and continuous air barrier membrane
with prefinished metal facia and soffit. All roof canopies are warm and form part of exterior walls. Metal soffits at sloped Main
Entrance canopy and east entrance canopy.

Rating        Installed Design Life      Updated
5             0         30               September 2004

B2020.01.01.02 Aluminum Windows*

1990: Aluminum windows with sealed double glazing. Library windows with awning sections. All windows incorporate motor
operated steel rolling shutters, installed in 2003.

Rating        Installed Design Life      Updated
5             0         35               September 2004




 Report run on: January 27, 2005 9:03 AM                                                                           Page 8 of 31
                                            Hines Creek - Grace Shepherd Elementary School (B3562A)

B2020.01.01.05 Wood Windows*

1980: The 1962 building windows, replaced in 1980, are of wood with metal awning sections. Windows are iin poor
condition. Windows incorporate motor operated steel rolling shutter, installed in 2003.

Rating       Installed Design Life     Updated
3            0         20              September 2004

Event:   Replace windows in 1962 building.

         Concern:
         The existing wood windows are in poor condition. Windows
         have been painted regularly but they paint continues to peel.
         Evidence of cracks on surfaces and condensation. Inside
         portions may already be rotting.
         Recommendation:
         Replace all existing windows in 1962 building with new
         aluminum windows, with thermally broken sealed double
         glazing and awning sections (14 windows @ 1.80 sq.m. each).

         Type                      Year Cost          Priority
         Failure Replacement       2006 $15,000       N/A

         Updated: September 30 2004

B2020.03 Glazed Curtain Wall*

2003: All windows use aluminum curtain wall system with thermally broken sealed double glazed units with tinted glass.
Except windows (Vision Wall) in Main Entrance Lobby, all windows incorporate awning sections and motor operated steel
exterior rolling shutters.

Rating       Installed Design Life     Updated
6            0         40              September 2004

B2030.01 Exterior Entrance Doors

1990: Steel double door, upper half glazed on steel frames with central mullions at north entrance of 1962 building and west
entrance of 1990 building. The doors and frames were refinished in 2003. Hardware include panics, closers, kickplates, pull
handles and locks.
2003: Double leaf, fully glazed insulated hollow metal doors on steel frames with removable central mullion located at the
Main Entrance and East Entrance of new addition. Main Entrance doors have automatic openers. Other hardware include
panics, closers, pulls, kickplates and locks.

Rating       Installed Design Life     Updated
5            0         30              September 2004

B2030.02 Exterior Utility Doors*

2003: Double leaf, insulated hollow metal doors on steel frames in CTS, Gymnasium and Gym. Storage. Gymnasium and
Gym Storage door frames incorporate central removable mullion. Hardware include closers, deadbolts, overhead stops,
panics, thresholds, kickplates, weatherstripping.

Rating       Installed Design Life     Updated
6            0         15              September 2004

B2030.03 Large Exterior Special Doors*

2003: Steel sectional overhead door, 3mx3m, insulated with viewing panels. Motor operation.

Rating       Installed Design Life     Updated
6            0         20              September 2004
Report run on: January 27, 2005 9:03 AM                                                                       Page 9 of 31
                                               Hines Creek - Grace Shepherd Elementary School (B3562A)

B3010.01 Deck Vapor Retarder and Insulation*

1985 / 1990: The 1962 building was re-roofed in 1985. Back slopes with rigid insulation provided. Vapour barrier assumed to
be provided. Cold air infiltration reported at isolated location in 1962 building roof. Interior seal to be investigated during year
end warranty inspection.
2003: Vapour barrier provided under rigid insulation. 100 mm rigid insulation; back sloped to drains.

Rating        Installed Design Life       Updated
5             0         22                September 2004

B3010.02.02.02 Concrete Roofing Tiles*

2003: Concrete roof tiles on wood strapping on the sloped roof of Gymnasium and Mezzanine areas; on the roof of Main
Lobby structure and on the canopy roof at the Main Entrance.

Rating        Installed Design Life       Updated
6             0         30                September 2004

B3010.04.01 Built-up Bituminous Roofing (Asphalt & Gravel)*

 1990: The 1962 building was re-roofed in 1990. The roof has ridge in the middle and internal roof drains are located along
east and west walls. Steep back slopes provided from parapets. All slopes appear to have been created with rigid insulation.
The roof is in poor condition. The 1990 building has flat portions of roofs with internal roof drains. It is in good condition.
All internal roof drain leaders discharge water to building exterior. Heat tracing provided.


Rating        Installed Design Life       Updated
4             0         25                September 2004

Event:   Replace roof of 1962 building with SBS roof.

         Concern:
         Existing BUR roof is in poor condition. Washed gravel, air
         pockets and leaky areas have been reported. Cold air draft was
         noted in the middle of the ceiling space. Condition of vapour
         barrier, and insulation not known.
         Recommendation:
         Thr roof should be replaced with SBS roof complete with proper
         deck seal, greater insulation value. Detailed investigation of the
         1990 bilding roof should also be completed at this time.

         Type                         Year Cost           Priority
         Lifecycle Replacement        2008 $52,000        N/A

         Updated: September 30 2004

B3010.04.04 Modified Bituminous Membrane Roofing (SBS)*

1990: Sloped roof above Library area (south-west).
2003: Sloped roof above CTS addition (south-west). All flat roof areas of new addition with internal drains and rain water
leader to discharge water to outside. Heat tracing provided (one heat tracing cable pulled (vandalism) on the south wall of
Administration). At the base of concrete tile roofing above Gymnasium and Mezzanine, continuous gutter (1.2m wide) has
been created between parapets and base of tile roofing. Gutters are made with back sloped wood structure, insulation and
SBS membrane with two internal drains each. SBS membranes have been carried up to about 1m underside of insulation as
ice damming. No problems reported with water leak.
The 2003 sloped roof above CTS addition and flat sections of the Main Lobby roof have only one roof drain.

Rating        Installed Design Life       Updated
5             0         25                September 2004


 Report run on: January 27, 2005 9:03 AM                                                                           Page 10 of 31
                                            Hines Creek - Grace Shepherd Elementary School (B3562A)

B3010.05 Traffic Coatings*

1990 / 2003: Some concrete pavers provided around mechanical equipment.

Rating       Installed Design Life     Updated
4            0         0               September 2004

B3010.08.02 Metal Gutters and Downspouts*

2003: Higher concrete tile roofs in the Main Lobby structure dis charge water to the lower SBS flat roofs by metal gutters
and downspouts. Water discharge from rain water leader in the Main Lobby SBS roofs causing flooding and icing in the
North Courtyard - see mechanical.

Rating       Installed Design Life     Updated
             0         30              September 2004

B3010.09 Roof Specialties and Accessories*

2003: Steel ladder provided to the higher roof of Gymnasium and Mezzanine area.

Rating       Installed Design Life     Updated
6            0         25              September 2004

B3020.02 Other Roofing Openings*

1990: Roof access hatch and steel ladder in 1990 building.
2003: Roof access hatch and ladder in Administration area of 2003 building.

