                                  Status of Active Proposals to Develop New and to
                                Revise Existing 3-A Standards and Accepted Practices
                                            (Note: The Inactive Proposal Chart follows the Active Cart)

January 4, 2010

This chart lists projects the 3-A SSI Working Groups are currently undertaking. It is updated on a routine basis. If a project has more than six months without any
activity it is subject to removal from this chart and placed on the Inactive Projects Chart.

Working Group Priorities — The following are the priorities of the Working Groups in developing new and revising existing 3-A Sanitary Standards and 3-A
Accepted Practices:

1. 3-A Sanitary Standards and 3-A Accepted Practice revisions in progress from the May 3-A SSI Annual Meeting.
2. Requests for new and to revise existing Standards and Accepted Practices approved by the Steering Committee.
3. Those Standards and Accepted Practices more than five years old, not in the above two categories. (Procedures state that these have to be reviewed for
   currentness and revised if deemed out of date.)
                                                                  Projects By Work Group

Format & Style Manual Work Group
1. T-00-04 to modify the definition of “Sanitizing”
2. T-00-05 to allow the use of dairy metal
3. T-00-06 to revise the metal alloys section
4. T-00-07 to make toxic material exclusion in appendix mandatory
5. T-00-08 to change reference and fabrication for metals (tabled indefinitely)
                                                   Projects By Work Group (Continued)
Work Group 1 (Vessels)                             Work Group 4 (Pumps & Mixers)                      7.   T-610-02 Membrane Processing Systems
1. T-01-09 Storage Tanks                           1. T-02-11 Milk Pumps
2. T-05-16 Stainless Steel Auto. Transport Tanks   2. T-02-12 Milk Pumps                              Work Group 9 (Farm/Raw Milk)
3. T-22-09 Silo-Type Storage Tanks                 3. T-04-05 Homogenizers & Reciprocating Pumps      1. T-13-11 Farm Milk Cooling & Holding Tanks
4. T-24-03 Batch Pasteurizers                      4. T-21-03 Centrifugal Separators & Clarifiers     2. T-30-02 Farm Milk Storage Tanks
5. T-25-04 Non-Coil Type Batch Processors          5. T-35-03 Blending Equipment                      3. T-606-06 Milking & Milk Handling Equipment
6. T-29-03 Air Eliminators                         6. T-77-00 Mechanical Seals
7. T-32-03 Uninsulated Tanks                                                                          Work Group 10 (Cheese & Butter Equipment)
8. T-78-02 Spray Devices                           Work Group 5 (Heat Exchangers)                     1. T-38-01 Open Cheese Vats & Tables
9. T-84-02 Personnel Access Ports                  1. T-11-10 Plate Heat Exchangers                   2. T-70-02 Filata Style Cheese Cookers
10. T-95-00 Vents on Automotive Transport Tanks    2. T-12-08 Tubular Heat Exchangers                 3. T-70-03 Filata Style Cheese Moulders
                                                   3. T-12-09 Tubular Heat Exchangers                 4. T-70-04 Filata Style Cheese Chillers
Work Group 2 (Fillers)                             4. T-19-07 Batch & Continuous Freezers             5. T-83-01 Enclosed Cheese Vats & Tables
1. T-17-11 Fluid Formers, Fillers, and Sealers     5. T-31-05 Scraped Surface Heat Exchangers
2. T-23-06 Viscous Products Equipment              6. T-31-06 Scraped Surface Heat Exchangers         Work Group 11 (Process & Cleaning Systems)
3. T-23-07 Viscous Products Equipment              7. T-31-07 Scraped Surface Heat Exchangers         1. T-603-07 Hi-Temp./Short Time Pasteurizers
4. T-27-06 Dry Products Equipment                  8. T-31-08 Scraped Surface Heat Exchangers         2. T-605-05 Permanently Installed Pipelines
5. T-27-07 Dry Products Equipment                  9. T-61-02 Steam Injection Heaters                 3. T-613-00 CIP for Equipment
6 T-99-00 Equipment Packaging Low Moisture Prod.                                                      4. T-614-00 Extended Shelf Life Products
                                                   Work Group 6 (Conveyors & Feeders)                 5. T-101-00 Pipeline Product Recovery Systems
Work Group 3 (Valves & Fittings)                   1. T-75-01 Belt-Type Feeders                          Using Projectiles
1. Mechanical Force Seal                           2. T-81-01 Auger-Type Feeders
2. T-33-02, Metal Tubing                           3. T-81-02 Auger-Type Feeders                      Work Group 12 (Plant Support Systems)
4. T-53-06 Compression Valves                                                                         1. T-609-04 Producing Culinary Steam
5. T-53-07 Compression Valves                      Work Group 7 (Instruments)                         2. T-612-00 Plant Air Quality
6. T-53-09 Compression-Type Valves                 1. T-28-04 Flow Meters                             3. T-615-00 Gas for Packaging of Products
7. T-55-02 Boot-Seal Type Valves                   2. T-74-05 Sensors & Sensor Fittings
8. T-58-01 Vacuum Breakers and Check Valves        3. T-74-06 Sensors & Sensor Fittings               Work Group 13
9. T-58-02 Vacuum Breakers and Check Valves        4. T-74-07 Sensors & Sensor Fittings               1. T-18-04 Rubber & Rubber-Like Materials
10. T-58-03 Vacuum Breakers and Check Valves       5. T-74-08 Sensors & Sensor Fittings               2. T-18-05 Rubber & Rubber-Like Materials
10. T-59-01 Automatic PD Samplers                  6. T-74-09 Sensors & Sensor Fittings               3. T-18-06 Rubber & Rubber-Like Materials
11. T-60-01 Rupture Discs                                                                             4. T-18-07 Rubber & Rubber-Like Materials
12. T-62-02 Hose Assemblies                        Work Group 8 (Concentrating Equipment)             5. T-20-29 Plastic & Plastic-Like Materials
13. T-63-04 Sanitary Fittings                      1. T-16-06 Milk Evaporators                        6. T-20-30 Plastic & Plastic-Like Materials
14. T-68-01 Ball-Type Valves                       2. T-26-07 Sifters for Dry Products
15. T-85-02 Double-Seat Mixproof Valves            3. T-45-03 Cross-Flow Membrane Modules
                                                   4. T-94-00 Centrifugal Evaporators
                                                   5. T-97-00 Vibratory Separators for Wet Products
                                                   6. T-100-00 Drum Dryers and Vacuum Drum Dryers
 Work Group Name           3-A Standard/Accepted Practice       Document Leader                                     Status
Format & Style Manual       T-00-04                            T-00-04: This proposal seeks to modify the definition of “sanitizing or sanitization”. It
                            Leader: Mel Jolly                  was received on June 18, 2009 and sent to the Steering Committee for initial evaluation.
Chair:                      jmeljolly@msn.com                  On August 3, 2009 the Steering Committee referred the proposal the F & S Manual
  Greg Marconnet                     Kraft Foods               Work Group for development.
  Kraft Foods

Vice Chair:
   Helen Piotter
   Dean Foods

Steering Cmte. Liaison:
   Open
                            T-00-05                            T-00-05: This proposal seeks to allow the use of dairy metal. It was received on June22,
                            Leader: Sam Sahu                   2009 and sent to the Steering Committee for initial evaluation. The Steering Committee
                            ssahu@waukeshafoundry.com          did not refer the proposal to the F & S Manual WG for development.
                            T-00-06                            T-00-06: This proposal seeks to revise the metal alloy sections of the Format & Style
                            Leader: R. Avery                   Manual. It was received on June30, 2009 and sent to the Steering Committee for initial
                            richardea@aol.com                  evaluation. On September 8, 2009 the Steering Committee referred the proposal to the
                                                               Work Group for development.
                            T-00-07                            T-00-07: This proposal seeks to move from the appendix to Section D the statement that
                            Leader: D. Wilding                 says alloys containing lead, leachable copper, or other toxic metals shall not be used.
                            Don.Wilding@Illinois.gov           Submitted for referral to the Steering Committee on August 5, 2009.
                            T-00-08                            T-00-08: Seeks to change the reference and fabrication sections with reference to metals.
                            Leader: IDFA                       On August 31, 2009 sent to the Steering Committee for initial evaluation and possible
                                                               referral to the Work Group.

                                                               On October 26, 2009 the Steering Committee referred the proposal to the Work Group
                                                               for development.

                                                               Since the Work Group could not identify the origin of this proposal, and because no one
                                                               could be located who wished to lead it, or support it, it was tabled on December 7, 2009.

#1: Vessels                 A. 01-08, Storage Tanks for Milk   T-01-09 Storage Tanks:       T-01-09 Storage Tanks: This is the 5-year revision of
                               and Milk Products               Leader: Stuart Salvador,     Standard 01-08. Document Leader and subgroup was
Chair:                                                         Paul Mueller Company         selected during the October 10, 2006 WG 1 conference call.
  Steve McWilliams                                             ssalvador@muel.com           Work has begun and on March 2, 2007 Mr. Barbee reported
  Walker Stainless Steel                                                                    that a first draft was developed and should be available for
                                                                                            Work Group review by April 5, 2007.
Vice Chair:
Last revised January 4, 2010                                                         1
 Work Group Name            3-A Standard/Accepted Practice     Document Leader                                  Status
   Bill Werner                                                                          S. Salvador took over the project and is holding regular
   Brenner Tank, Inc.                                                                   conference calls.

Steering Cmte. Liaison:
   David Strouse
   Walker Stainless Steel
                             B. 05-15, Stainless Steel        T-05-16 Stainless Steel   T-05-16 Stainless Steel Automotive Transportation
                                Automotive Transportation     Automotive                Tanks: This is the 5-year revision of Standard 05-15 and
                                Tanks for Bulk Delivery and   Transportation Tanks      will include a proposal from Truck Trailer Manufacturers
                                Farm Pick-Up Service          for Bulk Delivery and     Association (TTMA) to revise Standard 05-15 to clarify it,
                                                              Farm Pick-Up Service:     to include new drawings. Received July 19, 2006 and sent
                                                              Leader Jeff Sims, TTMA    to the Steering Committee for review and consideration. On
                                                              Jeff@ttmanet.org          August 28, 2006 the Steering Committee referred the
                                                                                        proposal to Work Group 1 for development.

                                                                                        During the October 10, 2006 WG 1 conference call, the
                                                                                        five-year revision of Standard 05-15 was incorporated into
                                                                                        Proposal T-05-16. The tank vent requirements (although
                                                                                        not addressed in standard 05-15) will be addressed in a
                                                                                        proposed new standard, designated by T-95-00, Automotive
                                                                                        Transportation Tanker Vents.

                                                                                        The revision has progressed nicely, with several conference
                                                                                        calls being held to develop and review the draft.
                             C. 22-08, Silo-Type Storage      T-22-09 Silo-Type         22-09 Silo-Type Storage Tanks: This is the 5-year
                                Tanks for Milk and Milk       Storage Tanks:            revision of Standard 22-. On March 2, 2007 Phil Wolff
                                Products                      Leader: Phil Wolff,       volunteered to lead the effort. Work has progressed well.
                                                              USDA                      On September 25, 2007 the draft was sent to staff to ballot
                                                              Philip.Wolff@usda.gov     to WG 1. The ballot went to the Work Group on February
                                                                                        29, 2008. Although passing numerically, two substantive
                                                                                        comments were returned. An attempt must be made to
                                                                                        resolve these comments.

                                                                                        Document Leader Phil Wolff addressed the comments and
                                                                                        on July 14, 2008 sent the draft, containing the technical
                                                                                        changes that were the result of comment resolution, to staff.
                                                                                        Since the technical changes were numerous, the proposal
                                                                                        was sent to WG 1 as a 2nd WG 1 original ballot. The ballot
                                                                                        went out on July 24, 2008. The ballot passed numerically,

Last revised January 4, 2010                                                      2
 Work Group Name        3-A Standard/Accepted Practice      Document Leader                                         Status
                                                                                            but two substantive comments were returned that require an
                                                                                            attempted resolution.
                          D. 24-02, Non-Coil Type Batch   T-24-03 Batch                     T-24-03 Batch Pasteurizers: During the May 2004
                             Pasteurizers                 Pasteurizers: Steve               meeting it was agreed that a small volume vat pasteurizer
                                                          McWilliams, Walker                standard and a standard for valve assemblies used in small
                                                          Stainless Steel                   volume vat pasteurizers is necessary — proposals were sent
                                                          smcwilliams@walkertransport.com   to the Steering Committee seeking authorization and were
                                                                                            approved.

                                                                                            In May 2006 Mr. Thomeczek suggested that the wording
                                                                                            could be revised in T-24-03 to accommodate small volume
                                                                                            batch pasteurizers. This would eliminate the need to create
                                                                                            T-89-00.

                                                                                            In October 2006 Mr. Tomeczek reported that a Work Group
                                                                                            1 ballot should be forthcoming soon for the T-24-03
                                                                                            proposal. The draft was reworked by staff to convert it to
                                                                                            the current Format & Style Manual format. There are
                                                                                            monthly Document Subgroup conference calls to develop
                                                                                            the draft.

                                                                                            T-24-03 was balloted to Work Group 1 on March 7, 2008.
                                                                                            The ballot passed, but one “Negative with reasons” vote
                                                                                            was returned. The person submitting this vote asked for a
                                                                                            recirculation ballot to determine if his proposed technical
                                                                                            changes was persuasive or not. The recirculation ballot was
                                                                                            sent to WG 1 on April 29, 2008.

                                                                                            The WG recirculation “A” ballot had a split vote — the
                                                                                            manufacturers and processors approved the proposed
                                                                                            technical change and the Sanitarians did not. The Work
                                                                                            Group must now resolve the issue, or the issue must be
                                                                                            withdrawn, for the proposal to move to Consensus Body
                                                                                            ballot.

                                                                                            The T-24-03 draft was reworked with Sanitarian input.
                                                                                            Technical changes were made, a large enough number to
                                                                                            warrant a second original Work Group 1 ballot, where the
                                                                                            whole draft is open for voting and comment. On December

Last revised January 4, 2010                                                         3
 Work Group Name        3-A Standard/Accepted Practice          Document Leader                                        Status
                                                                                              10, 2008 this second ballot was distributed to Work Group
                                                                                              1. The ballot closed on January 26, 2009.

                                                                                              Only one substantive comment was returned. The person
                                                                                              submitting the comment did not agree with the proposed
                                                                                              validation requirements in sections E1.11.1, E1.11.2, and
                                                                                              E1.15.1.2.2 and said that not all tank manufacturers are
                                                                                              equipped to handle, store, and dispose of product. Also, in
                                                                                              an engineered-to-order environment, it is not feasible to
                                                                                              require validation testing every time a user requests special
                                                                                              tank dimensions, this person commented. The desired
                                                                                              language was submitted with the ballot comment.

                                                                                              Chair McWilliams resolved this comment and in addition,
                                                                                              responded to all of those who provided other (editorial)
                                                                                              comments, as well (all were “affirm with comments votes).
                                                                                              The draft was passed by the Work Group.

                                                                                              The proposal went to Consensus Body ballot on November
                                                                                              12, 2009.
                          E. 25-03, Non-Coil Type Batch        T-25-04 Non-Coil Type          T-25-04 Non-Coil Type Batch Processors: This is the 5-
                             Processors                        Batch Processors:              year revision of the standard. Work will not begin until
                                                               Leader: William                Standard 24-03 is published, due to verbiage similarities.
                                                               Fredericks, NY Dept. of
                                                               Agriculture
                                                               bill.fredericks@agmkt.state.
                                                               ny.us

                          F. 29-02, Air Eliminators for Milk   T-29-03 Air                    T-29-03 Air Eliminators: On February 3, 2006 Mr.
                             and Milk Products                 Eliminators: Bob               Ksiazek reported that the Document Subgroup recently held
                                                               Ksiazek, Anderson              its first conference call. Mr. Ksiazek has completed the
                                                               Instrument Co.                 draft of Proposal T-29-03 on March 27, 2006. It was
                                                               bksiazek@andinst.com           balloted to the Work Group on April 11, 2006. The ballot
                                                                                              did not pass. Several comments were returned. They were
                                                                                              discussed in the Document Subgroup. A new draft,
                                                                                              addressing the comments, was developed and the re-
                                                                                              circulation ballot went to WG 1 on April 11, 2007. The
                                                                                              ballot passed. The few editorial comments returned were
                                                                                              addressed.

