Lean Six Sigma
Lean Six Sigma DMAIC Approach
Copyright 2005, AIT Group Inc. All rights reserved.
1
High Level DMAIC Approach
Define
• When did it happen? • Where did it happen? • What is the success criteria?
Lean Six Sigma
Measure
• How often does this happen? • What trends have we observed relative to the target? NEM Baseline (IMR) • Is the process capable? • Do we want to reduce variation? • Do we want to shift the mean? Process Capability • What changes have been made to the process? • What possible variables relate to the change ? Process Mapping • What does the process look like? • What does the process look like from the product’s view? • Is the measurement process capable? • Is the test a destructive test? Measurement System Analysis
Analyze
• What is the subgrouping strategy?
Improve
• What does the DOE process plan look like? •What responses are we interested in (Average, Range)? • What variables do we want to optimize? Why?
• How will we address Org. issues? • How will we address Behavioral issues?
Control
Preliminary Data Analysis
Advanced NEM (XbarR) • What variables are contributing to mean shifts? • What variables are contributing to variation?
Classification Of Control Issues • What variables do we need to control? • What control methods will be used to ensure gains are sustained? Control Methods •Who is responsible for implementing the control? •Who is accountable for the process results?
• Where in the process do we need to scope efforts? • What is the target value? • What are the specs?
DOE Planning Template • What observations did we have during the experiment? • What roles need to be established to run the DOE? DOE Execution
SIPOC
Components Of Variation / ANOVA
• What is causing failure? • What is the impact of failure? • How do we mitigate the risk of failure?
• How much waste is in this process? • What is our value added percentage?
FMEA Operator & Product Activity Analysis
• What variables are critical to the process? • How should the critical variables be set?
Value Stream Mapping
DOE Analysis & Results
Control Plan
Copyright 2005, AIT Group Inc. All rights reserved.
2
Funnel-Down Many Variables to the Critical Few!
x x x xxx x xx x x x x x x x x x x x xx x x x x x x x x x x x x x x x x x xx x x x x x x x x x x x x xx x x x xx xx
Improve
VELOCITY OPPORTUNITY (Reduce Waste)
Value Stream Mapping Product Families Product Flow Analysis Employee Activity Analysis Set-up Reduction
VARIATION OPPORTUNITY (Reduce Variation)
Thought Map TMAP SIPOC Detailed Process Map PMAP
Lean Six Sigma
Define
Measure
Failure Modes Analysis FMEA Measurement System MSE Numerical Evaluation of Metrics (NEM)
Analyze
Material Replenishment Improvement Considerations Workplace Design 5S Implementation
T-Test, Chi Square, ANOVA, COV
Design of Experiments DOE Regression Analysis
Control
xx x x
Control Strategies Standard Work Performance Metrics Mistake Proofing
Y=f(x)
Copyright 2005, AIT Group Inc. All rights reserved.
3
Define
Project Charter
Measure
Analyze
Lean Six Sigma
Numerical Evaluation of Metrics How is the
process performing today?
Measurement System Evaluation
Hypothesis Testing
ChiSquare
Gender
What variables are causing variation? ANOVA
One-way ANOVA: Total No Errors versus Hiring Location (Site) Source Hiring Loc Error Total DF 3 117 120 SS 2.12 269.95 272.07 MS 0.71 2.31 F 0.31 P 0.821 S = 1.519 R-Sq = 0.78% R-Sq(adj) = 0.00%
Boxplot of Total No Errors by Hiring Location (Site)
10 8
Total No Errors
Project Justification
Product Line Brackets Wheels Closures Shafts Separated Operations Seals Other Products Sales $ (YTD) $ 70.3 Million $ 60 Million Gross Margins $ 2.8 M / 39% $ 2.3 M / 38% $ 1 M / 33% $ 1 M / 40% Production Volumes 80 Million 94 Million 15 Million 5.4 Million 1.3 Million 4.5 Million 9.3 Million $ 31.1 Million $ 21.5 Million $ 1.7 Million $ 5 Million $ 4 Million
Thought Map
Problem Resolution Methodology
Define
Baseline Process
T-Test
Weekly vs. Quarterly Grant Date
1/1/02 – 12/31/03
Two-Sample T-Test and CI: Weekly, Quarterly Weekly Quarterly N 105 8 Mean 55.41 55.50 StDev 8.63 8.21 SE Mean 0.84 2.9 Estimate for difference: -0.089083 95% CI for difference: (-7.056468, 6.878301) T-Test of difference = 0 (vs not =): T-Value = -0.03 P-Value = 0.977 DF = 8
$ $
Process
$ 0.3 M / 19% $ 0.7 M / 7%
Market Comments High vol -Growing Cylindrical High vol. Growing Autom. Large Diameter Old Equip. Hydraulic Small batches High Labour Old equip. Automotive
6Project Phases
Establish Project Scope
Characterize Processes
Measure
ID Process Failure Modes Evaluate Measurement Systems ID Critical Variables
Analyze
$ 0.3 M / 17%
Improve
Implement Process Improvements
What is my project strategy?