Rating       Installed Design Life     Updated
5            0         0               September 2004

B3020.02.03 Roof Windows (Clearstory)

2003: Aluminum curtain wall sections (permanodic colour and clear anodized) with thermally broken double glazed sealed
windows in Main Lobby area.

Rating       Installed Design Life     Updated
6            0         0               September 2004




Report run on: January 27, 2005 9:03 AM                                                                     Page 11 of 31
                                            Hines Creek - Grace Shepherd Elementary School (B3562A)
S3 INTERIOR
C1010.01 Interior Fixed Partitions*

1962 / 1990: Wood stud and steel dtud walls and gypsum board cladding.
2003: Wood stud partiotions with gypsum board cladding. Rated (Type-X) gypsum boards in fire separations. Concrete
block walls, painted.

Rating       Installed Design Life     Updated
5            0         50              September 2004

C1010.04 Interior Balustrades and Screens, Interior Railings*

2003: Mezzanine rails and posts made of painted steel pipes.

Rating       Installed Design Life     Updated
6            0         40              September 2004

C1010.05 Interior Windows*

1962: Windows between Individual Instruction Rooms and adjacent Classroom. One was replaced with aluminum framed
single glazed window in 2003.
2003: Single glazed window on steel frame between Physical Education Instructor's Office and Gymnasium. Large windows
on aluminum curtain wall framing along interior walls of Main and North Entrance Vestibules in the MAin Lobby area.

Rating       Installed Design Life     Updated
6            0         40              September 2004

C1010.06 Interior Glazed Partition*

2003: A 20.60m long x 2.4m high fully glazed partition to enclose Excercise Room in Mezzanine is made of 12mm butt
jointed tempered glass panels (with decorative frost film designs) with aluminum top and bottom rails and supported by
three intermediate HSS posts covered with aluminum.

Rating       Installed Design Life     Updated
6            0         30              September 2004

C1010.07 Interior Partition Firestopping*



Rating       Installed Design Life     Updated
5            0         0               September 2004

C1010.08 Other Partitions*

2003: Gymnasium divider curtain, motor operated.

Rating       Installed Design Life     Updated
6            0         0               September 2004




Report run on: January 27, 2005 9:03 AM                                                                 Page 12 of 31
                                             Hines Creek - Grace Shepherd Elementary School (B3562A)

C1020.01 Interior Swinging Doors*

1962 / 1990: Solid core wood doors in pressed steel frames. Approximately 80% of doors are existing and refinished in
2003. The remaining doors are new solid core birch veneered doors on existing steel frames.
2003: Aprroximately 60% of doors are single leaf, birch veneer solid core doors on steel frames. Several doors incorporate
glazing and two doors have sidelights. Approximately 30% are single leaf hollow metal doors on steel frames. Several
incorporate glazing. Hardware include lever type chrome handles, with or without locksets, plastic kickplates in office areas
and stainless steel kickplates in other areas, door stops.
Hollow metal double leaf doors with glass in upper half and hollow metal double doors, fully glazed in Corridor on steel
frames. Hardware include exit devices, overhead stops, rod latch and guards, closers and kickplates. Lockset in
Gymnasium door and Sentronic lock in Corridor double door. All doors in fire separation are rated.

Rating        Installed Design Life     Updated
6             0         40              September 2004

C1020.02 Interior Entrance Doors*

1962 / 1990: Interior doors of Vestibules are hollow metal, double leaf doors with glass on upper half, on steel frames. Doors
and frames were refinished in 2003.
2003: The interior doors of East Entrance Vestibule and the North and Main Entrance Vestibules are double leaf, hollow
metal, fully glazed doors on steel frames with removable central mullion.
Hardware include closers, push bars, pulls, overhead stops and kickplates. The North Entrance doors frosts up and stays
closed in winter. This is to be reviewed (along with adequacy of air circulation from the force flow unit) during year end
warranty inspection.

Rating        Installed Design Life     Updated
5             0         50              September 2004

C1020.03 Interior Fire Doors*

See C1020.01.

Rating        Installed Design Life     Updated
6             0         50              September 2004

C1020.04 Interior Sliding and Folding Doors*

1990: A fully glazed , aluminum framed sliding door in Computer Lab. is an existing relocated door.

Rating        Installed Design Life     Updated
5             0         25              September 2004

C1020.07 Other Interior Doors*

2003: Steel rolling shutter in Kitche pass-thru. Aluminum sliding grille with pocket door at Reception counter.
Two single leaf frameless glass doors on glass partition of Excercise Room in Mezzanine. The doors are made of 12mm
thick tempered glass with top and bottom aluminum frames and pivot hinges and locksets.

Rating        Installed Design Life     Updated
6             0         0               September 2004

C1030.01 Visual Display Boards*

2003: White boards in Classrooms. Some Classrooms have white and chalk board combination. Tack boards in
Classrooms, Library, Main Lobby and Office areas and Staff Room.

Rating        Installed Design Life     Updated
6             0         10              September 2004




 Report run on: January 27, 2005 9:03 AM                                                                      Page 13 of 31
                                              Hines Creek - Grace Shepherd Elementary School (B3562A)

C1030.08 Interior Identifying Devices*

2003: Lamicoid signs throughout.

Rating        Installed Design Life      Updated
6             0         20               September 2004

C1030.10 Lockers*

2003: Full size metal lockers in Corridor of new addition; 3/4 size lockers in Gym Change Rooms, Corridor of 1962 building
and ECS room.

Rating        Installed Design Life      Updated
6             0         30               September 2004

C1030.12 Storage Shelving*

2003: Wood storage shelving throughout with or without doors, birch ply prefinished. Sliding steel file storage shelvings in
Office / Record Storage.

Rating        Installed Design Life      Updated
6             0         20               September 2004

C1030.14 Toilet, Bath, and Laundry Accessories*

2003: Tissue paper dispensers, paper towel dispensers, soap dispensers, waste receptacles, mirrors.

Rating        Installed Design Life      Updated
6             0         20               September 2004

C2010 Stair Construction*

2003: The two stairs to Mezzanines are made of steel with concrete filled steel pan treads.

Rating        Installed Design Life      Updated
6             0         100              September 2004

C2020.05 Resilient Stair Finishes*

2003: Rubber treads and risers with rubber nosing.

Rating        Installed Design Life      Updated
6             0         20               September 2004

C2020.08 Stair Railings and Balustrades*

2003: Painted pipe railings, mounted on walls.

Rating        Installed Design Life      Updated
6             0         50               September 2004

C2020.11 Other Stair Finishes*

2003: Painted stair stringers with plastic laminated plywood trim.

Rating        Installed Design Life      Updated
6             0         0                September 2004




 Report run on: January 27, 2005 9:03 AM                                                                     Page 14 of 31
                                            Hines Creek - Grace Shepherd Elementary School (B3562A)

C3010.01 Concrete Wall Finishes*

2003: Concrete block walls are painted in most areas. Lower portion of Gymnasium walls are smooth face concrete blocks,
painted with murals. Upper portions are exposed SKB (acoustic) blocks. A large mural on the west wall of the Main Lobby
(Student Gathering area) is made of clear Desco urethane coating on coloured MDF graphics.

