									                                   Workshop for PIN & Baseline,
                             ICS-CDM/JI programme in Cambodia
                                           15th November, 2004
                                        Phnom Penh, Cambodia




   Cambodian Model Case:
Renewable Energy Project Using
Wind and Solar Power in Mondul
   Kiri Province, Cambodia

               Norio Ikejima
          Marubeni Corporation
              (Tokyo, Japan)
        ikejima@tec.marubeni.co.jp
1. Renewable Energy Project Using Wind and Solar
     Power in Mondul kiri Province, Cambodia
                           Location: Highland in Mondul kiri
                           province near Sen Monorom. 390
                           km, East of Phnom Penh.
                           Population: approximately 40,000
                           Project period: 30 years
                           Equipment: 115 small-size hybrid
                           systems of wind and solar power
                           generation with a total of 1.4MW for
                           installed capacity. These hybrid
                           power generators are implemented
                           in 21 communes and 90 villages.
2. CO2 Emission Reduction Estimates
      Item                          Term / Parameter                       Value
              A   Number of hybrid systems                                  115
              B   Installed capacity per hybrid systems                Approx. 10-20
                                                                            kW
  Annual
 Output of    C   Total installed capacity of hybrid systems              1.4 MW
the Project   D   Annual average load factor of hybrid systems             20 %
              E   Total annual operating hours                           8,760 hrs
              F   Annual power generation of the Project [C x D x E]   2,452,800 kWh
  Annual      G   Default value for distribution losses                    20 %
  Energy      H   Energy baseline [F/(1-G)]                             3,066,00 kWh
 Baseline
              I   Emission coefficient for diesel generation units     0.9 kg-CO2/kWh
Annual CO2    J   Annual CO2 emission reductions [H x I]               2,759 t-CO2/yr
 Emission
 Estimates    K   Total CO2 emission reductions during the              57,939 t-CO2
  by the          crediting period (21yrs: 2006-2026)
  Project     L   Total CO2 emission reductions during the              82,770 t-CO2
                  Project (30yrs: 2006-2035)
3. Requirements of Small Scale CDM Project
A. Project Description
A. Project Description
B. Project Baseline
B. Project Baseline
C. Duration of the Project // Crediting
C. Duration of the Project Crediting
   Period
   Period
D. Monitoring Plan
D. Monitoring Plan
E. Calculation of GHG Emissions
E. Calculation of GHG Emissions
F. Environmental Impacts
F. Environmental Impacts
G.Comments by Local Stakeholder
G.Comments by Local Stakeholder
  4. Advantages of Our Project
   Renewable Energy Project Using Wind and Solar Power
   Renewable Energy Project Using Wind and Solar Power




          CAMBODIA                            JAPAN

Improvement of Living Standards
 Improvement of Living Standards   Carbon Credit
                                   Carbon Credit




Preservation of Local
 Preservation of Local             Regional Development

Environment                        Technical Transfer
Environment
5. Situation of Project’s Progress and Future Schedule

Jul 31 to Aug 7, 2004 (1st Mission)
 Jul 31 to Aug 7, 2004 (1st Mission)                At the End of March, 2005
                                                     At the End of March, 2005
      Selection of the candidate site for sample
       Selection of the candidate site for sample         Submission of F/S report to Japanese
                                                           Submission of F/S report to Japanese
      unit
       unit                                               Ministry of the Environment
                                                           Ministry of the Environment
      Interviews with the local stakeholders
       Interviews with the local stakeholders

                                                    Around Sep, 2005
                                                     Around Sep, 2005
Nov 10 to 16, 2004 (2nd Mission)
 Nov 10 to 16, 2004 (2nd Mission)                         Submission of PDD to U.N. CDM
                                                           Submission of PDD to U.N. CDM
      The meeting with the relevant                     Executive
                                                         Executive
       The meeting with the relevant
                                                          Board
                                                           Board
      Cambodia Governmental agencies
       Cambodia Governmental agencies
      Interviews with the stakeholders
       Interviews with the stakeholders
      Setting up of the sample unit
       Setting up of the sample unit

								