Data Integrity ?
6
Hiring location is not a significant contributing factor to errors!
XW = 55.41
XQ = 55.50
4
Conclusions:
ˆ
W
= 5.63
ˆ
Q
= 8.21
There is no significant difference between weekly and quarterly grant dates.
2
0 Field Sales TO Hiring Location (Site) TO - RML
Control
Control/Maintain Process Improvements
SIPOC
Process Name: Process Owner: Suppliers
(Providers of the required resources)
Process Map
Outputs
(Deliverables from the process)
Copper Tolling Eric Sandford Inputs
(Resources required by the process)
Customers
(Stakeholders who place the requirements on the outputs)
Product Portfolio Plan
Business Plan
Failure Modes and Effects Analysis:
Quote
Failure Modes & Effects Analysis
Failure Mode
(Describe what could go wrong.)
(Top level description of the activity)
Requirements Copper Manager Orders quantity from Delphi plants to merchant Quantity per merchant. Delivered/Timing
Requirements received f rom Delphi Plants
Requirements
Copper delivered to suppliers for transformation
Identify Product Portfolio Plans
Determine Business Opportunities
Customer Directed?
Yes
Business Pursued? No
Yes
Proceed With Sourcing
C Profit Margin C Costs to Do
Part/process
No Quote Letter to Ford
Failure Effects
(How does the failure affect the function of the step?)
Cathode delivered on time, quantity, Fabrication Suppliers right brand, and quality
Delphi accounting purchasing
Index used, timing & quantity's delivered & reported. Forecast from D Plants (Customer)
Accuracy Copper Tolling Level & Stable
N! Customer Directed Business N Vehicle Volume S CI0 (Budget, Resources) N Vehicle Timing No S PI (Budget, Resources) N Content N! ‘In Your Head’ N Ford Goals & Objectives N Personalities/Relationships S Opportunity Screener (Budget, Resources) C Customer Strategy/Portfolio C Divisional Strategies S Divisional Processes N Divisional Intelligence Apply S Divisional Quoting Philosophy Business
(What is the function of each step?)
S E V
Causes
(What is the root cause reason for the failure?)
O C C
Controls
(What controls are currently in place to catch or prevent this failure?)
D R E P T N
Actions
(What actions are being done to eliminate the cause?)
No Quote
C Doesn’t Fit Divisional Product Strategy C Doesn’t Fit Pursuit Plan C Poor Business Case
Delphi Plants PC&L
Lessons Learned
No
Yes
Pursued?
