Docstoc

Resume for Power Plant Engineers

Document Sample
Resume for Power Plant Engineers Powered By Docstoc
					NIMESHKUMAR D PATEL
44/A, MANJALPUR TOWNSHIP NO-1, NEAR DARBAR CHOWKDI, MANJALPUR, BARODA-390011.

CONTACTS Phone No. : +91 265 2663378 Mobile No. : +91 9427981783 E mail : patelswanim@gmail.com

APPLIED FOR The Position of Graduate Electrical Engineer (Power Plant Operation (CCR Engineer)). HOW DO I MATCH I am a Qualified B.E.ELECTRICAL Engineering from Gujarat University (SVIT, Vasad) I am having Total Experience of 2 Years 1 Months inclusive 1 Year 10 Months experience of Power Plant (O&M) and 3 Months in QA. Working as Engineer (E1) and Responsible for the Operation of Gas Turbine, Steam Turbine & Auxiliaries. Having sound background of Process condition and Operation. Willing to be relocate & Travel. Willing to work in rotating shift. Responsible and well versed for all Process related activities. Having good experience in Start Up and Safe Shutdown of Gas Turbine & Steam Turbine. Experience in Operation and Maintenance of Utility.

Regards, NIMESHKUMAR PATEL

1

CURRICULUM VITAE
___________________________________________________________________________________________________________________________

• • •

Name Date of Birth Address

: NIMESHKUMAR D PATEL : 25TH Apr. 1985 : 44/A, Manjalpur Township No-1,
Near Darbar Chowkdi, Manjalpur, Vadodara – 390011.

PERSONAL BRIEFING

• •

E-mail address Education

: patelswanim@gmail.com : B.E.Electrical (72.5%) from Gujarat University in 2006. Pursuing PGDBA (Finance) from Symbiosis Centre for Distance Learning, Pune. : F 3347284 : Unmarried : +91 9427981783 : +91 265 2663378

• • • •

Passport Detail /

Valid up to
Marital Status Mobile No. Phone No

/ 09th Jun, 2015

__________________________________________________________________________________ Parents

DEPENDANT BRIEFING

Name Date of Birth Relation Occupation Passport Details Sister Name Education

: Dineshbhai T Patel / Daxaben D Patel : 01st Jun. 1958 / 02nd Apr. 1958 : Father / Mother : : Service / Housewife Procedure under progress

: Hiral D Patel : Pursuing M.Sc. (Biochemistry)

2

ADDITIONAL KNOWLEDGE

Apart from the regular Work I well know about Computer software like MS Word, MS Excel, Power Point, e-Permit system, SAP MM & PM modules. SAP MM & PM Module : Issue / withdraw work permit, Generate DGR( Daily Generation Report), Create Purchase Indent, Keeping Plant S/D & Tripping Records, Create Material Issue Voucher, Clearing Material Receive Receipt. i. KNOWLEDGE COMPUTER TOOLS PRO-E Wildfire 2.0 ADDITIONAL ii. EXTRA CURRICULAR ACTIVITIES Self Learning of “Electrical Transient Analysis Program Version 4.0” [ ETAP 4.0 ] 1. One Line Diagram 2. One Line Editors 3. Familiarization with different modules for e.g. A.C. Edit Toolbar D.C. Edit Toolbar Composite Network Transient Analysis Load Flow Study iii. Exposure to Quality System Document Management System) EDMS (Enterprise

3

PROFESSIONAL EXPERIENCE
2 Years 1 Months of Experience inclusive 1 Year 10 Months in Combine Cycle Power Plant (305MW) 3 Months in Control Panel Production Unit as QA

ORGANISATION

Gujarat Industries Vadodara.

Power

Company

Limited,

Company is Engaged in Power Generation having Capacity of 305MW. Plant Configuration includes 1*106 MW Frame-9E series BHEL Gas Turbine & GE Mark V Control System. 1*54 MW BHEL Make Steam Turbine with EHTC. 3*32 MW Frame-6 BHEL Gas Turbine & GE MARK IV Control System. 1*49 MW BHEL Make Steam Turbine with ATRS.

PRESENT

ORGANISATION

Suzlon Energy Limited (CPU), Daman.
Suzlon Energy Limited is a leading Wind Turbine Generator making company having of capacity 600KW, 1.25MW, 1.5MW and 2.1MW. The CPU is Engaged in making the Control Panel for the above said Wind Turbine Generator.

PREVIOUS

4

GUJARAT INDUSTRIES POWER COMPANY LIMITED
Since April 2007 working as “Engineer (O&M), 305MW CCPP)” Power Plant Operation of 305MW from Central Control Room. I have a good experience in Operation of Gas Turbine and Steam Turbine. We are having following “Distributed Control System” for the HRSG. TATA HONEYWELL EXPERION PKS. YOKOGAWA CENTAM CS. Performance monitoring and tracking, Assisting maintenance in their day to day activities Daily generation report preparation, record keeping, Ensuring proper isolation and issuing work permit, ensuring safety of plant, Availability Declaration, Daily Nomination of Gas, co-ordination with external agencies like SLDC, GETCO, GAIL, GSPC etc. Responsible for safe operation of Gas Turbine & Steam Turbine. (ENGINEER O&M) JOB PROFILE Safe startup and shut down. Gas Turbine “ OFFLINE COMPRESSOR WASHING” Coordination with Maintenance team at the time of Annual inspection and shut down. Handing the defects in SAP module. Handing emergency safely. Auxiliary Operation Includes. i. Operation of 415V MCC, Auxiliary Power Panel, ii. Operation of 6.6KV PCC, iii. 6.6KV Motors, Cooling Water Pump Motors, GT Starting Motor (1MW), iv. Operating 415V ACB, 6.6KV VCB, v. Operation on Switchyard Equipment – 132KV SF6 CB, 11KV VCB, ISOLATOR, Earthing Switch. vi. Ensuring Electrical & Mechanical Operating Safety while Issuing Work Permit. vii. Active Participation in Shutdown Activities and Startup Activities.

5

SUZLON ENERGY LIMITED (CPU), Daman
From Jan. 2007 to March 2007 (GET - QA) _________________________________________________________________________ As a GET (QA), my key responsibility was to do continuity test and voltage consistency test of control panel of the above said Wind Turbine Generator. JOB PROFILE (GET - QA)

Also 142V D.C. Battery Box Production and Quality Assurance of Battery & Battery Box. Co-ordination with Third Party Inspection Person.

Fire fighting Skills
I am well versed with the experience in handling and operations of all types of fire fighting equipments, Deluge system operation, fire protection equipments and use of various types of hydrant systems.

Emergencies Handled in following cases

SKILL

Lightning Arrestor Fault at Remote End Substation so cause Tripping of Gas Turbine and Steam Turbine. Sudden Loss of Discharge Pressure of Condensate Extraction Pump at that time second Pump doesn’t start in Auto. CB Breaker Problem exit. So, I had to start it in Manual Mode Urgently and successfully saved the Tripping of Steam Turbine.

__________________________________________________________________________________

6

R e a s o n f o r l e a v i n g : For better prospect, knowledge and experience. Sir, if you give me a chance for interview, I will prove my ability to work and skills.

Thanking you. Nimeshkumar D Patel Mobile No. : +91 9427981783 / +91 265 2663378 Email : patelswanim@gmail.com, patelnimesh@aol.in

7


				
DOCUMENT INFO
Shared By:
Tags:
Stats:
views:17638
posted:12/28/2008
language:English
pages:7