Last revised January 4, 2010                                                           4
 Work Group Name        3-A Standard/Accepted Practice       Document Leader                                    Status

                                                                                        The draft of T-29-03 to be balloted to the Consensus Body
                                                                                        was developed, incorporating changes identified by both
                                                                                        Work Group ballots. The draft was sent to staff. On March
                                                                                        18, 2008 Proposal T-29-03 was balloted to the Consensus
                                                                                        Body.

                                                                                        The Consensus Body Ballot for Proposal T-29-03 passed
                                                                                        numerically, but one “Negative with reasons” and several
                                                                                        editorial comments were returned. The Work Group must
                                                                                        attempt to resolve the “Negative with reasons” comment.
                                                                                        Any technical changes to the proposal, made as a result of
                                                                                        comment resolution, will require a Work Group re-
                                                                                        circulation “B” and CB recirculation ballots.

                                                                                        On September 23, 2009 Mr. Ksiazek reported he needs to
                                                                                        rework a couple of sections based on Mr. Schonrock‟s
                                                                                        comments and then the draft will be ready for recirculation
                                                                                        ballot.
                          G. 32-02, Uninsulated Tanks for   T-32-03 Uninsulated         T-32-03 Uninsulated Tanks: On February 3, 2006 Mr.
                             Milk & Milk Products           Tanks: Steve                McWilliams reported that he developed a first draft and
                                                            McWilliams, Walker          recently circulated it among Work Group 1 members. Don
                                                            Stainless Eq. Co.           Wilding sent review comments to Mr. McWilliams. He
                                                            smcwilliams@walker.carl     plans to incorporate Mr. Wilding‟s comments into the draft
                                                            isle.com                    and then send Revision 2 to the Work Group for review and
                                                                                        comment.

                                                                                        On May 23, 2006 Mr. McWilliams reported that a second
                                                                                        draft is in development. It incorporates Don Wilding‟s
                                                                                        comments on the first draft. The Work Group will be
                                                                                        forwarded the second draft for review and comment when
                                                                                        completed.
                          H. 78-01, Spray Devices to        T-78-02 Spray Devices:      T-78-02 Spray Devices:
                             Remain in Place                Bo Jensen, Alfa Laval,
                                                            Inc.                        Note: In 2008 this proposal was moved to Work Group 1
                                                            bobb.jensen@alfalaval.com   from Work Group 3.

                                                                                        This proposal adds ball bearings to the “Non-metals” list
                                                                                        appearing in C2.1 for items that may be made from plastic.

Last revised January 4, 2010                                                      5
 Work Group Name        3-A Standard/Accepted Practice        Document Leader                                     Status
                                                                                         In addition, the statement “Bearings having a product
                                                                                         contact or solution contact surface shall be of a non-
                                                                                         lubricated type” is being proposed as section D6.2.

                                                                                         On March 14, 2005 Terry Gardner (previous Document
                                                                                         leader and originator of the proposal) sent staff the proposal
                                                                                         and request to ballot it to WG 3.

                                                                                         The proposal went to WG 3 ballot on April 7, 2005. The
                                                                                         ballot did not pass. The Ballot report and the possibility of
                                                                                         discontinuing the project were discussed during the Work
                                                                                         Group 3 meeting on May 24, 2005. No conclusions were
                                                                                         reached.

                                                                                         During the September 16, 2005 WG 3 conference call, the
                                                                                         decision was made to table this proposal, perhaps
                                                                                         indefinitely.

                                                                                         This proposal was originally under WG 3 (Valves &
                                                                                         Fittings) and in June 2008, a mutual decision was reached
                                                                                         between WG 1 and 3 chairs to move Standard 78- under the
                                                                                         auspice of Work Group 1, due to this being the more
                                                                                         appropriate WG for the equipment covered by the standard.

                                                                                         The proposal was reopened for development in June 2008.
                          I. 84-00, Personnel Access Ports   T-84-02 Personnel           T-84-02 Personnel Access Ports for Wet Applications:
                             for Wet Applications            Access Ports for Wet        This is the 5-year revision and in addition, includes a
                                                             Applications: Phil          proposal from Phil Wolff, USDA. Current Wording in
                                                             Wolff, USDA                 Sections D4.1, D4.2, D7.1, and D7.3 of the standard
                                                             Philip.Wolff@usda.gov       require accessibility. However, the manufacturer of the
                                                                                         PAP has no control over where it is installed so there is no
                                                                                         way for a CCE to verify accessibility during a TPV of the
                                                                                         PAP. The 3-A Sanitary Standards for the equipment that
                                                                                         the PAP will be part of will require all appurtenances to be
                                                                                         easily accessible. So accessibility should not be addressed
                                                                                         in this standard. Therefore, USDA suggests that Section
                                                                                         B9 be deleted and has suggested new wording.

                                                                                         Sent to SC for initial evaluation on February 3, 2006. On

Last revised January 4, 2010                                                         6
 Work Group Name        3-A Standard/Accepted Practice     Document Leader                                Status
                                                                                  March 13, 2006 the Steering Committee referred the
                                                                                  proposal to WG 1 for further development. Work is under
                                                                                  way.

                                                                                  The first draft went to WG 1 for review and comment on
                                                                                  January 8, 2007.

                                                                                  Staff received the second draft to ballot to WG 1. The WG
                                                                                  1 ballot went out on March 12, 2008. The ballot passed
                                                                                  numerically, but two substantive (“negative with reasons”)
                                                                                  votes and related comments were returned, along with
                                                                                  several editorial comments.

                                                                                  The comments were addressed by Mr. Wolff and a new
                                                                                  draft was developed that contained too many technical
                                                                                  changes for a recirculation ballot. The Work Group 1 ballot
                                                                                  for this draft was a Second Original Ballot. It was issued on
                                                                                  August 25, 2008 and it closed on October 13, 2008.
                                                                                  Although passing numerically, two “negative with reasons”
                                                                                  votes were returned suggesting technical changes to the
                                                                                  draft. Both persons commenting asked that the clause on
                                                                                  Personnel Access Port (PAP) Cover be removed. This
                                                                                  clause defines the exterior surface finish of the PAP as
                                                                                  being 32 micro-inch. One of the persons commenting also
                                                                                  suggests stipulating that if the PAP cover is capable of
                                                                                  swinging inside the tank, then its surface finish must be 32
                                                                                  micro inch, and that this change be added as an exception to
                                                                                  the Non-Product Contact Surfaces section of the revision.

                                                                                  The recirculation “A” ballot for this proposed technical
                                                                                  change went to the Work Group on February 13, 2009. The
                                                                                  sole suggested change balloted passed and will be written
                                                                                  into the draft. The draft will be sent to Consensus Body
                                                                                  ballot.
                          J. T-95-00, Pressure, Vacuum,   T-95-00 Pressure,       T-95-00 Automotive Transportation Tank Vents:
                             and Atmospheric Vents on     Vacuum, and             Request to develop new standard, submitted to 3-A SSI on
                             Automotive Transportation    Atmospheric Vents on    November 3, 2006, because vent requirements are not
                             Tanks                        Automotive              included in Standard 05-15 (Automotive Transportation
                                                          Transportation Tanks:   Tanks), but vents are to be included with tanks, according

Last revised January 4, 2010                                                 7
 Work Group Name        3-A Standard/Accepted Practice       Document Leader                                   Status
                                                            Steve McWilliams,          to Standard 05-15. This omission of vent requirements in
                                                            Walker Stainless Eq. Co.   Standard 05-15 means that vents must meet the quarter inch
                                                            smcwilliams@walker.carl    radius requirements for tanks, which is not practical. After
                                                            isle.com                   Standard 95-00 is published, Standard 05- will have to be
                                                                                       revised to reference 95-00.

                                                                                       On December 7, 2006 the Steering Committee approved
                                                                                       Work Group developing this standard.

                                                                                       The Work Group ballot draft was completed and sent to
                                                                                       WG 1 ballot on March 1, 2007. The ballot did not pass.
                                                                                       Numerous comments were returned needing resolution.

                                                                                       The comments were resolved and due to the extensive
                                                                                       proposed technical changes, a second “original” Work
                                                                                       Group ballot was issued on April 23, 2008. The ballot
                                                                                       passed numerically. There was one “Negative with reasons”
                                                                                       vote. Several editorial comments were returned, as well, for
                                                                                       consideration.

                                                                                       Mr. McWilliams has resolved the comments associated with
                                                                                       the “negative with reasons” vote through editorial changes
                                                                                       and made some additional editorial changes. The draft was
                                                                                       approved by the Work Group.

                                                                                       On October 14, 2009 Mr. McWilliams sent the draft to staff
                                                                                       to initiate the Consensus Body ballot. This ballot went out
                                                                                       on October 15, 2009. The ballot did not pass and three
                                                                                       substantive votes and related comments, along with some
                                                                                       editorial comments were returned. An attempt must be
                                                                                       made to resolve the substantive comments and this may
                                                                                       entail a Work Group Recirculation “B” ballot and
                                                                                       subsequent approval of the resolution technical changes by
                                                                                       the Consensus Body.

#2: Fillers               A. 17-10, Formers, Fillers, and   T-17-11 Fluid Formers,     T-17-11 Fluid Formers, Fillers, and Sealers: This is the
                             Sealers of Containers for      Fillers, and Sealers:      major (5-year) revision of the standard. On February 5,
Chair:                       Fluid Products                 Debra Henyon, Elopak       2008 3-A staff completed the conversion of the current
  Debra Henyon                                              dhenyon@elopakus.com       standard into to the current Format & Style Manual

Last revised January 4, 2010                                                     8
 Work Group Name           3-A Standard/Accepted Practice    Document Leader                                  Status
  Elopak, Inc.                                                                       language. This is Draft 1 for the Work Group to use as a
                                                                                     starting point for the revision.
Vice Chair:
   Tim Hughes
   Evergreen Packaging
   Equipment

Steering Cmte. Liaison:
  Rod Smith
  Packaging Technologies
                            B. 23-05, Equipment for         T-23-06 Viscous          T-23-06 Viscous Products Equipment: Proposed
                               Packaging Viscous Products   Products Equipment:      addition, requested in October 2006, to add the standard
                                                            Rod Smith,               definitions of Nonproduct Contact Surfaces and Splash
                                                            Packaging Technologies   Contact Surfaces and to include a clause on nonproduct
                                                            Rod.Smith@packt.com      contact surface required attributes. Also to include clauses
                                                                                     on permanent joints and press fits.

                                                                                     On December 1, 2006 the Steering Committee approved
                                                                                     WG 2 developing the proposal. The proposal was drafted.

                                                                                     A revision of Standard 23- (23-05) was published in
                                                                                     October 2006, and addressed press- and shrink-fits, using
                                                                                     the Format & Style Manual language. This published
                                                                                     revision was related to Proposal T-23-06.

                                                                                     During the Work Group 2 meeting, taking place during the
                                                                                     2008 3-A Annual Meeting, verbiage acceptable to the Work
                                                                                     Group was drafted to bring Proposal T-23-06 into
                                                                                     alignment with Standard 23-05, as revised. On June 25,
                                                                                     2008 Mr. Smith sent staff this proposed wording, ready for
                                                                                     a Work Group 2 ballot. The ballot went to WG 2 on June
                                                                                     27, 2008.

                                                                                     The ballot passed numerically, but one “negative with
                                                                                     reasons” vote was returned, which will require an attempted
                                                                                     resolution. If the draft is technically changed, as a result of
                                                                                     the resolution, a Work Group re-circulation ballot will have
                                                                                     to occur.
                                                            T-23-07 Viscous          T-23-07 Viscous Products Equipment: Received by 3-A

Last revised January 4, 2010                                                    9
 Work Group Name        3-A Standard/Accepted Practice     Document Leader                                         Status
                                                         Products Equipment:              SSI on October 16, 2008. This proposal seeks to revise
                                                         Achim Gingter, Benz &            Standard 23-05 to exclude the Wrapper/Film unwind area
                                                         Hilgers GmbH                     of the filling equipment from the requirements of the
                                                         Achim.Gingter@oystar.benhil.de   product contact surface requirements of the standard. Sent
                                                                                          to the Steering Committee for initial evaluation and
                                                                                          possible referral to WG 2 for development.

                                                                                          On December 8, 2008 the Steering Committee referred
                                                                                          Proposal T-23-07 to Work Group 2 for development.
                          C. 27-05, Equipment for        T-27-07 Dry Products             T-27-07 Dry Products Equipment: This proposal was
                             Packaging Dry Products      Equipment: Stephen J.            received in February 2006 by 3-A SSI. It is from All-Fill,
                                                         Pentek, All-Fill, Inc            Inc. It seeks to:
                                                         stevep@all-fill.com
                                                                                              1. Amend Section D9 (Radii) Paragraph D9.1 of
                                                                                                 Standard 27-05.
                                                                                              2. Amend Section D7, paragraph D7.1 of 27-05.
                                                                                              3. Amend Section D2 (Permanent Joints) of 27-05.

                                                                                          On February 21, 2006 the SC referred the proposal to WG
                                                                                          2 for development.

                                                                                          On March 24, 2008 Mr. Pentek reports that the revised
                                                                                          wording is almost ready for a WG 2 review.

                                                                                          On May 29, 2008 Mr. Pentek sent revised wording, based
                                                                                          on WG discussions during the 2008 Annual Meeting, for a
                                                                                          WG ballot. The ballot was sent to Work Group 2 on June 5,
                                                                                          2008. The ballot passed numerically, but two “negative
                                                                                          with reasons” votes were returned, which will require an
                                                                                          attempted resolution. If the draft is technically changed, as a
                                                                                          result of the resolution, a Work Group re-circulation ballot
                                                                                          will have to occur.
                          D 99-00, Equipment for         T-99-00, Low Moisture            T-99-00 Low Moisture Packagers: This is a proposal to
                            Packaging Low Moisture       Packagers: Debra                 develop a new standard, submitted to 3-A SSI on March 26,
                            Products                     Henyon, Elopak, Inc.             2009. The scope of this proposed standard is to cover the
                                                         dhenyon@elopakus.com             sanitary aspects of equipment for holding, forming,
                                                                                          dispensing, filling, weighing, deaerating, closing, and/or
                                                                                          sealing containers, and all parts which are essential to these
                                                                                          functions when they are performed as an integral part of the

Last revised January 4, 2010                                                        10
 Work Group Name          3-A Standard/Accepted Practice      Document Leader                                   Status
                                                                                       packaging operation. These standards do not pertain to the
                                                                                       container.

                                                                                       Product is defined as low moisture dairy products with <
                                                                                       25% moisture by weight.

                                                                                       This new standard is proposed because attempts have been
                                                                                       made to include low moisture products within the scope of
                                                                                       the Dry Products Standard, 27-05, with little success. The
                                                                                       Dry Product Equipment Standard is very specific to dry
                                                                                       products but there is a need for a Standard to include low
                                                                                       moisture products, such as shredded cheese etc.

                                                                                       On May 26, 2009 submitted to the Steering Committee for
                                                                                       review and possible referral to WG 2 for development.