Execute Divisional Strategic Analysis
Forecast Strategy
Issue Invoice
Invoice is incorrect Customer has dispute with invoice Slow response by business unit Lack of funds budgeted for payment
Customer disputes invoice delaying payment (40 days) Delay in payment due to invoice dispute (40 days) Delay in payment due to dispute (40 days) Delay in payment process (30 days)
5
Price, Quantity or Work-scope does not agree with quote Miscommunication between ATL and Billing Heavy workload creating conflicting priorities Limited budget allocation for weekly payments
4
Pricing database
8 4 0
Need to study dispute issues for reduction in disputes, Focus on Price Strengthen ATL communication with Billing by incentivised roles
Merchants supply quotes Delphi legal risk management (t.o), purchasing Buyer and receipt clerk
Global sourcing quotes Bailment contract
Selection of merchants based on Risk protection
When fabricated product is paid
VOC
Payment to fabrication supplier Per terms correct + amount Inventory accounting and costs +
C Budget Disconnects C Resource Disconnects C Poor Documentation
Continuous Improvement
N! Relationships N! Strategic Importance N ROLR (Right of Last Refusal) C Red Flags C Strengths C Divisional Product Strategy C Pursuit Plan
Shared Information Level Knowledge Base Leveraged Synergies
Critical X’s
Review and confirm invoices Dispute resolution & reissue Approve payment
5
3
None
7 5 5
Note: Not part of strategic analysis for selling process
Info Shared Between Divisions?
Unified Front to Customer Strategic Analysis for Selling (comparison & synergies applied) Divisional Intelligence & Lessons Learned (comparison & synergies applied) Philosophy of Quoting Techniques (comparison & synergies applied)
Yes
Identify Relationship Broker -or-Share Knowledge
C Tech Shows C Customer Contact Calls C Influence Peddling C! Divisional Strategic Analysis
5
3
None Accounts payable policy
7 5 5 6 5 0
Reduce disputes to alleviate workload Work with Customer to increase budget allocation for payments
Dacor invoices, plant receipts, fabrication buyer P.O. 's
Accurate
4
3
No
Delphi cost accounting Supplier cost accounting P.O. price entry Platts
Delphi inventory records Inventory Reconciliation
Accurate quantity's and value
Delphi Fabrication Suppliers
What is the project scope?
P.O. price and market index, quantity
Accurate
Payment to merchant = All-In Costs
Per terms correct amount
Merchants
Key: ! - Critical N - Noise S - Standard Operating Procedure C - Controllable
Complete Delphi Selling Strategy
C Linked Divisional Strategic Analysis C! Unlinked Divisional Strategic Analysis
Actions for improvement and next focus area identified
• ATL’s compensation will be dependent on customer satisfaction scores to provide incentive for improved communication
What does the process look like?
• Measure occurrences of no payment due to lack of funds, communicate to customer with disciplinary action of shipment hold • Need to further study source of disputes to resolve disputes
How do we mitigate process risk?
Product Families
Value Stream Map
Where should we focus?
PC & L 4 week rolling foreca st 6 week rolling foreca st Supplier Weekly Orde r Weekly Orde r Daily Ship Schedule Custome r r/ Distributo r Demand/wee k: Part A = 50 500 Weekly Build Schedule Part B = 120 1200 Part C = 70 700
Process Flow & Employee Activity Analysis
AREA NAME: SUPERVI OR: S NOTE: Depict rough scale o ff equip ment layout; a nd, dra w a point to poi nt diagr am of t he com plete pr oduct flow scale o equip ment layout; a nd, dra w a point he com plete pr oduct flow BEFORE - Car rier Asse mbly - Ball Bearings PREPAR ED BY: DATE:
40
The Seven Wastes D - Defective Production
Bench Tool Box
13 26 14 22 8 24 2 4 9 3018 12 16 20 44 34 38 42 32 6
OVEN
35 33 31
21
Press
2x/ week 2x/ day
23 39
Trash
10
O - Over Production T - Transportation W - Waiting I - Inventory M - Motion P - Processing
19
Anneal
Pickle
Draw
Straightening
Point/Chamfe r
Shipping
Vice
28 36
41
Part 15 Box17
I
60 coils
Where is the waste occurrin Copyright 2005, AIT Group Inc. All rights reserved. g?