Rating       Installed Design Life     Updated
6            0         100             September 2004

C3010.02 Wall Paneling*

2003: The high walls of light well in the Main Entrance Lobby are clad with spruce siding with clear coats of intumescent
paint.

Rating       Installed Design Life     Updated
6            0         30              September 2004

C3010.04 Gypsum Board Wall Finishes*

2003: All existing and new gypsum board walls were painted in 2003. The Corridor walls of 1990 building is painted with
Desco Urethane glazed coat.

Rating       Installed Design Life     Updated
6            0         40              September 2004

C3010.06 Tile Wall Finishes*

2003: Glazed ceramic tiles on Washrooms and Change Room walls. The walls of Barrier Free Washroom in 1990 building
incorporate cementitous backer boards.

Rating       Installed Design Life     Updated
6            0         50              September 2004

C3010.09 Acoustical Wall Treatment*

2003: The upper portions of Gymnasium walls are SKB (acoustic blocks).

Rating       Installed Design Life     Updated
6            0         15              September 2004

C3010.13 Wall Trim and Decoration*

2003: Gymnasium wall murals incorporate coloured MDF murals. Large mural in the Main Lobby - see C3010.01.

Rating       Installed Design Life     Updated
6            0         0               September 2004

C3020.01 Concrete Floor Finishes*

2003: Concrete hardener in Mechanical Room and the new CTS Pratical Lab.

Rating       Installed Design Life     Updated
6            0         20              September 2004

C3020.02 Tile Floor Finishes*

2003: Porcelain tiles with rubber bases in the Main Entrance Vestibule and North Vestibule and Washrooms. 25x25mm
non-slip ceramic tiles in Change areas.

Rating       Installed Design Life     Updated
6            0         30              September 2004



Report run on: January 27, 2005 9:03 AM                                                                     Page 15 of 31
                                             Hines Creek - Grace Shepherd Elementary School (B3562A)

C3020.04 Wood Flooring*

2003: Maple flooring with heavy duty steel angle bases in Gymnasium

Rating        Installed Design Life     Updated
6             0         10              September 2004

C3020.07 Resilient Flooring*

2003: Approximately 70% of areas have ne sheet vinyl flooring with new rubber bases, including all Classrooms in 1962 and
1990 buildings, Main Lobby and Corridors.
Flooring has bulged at the meeting point of 1962 and 1990 buildings; this should be reviewed during the warranty year end,
Floor, at meeting point of steel deck floor and structural slab floor, along the Kitchen wall in the Main Lobby had also
bulged. This has been rectified by splitting the floor along transition.

Rating        Installed Design Life     Updated
6             0         20              September 2004

C3020.08 Carpet Flooring*

2003: In Administration areas, Reception and Library.

Rating        Installed Design Life     Updated
6             0         10              September 2004

C3020.14 Other Floor Finishes*

2003: Tarkett floor with welded seams and rubber base in Exercise Room in Mezzanine.

Rating        Installed Design Life     Updated
6             0         0               September 2004

C3030.02 Ceiling Paneling (Wood)*

2003: Spruce slat ceiling in the central portion (below light well) in the Main Lobby. Wood surfaces are coated with
intumescent paint.

Rating        Installed Design Life     Updated
6             0         25              September 2004

C3030.04 Gypsum Board Ceiling Finishes*

2003: Approximately 30% of area has drywall ceiling, this includes most wet areas, Storage and Janitor Rooms. Old, as
well as new drywall ceilings were painted in 2003. Ceilings in shower cubicles have glazed ceramic tiles.

Rating        Installed Design Life     Updated
6             0         50              September 2004

C3030.06 Acoustic Ceiling Treatment (Susp.T-Bar)*

1962 / 1990 : Except in small rooms, all suspended ceilings are new.
2003: In Administration areas, Corridor, portions of the Main Lobby ceiling, Kitchen and Reception areas.

Rating        Installed Design Life     Updated
6             0         15              September 2004

C3030.07 Interior Ceiling Painting*

2003: All gypsum board ceiling were painted in 2003 - seeC3030.04.

Rating        Installed Design Life     Updated
6             0         10              September 2004


 Report run on: January 27, 2005 9:03 AM                                                                    Page 16 of 31
                                          Hines Creek - Grace Shepherd Elementary School (B3562A)

C3030.09 Other Ceiling Finishes*

2003: Exposed glulam trusses and galvanized steel decking in Gymnasium and Mezzanine Exercise Room. Exposed steel
decking and steel joists in CTS (Practical) Room.

Rating      Installed Design Life    Updated
6           0         0              September 2004




Report run on: January 27, 2005 9:03 AM                                                             Page 17 of 31
                                              Hines Creek - Grace Shepherd Elementary School (B3562A)
S4 MECHANICAL
D2010.01 Water Closets*

2003: Floor mounted flush valve hands free.

Rating        Installed Design Life     Updated
6             0         30              September 2004

D2010.02 Urinals*

2003: Wall mounted flush valve hands free.

Rating        Installed Design Life     Updated
6             0         30              September 2004

D2010.03 Lavatories*

2003: Millwoork mounted stainless steel hands free.

Rating        Installed Design Life     Updated
6             0         30              September 2004

D2010.04 Sinks*

2003: Stainless steel

Rating        Installed Design Life     Updated
6             0         30              September 2004

D2010.05 Showers*

2003:

Rating        Installed Design Life     Updated
6             0         30              September 2004

D2010.08 Drinking Fountains / Coolers*

1990: Two circa 1990 wall mounted non-refrigerated drinking fountains reused in the south wing of the building.

Rating        Installed Design Life     Updated
5             0         30              September 2004

D2010.08 Drinking Fountains / Coolers*

2003: One new refrigerated drinking fountain in the new east wing of the building.

Rating        Installed Design Life     Updated
6             0         30              September 2004

D2010.09 Other Plumbing Fixtures*

1990: Floor mounted mop sinks in Janitor's rooms.

Rating        Installed Design Life     Updated
5             0         0               September 2004

D2020.01.01 Pipes and Tubes: Domestic Water*

2003:

Rating        Installed Design Life     Updated
6             0         40              September 2004
 Report run on: January 27, 2005 9:03 AM                                                                      Page 18 of 31
                                             Hines Creek - Grace Shepherd Elementary School (B3562A)

D2020.01.02 Valves: Domestic Water

2003:

Rating        Installed Design Life     Updated
6             0         40              September 2004

D2020.01.03 Piping Specialties (Backflow Preventors)*

2003: Backflow preventors provided on the main sprinkler service and mechanical room make-up water piping.

Rating        Installed Design Life     Updated
6             0         0               September 2004

D2020.02.02 Plumbing Pumps: Domestic Water*

2003: Domestic hot water recirc pump.

Rating        Installed Design Life     Updated
6             0         20              September 2004

D2020.02.06 Domestic Water Heaters*

2003: One natural gas fired natural draft domestic water heater.

Rating        Installed Design Life     Updated
6             0         20              September 2004

D2020.03 Water Supply Insulation*: Domestic

2003:

Rating        Installed Design Life     Updated
6             0         0               September 2004

D2030.01 Waste and Vent Piping*

2003: New sanitary service to municipal sewer service.