                                                                                       On July 16, 2009 the Steering Committee referred the
                                                                                       proposal to WG 2 for development.

#3: Valves & Fittings      A. 33-01, Polished Metal Tubing   T-33-02, Metal Tubing:    T-33-02, Metal Tubing:
                              for Milk & Milk Products       Chuck Meek,               Standard 33-01 has not been updated since its creation in
Chair:                                                       Tetra Pak Processing      1994. The requirements included for surface finish have
  Terry Gardner                                              Systems Americas          been revised in many later documents as well as in the
  Alfa Laval, Inc.                                           chuck.meek@tetrapak.com   current Format and Style Manual (ref. E1.1.1), which
                                                                                       recognizes that “polishing” of a product contact surface is
Vice Chair:                                                                            not necessarily a requirement to make it acceptable as a
   George Medal                                                                        cleanable surface. In fact, it takes a notation in Appendix I
   Mixproof Solutions                                                                  to state that a properly applied polished surface is
                                                                                       equivalent to the requirements of E1.1.1 and that samples
Steering Cmte. Liaison:                                                                have to be tested to assure conformance.
   Robert Dumke
   Alfa Laval Inc.                                                                     The specific requirement in 33-01 that “All product contact
                                                                                       surfaces shall have a ground and/or polished finish.” is
                                                                                       contrary to the current requirements in the Format and Style
                                                                                       Manual and creates an unnecessary financial burden on
                                                                                       processors installing new piping systems. All newer or
                                                                                       more recently revised Standards incorporate the provision
                                                                                       that a surface having a finish at least as smooth as a 32µin.
                                                                                       Ra is acceptable.

Last revised January 4, 2010                                                     11
 Work Group Name        3-A Standard/Accepted Practice      Document Leader                                     Status

                                                                                        The proposal seeks to delete the above mentioned polishing
                                                                                        requirement, while updating the surface finish requirement
                                                                                        to the current F & S Manual language, and to delete
                                                                                        “Polished” from the standard‟s title.

                                                                                        Submitted to the Steering Committee on February 26, 2008
                                                                                        for review. On April 14, 2008 the Steering Committee
                                                                                        referred T-33-02 to WG 3 for development.

                                                                                        The T-33-02 Document Subgroup developed the wording
                                                                                        for the revision. On June 6, 2008 the draft was balloted to
                                                                                        Work Group 3. Four “Negative with reasons” votes were
                                                                                        returned.

                                                                                        The draft was revised with a proposed change in scope and
                                                                                        deletion of the welding standard references. On April 6,
                                                                                        2008 the recirculation “A” ballot was sent to Work Group
                                                                                        3. The ballot was “split” — the manufacturers and
                                                                                        sanitarians passed the proposed changes and the processors
                                                                                        did not. Since the vote was split, the Work Group needed to
                                                                                        discuss the ballot and reach an agreement on the proposed
                                                                                        revisions before the draft can move to Consensus Body
                                                                                        ballot.

                                                                                        Some ballot comments were withdrawn. Discussions
                                                                                        produced a proposed change in the scope to stipulate that
                                                                                        piping systems were excluded from the standard. This was
                                                                                        the subject of a re-circulation ballot, which passed.

                                                                                        The now accepted by Work Group 3 draft went to
                                                                                        Consensus Body ballot on June 11, 2009. The ballot closed
                                                                                        and a substantive comment was returned that was resolved
                                                                                        without a re-circulation ballot. The revised standard was
                                                                                        published September 4, 2009.
                          B. Mechanical Force Seal, Used   Mechanical Force Seal:       Mechanical Force Seal:
                             in Valve Standards 53-03,     Proposal from T. Gardner
                             58-00, and 85-00              to revise Standards 53-03,   Steering Committee comments and approval for project
                                                           58-00, and 85-00 to          referral to WG 3 granted on January 25, 2007.

Last revised January 4, 2010                                                    12
 Work Group Name        3-A Standard/Accepted Practice       Document Leader                                     Status
                                                            include the definition and
                                                            fabrication criteria for
                                                            mechanical force seals as
                                                            presented in the F & S
                                                            Manual, Number 00-01.
                                                            This design feature is
                                                            currently used and
                                                            common in the industry.
                          C. 42-01, In-Line Strainers for                                42-01 In-Line Strainers: This standard is more than five
                             Milk and Milk Products                                      years old (11/97 date) and needs to be reviewed and either
                                                                                         revised, reaffirmed, or withdrawn by the WG.
                          D. 51-01, Plug-Type Valves for                                 51-01 Plug-Type Valves: This standard is more than five
                             Milk and Milk Products                                      years old (11/98 date) and needs to be reviewed and either
                                                                                         revised, reaffirmed, or withdrawn by the WG.
                          E. 52-02, Plastic Plug-Type                                    52-02 Plastic Plug-Type Valves: This standard is more
                             Valves for Milk and Milk                                    than five years old (11/98 date) and needs to be reviewed
                             Products                                                    and either revised, reaffirmed, or withdrawn by the WG.
                          F. 53-03, Compression Type        T-53-06 Compression-         T-53-06 Compression Valves: A new proposal submitted
                             Valves                         Type Valves: Stéphane        to the Steering Committee on June 25, 2007 for initial
                                                            Moue, SAMSON SA              consideration and possible referral to Work Group 3 for
                                                            samson.sa@samson.fr          development.

                                                                                         Since Standard 53- lacks provisions for membrane designs
                                                                                         for valve stem sealing, this proposal seeks to include them.
                                                                                         These provisions are included in Standard 64-00 (Pressure
                                                                                         Reducing and Back Pressure valves). Standard 64-00
                                                                                         verbiage may be proposed. Like other manufacturers,
                                                                                         SAMSON SA uses membrane sealing for Compression-
                                                                                         Type valves. In order to retain its 3-A Symbol, the company
                                                                                         wants to have the membrane sealing system with leakage
                                                                                         detection incorporated as an option in the 53-03 Standard
                                                                                         for Compression-Type valves.

                                                                                         Steering Committee referred to Work Group 3 for
                                                                                         development on Aug. 16, 2007.

                                                                                         On September 11, 2008 staff received the proposal to send
                                                                                         to the Work Group for review and comment. The draft was
                                                                                         sent to the WG. The draft will be balloted to the Work
Last revised January 4, 2010                                                      13
 Work Group Name        3-A Standard/Accepted Practice       Document Leader                                      Status
                                                                                          Group at Mr. Moue‟s direction.

                                                                                          On March 9, 2009 a new draft of Proposal T-53-06 was
                                                                                          sent to WG 3 for review and comment.
                                                            T-53-07Compression-           T-53-07 Compression Valves: Proposal T-53-07 is the
                                                            Type Valves: Terry            five-year (major) revision of Standard 53-. On January 18,
                                                            Gardner, Alfa Laval           2008 staff completed the current standard (54-04)
                                                            terry.gardner@alfalaval.com   conversion to new F & S Manual format and sent the draft
                                                                                          to Chair Gardner. The Document Subgroup was established
                                                                                          during the May 2008 Work Group 3 meeting. Work will
                                                                                          begin soon.
                                                            T-53-09 Compression-          T-53-09 Compression-Type Valves: This proposal seeks
                                                            Type Valves: Jeremy           to revise Standard 53- to add the words “compression type
                                                            Hauser, Sudmo North           valve plugs” to section C2.3 such that the plastic section
                                                            America                       reads identical to the rubber and rubber-like section, C2.1.
                                                            jhauser@sudmona.com           Submitted by Jeremy Hauser, Sudmo North America, on
                                                                                          February 12, 2008, for Steering Committee review.

                                                                                          On April 2, 2008 the Steering Committee referred T-53-09
                                                                                          to WG 3 for development. The proposal was drafted and
                                                                                          reviewed by Work Group 3.

                                                                                          On December 18, 2008 the ballot was sent to WG 3 for
                                                                                          voting. Although passing the Work Group ballot
                                                                                          numerically, there were two substantive (Negative with
                                                                                          reasons) comments addressing the same issue (claim of a
                                                                                          lack of a clear definition for “compression valve plug”)
                                                                                          returned. On February 18, 2009, through additional
                                                                                          discussion, both comments were withdrawn and both
                                                                                          commentors approved the draft as balloted. Having full
                                                                                          approval by the Work Group, Proposal T-53-09 was sent to
                                                                                          Consensus Body ballot on February 20, 2009.

                                                                                          The ballot passed and the revision was published in early
                                                                                          April 2009.
                          G. 54-02, Diaphragm-Type                                        54-02 Diaphragm-Type Valves: This standard is more
                             Valves for Milk and Milk                                     than five years old (11/97 date) and needs to be reviewed
                             Products                                                     and either revised, reaffirmed, or withdrawn by the WG.
                          H. 55-01, Boot Seal-Type Valves   T-55-02 Boot-Seal Type        T-55-02 Boot-Seal Type Valves:

Last revised January 4, 2010                                                         14
 Work Group Name        3-A Standard/Accepted Practice       Document Leader                                     Status
                               for Milk and Milk Products   Valves: Lyle Clem,
                                                            Electrol Specialties        On December 14, 2007, during a Work Group 3 call, Lyle
                                                            Company                     Clem reported that about a year ago Standard 55- was
                                                            lyleclem@att.net            officially withdrawn because no company manufactured
                                                                                        boot-seal valves.

                                                                                        Recently, a representative of a company that manufactures
                                                                                        valves contacted Mr. Clem, wishing to apply for a 3-A
                                                                                        Symbol under the boot-seal valve standard. Because of this,
                                                                                        it is desired to reactivate the boot seal valve standard, Mr.
                                                                                        Clem said.

                                                                                        It is hoped to update retired standard 55- to the current
                                                                                        Format & Style Manual language, modify the diagrams,
                                                                                        and make some technical changes.

                                                                                        On January 30, 2008 Mr. Clem reported that a proposal to
                                                                                        reactivate and revise the Boot-Seal Valve standard will soon
                                                                                        be conveyed to the Steering Committee for consideration
                                                                                        and possible referral to Work Group 3 for development. Mr.
                                                                                        Clem will write the first draft of the revision and send it,
                                                                                        along with the request to revise the standard, to the Steering
                                                                                        Committee (though staff). The first draft is currently being
                                                                                        worked on.

                                                                                        On May, 19, 2008 Mr. Clem reported that he is in the
                                                                                        process of developing appendix graphics for the proposal.
                                                                                        The text of the previously withdrawn standard was updated
                                                                                        to reflect the current Format & Style Manual text.

                                                                                        TheT-55-02 Document Subgroup met on December 19,
                                                                                        2008 and has met about every two months thereafter, and
                                                                                        until the draft was completed for a Work Group 3 review in
                                                                                        August 2009. The draft was reviewed by the entire Work
                                                                                        Group and deemed ready for ballot.

                                                                                        On September 15, 2009 the draft was sent to Work Group 3
                                                                                        ballot. The ballot passed with only editorial changes
                                                                                        proposed. Draft will be sent to Consensus Body ballot at

Last revised January 4, 2010                                                       15
 Work Group Name        3-A Standard/Accepted Practice          Document Leader                                    Status
                                                                                           Mr. Clem‟s direction.
                          I.   56-00, Inlet and Outlet Leak-                               56-00 Inlet and Outlet Leak-Protector Plug-Type
                               Protector Plug-Type Valves                                  Valves: This standard is more than five years old (05/93
                               for Milk and Milk Products                                  date) and needs to be reviewed and either revised,
                                                                                           reaffirmed, or withdrawn by the WG.
                          J.   58-00, Vacuum Breakers and      T-58-01 Vacuum              T-58-01 Vacuum Breakers and Check Valves: This
                               Check Valves for Milk and       Breakers and Check          proposal is the 5-year revision of Standard 58-00. In
                               Milk Products                   Valves: Ray Borawski,       addition to the 5-year revision, the proposal seeks to modify
                                                               Swagelok Biopharm           section D9, Radii, by adding section D9.1.3 to read, “The
                                                               Services Company            seat seal gasket grooves for cohesively bonded gaskets may
                                                               Ray.Borawski@Swagelok.com   have radii of less than 1/16 in (1.6 mm). Sharp corners shall
                                                                                           be avoided.”

                                                                                           On June 3, 2008 staff converted the current standard into
                                                                                           the new Format & Style Manual language as the first draft
                                                                                           for the Work Group to begin work.
                                                               T-58-02 Vacuum              T-58-02 Vacuum Breakers and Check Valves: Proposal
                                                               Breakers and Check          from SPX Process Equipment received on August 27, 2007
                                                               Valves: G. Ferguson,        and sent to the Steering Committee for evaluation and
                                                               SPX Process Equipment       possible referral to WG 3. The proposal seeks to relax to
                                                               Gary.Ferguson@processe      1/32 inch (from 1/16) the radii requirement in Clause D9
                                                               quipment.spx.com            (Radii), to make the allowed radii the same that appears in
                                                                                           other 3-A Standards for other similar types of equipment.

                                                                                           On October 18, 2007 the Steering Committee referred the
                                                                                           proposal to WG 3 for development.

                                                                                           Wording was proposed for WG review. Editorial changes
                                                                                           were made to the proposal based on the review.

                                                                                           Staff sent the Work Group ballot out on October 31, 2007.
                                                                                           The ballot closed and did not pass. Substantive comments
                                                                                           were returned requiring resolution.
                                                               T-58-03 Vacuum              T-58-03 Vacuum Breakers and Check Valves: This
                                                               Breakers and Check          proposal was born from discussions among the CCEs about
                                                               Valves:                     deficiencies of the standard for valves encountered while
                                                               Leader: TBD                 performing TPV inspections. The proposal seeks to revise
                                                                                           Standard 58-00 to address check valves in use that should
                                                                                           be in the scope, but are not, and to include the necessary

Last revised January 4, 2010                                                        16
 Work Group Name        3-A Standard/Accepted Practice    Document Leader                                   Status
                                                                                   clauses for the materials of construction and design and
                                                                                   fabrication of these valves. One type to be included has a
                                                                                   „sump‟ when mounted horizontally which will always retain
                                                                                   liquid. Another valve type includes a “hybrid” valves that
                                                                                   have offset outlet ports to allow them to be self draining,
                                                                                   except for normal clingage, in both directions when
                                                                                   installed horizontally. By the nature of their function, these
                                                                                   valves will not drain down in the vertical attitude,
                                                                                   particularly with a rubber to metal seal, unless they can be
                                                                                   „actuated‟ in some way and the hybrid one has a
                                                                                   hermetically sealed magnetic core so it can be actuated
                                                                                   remotely to drain the vertical pipe work above the valve.
                                                                                   Another design that may be addressed is a valve that
                                                                                   utilizes an enclosed threaded connection between two parts
                                                                                   of the plug assembly to retain the O-ring seat seal and seal
                                                                                   the enclosed threads, similar to the pump nut scenario, and
                                                                                   58-00 is silent on this type of construction.

                                                                                   On December 21, 2009 this proposal was sent to the
                                                                                   Steering Committee for review and comment and possible
                                                                                   referral to Work Group 3 for development.
                          K. 59-00, Automatic Positive                             59-00 Automatic Positive Displacement Samplers: This
                             Displacement Samplers for                             standard is more than five years old (11/93 date) and needs
                             Fluid Milk and Fluid Milk                             to be reviewed and either revised, reaffirmed, or withdrawn
                             Products                                              by the WG.
                                                         T-59-01 Automatic         T-59-01 Automatic Positive Displacement Samplers:
                                                         Positive Displacement     Proposal T-59-01 seeks to revise Section D4 of Standard
                                                         Samplers: Caleb Brown,    59-00 to add: “except that, in samplers that are designed for
                                                         Anderson Instrument       CIP cleaning, where the sample port diameter is less than
                                                         Company, Inc.             1/8”, the primary seal may be further than the two times
                                                         cbrown@andinst.com        (2X) limitation. In no case shall it exceed twenty times
                                                                                   (20X) the nominal entry point diameter.” On July 9, 2009
                                                                                   the proposal was submitted to the Steering Committee for
                                                                                   possible referral to Work Group 3 for development.