6 coils 20 coils 3000
I
pcs
29 25 3 37 27
1 11
5
43
7
Takt = 240 min C.T. = 200 mi n D.T. = 0.5%
Takt = 240 min C.T. = 200 mi n D.T. = 1%
Takt = 19 min C.T. = 15 min D.T. = 4% FTQ = 99%
Takt = 20 sec C.T. = 20.4 sec D.T. = 3.1% FTQ = 99%
Takt = 20 sec C.T. = 10 sec D.T. = 1%
FTQ = 100% Lot Size =
FTQ = 100%
FTQ = 100% Lot Size =
C/O Ti me = 3 0 m
C/O Ti me = 1 0 min Lot Size = # of Shifts = 2 WIP = 4 coils
C/O Ti me = 3 0 min Lot Size = # of Shifts = 2 WIP = 8 coils 1
C/O Ti me = 1 hr Lot Size = # of Shifts = 2 WIP = 1500
C/O Ti me = 1 5 min
Parts Rack
# of Shifts = 2 WIP = 3 coils
# of Shifts = 2 WIP = 100 pc
pcs
Copyright 2005, AIT Group Inc. All rights reserved. 4
Improve
Design of Experiments
Design of Experiments:
Price Variance = f(OTD, Sp Price, LT, Profile)
Control
Control Strategies
Type of Control (Fix, Minimize, Standardize, Measure & Monitor, Communicate, Audit) Detailed Description of Control Facility Affected (Gas, Electric, Water) Setting or Tolerance Prior to Controls Control Set Point or Range
All computers with screen savers Personal Business Plan and Six Month Reviews
Lean Six Sigma
Management Requirements or Organizational Changes
Communicated at DRL meeting, part of security audit
Date Implemented or Projected to be Implemented
Responsible Individual
Jacovides, Director Steve, Security
Fix, Communicate, Audit
Install or enable screen savers on all computers Establish a Facilities Coordinator to be responsible for DRL facilities needs
Electric
Random implementation
April, 2002
ANOVA:
Factor Customer Profile Special Price Lead Time On-Time Delivery Type fixed fixed fixed fixed Levels 2 2 2 2 Values Tier 1 Tier 2 N Y Post LT Prior LT N Y
Standardize, Audit
Gas, Electric, Water
No individual responsible
Change in job description, PBP's
May, 2002
John Biafora
Fix, Measure
Reduce water flow through SEM by replumbing and installing chiller
Water
5 gal/ min, continuous
0 gal /min
Authorize chiller repair
June, 2002
John Biafora, Chris Thrush
Fix, Measure
Reduce water flow through vacuum chamber
Water
2 gal/min, continuous
1 gal/min, as needed Temperature control, now flow only when using instrument
Authorize replumb
June, 2002
John Biafora, Chris Thrush
Fix, Measure, Communicate
Thermostat control of outgoing water on MTS unit
Water
2.4 gal/min, continuous
Authorize purchase of temperature sensor
June, 2002
John Biafora, Tom Ellis
Fix, Measure
Reduce flow through Hall Effect system
Water
4 gal/min, continuous
2.5 gal/min, unit on only Authorize replumb, communicate need when doing measurements to have flow only during usage
June, 2002
John Biafora, Joseph Heremans
Source Customer Profile Special Price Lead Time On-Time Delivery Error Total
DF 1 1 1 1 11 15
SS MS 473 473 40905 40905 13053 13053 75488 75488 130267 11842 260186
F 0.04 3.45 1.10 6.37
P 0.845 0.090 0.316 0.028
Fix, Measure
Reduce flow through e-beam evaporator
Water
8 gal/min, continuous
6 gal/min
Authorize replumb
June, 2002
John Biafora, Chris Thrush
Regression
Fix, Measure
Reduce flow through environmental test chamber
Water
4 gal/min, continuous
3 gal/min, flow only during testing 94 k ft^3/min 36% of total time
Authorize replumb
June, 2002
John Biafora, Tom Ellis John Biafora, all lab users John Biafora, Fred Scott
Fix, Measure, Communicate
Manual operation of exhaust hoods
Gas, Electric
94 k ft^3/min continuous Random excursions in temperature
Placard
June-July, 2002
Fix, Measure, Communicate
Adjust pre temperature air box per season
Gas, Electric
65 - 72 F
Authorize facilities study
June-July, 2002
Special Pricing and On-Time Delivery are Significant Sources of Price Variation in the Co-Op System
Fix, Standardize, Communicate
Turn off unused equipment at 7:00 PM
Gas, Electric, Water
None
Turn off specific exhaust and return air systems that do not jeopardize safety requirements
Lab Director authorize and communicate at group meeting
May, 2002
John Biafora and Jones Lange and LaSalle representative John Biafora and Jones Lange and LaSalle representative
Standardize, Monitor, Measure
Program controls of specific exhaust and return air units that can be shutdown from 6:00 p.m. to 6:00 a.m. Mon. - Fri.