Rating        Installed Design Life     Updated
6             0         50              September 2004

D2030.02 Waste Piping Specialties*

2003:

Rating        Installed Design Life     Updated
6             0         50              September 2004




 Report run on: January 27, 2005 9:03 AM                                                                 Page 19 of 31
                                              Hines Creek - Grace Shepherd Elementary School (B3562A)

D2040.01 Rain Water Drainage Piping Systems*

2003: Roof drains to interior rain water leaders discharging through exterior walls to grade level.

Rating        Installed Design Life        Updated
3             0         50                 September 2004

Event:   Relocate North Courtyard rain water leader
         discharges.

         Concern:
         Grade at Rain water leader discharges on either side of North
         Courtyard are negatively sloped back to building causing icing
         in spring and fall, and flooding in the crawlspace.
         Recommendation:
         Relocate grade level discharges from rain water leaders serving
         roof area on either side of atrium to the south main entrance.

         Type                        Year Cost           Priority
         Repair                      2005 $5,000         Medium

         Updated: September 29 2004

D2040.02 Rain Water Drainage Specialties*

2003: Weeping tile around perimeter of building to sump pumps in crawlspace. Sumps pumps can discharge into sanitary
sewer system or to grade level.

Rating        Installed Design Life        Updated
6             0         0                  September 2004

D2040.02.04 Roof Drains*

2003:

Rating        Installed Design Life        Updated
4             0         40                 September 2004

D3010.02 Gas Supply Systems*

2003: New Natural gas main from utility.

Rating        Installed Design Life        Updated
6             0         50                 September 2004

D3020.02.01 Heating Boilers and Accessories: H.W.*

2003: Two RBI Futera II High efficiency low NOx glycol heating water boilers each with a boiler circulation pump, and two
main heating pumps circulate 50% glycol to the heating systems of the building.

Rating        Installed Design Life        Updated
6             0         30                 September 2004

D3020.02.02 Chimneys (&Comb. Air): H.W. Boiler*

2003:

Rating        Installed Design Life        Updated
6             0         30                 September 2004



 Report run on: January 27, 2005 9:03 AM                                                                   Page 20 of 31
                                             Hines Creek - Grace Shepherd Elementary School (B3562A)

D3020.02.03 Water Treatment: H. W. Boiler*

2003:

Rating        Installed Design Life      Updated
6             0         30               September 2004

D3040.01.01 Air Handling Units: Air Distribution*

2003: Two ahir handling units provide constant volume supply air to the school. AS-1 is a two speed unit serving the
exisitng wings of the school. AS-1 is a single speed unit serving the new wing of the school including the gymnasium.
Both units consist of a centrifugal supply fan, axial return fan, mixing section, 50mm removable media filters, and glycol
heating coil. Supply air is also provided for crawlspace ventilation.

Rating        Installed Design Life      Updated
6             0         30               September 2004

D3040.01.02 Fans: Air Distribution*

2003: Centrifugal Supply fans and axial return fans.

Rating        Installed Design Life      Updated
6             0         30               September 2004

D3040.01.03 Air Cleaning Devices:Air Distribution*

2003: 50mm replaceable media filters.

Rating        Installed Design Life      Updated
4             0         0                September 2004

D3040.01.04 Ducts: Air Distribution*

2003:

Rating        Installed Design Life      Updated
6             0         50               September 2004

D3040.01.05 Duct Accessories: Air Distribution*

2003:

Rating        Installed Design Life      Updated
6             0         0                September 2004

D3040.01.06 Air Terminal Units: Air Distribution*

2003: Reheat coils are provided for each zone.

Rating        Installed Design Life      Updated
6             0         0                September 2004

D3040.01.07 Air Outlets & Inlets:Air Distribution*

2003:

Rating        Installed Design Life      Updated
6             0         0                September 2004




 Report run on: January 27, 2005 9:03 AM                                                                     Page 21 of 31
                                               Hines Creek - Grace Shepherd Elementary School (B3562A)

D3040.03.01 Hot Water Distribution Systems*

2003: 50% glycol / 50% water is distributed to radiant panels, reheat coils, air system heating coils, entrance force flow
heaters, unit heaters, and crawlspace radiation throughout the building via two main heating pumps.

Rating        Installed Design Life       Updated
6             0         0                 September 2004

D3040.04 Special Exhaust Systems

2003: Various roof mounted exhausts serving washrooms, classrooms, CTS lab, crawlspace and a range hood.

Rating        Installed Design Life       Updated
6             0         30                September 2004

D3040.04.01 Fans*: Exhaust

2003:

Rating        Installed Design Life       Updated
6             0         30                September 2004

D3040.04.03 Ducts*: Exhaust

2003:

Rating        Installed Design Life       Updated
6             0         0                 September 2004

D3040.04.04 Ducts Accessories*: Exhaust

2003:

Rating        Installed Design Life       Updated
6             0         0                 September 2004

D3040.04.05 Air Outlets and Inlets*: Exhaust

2003:

Rating        Installed Design Life       Updated
6             0         0                 September 2004

D3050.01.01 Computer Room Air Conditioning Units*

2003: Two split system air conditioning units serving separate rooms. One wall mounted cassette serves the main
electrical / server room. One ceiling mounted unit serves the computer room. Both condensers are located on the roof of
the 1990 wing of the building.

Rating        Installed Design Life       Updated
6             0         30                September 2004

D3050.02 Air Coils*

2003: Glycol heating coils in both of the air handlers.

Rating        Installed Design Life       Updated
6             0         30                September 2004




 Report run on: January 27, 2005 9:03 AM                                                                     Page 22 of 31
                                             Hines Creek - Grace Shepherd Elementary School (B3562A)

D3050.05.02 Fan Coil Units*

2003: Force flow heaters at all entrances.

Rating        Installed Design Life     Updated
6             0         30              September 2004

D3050.05.03 Finned Tube Radiation*

2003: Wall fin radiation provided in the mezzanine wieght room and atrium. Bare fin radiation element is also provided for
crawlspace heating.

Rating        Installed Design Life     Updated
6             0         35              September 2004

D3050.05.06 Unit Heaters*

2003: Hot water unit heaters provided in the CTS shop and Mechanical room. An electric unit heater is provided for heating
in the fire pump room addition.

Rating        Installed Design Life     Updated
4             0         30              September 2004

D3060.02.05 Building Systems Controls(BMCS, EMCS)*

2003: Siemens APOGEE direct digital control system provides control of all mechanical system down to the space with
control of radiant panels and reheat coils.

Rating        Installed Design Life     Updated
6             0         25              September 2004

D4010 Sprinklers: Fire Protection*

2003: Wet sprinkler system provided throughout.

Rating        Installed Design Life     Updated
4             0         50              September 2004

D4030.01 Fire Extinguisher, Cabinets and Accessories*

2003: ABC fire extinguishers throughout.

Rating        Installed Design Life     Updated
6             0         30              September 2004

D4090.07 Fire Pumps & Water Storage Tanks*

2003: Diesel fire pump added after building modernization due to low village water pressures.