                                                                                   On January 4, 2010 the Steering Committee referred the
                                                                                   proposal to WG 3 for development.
                          L. 60-00, Rupture Discs        T-60-01 Rupture Discs     T-60-01 Rupture Discs: On the September 16, 2005 WG 3
                                                         Leader: Dan O‟Halloran,   conference call, Dan O‟Halloran agreed to lead the group to

Last revised January 4, 2010                                                17
 Work Group Name        3-A Standard/Accepted Practice    Document Leader                                     Status
                                                         Fike Corp.                  revise this standard, which is the standard that has gone the
                                                         dan.ohalloran@fike.com      longest of all the 3-A Standards since revision.

                                                                                     During the March 19, 2008 Work Group 3 conference call
                                                                                     Mr. O‟Halloran reported that the draft of the revision is
                                                                                     almost complete. He is seeking additional Document
                                                                                     Subgroup members to assist in the review of the draft.

                                                                                     On May 19, 2008 Mr. O‟Halloran reported that the T-60-01
                                                                                     Document Subgroup has met 3 times by phone and we are
                                                                                     making steady progress on the document draft. We meet
                                                                                     monthly and will meet again in mid June.
                          M. 62-01, Hose Assemblies      T-62-02 Hose                T-62-02 Hose Assemblies: This is the major revision of the
                                                         Assemblies: Murray          Hose Assemblies standard.
                                                         Smith, Nelson-Jameson,
                                                         Inc.                        In December, 2005 staff received the draft for ballot. The
                                                         m.smith@nelsonjameson.com   Work Group ballot went out on December 14, 2005. The
                                                                                     ballot did not pass. The Document Subgroup reviewed the
                                                                                     comments and revised the draft. The re-circulation ballot
                                                                                     went to WG 3 on July 20, 2006. The ballot did not pass and
                                                                                     several comments were returned needing resolution.

                                                                                     The second recirculation ballot (treated as a third original
                                                                                     ballot, due to extensive draft changes) went to Work Group
                                                                                     3 on October 31, 2007. The ballot passed numerically, but
                                                                                     one substantive comment was returned, needing resolution.

                                                                                     On November 5, 2008 Document Leader Murray Smith
                                                                                     reported that he has resolved all outstanding comments
                                                                                     pertaining to the Work Group ballot and has sent staff a
                                                                                     revised draft. Four proposed technical changes requested
                                                                                     during the Original Work Group ballot were identified.

                                                                                     On January 6, 2009 the Work Group recirculation “A”
                                                                                     ballot went out for voting on the four proposed changes.
                                                                                     The ballot closed on February 6, 2009 and all four items
                                                                                     passed. The items were added to the draft and the draft was
                                                                                     balloted to the Consensus Body.


Last revised January 4, 2010                                                   18
 Work Group Name        3-A Standard/Accepted Practice       Document Leader                                      Status
                                                                                        The CB ballot closed April 14, 2009 and did not pass.
                                                                                        Comments were addressed at the Work Group 3 meeting in
                                                                                        May 2009.

                                                                                        On October 2, 2009 a re-circulation “B” ballot went to the
                                                                                        Work Group for voting on five proposed technical changes
                                                                                        identified during the Consensus Body ballot. Three of the
                                                                                        five items passed and two did not and these two issues must
                                                                                        be resolved by the Work Group.
                          N. 63-03 Sanitary Fittings        T-63-04 Sanitary            T-63-04 Sanitary Fittings: Received from R. Feldmeier on
                                                            Fittings: Robert            November 18, 2008. The proposal seeks to add a new
                                                            Feldmeier, Feldmeier        paragraph in Section D1 stating “A product contact surface
                                                            Equipment, Inc.             that is cleaned mechanically with the proper concentration
                                                            RFeldmeier@feldmeier.com    of chemicals exceeding 160 degrees F. and which is free of
                                                                                        visible pits or occlusions is satisfactory if it is a 2B finish,
                                                                                        pickle finish, electro polished finish, or a bright annealed
                                                                                        finish. It need not be mechanically ground and polished.” to
                                                                                        standard 63-03. For submittal to SC for consideration and
                                                                                        possible referral to WG 3 for development.
                          O. 64-00, Pressure Reducing and                               64-00 Pressure Reducing and Back Pressure Regulating
                              Back Pressure Regulating                                  Valves: This standard is more than five years old (01/93
                              Valves for Milk and Milk                                  date) and needs to be reviewed and either revised,
                              Products                                                  reaffirmed, or withdrawn by the WG.
                          P. 68-00, Ball-Type Valves for    T-68-01 Ball-Type           T-68-01 Ball-Type Valves: This is the five-year revision of
                             Milk and Milk Products         Valves: Robert Elbich,      Standard 68-00. On May 27, 2009 staff was tasked with the
                                                            Exigo Manufacturing         conversion of Standard 68-00 into the new Format & Style
                                                            relbich@exigomfg.com        Manual verbiage so the T-68-01 Document Subgroup can
                                                                                        be assembled and begin revision of this standard.
                          Q. 85-00, Double-Seat Mixproof    T-85-02 Double-Seat         T-85-02 Double-Seat Mixproof Valves:
                             Valves                         Mixproof Valves:            Request to revise standard sent to 3-A SSI by T. Gardner,
                                                            Lyle Clem, Electrol         Alfa Laval, Inc., to bring Standard 85-00 into
                                                            Specialties Company         synchronization with the Pasteurized Milk Ordinance
                                                            lyleclem@att.net            (PMO). The 3-A standards should be aligned with the
                                                                                        PMO, and Standard 85-00 was, until the PMO was recently
                                                                                        revised, creating a divergence between the two documents.

                                                                                        On December 13, 2007 the proposal was submitted to the
                                                                                        Steering Committee for evaluation and possible referral to
                                                                                        Work Group 3 for development.

Last revised January 4, 2010                                                       19
 Work Group Name        3-A Standard/Accepted Practice    Document Leader                               Status

                                                                                On February 1, 2008 the Steering Committee referred the
                                                                                proposal to WG 3 for development.

                                                                                The Document Subgroup is meeting regularly and as of
                                                                                December 18, 2008 has almost completed a draft that is
                                                                                ready for balloting to Work Group 3.

                                                                                In addition, it was decided to roll proposal T-85-01 into T-
                                                                                85-02. The former is to address the same issues that placed
                                                                                TPVs on hold for the 53- Compression-Type Valves
                                                                                standard.

                                                                                On July 13, 2009 Mr. Clem sent T-85-02 to staff to ballot to
                                                                                Work Group 3. This followed a Work Group 3 review and
                                                                                comment period, where a few editorial changes were
                                                                                suggested. On July 16, 2009 staff sent Proposal T-85-02 to
                                                                                Work Group 3 ballot.

                                                                                The ballot closed on September 2, 2009 and there were four
                                                                                “Negative with reasons” votes returned along with a few
                                                                                editorial comments. Document Leader Lyle Clem
                                                                                communicated with those who provided substantive
                                                                                comments and was able to resolve all issues through
                                                                                explanation (some of those who voted “negative with
                                                                                reasons” then approved the draft) and through two editorial
                                                                                changes, which added clarity to the draft, the remaining
                                                                                person who voted against the draft approved it.

                                                                                Work Group 3 (Valves & Fittings) has now approved
                                                                                Proposal T-85-02 in its entirety and on September 21, 2009
                                                                                it was presented to the Consensus Body for voting. The
                                                                                ballot closed and a substantial (“negative with reasons”)
                                                                                vote and comment was returned. An attempt needs to be
                                                                                made to resolve this comment. Resolution may require a
                                                                                Work Group recirculation “B” ballot and final confirmation
                                                                                by the Consensus Body.

#4: Pumps & Mixers        A. 02-10, Centrifugal and      T-02-11 Milk Pumps:    T-02-11 Milk Pumps: A new proposal (T-02-11) for

Last revised January 4, 2010                                               20
 Work Group Name            3-A Standard/Accepted Practice    Document Leader                                      Status
                                Positive Rotary Pumps for    Greg Sturicz, United         revising the pump standard is the development of a specific
Chair:                          Milk & Milk Products         Industries                   list of pump components that may be excluded from the
  Open                                                       gregs@unitedindustries.com   radii requirements because of “essential functional
                                                                                          reasons.”
Vice Chair:
  Lyle Clem                                                                               The T-02-11 Document Subgroup met for the first time on
  Electrol Specialties Co                                                                 March 8, 2005.

Steering Cmte. Liaison:                                                                    The first draft of T-02-11 was developed during the WG 4
   Dennis Helmke                                                                          meeting at the 2005 3-A SSI Annual Meeting. The proposal
   Flow Products, LLC                                                                     includes a list of items that may deviate from standard radii.
                                                                                          It was circulated to WG 4.

                                                                                          On a WG 4 July 18, 2005 Conference call discussion
                                                                                          centered around the change from “not less than 1/8 inch” to
                                                                                          “not less than 1/32 inch” radii for all internal angles of less
                                                                                          than 135° on product contact surfaces. Don Wilding
                                                                                          reported that Sanitarians most likely would not approve this
                                                                                          change. It was also reported that the USDA position is that
                                                                                          a blanket 1/32 inch radii specification is not allowed.

                                                                                          In November 2005 the T-02-11 Document Subgroup polled
                                                                                          all WG 4 pump manufacturers and 02-09 Symbol Holders
                                                                                          and asked them what pump components must have 1/16
                                                                                          and 1/32 inch radii exemptions for “essential functional
                                                                                          reasons”. The data was compiled and sent to WG 4. On
                                                                                          12/21/05 there was a WG 4 conference call to discuss the
                                                                                          data and further develop Proposal T-02-11. It was decided
                                                                                          by the Work Group that managing the radius exemption list
                                                                                          would be a monumental task and decided instead to
                                                                                          stipulate in the draft that specifications must call for “not
                                                                                          less than 1/32 inch” radii for all internal angles of less than
                                                                                          135° on product contact surfaces. It was agreed to ballot the
                                                                                          proposal to the Work Group. The ballot was distributed on
                                                                                          January 9, 2006. The ballot closed February 27th and did
                                                                                          not pass. The Work Group needs to review ballot comments
                                                                                          returned.

                                                                                          During the 2007 Annual Meeting WG 4 met and devised T-

Last revised January 4, 2010                                                        21
 Work Group Name        3-A Standard/Accepted Practice    Document Leader                                 Status
                                                                                  02-11 wording to address the two substantive comments
                                                                                  from the WG ballot. This new wording was re-circ. balloted
                                                                                  and substantive comments were received. Additional
                                                                                  discussions need to be held to arrive at wording that the
                                                                                  three stakeholder groups can agree on, before a CB ballot is
                                                                                  attempted.

                                                                                  On a December 12, 2008 conference call, Work Group 4
                                                                                  agreed to discontinue Proposal T-02-11, due to a lack of
                                                                                  need. If some changes need to be made to Standard 02-10
                                                                                  that are in-line with this discontinued proposal, they can be
                                                                                  made under Proposal T-02-12, the 5-year revision of the
                                                                                  pumps standard.
                                                         T-02-12 Milk Pumps:      T-02-12 Milk Pumps: This is the 5-year revision of the
                                                         Leader: TBD              Pumps standard. On December 12, 2008 Work Group 4
                                                                                  made the decision to begin this project. Staff will develop
                                                                                  the first working draft by converting the current (02-10)
                                                                                  standard into the new Format & Style Manual wording.
                                                         T-02-13 Milk Pumps:      T-02-13 Milk Pumps: This proposal seeks to revise section
                                                         George Doan, Process     D9.1.1 (Radii) to allow smaller radii, for essential
                                                         Technologies Inc.        functional reasons, for rotor-to-rotor clearance areas, in
                                                         gdoan@process-           addition to the other components already listed. The
                                                         technologies.com         minimum radii stipulated would remain unchanged at no
                                                                                  less than 1/32 inches.

                                                                                  The proposal was submitted to the 3-A Steering Committee
                                                                                  on December 17, 2009 for review and possible referral to
                                                                                  WG 4.
                          B. 04-04, Homogenizers and     T-04-05 Homogenizers     T-04-05 Homogenizers and Reciprocating Pumps:
                             Reciprocating Pumps         and Reciprocating        This is the 5-year revision of the standard. At the march
                                                         Pumps: Mel Jolly,        2008 Work Group 4 meeting the T-04-05 Document
                                                         International Business   Subgroup was established. Staff converted the current
                                                         Consulting               standard to the new Format & Style Manual format as the
                                                         jmel_jolly@yahoo.com     first working draft for the revision. The first Document
                                                                                  Group conference was held July 30, 2008.

                                                                                  The Document Subgroup is holding meetings
                                                                                  approximately every month. As of January, 2009, the sixth
                                                                                  draft of Proposal T-04-05 had been developed.

Last revised January 4, 2010                                                22
 Work Group Name        3-A Standard/Accepted Practice         Document Leader                                       Status
                          C. 21-00, Centrifugal Separators   T-21-03 Centrifugal             T-21-03 Centrifugal Separators and Clarifiers: Proposal
                             and Clarifiers                  Separators and                  was received April 17, 2008 and forwarded to the Steering
                                                             Clarifiers: Robert              Committee for review and possible referral to Work Group
                                                             Sandblom, Alfa Laval            4 for development.
                                                             Tumba AB
                                                             robert.sandblom@alfalaval.com   The Proposal was withdrawn in early 2009.

                          D. 21-00, Blending Equipment       T-35-03 Blending                T-35-03 Blending Equipment: This is a Rapid Response
                                                             Equipment                       Ballot (dated November 20, 2008), from T. Schonrock, to
                                                                                             Steering Committee, for voting on the following addition:
                                                             Leader Not Applicable.          “D23.4.1.3 Small size continuous blenders may be
                                                             Rapid Response Ballot to        supported by the sanitary pipeline to which attached
                                                             fix non-controversial           provided they do not impede the proper draining of the
                                                             error in standard.              line.”

                                                                                             Standard 35-02 does not allow for small size units to be
                                                                                             supported solely by the product conveying line. The
                                                                                             current support sections are “shall” items that do not list
                                                                                             line support as an available option. This situation and the
                                                                                             need for correction were discussed at the May 2008
                                                                                             Steering Committee Meeting in Milwaukee.

                                                                                             On December 2, 2008 the Consensus ballot closed (because
                                                                                             all ballots were returned) and there were no “negative with
                                                                                             reasons” votes. As such, Mr. Schonrock instructed staff to
                                                                                             publish this revision ASAP.
                                                             T-35-04 Blending                T-35-04 Blending Equipment: When Standard #35-02
                                                             Equipment: Vince                became effective December 5, 2005, section D15 was
                                                             Mills, Consultant               amended to read “D15.1 All internal angles of less than 135
                                                             vrmills@mchsi.com               degrees or less on product contact surfaces shall have a
                                                                                             radii of not less than ¼” except that:” This was a departure
                                                                                             from the previous Standard (#35-01) and has resulted in
                                                                                             several Symbol Holders not meeting the newer standard
                                                                                             (#35-02) and thus having non-compliant equipment in the
                                                                                             field. Mr. Mills proposes that D15.1.1 be rewritten to say:
                                                                                             “Smaller radii may be used for space or functional reasons,
                                                                                             such as in sealing ring grooves and the way the rotors fit,
                                                                                             but in no case should the radii be less than 1/32 inch. The
                                                                                             product contact surfaces of the internal angle shall be

Last revised January 4, 2010                                                            23
 Work Group Name            3-A Standard/Accepted Practice    Document Leader                                   Status
                                                                                        readily accessible for cleaning and inspection”.

