Docstoc

REQUEST FOR TECHNICAL SUPPORT

Document Sample
REQUEST FOR TECHNICAL SUPPORT Powered By Docstoc
					                     TRIUMF Record        Document ID: RFTS_form               Revision No:    7
                     Title:       REQUEST FOR TECHNICAL SUPPORT
                     Author:      A. Hurst                    Date Issued:       June 28, 2008



                 REQUEST FOR TECHNICAL SUPPORT
                               Beamlines and Experimental Facilities
General Information             Requestor complete pages 1 and 2.                RFS: BL-
Requisitioner Name: Patrick Walden                                     Division: Science
Phone: 7340                                  email:mrspi@triumf.ca
TRIUMF Contact Name: Same as above
Phone:                                       email:                    Date: June 26, 2008
Project Title: install, align the apparatus for experiment 1104 at SEBT2 and provide power
Project Planning: Cross-references to REA, ECR/ECO, RFS, DR, Revisions Forms etc.



Project Description: (Add sheets if necessary)
Whenever applicable, provide drawings stamped “Approved for Manufacture”.

The E1104 chamber has been shipped from Madrid. The drawings with its dimensions are
attached. A sub-stand must be designed and built at TRIUMF by July 9.

The chamber must be clamped to the stand and aligned to the beamline.

There is an electronics rack next to the MAYA table. It must be powered.

Additional information on page 5



Account Information: Use 2331-MRO for now. An account for the group will be setup upon
their arrival.

Expected Schedule: July 1st to 15th setup. July 15th to 31st run experiment.


Resource Requirements: See next page




REQUEST AUTHORIZATION                             Date:
Signature of Account Holder:

Instructions for use:

File location:   Docushare                                                             Page 1 of 5
Registry:
Retention:       Until Work Report Filed.
                      TRIUMF Record        Document ID: RFTS_form                   Revision No:    7
                      Title:       REQUEST FOR TECHNICAL SUPPORT
                      Author:      A. Hurst                          Date Issued:     June 28, 2008



                 REQUEST FOR TECHNICAL SUPPORT
                               Beamlines and Experimental Facilities
Resource Requirements                Requestor complete this page.                    RFS: BL-
Area:                                Circle all that apply
Cyclotron Vault                       1V, 1AV, 1BV, 2C, 2AV, 4V, Lower Vault
Beamline Tunnel                       1A, 1B, 2A, 4A
Proton Hall                           4B, 4A2
Meson Hall                            M9A, M9B, M11, M13, M15, M20, TNF, Other
ISAC-I Building:                      Target Hall, Mass Sep Room, MSR, ESR, B2 Level
                                      TRINAT, LEBT, MEBT, HEBT, S-Bend
ISAC-II Building:                     Accelerator Vault, SEBT1, SEBT2, SEBT3A, SEBT3B
                                      Experimental Hall
Requirements:
Technical Specialties:                             Handling of materials and/or equipment
(check all that apply)                            (check all that apply)
Alignment                                         Receipt, handling etc.
Coring / Hilti fasteners                          storage, staging,
Fork lift truck                                   space requirements
Crane/Rigging                                     long term disposition
Machining                                         Equipment removal/clean-up
Mechanical installation                           Long-term storage
Services installation                             Active garbage
Flushing cart                                     Active Storage
Leak detector                                     Other
Other
Assessment Information: See next page




File location:    Docushare                                                                 Page 2 of 5
Registry:
Retention:        Until Work Report Filed.
                     TRIUMF Record        Document ID: RFTS_form            Revision No:    7
                     Title:       REQUEST FOR TECHNICAL SUPPORT
                     Author:      A. Hurst                 Date Issued:       June 28, 2008



                 REQUEST FOR TECHNICAL SUPPORT
                               Beamlines and Experimental Facilities
Assessment Information Beamlines Group Coordinator complete pages 3 and 4      RFS: BL-
The following shaded sections to be completed by the coordinator.
Estimated resource requirement:




Assignment:




Schedule and contingency:




Potential conflicts:




Closure Information: See next page


BL ASSESSMENT                                     Date:
Signature of BL Coordinator:

Distribution: Requestor, TRIUMF Contact, Account-holder, BL Group members.
File location:   Docushare                                                          Page 3 of 5
Registry:
Retention:       Until Work Report Filed.
                      TRIUMF Record        Document ID: RFTS_form               Revision No:    7
                      Title:       REQUEST FOR TECHNICAL SUPPORT
                      Author:      A. Hurst                      Date Issued:     June 28, 2008



                 REQUEST FOR TECHNICAL SUPPORT
                               Beamlines and Experimental Facilities
Closure Information            Beamlines Group Coordinator complete this page     RFS: BL-
Work Report:




Report filed?          Location:
Documentation up-date:




Manuals updated?
Training up-date:




Training up-dated?


Closure                                               Date:
Signature of Beamlines Coordinator:

Discard when closure information is processed and registry up-dated.



File location:    Docushare                                                             Page 4 of 5
Registry:
Retention:        Until Work Report Filed.
                     TRIUMF Record        Document ID: RFTS_form              Revision No:    7
                     Title:       REQUEST FOR TECHNICAL SUPPORT
                     Author:      A. Hurst                  Date Issued:         June 28, 2008


Project Description (continued):

The PPAC in front of the experiment must be fully operational. Signals must be provided to
the experimenter either directly via cables or via EPICS. This is to be decided.

The faraday cup directly downstream of the experiment must be fully operational. Signals
must be provided to the experimenter either directly via cables or via EPICS. This is to be
decided.

The PPAC and faraday cup signals must be provided to the control room.

An RF signal from the accelerator must be provided tom the experimenter.

Beam line pieces between the PPAC and the E1104 chamber and between the E1104 chamber
and the downstream diagnostics box must be made up. The drawings of the scattering
chamber are attached and can be use to get the length dimensions. A conceptual hook-up of
the chamber to the beam line is shown in the figure of page 2 of the safety report.

Vacuum system provided through the downstream diagnostics box. An EPICS screen must be
provided to the experimenter.

The location of the Ethernet hub must be pointed out to the experimenter.

The location of the counting room must be pointed out to the experimenter.




File location:   Docushare                                                            Page 5 of 5
Registry:
Retention:       Until Work Report Filed.

				