Rating        Installed Design Life     Updated
4             0         0               September 2004




 Report run on: January 27, 2005 9:03 AM                                                                    Page 23 of 31
                                             Hines Creek - Grace Shepherd Elementary School (B3562A)
S5 ELECTRICAL
D5010.01 Main Electrical Transformers*

2003 - Underground electrical primary service from ATCO Utility pole located from south-west corner of property to a
padmounted transformer located north-west of the building structure.

Rating        Installed Design Life     Updated
5             0         40              September 2004

D5010.03 Main Electrical Switchboards (Main Distribution)*

2003 - Square D main electrical switchboard located in Main Electrical Room 118, 600 amps - 120/208 volts, 3 phase 4
wires. Adequate capacity and spaces available for future breakers. Main molded case circuit breaker is a 600 amps rated
at 25 KAIC. Utility meter, ATCO Electric serial number V47007-05554589.

Rating        Installed Design Life     Updated
3             0         40              September 2004

Event:   Investigate electrical power supply surge
         protection requirement and evaluate existing
         power distribution in the school.

         Concern:
         Main molded circuit breaker trips on Utility power surge and
         when main breaker is reset, in rush current can not handle
         the full load current from all mechanical equipment causing
         tripping of circuit breaker for the Motor Control Center. Circuit
         breakers for two boilers and circulating pumps trips after main
         breaker is reset during power supply surge and they remain in
         "off" position.
         Recommendation:
         Provide an in depth power supply coordination study,
         requirement of surge protective device and load analysis to
         allow for proper evaluation of power distribution system in the
         building.

         Type                       Year Cost           Priority
         Study                      2005 $5,000         Medium

         Updated: September 29 2004

D5010.05 Electrical Branch Circuit Panelboards (Secondary Distribution)*

2003 - Square D panelboards cat. no. NQOD 454L225 CU series E2, 225 amps, 120/208 volts, 3 phase, 4 wires. Majority of
panelboards have no space for additional circuit breaker. Panelboards strategically located in Electrical, Mechanical and
Storage rooms to maintain minimum voltage drop to electrical devices, lighting. and mechanical loads. Panelboard C for
Computer Room electrical loads installed complete with surge protective device by Surgelogic, panelboard located in Main
Electrical Room 118. Panelboard in the Career Technology Studies, CTS is controlled by contactor for panelboard power
shut down in case of emergency.

Rating        Installed Design Life     Updated
4             0         30              September 2004

D5010.07 Motor Control Centers (Motor Control)*

2003 - Square D 600 amps, 3 phase, 3 wires, 60 Hz Cat. no. 15151577-012 Motor Control Center located in Mechanical
Room 203, space available for future motor/fan starters.

Rating        Installed Design Life     Updated
5             0         25              September 2004

Report run on: January 27, 2005 9:03 AM                                                                   Page 24 of 31
                                              Hines Creek - Grace Shepherd Elementary School (B3562A)

D5010.07.02 Motor Starters and Accessories*

2003 - Loose Telemecanique single phase starters located in Main Electrical Room 118.

Rating        Installed Design Life      Updated
5             0         0                September 2004

D5020.01 Electrical Branch Wiring*

2003 - General branch circuit wiring for devices, lighting and motor loads are conduit and wiring and flexible armored cables
for recessed fluorescent fixture final connections. Aluminum ladder type cables tray for voice/data cabling distribution.
Adequate amount of wall and flush floor mounted duplex receptacles and selected testing indicates proper terminations and
grounding. Thirteen exterior vehicle receptacles are mounted on pressure treated wood, for energy conservation power
supply is controlled by time clock and thermostat through DDC control system. Self regulating Thermon heat tracings
cables in roof drain down spouts are all exposed at the end and not on ground fault circuit breaker control, this is still
covered by warranty. Motorized window shutters on individual single pole line voltage switches, consider providing a
momentary control switch to avoid damage to motor if control limit switch fails.

Rating        Installed Design Life      Updated
4             0         50               September 2004

D5020.02 Interior Lighting

2003 - Lighting is generally fluorescent fixtures, T8 and PL lamps complete with electronic ballast. Corridors, classrooms,
general office, staff areas have 2, 3 and 4 T8 lamps, 2' x 4', recessed acrylic and 2 inch deep louver parabolic lenses,
indirect/direct and wrap around lighting fixtures, master/slave wiring ballasts were provided. Incandescent lamps are utilized
in crawlspace with porcelain lamp holder and in vapor proof lenses for air handling units. Lighting levels based on the spot
checks are within IES lighting level requirements.

Rating        Installed Design Life      Updated
4             0         35               September 2004

D5020.02.01 Lighting Accessories (Lighting Controls)*

2003 - Gymnasium fluorescent fixtures are controlled by low voltage relay system, SPI System Ltd. model LCS-2 S/N 03-
1003 rated at 120 volts, 60 Hz, 20 amps single phase complete with 20 amps HID relays located in Mechanical Room 203.
Occupancy motion sensor Leviton model ODC 10/15/20 are provided in Classrooms, Corridors and Washrooms. Library
and Student Gathering Areas controlled by ambient lighting sensor controls.

Rating        Installed Design Life      Updated
5             0         0                September 2004

D5020.02.02.01 Interior Incandescent Fixtures*

2003 - Fixtures in crawlspaces and in air handling units are illuminated with incandescent light source.

Rating        Installed Design Life      Updated
4             0         0                September 2004

D5020.02.02.02 Interior Florescent Fixtures*

2003 - Majority of fixtures are T8 lamps with electronic ballast and some recessed compact fluorescent fixtures.

Rating        Installed Design Life      Updated
5             0         0                September 2004

D5020.02.02.03 Interior Metal Halide Fixture*

2003 - Wall mounted metal halide fixtures in main lobby/student gathering area.

Rating        Installed Design Life      Updated
5             0         0                September 2004

 Report run on: January 27, 2005 9:03 AM                                                                       Page 25 of 31
                                              Hines Creek - Grace Shepherd Elementary School (B3562A)

D5020.02.03 Emergency Lighting*

2003 - Emergency lighting systems are provided by Battery Packs complete with integral and remote heads throughout the
school, Lithonia Cat. no. M12-72-12 RO CS, 12 volts DC, sealed lead calcium battery and complete with miniature halogen
lamps. Battery packs are controlled by DDC system for testing but were disconnected due to premature burnt out of
halogen lamps. Battery packs are now manually tested monthly. Exit lights are rated for dual voltages 120 or 347 volts
complete with metal stencil and LED lamps and also connected to battery packs.

Rating        Installed Design Life      Updated
5             0         0                September 2004

D5020.03.01.03 Exterior Metal Halide Fixtures*

2003 - Wall mounted HID in school perimeter and decorative pole mounted with prismatic acrylic refractor tempered glass in
main entrance and parking lot.

Rating        Installed Design Life      Updated
6             0         0                September 2004

D5020.03.02 Lighting Accessories (Lighting Controls)*

2003 - Exterior lights controlled by photo electric cell and time clock via DDC control.