                                                                                        Submitted to the 3-A Steering Committee on June 23, 2009
                                                                                        for review and possible referral to WG 4 for development.

                                                                                        On August 12, 2009 the Steering Committee referred the
                                                                                        proposal to Work Group 4 for development.
                             E. T-77-00, Mechanical Seals    T-77-00 Mechanical         T-77-00 Mechanical Seals: This standard was proposed
                                                             Seals: Henri Azibert,      and a draft developed in 1996 to address the sanitary
                                                             Chesterton                 aspects of mechanical seals for rotating shafts of machinery
                                                             AziberH@chesterton.com     for processing milk and milk products. This standard will
                                                                                        apply only to the mechanical seal and its assembly, and not
                                                             And:                       apply to the vessel or equipment to which the seal is
                                                                                        mounted. Aseptic seals are not in the scope of this draft.
                                                             Robert Elliott
                                                             relliott@zmtech.com        At the 2007 3-A SSI Annual Meeting WG 4 meeting the T-
                                                                                        77-00 Document Subgroup members were selected and a
                                                                                        conference call set for July 25, 2007. The Document
                                                                                        Subgroup has been holding calls every month or two since
                                                                                        inception, and several drafts have been developed. It is
                                                                                        anticipated that a Work Group 4 draft will be balloted soon.

#5: Heat Exchangers          A. 11-07, Plate Type Heat       T-11-10 Plate Heat         T-11-10 Plate Heat Exchangers: This is the five-year
                                Exchangers                   Exchangers: Bob            update of the 11- Standard. It will have the current the
Chair:                                                       Semerad, Consultant        Format & Style Manual language. It will also have new
  John Bohn                                                  rgseme8@yahoo.com          wording for the Scope, definitions of “Nonproduct contact
  AGC Engineering                                                                       surfaces” and “Cleaning”; expanding the wording for
                                                                                        “nonproduct contact surfaces” in D12.1; include a new
                                                                                        Appendix E4 to outline the minimum criteria for metals;
Vice Chair:
  Paul Krueger                                                                          The proposal also seeks to reduce the distance required
  Kraft Foods, Inc.                                                                     between plates when the heat exchanger is opened for
                                                                                        inspection. This is based on multiple years of success of
Steering Cmte. Liaison:                                                                 inspection with the reduced dimension. The specific
   Richard Smith                                                                        wording proposed is for Para D4.5: "Plate heat exchangers
   Richard K. Smith, Inc.                                                               shall be so constructed that when opened, plates may be
                                                                                        separated from frame components to provide a space for
                                                                                        cleaning and inspection at least equal to the lesser of the
                                                                                        width of one plate or 12in. (305mm)".

Last revised January 4, 2010                                                       24
 Work Group Name        3-A Standard/Accepted Practice      Document Leader                                      Status

                                                                                       In January 2007 the first draft was completed and sent to
                                                                                       plate heat exchanger manufacturers for review.

                                                                                       As of September 25, 2007 the Document Subgroup has
                                                                                       held conference calls approximately every month,
                                                                                       developing this major revision.
                          B. 12-07, Tubular Heat           T-12-08 Tubular Heat        T-12-08 Tubular Heat Exchangers: Decision made at
                             Exchangers                    Exchangers: John Barna,     2007 Annual Meeting to begin 5-year update of standard.
                                                           Enerquip, LLC               Will begin by holding Document Subgroup call.
                                                           johnbarna@enerquip.com
                                                                                       On June 23, 2008 staff began the F & S Manual language
                                                                                       conversion to develop the first working draft for the
                                                                                       revision. On October 30, 2008 staff sent Draft 1 to the WG.
                                                           T-12-09 Tubular Heat        T-12-09 Tubular Heat Exchangers: Received from R.
                                                           Exchangers: Robert          Feldmeier on November 18, 2008. The proposal seeks to
                                                           Feldmeier, Feldmeier        add a new paragraph in Section D1 stating “A product
                                                           Equipment, Inc.             contact surface that is cleaned mechanically with the proper
                                                           RFeldmeier@feldmeier.com    concentration of chemicals exceeding 160 degrees F. and
                                                                                       which is free of visible pits or occlusions is satisfactory if it
                                                                                       is a 2B finish, pickle finish, electro polished finish, or a
                                                                                       bright annealed finish. It need not be mechanically ground
                                                                                       and polished.” to standard 12-07. For submittal to SC for
                                                                                       consideration and possible referral to WG 5 for
                                                                                       development.
                          C. 19-05, Batch and Continuous   T-19-07 Batch &             T-19-07 Batch & Continuous Freezers: During the CCE
                             Freezers for Frozen Foods     Continuous Freezers:        conference call on September 17, 2008 it became apparent
                                                           No document leader,         that there was an error in recently published Standard 19-
                                                           revised under CB Rapid      06. The rubber and plastics materials sections do not
                                                           Response procedure to       provide for coatings. However, the fabrication section
                                                           correct obvious errors in   includes criteria specifying the required thickness of plastic
                                                           the standards.              when used as coatings, thus implying that rubber and
                                                                                       plastics can be used as coatings. To correct this error in a
                                                                                       timely manner, the Steering Committee utilized the Rapid
                                                                                       Response ballot to vote on deleting section E1.4.4. (this
                                                                                       section states the minimum thickness of plastic and rubber
                                                                                       coatings). The ballot passed unanimously. This revision will
                                                                                       be published ASAP as Standard 19-07.
                          D. 31-04, Scraped Surface Heat   T-31-05 Scraped T-31        T-31-05 Scraped Surface Heat Exchangers

Last revised January 4, 2010                                                     25
 Work Group Name        3-A Standard/Accepted Practice    Document Leader                                    Status
                               Exchangers                T-31-05 Surface Heat        This is the 5-Year revision of Standard 31-. The last major
                                                         Exchangers: Shaun           revision was in the year 2000. On a Work Group 5
                                                         Dwyer, Alfa Laval           December 2005 conference call it was agreed to assemble
                                                         shaun.dwyer@alfalaval.com   the Document Subgroup and begin the revision.

                                                                                     The draft revision had been reviewed several times by the
                                                                                     Work Group and changes incorporated, based on the review
                                                                                     comments.

                                                                                     Mr. Newcomer has developed the first working draft on
                                                                                     May 18, 2007 in the current Format and Style Manual
                                                                                     language.

                                                                                     In May 2009 Shaun Dwyer became the new Document
                                                                                     Leader.
                                                         T-31-06 Scraped             T-31-06 Scraped Surface Heat Exchangers: This
                                                         Surface Heat                proposed change addresses the visible inspection of the
                                                         Exchangers: Niels ter       bearing, shaft and seal of the Terlotherm Scraped Surface
                                                         Huurne, Terlet NV (MPE      Heat Exchanger to be in compliance with Standard 31-.
                                                         Group NV)
                                                         terhuurne@mpegroup.com      On May 30, 2007 the Steering Committee referred to WG 5
                                                                                     for further development.

                                                                                     The Document Subgroup worked over the next several
                                                                                     months developing the revision. The draft was sent to WG
                                                                                     5 for review and comment.

                                                                                     On December 18, 2007 the draft was sent to staff for
                                                                                     balloting to Work Group 5. The ballot went out on January
                                                                                     4, 2008. The ballot did not pass. Numerous comments were
                                                                                     returned that need resolution.
                                                         T-31-07 Scraped             T-31-07 Scraped Surface Heat Exchangers:
                                                         Surface Heat                Proposal submitted to 3-A SSI to add “centrifugally cast
                                                         Exchangers: Mel Jolly       metallurgical bonded coating” to the list of allowable
                                                         International Business      coatings in the standard. This was approved during the
                                                         Consulting                  recent extensive revision of Standard 19-. The rationale is
                                                         jmel_jolly@yahoo.com        that cylinders or barrels, as used in new equipment or
                                                                                     provided as replacement parts, fabricated using
                                                                                     centrifugally cast metallurgical bonded coatings provide a

Last revised January 4, 2010                                                  26
 Work Group Name        3-A Standard/Accepted Practice    Document Leader                                 Status
                                                                                surface against which stainless steel series 400 scraper
                                                                                blades can be used. The use of stainless steel scraper blades
                                                                                enables the equipment to process an expanded range of
                                                                                food products where crystallization, change of “state” of
                                                                                product occurs during processing, and partial freezing takes
                                                                                place which require physical properties of the scraper blade
                                                                                that are significantly difficult to achieve with plastic scraper
                                                                                blades and require compatible materials of construction
                                                                                which usually have lower coefficient of thermal
                                                                                conductivity.

                                                                                Sent to the Steering Committee on July 23, 2008 for
                                                                                evaluation and possible to WG 5 for development.

                                                                                On September 12, 2008 the Steering Committee referred
                                                                                the proposal to WG 5 for development.

                                                                                On October 28, 2008 the proposal was balloted to WG 5.
                                                                                The ballot did not pass, but it appears to be an easily
                                                                                resolvable issue. The only outstanding matter is that the two
                                                                                Sanitarians on the Work Group need to have definitions
                                                                                included for the terms “centrifugally cast” and
                                                                                “metallurgical bond”.

                                                                                Document Leader Mel Jolly developed the definitions with
                                                                                Sanitarian input.

                                                                                The re-circulation ballot went to WG 5 on January 7, 2009.
                                                                                The two suggested technical changes passed, without any
                                                                                “negative with reasons” votes. A few editorial comments
                                                                                were received.

                                                                                Submitted to Consensus Body ballot on February 24, 2009
                                                                                and closed on April 10, 2009. One substantive comment
                                                                                was received. The comment was resolved through an
                                                                                editorial change of the draft. The revised standard was
                                                                                published in April, 2009.
                                                         T-31-08 Scraped        T-31-08 Scraped Surface Heat Exchangers:
                                                         Surface Heat           Proposal submitted to 3-A SSI on June 16, 2009, on behalf

Last revised January 4, 2010                                               27
 Work Group Name          3-A Standard/Accepted Practice        Document Leader                                   Status
                                                               Exchangers: Mel Jolly     of a client, to Upgrade certain technical criteria provisions
                                                               International Business    to facilitate a new symbol application for equipment and
                                                               Consulting                RPQC and in so doing use appropriate verbiage from
                                                               jmel_jolly@yahoo.com      Format & Style Manual version 002 with clarifications.

                                                                                         Submitted to the Steering Committee on June 16, 2009 for
                                                                                         review and possible referral to WG 5.

                                                                                         On August 10, 2009 the Steering Committee referred the
                                                                                         proposal to WG 5 for development.

                                                                                         The draft was developed and reviewed by the Work Group.
                                                                                         On September 3, 2009 the ballot went to Work Group 3 for
                                                                                         voting. The ballot closed and did not pass.
                           E. 61-00, Steam Injection Heaters   T-61-02 Steam Injection   T-61-02 Steam Injection Heaters:
                              for Milk and Milk Products       Heaters: Richard Smith,   This is the five-year revision of Standard 61-. Work is
                                                               Richard K. Smith, Inc.    underway on this revision.
                                                               smithrk@flash.net


#6: Conveyors &            A. 75-00, Belt-Type Feeders         T-75-01 Belt-Type         T-75-01 Belt-Type Feeders: This is the 5-year revision of
    Feeders                                                    Feeders: Jim McKenzie,    the standard. At the WG 6 meeting during the 2007 3-A
                                                               Schenk Accurate           Annual Meeting, the Document Subgroup was established.
Chair:                                                         mckenzie@sarinc.com       The first conference call was on June 28, 2007 to begin
  Jacques Pienaar                                                                        work. Another conference call was held on February 22,
  The Design Group                                                                       2008.

Vice Chair:
  Jack McCormick
  CPS Scherping

Steering Cmte. Liaison:
  Helen Piotter
  Dean Foods

                           B. 81-00, Auger Type Feeders        T-81-01 Auger Feeders:    T-81-01 Auger Feeders: Approved by TC and User Group
                                                               Mike Olson, Tetra Pak     at May 2003 meeting. Staff e-balloted CSP 02/19/04. The
                                                               Mike.Olson@tetrapak.com   ballot did not pass. The TC was to address the comments
                                                                                         and modify the draft during the May 2004 meeting, but did

Last revised January 4, 2010                                                       28
 Work Group Name        3-A Standard/Accepted Practice    Document Leader                                    Status
                                                                                    not because no TC members were present during the Joint
                                                                                    TC/User Group session.

                                                                                    The WG is to finalize this draft, if possible.

                                                                                    During the Work Group 6 meeting in May 2005 the T-81-
                                                                                    01 Document Subgroup asked staff to send them the ballot
                                                                                    report from the February 19, 2004 CSP Ballot. The
                                                                                    Subgroup will review the ballot report and will revise the
                                                                                    proposal, using the ballot report and the 3-A Format and
                                                                                    Style Manual as input.

                                                                                    During the WG 6 meeting in May 2007 the Document
                                                                                    Subgroup was formed and Mr. Olson volunteered to lead
                                                                                    the revived revision effort. The first conference call to
                                                                                    begin the revision again was held July 19, 2007.
                                                                                    Conference calls have been occurring on a monthly basis,
                                                                                    with several draft revisions occurring.

                                                                                    In October 2007 draft was sent to staff to review for proper
                                                                                    format and to ballot to Work Group 6. The WG ballot went
                                                                                    out on February 28, 2008. The ballot did not pass.
                                                                                    Comments return must be addressed.


                                                         T-81-02 Auger Feeders:     T-81-02 Auger Feeders: Proposal received October 3,
                                                         Mel Jolly, International   2007 (via Mel Jolly), that seeks to include change in scope
                                                         Business Consulting        to cover, in addition to solid product feeders, semi-liquid
                                                         jmeljolly@msn.com          and liquid product auger feeders. Also seeks to allow
                                                                                    chrome (engineered) plating on various components and to
                                                                                    allow the use of specific integral mechanisms of pumps and
                                                                                    blenders. Sent to the Steering Committee for initial
                                                                                    evaluation.

                                                                                    On December 3, 2007 the SC approved WG 6 developing
                                                                                    the proposal.

                                                                                    The draft was completed in January 2008 and went to ballot
                                                                                    on January 28, 2008. The ballot passed numerically, but

Last revised January 4, 2010                                                 29
 Work Group Name          3-A Standard/Accepted Practice       Document Leader                                   Status
                                                                                         three substantive comments were returned that must be
                                                                                         resolved before the proposal can advance to Consensus
                                                                                         Body ballot.

                                                                                         This proposal was withdrawn by Mel Jolly on May 29,
                                                                                         2008. The decision to withdraw the proposal was based on
                                                                                         discussions held with Work Group 6 during the 2008
                                                                                         Annual Meeting.

#7: Instruments            A. 28-03, Flow Meters for Milk &   T-28-04 Flow Meters:       T-28-04 Flow Meters: This standard is more than five
                              Milk Products                   Charlie Price, FDA         years old (11/95) and needs to be reviewed and either
Chair:                                                        cdplep@aol.com             revised, reaffirmed, or withdrawn by the WG.
  Bill Wilson
  Anderson Instruments                                                                   On October 23, 2008 Staff completed the Format & Style
                                                                                         Manual conversion of the standard and sent it to Chair
Vice Chair:                                                                              Wilson as the first working draft for the revision.
 Byron Bailey
 Bailey Sys. Automation

Steering Cmte. Liaison:
  John Yacoub
 Safeline, Inc.
                                                              T-28-05 Flow Meters        T-28-05 Flow Meters: This is a Rapid Response Ballot
                                                                                         (dated November 20, 2008), from T. Schonrock, to Steering
                                                              Leader Not Applicable.     Committee, for voting on the following addition: “D11.1.4
                                                              Rapid Response Ballot      Small size flow meters may be supported by the sanitary
                                                              to fix non-controversial   pipeline to which attached provided they do not impede the
                                                              error in standard.         proper draining of the line.”