Gas, Electric
None
Shutdown specific exhaust and return air units from 6:00 p.m. to 6:00 a.m.
Lab Director authorize
June-July, 2002
Fix, Standardize, Audit, Measure & Monitor
Curtail all non-essential power usage during peak electrical draw from the grid. Credit from electric supplier.
Electric
None
Call from Detroit Edison to implement power curtailment
Lab Director authorize and communicate at group meeting
July-August, 2002
John Biafora
How do we optimize critical inputs?
How do we sustain the gains?
Standard Work
Standard Job Sheet
Part N umber Part D escri pti on Part F amil y Dat e: Revisi on: B 2400172 -1 Impell ar Casti ngs
Cell or Process Design/To-Be Work Flow
15s
200s
350s
62s
401s
245s
Oper ator 1
Oper ator 2
Oper ator 3
190s
25s
33s
161s
191s
Qualit y Chec k
Safet y
St andard Wor k Takt T ime in Proc ess 600s
Lead Ti me
Number of Operat ors 3
Measure & Monitor
Liner Web Break Downtime (min) by Month
98
99
Moving Range
What does the future work flow look like?
1000
Individual Value
Material Replenishment
500 1 0 Subgroup
Month
3.0SL=253.4 X=167.4 -3.0SL=81.44
0
10
10/98
20 99
600 500 400 300 200 100 0
3.0SL=105.6 R=32.33 -3.0SL=0.00E+00
Have we met our goals?
Copyright 2005, AIT Group Inc. All rights reserved. Copyright 2005, AIT Group Inc. All rights reserved.
5
Author
Lean Six Sigma
Steven Bonacorsi is a Senior Master Black Belt instructor and coach. He has trained hundreds of Master Black Belts, Black Belts, Green Belts, and Project Sponsors and Executive Leaders in Lean Six Sigma DMAIC and Design for Lean Six Sigma process improvement methodologies. Steven is a board member for the Boston Chapter of the Industry of Industrial Engineers. Full Bio: http://www.linkedin.com/in/stevenbonacorsi Lean Six Sigma White Belt Certification: • Add Lean Six Sigma White Belt (Basic Awareness) Training and Certification to your Resume or Job Skills. • Learn topics from one of the original Master Black Belts and world experts on Value Stream Mapping, 5s, Process Capability, Deployment Planning, Roles and Responsibilities, FMEA Risk Analysis, Control Plans and more. • Certificates will be signed for all who complete the 2 hour training session.
Copyright 2005, AIT Group Inc. All rights reserved.
6
Learn More about The AIT Group
http://www.theaitgroup.com
Lean Six Sigma
Copyright 2005, AIT Group Inc. All rights reserved.
7
Who is AIT?
• AIT is a premier provider of Lean, Six Sigma and Supply Chain solutions. • Solutions are customized to the customer – not one size fits all. • The company was started in 1998 by three individual that recognized extremely early in the industry how well Lean, Six Sigma and Supply Chain disciplines integrate. • Our goal is the complete transfer of knowledge via client specific solutions – not training. • Your instructors from AIT are Certified Master Black Belts and Lean Experts. • We have worked with many different clients and some of the largest companies in the world. • We have Offices in the US, Europe, Mexico and China.
Lean Six Sigma
The AIT Group is an international consulting firm that has been specifically designed to help companies increase profitability by improving overall business performance and customer satisfaction through the integrated application of:
Lean
Supply Chain Mgmt. Value $ Six Sigma
www.theAITgroup.com
The AIT Group excels in implementation … not recommendation!
Copyright 2005, AIT Group Inc. All rights reserved.
8