Rating        Installed Design Life      Updated
5             0         0                September 2004

D5030.01 Detection and Alarm Fire Alarm*

2003 - Fire alarm system is an Edwards ESI Quick Start QS4 fire alarm control panel in the main vestibule complete with
LED annunciator. Fire alarm verification performed last February 27, 2004. Some smoke detector experiencing premature
system trouble indicating dirty sensor, covered by supplier warranty to adjust devices sensitivity. 1962 crawlspace
construction area not protected with heat detector.

Rating        Installed Design Life      Updated
4             0         25               September 2004

D5030.02.01 Door Answering*

2003 - Main entrance buzzer system with one push button by main exterior and buzzer in Main Office area.

Rating        Installed Design Life      Updated
5             0         25               September 2004

D5030.02.02 Intrusion Detection*

2003 - Alarm Bridge Security Monitoring DSC-Power Series 832 PC 5010 intrusion alarm control panel located in the
Electrical Room 118 complete with two key pads. PIR detectors located throughout the school with one audible siren. All
exterior doors are also monitored with door contacts.

Rating        Installed Design Life      Updated
4             0         25               September 2004

D5030.02.03 Security Access*

2003 - Entry key pad located in corridor adjacent to General Office and one audible siren.

Rating        Installed Design Life      Updated
4             0         25               September 2004




 Report run on: January 27, 2005 9:03 AM                                                                    Page 26 of 31
                                            Hines Creek - Grace Shepherd Elementary School (B3562A)

D5030.03 Clock and Program Systems*

2003 - Battery operated clocks provided throughout the school.

Rating       Installed Design Life     Updated
5            0         20              September 2004

D5030.04 Voice and Data Systems

2003 - Data wiring are FT 4 rated Cat 5e cables. Internet system provided by Bell Express with roof top mounted antenna.
Two data racks are provided in the Electrical Room 118.

Rating       Installed Design Life     Updated
4            0         15              September 2004

D5030.04.01 Telephone Systems*

2003 - Telephone service is via underground with 2 inch conduit from Utility Pole located south-west of the property.
Telephone system is a Panasonic D1232 Digital Super Hybrid System KX-TD. Head-end equipment located in the
Electrical Room 118. Telephone sets in staff areas and classrooms. Equipment power supply protected with Surge Arrest
Network APC.

Rating       Installed Design Life     Updated
4            0         15              September 2004

D5030.04.02 Paging Systems*

2003 - Paging system control panel located in Electrical Room 118, Rauland Telecenter TC 2100 for intercom, public
address sound system and class schedule bell system.

Rating       Installed Design Life     Updated
5            0         15              September 2004

D5030.05 Public Address and Music Systems*

2003 - Paging system component, TOA 900 Series II Amplifier M900 KM2.

Rating       Installed Design Life     Updated
5            0         0               September 2004

D5030.06 Television Systems*

2003 - Roof mounted antenna with Holland Model HDA-1800 Broadband Distribution Amplifier located in Electrical Room
118. Power supply protected by Surge Arrest Network APC.

Rating       Installed Design Life     Updated
4            0         0               September 2004

D5090.01 Uninterruptible Power Supply Systems*

2003 - Data rack back up power supply provided by APC Smart UPS 1000.

Rating       Installed Design Life     Updated
5            0         20              September 2004




Report run on: January 27, 2005 9:03 AM                                                                   Page 27 of 31
                                           Hines Creek - Grace Shepherd Elementary School (B3562A)
S6 EQUIPMENT, FURNISHINGS AND SPECIAL CONSTRUCTION
E1010.07.02 Vending Machines

2003: Four vending machines in the Main Entrance Lobby.

Rating       Installed Design Life    Updated
5            0         0              September 2004

E1020.05 Audiovisual Equipment

2003: Pull dowm projection screens in Classrooms. A large (7m x 5m) projection screen installed in Gymnasium for
community use.

Rating       Installed Design Life    Updated
6            0         0              September 2004

E1090.02 Solid Waste Handling Equipment*

1990: Commercial bin.

Rating       Installed Design Life    Updated
5            0         0              September 2004

E1090.04 Residential Equipment*

2003: Stove, exhaust hood, fridge, dishwasher and microwave in Staff Room. Washer, dryer, stove and exhaust hood, fridge
in CTS / Theory / Science Room, stove with exhaust hood and fridge in ECS Room. Two range with exhaust hood and a
cooler and microwave in Kitchen.

Rating       Installed Design Life    Updated
6            0         10             September 2004

E1090.07 Athletic, Recreational, and Therapeutic Equipment*

2003: Excercise equiment in Exercise Room. Six basket ball hoops (four movable), badminton and volley ball poles and
nets, floor hockey goals, climbing and gymnastic apparatus and an electronic score board in Gymnasium.

Rating       Installed Design Life    Updated
6            0         15             September 2004

E2010.02.05 Educational Facility Casework*

2003: Extensive casework, old and new. Most built-in casework in 1962 and 1990 buildings have been retained and some
have been refinished. Classrooms typically incorporate sink and storage cabinets with open shelving or with doors. Some
Classrooms incorporate continuous cupboards. The CTS / Theory / Science Room has sink cabinets and continuous glass
front cupboards, sewing cart storage cabinet and storage bins above and demonstration counter with cabinets and rotating
mirror above. Computer Lab. has mobile computer stations. Classrooms and Library in 1962 and 1990 buildings have also
been provided with mobile computer stations. CTS (Wood Working) has work benches, storage cabinet and cupboards,
peg boards. The Work Area in Staff Room incorporated full size storage cabinets, counter/ work stations and storage
cabinets.
All new casework is birch veneer with plastic laminate counter tops.

Rating       Installed Design Life    Updated
6            0         0              September 2004

E2010.02.07 Kitchen Casework*

2003: Cabinet with counter top, cupboards sink cabinets, pass-thru counter in Kitchen. Staff Room incorporates sink and
storage cabinets and cupboards. Birch veneer with plastic laminate counter tops with semi round birch edging.

Rating       Installed Design Life    Updated
6            0         0              September 2004

Report run on: January 27, 2005 9:03 AM                                                                   Page 28 of 31
                                              Hines Creek - Grace Shepherd Elementary School (B3562A)

E2010.02.09 Library Casework*

2003: Library has a large counter with drawer units, shelving units, storage and card filing cabinets.

Rating        Installed Design Life      Updated
6             0         0                September 2004

E2010.02.99 Other Casework*

2003: A large reception counter in the Main Lobby. Plastic laminate with custom design and plastic laminate counter top
with birch edging. Mobile storage bins and carts for shot put and other atheletic equipment. Boot racks in Vestibules.

Rating        Installed Design Life      Updated
6             0         0                September 2004

E2010.03.06 Curtains and Drapes*

2003: Shower curtains in Change Rooms.

Rating        Installed Design Life      Updated
6             0         20               September 2004

E2020 Moveable Furnishings*

1990 / 2003: Students' desks and chairs, round tables and chairs in ECS Room, CTS / Science / Theory, Library; Board
table and chairs and sofas in Staff / Work Room, office desks and chairs.

Rating        Installed Design Life      Updated
5             0         20               September 2004




 Report run on: January 27, 2005 9:03 AM                                                                   Page 29 of 31
                                             Hines Creek - Grace Shepherd Elementary School (B3562A)

F1010.02.04 Portable #1 (West Portable)

PORTABLE #1 (West Portable)
Built and installed in 2003 and attached on the east side of the main building structure. One storey wood structure with flat
roof and brick exterior.