                                                                                         Standard 28-03 does not allow for small size units to be
                                                                                         supported solely by the product conveying line. The
                                                                                         current support sections are “shall” items that do not list
                                                                                         line support as an available option. This situation and the
                                                                                         need for correction were discussed at the May 2008
                                                                                         Steering Committee Meeting in Milwaukee.

                                                                                         On December 2, 2008 the Consensus ballot closed (because
                                                                                         all ballots were returned) and there were no “negative with
                                                                                         reasons” votes. As such, the revision was published.

Last revised January 4, 2010                                                       30
 Work Group Name        3-A Standard/Accepted Practice    Document Leader                                       Status
                          B. 74-03, Sensors and Sensor   T-74-05 Sensors &             T-74-05 Sensors & Sensor Fittings: This is the 5-year
                             Fittings and Connections    Sensor Fittings:              revision of Standard 74-. On December 15, 2008 staff sent
                                                         Bill Wilson, Anderson         draft 1 (the current standard, 74-03, in the current Format
                                                         Instruments                   & Style Manual format) to Chair Wilson to enable Work
                                                         bwilson@andinst.com           Group 7 to begin work.

                                                                                       Work has begun and the first draft from the Document
                                                                                       Subgroup is dated February 24, 2009. The draft has been
                                                                                       revised by the subgroup and on March 30, 2009 was sent to
                                                                                       WG 7 for review and comment.

                                                         T-74-06 Sensors &             T-74-06 Sensors & Sensor Fittings: Proposal to revise
                                                         Sensor Fittings:              74-03 r.e. gasket requirements, submitted by K. Klinger,
                                                         Karl Klinger, ifm Efector,    ifm Efector. On January 17, 2007 submitted to Steering
                                                         Inc.                          Committee for review and possible referral to WG 7.
                                                         Karl_klinger@ifmefector.com
                                                                                       On March 5, 2007 the Steering Committee approved of WG
                                                                                       7 developing the proposal.
                                                         T-74-07 Sensors &             T-74-07 Sensors & Sensor Fittings: This revision is
                                                         Sensor Fittings:              being pursued to allow additional technologies to be used in
                                                         David Ross-Hamilton           the Standards for Sensors and Sensor Fittings &
                                                         Mobrey Measurement,           Connections, Number 74-03. Vibrating elements sensors
                                                         Division of Emerson           are used to measure numerous fluid properties which
                                                         Process Management            include level, density, and viscosity. These sensors require
                                                         David.Ross-                   defined changes in section to operate reliability, which
                                                         Hamilton@Emerson.com          therefore requires the use of the small radius clause D.6.1.
                                                                                       As D.6.1 has an exclusive list, this type of sensor is not
                                                                                       capable of being 3-A compliant.

                                                                                       Submitted to 3-A SSI on December 10, 2008 and
                                                                                       immediately forwarded to the Steering Committee for
                                                                                       consideration for future development in WG 7. On January
                                                                                       29, 2009 the Steering Committee referred the proposal to
                                                                                       Work Group 7 for development.
                                                         T-74-08 Sensors &             T-74-08 Sensors & Sensor Fittings: This proposal seeks
                                                         Sensor Fittings:              to revise Standard 74- to state “All sanitary pressure gauges
                                                         R. Feldmeier, Feldmeier       with stainless steel diaphragms less that 0.049” thick must
                                                         Equipment, Inc.               have a leak detector adapter attached to assure that the
                                                         jeanne@feldmeier.com          pressure transfer medium does not enter the product.”

Last revised January 4, 2010                                                    31
 Work Group Name          3-A Standard/Accepted Practice         Document Leader                                   Status

                                                                                          Sent to staff on August 31, 2009 and then sent to Steering
                                                                                          Committee for review and possible referral to WG 7.

                                                                                          On November 2, 2009 referred to WG 7 for development.
                                                                T-74-09 Sensors &         T-74-09 Sensors & Sensor Fittings: This proposal seeks
                                                                Sensor Fittings:          to provide clarification in 74-03 Section D6.1.2 regarding
                                                                Paul Bokelmann,           grooves, add fiber optic filament bundles to 74-03 Section
                                                                Advanced Process          D12.2, clarify that O-rings of sizes other than ¼” and 1/8”
                                                                Technologies, Inc.        can be used in 74-03 Section D6.1.3, and provide for gasket
                                                                pbokelmann@apt-inc.com    retaining grooves greater than ¼” in width in 74-03 Section
                                                                                          D5.2 and D5.3. On August 27, 2009 this proposal was sent
                                                                                          to the Steering Committee for review and possible referral
                                                                                          to WG 7.

                                                                                          On October 19, 2009 the Steering Committee referred this
                                                                                          proposal to WG 7 for development.

#8: Concentrating          A. 16-05, Milk and Milk Products     T-16-06 Milk              T-16-06 Milk Evaporators: This is the 5-year revision of
    Equipment                 Evaporators and Vacuum Pans       Evaporators: Cal          Standard 16-.
                                                                Lockner, GEA/Niro Inc.
Chair:                                                          cxl@niroinc.com           Work Group 8 reviewed the draft during its May 2005
  Steve Warren                                                                            meeting and made changes.
  GEA Filtration
                                                                                          Cal Lockner reported on April 13, 2006 that the draft was
Vice Chair:                                                                               almost ready to be sent to WG 8 for review and comment.
  Bob Semerad
  Consultant                                                                              On September 25, 2007 Mr. Lockner reported that the draft
                                                                                          is complete, except for resolving the issue of the definition
Steering Cmte. Liaison:                                                                   of an evaporator. This was the topic of much discussion at
   Tom Honse                                                                              the Milwaukee meeting in 2006. Soon Mr. Lockner will
   AMPI                                                                                   formulate a definition based on the discussions and submit
                                                                                          the draft for distribution to WG8 for comments.


                           B. 26-04, Sifters for Dry Products   T-26-07 Sifters for Dry   T-26-07 Sifters for Dry Products: Proposal, received
                                                                Products:                 from AZO, Inc. on February 21, 2007, to revise Standard
                                                                William Von Staden,       26- to include in its scope rotary-type sifters. Sent to the 3-
                                                                AZO, Inc.                 A Steering Committee for initial consideration and possible

Last revised January 4, 2010                                                         32
 Work Group Name        3-A Standard/Accepted Practice       Document Leader                                  Status
                                                            Bvonstaden@azo.com       referral to WG 8 for development. On April 9, 2007 the SC
                                                                                     approved of WG 8 developing the proposal.

                          C. 34-02, Portable Bins for Dry   T-34-03 Portable Bins    T-34-03 Portable Bins for Dry Products: This standard is
                             Milk & Dry Milk Products       for Dry Products: Les    more than five years old (09/92 date) and needs to be
                                                            Boian, FDA Seattle, WA   reviewed and either revised, reaffirmed, or withdrawn by
                                                            les.boian@fda.gov        the WG.
                          D. 45-02, Cross-Flow Membrane     T-45-03 Cross-Flow       T-45-03 Cross-Flow Membrane Modules: On February
                             Modules                        Membrane Modules:        19, 2009 staff sent Draft 1 (current standard updated to the
                                                            Steve Warren, GEA        current Format & Style Manual language) to Mr. Warren to
                                                            Filtration               begin the 5-year revision.
                                                            spw@geafiltration.com
                          E. 97-00, Vibratory Separators    T-97-00 Vibratory        T-97-00 Vibratory Separators for Wet Products: A
                             for Wet Products               Separators for Wet       proposal for a new standard that seeks to detail the sanitary
                                                            Products:                requirements for vibrating wet sifters for use as cheese fines
                                                            Joseph Smith, Sweco      savers, as well as for other wet dairy uses.
                                                            joe.smith@sweco.com
                                                                                     Submitted to 3-A SSI on March 24, 2009 and referred to
                                                                                     the Steering Committee for initial evaluation and possible
                                                                                     referral to WG 8 for development.

                                                                                     On May 16, 2009 the Steering Committee referred the
                                                                                     proposal to WG 8 for development.
                          F. 100-00, Drum Dryers and        T-100-00 Drum Dryers     T-100-00 Drum Dryers and Vacuum Drum Driers:
                             Vacuum Drum Dryers             and Vacuum Drum          A proposal sent to 3-A SSI on July 3, 2009 for the
                                                            Driers                   development of a new standard.

                                                            Kenneth O‟Connor,        Drum Dryers have been used to process food and
                                                            Buflovak LLC             pharmaceutical materials for almost one hundred years. No
                                                            koconnor@buflovak.com    standard exists regarding sanitary requirements for this
                                                                                     machinery. Many of the drum dryers used to produce
                                                                                     products for human consumption contain design features
                                                                                     which conflict with the requirements of the 3-A standards.
                                                                                     These features include the use of cast iron, copper alloys
                                                                                     and non-food materials in direct contact with the product
                                                                                     being processed. Drum dryers have special problems not
                                                                                     normally encountered with most equipment. A standard for
                                                                                     this equipment would help eliminate unsanitary equipment
                                                                                     being offered in the market place.

Last revised January 4, 2010                                                   33
 Work Group Name        3-A Standard/Accepted Practice        Document Leader                                Status

                                                                                     On July 13, 2009 the proposal was sent to the Steering
                                                                                     Committee for review and possible referral to Work Group
                                                                                     8 for development and balloting. On September 7, 2009 the
                                                                                     Steering Committee referred the project to Work Group 8
                                                                                     for development.
                          G. 610-01, Accepted Practice for   T-610-02 Membrane       T-610-02 Membrane Processing Systems: Part of the
                             Sanitary Construction,          Processing Systems:     document was approved May 2003, dist. for signature, and
                             Installation, and Cleaning of   Steve Warren, Niro      sent to Techstreet on Nov.10, 2003. Staff e-balloted the rest
                             Crossflow Membrane              Inc./GEA Filtration     of the document to the CSP-PHS on 02/13/04. The ballot
                             Processing Systems              spw@geafiltration.com   did not pass. CSP-PHS further reviewed the document
                                                                                     during the May 2004 meeting and returned it to the TC.
                                                                                     CSP-PHS‟s primary concerns are with gaskets and radii
                                                                                     sections since they differed from the model document.

                                                                                     The Proposal went to WG 8 ballot on March 3, 2006. The
                                                                                     ballot did not pass. The draft was rewritten, based on ballot
                                                                                     comments, and sent to WG 8 re-circulation ballot on July
                                                                                     26, 2006. The ballot passed, with two “Negative with
                                                                                     reasons” votes. The comments were addressed and the draft
                                                                                     technically changed.

                                                                                     A Work Group re-circulation ballot was issued on
                                                                                     December 1, 2006. This re-circulation ballot did pass, and
                                                                                     without any “negative with reason” votes returned. Several
                                                                                     “affirmative with comments” votes were returned. Through
                                                                                     reviewing the draft the T-610-02 Document Subgroup made
                                                                                     a few additional technical changes. These latest technical
                                                                                     changes were balloted to the Work Group as a third re-
                                                                                     circulation ballot, on March 19, 2007. The ballot passed
                                                                                     with no “No” votes.

                                                                                     During the 2007 3-A Annual Meeting the T-610-02
                                                                                     Document Subgroup finalized the draft for a Consensus
                                                                                     Body ballot. The draft went to CB ballot on July 9, 2007.
                                                                                     The Consensus Body Ballot met the numerical
                                                                                     requirements for passage, but there were substantive
                                                                                     comments returned.


Last revised January 4, 2010                                                    34
 Work Group Name        3-A Standard/Accepted Practice      Document Leader                                 Status
                                                                                    The draft was significantly rewritten when addressing the
                                                                                    Consensus Body ballot comments. This necessitated
                                                                                    another “original” Work Group, in which the ballot process
                                                                                    started over. There were too many technical changes to re-
                                                                                    circulate back to the Work Group as individual ballot items.

                                                                                    The draft was significantly and technically rewritten when
                                                                                    addressing the Consensus Body ballot comments. As per
                                                                                    Steering Committee direction, these changes necessitated an
                                                                                    additional “original” Work Group ballot, in which the
                                                                                    process started over. There were too many technical
                                                                                    changes to re-circulate back to the Work Group as
                                                                                    individual ballot items.

                                                                                    The new original ballot went to the Work Group on June
                                                                                    30, 2008. The ballot closed 45 days later and did not pass
                                                                                    because one of the three stakeholder groups did not pass the
                                                                                    proposal. Document Leader Steve Warren worked with
                                                                                    those Work Group members who provided substantive
                                                                                    comments and reworked the draft proposal, based on the
                                                                                    comments.

                                                                                    In December 2008 a new draft, incorporating five technical
                                                                                    changes (and several editorial changes) based on the
                                                                                    comments, was sent to staff. 3-A SSI Staff developed the
                                                                                    Work Group re-circulation “A” ballot from this new draft.
                                                                                    The ballot was sent to Work Group 8 on January 29, 2009
                                                                                    and closes on March 17th.

                                                                                    All five proposed changes were adopted by the Work
                                                                                    Group and were written into the draft. The draft went to
                                                                                    Consensus Body ballot on April 8, 2009.

                                                                                    The Consensus Body closed with one substantive comment
                                                                                    returned. This comment was later withdrawn after an
                                                                                    editorial changes was made. This revision has been
                                                                                    approved and was published July 27, 2009.

#9: Farm/Raw Milk        A. 13-10, Farm Milk Cooling and   T-13-11 Farm Milk        T-13-11 Farm Milk Cooling and Holding Tanks:

Last revised January 4, 2010                                                   35
 Work Group Name          3-A Standard/Accepted Practice        Document Leader                                       Status
                               Holding Tanks                  Cooling and Holding             This is the 5-year revision of the standard. In May 2008 the
Chair:                                                        Tanks:                          Document Subgroup was developed and work has begun on
  Roger Hailey                                                Roger Hailey, Paul              the revision.
  Paul Mueller Company                                        Mueller Company
                                                              rhailey@muel.com
Vice Chair:
  Joe Smucker
  Smucker & Associates

Steering Cmte. Liaison:
   David Rowe
   Paul Mueller Company

                          B. 30-01, Farm Milk Storage         T-30-02 Farm Milk               T-30-02 Farm Milk Storage Tanks: At the May 2005
                             Tanks                            Storage Tanks:                  WG 9 meeting, the draft was reviewed and several changes
                                                              Roger Hailey, Paul              noted. A new draft was sent to the Work Group following
                                                              Mueller Company                 the meeting.
                                                              rhailey@muel.com
                                                                                              During a 04/19/07 Work Group 9 conference call, Roger
                                                                                              Hailey reported that following the May 2006 Work Group 9
                                                                                              meeting he rewrote the T-30-02 proposal. He included
                                                                                              current Format & Style Manual language, where
                                                                                              appropriate. Staff e-mailed the draft to the Work Group
                                                                                              with the April 19, 2007 conference call notice. The Work
                                                                                              Group 9 members on the call reviewed the draft. Some
                                                                                              additional changes were agreed to and noted by chair
                                                                                              Hailey.

