agricultural
Document Sample


COUNTY OF WILL
PERMIT E????
DEPARTMENT OF HIGHWAYS
AGRICULTURAL ACCESS
ALL CONSTRUCTION TO BE DONE CENTERLINE
NOTE:
OF ROAD EDGE OF PVT
ACCORDING TO STATE OF ILLINOIS
"STANDARD SPECIFICATIONS FOR
ROAD AND BRIDGE CONSTRUCTION" CUT OUT DIRT FOR
GRAVEL OR CRUSHED
CUT OUT DIRT ON SHOULDER AND STONE SURFACE
INSTALL 12" AGGREGATE SURFACE COURSE
ALL GROUND AREAS DISTURBED SHALL
BE RESEEDED AND MULCHED OR JUTE
COMPACTED EARTH
MATTED AS SOON AFTER CONSTRUCTION
BACKFILL
.)
N
AS POSSIBLE
I
TRENCH BACKFILL/
M
AGGREGATE SURFACE
(
:1
DIRT DIRT
3
CORRUGATED METAL CULVERT PIPE EXIST. DITCH LINE
4" MIN. COMPACTED BASE
24’ INSTALL 15" x 40’ (MIN. LENGTH) OF
CORRUGATED METAL CULVERT PIPE
MAINTAIN 3:1 (PREFERABLY 4:1)
PROPERTY LINE DRIVE
DIRT DITCH SLOPES
’
30
R
DIRT FOR SLOPE
STABILIZATION
3/16 "
PER FT
SLOPE
SHOULDER LINE
EDGE OF EXISTING ROAD
CENTERLINE OF COUNTY HIGHWAY
Revised 8/18/05
Shared by: Fighting Yank
About
These documents were primarily taken from government websites as part of a personal project to archive political and governmental documents on Docstoc. Please email gov.archive.project@gmail.com for prompt removal if you discover
(More...) a copyrighted document. Thank you!
Related docs
Other docs by chrstphr