BUILDING STRUCTURE & BUILDING ENVELOPE
Foundation:
2003: Concrete piles. Crawl space heated and ventilated.
Floor Construction:
2003: HSS beams on piles. Wood joists, batt insulation and plywood subfloor.
Exterior Walls:
2003: 38 x 235 mm wood stud load bearing walls. Batt insulation and poly vapour barrier. Gypsum board interior and
plywood exterior sheathing. Building paper, metal lath and plaster coats and brick slices.
Roof:
2003: 2 ply SBS membrane, fibreboard, 100mm EPS insulation sloped to drain, plywood sheathing and TJI roof joists. One
internal roof drain.
Exterior Doors and Windows:
2003: Aluminum windows, curtainwall sections with thermally broken, sealed double glazing units and awning sections. No
exterior doors.

BUILDING INTERIOR
Interior Walls:
2003: 38 x 140 mm wood stud walls with rated and non-rated gypsum boards, painted.
Flooring:
2003: Sheet vinyl and rubber base.
Ceiling:
2003:Two layers of rated gypsum boards under roof joists and suspended acoustic tile ceiling..
Casework, Equipment & Furnishings:
2003: Student desks and chairs, mobile computer stations, storage cabinets and counter tops, white boards and tack
boards.

MECHANICAL
Heating:
2003: Hot water radiant panel heating.
Ventilation:
2003: Furnace with ceiling mounted duct work and diffusers, return air and roof mounted general exhaust. Crawl space
ventilated by supply air from main air system and a roof mounted exhaust drawing air from crawl space.
Plumbing:
None.
Sprinklers:
2003: Wet sprinkler system connected to main building distribution.
Rain Water:
Roof drains to grade level splash pads.

ELECTRICAL
Power:
From the main building.
Lighting:
Fluorescent fixtures, T8 lamps with electronic ballasts. Occupancy motion sensor.
Emergency Lighting & Fire Allarm:
Main building.


Rating        Installed Design Life      Updated
6             0         0                September 2004




 Report run on: January 27, 2005 9:03 AM                                                                        Page 30 of 31
                                             Hines Creek - Grace Shepherd Elementary School (B3562A)

F1010.02.04 Portable #2 (East Portable)

2003: All descriptions and comments are identical to Portable #1, see F1010.02.04.

Rating       Installed Design Life     Updated
6            0         0               September 2004

F1010.02.04 Portable #3 (North Portable)

2003: All descriptions and comments are identical to Portable #1 - see F1010.02.04.

Rating       Installed Design Life     Updated
6            0         0               September 2004

F1010.02.05 Bleachers*

2003: Two sets of portable bleachers in Gymnasium.

Rating       Installed Design Life     Updated
6            0         0               September 2004



S8 FUNCTIONAL ASSESSMENT
K4010.01 Barrier Free Route: Parking to Entrance

2003: Curb cuts provided. Handicapped parking stall provided. Entrance at grade.

Rating       Installed Design Life     Updated
6            0         0               September 2004

K4010.02 Barrier Free Entrances

2003: The Main Entrance doors incorporate automatic door openers.

Rating       Installed Design Life     Updated
6            0         0               September 2004

K4010.03 Barrier Free Interior Circulation

2003: All areas, except mezzanine level is accessible by the handicapped.

Rating       Installed Design Life     Updated
5            0         0               September 2004

K4010.04 Barrier Free Washrooms

2003: Barrier free wc and shower facilities in Change Rooms, complete with fold down seating in shower and grab bars. One
wc door swings inward. A complete suite of barrier free washroom, including shower provided near Special Education Room
in 1990 building.

Rating       Installed Design Life     Updated
6            0         0               September 2004




Report run on: January 27, 2005 9:03 AM                                                                   Page 31 of 31
                                                     Hines Creek - Grace Shepherd Elementary School (S3562)
                    Facility Details                                                   Evaluation Details
   Building Name: Grace Shepherd Elementary                     Evaluation Company: Lotus Architecture Ltd.
          Address:                                                   Evaluation Date: May 1 2004
         Location: Hines Creek
                                                                     Evaluator Name: Mr. Tonu Mitra
       Building Id: S3562
 Gross Area (sq. m): 0.00                                            Evaluator Phone: (780) 413-9361
 Replacement Cost:   $0
  Construction Year: 0                                                     Total Maintenance Events Next 5 years:
                                                                           5 year Facility Condition Index (FCI):                       0%
General Summary:
The front area of the building was developed in 2003.The site is entered by two access roads; one for the bus turn
around and drop- off and other for parking and parent turn around and drop-off. Both are tied together with a large
concrete pavement and sidewalks. The circular section of bus turn around has been landscaped.
All roadways and parking lot are paved with asphalt with surface drainage.
Generally, all front development is in good condition.
Play field and playground are located to NW of site and all equipment are existing. Some seed ing was completed last
year.
A Student Courtyard has been developed north of the Main Entrance Lobby. It incorporates pavers and grass with
shrubs, planters and picnic tables. Some flooding reported in this area rom water in roof drains.
Areas around the building were sodde last year. There no mature trees on the site. Perennials and shrubs planted in the
front area.

Structural Summary:



Envelope Summary:



Interior Summary:



Mechanical Summary:
Utilities (natural gas, water and sanitary sewer) provided from services in adjacent street. Non-freeze hose bibbs
provided for site irrigation, and storm water is drained to the site surface. All mechanical componentsare new and in
good condition.


Electrical Summary:
School electrical modernization completed in 2003. Underground electrical service to the school is 600 amp, 3 phase, 4
wires, 120/208 volts. Telephone service is also undrground with 50mm conduit from Utility Pole. All electrical
components are new and in good condition.

                                                                  Rating Guide
 Condition Rating   Performance
     1 - Critical   Unsafe, high risk of injury or critical system failure.
      2 - Poor      Does not meet requirements, has significant deficiencies. May have high operating/maintenance costs.
   3 - Marginal     Meets minimum requirements, has significant deficiencies. May have above average operating maintenance costs.
  4 - Acceptable    Meets present requirements, minor deficiencies. Average operating/maintenance costs.
      5 - Good      Meets all present requirements. No deficiencies.
   6 - Excellent    As new/state of the art, meets present and foreseeable requirements.




Report run on: January 31, 2005 8:48 AM                                                                                             Page 2 of 6
                                                 Hines Creek - Grace Shepherd Elementary School (S3562)
S7 SITE
G2010.02.02 Flexible Pavement Roadway (Asphalt)*

2003: There are two roadways from south; one leading to the bus / vehicle drop-off and turn around infront of the Main
Entrance and other from SW corner to the parking lot. The roads are paved with asphalt. Surface drainage.
Minor ponding in bus turn around and should be reviewed during the warranty inspection.

Rating        Installed Design Life        Updated
5             0         0                  September 2004

G2010.05 Roadway Curbs and Gutters*

2003: Concrete curbs. Existing curbs part way along the access road to drop-off.