                                                                                              In September 2007 chair Hailey sent the draft to staff to
                                                                                              send out to Work Group 9 ballot. The ballot went to WG 9
                                                                                              on October 5, 2007. The ballot passed with only editorial
                                                                                              changes suggested.
                           B. 606-05, Proposal, Design,       T-606-06 Milking and            T-606-06 Milking and Milk Handling Equipment:
                              Fabrication, and Installation   Milk Handling                   This is the five year revision of AP 606-. The Document
                              of Milking and Milk Handling    Equipment:                      Leader was selected during the 2008 Annual Meeting and
                              Equipment                       Jim Parker, Westfalia           work will begin soon.
                                                              Surge
                                                              parker.jim@westfaliasurge.com




Last revised January 4, 2010                                                             36
 Work Group Name          3-A Standard/Accepted Practice     Document Leader                                     Status
                           C. 611-00, Farm Milk Cooling     611-00 Farm Milk             611-00 Farm Milk Cooling and Storage Systems: This
                              and Storage Systems           Cooling and Storage          standard is more than five years old (11/94 date) and needs
                                                            Systems:                     to be reviewed and either revised, reaffirmed, or withdrawn
                                                            Roger Hailey, Paul           by the WG.
                                                            Mueller Company
                                                            rhailey@muel.com

#10: Cheese & Butter      A. 38-00, Open Cheese Vats and    T-38-01 Open Cheese          T-38-01 Open Cheese Vats and Tables: This is now the
     Equipment               Tables                         Vats and Tables: Paul        5-year revision of Standard 38-00. In May 2007 the Work
                                                            Bokelmann, Advanced          Group decided to use the latest T-38-01 draft as a starting
Chair:                                                      Process Technologies,        point. The Document Subgroup is holding monthly
  Paul Bokelmann                                            Inc.                         conference calls and is developing a draft for ballot.
  Advanced Process                                          pbokelmann@apt-inc.com
  Technologies, Inc.

Vice Chair:
  Jacques Pienaar
  The Design Group

Steering Cmte. Liaison:
   Carl Buell
   Leprino Foods
                          B. 70-01, Italian-Type Pasta      T-70-02 Cheese               T-70-02 Cheese Cookers: This is the 5-year revision of
                             Filata Style Cheese Cookers    Cookers: Gary Nesheim,       Standard 70-01. In May 2007 the Work Group decided to
                                                            Johnson Industries           begin the revision. First conference call held June 26, 2007
                                                            gnesheim@johnsonindint.com   to begin work. Regular conference calls are being held.
                          C. 71-01, Italian-Type Pasta      T-71-02 Cheese               T-71-02 Cheese Moulders: This is the 5-year revision of
                             Filata Style Cheese Moulders   Moulders: Gary               Standard 71-01. In May 2007 the Work Group decided to
                                                            Nesheim,                     begin the revision. First conference call held June 26, 2007
                                                            Johnson Industries           to begin work. Regular conference calls are being held.
                                                            gnesheim@johnsonindint.com
                          D. 72-01, Italian-Type Pasta      T-72-02 Cheese               T-72-02 Cheese Chillers: This is the 5-year revision of
                             Filata Style Moulded Cheese    Chillers: Gary Nesheim,      Standard 72-01. In May 2007 the Work Group decided to
                             Chillers                       Johnson Industries           begin the revision. First conference call held June 26, 2007
                                                            gnesheim@johnsonindint.com   to begin work. Regular conference calls are being held.
                          E. 83-00, Enclosed Cheese Vats    T-83-01 Enclosed             T-83-01 Enclosed Cheese Vats and Tables: This is the 5-
                             and Tables                     Cheese Vats and              year revision of the standard and will begin during the WG
                                                            Tables: Leader TBD.          10 meeting at the 2008 Annual Meeting.

Last revised January 4, 2010                                                      37
 Work Group Name            3-A Standard/Accepted Practice       Document Leader                                    Status

                                                                                            Staff converted the current (83-00) standard into Format &
                                                                                            Style Manual text and sent to P. Bokelmann on 07/07/08 as
                                                                                            the first working draft.

#11: Process &               A. 603-06, Accepted Practice for   T-603-07 Hi-Temp            T-603-07 Hi-Temp Short Time Pasteurizers: In
     Cleaning Systems           Sanitary Construction,          Short Time                  September 2007 WG 11 Chair Gabe Miller provided the
                                Installation, Testing, and      Pasteurizers:               following information:
Chair:                          Operation of High-              Lyle Clem, Electrol
  Gabe Miller                   Temperature Short-Time and      Specialties Company         The proposed revision of 603-07 will include the following:
  Sani-Matic, Inc.              Higher-Heat Shorter-Time        lyleclem@worldnet.att.net   1. Separate the document into HTST and HHST sections.
                                Pasteurizer Systems                                         2. Align the document with the current PMO and actions of
Vice Chair:                                                                                     2007 NCIMS
  Lyle Clem                                                                                 3. Include separate diagrams for HTST and HHST
  Electrol Specialties Co                                                                   4. Possible scope revisions to be considered.

Steering Cmte. Liaison:                                                                     Work is progressing towards these goals.
   Doug Harper
      Tetra Pak
                             B. 605-04, Accepted Practice for   T-605-05 Permanently        T-605-05 Permanently Installed Product and Solution
                                 Permanently Installed          Installed Product and       Pipelines and Cleaning Systems: During the Work Group
                                 Product and Solution           Solution Pipelines and      meeting on May 25, 2005 it was noted that the draft for the
                                 Pipelines and Cleaning         Cleaning Systems:           new AP T-613-00, CIP for Equipment, will be developed
                                 Systems Used in Milk and       Sam Lebowitz, Electrol      first. After T-613-00 is completed work will begin on
                                 Milk Product Processing        Specialties Company         revising AP 605-04 to mirror 613-00. The same document
                                 Plants                         sam4cip@aol.com             team is responsible for both practices.

                                                                                            As of 09-24-07 work is progressing nicely.

                                                                                            During the 2009 Annual Meeting Work Group 11 session,
                                                                                            document Leader Sam Lebowitz reported that it was decided
                                                                                            that T-605-05 will be developed after the approval of T-613-
                                                                                            00, due to similarities between the two documents.
                                                                                            Specifically, it is planned to adopt some of the “cleaning”
                                                                                            clause verbiage from T-613-00.
                             C. 613-00, Accepted Practice for   T-613-00 CIP for            T-613-00 CIP for Equipment: Revisions have been made
                                CIP for Equipment               Equipment: Gabe             to the document including consensus comments at the May
                                                                Miller, Sani-Matic, Inc.    2008 meeting. Proposed final revisions are under review by
                                                                Gabem@sanimatic.com         the Document Subgroup. Document Subgroup is meeting
Last revised January 4, 2010                                                          38
 Work Group Name        3-A Standard/Accepted Practice         Document Leader                                      Status
                                                                                            regularly to develop the proposal.

                                                                                            In January 2009 the proposal was completed, including an
                                                                                            extensive review by Work Group 11. The letter ballot for
                                                                                            this proposed new Accepted Practice went to WG 11 on
                                                                                            January 26, 2009. There were substantive comments that
                                                                                            require attempted resolution (and possibly a WG 11 re-
                                                                                            circulation ballot) before the draft can advance to
                                                                                            Consensus Body ballot.

                                                                                            In January 2009 Proposal T-613-00 was completed and
                                                                                            underwent an extensive review by Work Group 11. The
                                                                                            letter ballot for this proposed new Accepted Practice went
                                                                                            to Work Group 11 on January 26, 2009. There were
                                                                                            substantive comments returned that require attempted
                                                                                            resolution (and possibly a WG 11 re-circulation ballot)
                                                                                            before the draft can advance to Consensus Body ballot.

                                                                                            During the 2009 Annual Meeting Work Group 11 session,
                                                                                            Chair Miller (also the Document Leader) led a line-by-line
                                                                                            review of the changes to Proposal T-613-00, made as the
                                                                                            result of the Work Group ballot comments received. The
                                                                                            following questions arose during the review:

                                                                                            • Do we need to delete the Fabrication section, since once
                                                                                            approved this will be an Accepted Practice?
                                                                                            • Should the Materials and Fabrications clauses be moved to
                                                                                            the Appendix?
                                                                                            • Should manufacturing criteria be removed from T-613-00
                                                                                            and the Format and Style Manual verbiage be used for this
                                                                                            criteria?

                                                                                            No conclusions were reached. Mr. Miller said he plans to
                                                                                            schedule a T-613-00 Document Subgroup conference call
                                                                                            in the near future to discuss these items.
                          D. 614-00, Accepted Practice for   T-614-00 ESL: Frank            T-614-00 ESL: In September 2007 WG 11 Chair Miller
                             Systems Used to Produce         Bartholomay, Ecolab            provided the following update:
                             Refrigerated Extended Shelf-    Frank.Bartholomay@ecolab.com
                             life Products                                                  The title and scope of the standard have been revised,

Last revised January 4, 2010                                                          39
 Work Group Name          3-A Standard/Accepted Practice       Document Leader                                 Status
                                                                                         and consensus reached at the May 2007 3-A Annual
                                                                                         Meeting. Document Subgroup to teleconference in
                                                                                         Sept. 2007 for continued review and document
                                                                                         development.
                           E. T-101-00, Standard for          T-101-00 Pipeline          T-101-00 Pipeline Recovery Systems: A proposal for a
                              Pipeline Product Recovery       Recovery Systems Using     new standard addressing hygienic pigging systems to clean
                              Systems Using Projectiles       Projectiles                constant diameter piping and product vessels. Pigging
                                                              Bryan Downer, Central      systems are used extensively in dairy applications and to
                                                              States Industrial          date, no 3-A Standard has been developed addressing these
                                                              bryand@csidesigns.com      systems. It would be important that a standard be developed
                                                                                         so that these systems could be manufactured and installed
                                                                                         with materials, application and sanitation addressed.

                                                                                         Sent to 3-A SSI on April 24, 2009 by the IDFA 3-A User
                                                                                         Task Force and sent to the 3-A Steering Committee for
                                                                                         evaluation.

                                                                                         On June 11, 2009 the Steering Committee referred the
                                                                                         proposal to WG 11 for development. Monthly conference
                                                                                         calls are being held to develop the draft.

#12: Plant Support         A. 609-03, Accepted Practice for   T-609-04 AP for            T-609-04 Producing Culinary Steam: This is the 5-year
     Systems                  Method for Producing Steam      Producing Culinary         revision of the AP. During the Work Group 12 meeting on
                              of Culinary Quality             Steam: Chris Parkinson,    May 22, 2008 it was agreed to begin the revision. The
Chair:                                                        Zander Filtration          Document Subgroup will be formed.
  Paul Rebe                                                   Systems, Inc.
  Parker Hannifin                                             ultrapar@att.net

Vice Chair:
  Chris Parkinson
  Zander Filtration
  Systems, Inc.

Steering Cmte. Liaison:
   Ray Dyke
      Agri-Mark, Inc.
                           B. 612-00, Accepted Practice for   T-612-00 AP for Air        T-612-00 Air Quality: Mr. Rebe sent the draft to staff in
                              Air Quality                     Quality: Paul Rebe,        December 2005 for a WG 12 ballot. The ballot was sent out

Last revised January 4, 2010                                                        40
 Work Group Name         3-A Standard/Accepted Practice     Document Leader                                  Status
                                                           Parker Hannifin           12/15/05. The ballot passed, but several comments were
                                                           prebe@parker.com          returned that need addressing.

                                                                                     The comments were addressed by Paul Rebe. In addressing
                                                                                     these comments, Mr. Rebe made technical changes to the
                                                                                     draft that led to the development of the sixth revision that
                                                                                     necessitated a re-circulation ballot. The Work Group 12 re-
                                                                                     circulation ballot went out on April 23, 2007. Although
                                                                                     passing numerically, there is one “negative with reasons”
                                                                                     comment that needs to be addressed.

                                                                                     To address the ballot issue, the draft was reworked during
                                                                                     the WG 12 meeting at the 2007 Annual Meeting. This
                                                                                     generated four technical changes. On January 8, 2008 a
                                                                                     Work Group re-circulation ballot went out for these
                                                                                     changes. All proposed changes passed. The Consensus
                                                                                     Body ballot is next.

                                                                                     The Consensus Body draft has been developed and the
                                                                                     ballot went out on April 27, 2009. The ballot closed and did
                                                                                     not pass. Several substantive comments were returned that
                                                                                     need an attempt at resolution.
                          C. T-615-00, Accepted Practice   T-615-00 AP for Gas       T-615-00, submitted by P. Rebe on May 1, 2008 for
                             for Gas for Packaging         for Packaging Products:   Steering Committee review and possible referral to WG 12
                             Products                      Paul Rebe, Parker         for development of a proposed Accepted Practice for
                                                           Hannifin                  providing suitable gas compositions for packaging and
                                                           prebe@parker.com          protecting products from microorganism decay and
                                                                                     deterioration.

                                                                                     Sent to the Steering on May 1, 2008 for review. On June
                                                                                     27, 2008 the Steering Committee gave approval for WG 12
                                                                                     to develop Proposal T-615-00.

#13: Materials &          A. 18-03, Multiple-Use Rubber    T-18-04 Rubber            T-18-04 Rubber & Rubber-Like Materials: T-18-04 is
     Materials Testing       and Rubber-Like Materials     Materials                 the five-year revision of Standard 13-.
                             Used as Product               Jeff Jansen, Stork                                              08/99
Chair:                       Contact Surfaces              Technimet                 During the Work Group 13 conference call on August 16,
  Jeff Jansen                                              jeff.jansen@stork.com     2006 there was discussion about withdrawing the standard
  Stork Technimet                                                                    due to it being outdated. The general consensus expressed

Last revised January 4, 2010                                                   41
 Work Group Name            3-A Standard/Accepted Practice    Document Leader                              Status
                                                                                   was that Standard 18- was in serious need of revision and
Vice Chair:                                                                        should be retained, but revised from the ground up. The
  Lyle Clem                                                                        Work Group was formed to do this.
  Electrol Specialties Co
                                                                                   The first T-18-04 Document Subgroup conference call was
Steering Cmte. Liaison:                                                            held on September 8, 2008 and the plan to revise the
   Tracy Schonrock                                                                 standard and Document Subgroup members were
   3-A Steering Cmte.                                                              confirmed.

                                                                                   On October 1, 2008 staff sent the first draft of T-18-04,
                                                                                   updated to the current Format & Style Manual language, to
                                                                                   Mr. Jansen.

                                                                                   As of March, 2009, conference calls are being regularly
                                                                                   held. There is a proposal to change the definitions of the
                                                                                   rubber classes and talk about seeking a “grandfathering” for
                                                                                   current rubber formulations as meeting Standard 18- after
                                                                                   the test requirements of the standard are substantially
                                                                                   revised.

                                                                                   During the Work Group 13 session at the May 2009 Annual
                                                                                   Meeting, an abrupt course of action was taken. It was
                                                                                   decided to halt work on revising Standard 18-03 and
                                                                                   instead, ballot the Work Group to re-affirm the current
                                                                                   standard. A major driver for this decision was the
                                                                                   perception that the Steering Committee would require
                                                                                   currently-accepted rubber materials (under Standard 18-03)
                                                                                   to meet the revised standard. This would entail testing to
                                                                                   the new requirements.

                                                                                   Proposal T-18-04 is on hold.

                                                                                   The re-affirmation of Standard 18-03 is cataloged as
                                                                                   Proposal T-18-07.
                                                             T-18-05 Rubber        T-18-05 Rubber & Rubber-Like Materials: Proposal
                                                             Materials             submitted to 3-A SSI on May 9, 2006 to change the Class I
                                                             Jim Cetnar, MOYNO,    and Class II designations in Section B3 to make them less
                                                             Inc.                  restrictive. Specific wording was provided. Sent to the
                                                             jcetnar@moyno.com     Steering Committee for initial evaluation.

Last revised January 4, 2010                                                  42
 Work Group Name        3-A Standard/Accepted Practice    Document Leader                                    Status

                                                                                    On June 26, 2006 the Steering Committee approved of WG
                                                                                    13 developing the proposal.

                                                                                    On January 18, 2008 Mr. Cetnar sent 3-A SSI a revised
                                                                                    proposal containing wording for Work Group review and
                                                                                    comment.