Rating        Installed Design Life        Updated
5             0         0                  September 2004

G2010.06 Roadway Appurtenances*

2003: Access roads identification provided. No traffic barriers and no pavement marking on roads.

Rating        Installed Design Life        Updated
5             0         0                  September 2004

G2020.02.02 Flexible Paving Parking Lots(Asphalt)*

2003: Asphalt parking lot incorporates staff parking (33 stalls energized), visitor parking (3 stalls) and one barrier free stall.
Paved with asphalt; surface drainage. Added 14 more energized stalls last year. Parking lot has paved semi-circular turn
around for parent drop-off.

Rating        Installed Design Life        Updated
5             0         0                  September 2004

G2020.05 Parking Lot Curbs and Gutters*

2003: concrete curbs.

Rating        Installed Design Life        Updated
6             0         0                  September 2004

G2020.06.01 Traffic Barriers*

2003: Painted pipe rails along sidewalk.

Rating        Installed Design Life        Updated
5             0         0                  September 2004

G2020.06.03 Parking Lot Signs*

2003: Barrier free and visitor stalls have been idenfied.

Rating        Installed Design Life        Updated
6             0         0                  September 2004

G2020.06.04 Pavement Markings*

2003: All parking stalls are marked and barrier free marking on the pavement.

Rating        Installed Design Life        Updated
5             0         0                  September 2004




 Report run on: January 31, 2005 8:48 AM                                                                              Page 3 of 6
                                               Hines Creek - Grace Shepherd Elementary School (S3562)

G2030.04 Rigid Pedestrian Pavement (Concrete)*

2003:A large area in the front of the building is paved with concrete which ties together the curb sides of bus turn around
(circular) and parent drop-off (semi-circular) and sidewalks to building entrances.
Concrete surface has started to spall in some locations - to be reviwed during warranty inspection.
Concrete sidewalk from the building and along the east side of access roadway (to bus turn-off) connects to the existing
sidewalk part way of the access road. A new sidewalk added last year to the right side of the Main Entrance.

Rating        Installed Design Life       Updated
5             0         0                 September 2004

G2040.02 Fences and Gates*

2003: 2 m high chain link fence, at the north side of CTS addition encloses a pump shed and an antenna.

Rating        Installed Design Life       Updated
6             0         0                 September 2004

G2040.03 Athletic and Recreational Surfaces*

1990 / 2003: Play field and playground areas to NW of property. Most surfaces were seeded in 2003. The future athelic/
play field is planned in SW corner, however, the existing school building is still being demolished. Directly north of the Main
Lobby (the space between 1962 building and the new addition) has been developed as courtyard for students with unit
pavers and grass in the middle. However, paving surfaces near the building gets flooded with roof drain water and freezes -
see Mechanical evaluation.

Rating        Installed Design Life       Updated
4             0         0                 September 2004

G2040.03.07 Rigid Pavement

2003: Concrete slab within the fenced area, north of CTS addition.

Rating        Installed Design Life       Updated
6             0         0                 September 2004

G2040.05 Site and Street Furnishings*

2003: Picnic tables in north courtyard.

Rating        Installed Design Life       Updated
5             0         0                 September 2004

G2040.05.03 Trash and Litter Receptacles

2003: Provided in the front concrete area.

Rating        Installed Design Life       Updated
6             0         0                 September 2004

G2040.06 Exterior Signs*

2003: 150mm high cast aluminum sign mounted on painted pressure treated sign structure, 1.2m high, infront of the Main
Entrance. The sign appears low for it to be viewed from access roads.

Rating        Installed Design Life       Updated
4             0         0                 September 2004




 Report run on: January 31, 2005 8:48 AM                                                                          Page 4 of 6
                                               Hines Creek - Grace Shepherd Elementary School (S3562)

G2040.08 Flagpoles*

2003: Two flag poles in the concrete area between the two turn arounds.

Rating        Installed Design Life     Updated
6             0         0               September 2004

G2050.01 Irrigation Systems*

2003: Exterior non-freeze hose bibbs.

Rating        Installed Design Life     Updated
5             0         0               September 2004

G2050.04 Lawns and Grasses*

2003: Grass turf was laid around the building in 2003. A 600mm wide continuous strip of shale along the perimeter of the
facility walls. Grass in the middle portion of Student Courtyard (north of the Main Lobby and within the circular space of bus
turn around.

Rating        Installed Design Life     Updated
5             0         0               September 2004

G2050.05 Trees, Plants and Ground Covers*

2003: Shrubs and perennials in the front area; within the circle area of bus turn around and in the Student Courtyard, north
of Main Lobby. There are no mature trees around the building, however, the site is surrounded by forest like setting.

Rating        Installed Design Life     Updated
5             0         0               September 2004

G2050.07 Planting Accessories*

2003: Concrete planters in Student Courtyard, north of MAin Lobby.

Rating        Installed Design Life     Updated
5             0         0               September 2004

G3010.02 Site Domestic Water Distribution*

2003: 150mm DCW from Municipal service.

Rating        Installed Design Life     Updated
6             0         0               September 2004

G3010.03 Site Fire Protection Water Distribution*

2003: Fire hydrant and siamese connection.

Rating        Installed Design Life     Updated
6             0         0               September 2004

G3020.01 Sanitary Sewage Collection*

2003: 100mm sanitary connection to Municipal service.

Rating        Installed Design Life     Updated
6             0         0               September 2004




 Report run on: January 31, 2005 8:48 AM                                                                          Page 5 of 6
                                             Hines Creek - Grace Shepherd Elementary School (S3562)

G3030.01 Storm Water Collection*

2003: Surface drainage.

Rating        Installed Design Life    Updated
5             0         0              September 2004

G3060.01 Gas Distribution*

2003: 50mm natural gas from utility.

Rating        Installed Design Life    Updated
6             0         0              September 2004

G4010.02 Electrical Power Distribution Lines*

2003: Underground electrical primary service from ATCO Utility power pole located south-west of the school property to a
pad mounted transformer located north-west of the building.

Rating        Installed Design Life    Updated
5             0         0              September 2004

G4010.03 Electrical Power Distribution Equipment*

2003: The main electrical switchgear, a Square D is located in the Main Electrical Room 118, a 600 amps 120/208 volts, 3
phase, 4 wires with 3 pole 600 amp molded case circuit breaker rated at 25kAIC. No power surge protection (see Electrical
D5010.03).

Rating        Installed Design Life    Updated
3             0         0              September 2004

G4010.04 Car Plugs-ins*

2003: Thirteen weather proof exterior vehicle duplex receptacles are mounted on pressure treated wood. Power supply to
each receptacle controlled by time clock and thermostat through DDC control system for energy conservation.

Rating        Installed Design Life    Updated
4             0         0              September 2004

G4020 Site Lighting

2003: Wall mounted HID fixtures in school perimeter and decorative pole mounted fixtures with prismatic acrylic refractor
tempered glass are located in the main entrance and parking lot.

Rating        Installed Design Life    Updated
4             0         0              September 2004




 Report run on: January 31, 2005 8:48 AM                                                                     Page 6 of 6

				
DOCUMENT INFO