                                                                                    Work on this proposal was put on hold, pending resolution
                                                                                    of whether or not Standard 18-03 will be re-affirmed or
                                                                                    revised.
                                                         T-18-06 Rubber             T-18-06 Rubber & Rubber-Like Materials: Proposal to
                                                         Materials                  revise Standard 18-, received on March 25, 2008, from
                                                         Lyle Clem, Electrol        Bruno LaFont (PCM USA Inc.) and Lyle Clem. The
                                                         Specialties Company        proposal notes that the singular reference to
                                                         lyleclem@att.net           21CFR177.2600 excludes certain materials that are proven
                                                                                    safe by other testing criteria. The additional allowance is
                                                                                    being requested for materials complying with United States
                                                                                    Pharmacopeia (USP) Monograph 88, Class III or greater.
                                                                                    This is a very stringent testing method that is the preferred
                                                                                    standard for the pharmaceutical industry for rubber and
                                                                                    rubber-like materials and includes in vivo testing of
                                                                                    materials for toxicological impact.

                                                                                    The proposal ascertains these materials will still be tested
                                                                                    against the existing sections C and D of the Standard and
                                                                                    further, Class III or greater means that extracts of the
                                                                                    material are prepared in vegetable oil, propylene glycol 400,
                                                                                    sodium chloride injection solution, and alcohol in sodium
                                                                                    chloride and are subjected to live mouse and rabbit testing.

                                                                                    The proposal included the desired wording changes.

                                                                                    Submitted to the 3-A Steering Committee on March 25,
                                                                                    2008 for consideration and possible referral to WG 13 for
                                                                                    development. On May 12, 2008 the Steering Committee
                                                                                    approved of WG 13 developing the proposal.

                                                                                    During the Work Group 13 meeting, occurring during the

Last revised January 4, 2010                                                   43
 Work Group Name        3-A Standard/Accepted Practice      Document Leader                                  Status
                                                                                    2009 3-A Annual Meeting, Document Leader Lyle Clem
                                                                                    reported that he is collecting additional data for Proposal T-
                                                                                    18-06. The Proposal is tabled for now and work may begin
                                                                                    on it at a later date.
                                                           T-18-07 Rubber           T-18-07 Rubber & Rubber-Like Materials: This
                                                           Materials                proposal is for the re-affirmation of Standard 18-03, in lieu
                                                           3-A Staff                of revision of the standard.

                                                                                    During the Work Group 13 session at the May 2009 Annual
                                                                                    Meeting, a change in course of action was taken. It was
                                                                                    decided to halt work on revising Standard 18-03 (Proposal
                                                                                    T-18-04) and instead, re-affirm the standard, if possible, by
                                                                                    balloting it to the Work Group. A driver for this decision
                                                                                    was the perception that the Steering Committee would
                                                                                    require currently-accepted rubber materials (under Standard
                                                                                    18-03) to meet the revised standard. This would entail
                                                                                    testing to the new requirements.

                                                                                    Proposal T-18-04 (the 5-year revision of Standard 18-)
                                                                                    is on hold.

                                                                                    On June 15, 2007 staff balloted to WG 13 for the possible
                                                                                    reaffirmation of the standard. The ballot closed with
                                                                                    substantive comments that must be resolved for the
                                                                                    proposal to move forward.
                          B. 20-25, Multiple-Use Plastic   T-20-29, Plastic         T-20-29 Plastic and Plastic-Like Materials:
                             Materials Used as Product     Materials                                                       the standard. The
                                                                                    This is the major (5-year) revision of 08/99
                             Contact Surfaces              Leader: TBD              project is on hold pending the re-affirmation of Standard
                                                                                    18-.
                                                           T-20-30, Plastic         T-20-30 Plastic and Plastic-Like Materials:
                                                           Materials
                                                           Raymond Baughan,         This revision seeks to revise Standard 20-25 to include in
                                                           AccroSeal                its scope and allow for the use of Accrolon 1640 (PTFE
                                                           ray@accroseal.com        with Stainless Steel Fillers) and to include a Table 1 entry
                                                                                    for this material with a maximum weight gain of 0.05% for
                                                                                    all three weight gain tests (Section E - Cleanability
                                                                                    Response, Section F - Product Treatment (Solution I), and
                                                                                    Section F - Product Treatment (Solution J)).

Last revised January 4, 2010                                                   44
 Work Group Name        3-A Standard/Accepted Practice        Document Leader                                 Status
                                                                                      If after submittal to the Work Group for development, it is
                                                                                      deemed that Accrolon 1640 can not be included within the
                                                                                      Scope of Standard 20-25, then we would like to develop a
                                                                                      new 3-A Standard for this material along the lines of
                                                                                      Standard 20-25.

                                                                                      On March 23, 2009 submitted to the 3-A Steering
                                                                                      Committee for initial evaluation and possible referral to
                                                                                      WG 13 for development. On May 13, 2009 referred to WG
                                                                                      13 for development.
                          C. T-96-00, Standards for Metals   T-96-00 Metals and       T-96-00 Metals and Metal Alloys: This is a proposal for a
                             and Metal Alloys Used as        Metal Alloys             new standard. At the Work Group 13 meeting, held during
                             Product Contact Surfaces        Leader: Richard Smith,   the 2006 Annual Meeting, it was decided to develop a new
                                                             Richard K. Smith, Inc.   Document Subgroup to explore the development of a new
                                                             rksmith@flash.net        3-A metals standard and concurrently update the Optional
                                                                                      Metal Alloys Table (appearing in the Format & Style
                                                                                      Manual) to include Duplex stainless. Steels, other than
                                                                                      Duplex, may be added to the table as deemed necessary
                                                                                      through the balloting process (e.g., 302 stainless steel).

                                                                                      On April 19, 2006 the Steering Committee referred the
                                                                                      Proposal to WG 13 for development.

#14: Egg Equipment        A. T-E-600-01, Egg Breaking
                               and Separating Machines
Chair:
  TBD

Vice Chair:
  TBD




Last revised January 4, 2010                                                     45
                                                                                        R




                   *Inactive Status of Proposals to Develop New and to Revise Existing
                                  3-A Standards and Accepted Practices

*This chart lists inactive projects the 3-A SSI working groups have begun, but not finished. “Inactive” is defined as more than six months having passed with no
work on a proposal listed herein and no correspondence within at least the last six months with 3-A SSI regarding the project. This chart is updated on a routine
basis.
 Work Group Name            3-A Standard/Accepted Practice        Document Leader                                Status

#1: Vessels                  There are no inactive projects in
                             Work Group 1.
Chair:
  Steve McWilliams
  Walker Stainless Steel

Vice Chair:
   Bill Werner
   Brenner Tank, Inc.

Steering Cmte. Liaison:
   David Strouse
   Walker Stainless Steel

#2: Fillers                  A. 27-05, Dry Products              T-27-06 Dry Products   T-27-06 Dry Products Equipment: WG 2 began work on
                                Equipment                        Equipment: Open        the proposal on June 16, 2005. It was noted that the main
Chair:                                                                                  task at hand is to define moisture limits for dry products. It
  Debra Henyon                                                                          was not readily apparent how to define “dry products”. A
  Elopak, Inc.                                                                          “dry products” food company representative will be
                                                                                        recruited for input.
Vice Chair:
   Tim Hughes                                                                           As of July 7, 2006 there is no new information to report on
   Evergreen Packaging                                                                  this project.
   Equipment

Steering Cmte. Liaison:
  Rod Smith
  Packaging Technologies

#3: Valves & Fittings        A. 53-03, Compression-Type          T-53-04 Compression-   T-53-04 Compression Valves: Proposal T-53-04 addresses
                                Valves                           Type Valves: Richard   valve shaft seal design criteria. On June 29, 2005 the
Chair:                                                           Smith, Consultant      Proposal T-53-04 Document Subgroup was selected.
  Terry Gardner                                                  smithrk@flash.net      Members are: Dick Smith, George Medal, Jack Jordan, Lyle
  Alfa Laval, Inc.                                                                      Clem, and Ron Baranski. Work on this proposal will begin.
                                                                                        An update on the progress of the development of Proposal
Vice Chair:                                                                             T-53-04 will be given on the next conference call.
   George Medal
   Mixproof Solutions

Last revised January 4, 2010                                                        1
 Work Group Name            3-A Standard/Accepted Practice       Document Leader   Status

Steering Cmte. Liaison:
   Robert Dumke
   Alfa Laval Inc.

#4: Pumps & Mixers           There are no inactive projects in
                             Work Group 4.
Chair:
  Open

Vice Chair:
  Lyle Clem
  Electrol Specialties Co

Steering Cmte. Liaison:
   Dave Lattan
   Prairie Farms Dairy

#5: Heat Exchangers          There are no inactive projects in
                             Work Group 5.
Chair:
  Open


Vice Chair:
  Paul Krueger
  Kraft Foods, Inc.

Steering Cmte. Liaison:
   Richard Smith
   Richard K. Smith, Inc.

#6: Conveyors &              There are no inactive projects in
    Feeders                  Work Group 6.

Chair:
  Jacques Pienaar
  Sharpe Engineering


Last revised January 4, 2010                                                   2
 Work Group Name          3-A Standard/Accepted Practice    Document Leader                                Status
Vice Chair:
  Jack McCormick
  CPS Scherping

Steering Cmte. Liaison:
  Helen Piotter
   Dean Foods

#7: Instruments            A. 74-03, Sensors and Sensor    T-74-04 Sensors &       T-74-04 Sensors & Sensor Fittings:
                              Fittings and Connections     Sensor Fittings:
Chair:                                                     Chris Newcomer,         During the May 24, 2005 meeting Work Group 7 began
  Bill Wilson                                              New-Tech Consulting     work on Proposal T-74-03 and settled on the following
  Anderson Instruments                                     cnewcomer@prodigy.net   wording:

Vice Chair:                                                                          a. Under Definitions:
 Byron Bailey
 Bailey Sys. Automation                                                                  “B6.9 Microwave Sensor: Shall mean a device
                                                                                         capable of measuring density, solids, turbidity, or
Steering Cmte. Liaison:                                                                  other variables using microwave energy.”
  John Yacoub
   Safeline, Inc.                                                                        “B6.10 Sensing Element: Shall mean only the
                                                                                         portion of the sensor where the active measurement
                                                                                         occurs and the material immediately adjacent to
                                                                                         which it is attached (this does not refer to the rest of
                                                                                         the inserted device).”

                                                                                     b. Under Fabrication:

                                                                                         “D6.1.1. Smaller radii may be used when they are
                                                                                         required for essential functional reasons such as
                                                                                         those in sensing elements for pressure gauges,
                                                                                         viscosity sensors, ultrasonic level sensing devices,
                                                                                         conductivity sensors, and microwave sensors. In no
                                                                                         case shall such radii be less than 1/32 in (0.794 mm)
                                                                                         except that:”

                                                                                   This wording should be ready for WG 7 balloting following
                                                                                   the meeting.


Last revised January 4, 2010                                                 3
 Work Group Name          3-A Standard/Accepted Practice      Document Leader                                Status
#8: Concentrating          A. 93-00, Explosion Suppression   T-93-00 Fire and        T-93-00 Fire and Explosion Suppression Injectors
    Equipment                 Injectors                      Explosion Suppression
                                                             Injectors               A request to develop a new standard initiated by P. Sandfort
Chair:                                                       Leader: TBD             to be developed in conjunction with the T-92-00 (Explosion
  Steve Warren                                                                       Vents) draft. The request was sent to the 3-A Steering
  GEA Filtration                                                                     Committee on November 22, 2005 for evaluation and
                                                                                     possible referral to WG 8 for development, if warranted.
Vice Chair:
  Bob Semerad                                                                        These devices (nozzles or injectors) are located within the
  Consultant                                                                         product contact zone of dry products processing equipment
                                                                                     such as driers, bag houses, pneumatic conveyor receivers,
Steering Cmte. Liaison:                                                              etc.
   Tom Honse
   AMPI                                                                              On December 29, 2005 the SC granted permission to
                                                                                     WG 8 to develop this proposal.
                           B. 94-00, Centrifugal             T-94-00 Centrifugal     T-94-00 Centrifugal Evaporators: In September 2005
                              Evaporators                    Evaporators:            staff received a proposal for the revision of Standard 16-,
                                                             Chris Newcomer, New-    which was sent to the Steering Committee for initial
                                                             Tech Consulting, Inc.   evaluation. The proposal seeks to include provisions
                                                             cnewcomer@prodigy.net   covering the Centritherm type of evaporator. After Steering
                                                                                     Committee referral, it was decided to develop a new
                                                                                     standard for centrifugal evaporators, since the Centritherm
                                                                                     was this type of evaporator.

                                                                                     On October 24, 2005 the Steering Committee approved
                                                                                     referral of T-16-07 to WG 8 for development. Now
                                                                                     cataloged at T-94-00, to develop a new standard.

                                                                                     On April 13, 2006 there was a conference call to begin
                                                                                     work. Work is progressing well.

#9: Farm/Raw Milk         A. 13-10, Farm Milk Cooling and    T-13-11 Farm Milk       T-13-11 Farm Milk Cooling & Holding Tanks: The
                             Holding Tanks                   Cooling & Holding       proposal seeks to add reference in section D8.1 of Standard
Chair:                                                       Tanks                   Number 13-10, Farm Milk Cooling and Holding Tanks for
  Roger Hailey                                                                       the use of valves conforming to Standard Number 53-,
  Paul Mueller Company                                       Leader: TBD             Compression-Type Valves. On October 16, 2005 the
                                                                                     Steering Committee approved WG 9 working on this
Vice Chair:                                                                          proposal.
  Joe Smucker
Last revised January 4, 2010                                                     4
 Work Group Name            3-A Standard/Accepted Practice       Document Leader   Status
  Smucker & Associates

Steering Cmte. Liaison:
   David Rowe
   Paul Mueller Company

#10: Cheese & Butter        There are no inactive projects in
     Equipment              Work Group 10.

Chair:
  Paul Bokelmann
  Advanced Process
  Technologies, Inc.

Vice Chair:
  Jacques Pienaar
  Sharpe Engineering

Steering Cmte. Liaison:
   Carl Buell
   Leprino Foods

#11: Process &               There are no inactive projects in
     Cleaning Systems        Work Group 11.

Chair:
  Gabe Miller
  Sani-Matic, Inc.

Vice Chair:
  Lyle Clem
  Electrol Specialties Co

Steering Cmte. Liaison:
   Don Wilding
   Illinois DPH

#12: Plant Support          There are no inactive projects in

Last revised January 4, 2010                                                   5
 Work Group Name            3-A Standard/Accepted Practice       Document Leader                           Status
     Systems                 Work Group 12.

Chair:
  Paul Rebe
  Parker Hannifin

Vice Chair:
  Chris Parkinson
  Zander Filtration
  Systems, Inc.

Steering Cmte. Liaison:
   Ray Dyke
   Agri-Mark, Inc.

#13: Materials &             There are no inactive projects in
     Materials Testing       Work Group 13.

Chair:
  Jeff Jansen
  Stork Technimet

Vice Chair:
  Lyle Clem
  Electrol Specialties Co

Steering Cmte. Liaison:
   Tracy Schonrock
   3-A Steering Cmte.

#14: Egg Equipment           A. T-E-600-01, Egg Breaking                           T-E-600-01 Egg Breaking and Separating Machines:
                                 and Separating Machines                           Request from Santiago Gomez, Diamond Systems, to finish
Chair:                                                                             revision of the E-600 Standard. Revision of this standard
  TBD                                                                              was begun and a new draft developed in the year 2000.
                                                                                   Work then ceased.
Vice Chair:
  TBD                                                                              The 3-A Steering Committee on November 4, 2005
                                                                                   approved the continuation of work on this proposal.


Last revised January 4, 2010                                                   6